Sunteți pe pagina 1din 6

Installation Instruction

EPP-1718-10/09

Raychem
Screened Separable
Connector 800 A for Bushing
Profile “C”
in Accordance to EN 50181,
and Single Core Polymeric
Insulated Cable up to
36 (42) kV

Typ: RSTI-68xx

Safety Warning:
It is essential to observe the
applicable safety regulations
for working with high voltage
equipment.
For precise safety information
please contact the responsible
authority.

Tyco Electronics Raychem GmbH


Energy Division
Finsinger Feld 1
85521 Ottobrunn/Germany
0049-89-6089-0 tel
0049-89-6096-345 fax
http://energy.tycoelectronics.com
Before Starting
Check to ensure that the kit you are going to use fits the cable.
Refer to the kit label and the title of the installation instruction.
Components or working steps may have been improved since you last installed this product.
Carefully read and follow the steps in the installation instruction.

Kit Content

4 8 13

1 5 9 Assembly
Lubricant 14

6 10 15

2
7 11 16

3 12 17

1 3 x Connector body 4 3 x Covering cap 8 3 x Threaded pin M16 13 3 x Screen cable lug
2 3 x Back plug 5 3 x Stress cone 9 1 x Assembly lubricant 14 3 x Wave type washer
3 3 x Gloves 6 3 x Main cable lug 10 1 x PVC tape 15 3 x Nut M16
7 1 x Binding wire 11 3 x Cable lug (16 + 25) 16 3 x Protective bag
12 1 x String 17 3 x Sealing tape (grey)

Table 1
Cross Section Ø Core Insulation Reference No.
36 (42) kV
mm2 min max Al Cu
50 RSTI-6811 RSTI-6821
70 RSTI-6812 RSTI-6822
22.4 - 35.5
95 RSTI-6813 RSTI-6823
120 RSTI-6814 RSTI-6824
150 RSTI-6815 RSTI-6825
185 RSTI-6816 RSTI-6826
28.9 - 42.0
240 RSTI-6817 RSTI-6827
300 RSTI-6818 RSTI-6828
35 - 95 RSTI-6851
22.4 - 35.5
95 - 150 RSTI-6852
120 - 240 RSTI-6853
28.9 - 42.0
185 - 300 RSTI-6855

The Information contained in these installation instructions is for use only by installers trained to make electrical power installations and is intended
to describe the correct method of installation for this product. However, Tyco Electronics has no control over the field conditions which influence
product installation.
It is the user’s responsibility to determine the suitability of the installation method in the user’s field conditions. Tyco Electronics’ only obligations are
those in Tyco Electronics’ standard Conditions of Sale for this product and in no case will Tyco Electronics be liable for any other incidental, indirect
or consequential damages arising from the use or misuse of the products.
Raychem, TE Logo and Tyco Electronics are trademarks.

EPP-1718-10/09 Page 2/6


Cable Preparation

600
a
1 metre
255

1 2 3
Clean and degrease the end of the Cable with wire shield Wrap one turn of sealant tape (grey)
oversheath for a length of 1 metre with Position the cable with sufficient with no overlap and slight tension
solvent wipe. overlap to the bushing centre. around the end of the oversheath.
Mark the oversheath 255 mm below the
Cut the tape and push ends together.
bushing centre.
Cut the cable 600 mm above the mark Bend the shielding wires back onto the
and remove the oversheath over this oversheath.
distance. Cut off Cu-spiral screening
Avoid crossing the individual wires.
tape flush with end of outer sheath.
Temporarily secure the wires with a
Edges projecting beyond the outer
tape or wire binder.
sheath must be avoided, so that the
stress cone can not be damaged during
push on procedure.
Cut the core according to the dimension
given in the drawing. Remove the core
screen with appropriate screen cutting
tool according to the drawing. The
Cut back the insulation according to
surface of the insulation should be free
dimension K given in drawing details.
from all traces of conductive material. Recommendation for large cross
A. Hexagonal and deep indent
Compare the diameter over insulation sections
compression lugs
with application range as shown in
Dimension K must not exceed 60 mm. Convenient push on process of the
Table 1 as well as with marking of
B. Mechanical lugs stress cone requires chamfering of the
supplied stress cone.
Dimension K is identical to depth of insulation for cross section 240 mm²
Application Check! bore. Barrel butts against insulation! and above. See drawing!

4 5 6
≥ 240 mm2

aaaa
aaaa

210
5 Chamfer

40

EPP-1718-10/09 Page 3/6


Core Preparation
Table 2 - Use of Insert

Lug

BLMC-185/300-16-800A
BLMC-95/240-16-800A
BLMC-25/95-16-800A
Type

Cross
Section
(Stranded
mm2 (RM)
35 YES -
50 YES -
70 NO -
95 NO YES -
120 - YES -
150 - YES -
7 8
185 - NO YES Slide the small protective bag Apply onto the inner surface of the
240 - NO YES (assembly aid) over the exposed stress cone at the bottom end a 3 cm
conductor and tie it down with a PVC long sausage of assembly lubricant and
300 - - NO
tape as shown in the drawing. spread it evenly over the inner surface.
Gently lubricate the outer surface of the Use assembly lubricant without sponge
protective bag and the core insulation top. Push the stress cone in one
with a thin layer of assembly lubricant sequence with a twisting movement
Apply the lubricant layer with the over the assembly aid completely onto
sponge top as shown. the insulation until the inner collar of the
stress cone stops at the oversheath cut
back of the cable.
Note: The arrow on the stress cone
B. Mechanical lugs with inserts should point onto the cable sheath.
The insert has to be used as noted in Remove the assembly aid from the
Table 2. conductor.
A. Compression lugs
Ensure that the retention of the insert
Install the cable lug with the appropriate is locked into the appropriate slot in the
die and compression tool. barrel.
Note: Install the cable lug using a lug fixture.
Remove any sharp edges. Tighten the bolt set alternately in
Clean and degrease the lug and several equal steps until the heads Apply a thin layer of lubricant onto the
insulation from any excessive shear off. outer surface of the stress cone with
compression grease. Remove any sharp edges. the sponge top.

9a 9b 10

EPP-1718-10/09 Page 4/6


Installation of Connector Body

11a

11b 12
a. Abrade and clean the contact ring Clean the conical surface of the
of the bushing thread from residuals bushing and lubricate it with the
such as resin or varnish if any. assembly lubricant as shown.
b. Insert the threaded stud into the
bushing and tighten it up with an
Allen key (8 mm). Maximum torque:
35 Nm.

Clean and degrease the bottom and


front end of the screened connector
body and apply a thin layer of lubricant
onto the inner surface without the
sponge top as shown.
Push screened connector body with no
Note: Use one way glove to evenly interruption onto the stress cone and Align the eye of the cable lug with the
lubricate the inner surface at a length of hold it. Continue immediately with the threaded pin and push the screened
approximately 50 mm. next step. connector onto the bushing.

13 14 15

EPP-1718-10/09 Page 5/6


18a

16 17 18b
Insert the spring washer and hex nut. Clean the inner surface of connector a. Place a string into the rear entry of
Tighten the hex nut onto the stud with a back end and apply a thin layer of the connector as shown.
spanner (24 mm) at a torque of 30 Nm. assembly lubricant. Do the same with
b. Insert the back plug and screw it
the conical interface of the back plug as
into place using a spanner (19 mm)
shown.
at a torque of 30 Nm.
Remove the string prior to the last two
turns.

Ensure that the grounding lead is


fastened tightly.
Fix the shielding wires with a wire
a. Flip-back the endcap as shown in binder (four layers) at the end of the
detail a. Position the protruding ring stress cone. Gather the wires together Screened separable connector
onto test point. to form an earth lead. Install at the end completed.
of the shielding wires the connection
b. Flip the endcap into final position Please dispose of all waste
lugs supplied in the kit.
with your finger as shown in according to environmental
detail b. Perform connection to ground. regulations.

19 a.
20 21

b.

EPP-1718-10/09 Page 6/6

S-ar putea să vă placă și