JANUARY FEBRUARY MARCH APRIL MAY JUNE JULY AUGUST SEPTEMBER OCTOBER NOVEMBER DECEMBER
NO. NAMES OF EQUIPMENTS 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4
AIRCONDITIONING SYSTEM (Admin Office)
PASSENGER ELEVATOR 1
PASSENGER ELEVATOR 2
PASSENGER ELEVATOR 3
SERVICE ELEVATOR
MECHANICAL
TELEPHONE PROVISION
CCTV SYSTEM G/F - 42F
CCTV SYSTEM PE1, PE2, PE3,SE
CATV SYSTEM
TRAFFIC MANAGEMENT SYSTEM
SEISMIC ACCELEROGRAPH SYSTEM
SEWAGE EJECTOR PUMP
CISTERN TANK
PLUMBING
FIRE TANK
OVERHEAD TANK
ELEVATOR PIT PUMP
SUMP PUMPS W/ CONTROLLERS
SUMP PUMPS W/ CONTROLLERS
FIRE PRO & SAFETY
MDF ROOM
EE ROOM G/F TO 42
GENSET ROOM
SEWAGE PUMP ROOM STP
G/F PARKING
2/F PODIUM 1 PARKING
3/F PODIUM 2 PARKING
4/F PODIUM 3 PARKING
POOL PUMP ROOM
FIRE EXIT 1
FIRE EXIT 2
ROOF DECK AND UPPER ROOF DECK
HALLWAYS AND LOBBIES
AMENITIES
LEGEND
Prepared by:
________________________ Testing Monthly Contractors Job Pumps and Fans Monthly
Billy Dumlao Checking and read supply voltage and ampere load Preventive Maintenance Get parameters of the motors
Building Engineer Dusting off of contacts, check for arcing on contacts Cleaning of the pumps and motor pump parts
Check and retighten mounting bolts, loose screws and springs Yearly Cleaning of pits and tanks Check for high temp. including noise & vibration
Noted by: Schedule during holiday vacation: Greasing, lubrication of moving parts
________________________ Inspection Check belt tension and wear
Ms. Dang Cabarles Cleaning ACU @ Ground floor lobby Monthly Test run for 5 minutes
Building Manager Repair Air filter cleaning Inspection and retightening of screws and bolts
Leak Check ( Water and Freon ) Checking of all electrical components
Vibration Unusual sound and temperature check Check packing seal , oil level of bearings and alignment.
Cleaning of starter and relays contacts Application of contact cleaner to contact surfaces.