Potential Recovery
Job Description of Potential Impact Control Measures
L S R L S R Result
Step Job Step Hazards Measures
1 Preparation before task - Lack in communication - Wrong information 2 1 2 - Permit application and valid - Report to MIE 1 1 1 Acceptable
& information - Emergency event prior to work Management Rep.
- Safety briefing during toolbox - Report incident to
meeting or before starting consortium
work as necessary
- Proper planning prior to work
- Workers are observed Rules &
Regulation on site through
HSE Induction
2 Installation of padding - Flaying object - Eye injury 2 2 4 - wear proper PPE (goggles/ - Report to MIE 1 2 2 Acceptable
(Chipping & Grouting) Face shield) Management Rep.
- Report incident to
- Dust - Asthma 2 2 4 - work leader to ensure PPE consortium 1 2 2 Acceptable
compliances (dust mask) - To contact nearest
first aider on site
- Electrocution - Electrical shock 2 2 4 - To ensure all equipment had 1 2 2 Acceptable
been inspected by consortium
- Sharp object - Personal injury 2 2 4 - secure any sharp object - Report to MIE 1 2 2 Acceptable
- wear proper PPE (hand gloves) Management Rep.
- Report incident to
- Poor maintenance of - Oil spillage / leakage 2 2 4 - Ensure generator had been consortium 1 2 2 Acceptable
generator inspected by consortium - To contact nearest
- provided drip pan first aider on site
- Poor maintenance of - Oil spillage / leakage 2 2 4 - To ensure the transport had - Report to MIE 1 2 2 Acceptable
the transport been inspected by consortium Management Rep.
personnel -Report incident to
consortium
2 2 4 - Properly secure the equipment - To contact nearest 1 2 2 Acceptable
- Equipment fall from - Property damage/ by proper method first aider on site
Transport personal injury
2 2 4 - Eliminated any sharp object 1 2 2 Acceptable
- Unpack equipment - Protruding nails - Physical injury - Removed immediately the
wooden from work area
4 Setting-up positioning of - Wrong position - Vehicle accident 2 2 4 - Crane operator has a valid - Report to MIE 1 2 2 Acceptable
crane/lorry - Traffic obstruction DOSH competency license Management Rep.
- Property damage - Crane must have PMA - Report incident to
- Physical injury certificate consortium
- Flagman to prevent - To contact nearest
unauthorized entry during lifting first aider on site
- Ensure ground condition before
work start
- Fully extend outrigger
- Pad provided
- Ensure all the tires are above
ground
- Cordon off working area with
barricade & proper signage
- Road close - Other vehicle cannot 2 1 2 - Cordon off working area with - Report to MIE 1 1 1 Acceptable
use the main road/road barricade & proper signage Management Rep.
obstruction - Flagman to fully standby - Report incident to
- Alternative road will be used consortium
5 To set up lifting gears - Defective lifting - Property damage 2 2 4 -Ensure that web slings, shackle - Report to MIE 1 2 2 Acceptable
lifting gears and the crane block Management Rep.
safety latch in good condition. - Report incident to
- Riggers / Work supervisor must consortium
ensure all loads to be properly
secured
- Follow work method statement
JOB HAZARD ANALYSIS
- Sharp edges - Personal injury 2 2 4 - Eliminated sharp edges - Report to MIE 1 2 2 Acceptable
- Wear proper PPE Management Rep.
- Report incident to
- Knocking and - Property damage to 2 2 4 - Competent signal man must consortium 1 2 2 Acceptable
damaging equipment equipment guide vehicle during movement - To contact nearest
- Make clear off the access way first aider on site
- Cordon off working area with
barricade & proper signage
- Tagline to be used during lifting
- Ensure proper communication
hand signal
- All tools must be inspected
- Falling from height - Personal injury 2 2 4 - practice buddy system when - Report to MIE 1 2 2 Acceptable
using ladder Management Rep.
- Report incident to
consortium
- To contact nearest
first aider on site
6 Lifting of Load - Crane toppled - Property damage 2 2 4 - Ensure ground condition before - Report to MIE 1 2 2 Acceptable
work start Management Rep.
- Fully extend outrigger - Report incident to
- Pad provided consortium
- Follow actual lifting chart
- Cordon off radius working area
with barricade & proper signage
- Dropped Load - Damage to equipment/ 2 2 4 -Ensure that web slings, shackle - Report to MIE 1 2 2 Acceptable
property lifting gears and the crane block Management Rep.
safety latch in good condition. - Report incident to
- Riggers / Work supervisor must consortium
ensure all loads to be properly
secured
- Strictly no lifting during heavy
rain and windy
- Swinging of load - Property damage 2 2 4 - Riggers /work supervisor must - Report to MIE 1 2 2 Acceptable
ensure that Tag line in good Management Rep.
condition and adequate in - Report incident to
length and must be used to consortium
control the swinging of the load.
- Stay clear of suspended load
swing radius
JOB HAZARD ANALYSIS
- Miscommunication - Damage to equipment 2 2 4 - Only the authorized signalman - Report to MIE 1 2 2 Acceptable
should give signals to the crane Management Rep.
operator - Report incident to
- Ensure proper communication consortium
hand signal, walkie-talkie or
whistle
- Vehicles and other - Vehicle accident 2 2 4 - Display front and back warning - Report to MIE 1 2 2 Acceptable
personnel moving in - Personnel injury signage’s and barricade the Management Rep.
and around the lifting area to notify other personnel of - Report incident to
area the activities going on consortium
- Flagman to prevent - To contact nearest
unauthorized entry during lifting first aider on site
7 Transformer Installation - Slip, Trip & Fall - Physical injury 2 2 4 - Maintain good housekeeping at - Report to MIE 1 2 2 Acceptable
Work all time Management Rep.
- Clear any obstruction at work - Report incident to
area consortium
- Do proper planning & - To contact nearest
arrangement for the task first aider on site
- Barricade / covered any open
hole
- Visual inspection - Sharp edges - Personal injury 2 1 2 - secured/covered any sharp - Report to MIE 1 1 1 Acceptable
edges Management Rep.
- wear proper PPE - Report incident to
consortium
- Transformer alignment - Transformer topple/ - Property damage 2 2 4 - Proper planning & follow work - To contact nearest 1 2 2 Acceptable
work hit people - Personal injury method for installation work first aider on site
- experience manpower to carry
out the task
- Enough manpower for activity
- Concrete hole - Electrocution - Electrical shock 2 2 4 - All tools must be inspected - Report to MIE 1 2 2 Acceptable
- wear proper PPE Management Rep.
- Report incident to
- Flaying object - Eye injury 2 2 4 - wear proper PPE (goggles/ consortium 1 2 2 Acceptable
face shield) - To contact nearest
first aider on site
- Dust - Asthma 2 2 4 - work leader to ensure PPE 1 2 2 Acceptable
compliances (dust mask)
JOB HAZARD ANALYSIS
8 Daily job completion / -Walkway obstruction - Slip and fall 2 2 4 - Remove all material from - Report to MIE 1 2 2 Acceptable
Housekeeping - Tripping hazard access way Management Rep.
- Ensure work area is kept clean -Report incident to
- Waste material should be consortium
disposed at designated place -To contact nearest
- Properly stacking and secure first aider on site
the materials