KMV PROJECTS LTD

CHECKLIST FOR QUALITY CONTROL


ACTIVITY : INTERIOR PLASTERING

Project :
Location :

NOTE : Please mark as y for yes or n for no in the appropriate box or enter readings as per requirements
SL . NO. To be checked YES NO
1 Name,date and number of the drawing
PRE - EXECUTION CHECKS
2 Latest approved Drawing at site [ ] [ ]
sufficient quantum of work available to
3 start the activity . [ ] [ ]
all the mason tools , measuring boxes are
4 at site . [ ] [ ]
Any necessary barricading for safety
5 measures [ ] [ ]

All the concrete surfaces wherever


necessary are hacked with 80 indents per
6 sq. ft at least . [ ] [ ]
Button marks at appropriate intervals are
7 made . [ ] [ ]
8 Cement is not older than one month . [ ] [ ]
al the matal lath installed areas are cured
9 well. [ ] [ ]
FFL , skirting height is marked . Ckeck for
flushing condition of skirting ie flush with
10 plaster or not . [ ] [ ]
All the necessary conduiting for the
11 services is done . [ ] [ ]

Box cut outs for electric switches are at


correct levels and covered with dummy
12 plates . [ ] [ ]

In case of toilets and kitchens , refer to


the drawings carefully for the positions of
geyser point , electric cooker point ,
location of shower , taps , toilet
13 accessories etc , [ ] [ ]

The surface is wet enough and free from


all loose particles , dead mortar and any
14 other foreign material . [ ] [ ]

Scaffolding and safety measures and


15 necessary tools . [ ] [ ]
Check During Execution
10 Mix of cement mortar [ ] [ ]
Plaster to plumb , check diagonally also
11 with aspirit level . [ ] [ ]
Check at jambs and sills at windows and
12 door locations . [ ] [ ]

13 Check the corners for line and finish . [ ] [ ]


14 Termination of plaster at skirting .
Check for the required finish necessiating
the next activity such as Tiling , POP ,
15 Texture finish or so .
POST - EXECUTION CHECKS
15 Curing for 7 days or as in agreement . [ ] [ ]
Grooves , drip lines and mortar bands as
16 per drawing . [ ] [ ]
Cleaning of mortar spillage and any excess
17 plastering at expansion joints . [ ] [ ]

Contractor's Site Engineer's signature


Contractor's QA/QC Site Engineer's signature or remarks if any

Client's representative's signature or remarks if any


Date :

Remarks /clarifications