Sunteți pe pagina 1din 1

Document No: KURDISTAN PETROCHEMICAL COMPANY Page: 1/2

Rev: Area:
Date:
Inspection Plan Plant:

Sketch:

General Data Access for Maintanance&Inspection


Equipment Tag: V 1801 Insulation:
Equipment Title: Access to Internal:

Function: Repair needs:

Equipment Type: No: Size:


No & Size of Manway:
Refference PID: Refference PFD:
NEC Drawing No:
Test Data
Manufacturer: Year of build:
Test Pressure:
Design Data
Test Tempreture:
Design Code: Year Edition: Test Floid:
Head Type: Joint Efficiency:
PSV& Rupture Disks
Head Thickness: Head C.A: Head RT:
Head Material: S Allowable: PWHT: PSV Type:
Shell Inside diameter: Joint Efficiency: PSV No:
Shell Thickness: Shell C.A: Shell RT: Due Date:
Shell Material: S Allowable: PWHT: Rupture Disk No:
Cladding/Lining: Type: Cladd PWHT:
Inspection Intervals
Internal Coating: Type:
Support Type: Last InspectionDate:
DF: DT: MAWP: MOP: Half life based of last inspection
MDMT: Operation Temp. Between: and Next Inspection Date:
Previously repairs
row date Description row date Description

1 7

2 8

3 9

4 10

5 11

6 12