To: LISCO, Misurata Date: 16 th october 2007

Ref. No. CTC-LIM-11MT-L0013


Attn: Mr. Abdusalam Elkaloush,
Project Manager cc: abdulmalik@libyansteel.com
asp_project@libyansteel.com cc: gtechmng@libyansteel.com
cc: mang_proj@libyansteel.com
From: CATIC, Shanghai cc: util_mwgs@libyansteel.com
cc: dastur@lttnet.net
Ms. Tracy Yeh cc: Prasanta.G@dasturco.in
Project Manager Assistant cc: zhoulianbing@gmail.com
tracy51911301@gmail.com cc: loveqiaolinger@gmail.com

Re: LISCO - 250 TPD Air Separation Plant

Dear Mr. Abdusalam Elkaloush,

This has reference to your letter No. LIM-CTC-11MT-L0016 dated on


9 th October 2007.

1. Please find the Inspection Schedule in the attachment. And this


Inspection Schedule includes all the equipment which will be
inspected by LISCO/DEI engineers, means the equipment indicated
with “0” in the FM-I and FM-II and the equipment which indicated
with “*” are not included.

2. Electrical/instrumentation items have been added into the


Inspection Schedule.

3. The inspection period for equipment in China will be controlled


within one week. There are one or two days for the equipment in
one place. Please find details in the Inspection Schedule.

4. Please be noted that the inspection time in the Schedule is


approximate, and may be changed according to the plan of our sub
venders. Because they can not provide the exactly date now.

5. Please give us the information of LISCO/DEI engineers who will


attend the inspection both in China and outside of China (Europe
and U.S.) as below:
Name:
Nationality:
Date of Birth:
Passport Number:
Name of Company:
Position:

Please provide to us ASAP to open Invitation Letter for you.

6. Project Manager, Charles Chan, will apply the visa at the end of
October. Please be noted that he’s possible to be rejected.

Thanking you,

Yours truly,

Tracy Yeh
Project Manager Assistant