PLANT OWNER P ROJECT : CONSULTANT

CENTRALIZED FOAM SYSTEM

inch. ½ ¾ 1 1¼ 1½ 2 2½ 3 4 6 8
SIZE
mm NB 15 20 25 32 40 50 65 80 100 150 200
MATERIAL ASTM A 312 TP 304
END PLAIN BEVEL
PIPES PIPE TO PIPE JOINT SW BW
SCHEDULE SCH 40 SCH 10
DIM STD. ASME B 36.19
MATERIAL ASTM A 182 ASTM A 403-GR.WP 304-S
END GR F 304 BW
FITTINGS
SCH 3000 # SCH 40
DIM STD. ASME B 16.11 ASME B 16.9
MATERIAL ASTM A 182 GR. F 304
TYPE SW SO-RF SERRATED FINISH
FLANGES
RATING 150 #
DIM STD. ASME B 16.5
MATERIAL ASTM A 182 GR. F 304
BLIND TYPE RF SERRATED FINISH
FLANGES SCH 150 #
DIM STD. ASME B 16.5
MATERIAL ASTM A 182, GR F304
SPT. TYPE RF
FLANGES SCH 150 #
DIM STD. ASME B 16.48
TYPE STUD
STUD / BOLT
BOLT / SS
MATERIAL
STUD &
NUT NUT MATERIAL SS

DIM STD. STUD TO ASME B 16.5, NUTS TO ASME B 18.2.2 HEAVY HEX.
MATERIAL SS 316 + GRAFIL + 1 RING
TYPE SPIRAL WOUND
GASKET THICKNESS AS REQUIRED
FLANGE RATING 150 #
DIM STD. ASME B 16.20
END
SW FLG
GATE CONN.
VALVE SRE
N/A N/A
STD
END
SW FLG
GLOBE CONN.
VALVE
STD BS 5352 BS 1873
VALVES END
SW FLG
CHECK CONN.
VALVE
STD BS 5352 BS 1868

END
SW FLG
CONN.
BALL VALVE
STD BS 5351 BS 5351

DOCUMENT DATA SHEET FOR FOR SS PIPE DOC. NO. CXXX-S-DP-701 SHEET NO.
TITLE 1 of 2
PLANT OWNER P ROJECT : CONSULTANT
CENTRALIZED FOAM SYSTEM

B : TEE
W : WELDOLET
H : HALF COUPLING
P : STUB IN / OUT

BRANCH TABLE
18 450 B
16 400 P B
14 350 P P B
12 300 P P P B
10 250 P P P P B
8 200 P P P P P B
6 150 P P P P P P B
4 100 P P P P P P P B
3 80 P P P P P P P P B
2½ 65 P P P P P P P P P B
2 50 P P P P P P P P P P B
1½ 40 H H H H H H H B B B B B
1¼ 32 H H H H H H H H B B B B B
1 25 H H H H H H H H H B H B B B
¾ 20 H H H H H H H H H H H B B B B
½ 15 H H H H H H H H H H H B B B B B
mm 450 400 350 300 250 200 150 100 80 65 50 40 32 25 20 15
2 1 1
Inch. 18 16 14 12 10 8 6 4 3 2 1 ¾ ½
½ ½ ¼
RUN PIPE

TEMPERATURE (Deg.C) AND PRESSURE (Kg/cm2 g) RATINGS

TEMP (-)29 38 93 149 204 260 316 343

PRESSURE 50.5 50.5 42.18 37.96 34.8 32.69 30.58 30.23

SERVICE FOAM CONCENTRATE


NOTES
1.0 NDT REQUIREMENTS AS PER STANDARD

2.0 IMPACT TESTING REQUIRED AS PER ASME B 31.3 AND ASTM A 370

3.0 INSTRUMENT CONNECTION SHALL BE FLANGED

4.0 MAINTENANCE JOINTS ARE TO BE FLANGED AND MINIMUM

FUTURE EXTENSION PROVISION TO BE FLANGED WITH VALVES PROVIDED (TO BE KEPT CLOSED) ALONG WITH
5.0
BLIND FLANGES PROPERTY BOLTED TO FACILITATE FUTURE EXTENSION WITHOUT TAKING SHUT DOWN.

6.0 WALL THICKNESS CALCULATION TO BE SUBMITTED CONSIDERING CORROSION ALLOWANCE OF 1.5 MM

7.0 VALVE SHALL HAVE EXTENDED BONNET, IF PIPELINE IS INSULATED