Letter of Equivalency
Confirmation of Verification Evidence Report (COVER)
Date:
[Insert name of LDC] acknowledges and agrees to ensure that the embedded generation
facility connection of [Insert H1 CIA Project Reference] to [Insert name of LDC]’s
distribution system does not and will not materially adversely affect the safety,
reliability and efficiency of either Hydro One Networks Inc.’s distribution or
transmission systems and meets the technical requirements specified in Appendix F.2 of
the Distribution System Code, in accordance with section 6.2.25 of the Distribution System
Code.
Furthermore, [Insert name of LDC] verifies and confirms to Hydro One that:
(a) the connection of embedded generation facility [Insert H1 CIA Project Reference] to
Insert name of LDC]’s distribution system has been properly commissioned by the
[Insert name of LDC] in accordance with Appendix F.1 of the Distribution
System Code and the requirements specified within the Connection Impact
Assessment performed by Hydro One (the “CIA”); and
(b) the Existing feeder protections are suitable within the stated terms of the CIA.
Please reference the project data below for your operational schedules.
Generator/ Site
HONI Project ID
Does this project have a Capacity
Allocation Notification Agreement Yes No
(CANA)?
Does this project fall under a Threshold Yes No
Allocation Agreement?
LDC Project ID (if applicable)
Name of Facility (Generator)
OPA Contract Number (if applicable)
Legal Address
The LDC shall complete and submit a Single Line Diagram (SLD).
Signature
Title