FR SEVILLA INDUSTRIAL & DEVELEPOMENT CORPORATION

MONTHS NO.EQUIPMENTS OPERATIONAL NON OPERATIONAL %

Jan-18 92 91 1 98.91%
Feb-18 92 90 2 97.83%
Mar-18 92 90 2 97.83%
Number of Equipments

Uptime Percentage
Preventive Maintenance of Machine & Equipments

100 92 92 92 100.00%
91 90 90
90 99.50%
80 98.91% 99.00%
70 98.50%
60 98.00%
97.83% 97.83%
50 97.50%
40 97.00%
30 96.50%
20 96.00%
10 2 2 95.50%
1
0 95.00%
NO.EQUIPMENTS OPERATIONAL NON OPERATIONAL %
Ja n-18 Fe b-18 Ma r-18

Equipment Defective Date Date Completed


BAR CUTTING MACHINE 2 JANUARY, FEBRUARY & MARCH 2̀May 16,2018
SHEET SHEARER 1 6-Feb-18 Feb. 8, 2018
COIL FEEEDER 2 3-Mar-18 Mar. 3, 2018

Prepared by: Checked by: Noted By:


Rolando C. Dela Cruz Jaime M. Sevilla Jr. Efren D. Catayoc Romeo S. Macatangay Jaime R. Sevilla Sr.
QA/QC Engineer Asst. Plant Manager Asst.Plant Manager Plant Manager Plant Consultant
FR SEVILLA INDUSTRIAL & DEVELEPOMENT CORPORATION

MONTHS NO.EQUIPMENTS OPERATIONAL NON OPERATIONAL %

Apr-18 92 91 1 98.91%
May-18 92 89 3 96.33%
Jun-18 92 90 2 97.83%
Number of Equipments

Preventive Maintenance of Machine & Equipments

Uptime Percentage
100 92 92 92 100.00%
91 89 90
90 99.50%
80 98.91% 99.00%
70 98.50%
60 98.00%
97.83%
50 97.50%
40 97.00%
30 96.50%
96.33%
20 96.00%
10 3 2 95.50%
1
0 95.00%
Apr-18 NO.EQUIPMENTS OPERATIONAL
May-18 NON OPERATIONAL %
Jun-18

Equipment Defective Date Date Completed


BAR CUTTING MACHINE 2 APRIL, MAY 2018 May 16,2018
LATHE MACHINE 4 18-May-18 May 26,2018
LOCK FORMER MC 3 23-May-18 May 28,2018
DUCT FLANGE MC 15mm/20mm 23-May-18 May 29,2018
COIL FEEDER 1 2-Jun-18 June 2,2018
Prepared by: Checked by: Noted By:
Rolando C. Dela Cruz Jaime M. Sevilla Jr. Efren D. Catayoc Romeo S. Macatangay Jaime R. Sevilla Sr.
QA/QC Engineer Asst. Plant Manager Asst.Plant Manager Plant Manager Plant Consultant
FR SEVILLA INDUSTRIAL & DEVELEPOMENT CORPORATION

MONTHS NO.EQUIPMENTS OPERATIONAL NON OPERATIONAL %

Jul-18 92 89 3 96.33%
Aug-18 92 91 1 98.91%
Sep-18 92 91 1 98.91%
Number of Equipments

Preventive Maintenance of Machine & Equipments

Uptime Percentage
100 100.00%
92 92 91 92 91
89
90 99.50%
80 98.91% 98.91% 99.00%
70 98.50%
60 98.00%
50 97.50%
40 97.00%
30 96.50%
96.33%
20 96.00%
10 3 95.50%
1 1
0 95.00%
Jul -18 NO.EQUIPMENTS OPERATIONAL
Aug-18 NON OPERATIONAL %
Sep-18

Equipment Defective Date Date Completed


HYDRAULIC BENDER 2 6-Jul-18 7-Jul-18 JO#3432
MANUAL BENDER 2 (8FT) 7-Jul-18 7-Jul-18 JO#3435
SHEET SHEARER 3 19-Jul-18 19-Jul-18 JO#3438
SHEET SHEARER 1 10-Aug-18 10-Aug-18 JO#3445
COIL FEEDER 12-Sep-18 12-Sep-18 JO#3858
Prepared by: Checked by: Noted By:
Rolando C. Dela Cruz Jaime M. Sevilla Jr. Efren D. Catayoc Romeo S. Macatangay Jaime R. Sevilla Sr.
QA/QC Engineer Asst. Plant Manager Asst.Plant Manager Plant Manager Plant Consultant
FR SEVILLA INDUSTRIAL & DEVELEPOMENT CORPORATION

NON
MONTHS NO.EQUIPMENTS OPERATIONAL
OPERATIONAL %

Jan-18 82 81 1 99.18%
Feb-18 82 80 2 98.36%
Mar-18 82 81 1 99.18%
Nos. of Equipments

82 81 82 82 81
80
80

70
0.9918 0.9918

60

0.9836
50

40

30

20

10

1 2 1
0
43101 43132 43160

Quarterly

Col umn B Col umn C Col umn D Col umn E

BAR CUTTING MACHINE 2 JANUARY, FEBRUARY & MARCH


SHEET SHEARER 1 8-Feb-18
82 81 1

0.995
0.9918
0.99

0.985
Uptime in Percentage

0.98

0.975

0.97

0.965

0.96

0.955
1
0.95
43160

Col umn E

Y, FEBRUARY & MARCH


FR SEVILLA INDUSTRIAL & DEVELEPOMENT CORPORATION

MONTHS NO.EQUIPMENTS OPERATIONAL NON OPERATIONAL %

Oct-18 92 92 0 100.00%
Nov-18 92 92 0 100.00%
Dec-18 92 91 1 98.91%
Number of Equipments

Preventive Maintenance of Machine & Equipments

Uptime Percentage
100 100.00% 100.00% 100.00%
92 92 92 92 92 91
90 99.50%
80 98.91% 99.00%
70 98.50%
60 98.00%
50 97.50%
40 97.00%
30 96.50%
20 96.00%
10 95.50%
1
0 95.00%
Oct-18 0 NO.EQUIPMENTS Nov-18 0
OPERATIONAL NON OPERATIONAL %
Dec-18

Equipment Defective Date Date Completed


HYDRAULIC BENDER 2 10-Dec-18 10-Dec-18 JO#5070
Prepared by: Checked by: Noted By:
Ernesto M.Sagaran Jaime M. Sevilla Jr. Efren D. Catayoc Jaime R. Sevilla Sr.
Maintenance Manager Asst. Plant Manager Plant Manager Plant Consultant
FR SEVILLA INDUSTRIAL & DEVELEPOMENT CORPORATION

MONTHS NO.EQUIPMENTS OPERATIONAL NON OPERATIONAL %

Jan-19 92 92 0 100.00%
Feb-19 92 92 0 100.00%
Mar-19 92 91 0 100.00%
Number of Equipments

Preventive Maintenance of Machine & Equipments

Uptime Percentage
100 100.00% 100.00% 100.00% 100.00%
92 92 92 92 92 91
90 99.50%
80 99.00%
70 98.50%
60 98.00%
50 97.50%
40 97.00%
30 96.50%
20 96.00%
10 95.50%
0 95.00%
Ja n-19 0 NO.EQUIPMENTS Feb-19 0
OPERATIONAL NON OPERATIONAL %
Ma r-19 0

Prepared by: Checked by: Noted By:


Ernesto M.Sagaran Jaime M. Sevilla Jr. Efren D. Catayoc Jaime R. Sevilla Sr.
Maintenance Manager Asst. Plant Manager Plant Manager Plant Consultant
FR SEVILLA INDUSTRIAL & DEVELEPOMENT CORPORATION

MONTHS NO.EQUIPMENTS OPERATIONAL NON OPERATIONAL %

Apr-19 92 92 2 97.83%
May-19 92 92 1 98.91%
Jun-19 92 91 0 100.00%
Number of Equipments

Preventive Maintenance of Machine & Equipments

Uptime Percentage
100 100.00% 100.00%
92 92 92 92 92 91
90 99.50%
80 98.91% 99.00%
70 98.50%
60 98.00%
97.83%
50 97.50%
40 97.00%
30 96.50%
20 96.00%
10 95.50%
2 1
0 95.00%
Apr-19 NO.EQUIPMENTS OPERATIONAL
May-19 NON OPERATIONAL %
Jun-19 0

Equipment Defective Date Date Completed


LOCK FORMER MACHINE 3 24-Apr-19 24-Apr-19 JO#5856
BOLT THREADING MACHINE 1 26-Apr-19 27-Apr-19 JO#5857
HYDRAULIC BENDER 3 24-May-19 24-May-19 JO#5859
Prepared by: Checked by: Noted By:
Ernesto M. Sagaran Jaime M. Sevilla J Efren D. Catayoc Jaime R. Sevilla Sr.
Maintenance Manager Asst. Plant Mana Plant Manager Plant Consultant
FR SEVILLA INDUSTRIAL & DEVELEPOMENT CORPORATION

MONTHS NO.EQUIPMENTS OPERATIONAL NON OPERATIONAL %

Jul-19 92 92 1 98.91%
Aug-19 92 92 0 100.00%
Sep-19 92 91 0 100.00%
Number of Equipments

Preventive Maintenance of Machine & Equipments

Uptime Percentage
100 100.00% 100.00% 100.00%
92 92 92 92 92 91
90 99.50%
80 98.91% 99.00%
70 98.50%
60 98.00%
50 97.50%
40 97.00%
30 96.50%
20 96.00%
10 95.50%
1
0 95.00%
Jul -19 NO.EQUIPMENTS Aug-19 0
OPERATIONAL NON OPERATIONAL %
Sep-19 0

Equipment Defective Date Date Completed


LATHE MACHINE 3 16-Jul-19 22-Jul-19 JO#7301
Prepared by: Checked by: Noted By:
Ernesto M.Sagaran Jaime M. Sevilla Jr. Efren D. Catayoc Jaime R. Sevilla Sr.
Maintenance Manager Asst. Plant Manager Plant Manager Plant Consultant