[ ] RT [ ] AUT [ ] MT [ ] PT
==================================================================================================
CONCUR: _________________________________________________
SAPMT PROJECT MANAGER
CONDITIONS:
1- Utilize skilled welders with rejection rate of less than five (5) percent on a joint basis or 0.2% on a linear basis in
the most recent past twelve (12) months.
2- Use Saudi Aramco approved Welding Procedure Specification (WPS).
3- Visually inspect the root, filling and cap passes during the welding process with a Saudi Aramco inspector.
4- Perform 100% radiographic testing (RT) of butt welds.
5- Perform 100% phased array ultrasonic testing of all welds (e)(f)(g)(h).
6- Category D or “Utility” Fluid service welds are exempt from phased array requirements in condition # 5 and this
examination can be replaced with manual UT shear wave.
7- Radiographic film to be interpreted by senior RTFI Level II personnel with a minimum of 5 years post
qualification/interpretation experience and advanced UT by Phased Array Level III personnel or UT Level III
personnel, who is certified to minimum level II in phased array.
8- All NDT personnel shall have passed Saudi Aramco verification exam in the applicable NDT method and/or
technique.
NOTES:
a. Sketch or drawing showing location of all welds to be radiographed, qualifications of the welder(s) and the
approved Welding Procedure Specification shall be attached.
b. Design information such as line/equipment number, wall thickness, material, service conditions, operating
pressure and temperature shall also be included.
Saudi Aramco: Company General Use
Page 31 of 33
Document Responsibility: Project Quality Standards Committee SAES-A-004
Issue Date: 29 August 2016
Next Planned Update: 7 January 2019 General Requirements for Pressure Testing