Checklist for Internal Plaster(Gypsum Plaster)


Work Site: ARG Ananta 2
Location: Date:
Reference Drawing Number: Time of Inspection :
Contractor: Karnikripa Buildtech
Sr. no. Item Results Remarks
Yes No

Preparation of Surface :

Ensure Surface to be plastered should be cleaned &


1 free from efflorescence, sufficiently rough to
ensure proper bond.

Ensure proper hacking to be done in concrete


2
surface.

Electric Wall Conduiting is completed,MS boxes are


3
fixed properly and repairing has been done.
Wooden Door Frames are fixed and hold fast are
4
properly grouted.
Ensure At the junction of columns, beams vertically
& horizontally fiber mesh to be provided with
5
100mm overlap each side.
surface.
Ensure Level pad to be provided prior
6 to the plaster for dimension, Plumb, right angles
checks.

Application of Gypsum plaster :

Ensure Approved material should be used


7
(Gypsum, bonding agent, fiber mesh etc.)
Ensure Bonding agent is applied on ceiling
8
wherever required
Check the dimension of doors and windows as per
9
drawing

Check and ensure uniformity of the plaster surface


10 is achieved and all the corners have been smoothly
finished.

Check and ensure right angles and plumb for the


11
surface.
Check and ensure the dimension of room is as per
12
drawing.

Check and ensure cleaning is done after completion


13
of plaster on the same day .
Note:

Date:
ARG ENGR CONT ENGR:
# Item Results
Yes No
Plaster Surface :
14 Check the dimension of doors and windows as per
drawing
15 Ensure and check areas of skirting and
waterproofing.
Check undulations if any for plaster surface by level
16 Aluminium box
bottom pati
Check and ensure uniformity of the plaster surface
is achieved By completing the plaster on the same
17
day without any joints.

Sr. no. Check and ensure right angles and plumb for the
surface.
20 Check and ensure the dimension of room is as per
drawing.
Check and ensure cleaning is done after completion
21 of plaster on the same day .

25 Ensure proper curing


Work is allowed / not allowed:

After Rechecking
Application of Gypsum plaster :
Ensure Approved material should be used (Gypsum, bonding agent, fiber mesh etc.)
Ensure Bonding agent is applied on ceiling if thickness of ceiling plaster is more than 6mm
Gypsum Plaster is finished to a good degree of smoothness. All the corners have been smoothly finished and are in right angle.
All horizontal lines and surfaces are tested with a level.
Remarks

smoothly finished and are in right angle.