STATEMENT OF FACTS
13. From the time the Complainant has paid half of the
total cost of the bridesmaid’s gowns until 23 March 2018,
the Respondent became very persistent in convincing the
Complainant to let him design and make the groom’s and
groomsmen’s suits as well.
27. Most of the dresses too were not finished- the hems
were not closed in stitches while the armpit areas were not
closed.
29. The gowns for the 2 Maids of Honor, just like the
bridesmaids’ gowns, did not fit and were made out of cheap
illusion net. Words could not explain the fact that it was
poorly done and obviously unfinished when delivered.
34. Aside from the fact that the Respondent glued all the
beads in the bridal gown, the sleeves too were not of the
same color as that of the bridal gown. Various rips and
tears were also noticeable in the gown.
35. The back part of the gown could also not be closed
because the holes made for the buttons were too loose and
not made of stretch material.
36. Lastly, the train that went with the package, was
simply a piece of fabric that was cut out with nothing at all.
40. The color of the suit was not the one agreed upon by
the Complainant and Respondent. In fact, it was the
Respondent himself who sent the Complainant the design of
the suits and with proposed color scheme.
42. The suits that arrived, were obviously not finished; the
hems were not sewn, and the pants did not have buttons.
Some of the suits even had loose threads dangling around.
43. The pants and the suits did not even fit the entourage.
The suits and the pants were too short for its owners.
45. The contract also provides that the gowns and suits
(all of it) will be delivered the latest, two weeks before the
wedding of 16 December 2018.
53. Aside from the fact that the Respondent did not timely
deliver his commitments to the Complainant, what was
delivered instead were unfinished and unwearable items on
their very special day.
59. It was only upon receipt of the gowns and suits that
the Complainant came to realize that the measurements
were asked to be resent by the Respondent because he has
not actually commenced making the Complainant’s orders
in the first place.