Sunteți pe pagina 1din 64

INVESTMENT SEEKING PROJECTS

BRIEF PROFILES

2008
CONTENT
№ INDUSTRY PAGES
“DARKHAN” INDUSTRIAL AND TECHNOLOGICAL PARK
Introduction to “Darkhan” Industrial and technological park 3-6
Production of cement /”Erel Cement” Enterprise/ 7-8
Production of mineral cotton /“Erdes khuvun” Co., Ltd/ 9-10
Production of sheepskin, leather and fur products /“Darkhan Nekhii” Joint Stock
Company/ 11-13
Production of wooden vacuum doors and windows /“MG WOOD” Co, .Ltd/ 14-15
Production of light concrete blocks and lime/“Silicate” Co., Ltd/ 16-17
“ZAVKHAN” INDUSTRIAL AND TECHNOLOGICAL PARK
Meat and meat product production 18-20
Cashmere and sheep wool processing production 21-23
Construction materials factory 24-26
Food Factory 27-29
TSAGAANNUUR FREE TRADE ZONE
Introduction to Tsagaannuur FTZ 30-31
Construction of the plant producing flour 32
Constructions of the plant producing thermal insulation wall block 33
FOOD AND AGRICULTURE
“Third Crop Rehabilitation National Campaign” 34-36
Establishment of national reference laboratory of food security 39-40
“Potato seed renovation for increasing domestic safety potato production” 41
Intensified dairy farm for 50 black and white cows 37-38
ENVIRONMENT
Make a base research on identifying water supply resource of Ulaanbaatar city, develop
underground water monitoring network 42
Designing methods to perform biological rehabilitations on desolated areas in the procees of
mining, between the years 2009-2011 43-44
To improve the monitoring ability of environmental pollution and toxic chemical substances that
remain in the environment. To perform chemical analysis on 1500 environmental samples
annually. 45
To conduct survey on plants’ spread and resources of Mongolia with the aim of protecting
Mongolia’s rare plants, and identifying the resource. 46
“To improve the control of air pollution and research network’s ability – to maximize ecological
education of the public ” 47-48
Electronic network of exchanging chemical information between the organizations that provide
state service 49-50
“To improve the potential of state administration organizations engaged in forest matters”. The
project will be implemented from 1st of September, 2008 until 1st of September, 2009. 51-52
Reforming a machinery and a technology of the precede treatment plant which saves the Tuul
River from a pollution of industrial factories’ waste water 53
CONSTRUCTION AND URBAN DEVELOPMENT
40.000 housing project 54
Building of 1200 appartments in the XXII microdistrict in the frame of 40.000 housing
project 55-57
Building material laboratory construction of facilities 58
Darkhan city water supply development and improvement 59
Sukhbaatar city and Altanbulag soum of the Selenge province water supply system
development and improvement 60
Ulaanbaatar water supply development in Gachuurt 61
Water supply and guarantees citizens rights to healthy environment 62
Water supply of Erdenet city 63
TOURISM
Rest Area development 64
Technical and Economical substantiation of “Darkhan” Industrial and Technological Park

The main purpose is to contribute towards the local development based on centralized productions of
construction material, skin, fur and wooden products and management possibilities of the Park. The strategic
purpose will be provided by long and short term planning and will pass several development stages.
Darkhan Industrial and Technology Park will consists of two sections /Tenant Park/ depending on objective
of regional development and development process of industries and location centralization
Section 1: Export production or mixed park /94.5 thousand hectare area in the former industrial region, 45
hectare constructed area, and over 40 hectare area which will be used newly/ It includes:
1. Construction material Industries
2. Hide and skin processing Industries /with its purifying system/
3. Metal item industries
4. Wood processing Industries

Section 2: Small and Medium Industrial Tenant park/ will be built newly and it has 100 hectare area in
agricultural area/
1. Sewing factory
2. Small Knitting factory
3. Industries of high technology

The objectives and purpose of the development


of “Darkhan” Industrial and Technological Park

For selection of the Industrial and Technology Park’s administration structure, the principle that we
should maintain is aimed to resolve main objective and purpose of providing industrial hospitality in which the
Park could develop intensively by using local resource and considering internal and external factors and also of
operating suitably, for legal rights.
According to the research work, the ITP development and its objective and purpose are defined as follows:
Objective 1: As priority, to establish construction material, metallurgy, hide, fur item industries which
are able to substitute for import production and which have uninterruptedly chain system of export, as a complex
production into park and develop them
Directions of activity that will be carried out:
a. Developing productions of cement, silicate, mineral wool, construction material and other raw materials
through import substitution field by using advanced technology
b. Owning Tumurtei deposit and Tumur Tolgoi Deposit under the foreign investment and making great
capacity for metal to melt making present metallurgical plant into united organization system, expanding
raw material resource base of other kind of industries
c. Processing raw materials of hide-fur industries by the technology which is not harmful for ecology basing
on the purifying system of “Darkhan Nekhii” Joint Stock Company and mainly developing export
production
d. In conformity with the development of the above enterprises, providing development of supplementary
small and medium production and infrastructure
e. Defining truly direction of Tenant Park that is located in the 2nd region and developing it like a park
Objective 2: Basing on the joint utilization and collaboration of industries, providing development of
infrastructure and improving its sustainability and decreasing its expense.
Directions of activity that will be carried out:
a. Improving infrastructure including electricity, heating, water supply and communication system and
providing transportation logistics, safety and social service / meeting, exhibition site, hospital, apartment
et/ and establishing them under the state support and joint investment
b. Establishing bank an financial system, professional inspection system, training and research center,
expertise laboratory, business incubator, and center for innovation and information
c. Developing united network for processing raw materials and for production sale
Objective 3: Providing human resource development in the condition of strengthening technology
dissemination and providing science and technology advance
a. Training professional employees, re-train in the frame of cooperation with industry and educational
establishment
b. Preparing specialized professional engineer cooperation on industrial and technical employees, and
collaborating with universities and colleges on re-training issues
c. Developing advanced standard of cooperating on some direction of human resource management
d. Increasing values of labor workers
e. Creating new technology in park structure and strengthening its dissemination
f. Creating and developing capability of technological transfer
g. Improving quality, appearance, design, package of products
h. Increasing competitiveness of products of all producers and making hide-fur, metallurgical and cement
plant to have capability of competing in international market
Objective 4. Encouraging existed business and new business environment for attracting investment, and
making healthy economical and financial conditions in order to make a friendly environment for business
a. Providing tax reduction and tax release for the industries that belongs to the park in the scope of related
law and regulation
b. Providing all kinds of state service and inspection at one point
c. Organizing professional and production inspection efficiently and directing it to the international standard
d. Establishing professional consulting service point which focused on encouraging the industries of the
park
e. Improving quality of all kinds of social services/food supply, stores, cultural service safety/ in the
industrial zone up to the required standard
Objective 5. Coordinating administration of the park with the external administration system
a. Coordinating administration of the park with local and branch administration
b. Providing administration of the park with attendance of civil social service
c. Constantly studying experience from foreign countries

Calculation of the investment which is necessary for infrastructural improvement


of “Darkhan” Industrial and Technology Park

Amount of
required
Objects that need
¹ Period Planned activities investment
infrastructural investment
(billion
tugrugs)
I. In the scope of Industrial Region

1 Innovation for turbo of Power plant October of 2009 Installing 30 ì turbo 3,6

8.00 million MNT


2 Innovation for stove of Power plant 2009 was spent for stove 2,2
renovation in 2008
3 Customs guaranteed storehouse 2010 * 1,8
4 Administration building of park 2009 * 0,96
Sum 8,56
II. In the scope of tenant park

Putting 600 lines which conduct heating by


1 2009-2010 3 1,66
sourcing from central line of Darkhan

2 Pure and dirty water line 2009-2010 7 3,855

Sub station and line network which will


3 2009-2011 5 1
conduct electricity
Paving road of reaching to Tenant park and
4 2009-2011 3 0,56
around of the park

5 Establishing Incubator Center in Tenant Park 2009 * 0,48


Sum 7,555

Total Amount 16,115


Calculation of investment for “Darkhan” Industrial and Technology Park
Name of Name of Capacity of Amount of
¹ Current Capacity Productivity
organizations products planned project Investment
Industrial capacity and utilization -
Producing 330
“Darkhan” Steel Cast framework, 75% (with capacity of producing
1. 75 thousands.tîn thousand ton cast 96.0 billion
mill steel framework 100 thousand ton cast products per
iron
year)
Cement Industrial capacity and utilization Producing 500
“Erel Cement” (Portland cement -60% (with capacity of producing thousand ton
2. 110 thousand ton 4 billion
Industry of 400,500 185 thousand ton cement) Portland cement
mark)
Industrial capacity and utilization -
27.0 million pcs
(with capacity of producing 100ì3
Lime, light of silicate bricks
3. “Silicate” light concrete per day and 669 million
concrete 22. thousand ton
producing 70-80 òon technical and
lime
construction lime
“Darkhan- Industrial capacity and utilization - Complex project
sheepskin , 40% (processing 160.000 pcs of of processing fur
Nekhii” Stock
4. sheepskin sheepskin) 64 thousand pcs products, leather
Holding 17 billion
product and skin products
Company
Wood Industrial capacity and utilization -
“MG Wood”
5. framework 42 % 2.5 thousand ì3 200 million
Co.,Ltd
products
Light concrete, No working
“Mineral Wool” 1 billion 94
6. construction - 35000ì3
Co., Ltd million
material
119 billion
Sum
460 million
Investment for
infrastructure of
the industries in 8 billion 56
7.
Industrial and million
Technology
Park
Investment for
7 billion
8. infrastructure of
555 million
the tenant park
Investment for Small and Medium Enterprises of Construction 2.32
9.
material billion,
Total 137 billion 42 million / MNT/
Brief introduction of ”Erel Cement” Enterprise

The Enterprise was established with involvement of Mongolian-Czech techniques,


economy and personnel and was put into operation in 1968. According to the decision of
Government of Mongolia privatization commission on January 10, 1992 the Enterprise was
organized as Co., LTD with 90593.6 thousand equity fund 20% of which belongs to the State.
This enterprise has full capacity to produce 185000 tons of Portland cement through dump
method.
Legal status Company Limited
Business scope Construction material enterprise
Executive director Ch.Sainbayar
Main shareholders Property of “Erel “ Co., LTD
Number of employees 379
Year of establishment 1968
Year of privatization 1992
Production capacity 185000 tons per year
Main competitors “Khutul” cement and lime enterprise, Chinese cement
Location 500õ300 ì êâ good environmental enhancement
Building 4.626.163.922
Enterprise building
Accumlated weariness /860.363.407.
2248.074.002
Equipments
Accumlated weariness /771.975.727 òºã/
Main raw material of cement is lime stone and gypsum. Mine lime stone from
Raw materials supply own deposit located 7 km from the enterprice, gypsum from Unegt deposit in
Dornogobi.

The advantage and significance of the project for expending “Erel cement” Co., Ltd
There are 3 main technological methods to produce cement. All enterprises in our country use
damp technology. In order to crash raw materials into powder 356-36% water mixture is used and
is burned in rotate stove making it proper mineral structure with piece of cement stone.
Advantage of this method is less dusting because of dump. At present because of Darkhan and
Khutul cement enterprises normal operation loss, cement mineral is derived unequally and badly
effect to the quality of product. Beside that C3A has a lot of mineral thus it is resistant to sulfur
reaction. Also it is not suitable for engineering. Developed countries are moving on dry method.
The advantage of the project is we aim to produce cement that meets normal standard by physic
and mechanic characteristic through new cost effective technology.

Economical indicators of the project

Investment estimation
Name of equipment and Unit of
¹ Quantity Unit price Total price
building measurement
1. Buildings ì2 3500 217.980.00 762.930.0
2. Warehouse ì2 576 205.981.00 118.645.0
3. Utility and office building ì2 1080 233.986.00 252.704.8
4. Environmental enhancement ì2 260 4.680.00 1.216.8
5. Equipment of total technology set 1 2.350.000.000.0 2.350.000.0
6. Supporting equipment - - 275.000.0
7. Spare parts - - 160.000.0
Total 3920496.6

Financial estimation
№ Index Size
Investment required for buying equipment and
1 4 billion
constructing buildings

Indicators of efficiency
¹ Indices Per year /Thousand.MNT/
1 Sales income 16,500,000.0
2 Production cost 12,845,367.2
3 General Administration expense 607,158.0
4 Profit before tax 2,374,848.5
5 Income tax 237,484.9
6 Profit after tax 2,137,363.7
Brief introduction of “Erdes khuvun” Co., LTD

Diorite and dolomite /mineral rock/ which are main raw materials are found 15 km far the
enterprise. Geological exploration revealed that there are 300.000 tons of diorite and 200.000 tons
of dolomite resource in this area. Using present capacity the enterprise can produce 60.000 m2 of
mineral cotton per year and is expected to have 60 year resource. But it is necessary to find
source where coke can be mined that comprises ¼ of the mixture for cotton production. For
cotton production, sedimentary, spinning, changeable rocks, mineral production waste, piece of
dregs which is second raw material of metal processing, fuel ash, burned mud are used.

The requirement and basis of expanding “Erdes khuvun” Co., LTD

Natural mineral rock which is suitable for mineral cotton production is widespread
through the country. For instance, there is deposit with 500.000 tons of diorite and dolomite
resource in Khongor soum, Darkhan-Uul aimag that is enough to produce 60.000m3 of cotton
during 60 years. But coke which emits energy is in difficulty. However we can use Tavan Tolgoi
coke in South-Gobi aimag. Production technological transfer is that selected rocky coke at proper
ratio is loaded into the upright oven and is casting at 1500-1600C then it made as glass fiber.
Mineral cotton is used in all sectors of the country. For example, it is used for reduction of heat
loss of building and thermal grid, thermal equipment.
Because of inaccuracy of privatization this enterprise was not in operation for long time
and started it’s operation this year. If we renovate just it’s equipment completely we can
operate using engineering network.
Research of financial feasibility of “Mineral Cotton” Co., Ltd enterprise brought us to
the following conclusions.
• The need for mineral cotton is huge
• Deposit of asbestos provides future development
• It is necessary to invest and reform.

The Economical indicators of the project

The enterprise prepares cylinder and semi-cylinder items and soft, stiff, semi-stiff panels
in any size with 50-350 kg/m3 average density binding glass fibers with various synthetic
materials that are resistant to mould and are not enable to be holed up by destructive rodents and
pests.

Investment estimation of the enterprise


Measurement
Buildings and equipment Number Price of unit Total cost
unit
Building of enterprise м2 576 233,986 134,776
Warehouse of finished goods м2 288 205,981 59,323
Warehouse of raw materials and
216 205,981 44,492
fuel м2
Office building м2 480 291,932 140,127
Garage, mechanic section м2 288 233,986 67,388
Technological line Set 1000 480,000 480,000
Machinery sub-equipment and parts -
Equipment of mechanic shop and
Set 1000 48,000 48,000
laboratory
Sum 1,094,106

Efficiency calculation
Total expense
¹ Indices
Thousand MNT
1 Sales income 1500
2 Production cost 163,032
3 General administration expense 182.3
4 Profit before tax 629952.6
5 Income tax 62995.2
6 Profit after tax 566957.4
Brief Introduction of “Darkhan Nekhii” Joint Stock Company

Darkhan – Nekhii Joint Stock Company provides customers with sheepskin, leather
and fur products putting them on domestic and world markets. The company supplies
domestic market with 25 name kind sheepskin products which are designed in 120
patterns and Siberian market with 7 various kinds of sheepskin products which are
designed in 10 patterns. Beside the “Darkhan minj” Co. Ltd, “Darkhan Sergen Mandalt”
Co. Ltd, the Republic of Korea, the Republic of Turkey, and the Republic of China
supply their sheepskin products in our domestic market.
Total sale of imported sheepskin in the domestic market is 15000 of sheepskin
garments year. The company exports it’s semi-processed skin and sheepskin, fur and
leather products to the Republic of China, Italy, the Republic of Korea, Spain, Canada,
Taiwan, and Hungary.
The company has processing and sewing enterprises. The processing enterprise with
capacity to process 1,5 million sheepskins a year processes the skins through chemical
and mechanic method and produces semi-processed and fully processed sheepskin. The
sewing enterprise produces fully processed and double face colored sheepskin products.
This enterprise equipped with German and Japanese techniques and consists of fashionable
garments section, chamois leather sewing shop, soft item sewing shop, and cutting shop.
In 1994 and 2000-2006 new technology was introduced and the techniques were
renovated in the company.
The processing enterprise was equipped with European machines and techniques and
consists of experimental shop, chemical and mechanic processing shops. The enterprise
was renovated several times in 1994 and 2000-2006 and expanded.
“Darkhan nekhii” Joint Stock Company has 13000 square km2 and the lighting and
heating were connected with Electrical Station. In the scope of project to reform the
enterprise’s structure with assistance of the United Nations Spanish expert from “skin
ABC” company have introduced Spanish skin processing technology since 1999.
Introducing new technology is lasting for 3 years and the company has completed the
first phase to process double face colored sheepskin through soft method. Starting from
2002 the company has made change in their traditional products and has produced leather
garments.

The requirement and basis of expanding “Darkhan Nekhii” Joint Stock Company

New technology will give opportunity to produce double face colored sheepskin,
fur, leather, and skin products which attract foreign consumers.
According to the survey conducted in Siberia the consumers prefer Mongolian double
faced products because of their warmth and solidity to Chinese, Korean and Turkish
ones. The products from these countries did not meet the standard. Increase in leather products
need in Siberia of the Russian Federation in the Mongolian government policy to support
skin, wool and cashmere product export and import tax decrease from 7,5% to 10%
during the official meeting conducted in Moscow on September 15, 2007 provided with
pleasant opportunity for foreign trade.

The advantage and significance of the project for expanding “Darkhan Nekhii” Joint Stock
Company
Result from “Darkhan nekhii” Joint Stock Company expansion project in order to
increase the sales the company planned to expand its production. In the future the
company will implement the main and supporting equipment investment plan. As a result
of that quality control will be improved and energy loss and defect during the production
will be disappeared. Main and supporting technique investment will give opportunity to
produce leather products and to process sheepskin.
There are some advantages as “Darkhan Nekhii” Joint Stock Company expansion.
• Equipment renovation will upgrade the tools first. This will provide with possibility to
produce various kinds of or flexible products for many purposes with less energy
than before.
• New product production will provide year-around activities. Basic capital usage and the
profit will be increased. Financial situation will be improved.
• By speedy up the research we can produce high quality by and special products.

Economical indicators of project


Basic and circulating capital investment estimation: 19,57 million USD is needed for
total investment. From this amount skin processing enterprise needs 5,1 million USD,
leather processing enterprise - 8,51 million USD, fur processing enterprise - 5,96 million
USD for investment, respectively.

Investment estimation of skin processing enterprise


¹ Investment type Investment expense/dollar/
Fixed assets investment
1 Construction 0
2 Equipment 1,962,637
Fixed assets 1,962,637
3 Direct material cost 2.070.212
4 Indirect material cost 1.073.532
5 Current assets 3.143.745
6 Total Expense 5.106.382
For skin processing enterprise. Net money flow of Projects economical indicators will be
estimated from budgeted in come report. According to the current estimation benefit from
the investment is 21,6% and repayment term will last 4 years 8 months.

Leather processing enterprise investment estimation


¹ Investment type Investment expense/dollar/
Fixed assets investment
1 Buildings improvement 323,464
2 Equipment 2,989,276
Amount of fixed assets 3,312,740
Amount of current assets
3 Direct material expense 3.771.914
4 Indirect material expense 1,425,982
Amount of current assets 5.197.897
Total Expense 8.510.638
As for leather processing enterprise : Net money flow of Projects economical indicators
will be estimated from budgeted income report. According to the current estimation benefit
from the investment is 19,93% and repayment term is 5 years 1 month.

Fur items processing investment calculation


¹ Investment type Investment expanse (USD)
Investment
1 Buildings 0
2 Equipment 170.212.77
Amount of fixed assets investment 170.212.77
Amount of current assets
3 Direct material expense 510.638.31
4 Indirect material expense 170.212.77
Amount of current assets 680.851.06
Total Expense 851.063.83

Research conclusion: We claimed that it is necessary to expand “Darkhan nekhii ” Joint Stock
Company as a complex in the future. According to preliminary research there are 3 main
productions that can be capable to develop.
1. skin processing enterprise /double face tannery/
2. leather processing enterprise /napped tannery/
3. Fur processing enterprise /fur tannery/
As result of Tgs17 billion investments there will be created 1689 working places and
average salary of the staff will reach Tgs329000
Brief Introduction of “MG WOOD” Co, .Ltd

Mongolian and German joint company “M-G-Wood” Co., Ltd engaged in woodwork is
located in Darkhan soum, Darkhan –Uul aimag covering territory of 22700 square km2.
The company started up in January of 2003 in the extension building of “Nekhii”
Shareholding. The company has over 50 staff. The enterprise building is connected with
electricity, heating, hot and cleans water systems. Transportation and communication
infrastructure is developed well.
“M-G-Wood” Co., LTD is equipped with powerful techniques from Germany and is
introduced advanced technology. The company has a capacity to process 10-12 thousand cubic
meter of wood and produce 2-3 thousand cubic meter of window glued semi-finished and
finished products. The company uses German tools such as heavy metal surfaced sawing
machine, sawing machine with moving edges, detailed cutting machine with laser gauge, Hybrid
drying camera, Herbs plane with 6 sides, Vanish plane with 4 sides, Varnish hydro plane with 2
sides, Shariff and Hegel edged equipment, Kom Tech plate compressing machine, across sawing
machine.

The requirement and basis of expanding “MG WOOD” Co., LTD


Pine and Larch that grow mainly in Khangai and Khentii ranges of the country are the basic
raw materials. Beside that D4 and d5 group glue which meets the standard and resistant to any
climate condition is used. Although the company’s capacity is 5-6 thousand cubic meter semi-
finished products the company can not use its all potential due to shortage of raw material. The
company has much experience to renovate the technology and increase the sorts of the products
put into domestic and world market.

The advantage and significance of the project for expanding “MG WOOD” Co., LTD
In connection with construction sector’s rapid development, the increasing need for
ecologically-friendly wooden vacuum door and window that can replace high quality and
fashionable import products requires to establish this kind of enterprise in the Darkhan industrial
and Technology Park zone. Also it is essential to produce doors and windows that match interior
design and furnishing.

Economical indicators of project


a. Wooden vacuum door enterprise project.
Efficiency indicators /thousand MNT/
Running with complete capacity
Year
2009 2010 2011 2012 2013
Utilization capacity
Percentage 100% 100% 100% 100% 100%
/thousand MNT/
1.Sales Income 194216,4 194216,4 194216,4 194216,4 194216,4
2. Production cost 159427,0 159427,0 159427,0 159427,0 159427,0
3. Profit before tax 34,789,4 34,789,4 34,789,4 34,789,4 34,789,4
4. Income tax 3,478,9 3,478,9 3,478,9 3,478,9 3,478,9
5.Profit after tax 31,310,5 31,310,5 31,310,5 31,310,5 31,310,5
b. Project of vacuum window enterprise.
Efficiency indicators /thousand MNT/
Beginning Running with complete capacity
2008 2009 Year 2011 2012 2013
Utilization 100%
capacity Percentage 80% 100% 100% 100% 100%
/thousand MNT/
1.Sales Income
2. Production cost 292723,2 292723,2 292723,2 292723,2 292723,2
3. Profit before tax 231674,6 231493,9 231493,9 231493,9 231493,9
4. Income tax 61,048,6 61,229,3 61,229,3 61,229,3 61,229,3

Utilization
Percentag
capacity 6,104,9 6,122,9 6,122,9 6,122,9 6,122,9
e
/thousand MNT/
1.Sales Income 54,943,8 55,106,4 55,106,4 55,106,4 55,106,4

If production of wooden door and window is organized together the investment and management
cost will be saved and the investment will be repaid within 17 months.
Brief Introduction of “Silicate” Co., Ltd

‘Silicate’ Co., Ltd was put into operation with assistance of the People’s Republic of
Poland in 1966. Now the company produces light block and construction lime. The capacity of
the company is 100 m3 of light concrete, 70-80 tons of technological construction lime a day.
Total sales are Tgs 250-350milion a month. 4.5 hectare belongs to company. ‘Silicate’ Co., Ltd
changed its technological line in 2006 and started to produce light concrete blocks.
According to the project the company is capable to produce 350.000 m 3 wall block and
20.000 m3 lime a year. The company owns lime and sand deposits. There are 3 lime burning
stoves that can be used in the future. The technology to produce old white bricks has been
changed by Mongolian engineer into the technology to produce concrete blocks.

The requirement and basis of expanding “Silicate” Co., Ltd


Light concrete products are used as heat insulation materials. They are lightweight, cheap
and porous in same size and have many technical and economical advantages. At present for heat
insulation usage 100.000 m3 light concrete is produced a year in Ulaanbaatar. This does not fulfill
all needs. These enterprises that produce light concrete use lime and cement mixture binder, sand
filler and aluminum powder as foam generator.

The advantage and significance of the project for expanding “Silicate” Co., Ltd
It is time to introduce ALC technology that is popular through Asian countries, Czech
and Polish CEPOL, CEBET and UNIPOL technologies. They are used for not only production of
building walls but also production of roof covering and divisions between stories, slapping roof
with rafters, stairs march, transom, garage covering, also dry admixture that is used for brick
laying and plastering mixture. The project aims to implement “40.000 Households Apartment
Building Program” initiated by the Government, to provide construction need of the city with
high quality light concrete, and to produce earthquake-resistant, cost effective materials.

The Economical indicator of the project


Sales income and profit calculation of the enterprise. The enterprise will sell its scarce blocks
at the standard price of current market. The gas block which is similar to the products above but
is lower by quality is sold for Tgs55000-60000.

Gross production profit and income statement


Total amount
¹ Indicators
/Thousand.MNT/
1 Total sales income 1925000
2 Operation cost 947107
3 Gross profit( before tax ) 977893
4 Income tax 10 % 97789.3
5 Net profit (3-4) 880103.7
6 Loan interest (1.8% per month, 21.6% per year ) 144720
7 Compensation resource for investment expense 350000
8 Operation expense financing (947107.0/ 4 ) 236776.75
9 Accumulation (5-6-7-8) 148606.95

Tgs 192 million is needed to expand the production by preliminary calculation.


Meat and meat product production of “Zavkhan” ITP.
A meat processing factory will process 633.6 tons of beef, 323.8 tons of horse

PROJECT meat, 1050 tons of mutton, in a total more than 2000 tons of meat a year in
TITLE, average; and produce 250 tons of sausages, 510 tons of meat using meat and 42.6
CAPACITY
tons of canned products using by-products. In addition to that there is a plan to
process and export about 100 tons of fish.

The necessity of establishing and operating the “Zavkhan” ITP


PROJECT The general level of economic development in western part of our country
remains low. This region’s contribution to the gross industrial output of our country
GOAL, is 0.1% and the GDP per capita in this region is 2.0 times lower than the country
OBJECTIVES average, 2.7 times lower the Ulaanbaatar GDP per capita and 2.0 times lower than
the Khangai region average. It is also lower by 10-12% when compared to other
regions.
The sectoral structure of the Western region’s economy is also lagging
behind. Agricultural sector, services sector and the industrial and construction
sectors comprise 61.0%, 38.4% and 0.6% of the regions GDP against the 18.8%,
40.4% and 40.8% respectively in the country’s GDP.
The pastoral livestock herding which is heavily dependent on environmental
factors constitutes a major part if not most important part of the Western region’s
economy.
Due to low GDP per capita of the Western region and due to the importance
of pastoral livestock herding in the region’s economy, the poverty and
unemployment levels in the region are high with poverty rate of 38% in the
Western region compared to 32.2% for the country as a whole.
The level of economic development of Zavkhan aimag remains low. The
GDP per capita in this province was 640.4 thousand Tug, which is 0.9% less that
regional average (643.5 thousand Tug) and is 1.9 times lower than the country
average GDP per capita which is 1230.3 thousand Tug. The high levels of
unemployment and poverty in this aimag are also related to this.
The Western region and Zavkhan aimag play an important role in livestock
herding agriculture of our country. However, the main products of livestock
agriculture such as meat, wool & cashmere and unprocessed animal skins are
predominantly being exported to Russia and China as raw materials. If the
agricultural produce can be processed into final products using high technologies
and exported abroad, this would increase the price of raw agricultural produce, thus
creating the possibility of maintaining the herders’ income at sustainable high
levels. The herders’ income can be increased by developing processing industries
producing export-oriented final products meeting world standards from agricultural
products.
Therefore, increasing the GDP per capita of Zavkhan aimag, improving the
economic structure of the Western region, particularly, of Zavkhan aimag and
developing processing industries, thus improving the situation with poverty and
unemployment, is of utmost importance. Establishing the “Zavkhan” ITP will be an
important step towards implementing this goal.
On the other hand, the establishment and operation of Meat and meat product
production of “Zavkhan” ITP will play an important role and help diversifying
the economy of our country, will increase the production of export-oriented goods
and furthermore, will increase the competitiveness of such products on the world
markets.
“Zavkhan” ITP will be established in Ulziit bag territory to the south of
Uliastai city centre. Total area is 76.2 hectares

PROJECT
VENUE

The meat factory to be included in the “Zavkhan” ITP is indicated in the map
as “Meat and meat product production”

TOTAL • The total investment amount necessary for the meat processing
INVESTMENT factory is estimated to be 2,250,000 000 Tug, out which the
renovation of refrigerating and freezing equipment will cost 150,000
000 Tug, repairs of plant equipment will cost 80,000 000 Tug,
canned product equipment will cost 250,000 000 Tug, fish
processing equipment will cost 90,000 000 Tug, sausage making
equipment will cost 100,000 000 Tug, 500 ton refrigerated storage
facility in Artssuuri will cost 1,000,000 000 Tug, 200 ton
refrigerated storage facility in Ulaanbaatar will cost 400,000 000
Tug, other machinery equipment will cost 40,000 000 Tug,
installation costs will be 80,000 000 Tug, and transportation costs
will be 60,000 000 Tug. The meat factory will borrow 2,504,508
000Tug for 17 years at 12% per annum interest rate. The meat
processing plant will borrow 2,336,000,000 Tug and invest
3,800,000,000 from own internal recourses. In 2008, products
amounting to 5,135,777,400 Tug will be sold with a profit of
1,304,905,285 Tug and in 2009, sales volume will be 8,000,180,800
Tug, with a profit of 3,476,307,547 Tug. The total profit for 2008-
2013 is estimated to be 20,336,399,897 Tug.

All the equipment of the meat processing factory is in order. However there
is a need to replace some cooling equipment in the cellar. Within the project scope
COOPERATION there is a need to procure and install a set of equipment for production of sausages,
processing fish and canning meat. A new cellar with the capacity to store 500 tons of
MODE meat and meat production with cooling system at the Arts suur border crossing point will
be built.

Total Amount Total Amount


№ Items (Tug) (USD)
1 Sales Income 84 703 739 400 72 520 325
2 Own investment 3 000 000 000 2 568 493
3 Borrowed Funds 8 549 394 888 7 319 687
ECONOMIC
4 Total Costs 76 476 665 345 65 476 597
BENEFITS, 5 Loan repayments 8 549 394 889 7 319 687
INVESTMENT 6 Loan Interest Payments 2 537 745 382 2 172 727
7 Loan Outstanding 0
RECOVERY Total amount of loan payments
PERIOD 8 and interest payments 11 087 140 271 9 492 415
9 Profit before tax 15 602 659 344 13 358 441
1
0 Taxation 16 885 212 025 14 456 517
1
1 Income 2 891 256 918 2 475 391
EXPECTED
RESULTS

Contact person (management/organizational structure (or chart), including possible


CONTACT names of senior personnel), address, including mailing and post office box details,
INFORMATION telephone and facsimile numbers, and email address
Cashmere and sheep wool processing production “Zavkhan” ITP.

• There is a plan to process in average 100-200 tons of cashmere and 800-1000


tons of sheep wool a year, dehair 200 tons of cashmere and 1000 tons of sheep
PROJECT
TITLE, wool, degrease 150-200 kg of Cashmere and wool an hour and produce 300-
CAPACITY
350 tons of dehaired cashmere and 120-130 tons of yarns a year along with
140,000-150,000 linear meters of nitted fabrics and cloth at the Cashmere and
wool processing factory

The necessity of establishing and operating the “Zavkhan” ITP


PROJECT The general level of economic development in western part of our country
remains low. This region’s contribution to the gross industrial output of our country
GOAL, is 0.1% and the GDP per capita in this region is 2.0 times lower than the country
OBJECTIVES average, 2.7 times lower the Ulaanbaatar GDP per capita and 2.0 times lower than the
Khangai region average. It is also lower by 10-12% when compared to other regions.
The sectoral structure of the Western region’s economy is also lagging behind.
Agricultural sector, services sector and the industrial and construction sectors
comprise 61.0%, 38.4% and 0.6% of the regions GDP against the 18.8%, 40.4% and
40.8% respectively in the country’s GDP.
The pastoral livestock herding which is heavily dependent on environmental
factors constitutes a major part if not most important part of the Western region’s
economy.
Due to low GDP per capita of the Western region and due to the importance of
pastoral livestock herding in the region’s economy, the poverty and unemployment
levels in the region are high with poverty rate of 38% in the Western region
compared to 32.2% for the country as a whole.
The level of economic development of Zavkhan aimag remains low. The GDP
per capita in this province was 640.4 thousand Tug, which is 0.9% less that regional
average (643.5 thousand Tug) and is 1.9 times lower than the country average GDP
per capita which is 1230.3 thousand Tug. The high levels of unemployment and
poverty in this aimag are also related to this.
The Western region and Zavkhan aimag play an important role in livestock
herding agriculture of our country. However, the main products of livestock
agriculture such as meat, wool & cashmere and unprocessed animal skins are
predominantly being exported to Russia and China as raw materials. If the
agricultural produce can be processed into final products using high technologies and
exported abroad, this would increase the price of raw agricultural produce, thus
creating the possibility of maintaining the herders’ income at sustainable high levels.
The herders’ income can be increased by developing processing industries producing
export-oriented final products meeting world standards from agricultural products.
Therefore, increasing the GDP per capita of Zavkhan aimag, improving the
economic structure of the Western region, particularly, of Zavkhan aimag and
developing processing industries, thus improving the situation with poverty and
unemployment, is of utmost importance. Establishing the “Zavkhan” ITP will be an
important step towards implementing this goal.
On the other hand, the establishment and operation of Cashmere and sheep wool
processing production “Zavkhan” ITP will play an important role and help
diversifying the economy of our country, will increase the production of export-
oriented goods and furthermore, will increase the competitiveness of such products
on the world markets.

“Zavkhan” ITP will be established in Ulziit bag territory to the south of


Uliastai city centre. Total area is 76.2 hectares

PROJECT
VENUE

The meat factory to be included in the “Zavkhan” ITP is indicated in the map
as “Cashmere and sheep wool processing production ”

TOTAL This factory will produce 7 types of products and for the period between 2008 and
2012, the estimated sales income of the factory calculated basing on 2007 average
INVESTMENT
USD – MNT exchange rate is expected to be 71,179,613 USD. The operating costs
throughout the period are estimated to be 76,476,665,343 Tug or 65,476,597 USD
using 2007 average exchange rate and initial investment necessary is estimated to be
6,749,680,000 Tug. Land and factory building will cost 1,939,700 000 Tug, factory
machinery and equipment – 4,391,100 000 Tug, transportation and installation of
machinery and equipment – 353,430 000 Tug, and technology will cost 65,450 000
Tug. The profit loss calculations have been made for the period of 2008-2012, and
the estimated profit for the period is 8,006,879,251 Tug. The cashmere and Sartuul
sheep wool processing factory to be established as a part of “Zavkhan” ITP will be
financed from own funds and bank borrowings. In the first instance, a loan in the
amount of 8,549,394,888 Tug at 12% per annum is necessary and calculations show
that this loan can be repaid in 5 years time. The total amount of investment in the
cashmere and wool factory will be 11,549,397,888 Tug, out which 3,000,000,000
Tug will invested from own funds, and 8,549,394,888 Tug of bank loans will be
required. The sales volume in 2008 will be 1,530,747,888 with a net profit of
373,343,672 Tug. The sales amount will be 1,614,747,888 in 2009, further increasing
to 1,694,747,888 Tug in 2010, bringing the total sales volume throughout the period
to 8,470,373,940 Tug.
It is necessary to select and install new equipment meeting the requirements of
modern technology. The cashmere processing technology needs to be the most
advanced and most efficient technology suited best to the specifics of cashmere from
COOPERATION Mongolian goats. A special attention should be paid to selecting appropriate
MODE technological processes suiting the most to all steps of cashmere processing such as
bleaching, washing, dying and finishing of raw cashmere, thus allowing the
production of higher quality products.

Total Amount Total Amount


№ Items (Tug) (USD)
1 Sales Income 48 532 781 400 41 552 039
2 Own investment 3 800 000 000 3 253 425
3 Borrowed Funds 2 336 000 000 2 000 000
ECONOMIC 4 Total Costs 28 441 003 044 24 350 174
BENEFITS, 5 Loan repayments 1 425 181 967 1 220 190
6 Loan Interest Payments 1 033 256 926 884 638
INVESTMENT
7 Loan Outstanding 1 454 873 258 1 245 611
RECOVERY Total amount of loan payments
PERIOD 8 and interest payments 2 458 438 892 2 104 828
9 Profit before tax 41 950 794 077 35 916 776
1
0 Taxation 20 408 032 034 17 472 630
1
1 Income 5 819 746 322 4 982 660
The section should describe the overall results that the project is expected to produce
- on successful completion - among its intended beneficiary group (how many people
EXPECTED
are expected to benefit from the project - directly and indirectly). The discussion
RESULTS
should also discuss whether there may be unintended effects of the project. The
discussion should indicate in quantitative terms, to the extent possible, what the
project will produce through its planned activities and budget.
P.O Box-211137 Ulaanbaatar Mongolia, Sukhbaatar District 5th horoo
CONTACT Budkhand namjilsuren: Mobile; 976-99-009181 , Tel; 976-11-635289, Fax; 976-11-
INFORMATION 635289
E-mail; ltsedendamba@yahoo.com
Construction materials factory of “Zavkhan” ITP.
• The plan is to produce 4000 pieces/м3/ of airy concrete, 20,000
light/porous concrete blocks, 15,000 ash blocks and sand blocks, 100,000
PROJECT bricks, 2500 pieces/ м3/ of walk path blocks, 230 pieces/м3/ of concrete
TITLE,
CAPACITY pillars, 12 200 pieces/м3/ of ХНХ 59 and 1750 pieces/м3/ of 0.5 gravel at the
construction materials production factory in 2008-2009.

1.1. The necessity of establishing and operating the “Zavkhan” ITP


PROJECT The general level of economic development in western part of our country
GOAL, remains low. This region’s contribution to the gross industrial output of our
country is 0.1% and the GDP per capita in this region is 2.0 times lower than the
OBJECTIVES
country average, 2.7 times lower the Ulaanbaatar GDP per capita and 2.0 times
lower than the Khangai region average. It is also lower by 10-12% when compared
to other regions.
The sectoral structure of the Western region’s economy is also lagging
behind. Agricultural sector, services sector and the industrial and construction
sectors comprise 61.0%, 38.4% and 0.6% of the regions GDP against the 18.8%,
40.4% and 40.8% respectively in the country’s GDP.
The pastoral livestock herding which is heavily dependent on environmental
factors constitutes a major part if not most important part of the Western region’s
economy.
Due to low GDP per capita of the Western region and due to the importance
of pastoral livestock herding in the region’s economy, the poverty and
unemployment levels in the region are high with poverty rate of 38% in the
Western region compared to 32.2% for the country as a whole.
The level of economic development of Zavkhan aimag remains low. The
GDP per capita in this province was 640.4 thousand Tug, which is 0.9% less that
regional average (643.5 thousand Tug) and is 1.9 times lower than the country
average GDP per capita which is 1230.3 thousand Tug. The high levels of
unemployment and poverty in this aimag are also related to this.
The Western region and Zavkhan aimag play an important role in livestock
herding agriculture of our country. However, the main products of livestock
agriculture such as meat, wool & cashmere and unprocessed animal skins are
predominantly being exported to Russia and China as raw materials. If the
agricultural produce can be processed into final products using high technologies
and exported abroad, this would increase the price of raw agricultural produce,
thus creating the possibility of maintaining the herders’ income at sustainable high
levels. The herders’ income can be increased by developing processing industries
producing export-oriented final products meeting world standards from
agricultural products.
Therefore, increasing the GDP per capita of Zavkhan aimag, improving the
economic structure of the Western region, particularly, of Zavkhan aimag and
developing processing industries, thus improving the situation with poverty and
unemployment, is of utmost importance. Establishing the Construction materials
factory of “Zavkhan” ITP will be an important step towards implementing this
goal.
On the other hand, the establishment and operation of Construction
materials factory of “Zavkhan” ITP will play an important role and help
diversifying the economy of our country, will increase the production of export-
oriented goods and furthermore, will increase the competitiveness of such products
on the world markets.

“Zavkhan” ITP will be established in Ulziit bag territory to the south of


Uliastai city centre. Total area is 76.2 hectares

PROJECT
VENUE

The meat factory to be included in the “Zavkhan” ITP is indicated in the


map as “Construction materials production ”

TOTAL The required amount of investment into this factory is 1,647,318.800 Tug, out
which 906,047.000 Tug is working capital and 741,271.800 Tug are capital
INVESTMENT
expenditures. Capital expenditures include the 360,000 000 Tug for purchase and
renovation of property, and 212,811.800 Tug for building the sea-buckthorn and
other fruit growing plantation. Of the total investment amount of 1,647,318.800
Tug, 1,625,313.800 will be raised through a bank loan and 22,000.000 Tug will be
invested from own funds. The bank loan will bear an interest of 12% per annum
and is expected to be completely repaid in 6 years time. This factory will increase
its production along with the year over year growth in raw materials, thus allowing
increasing profits. For instance, in 2012 and 2013, the factory will work with net
profits of 1,084,332,445 Tug and 1,527,916,836 Tug respectively. The food
factory will produce products to the total amount of 1,624,655,556 Tug,
1,825,072,482 Tug, 2,951,009,404 Tug, and 3,483,274,289 Tug in 2009, 2010,
2011 and 2012 respectively. The aggregate sales volume for 2008-2013 will be
14,751,273,442 Tug.
The construction materials factory will have the following equipments: 1 8-ton
Grab crane G, 1 SM108 crusher, 1 10-ton crane, 1 overhead crane, 1 point-welding
equipment, 1 C229 mechanical scissors, 2 steel expanders, 1 5-ton mirror, 2 20-ton
carts, 1 holed-plate producing equipment, 1 SM 36D concrete mixer, and 36
COOPERATION forms. In order to ensure further uninterrupted operation of the factory, it is
necessary to renovate the existing equipment and technology by introducing new
MODE advanced technologies to the factory’s quarry, by installing new concrete supporter
equipment and etc. Also, a printing machine, a salver/tray, 5-ton boom crane, KAT
SOLOR 200, 10 10-ton KAMAZ trucks and a small steam furnace with a capacity
to produce 1 ton of 4 atm. steam per hour will be purchased.

№ Items Total Amount Total Amount


(Tug) (USD)
1 Sales Income 6 217 600 000 5 323 288
2 Own investment 150 000 000 128 425
ECONOMIC 3 Borrowed Funds 1 426 509 480 1 221 327
4 Total Costs 5 255 723 640 4 499 763
BENEFITS, 5 Loan repayments 870 306 330 745 125
INVESTMENT 6 Loan Interest Payments 31 466 782 26 941
7 Loan Outstanding 8 056 708 716 6 897 867
RECOVERY 8 Total amount of loan payments 901 773 111 772 066
PERIOD and interest payments
9 Profit before tax 1 960 835 807 1 678 798
1
0 Taxation 2 345 476 171 2 008 113
1
1 Income 342 909 670 293 587
P.O Box-211137 Ulaanbaatar Mongolia, Sukhbaatar District 5th horoo
CONTACT Budkhand namjilsuren: Mobile; 976-99-009181 , Tel; 976-11-635289, Fax; 976-
INFORMATION 11-635289
E-mail; ltsedendamba@yahoo.com
Food Factory of “Zavkhan” ITP.
It is planned to process 25 tons of blueberries, 5 tons of cranberries, 5 tons of currants
and 30 tons of seabuckthorns in 2008. 92 tons of red garlic potion, and 3911 tons of

PROJECT canned red garlic are planned to be produced by increasing sowing and seeding of red
TITLE, garlic each year. With the growth of production the plan is to process 108 tons of
CAPACITY
blueberries, 12 tons of cranberries, 10 tons of currants and 15 tons of cultivated
currants and 100 tons of seabuckthorns. It is expected to process 100 tons of
cultivated seabuckthorns.

1.2. The necessity of establishing and operating the “Zavkhan” ITP


PROJECT The general level of economic development in western part of our country
GOAL, remains low. This region’s contribution to the gross industrial output of our country
is 0.1% and the GDP per capita in this region is 2.0 times lower than the country
OBJECTIVES
average, 2.7 times lower the Ulaanbaatar GDP per capita and 2.0 times lower than
the Khangai region average. It is also lower by 10-12% when compared to other
regions.
The sectoral structure of the Western region’s economy is also lagging
behind. Agricultural sector, services sector and the industrial and construction
sectors comprise 61.0%, 38.4% and 0.6% of the regions GDP against the 18.8%,
40.4% and 40.8% respectively in the country’s GDP.
The pastoral livestock herding which is heavily dependent on environmental
factors constitutes a major part if not most important part of the Western region’s
economy.
Due to low GDP per capita of the Western region and due to the importance
of pastoral livestock herding in the region’s economy, the poverty and
unemployment levels in the region are high with poverty rate of 38% in the
Western region compared to 32.2% for the country as a whole.
The level of economic development of Zavkhan aimag remains low. The
GDP per capita in this province was 640.4 thousand Tug, which is 0.9% less that
regional average (643.5 thousand Tug) and is 1.9 times lower than the country
average GDP per capita which is 1230.3 thousand Tug. The high levels of
unemployment and poverty in this aimag are also related to this.
The Western region and Zavkhan aimag play an important role in livestock
herding agriculture of our country. However, the main products of livestock
agriculture such as meat, wool & cashmere and unprocessed animal skins are
predominantly being exported to Russia and China as raw materials. If the
agricultural produce can be processed into final products using high technologies
and exported abroad, this would increase the price of raw agricultural produce, thus
creating the possibility of maintaining the herders’ income at sustainable high
levels. The herders’ income can be increased by developing processing industries
producing export-oriented final products meeting world standards from agricultural
products.
Therefore, increasing the GDP per capita of Zavkhan aimag, improving the
economic structure of the Western region, particularly, of Zavkhan aimag and
developing processing industries, thus improving the situation with poverty and
unemployment, is of utmost importance. Establishing the Food Factory of
“Zavkhan” ITP will be an important step towards implementing this goal.
On the other hand, the establishment and operation of Food Factory of
“Zavkhan” ITP will play an important role and help diversifying the economy of
our country, will increase the production of export-oriented goods and furthermore,
will increase the competitiveness of such products on the world markets.

“Zavkhan” ITP will be established in Ulziit bag territory to the south of


Uliastai city centre. Total area is 76.2 hectares

PROJECT
VENUE

The meat factory to be included in the “Zavkhan” ITP is indicated in the map
as “Food production”

TOTAL The required amount of investment into this factory is 1,647,318.800 Tug,
out which 906,047.000 Tug is working capital and 741,271.800 Tug are capital
INVESTMENT
expenditures. Capital expenditures include the 360,000 000 Tug for purchase and
renovation of property, and 212,811.800 Tug for building the sea-buckthorn and
other fruit growing plantation. Of the total investment amount of 1,647,318.800
Tug, 1,625,313.800 will be raised through a bank loan and 22,000.000 Tug will be
invested from own funds. The bank loan will bear an interest of 12% per annum
and is expected to be completely repaid in 6 years time. This factory will increase
its production along with the year over year growth in raw materials, thus allowing
increasing profits. For instance, in 2012 and 2013, the factory will work with net
profits of 1,084,332,445 Tug and 1,527,916,836 Tug respectively. The food factory
will produce products to the total amount of 1,624,655,556 Tug, 1,825,072,482
Tug, 2,951,009,404 Tug, and 3,483,274,289 Tug in 2009, 2010, 2011 and 2012
respectively. The aggregate sales volume for 2008-2013 will be 14,751,273,442
Tug.
The food factory will newly require 2 refrigerating cellars with a capacity of
20 tonnes, 2 2.5-ton refrigerator trucks for transporting fruits and raw materials, 1
fruit press, 1 seed/skin/juice separating machine, 1 automated juice bottling line, 1
vacuum fruit juice condensing equipment, 1 jam producing, bottling and cooling
COOPERATION line, 10 5-ton steel tanks for the storage of juice, 20 1-ton containers for the storage
of fruits, and 10 5-ton steam-and-water bath steel containers for storing fruit juice.
MODE Also, it is necessary to build and start a small furnace capable of producing 0.5
tonnes of steam per hour. For the garlic product facility, a new HGS-3 peeling
machine, KM-1 garlic splitting machine and KK-3 garlic sorting machines are
required.

Total Amount
№ Items Total Amount (Tug) (USD)
1 Sales Income 14 751 273 442 84 703 739 400
2 Own investment 22 000 000 3 000 000 000
3 Borrowed Funds 1 625 318 800 8 549 394 888
ECONOMIC 4 Total Costs 11 913 386 333 76 476 665 345
BENEFITS, 5 Loan repayments 1 742 561 744 8 549 394 889
6 Loan Interest Payments 531 481 332 2 537 745 382
INVESTMENT
7 Loan Outstanding 0
RECOVERY Total amount of loan payments
PERIOD 8 and interest payments 2 274 043 076 11 087 140 271
9 Profit before tax 3 476 128 579 15 602 659 344
1
0 Taxation 4 092 673 898 16 885 212 025
1
1 Income 392 532 011 2 891 256 918
P.O Box-211137 Ulaanbaatar Mongolia, Sukhbaatar District 5th horoo
CONTACT Budkhand namjilsuren: Mobile; 976-99-009181 , Tel; 976-11-635289, Fax; 976-
INFORMATION 11-635289
E-mail; ltsedendamba@yahoo.com
BRIEF INTRODUCTION ON THE TSAGAANNUUR
FREE TRADE ZONE /FTZ/

The reason for development of Tagaannuur free trade zone is to attract foreign and
domestic investors to the area in order to cooperate with international trade, support the
development and prosperity of travel and tourism with the aim to decrease unemployment and
poverty in the zone.
The zone is located in the North Western part of Mongolia and at 1700 km from
Ulaanbaatar, 65km from Bayan-Ulgii city centre 28 km from Russian borders entry point, the
zone is also found to be on the Euro-Asian international highway AN-32 and covers landscape of
708.4ha.

Environment and geographical landscape Service area of “Tsagaannuur” free trade


zone contains the west zone of Mongolia and as for nature it locates in Altai Tavan Bogd,
Kharkhiraa, Khankhukhii, Cinlkhem, the hottest temperature reaches + in the hollow of big lakes,
the coldest point is –60 in Tosontsengel soum of Zavkhan province. Zonal average is about + 20
–25. The combination of natural zone and range like High mountains of Otgontenger, the hollow
of big lake, Shargiin Gobi, is located at 800-3500 m high from the sea level, between the north
latitude 44-50 and the east longtitude 88-96, lenghtened fron the north to the south. Territory of
the west zone 41705.4 thousand hectare and it places 26.52% of the total territory of Mongolia.
Thence the pasture land is 35391.4 thousand hectare and plantation land is 110.9 thousand
hectare.
The total water reserve of the west zone is 7908 million cube meter and it places 22.9 %
of state whole.

Transport & Electricity from Russian border to Ulgii province there is a modest road and
is being improved to the international standards, the improvement activities have been started in
2005. Hereinafter to cooperate with concerning organisations regarding to construction of AN-4
road network which links Tsagaannuur at Russian border to Yaranta at Chinese border.
Tsagaannuur village now has a diesel power station and in 2008 the village is planned to
be connected to national grid with 35 kilo- bait- high voltage electricity.

Communication Tsagaannuur's post office has an automatic telephone station.


Administration of Tsagaannuur FTZ is cooperating with Bayan- Ulgii province’s post office
regarding to draw fibre cable and to connect with mobile network.

Customs customs new complex which is made up from 27 objects, 2.7 hectare square of
Ulaanbaishint that links with Tashant port of Russian Federation, costed by 3.0 billion tugrug,
equipped with modern techniques of customs inspection, that has got a capacity to check and
convey 80 trucks and buses, 20 cars, 400 passengers a day, floated on August 29, 2005. And it
became the beginning of the activities of plantation land is “Tsagaannuur” free trade zone.

Population As for the end of 2004 there are 312 families, 1626 people and 395 of
them are unemployment.
There are 284 pupils in 8 years secondary school. New center of Tsagaannuur village of
Nogoonnuur soum of Bayan-Ulgii province was built in 1985-1990. There are more than 20 big
buildings such as 8 years secondary school of 300 children, a school’s dormitory with 70 beds, a
hospital with 30 beds, a kindergarden of 50 children, a hot shower house, a post office, a cultural
center with 300 seats, a central heating stove, a hotel with 20 beds, a good storage, a petroleum
base that has a capacity of 6000 cube meter and a boundary military base.

The boundaries of the free zone initially involves western boundaries of Mongolia,
Altai republic of Russia, Xingjian republic of China then it will include some of Euro-Asian
countries such as Germany, Turkey , Kazakhstan, Russian Federation, South Korea, Singapore
and Mongolia (as a whole).
Western zone of Mongolia forms the 26.5% of landscape and 16.2% of population live in
the above zone.
Xingjian of China which has a bordered link with western zone has a population of about
20 million, Altai republic of Russia with Novosibirsk state have population of about 5 million.

Address:
Government Building # 11, J.Sambuu street ,
Chingeltei district, Ulaanbaatar, Mongolia
Å-mail: tsagaannuur.@mit.pmis.gov.mn
Web: www.tsagaannuur.mn
Tel:(976-11) 324026, 264026
Fax:(976-11) 324026.
CONTSTRUCTION OF THE PLANT PRODUCING FLOUR,
PROJECT TITLE,
“TSAGAANNUUR” FREE TRADE ZONE OF NOGOONNUUR SOUM
CAPACITY
OF BAYAN-ULGII PROVINCE.
Planned capacity per year 20000 tn, per day 72.7 tn

PROJECT GOAL, Improve flour supply not less than 30% to Western region.
Market satiety with good quality and low price flour of domestic
OBJECTIVES producers in further.

The project will be completed in "Tsagaannuur" free trade zone of


PROJECT VENUE
Nogoonnuur soum of Bayan-Ulgii province. The infrastructure including
transport ways, energy and communication will be constructed.

TOTAL INVESTMENT 420.0 million tugric

Joint-venture (equity), management expertise, market access, buy-back


COOPERATION MODE arrangement, technology transfer, Joint R&D, equipment purchase,
technical expertise, marketing expertise, sub contracting or others

ECONOMIC BENEFITS,
INVESTMENT RECOVERY 2 years
PERIOD
• To improve living standards of the regional population, create 24 new

EXPECTED RESULTS jobs


• To promote free trade zone's development
• Improve flour supply to Western regions
Government Building No.11, suite 1006,
CONTACT INFORMATION Tel (976-11) 324026
Fax (976-11) 324026
CONTSTRUCTION OF THE PLANT PRODUCING THERMAL
INSULATION WALL BLOCK,
PROJECT TITLE,
“TSAGAANNUUR” FREE TRADE ZONE OF NOGOONNUUR SOUM
CAPACITY
OF BAYAN-ULGII PROVINCE.
Planned capacity per year 3120 m3, per day 10.4m3

To supply with the thermal insulation wall blocks to buildings which will
PROJECT GOAL, be built in Tsagaannuur sum and Bayan-Ulgii province in accordance with
OBJECTIVES confirmed Government program "40000 house”
Securing employment, development of zone's activity
The project will be completed in "Tsagaannuur" free trade zone of
PROJECT VENUE Nogoonnuur soum of Bayan-Ulgii province. The infrastructure including
transport ways, energy and communication will be constructed.

TOTAL INVESTMENT 69,0 million tugric

Joint-venture (equity), management expertise , market access, buy-back


COOPERATION MODE arrangement, technology transfer, Joint R&D, equipment purchase,
technical expertise, marketing expertise, sub contracting or others
ECONOMIC BENEFITS,
INVESTMENT RECOVERY 2 years
PERIOD
• To supply with the thermal insulation wall blocks to buildings which
will be built in Tsagaannuur soum
• To supply with the heat insulating material to buildings which will be
EXPECTED RESULTS built in Bayan-Ulgii province
• To improve living standards of the regional population, create new
jobs
• To promote free trade zone's development

Government Building No.11, suite 1006,


CONTACT INFORMATION Tel (976-11) 324026
Fax (976-11) 324026

“Third Crop Rehabilitation National Campaign”


Duration: 2008-2010

One. Current situation of Crop Sector

1. The first and second crop rehabilitation campaigns were successfully introduced in 1959 and in
1976 respectively in Mongolia. As a result, entire size of arable land reached to 1.2 million
hectares and it opened new era for country’s crop development by reaching self-sufficiency in
wheat potatoes and vegetables. But due to many factors such as weather changes accelerated by
global warming, poor financial capacity of crop entities, lack of qualified staff, and reduction of
number of expert, currently, only 30.0 percent of entire arable land is used for cultivation by
producing 24.9% of domestically needed wheat, 47.0% of vegetables, and 86.0% of potatoes. In
addition, majority of agricultural machineries and equipment are now being used became
old/obsolete because of lack of maintenance and renovation over the last 18 years of transition.
Crop entities don’t always use fertilizers due to their limited financial capacity, accordingly there
have been negative impacts related to weed infestation and low soil fertility. Those impacts lead
to not only drought risk and decline in both productivity and quality of crop produce. There has
been energy shortage due to oil price increase at global market, and most developed countries
tend to their cultivated crops for bio-diesel production. Some wheat exporting countries face loss
of crop because of global warming; accordingly consumption of plant-origin products is
substantially increasing.

Two. Justification and demand to elaborate the program

2. Despite the increased demand on wheat and flour and sharp increase its price in the global
market, consumers and people from developed countries prefer to use safe ecologically clean
products. Considering the phenomenon, our country needs to mobilize its internal and external
resources of practical experiences and lessons from the past for restoring crop sub-sector.

It is necessary to implement SMART activities to achieve crop sub-sector goals set forth in the
‘State Agriculture Sector Policy’, approved by Decree No. 29 by the Parliament in 2003, and
‘Priority Directions of Economic and Social Development in 2008’. The Government announced
2008 a year of ‘Food Supply and Security’. In this scope, ‘Crop Rehabilitation Third National
Mobilization’ program for crop development is developed in order to ensure full self-
sustainability of Mongolia for wheat, potatoes and other main vegetable items.

Three. Principle for Program Implementation

3. Following are the guiding principles:


To preserve ecological balance;
To use modern technology and equipment;
To employ most efficient and cost-effective approaches;
To ensure full-fledged involvement of citizens and private enterprises.

Four. Program Goal and Objectives

4. The overall goal of the Program is to create favorable economic conditions and enabling
legal framework in crop sub-sector to increase production, and through this maintain
sustainable supply of safe food products to the population, eliminate import-dependence,
and intensify crop development.

5. The Program shall achieve following objectives:


To provide favorable economic conditions and enabling legal framework for crop production;
To strengthen human resources through capacity building of farmers, specialized staff
(vocational training), re-training, provide timely information;
To intensify crop production through introduction of modern technology and equipment;
To improve quality and supply of main crop cultivars seed;
To increase cultivation land area through rehabilitation of abandoned crop fields;

Five : Activities to be implemented under the campaign

- The law on making amendment into crop related legal laws will be drafted in
consideration of complex issues, related to supporting for the strategic production of
wheat.
- Crop production management and producers’ capability to run the crop production will
be streamlined and improved; long and short term training will be conducted for crop
producers.
- Production, training and research institutes, aimed to train crop farmers and to introduce
new techniques and technology will be supported
- Introduce state of the art technologies for protecting soil from wind erosion and
enhancing fertility.
- Renovate 70 – 80% of the Agricultural production techniques and establish economic
entity to provide technical service to family based crop producers.
- Survey on determining volume of the abandoned crop land, possible to be used again and
soil fertility will be conducted by the professional institutes and basing on this survey,
additionally, 230 thousand ha of abandoned land, suitable for the crop production will be
used for production purpose.
- The state will support activities of the economic entity, engaged in multiplying seed of
crop cereals, fodders and vegetables that are drought resistant, highly yielded in irrigated
and non-irrigated conditions.
- Volume of irrigated crop production area will reach 54.2 thousand ha by increasing it by
2 times.
- Introduce drop irrigation schemes and increase volume of the greenhouse production
- Support development of storage facilities.

Six : Management and implementation arrangements of the campaign

The Prime Minister will chair the National Council for the campaign implementation and the
Minister of Food and Agriculture will be the vice chairman of the Council. Members of the
Government cabinet Minister of Finance and Nature and Environment, Aimag Governors,
Directors of Government Agencies and Representatives of NGOs will be included into the
membership of the Council.

Ministry of Food and Agriculture will fulfill the duty of coordinating the campaign at the national
level and of providing professional management methodologies.
Seven : Expected results

49% of the flour needs will be met in 2008


67% - in 2009
100% -in 2010

58.3% of the vegetable needs will be met in 2008


80.4% - in 2009
100% - in 2010

Eight : The required funds

/by billion tugrugs/

Source of Year
funding 2008 2009 2010 Total
1. State budget 24.03 38.11 51.39 113.52
2. Economic 62.50 121.57 144.87 328.95
entity
3. Loan and 6.10 17.77 17.17 41.05
Assistance
Total 92.63 177.45 213.44 483.51
Project title: INTENSIFIED DAIRY FARM
FOR 50 BLACK AND WHITE COWS
Project duration: The project will be implemented during the period of 2009-2012

Implementing Ministry of Food and Agriculture and Selected private owned dairy farms
organization: and companies

The main In compliance with the regional concepts of Mongolia, to produce livestock
objective: products that can meet international standard and market demand and to
improve food security of the population by developing crop and livestock
integrated intensified farming system in Mongolia.

Project output: Nucleus herd of dairy cattle will be established. Breeding young bulls and
heifers will be reared and provided to interested farms and people including
an increase in their income and welfares, which are selected by productivity
and fertility will be used for further breeding

Economic calculation for building intensified farm with 50 dairy cows

Unit price Total


No Items Unit Quantity
(USD) (USD)
1 Outside yard of a farm m2 100 50.0 5000.0
2 Cow shed set 1 23 000.0 23 000.0
3 Water well Piece 1 6 000.0 6 000.0
Warehouse with a capacity of 200
4 Piece 1 7 000.0 7 000.0
tons of concentrated fodder
5 To purchase or import pure dairy cow head 50 2 000.0 100 000.0
6 Small scale fodder unit set 1 10 000.0 10 000.0
7 Fenced and irrigated forage field ha 50 440.0 22 000.0
8 Electricity supply 10 000.0
9 Milking apparatus set 10 600.0 6000.0
10 Milk freezer piece 1 2000.0 2000.0
Milk transporting track with a
11 piece 1 6000.0 6000.0
capacity of 2.5 ton
Small scale tractor with a capacity of
12 piece 2 5400.0 10 800.0
29 horse power
13 Hanging equipment for tractor set 1 3000.0 3000.0
14 House for farmer piece 1 15 000.0 15 000.0
Veterinary services and animal
15 Set 1 3 000.0 3 000.0
breeding unit
Total 228 000.0

Remark: An intensified farm with a capacity of 50 cows is required about 200.000 euros
Production output

No Name of products Total output of which for sale


Unit Total
Number Output per
price price
of animal unit
(USD) (USD)
1 Milk 45 6000 L 27 0000 L 0.4 108.000
Breeding young
2 15 1000 15 000
cows for sale
Breeding young
3 10 1000 10 000
bulls for sale
Fattening cattle with
4 the age of 18-24 8 400 3.2 ton 0.5 1600
months
Total 1346 00.0
PROJECT TITLE: ESTABLISHMENT OF NATIONAL REFERENCE
LABORATORY OF FOOD SECURITY

IMPLEMENTING AGENCY: MINISTRY OF FOOD AND AGRICULTURE

BUDGET: 3.151.685.000 US$

DURATION: from 01 January, 2010 to 01 January, 2015

Justification:

1. Food security control is directed only to ready-made products and there is lack of a
required laboratory for food security control, risk assessment, and taking appropriate
safety measures with exporting countries.
2. With aim to improve food supply, production and import of food products made by
untraditional ways and technique such as using chemical fertilizers and plant protection
chemicals in agricultural production and medicine and antibiotics in livestock, affecting
genes and changing innate property of raw materials using biotechnology, adding up
chemicals to improve appearance and to extend store period.
3. As shown in food statistics in 2007, Mongolia imports over 50% of main food products
of which only 40% is imported on the basis of sensual analysis by inspection officer at
border control ports.
4. Currently, 49 accredited laboratories conduct chemical, microbiological and sensual
standard analysis of food products and raw materials of which 5 provide service to the
mass but the others work at particular aimags or organizations. Due to capacity weakness
of food laboratories and personnel’s poor knowledge and skills, name and type of
analysis are very few and their result is uncertain.

Therefore, to protect the people’s health, it is vital to establish national reference independent
food laboratory which is equipped with high-sensitive devices and internationally

Total cost for the establishment of the lab is around Tg3.7 billion. The estimation is based on the
average costs for construction and transportation and relevant taxes; and some easily broken
items and reagents are calculated for one year consumption.

Calculation for funding


No Description Cost
(thous.tog)
1. Cost for the lab construction plan ( 5 – 10% of constrcution cost) 51.000
2. Supervising and confirming the construction plan and budget 20.000
3. Construction 710.000
4. Salary fund for before utilization 36.000
5. Equipment, tools and furnishing 1.400.405
6. Equipment transportation 17.610
7. Tax (15.5% of total equipment cost) 179.167.6
8. Equipment Installation and Adjustment (3-5% of equipment cost) 55.864
9. Reagents (for 1-2 years preservation) 44.483
10. Training for specialists 138.700
11. Drafting up legal documents and their approval 100.000
12. Purchasing report of the international accreditation 250.000
13. Purchasing methodology and program 200.000
14. Other 500.000
Total 3.703.230.1

Importance and Outcomes:

1. As result of having the internationally accepted laboratory, securty indicators for the food raw
materials and products will be fully determined and control on food production, importing and
exporting will be improved
2. Potential risks will be prevented and, thus possitive influence on the social health
3. The condition to solve dispute between reference laboratories and thier clients will be provided
4. Techinical barrier on trading will be reduced and food producers’ income from exporting will
increase
5. Based on the result of the lab examinations, research works will be conducted that creates on
opportunity to establish databases on safety standards.
6. Will have an opportunity to reveal the genetically modified foods, biological elements,
pathogenic microorganism and virus in a short period and contaminated food raw materials and
products with ray can be examnied.

MINISTRY OF FOOD AND AGRICULTURE


PROJECT TITLE: “Potato seed renovation for increasing domestic safety
potato production”
PROJECT
Ministry of Food and Agriculture
INITIATOR:
PROJECT Seed multiplying system was collapsed during the privatization. All registered potato
INTRODUCTION: varieties was more than 20 years old. Last 15 years until 2005, most of the farmers
almost did not renovate farm saved potato seed due to insufficient supply of healthy,
high quality seed. The average yield of potato decreased by 40% (8-9 t/ha) comparing
to average of 1980-90 (12 t/ha) due to low quality seed and old varieties. The national
potato production covered by 60-70% of domestic consumption and rest of demand
covered by imported potato mainly from China. Since 2005 SDC financed
Revitalization of Mongolian potato Sector’ Program for restructuring of potato seed
system and reorganized Nation wide potato seed system including informal seed
multipliers. After testing of new potato varieties, we registered 2 varieties such as
Impala and Vitara. But sources of high quality seeds of the new varieties not enough
to renovate farmers seed. Therefore MOFA requested to Government of Germany to
support for importing 1000 tons of elite seeds of Impala and Vitara varieties for the
farmers seed renovation through existing seed system.
PROJECT
2009-2011
DURATION:
PROJECT - Test and identify of new potato varieties
OBJECTIVES: - Renovation of the farm saved potato seed
- Improve the farmers storage facilities
PROJECT PHASE: phase I: Test and identify of new varieties originated from foreign countries
phase II: Renovate farm saved low quality potato seed by the registered new potato
varieties such as Vitara and Impala.
- 500 tons of elite seed from the each variety used for seed renovation through
existing potato seed system in the 2009
PROJECT BUDGET: 2 000 000 EURO

Budget breakdown
New varieties for testing 100 000 Euro
1500 tons of elite seed 1 050 000 Euro
Upgrading storage facilities 200 000 Euro
Training and study tour 100 000 Euro
Glasshouse equipped with aerophonic 200 000 Euro
facilities for mini-tuber production
Consultant and Monitoring 100 000 Euro
Irrigation equipments 250 000 Euro

TOTAL BUDGET: 2 000 000 EURO


Project name, Make a base research on identifying water supply resource of Ulaanbaatar city,
capacity develop underground water monitoring network
Project objective, Objective: To identify final extent of underground water resource contained in the
mission thick side of the accumulation of Tuul river, which is the source of water supply for
Ulaanbaatar city, and to build underground water monitoring network
Missions:
1. To do exploitation survey on identifying remaining amount of resource from
sources of pure water, that are being used for Ulaanbaatar city’s water supply
2. To perform rummage work on identifying new resources for places with a
possibility to identify resources
3. To generate underground water monitoring system that will control the outage and
pollution of water resources that are being exploited.
Area of project Tuv province territory, along the river Tuul
implementation:
Form of To collectively perform base research on identifying a resource, and to purchase
cooperation with monitoring network facilities
Foreign investor

Total amount of USD1,500,000


investment

Time frame on The population of Ulaanbaatar city, and its territorial industries will have a secure
paying back the source of water supply. Based on the results of resource research, the settlement of
economic benefit payment will be done after the exploitation building is constructed, which is in around
and investment 5-10 years

Expected results By defining the current situation and prospect of supplying process from underground
from the project water resource contained in the thick side of the accumulation of Tuul river, it will be
possible to plan the measurements on implementing the decisions about finding a way
to resolve the issue of Ulaanbaatar city’s pure water supply without wasting time.
Underground water monitoring network will provide reliable and correct information
about the resource and quality of underground water to decision makers and related
organizations.
Contact address Ministry of Environment. Officer in the Environmental and Natural resources
authority G.Tserendondov, Tel 267545, Fax 326616
Authority of Water. Director Ts.Badrakh, Tel/Fax 300074

Project name, Designing methods to perform biological rehabilitations on


capacity desolated areas in the procees of mining, between the years 2009-
2011
Project objective, To properly exercise the biological rehabilitation on desolated landscape
mission that is situated in the distinct zones of Mongolia’s timbered, prairie,
desert-like steppe, and to transmit results into production by creating
natural pasturage from agro ecosystem. By doing so, we are aimed at
designing methods to rehabilitate thousands of hectares desolated
pasturage, hence to make a research that will contribute greatly to the
country’s economy. Within the extent of these objectives, the missions
are:
1. To analyse the current situation of rehabilitation of mining
techniques, and also to perform land and water laboratory tests prior to
biological rehabilitation.
2.The act of planting perennial plants on 2 hectares field for each of the
Bayan-Ovoo sum (administrative unit next below the province) of
Bayankhongor province, Tsenkher sum of Arkhangai province, Zaamar
sum of Tuv province areas is to be divided into 3 types of experiments
on the 1 hectare irrigative field: enriched by homesteads, enriched by
biodecompositions, and non-enriched, and the other 1 hectare non-
irrigatve field is divided into 3 types of experiments that are: enriched
by homesteads, enriched by biodecompositions, and non-enriched,
totalling to 18 experiments to be performed.
3. To create field pattern of bioloigical rehabilitation for each of the
three environmental zones and regions.
4. To organize and promote conferences and training programs that are
exhibited by the outcome of the work
5. To warrant directions and standards of rehabilitations to be made on
the three environmental zones and regions that are desolated while in the
process of mining, and to report the results.
Area of project -2 hectare field of Bayan-Ovoo sum of Bayankhongor province
implementation -2 hectare field of Tsenkher sum of Arkhangai province
-2 hectare field of Zaamar sum of Tuv province
Form of We will train future biological rehabilitation professionals by
cooperation with including 6 masters’ students in the projects crew who will be working
Foreign investor on 6 fields, and enabling them to acquire experimental methods of the
research. Because this, in turn, has an advantage of creating staff that
will further implement into production the directions and standards
designed by themselves, there is an opportunity to do joint research
work with foreign professionals.
Within the framework of balancing the ecological scheme against
the global warming, air pollution, storms and other natural disasters, it is
necessary to cooperate and receive technical and technological support
from highly developed foreign countries with the purpose of healing
disengaged topsoil formed from the large fields desolated by mining.
Total amount of 240783.228 thousand tugrik
investment

Time frame on The land that is rehabilitated as a result of biological rehabilitation


paying back the project will increase the natural pasturage occupancy rate by certain
economic benefit amount, thus, the environmental balance is kept and ecological-
and investment economical appraisal is maximized when plants equably grow on the
land. Prior to starting biological rehabilitation, there will be strict control
on the technical rehabilitations like burying major holes created while
mining, flattenning lumps, and transforming the land into natural
condition to a certain extent by re-flattening. This, in turn, will have
crucial social benefits such as the safety of the living condition of the
locals, to peacefully fed the livestock on their homeland. As the
investement of this project is spent on scientific benefits, it is not
possible to be paid back.
Expected results If our recommended project is implemented, the results are as follows:
from the project 1. The research of experimental land’s situation prior to biological
rehabilitation is identified laboratory tests, and we will rate the current
condition.
2. Choose the production standard from the 18 versions of rehabilitation
experiments that includes reclamation of timbered, prairie, desert-like
steppe zones.
3. There will be model land for display and demonstration for each
field that has been biologically rehabilitated.
4. The technological directions for doing biological rehabilitation on the
mentioned zones is to be renewed.
5. A standard of rehabilitating and submitting fields that were used for
mining purposes will be set for each of the zones.
6. The rating will be done on the costs of biological rehabilitation work.
7. We will contribute to the improvement of people’s ecological
education, which are about the safe living condition of the people and
their livestock resulted from the research, and about what are the
chances of rehabilitating desolated areas.
Contact address University of Agriculture, Science Committee, Tel: 341770; Scientist
and secretary in the University of Natural Science
P. Ariunsuren, 99291991

Project name, To improve the monitoring ability of environmental pollution, and toxic
capacity chemical substances that remain in the environment. To perform chemical
analysis on 1500 environmental samples annually.
Project objective, Increase the monitoring ability of environmental /air, water, topsoil/ quality, and to
mission form conditions that will define particularly the contents of toxic chemical
substances’ remainders in the environment.
1. To facilitate with analytic equipments that will identify non-organic elements
and toxic organic combinations such as scented carbohydrates, petroleum
products, pesticide remainders and slow decomposing organic substances that are
in the air, water and topsoil samples.
2. To train laboratory staff about prefabricating samples, cleaning methods,
repair and service for the purpose of measuring air, water and topsoil samples by
highly sensitive analytic tools
Area of project Laboratories of natural and environmental research that are located in Ulaanbaatar
implementation city and centres of the province
Form of To supply analytic tools and equipments, to transmit advanced research technologies,
cooperation with and to conduct joint survey and research
Foreign investor
Total amount of USD1,500,000
investment

Time frame on Irreclaimable aid


paying back the
economic benefit
and investment
Expected results By implementing the project, performance of laboratories will be improved
from the project drastically, monitoring system of chemical remainder toxic substances will work
properly, and there will be reliable information about pesticide and other toxic
substance remainders that are used for agricultural purposes, about slow
decomposing organic substance and about the pollution of petroleum products.
Simultaneously, natural and environmental quality will be improved by bringing in
excellent management, right policy, and technologies that reduce pollution.
Contact address Ministry of Environment, Senior Officer in the Environmental and Natural resources
authority T.Bulgan, Tel: 267545, Fax: 326616, bnbn@magicnet.mn

Project name, capacity To conduct survey on plants’ spread and resources of Mongolia
with the aim of protecting Mongolia’s rare plants, and
identifying the resource.
Project objective, mission 2008-2009
To identify natural plants’ resources, to examine incurred harms and
injuries, to protect them, to adopt them appropriately, to rehabilitate,
and to create scientific evidence.
(Offers about the methods of identifying plant resources will be
originated resulting from organizing meetings and seminars with
research entities about protecting plants and identifying resources
of Mongolia)
2009-2012
1. To carefully determine Mongolia’s plants’ rare and beneficial
items, their classification, spread, and resource
2. The research results and information about scarce, non-
destroyable items to be inducted and accomplished into books and
booklets
3. To establish information fund of Mongolia’s rare plants
(plant_mongolia@gov.mn e-mail address of combined information
will be formed)
Area of project implementation All areas of Mongolia

Form of cooperation with foreign Financial, technical and technological support


investor

Total amount of investment USD1.000’000 (one million USD)

Time frame on paying back the Term of implemetation: 2008-2012


economic benefit and investment
Expected results from the project 1. There will be formed pleasant opportunity to protect extremely
rare and rare beneficial plants, their appropriate usage, to be
rehabilitated, and the ecological balance will be kept.
2. The link between the research and training, production that
focuses on protecting Mongolia’s plant cloak, and their appropriate
usage, will be imporved, and the results of research work will be
practiced.
Contact address Ministry of Environment, Officer in the Environmental and Natural
resources authority, Tel: 267545, 266528, info@mne.gov.mn

Project name, “To improve the control of air pollution and research network’s ability – to
capacity maximize ecological education of the public ”
- Air pollution is increasing every year and it has become one of the problematic
environmental issues in countryside, and other major cities. Information fund about
air pollutions will expand, and it becomes the main base for environmental policy
management by improving the air quality control and research ability in countryside
and some cities, and by increasing the air pollution indications. The air pollution is
increasing every year because of inappropriate human actions. By increasing the
citizens’ and organizations’ level of ecological education, they will participate
actively and responsibly in the environmental tendency, environmental protection
events, and realize their duties.
Project objective, 1. Basic policy, trend and objectives to reduce air pollution
mission Air pollution in the city is increasing intensively and has reached a dangerous level,
with the main reasons being: interrelated with centralization of the city’s population,
the usage of non-exploited raw anthracites for the low pressure steaming stokehold of
ger (Mongolian felt tent) households’ growth and heating, and for thermal electric
stations, as well as over-obsolete cars, and the low quality fuel used for those cars.
Likewise, for the reasons like geographic location, natural and meteorological
antipodal condition, air stagnancy in cold seasons, the rise of temperature inverse and
inexpedient town planning, the air pollution is increasing.
When people light up the fires during the winter seasons in our capital city, the
amount of sulphur dioxide, nitrogen dioxide, sulphuretted hydrogen and lead is below
the permitted level by 1.5-20 times, and in major cities like Darkhan, Erdenet and
Choibalsan the increase of air pollution is notable.
In connection with the above condition, we set the following missions in order to
improve air pollution’s control and research quality – to raise the ecological education
of citizens and entities.
2. Functions and missions to be exercized to reduce air pollution
- To increase the participation, duties and responsibilities of citizens, enterprises,
organizations, non-state organizations and the public.
- To increase the ecological education of citizens, enterprises, organizations and non-
state organizations.
- To enhance the staff capabilities and techinical appliances for air quality control-
research work.
- To organize the work of setting mobile laboratories of air quality research in the
major cities.
Area of project Administrating organization:
implementation - Ministry of Environment
Implementing organization:
- Air quality serivce
- Central laboratory of environmental research and metrology
- Educational organization
Form of Technology transfer, joint research work, supply of equipments, observe and
cooperation with exchange experience
foreign investor
Total amount of USD 1 million
investment
Time frame on Project implementation between the years 2009-2012
paying back the
economic benefit
and investment
Expected results 1. The united information fund ability, which is about the air quality control –
from the project research network quality and air pollution, will be improved
2. The ecological education level of citizens and enterprises will be improved.
3. Reduction of air pollution
Contact address Ministry of Environment, Ofiicer in the Environmental and Natural resources
authority S.Tumenjargal

III Government Building Tel: 976-51-267545


Baga Toiruu-44 E-mail: tumee_13@yahoo.com
Ulaanbaatar -11 Fax: 976-51-266528
Mongolia

Chemical Mongolia – national committe website in charge of managing toxic and


dangerous chemical substance policy issues, joint information fund and electronic
network of chemical substances.
Project name, 1. www.chemical-mongolia.org
capacity National committe website in charge of managing toxic and dangerous chemical
substance policy issues
2. www.chemical-mongolia.org/chemicals
Classification of chemical substances, informational electronic network
3. Electronic network of exchanging chemical information between the
organizations that provide state service.
By the internet network, it is possible to obtain the desired information from
anywhere and anytime in today’s informational period. There will be a national portal
website in Monoglia, that contains information about the chemical safety
implemented by the state, laws and regulations about chemical substances, works,
their current situation, news and information, information about the dangers of many
types of chemical substances that are widely consumed on international level, their
classification, information about laws and legal condition. The electronic network will
focus on refining the correlation of chemical substance management between state
owned organizations.
Project objective, As the industrial and mining sectors expanding, there is a swift increase in the amount
mission and assortment of chemical substances that is adopted in Mongolia. Within the
complex policy of environment and nature, stable development implemented by
government, it is highly beneficial to create appropriate adoption of chemical
substance, to accomplish laws and legal regulations as such that the chemicals can be
adopted without harming the environment and people’s health, as well as to improve
knowledge about chemical substance of the public. Currently, Mongolians are able
find news and information, act and enactments about the safety of chemical
substances only on the Ministry of Environment website. By implementing this
project, the following basic objectives will be accomplished:
1. To improve the state service that is provided to citizens and enterprises
2. To enhance the output of chemical substance classification system, and
implementation of laws and legal condition
3. To provide timely and correct knowledge, information to citizens
In order to reach the above objectives, the missions to be accomplished are:
1. To conduct a research on programme supply and information security
2. To build information and security system
3. To transfer information fund into electronic form and to launch it on the
internet
4. Promotion (website, information fund)
5. To set up united electronic network of chemical substance for organizations
providing state service
Area of project Ulaanbaatar city, Mongolia
implementation The information fund, network and website of national committee policy which is in
charge of regulation matters on toxic and dangerous chemical substances will be
located on the high speed internet server of an enterprise registered in Mongolia. As
the electronic information fund uses dynamic website form, it is possible to update the
information in due course. This will become the first information fund of chemical
substance in Mongolia, the website can be browsed free of charge by anyone, from
anywhere, and the information fund will be used for a certain fee by enterprises and
organizations that adopt chemical substances for production and service. This portal
server will be in both english and mongolian language.
Form of Financial and technological help and support
cooperation with
foreign investor
Total amount of USD 1 million
investment

Time frame on Project implementation between the years 2009-2015


paying back the
economic benefit
and investment
Expected results 1. The state service provided to citizens and enterprises will be quick and fast
from the project 2. Chemical substance classification system, the law and legal condition’s
implementation will be become more beneficial
3. Provide timely and correct knowledge, information to public
4. Creation of new workplace
5. Certain amount of positive influence on consolidating the interrelation
between state organizations
Contact address National committee in charge of toxic and dangerous chemical substance regulation
policies of the Prime Minister of Mongolia.
Personnel of National Committee Work B.Altangadas
Tel: 99010490, 266528
Fax: 976-51-266528
E-mail: altangadas@live.com

Project name, “To improve the potential of state administration organizations engaged in forest
capacity matters”. The project will be implemented from 1st of September, 2008 until 1st
of September, 2009.
Project objective, The responsibilty of protecting the environment, appropriate usage of its wealth,
mission rehabilitation process, state policy of supplying environmental balance, setting and
implementation of rules and regulations is legally entrusted to Ministry of
Environment, and controlling the procees of environment protection, appropriate
usage of its wealth, implementation of rehabilitation process, and the fulfilment of
rules and regulations is legally entrusted to province and sum (administrative unit
next below the province) administrations. This entrustment is consistent with
principles of prolonging the centralization, however, it is not fulfilled as there is no
professional forest organization structures in provinces to implement them.
We are aimed at creating implementing agency in charge of fulfilling the forest
wealth adoption, protection, rehabilitation matters on branch level, and supplying
forest enterprises with united policy, profession, methodology administrations, as well
as creating professional forest organizational structure and composition engaged in
providing professional service to enterprises and public on forest wealth adoption and
protection matters in provinces, implementing programs and management plans,
organizing policies and actions that are performed by province state administration
organizations.
Therefore, there is a rightly need for fast performance of the actions to be
implemented within the forest rules, and improvement of the new structure
capabilities of newly developing “Forest Authority”’. Hence, the missions are as
follows:
1. To analyze and summarize the Forest Authority’s structure and actions
2. To supply Forest Authority with technical and technological equipments
3. To train the Foreign Authority administration staff, and let them learm
foreign experience
4. The administration and officers of “Forest class” that will be developed in
provinces to be included in training and experience learning programs
5. To supply Forest classes with machines, technology and equipments
6. To hold meetings about the cooperations between Forest Authority, Forest
Classes and state administration organizations of provinces
Area of project Ministry of Environment’s Policy Regulation division will jointly implement the
implementation project with professional forest organization (forest classes) of provinces, capital city,
and provincial administration organizations.
Form of Transfer of new technologies, purchase of facilities and equipments, to cooperate on
cooperation with research work.
foreign investor
Total amount of USD150,400
investment
Time frame on
paying back the
economic benefit
and investment
Expected results By implementing the project, the Forest Authority’s administration becomes simple,
from the project fast, moreover, crucial significance will be created for effective implementation of
forest state policies, and clear results will occur on protecting the forest, its
appropriate usage, rehabilitation by the increased capability of provincial professional
forest organizations, and finally, the provincial administration itself will reach certain
growth on forest protection, appropriate usage and rehabilitation.
Contact address Ministry of Environment, Forest Policy Regulation division, Head of division
H.Ykhanbai,
Tel: 99282205, e-mail: ykhanbai@magicnet.mn,
Ministry of Environment, Forest Planning Bureau, Head of Bureau Ts.Batchuluun,
Tel: 99282400, e-mail: batchuluun@mne.gov.mn
Name of the project Reforming a machinery and a technology of the
precede treatment plant which saves the Tuul River
from a pollution of industrial factories’ waste water
Sector: Industry
Location: Ulaanbaatar city
Implementing organization: Ministry of Industry and Trade
Duration: 2008-2009

Background and necessity:

Because of there has not been made any reformation or reconstruction to the
techniques and technologies of the precede treatment plant of a tannery waste water, located
in Ulaanbaatar, since 1972, not only a lot of damage or breakdown has occurred regularly, but
also some facilities already stopped to operate. Regarding this abnormal situation, the Tuul
River and its environment have polluted so much that it reached to the point where the
standard for the drinking water of the population of the Ulaanbaatar city is in danger.
Also in the recent years, the Authority of Monitoring Organization has demanded to
solve the above mentioned problems as soon as possible and even warned to stop the
treatment plant’s operation if nothing would change. Therefore, it is clear to see that there is a
necessity to reform its technology and machineries.

Purpose and intention:

• To keep the Tuul River and its environment from a pollution such as waste
water and other trash
• To reform a machinery and a technology of the precede treatment plant of the
tannery
• To implement this project for 2 years

Activity:

The project proposal offering to the Government credit and grant aids within the
framework of Mongolian and Chinese economic cooperation.

Benefits:

The most important and expected result of the project is that by having a capability of
cleaning 10 thousand square meter waste water everyday, not only it would show some
positive effect to the technology of the treatment plant, but there would be some benefits in
terms of economic and ecological way, such as keeping the Tuul River from pollution and
providing a normal activity of a tannery.

Cost of the project:


Total estimated cost is 6,5 million USD.

Project “40,000 HOUSING”


name
Preamble o The purpose of the “40,000 Housing” Program is to implement the objectives
of the Government Action Plan on upgrading the living conditions of
citizens by providing them with sustainable employment and adequate
housing.
o Program implementation will result in improved employment opportunities,
living standards, housing supply, and improved housing affordability by the
population, which will lead to a positive social mentality and will spur
communities’ motivation to work.
Project ~ About 54 per cent of the country’s population is aged under 25. As of 2003,
basis: there were 263,300 youth aged 15-19 in the country. Those young people
will reach labor age by 2005-2010. This will contribute to a sharp increase
in the country’s housing demand. Developing a proactive policy for
addressing this demand is not only closely related to the long-term vision of
the Government but an improved housing supply will also have positive
impacts on the sustainability of families and the society as a whole.
~ In general, such factors as the legal environment for housing, adequate tax
regulations, the mortgage lending system, state budget expenditure, and the
state audit system have a significant impact on the housing policies of
every country. The purpose of the “40,000 Housing” Program is to develop
an overall housing policy considering international practices and specific
current social challenges, thereby improving the living conditions of the
population and contributing to the country’s development in the long term.
~ Thus, current circumstances require alleviating poverty and ensuring a
sustainable livelihood for the population by undertaking a set of such
measures to increase the number of households with access to adequate
housing, reducing the price per unit of floor area, and increasing
employment generation. The proposed “40,000 Housing” Program will
identify overall policies for addressing the above issues and will make
construction one of the priority sectors of the Mongolian economy.

Project The project aims to improve the living conditions of the population and
goals: contributing to the country’s development in the long term.
Requested 600,0 million USD
amount:

Project name: BUILDING OF 1200 APPARTMENTS IN THE XXII


MICRODISTRICT IN THE FRAME OF “40 HOUSING”
Implementing Construction Technology College
organisation:
Project purpose: • To apply teaching staff of professional schools in Ulaanbaatar
within the program of the Mongolian Government to build
40000 apartments
• The future owners of the apartments will be able to finance the
apartments by a loan from the government within the program
of Mongolian Government to build 40000 apartments
• To build the first micro district of apartment buildings with an
independent infrastructure not depending on the centralized
heating system in Ulaanbaatar
• To help sharing in solving the airpollution in Ulaanbaatar
Posibility of • The project to build 40000 apartments was approved within
implementing the Government program of Mongolia.\
project: • In according to finance the apartments, the government
realized a bonus and cooperation was established to finance the
apartments.
• A general plan to build infrastructure and use a land was
approved according to build the apartments.
• The Construction Technological College established an
agreement to build 400 apartments for 5 years on the base of
taken right of implementing organization for the “40000
apartments program” and gotten accredit or guarantee of the
Government.
• Within the “40000 apartments program”, the college is
included in the list of those organizations which will be
financed and in financing budget from the government after
building 400 apartments .
• General plan of building 400-1200 apartments, architecture
drawing and design of the buildings which will be built on the
50000 m2 square of our ownership place were confirmed by all
concerning organizations.
Place of The first horoo (the smallest administration unit), 22 km from the
implementing central point of UB
project:
Project term: 60 months
Project volume: 400-1200 apartments are planed to build.

Calculation of project financing profit

Number of Square m2 Total of Expenditure All expenditure All income of Total


apartments for a square of one m2 expenditure of one m2 selling profit
family m2 square $ square to $ $
sell $
3 1200 64 76 800 300 23 040 000 350 26 880 000 3 840 000
2 800 64 51 200 300 15 360 000 350 17 920 000 2 560 000
1 400 64 25 600 300 7 680 000 350 8 960 000 1 280 000
Short substance down of all works and services which will be financed
Planed works and services Measuring Number Expenditure for 1 m2 Total of Term
unit square expenditure
1 Work out a drawing and project м2 25 600 6,0 153600
2 Temporary building and external COM 22 1728,0 38016
guard
3 Assembling work м2 25 600 150,0 3840000
4 External engineering network У/М 1600 176,7 282720
5 Internal engineering network COM 22 12672,0 278784
6 Internal and external decoration м2 78408 12,0 940896
work
7 Works of external road and м2 24400 25,0 610000
square, garden
8 Work and service to present to м2 25600 60,0 1536000
the Government
9 Selling work and service COM 22

Explanation: Above direct financial profit will be created with implementing the project and
a infrastructure in the micro district will be a property of the project initiator or implementer
and a possibility will be completed to find regular income.

Assignment:

Expenditure source under implementing the project will be assignment bond of building
40 000 apartments or others loans, foreign investment.

Guarantee:

The guaranty which as equal to definite per cent of assignment will be made with following
forms in case of that expenditure source under implementing the project will be foreign
investment or bank loan. There are:
• Enclosed a copy of governor’s permission of Songino-Hairhan district on the 1st of
January. 2005 on 50000 m2 of place (land) to be used to build apartments for 15
years.
• Accredit or guarantee of the Government
• Agreement on an assignment after building apartments
• Decision of Construction Technological College’s founder and concerning other
documents

№ Collecting materials Explanation


Official address of enterprise: Songino-Hairhan district, 21st micro district, 5th horoo
Post office, telephone number, fax and (the smallest administration unit), Construction
e-mail Technological College, Ulaanbaatar-37, Mongolia, Post
office -37/108
1
Telephone: 976-11-634473
Fax: 976-11-634071
Е-mail: gankhuyag@gmail.com
http;//www.ctc.edu.mn
Copy of state registered certificate 2004/02
2
Enclosed
Copy of a certificate of special 183
3
permission Enclosed
4 About Copy of the decision on Enclosed a copy of governor’s permission of Songino-
suggested a place for the Hairhan district on the 1st of January. 2005 on 50000 m2
apartments of place (land) to be used to build apartments for 15
years.
Confirmed drawing and A drawing of Construction Technological College was
5 apartments to budget with apartment confirmed by a faculty of drawing – architecture
assurance expert Enclosed material.
(ratification) A permission to begin a A request was made to appropriate level organization
6
building apartments
Suggesting price for 1 Price for 1 m2 square: 300-350 $
7 m2 square of the
apartment /$/
Definition of concerning judge on a
8 No
disputation
9 Definition of jurisdiction tax service Enclosed
10 Insurance certificate Enclosed
11 Account and balance of 2005 Enclosed
12 Introduction of organization Enclosed
Enclosed: introducing photo, computer graphics , AKT
13 Others
of the apartments
14 Official letter Enclosed

15 Property source From a budget of the “40 000 apartments” program


Project PROJECT OF BUILDING MATERIAL LABORATORY
title: CONSTRUCTION OF FACILITIES
Applicant: Government of Mongolia, Ministry of Construction and Urban Development,

Sector Grant
Project Water supply and Sanitation Sector
type:
Type of loan
finance
Requested 0.9 million USD
amount:
Target site: Construction sector
Project The piped water supply for Ulaanbaatar city using groundwater which has
basis: 240,000 m3/day capacity for water supply as end of 2006. But this 240,000
m3/day is estimated to meet the water demand of 2011 year due to increasing
a population continuously. The development and improvement of the water
supply for Ulaanbaatar city would contribute to the socioeconomic
development of these strategically important capital city of Mongolia, and
turn to the more balanced development of the national land sicio-economy.
Project To improve the water supply services for citizen in Ulaanbaatar ccity
goals: including the Ger areas through: development of new water source for safe
drinking water with disinfection.
To contribute to the improvement of financial conditions of the Water supply
of Ulaanbaatar city through the reduction of operation and maintenance costs
with the new facilities.
Contact Ministry of Construction and Urban Development,
address: Barilgachdiin talbai 3
Ulaambaatar 211238, Mongolia
Telephone: 976-11-263188
Fax: 976-11-322904
Web-site: mcud.pmis.mn
e-mail: webmaster@mcud.gov.mn
Project DARKHAN CITY WATER SUPPLY DEVELOPMENT AND
title: IMPROVEMENT PROJECT
Applicant: Government of Mongolia, Ministry of Construction and Urban Development,

Sector Grant
Project Construction of facilities with provision of necessary equipment
type:
Type of grant
finance
Requested 7.8 million USD
amount
:
Target site: Darkhan province, Darkhan city, Mongolia
Project Darkhan city is located at the northern local area, close to the border with
basis: Russia. And strategically important for the socioeconomic development of
Mongolia. Darkhan city is the industrial center of the Darkhan province with
food processing, construction materials, mines industry and other light
industries. The water demand is expected to increase as more industrial
industries are schedule to be located in the city, eventually resulting in
increase of the population.
The piped water supply for Darkhan city using groundwater suffers from
trouble with its chlorination equipment as well as treatment facilities in
general. Old water pumps cannot be renewed due to limited financial area.
The water supply systems for Darkhan city cover some 60% of the urban
population in Darkhan.
Project To improve the water supply services for people in the city including the ger
goals: areas through: renewal of old and overage facilities, installation of water
meters, and improvement of water quality for safe drinking water with
chlorination and reduction of rust and other problems.
To contribute to the improvement of financial conditions of the water supply
and Sewerage Public Corporation of DArkhan city through the reduction of
operation and maintenance costs with the installation of more water meters;
To support the upgrading of technical skills for water quality management
and other works by training with renewed water quality test and other
equipmet, and the institutional and organizational development for better
operation and menegement of the respective water supply and sewerage
systems.
Contact Ministry of Construction and Urban Development,
address: Barilgachdiin talbai3
Ulaambaatar 211238, Mongolia
Telephone: 976-11-263188
Fax: 976-11-322904
Project SUKHBAATAR CITY AND ALTANBULAG SUM OF THE SELENGE
title: PROVINCE WATER SUPPLY SYSTEM DEVELOPMENT AND
IMPROVEMENT
Applicant: Government of Mongolia, Ministry of Construction and Urban Development,

Sector Grant
Project Water supply and sanitation sector
type:
Type of grant
finance
Requested 17.6 mln USD
amoun
t:
Target site: Selenge province, Sukhbaatar city, Altanbulag sum, Mongolia
Project The water supply systems for Sukhbaatar city needs new chlorination
basis: equipment especially as the quality of the grant water is degraded with
increasing ammonia contents. The water supply system for Altanbulag sum is
now operated under its capacity as one of three wells is out of order and the
pipe for an elevated water tank has been broken down depriving some 800
households from water supply. The water supply systems for three cities
cover some 50% in Sukhbaatar, (including the Ger area), and 45% in
Altanbulag.
The two places are located to the north of the capital city, close to the border
with Russia, and strategically important for the socioeconomic development
of Mongolia. Sukhbaatar city of the Selenge province is located on the border
with Russia, and expected to develop as a fee economic trade zone.
The development and improvement of the water supply system for the two
palces are critiacally important for the balanced socioeconomic development
of Mongolia.

Project To improve the water supply services for people in the two places including
goals: the Ger areas through: renewal of old and overage facilities, installation of
water meters, and improvement of water quality for safe drinking water with
chlorination and reduction of rust and other problems.
Contact Ministry of Construction and Urban Development,
address Barilgachdiin talbai3
: Ulaambaatar 211238, Mongolia
Telephone: 976-11-263188
Fax: 976-11-322904
Web-site: mcud.pmis.mn
e-mail: webmaster@mcud.gov.mn
Project ULAANBAATAR WATER SUPPLY DEVELOPMENT IN GACHUURT
title:
Applicant: Government of Mongolia, Ministry of Construction and Urban Development,

Sector Grant
Project Water supply and Sanitation Sector
type:
Type of grant
finance
Requested 21.7 mln USD
amount:
Target site: Capital city of Mongolia, Ulaanbaatar
Project The piped water supply for Ulaanbaatar city using groundwater which has
basis: 240,000 m3/day capacity for water supply as end of 2006. But this 240,000
m3/day is estimated to meet the water demand of 2011 year due to increasing
a population continuously. The development and improvement of the water
supply for Ulaanbaatar city would contribute to the socioeconomic
development of these strategically important capital city of Mongolia, and
turn to the more balanced development of the national land sicio-economy.
Project To improve the water supply services for citizen in Ulaanbaatar ccity
goals: including the Ger areas through: development of new water source for safe
drinking water with disinfection.
To contribute to the improvement of financial conditions of the Water supply
of Ulaanbaatar city through the reduction of operation and maintenance costs
with the new facilities.
Contact Ministry of Construction and Urban Development,
address: Barilgachdiin talbai 3
Ulaambaatar 211238, Mongolia
Telephone: 976-11-263188
Fax: 976-11-322904
Web-site: mcud.pmis.mn
e-mail: webmaster@mcud.gov.mn
Name: “PROJECT WATER SUPPLY AND GARANTEES CITIZENS’ RIGHTS
TO HEALTHY ENVIRONMENT”
Applicant: Ministry of Construction and Urban Development, the Government of
Mongolia
Type of Private and other Investment
finance:
Sector: Water supply and sanitation
Project all type of project
type:
Target site: Mongolian cities and suburbs of cities
Project Reception of qualitative water in enough one of fundamental rights of the
basis: human given to him both a nature and the state. Water has been identified as
the divisive factor for urban and rural disparity in the 2003 National human
development Report. The government of Mongolia stresses the importance of
issues on water and sanitation, and human settlement by demonstrating its
efforts to mainstream the global targets into national development policies and
strategies Economic Growth Support and Poverty Reduction Strategy, and
Action Plans.
Project The project aims is adopting the MDG targets as the Government’s mid-term
goals: strategic goal of increasing the coverage of improved water sources to 80%,
and improved sanitation services to 62% of the population by 2015 against the
1990 baseline average.
The purpose can be achieved in 3 basic directions
1. Expansion of area of water supply system and sanitation
2. Improving sustainability and affordability of water management systems
3. Involving both private and other investments, establishing community-based
service and increasing of workplaces

Requested 874.038.956 USD


amount:
Project PROJECT FOR WATER SUPPLY OF ERDENET CITY
title:
Applicant: Government of Mongolia, Ministry of Construction and Urban Development,

Sector Grant
Project Construction of facilities with provision of necessary equipment
type:
Type of grant
finance
Requested 17.6 mln USD
amount:
Target site: Orkhon province, Erdenet city, Mongolia
Project In the case of erdenet, as is described later on, the municipal water supply
basis: services distributes water to citizens based on receipt of between 17,000-
25,000 m3/day of water from the industrial water system on the Erdenet
Mining Company. However, the level of water supply is unable because
water supply to the city has been reduced and the company has raised the
water rate.
Service interruptions sometimes occur during water demand times, thereby
having a major impact on the everyday lives of citizens. Moreover, due to the
deteriorated state of facilities, frequent rehabilitation works are necessary and
the resulting costs place additional pressure on the waterworks budget. Water
authorities in all cities household accounts, the tariff increase are not being
widely accepted. In the case of Erdenet, the rate population increase.
Project The project aims to newly develop the city water facilities of Erdenet.
goals: Bacause the city water utility of Erdenet was originally operated in
combination with the industrial water supply of the state enterprise Erdenet
Mining, the financial burden of the city water utility was light.
Contact Ministry of Construction and Urban Development,
address: Barilgachdiin talbai3
Ulaanbaatar 211238, Mongolia
Telephone: 976-11-263188
Fax: 976-11-322904
Project title: REST AREA DEVELOPMENT

Project background: Main tourism destinations locate far from each other and it is
reachable by automobiles. This project aims to setting up model rest
areas throughout auto roads from Ulaanbaatar to Rashaant of Bulgan
province.
Project outline: Modern restaurants, rest rooms and comfortable rooms for any ones
need to take rest while they are traveling. Establishment of
petroleum station, water supply, electricity supply and other
infrastructure elements.
Market orientation There is not yet any infrastructure developed between towns and
and market analyses, provinces for these who are traveling. Tourists and tour companies
market survey are compiling necessity of rest area.

Cooperation mode: Private


Total investment: 150 000USD
Requested 150 000USD
investment from
foreign partners:
Project venue, Next to the auto road of Ulaanbaatar and Rashaant of Bulgan
construction venue: provinve
Occupation area and 1 km.sq
construction area:
Estimated economic Annually 100 000USD revenue
benefit:
Estimated 50% per year
investment profit
rate:
Investment recovery 3 years
period:
Introduction the mongolian partner
Enterprise name: Tourism Department
Ownership: State organisation
Enterprise outline: Travel and tourism
CONTACT
Address: United nations street-5/2
Telephone: 318493 /311102
Fax: 310612
E-mail: info@mongoliatourism.gov.mn
Web-site: www.mongoliatourism.gov.mn

S-ar putea să vă placă și