Piping Checklist for 60% 3D Model Review 


60% model review is one of the reviews planned in all the EPC projects execution at diff
stages- 30%, 60% and 90% of design completion.

60% 3D model review is an intermediate review which take place when the final structur
steel, final equipment and the majority of the major piping runs, duct-work, instrument an
electrical trays have been MODELLED. The primary purpose of these reviews is to review
routings to insure that process integrity has not been compromised, that the pipe, duct-wor
tray runs are in accordance with the minimum criteria established for the project and to ob
any potential interference in the operability or maintainability, created by the routing of th
items.
Below is the piping check point which shall be reviewed prior to 60% 3D model review:

PROJECT NAME : PROJECT NO. :

CLIENT : AREA OR WBS NAME :

REV. : DATE : DD/MM/YYYY

DOCUMENT NO. :

Check List for 60% Model Review


Related titles
General:
https://www.scribd.com/document/406696423/Piping-Checklist-Copy-docx 1/51
8/15/2019 Piping Checklist - Copy.docx | Pump | Valve
General:
 Search    

Download
1 1 of 43modeled and checked.
All underground piping systems are  Search document 
2 Piping having size 2” and above is modeled and checked. 

3 Pipe supports locations & types are correct. Supports for stress critical systems shall be based on
stress analysis calculations.

4 Utility stations locations are shown by volume box and the locations are checked.

Checking Piping
5 Hp Dosing-
Foam Agec
powder Dosing
& Water SprayProduct
Systems are1574_03-Vol- Cp Man Prd 1500
modeled and checked. Chemical
Drawings… price list by… 2B_DS-… Rev01 Injection Method
6 Eye wash and Safety Shower locations modeled and checked.

7 Access and egress, operation and maintenance of valve and instruments are checked.

8 The model is updated as per the vendor drawings of the packages.


9 All equipment are modeled as per latest vendor drawings & checked.

10  All mechanical handling equipment’s like cranes, monorails, davits, eye pads, EOT’s etc… are
modeled and checked.

11 All structural steel, e.g. pipe racks, technological structures, shelters, platforms, stair cases /ladders,
pipe supports designed by civil etc… are modeled as Civil design a nd checked.

12 All Paving and curbing is modeled and checked.

13 All foundations are modeled and checked.

14 All buildings are modeled and checked.

15 All Instrument items like junction boxes, panels, cabinets, SIV vessels Inclusive of supports) are
modeled and checked.

16  All Electrical items like junction boxes, panels, cabinets, lighting poles, flood lights, masts etc…
(Inclusive of supports) are modeled and checked.

17 All Telecom items like junction boxes, panels, cabinets, CCTVs, PAGA speakers, telecom tower,
etc… are modeled and checked. 

18 All above ground cable tray routing is modeled and checked. Outline of drops to equipment/all users
is shown in the model.

19 All underground cable trenches are modeled and checked.

20 Analyzer shelters modeled and checked.

21 Where applicable passive fire proofing is incorporated in the model.

22 Construction access is checked.

23 Review tags of 30% model review are closed.


Related titles
24 Interdisciplinary model review is conducted and all the comments are resolved.
https://www.scribd.com/document/406696423/Piping-Checklist-Copy-docx 2/51

S-ar putea să vă placă și