PROFORMA

I Area statement

1. Area of plot
a) Area of reservation in plot = 294.45 SQ.M
b) Area of road set back = 471.71 SQ.M
c) Area of DP road = 2735.44 SQ.M

2. Deductions for
A) For reservation/road area
a) Road set back area to be handed over = 0
b) Proposed DP road to be handed over = 1367.72 SQ.M
c) i) Reservation area to be handed over = 0
ii) Reservation area to be handed over as per AR = 0

B) For amenity area


a) Area of amenity plot/plots to be handed over as per DCR 14(A) = 5% = 209.14 SQ.M
b) Area of amenity plot/plots to be handed over as per DCR 14(B) = 0
c) Area of amenity plot/plots to be handed over as per DCR 35 = 0

C) Deductions for existing BUA to be retained if any/ land component of existing BUA as
per regulation under which the development was allowed = 294.45 SQ.M

3. Total deductions = 504.41 SQ.M


4. Balance area of plot = 3694.85
5. Plot area under development after areas to be handed over to MCGM/appropriate authority
as per Sr.no.4 above = 0
6. Zonal (basic) FSI = 1
7. Built up area as per Zonal (basic) FSI = 4199.265 SQ.M
8. Built up equal to area of land handed over as per regulation 30A = 0
9. Built up area in lieu of cost of construction of built up amenity to be handed over (within the
limit of permissible BUA on remaining plot) =0
10. Built up area due to additional FSI on payment of premium as per table no.12 of regulation
no 30(A) on remaining/balance plot =2099.63 SQ.M
11. Built up area due to admissible TDR as per table no.12 of regulation no 30(A) and 32 on
remaining/balance plot = 3779.33 SQ.M
12. Permissible built up area = 10078.236 SQ.M
13. Proposed built up area = 10078.236 SQ.M
14. TDR generated if any as per regulation 30(A) and 32 = 0.9
15. Fungible/compensatory area as per regulation No 31(3)
a) i) Permissible fungible compensatory area for rehab component without charging
premium = 35% = 1479.87 SQ.M
ii) Fungible compensatory area availed for rehab component without charging premium
= 1479.87 SQ.M
b) i) Permissible fungible compensatory area by charging premium = 0
ii) Fungible compensatory area availed on payment of premium = 0
16. Total built up area proposed including fungible compensatory area = 11558.106 SQ.M

17. FSI consumed on net plot


II) Other requirements
A) Reservation/Designation
a) Name of reservation = FOR AXIS
b) Area of reservation affecting the plot = 294.45 SQ.M
c) Area of reservation land to be handed/handed over as per Regulation No.17
=0
d) Built up area of amenity to be handed over as per regulation no 17 = 0
e) Area/built up area of designation = 0
B) Plot area/built up amenity to be handed over as per regulation no
i) 14(A) = 209.14 SQ.M
ii) 14(B) = 0
iii) 15 = 0
C) Requirement of recreational open space in layout/plot as per regulation no. 27
= 627.44 SQ.M
D) Tenement statement
i) Proposed built up area = 11558.106 SQ.M
ii) Less deduction of non-residential area = 0
iii) Area available for tenements= 4228.2 SQ.M
iv) Tenements permissible= 63
v) Total no of tenements proposed on the plot = 63
E) Parking statement
i) Parking required by regulations for –
Car scooter/motor cycle outsiders
ii) Covered garage permissible
iii) Covered garage proposed car
Scooter/motor cycle outsider
iv) Total parking provided
F) Transport/vehicles parking
i) Spaces for transport vehicle parking required by regulations
ii) Total no of transport vehicle parking spaces provided