Sunteți pe pagina 1din 11

CLIENT :

VENDOR : CONTRACTOR : PT. PERUSAHAAN GAS NEGARA


PT. PETROTEC AIR POWER PT.REKAYASA INDUSTRY GAS BOOSTER STATION PROJECT

Rev : 0 Prep'd.
: ASPChk'd
by by : AAL Appv'd by : Appv'd by :
REQ. NO. : PGN-MR-M-008 ITEM NO : T1-C-2310 A/B & T2-C-2310 A/B
LOCATION : KP 136 & KP 276 SERVICE : AIR COMPRESSOR
DATE : 15-Aug-02 DOC. NO : PGN-VD-M-451 REV. C
PROJECT NO : 015/064/59020/PLPBJ-ST I/2001 QTY : 4 (FOUR)

DATA SHEET OF AIR FILTER


DATA ON PER UNIT BASIS LOCATION
GAS HANDLED : AIR INDOOR HEATED UNDER ROOF
CAPACITY : 230 SCFM OUTDOOR UNHEATED PARTIAL SIDES
INLET PRESSURE : ATM GRADE MEZANINE ONSHORE
AVERAGE RELATIVE HUMIDITY : 80%
WORKING PRESSURE : 150 PSI ELECTRICAL DATA: UNCLASSIFIED AREA
SERVICE : CONTINOUS
NOISE SPECIFICATION : 85 Dba in 3.5 ft FROM THE SKID UNUSUAL CONDITION
PAINTING : Manufacturer Standart w/ change DUST FUMES
of color to sky blue, RAL no. 5015
COMPRESSOR PERFORMANCE ELECTRICAL CONTROL
Manufacturer : Sullair Main Control System : Supervisor II Deluxe
Model : LS16-75 HHAC Voltage : 110 Volt
Type, & No. Stages : : Screw, Single Stage Phase :1
Working Pressure : 150 PSIG Frequency : 50 Hertz
Capacity : 230 SCFM
Max. Temperature : 2350F ( 1130C )

BEARING LUBRICANT :
TYPE : Anti-friction Lubricant : Sullube 32
RADIAL LOAD : FOUR TAPERED ROLLER RADIAL BEARINGS
Oil Fill Capacity : 10 gallons
THRUST LOAD : TWO TAPPERED ROLLER THRUST BEARINGS
Volume Air/Fluid Receiver : 3.5 cubic feet
RATED : B 10
LIFE TIME DESIGN : 100,000 HOURS

ELECTRICAL DATA ( MAIN DRIVER ) PACKAGE COOLING


MOTOR H. P. : 75 Cooling System : Air
Manufacturer : SULLAIR STD Fan Motor H. P. : 3 HP
Voltage : 400 Volt Manufacturer of Fan Motor: SULLAIR STD
Phase :3 Voltage : 400 Volt
Frequency : 50 Hertz Phase :3
RPM : 1475 Frequency : 50 Hertz
Ampere : 126 Motor Enclosure : TEFC ( NEMA 4 STD )
Locked motor Amps : 705 to meet Class I Div. 2 Group C/D area
Service Factor : 1.15
Motor Efficiency : TBA
Motor Enclosure : TEFC ( NEMA 4, STANDART ) to meet
Class I Div. 2 Group C/D area
DIMENSION & WIEIGHTS SHOP INSPECTION TEST
Length : 1829 mm MECHANICAL RUN TEST UNWITNESS
Width : 1219 mm VENDOR WORKSHOP INSPECTIONWITNESS
Height : 1537 mm
Weight : 1590 KGS
Discharge Connection : 1 1/2 INCH ANSI 150 # RF
Moisture Drain Connection
: 3/4 INCH NPT ( FEMALE )
PT. PERUSAHAAN GAS NEGARA (Persero) Page :
GAS BOOSTER STATION PROJECT 2 OF 8
DATA SHEET Document Number :

AIR COMPRESSOR PGN-DS-M-023A


Client : PT. PERUSAHAAN GAS NEGARA (Persero) Item No. : T1-C-2310 A/B & T2-C-2310 A/B
Location : KP 136 & KP 276 Service : AIR COMPRESSOR
Engineer : PT REKAYASA INDUSTRI PID No. : S01-DG-P-221 & SO2-DG-P-221
Project No. : 015/064/59020/PLPBJ-ST I/2001 Quantity.: 4 (FOUR)
1 APPLICABLE TO: PROPOSAL x PURCHASE AS BUILT
2 FOR PT PERUSAHAAN GAS NEGARA UNIT
3 SITE KP 136 & KP 276 SERIAL NO.
4 SERVICE INSTRUMENT/UTILITY AIR COMPRESSOR NO. REQ'D 4 ( FOUR )
5 MANUFACTURERSULLAIR MODELLS16-75HHAC DRIVER ELECTRIC MOTOR
X MANUFACTURER
6 NOTE: INFORMATION TO BE COMPLETED BY PURCHASER x
X
7 OPERATING CONDITIONS (VENDOR TO COMPLETE)
8 FIRST SECOND OTHER CONDITIONS
9 (ALL DATA ON PER UNIT BASIS) STAGE STAGE A B C D
10
11
12 X AIR HANDLED
13 CFM 230
14 WEIGHT FLOW, lb.hr (WET)(DRY)
15 INLET CONDITIONS:
16 PRESSURE (psi a) ATM
17 TEMPERATURE (°F) 95
18 AVERAGE RELATIVE HUMIDITY (%) 80%
19 MOLECULAR WEIGHT (M) 29.09
20 cp/cv (K1) OR (K
AV )
21 COMPRESSIBILITY (Z1) OR (ZAVG)
22 INLET VOLUME, (SCFM-WET)
23 DISCHARGE CONDITIONS:
24 WORKING PRESSURE (psia) 140
25 TEMPERATURE (°F) 45
26 cp/cv (K2) OR (KAVG)
27 COMPRESSIBILITY (Z2) OR (ZAVG)
28
29 BHP REQUIRED (ALL LOSSES INCL) 81.7+ 3
30 MOTOR SPEED ( RPM ) 1475
31 GEAR RATIO 1.91
32 VOLUMETRIC EFFICIENCY (%)
33 SILENCER P
34
35 PERFORMANCE CURVE NO.:
36
37 PROCESS CONTROL:
38 METHOD: BYPASS FROM TO
39 BYPASS: MANUAL AUTO
40 SPEED VARIATION FROM TO
41 OTHER
42 SIGNAL: SOURCE TYPE
43 RANGE: FOR PNEUMATIC CONTROL RPM @ psig RPM @ psig
44 OTHER
45 SERVICE: X CONTINUOUS INTERMITTENT STANDBY
46 DESIGNATION REV. DATE BY CHK'D APP'D
47
48
49
50
51 ISSUED FOR BID 0 31-Jul-01 HES HID AP

FILE : PGN-DS-M-023, Rev 0, Air Compressor T1,T2-C-2310A,B (1)


PT. PERUSAHAAN GAS NEGARA (Persero) Page :
GAS BOOSTER STATION PROJECT 3 OF 8
DATA SHEET Document Number :

AIR COMPRESSOR PGN-DS-M-023A


Client : PT. PERUSAHAAN GAS NEGARA (Persero) Item No. : T1-C-2310 A/B & T2-C-2310 A/B
Location : KP 136 & KP 276 Service : AIR COMPRESSOR
Engineer: CNA IN ASSOCIATION WITH PB POWER & AES
PID No. : S01-DG-P-221A & SO2-DG-P-221A
Project No. : 015/064/59020/PLPBJ-ST I/2001 Quantity.: 4 (FOUR)
1 AIR ANALYSIS OTHER CONDITIONS REMARKS
2 MOL % MOL % A B C D

3 M.W.
4
5 N2 28 75.55
6 O2 32 23.15
7 Ar 39.9 1.325
8 CO2 44 0.048
9 Ne 20 0.0013
10 He 4 7.2E-05
11 Kr 83.8 0.00041
12 CH4 16 0.00011
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28 TOTAL 100
29 AVG. MOL. WT. 29.0906
30 LOCATION: NOISE SPECIFICATIONS:
31 INDOOR HEATED UNDER ROOF APPLICABLE TO MACHINE
32 X OUTDOOR X UNHEATED PARTIAL SIDES 85 DBA in 3.5 ft from the skid
33 GRADE MEZZANINE X ONSHORE APPLICABLE TO NEIGHBORHOOD
34 X ELECTRICAL AREA UNCLASSIFIED AREA SEE SPECIFICATION
35 WINTERIZATION REQ'D. X TROPICALIZATION REQ'D. ACCOUSTIC HOUSING: YES NO
36 SITE DATA: SOUND LEVEL84 dB @ 3 ft. From the skid
37 ELEVATION < 100 FT. BAROMETER 14.69 psi.a dB RE: 0.0002 MICROBAR
38 RANGE OF AMBIENT TEMPS.: APPLICABLE CODES: VENDOR TO SPECIFY
39 DRY BULB WET BULB
40 SITE RATED °F 95
41 NORMAL °F 86 PAINTING; Mfr's Standard w/change color to Yellowish Brown
42 MAXIMUM °F 95 SHIPMENT: MFR'S STANDARD
43 MINIMUM °F 77 DOMESTIC X EXPORT X EXPORT BOXING REQ'D
44 UNUSUAL CONDITIONS: DUST FUMES
45 OTHER

46
47 DESIGNATION REV. DATE BY CHK'D APP'D
48
49
50
53 ISSUED FOR BID 0 31-Jul-01 HES HID AP

FILE : PGN-DS-M-023, Rev 0, Air Compressor T1,T2-C-2310A,B (1)


PT. PERUSAHAAN GAS NEGARA (Persero) Page :
GAS BOOSTER STATION PROJECT 4 OF 8
DATA SHEET Document Number :

AIR COMPRESSOR PGN-DS-M-023A


Client : PT. PERUSAHAAN GAS NEGARA (Persero) Item No. : T1-C-2310 A/B & T2-C-2310 A/B
Location : KP 136 & KP 276 Service : AIR COMPRESSOR
Engineer: CNA IN ASSOCIATION WITH PB POWER & AESPID No. : S01-DG-P-221A & SO2-DG-P-221A
Project No. : 015/064/59020/PLPBJ-ST I/2001 Quantity.: 4 (FOUR)
1 SPEEDS: SHAFT:
2 MAX. CONT. 1475 RPM TRIP RPM MATERIAL -
3 MAX. TIP SPEEDS: 30 FPS @ RATED SPEED DIA @ ROTORS (in) -
4 FPS @ MAX. CONT. SPEED SHAFT END. TAPERED CYLINDRICAL
5 LATERAL CRITICAL SPEEDS:
6 FIRST CRITICAL - RPM SHAFT SLEEVES:
7 DAMPED - UNDAMPED - AT SHAFT SEALS - MATL.
8 MODE SHAPE -
9 LATERAL CRITICAL SPEED - BASIS:
10 DAMPED UNBALANCE RESPONSE ANALYSIS TIMING GEARS:
11 SHOP TEST SIZE (in.) - TYPE
12 OTHER TYPE ANALYSIS: MATERIAL
13 (SPECIFY) SHAFT SEALS:
14 TORSIONAL CRITICAL SPEEDS: TYPE
15 FIRST CRITICAL - RPM SEAL SYSTEM TYPE -
16 SECOND CRITICAL - RPM INNER OIL LEAKAGE GUAR. (GAL/DAY/SEAL) -
17 THIRD CRITICAL - RPM TYPE BUFFER GAS -
18 VIBRATION: BUFFER GAS FLOW (PER SEAL)
19 ALLOWABLE LEVEL - TEST NORMAL: #/MIN. @ psi
20 (PEAK TO PEAK) - SITE MAX.: #/MIN. @ psi
21 BEARING HOUSING CONSTRUCTION:
22 ROTATION, VIEWED FROM DRIVEN END: TYPE (INTEGRAL) SPLIT
23 CASING: MATERIAL
24 MODEL RADIAL BEARINGS:
25 CASING SPLIT TYPE - SPAN (in.)
26 MATERIAL AREA (in²) LOADING (psi) : ACT. ALLOW.
27 OPERATION: DRY X FLOODED, w/ OIL LIQUID CENTER PIVOT OFFSET PIVOT
28 THICKNESS (in.) CORR. ALLOW (mm.) % OFFSET FROM LEADING EDGE
29 MAX. WORK PRESS. 100 psigat discharge NO. PADS ROTOR ON OR BETWEEN PADS
30 RELIEF VALVE SETTING psig PAD MATERIAL
31 MARGIN FOR ACCUMULATION psig TYPE BABBIT THICKNESS (in.)
32 TEST PRESS. (psi.g) HELIUM HYDRO
33 MAX. ALLOW. TEMP. °F MIN. OPER. TEMP. °F
34 MAX. CASING CAPACITY (SCFM) THRUST BEARING:
35 RADIOGRAPH QUALITY X YES NO LOCATION - TYPE
36 ROTORS: MFR. AREA (IN.²)
37 DIAMETER (in.): TYPE: LOADING (PSI): ACT. ALLOW.
38 NO. LOBES: MALE FEMALES GAS LOADING (LB.) CPLG. SLIP LOAD (LB.)
39 TYPE FABRICATION CPLG. COEFF. FRICT. CPLG. GEAR PITCH DIA. (mm.)
40 MATERIAL MAX. YIELD STRENGTH (psi) BAL. PISTON COMPENSATING LOAD lbf
41 BRINELL HARDNESS. MAX. MIN. CENTER PIVOT OFFSET PIVOT
42 ROTOR LENGTH TO DIAMETER RATIO (L/D) % OFFSET FROM LEADING EDGE
43 ROTOR CLEARANCE (in.) MAX. DEFLECTION (in.) NUMBER OF PADS
44 MAX. MACHINE MACH NO. @ LOBES PAD MATERIAL
45 INTERNALLY COOLED UNCOOLED TYPE BABBIT THICKNESS (mm.)
46 DESIGNATION REV. DATE BY CHK'D APP'D
47
48
49
50
51 ISSUED FOR BID 0 31-Jul-01 HES HID AP

FILE : PGN-DS-M-023, Rev 0, Air Compressor T1,T2-C-2310A,B (1)


PT. PERUSAHAAN GAS NEGARA (Persero) Page :
GAS BOOSTER STATION PROJECT 5 OF 8
DATA SHEET Document Number :

AIR COMPRESSOR PGN-DS-M-023A


Client : PT. PERUSAHAAN GAS NEGARA (Persero)Item No. : T1-C-2310 A/B & T2-C-2310 A/B
Location : KP 136 & KP 276 Service : AIR COMPRESSOR
Engineer: CNA IN ASSOCIATION WITH PB POWER &PID
AESNo. : S01-DG-P-221A & SO2-DG-P-221A
Project No. : 015/064/59020/PLPBJ-ST I/2001 Quantity.: 4 (FOUR)
1 MAIN CONNECTIONS: AXIAL POSITION DETECTOR:
2 ANSI POSI- IN ACCORDANCE WITH:
3 SIZE RATING FACING TION OTHER (SPECIFY)
4 TYPE MODEL
5 DISCHARGE 2" 150# RF HORIZ. MFR. NO. REQ'D
6 OSCILLATOR-DETECTORS SUPPLIED BY
7 MFR. MODEL
8 MONITOR SUPPLIED BY
9 LOCATION ENCLOSURE
10 ALLOWABLE PIPING FORCES AND MOMENTS: MFR. MODEL
11 INLET DISCHARGE SCALE RANGE ALARM: SET @ MILS
12 FORCE MOMT FORCE MOMT FORCE MOMT SHUTDOWN: SET @ MILS TIME DELAY SEC
13 lbf lb-ft lbf lb-ft lbf lb-ft
14 AXIAL COUPLINGS: NA
15 VERTICAL IN ACCORDANCE WITH: API 671
16 HORIZ. 90° OTHER (SPECIFY)
17 FORCE MOMT FORCE MOMT FORCE MOMT
18 lbf lb-ft lbf lb-ft lbf lb-ft DRIVER-COMP
19 AXIAL OR
20 VERTICAL DRIVER GEAR-COMP
21 HORIZ. 90° MAKE
22 OTHER CONNECTIONS: MODEL
23 SERVICE: NO SIZE TYPE LUBRICATION
24 LUBE OIL INLET MOUNT CPLG. HALVES
25 LUBE OIL OUTLET SPACE REQUIRED
26 SEAL OIL INLET LIMITED END FLOAT REQ'D
27 SEAL OIL OUTLET CPLG. RATING (HP/100 RPM)
28 CASING DRAINS KEYED (1) OR (2) OR HYDR. FIT
29 VENTS BASEPLATE & SOLEPLATES:
30 COOLING WATER SOLE PLATES FOR: X COMPRESSOR GEAR X DRIVER
31 PRESSURE BASEPLATE:
32 TEMPERATURE X COMMON (UNDER COMPRESSOR & DRIVER)
33 PURGE FOR: UNDER COMP. ONLY OTHER
34 BRG. HOUSING DECKED WITH NON-SKID DECK PLATES OPEN CONSTR.
35 BETWEEN BRG. & SEAL DRIP RIM WITH OPEN DRAIN
36 BETWEEN SEAL & GAS HORIZONTAL ADJUSTING SCREWS FOR EQUIPMENT
37 SUITABLE FOR POINT SUPPORT
38 SUITABLE FOR PERIMETER SUPPORT
39
40 VIBRATION DETECTORS:
41 IN ACCORDANCE WITH: API 670 - VIBRATION DETECTORS (CONTINUED)
42 OTHER (SPECIFY) MONITOR SUPPLIED BY
43 TYPE MODEL LOCATION ENCLOSURE
44 MFR. MFR. MODEL
45 NO. AT EACH SHAFT BEARING TOTAL NO. SCALE RANGE ALARM. SET @ MILS
46 OSCILLATOR-DETECTORS SUPPLIED BY SHUTDN: SET @ MILS TIME DEL. SEC
47 MFR. MODEL PHASE REFERENCE TRANSDUCER
48 DESIGNATION REV. DATE BY CHK'D APP'D
49
50
51
53 ISSUED FOR BID 0 31-Jul-01 HES HID AP

FILE : PGN-DS-M-023, Rev 0, Air Compressor T1,T2-C-2310A,B (1)


PT. PERUSAHAAN GAS NEGARA (Persero) Page :
GAS BOOSTER STATION PROJECT 6 OF 8
DATA SHEET Document Number :

AIR COMPRESSOR PGN-DS-M-023A


Client : PT. PERUSAHAAN GAS NEGARA (Persero)Item No. : T1-C-2310 A/B & T2-C-2310 A/B
Location : KP 136 & KP 276 Service : AIR COMPRESSOR
Engineer: CNA IN ASSOCIATION WITH PB POWER &PID
AESNo. : S01-DG-P-221A & SO2-DG-P-221A
Project No. : 015/064/59020/PLPBJ-ST I/2001 Quantity.: 4 (FOUR)
1 UTILITY CONDITIONS: WEIGHTS (LBS):
2 STEAM N.A. DRIVERS HEATING COMPR. GEAR DRIVER BASE
3 INLET MIN. psig °F psig °F ROTORS: COMPR. DRIVER GEAR
4 NORM psig °F psig °F COMPR. UPPER CASE
5 MAX. psig °F psig °F L.O. CONSOLE S.O. CONSOLE
6 EXHAUST MIN. psig °F psig °F MAX. FOR MAINTENANCE (IDENTIFY)
7 NORM psig °F psig °F TOTAL SHIPPING WEIGHT
8 MAX. psig °F psig °F
9 ELECTRICITY: SHUT- SPACE REQUIREMENTS (FEET & INCHES):
10 DRIVERS HEATING CONTROL DOWN COMPLETE UNITY L W H
11 VOLTAGE Refer to PGN-DS-E-002 L.O. L W H
12 HERTZ S.O. CONSOLE: L W H
13 PHASE
14 COOLING WATER MISCELLANEOUS:
15 TEMP. INLET °F MAX. RETURN °F RECOMMEND STRAIGHT RUN OF PIPE DIA. BEFORE SUCTION
16 PRESS. NORM psig DESIGN psig
17 MIN. RETURN psig MAX. ALLOW P psig VENDOR'S REVIEW & COMMENTS ON PURCHASER'S PIPING
18 WATER SOURCE & FOUNDATION
19 INSTRUMENT AIR: OPTICAL ALIGNMENT FLATS REQUIRED ON COMPRESSOR,
20 MAX PRESS psig MIN. psig GEAR & DRIVER
21 TOTAL UTILITY CONSUMPTION: PROVISION FOR WATER WASHING BEFORE OPENING CASING
22 COOLING WATER - CMH BY
23 STEAM, NORMAL #/HR TORSIONAL ANALYSIS REPORT REQUIRED
24 STEAM, MAX #/HR PROVISIONS FOR TORSIONAL PICKUP ON CASE
25 INSTRUMENT AIR SCMH CONDENSATE REMOVAL EQUIPMENT REQUIRED
26 HP (DRIVER) KW YES NO
27 HP (AUXILIARIES): KW SILENCERS FURNISHED BY
28
29 REMARKS: -
30 SHOP INSPECTION TESTS: REQ'D WITNESS
31 SHOP INSPECTION ( vendor work shop ) X
32 HYDROSTATIC ( report ) X
33 LEAK TEST REQUIRED
( Not Available ) X X
34 MECHANICAL RUN ( non - witnessed ) X X
35 MECHANICAL RUN SPARE ROTORS
36 FIT IN SPARE ROTORS
37 PERFORMANCE TEST (AIR)
( vendor workshop )X X
38 COMP. WITH DRIVER( vendor workshop ) X X
39 COMP. LESS DRIVER
40 USE SHOP LUBE & SEAL SYSTEM DISASSSEMBLE-REASSEMBLE COMP.
41 USE JOB LUBE & SEAL SYSTEM AFTER TEST
42 USE SHOP VIBRATION PROBES, ETC CHECK BRGS. & SEALS AFTER TEST
43 USE JOB VIB. & AXIAL DISP. PROBE, NOISE LEVEL TEST X
44 OSCILLATOR-DETECTORS & MONITOR
45 PRESSURE COMP. TO FULL OPER. PRESS.X X
46 ( vendor workshop )
47
48 DESIGNATION REV. DATE BY CHK'D APP'D
49
50
51
53 ISSUED FOR BID 0 31-Jul-01 HES HID AP

FILE : PGN-DS-M-023, Rev 0, Air Compressor T1,T2-C-2310A,B (1)


PT. PERUSAHAAN GAS NEGARA (Persero) Page :
GAS BOOSTER STATION PROJECT 7 OF 8
DATA SHEET Document Number :

AIR COMPRESSOR PGN-DS-M-023A


Client : PT. PERUSAHAAN GAS NEGARA (Persero)Item No. : T1-C-2310 A/B & T2-C-2310 A/B
Location : KP 136 & KP 276 Service : AIR COMPRESSOR
Engineer: CNA IN ASSOCIATION WITH PB POWER &PID
AESNo. : S01-DG-P-221A & SO2-DG-P-221A
Project No. : 015/064/59020/PLPBJ-ST I/2001 Quantity.: 4 (FOUR)
1 AREA CLASSIFICATION:UNCLASSIFIED AREA
2 ZONE GROUP
3 MOTOR CONTROL & INSTRUMENT VOLTAGE:
4 VOLTS DC 48 PHASE CYCLES
5 ALARM & SHUTDOWN VOLTAGE:
6 VOLTS DC 48 PHASE CYCLES 50 DC
7 LOCAL PANEL:
8 FURNISHED BY: VENDOR PURCHASER OTHERS
9 FREE STANDING WEATHERPROOF TOTALLY ENCLOSED EXTRA CUTOUTS
10 VIBRATION INSOLATORS STRIP HEATERS PURGE CONNECTIONS
11 ANNUNCIATOR: FURNISHED BY: VENDOR PURCHASER OTHERS
12 ANNUNCIATOR LOCATED ON LOCAL PANEL MAIN CONTROL BOARD
13 CONTRACTOR CONNECTIONS BROUGHT OUT TO TERMINAL BOXES BY VENDOR
14 INSTRUMENT SUPPLIERS: VENDOR TO ADVISE
15 PRESSURE GAGES: MFR. - SIZE & TYPE:
16 TEMPERATURE GAGES: MFR. - SIZE & TYPE:
17 LEVEL GAGES: MFR. Not - Available SIZE & TYPE:
18 DIFF. PRESSURE GAGES: MFR. - SIZE & TYPE:
19 PRESSURE SWITCHES: MFR. SIZE & TYPE:
20 DIFF. PRESSURE SWITCHES: MFR. - SIZE & TYPE:
21 TEMPERATURE PRESSURE SWITCHES: MFR. - SIZE & TYPE:
22 LEVEL SWITCHES: MFR. Not - available SIZE & TYPE:
23 CONTROL VALVES: MFR. - SIZE & TYPE:
24 PRESSURE RELIEF VALVES: MFR. - SIZE & TYPE:
25 THERMAL RELIEF VALVES: MFR. - SIZE & TYPE:
26 SIGHT FLOW INDICATORS: MFR. - SIZE & TYPE:
27 GAS FLOW INDICATOR: MFR. Not - Available SIZE & TYPE:
28 VIBRATION EQUIPMENT: MFR. Not - Available SIZE & TYPE:
29 TACHOMETER: MFR. Not - Available RANGE & TYPE:
30 SOLENOID VALVES MFR. - SIZE & TYPE:
31 ANNUNCIATOR: MFR. - MODEL & NO. POINTS
32
33
34 NOTE: SUPPLIED BY VENDOR SUPPLIED BY CONTRACTOR LOCALLY LOCAL
35 PRESSURE CAGE REQUIREMENTSLOCALLY GUAGE FUNCTION MOUNTED PANEL
36 FUNCTION MOUNTED BOARD GOV. CONTROL OIL
37 LUBE OIL PUMP DISCHARGE GOV. CONTROL OIL P
38 LUBE OIL FILTER P COUPLING OIL P
39 LUBE OIL SUPPLY MAIN STREAM IN P
40 SEAL OIL PUMP DISCHARGE 1ST STAGE STEAM P
41 SEAL OIL FILTER P STEAM CHEST P
42 SEAL OIL SUPPLY (EACH LEVEL) EXHAUST STEAM
43 SEAL OIL DIFFERENTIALP EXTRACTION STEAM
44 REFERENCE GAS & BALANCE LINE STEAM EJECTOR
45 SEAL EDUCTOR & BUFFER SEAL COMPRESSOR SUCTION & DISCHARGE
46
47 DESIGNATION REV. STATUS DATE BY CHK'D APP'D
48
49
50
51
52 ISSUED FOR BID 0 31-Jul-01 HES HID AP

FILE : PGN-DS-M-023, Rev 0, Air Compressor T1,T2-C-2310A,B (1)


PT. PERUSAHAAN GAS NEGARA (Persero) Page :
GAS BOOSTER STATION PROJECT 8 OF 8
DATA SHEET Document Number :

AIR COMPRESSOR PGN-DS-M-023A


Client : PT. PERUSAHAAN GAS NEGARA (Persero)Item No. : T1-C-2310 A/B & T2-C-2310 A/B
Location : KP 136 & KP 276 Service : AIR COMPRESSOR
Engineer: CNA IN ASSOCIATION WITH PB POWER &PID
AESNo. : S01-DG-P-221A & SO2-DG-P-221A
Project No. : 015/064/59020/PLPBJ-ST I/2001 Quantity.: 4 (FOUR)
1 TEMPERATURE GAGE REQUIREMENTS:
2 LOCALLY LOCAL LOCALLY LOCAL
3 FUNCTION MOUNTED PANEL FUNCTION MOUNTED PANEL
4 LUBE OIL DISCHARGE COOLER OIL OUTLET
5 COMPR. JOURNAL BEARING SEAL OIL OUTLET
6 DRIVER JOURNAL BEARING COMPRESSOR SUCTION
7 GEAR JOURNAL BEARING COMPRESSOR DISCHARGE
8 COMPRESSOR THRUST BEARING LUBE OIL RESERVOIR
9 DRIVER THRUST BEARING
10 GEAR THRUST BEARING
11 MISCELLANEOUS INSTRUMENTATION:
12 SIGHT FLOW INDICATORS, EACH JOURNAL & THRUST BEARING & EACH COUPLING OIL RETURN LINE
13 SIGHT FLOW INDICATIORS, EACH SEAL OIL RETURN LINE
14 LEVEL GAGES, LUBE AND/OR SEAL OIL RESERVOIRS, S.O. DRAIN TRAPS & S.O. OVERHEAD TANK
15 VIBRATION AND SHAFT POSITION PROBES & PROXIMITORS
16 VIBRATION AND SHAFT POSITION READOUT EQUIPMENT
17 VIBRATION READOUT LOCATED ON: LOCAL PANEL SEPARATE PANEL MAIN BOARD
18 TURBINE SPEED PICKUP DEVICES
19 TURBINE SPEED INDICATORS
20 TURBINE SPEED INDICATORS LOCATED ON: LOCAL PANEL MAIN BOARD
21 REMOTE HAND SPEED CHANGER - MOUNTED ON LOCAL PANEL
22 ALARM HORN & ACKNOWLEDGEMENT SWITCH
23 ALARM & SHUTDOWN SWITCHES: PRE- PRE-
24 FUNCTION ALARM TRIP FUNCTION ALARM TRIP
25 LOW LUBE OIL PRESSURE COMPRESSOR VIBRATION
26 HI LUBE OIL FILTER P COMPRESSOR AXIAL POSITION
27 HI SEAL OIL FILTER P TURBINE VIBRATION
28 LOW LUBE OIL RESERVOIR LEV. TURBINE AXIAL POSITION
29 LOW SEAL OIL RESERVOIR LEV. GEAR VIBRATION
30 HI SEAL OIL LEVEL GEAR AXIAL POSITION
31 LOW SEAL OIL LEVEL COMPRESSOR MOTOR SHUTDOWN
32 HI SEAL OIL PRESSURE TRIP & THROTTLE VALVE SHUT
33 LOW SEAL OIL PRESSURE HI TURB. STEAM SEAL LEAKAGE
34 AUX. SEAL OIL PUMP START HI COMPR. THRUST BRG. TEMP. (OIL)
35 AUX. LUBE OIL PUMP START HI DRIVER THRUST BRG. TEMP.
36 HI SEAL OIL OUTLET TEMP. (COOLER) COMPR. BALANCE DRUM P
37 HI LIQUID LEV. SUCT. SEPERATOR COMPRESSOR HI DISCH. TEMP.
38 HI LUBE OIL OUTLET TEMP. (COOLER)
39 SWITCH CLOSURES:
40 ALARM CONTACTS SHALL: OPEN CLOSE TO SOUND ALARM AND BE NORMALLY ENERGIZED DE-ENERGIZED
41 SHUTDOWN CONTACTS SHALL: OPEN CLOSE TO TRIP AND BE NORMALLY ENERGIZED DE-ENERGIZED
42 NOTE: NORMAL CONDITIONS IS WHEN COMPRESSOR IS IN OPERATION.
43 MISCELLANEOUS: X INSTRUMENT TAGGING REQUIRED.
44 NOTES 1. PRE-ALARM AND SHUTDOWN SWITCHES SHALL BE SEPARATE.
45 2. VENDOR MAY SUBMIT HIS STANDARD DATA SHEET IN LINE WITH PURCHASER DATA SHEET
46
47
48 DESIGNATION REV. DATE BY CHK'D APP'D
49
50
51
52
53 ISSUED FOR BID 0 31-Jul-01 HES HID AP

FILE : PGN-DS-M-023, Rev 0, Air Compressor T1,T2-C-2310A,B (1)