Cost Measuremnt
Rate of Materials
F/Y:-2071/072
Rate for Vat @
SN Particular Unit Rate Unit Unit Rate/kg/km Dist Km Load / Transportation Cost
Analysis 13% Remarks
Weight Unload
Tractor Porter Tractor Porter Tractor Porter
1 Skill Labour 870.00 955.00 md
2 Unskill Labour 650.00 700.00 md
3 Painter 955.00 955.00 md
4 Cement ( OPC NS mark) 22093.00 17600.00 mt 2,288.00 1000 0.147 0.5938 15 2205 -
5 Sand 2870.40 2400.00 m3 1600 0.147 0.5938 2 470.4 -
6 Aggrigate 40mm 2446.80 1800.00 m3 2200 0.147 0.55 2 646.8 -
7 Aggrigate 20mm 2446.80 1800.00 m3 2200 0.147 0.55 2 646.8 -
8 Aggrigate 10mm 2446.80 1800.00 m3 2200 0.147 0.55 2 646.8 -
9 Stone 1632.30 1500.00 m3 1800 0.147 0.55 0.5 132.3 -
10 River Bed Material 1400.00 1400.00 m3 2200 0.147 0.55 0 0 -
11 Sal wood 45000.00 36000.00 m3 800 0.147 0.90 0 -
12 Local Wood 45000.00 36000.00 m3 600 0.147 0.90 0 -
13 Nail 118.65 105.00 kg 13.65 1 0.147 0.90 0 -
14 Reinforcement Bar 93790.00 83000.00 mt 10790 1000 0.147 0.90 0 -
15 Binding wire(Black) 113.00 100.00 kg 13 1 0.147 0.90 0 -
16 Snowcem Paint 70.06 62.00 kg 8.06 1 0.147 0.90 0 -
17 White Cement 29.38 26.00 kg 3.38 1 0.147 0.90 0 -
18 2X 500 gauge polythene 93.79 83.00 m2 10.79 0.147 -
19 Chicken wire 113.00 100.00 sq.m 13 0.147 -
20 Plain wire 214.70 190.00 Kg 24.7 1 0.147 0.90 0 -
21 Barbed wire 126.95 110.00 Kg 14.3 1 0.147 0.90 18 2.646 -
22 Iron angled post (13 kg) 1429.95 1235.00 nos 160.55 13 0.147 0.90 18 34.398 -
item : laying of locally available granular materials for gravelling in Roadway for
gravelling including j10m lead & 1.5m lift-per m3
particular unit Qantity Rate Amount Remarks
subgrade preparation 10 cm depth
labour unskill md 0.05 510.00 25.5
laying of sub base for 0
gravelling 15cm thick 0 pouring
labour unskill md 1.5 510.00 765 &
Material kg km levelling
Transportation
upto 4 km for
1m3=1800kg/m3 1800 5.5 0.047 465.3
Sub-total 1255.8
15%overhe 188.37
unit rate 1444.17
2
Earthwork in excavation in
a ordinary soft soil- For 1 m3 Unskill 0.50 700 350.00 Tools & Plant 3 % of labour cost 10.50 360.50 5.2-1.2.2(a)
b Hard soil- For 1 m3 Unskill 0.60 700 420.00 Tools & Plant 3 % of labour cost 12.60 432.60 5.2-1.2.2(b)
c Soft Rock- For 1 m3 Unskill 2.00 700 1400.00 Tools & Plant 3 % of labour cost 42.00 1442.00 5.2-1.2.2(c)
d Medium Rock- For 1 m3 Unskill 4.00 700 2800.00 Tools & Plant 3 % of labour cost 84.00 2884.00 5.2-1.2.2(d)
e Hard Rock- For 1 m3 Unskill 17.00 700 11900.00 Tools & Plant 3 % of labour cost 357.00 12257.00 5.2-1.2.2(e)
Refilling of trench with
3
excavaited materials Unskill 0.25 700 175.00 Tools & Plant 3 % of labour cost 5.25 180.25 10) 2 -5
4 Stone Solling& Leveling Unskill 1.25 700 875.00 Tools & Plant 3 % of labour cost 26.25 901.25
Blockstone 1.10 1632.30 1795.53 1795.53
Total 875.00 1821.78 2696.78 49)17-6
Formworksof Local wood for
5
Beam/Slab Skill 0.150 955 143.25 Local Wood 0.0070 38808.00 271.66 m3 U/D+DoLIDAR
For 1 Sq.m. Unskill 0.200 700 140.00 Nails 0.25 118.65 29.66 kg
Total 283.25 301.32 584.57 39)9.a
Quantity of wood required for 1 sqm formwork = 0.0526 cum.
Wood can be used 6 times for the formwork and after then 25% cost
of the wood is recovered. So the quantity of wood required for 1 sqm = 0.00658 cum.
6
Plain cement concrete work Skill 1.00 955 955.00 Cement 0.22 17628 3878.16 MT
M10(P.C.C. 1:3:6) Unskill 4.00 700 2800.00 Agg.40mm 0.65 2700.00 1755.00 cu.m DoLIDAR
and wall - For 1 m3 Agg.20mm 0.24 2700.00 648.00 cu.m 41.11A.a
Sand 0.47 1700.00 799.00 cu.m
Total 3755.00 7080.16 10835.16
7
Plain cement concrete work Skill 1.00 955 955.00 Cement 0.32 17628 5640.96 MT
M15(P.C.C. 1:2:4) Unskill 4.06 700 2842.00 Agg.40mm 0.52 2700 1404.00 cu.m DoLIDAR
and wall - For 1 m3 Agg.20mm 0.22 2700 594.00 cu.m 41.11A.b
Agg.10mm 0.11 2700 297.00 cu.m
Sand 0.44 1700.00 748.00 cu.m
Total 3797.00 8683.96 12480.96
8
Plain cement concrete work Skill 1.00 955 955.00 Cement 0.40 17628 7051.20 MT
M20(P.C.C. 1:11/2:3) in
foundation Unskill 5.12 700 3584.00 Agg.20mm 0.57 2700.00 1539.00 cu.m DoLIDAR
and wall - For 1 m3 Agg.10mm 0.29 2700.00 783.00 cu.m 41.11B.b
Sand 0.425 1700.00 722.50 cu.m
Total 4539.00 10095.70 14634.70
9
Stone masonry work in 1:4 Skill 1.50 955 1432.50 Cement 0.116 17628 2044.85 MT 38-8-A.c
cement mortar - For 1 m3 Unskill 3.24 700 2268.00 Sand 0.47 2870.40 1349.09 cu.m
Blockstone 1.00 1632.30 1632.30 cu.m
Bondsotne 0.10 1632.30 163.23 cu.m
Total 3700.50 5189.47 8889.97 cu.m
10
Stone masonry work in 1:6 Skill 1.50 955 1432.50 Cement 0.092 22093 2032.56 MT 38-8-A.d
cement mortar - For 1 m3 Unskill 3.29 700 2303.00 Sand 0.50 2870 1435.00 cu.m
Blockstone 1.00 1632 1632.00 cu.m
Bondsotne 0.10 1632 163.20 cu.m
Total 3735.50 5262.76 8998.26 cu.m
Dry stone masonry work with
11
rubble stone Skill 0.50 955 477.50 Blockstone 1.00 1632 1632.00 cu.m DoLIDAR
For 1 m3 Unskill 1.50 700 1050.00 Bondsotne 0.10 1632 163.20 cu.m 38. 8
Total 1527.50 1795.20 3322.70 cu.m
plaster in 1:2 cement sand Unskill 0.1344 700 94.08 Sand 0.01330 2870 38.17 cu.m DoLIDAR
mortar -For 1 m2 Total 237.33 185.09 422.42 m2
17 12.5 mm thick cement Skill 0.150 955 143.25 Cement 0.00625 22093 138.08 MT 37)7-13.2.b
plaster in 1:3 cement sand Unskill 0.135 700 94.50 Sand 0.01280 2870 36.74 cu.m DoLIDAR
mortar -For 1 m2 Total 237.75 174.82 412.57 m2
18 12.5 mm thick cement Skill 0.15 955 143.25 Cement 0.00363 22093 80.20 MT 37)7-13.2.c
plaster in 1:4 cement sand Unskill 0.1359 700 95.13 Sand 0.01460 2870 41.90 cu.m DoLIDAR
mortar -For 1 m2 Total 238.38 122.10 360.48
19 20 mm thick cement Skill 0.14 955 133.70 Cement 0.0081 22093 178.95 MT Urban Devemt
plaster in 1:4cement sand Unskill 0.19 700 133.00 Sand 0.0220 2870 63.14 cu.m I 4. 12(4)b
mortar -For 1 m2 Total 266.70 242.09 508.79
20
3 mm thick cement punning Skill 0.10 955 95.50 Cement 0.00532 22093 117.53 MT Urban Devemt
in 1:1 cement sand mortar - Unskill 0.10 700 70.00 Sand - 2870 0.00 cu.m H20 11-20
For 1 m2 165.50 117.53 283.03
21
Reinfocement for RCC work Skill 7.000 955 6685.00 M.S. Rod 1.05 93790 98480 MT 40.10
in position and binding of Unskill 7.000 700 4900.00 Binding wire 10.00 113.00 1130.00 Kg DoLIDAR
23
Formworks for ferrocement Skill 0.167 955 159.49 Bamboo 0.333 175.00 58.28 Dept.N.
works - For 1 m2 Unskill 0.111 700 77.70 Nails 4.000 118.65 474.60 21-01
Binding wire 0.083 113.00 9.38
HDPE pipe 32mmke/cm2 from Stock
Total 237.19 542.26 779.45
including
VAT
Formworks of Local wood for
5
Beam/Slab Skill 0.150 815 122.25 Local Wood 0.0070 38808.00 271.66 m3
For 1 Sq.m. Unskill 0.200 610 122.00 Nails 0.25 118.65 29.66 kg
Total 244.25 301.32 545.57
Barbed wire fencing
24 (5Hori,2Diag line) Sal wood Barbed
post c/c 3m dist Skill 0.0333 955 31.80 wire8.33m 8.33 118.65 988.35 kg 24-6
work - For 1 m Unskill 0.0667 700 46.69 U hook 2.57 2.26 5.81 nos
Sal wood post 0.0063 134064.00 844.60 m3
Total 78.49 1838.76 1917.25
###
!= ljnsf] qmd ;+Vof MclGtd Kathekhola Rural Municipality &= ;Demf}tf ldlt M
cfof]hgfsf] gfdM ;fgf ltªl/ª 38]/L a Office Of The Rural Municipality Executive *= sfd ;dfKt ug'{kg]{ ldlt M
7]ufgfM sf=uf=kf= &, /]z Bihunkot, Baglung (= sfd gfkL ePsf] ldlt M
$= ;Demf}tf g+= M Gandaki Province, Nepal e'QmfgL ef}r/ g+= M
%= cl3Nnf] e'QmfgL ljnsf] qmd ;+Vo e'QmfgL ldlt M
^= cl3Nnf] e'QmfgL ljnsf] ef}r/ g+=
cf pkef]Qmf ;DaGwL lan gfkL lstfj g+= M
O6 cBfjlws sfd ePsf] cl3Nnf] ljnsf] r9]sf] xfn ePsf] sfd
n=O{=
d sfdsf] ljj/0f PsfO{ s}lkmot
kl/df0f kl/df0f b/ hDdf d"No kl/df0fhDdf d"No kl/df0f hDdf d"No
g+
=
1 E/W in excavation for gabion box m3 9.00 9.00 84.75 762.75 9.00 762.75
4 E/W excavation in roadway by excavator 0 0.00 0.00 0.00 0.00 0.00 0.00
10 Project management cost job 1.00 1.00 5000.00 5000.00 1.00 5000.00
hDdf /sd 1,399,453.69 1,399,453.69
! of] lan jdf]lhd e'QmfgL hDdf ?= 1399453.69 $ s§f ug'{ kg]{ ?=
@ hg;|dbfg 699453.69 49.98% s= k]ZsL
# afFsL lbg' kg]{ ?= 700000.00 v= dfn;fdfgsf] df]n
$ v'b afFsL lbg' kg]{ ?= u= cGo
% v'b lbg'
gf]6
ufpkflnsfsf] sfof{non] pkef]Qmf ;ldlt;+u ;Demf}tf
ubf{ lgDgfg';f/sf] zt{x?sf] clgjfo{ kfngf u/fpg] k|ltj4tf lnP/
dfq ;Demf}tf u/fpgsf nflu cg'/f]w
!=pkef]Qmf ;ldltn] gS;f tyf nfut Ol:6d]6 adf]lhd lgdf{0f ubf{ k'/fgf vfg]kfgL,
l;+rfO{, ljBfno ejg, lghL 3/, uf]7, cf+“ug cfbL k"jf{wf/ ;+/rgf Iflt k'¥ofPsf]
v08df ;f]xL pkef]Qmf ;ldltn] cfkm";+u ePsf] ;Demf}tf /sd leqsf] ah]6af6
dd{t, lgdf{0f jf k'glg{df{0f ul/lbg' kg]{5 . ;f] ;DjGwdf s'g} ph'/L kg{ cfPdf
pQm Iflt ePsf] lgdf{0f ug{ nfUg] /sd ;DjlGwt pkef]Qmf ;ldltsf] vftfaf6 s§f u/]/
dfq clGtd km/kmf/s ug]{ Joj:yf ldnfpg'x'g .
@= ;DjlGwt k|fljlws 6f]nLn] ;fO{6df u/]sf] ;e]{, sfof{nosf] :jLs[t nfut cg'dfg
Pj+ gS;fx? cg';f/ g} lgdf{0f sfo{ u/fpg] k|ltj4tf lng' x'g .
#= :jLs[t nfut cg'dfg / gS;f eGbf km/s sfo{ u/L sfof{non] d"Nof+sg gu/]sf]
v08df s'g} lsl;dsf] ph'/ nfUg]5}g eGg] k|ltj4tf lng'x'g .
$= ;Demf}tf adf]lhdsf] lgdf{0f ubf{ u/fpbf jftfj/0f ;+/If0f P]g @)%# / jftfj/0f
lgodfjnL @)%$adf]lhd jftfj/0fdf gsf/fTds k|efj gkg]{ul/ u/fpg] k|ltj4tf lng'x'g .
ect
f}/ ;8s ;'wf/ lj:tf/
mf}tf
g] k|ltj4tf lnP/
S.N. Description of items NO. Length Breadth Height Quantity Unit Remarks
1 E/W excavation for
gabion wall 0.5 18 1 1 9 m3
Volume/
Volume
2 Gabion box Size gabion No
(m3)
( m3)
Sub total 54 m3
3 Stone soling work 1 15 4 0.2 12 m3
Breadth Height
4 2
93.75 0.00
4.5 1 0.00 100.00
127.50 0.00
4.3 1.3 0.00 100.00
150.00 0.00
4 2 0.00 100.00
./Y.:-2075/ 076
82.50 0.00
4 2.5 0.00 100.00
78.76 0.00
4.5 2.5 0.00 100.00
115.50 0.00
4.5 1 0.00 100.00
156.00 0.00
4 2.5 0.00 100.00
165.00 0.00
3.6 4.5 0.00 100.00
135.00 0.00
4 4 0.00 100.00
135.00 0.00
4.6 4 0.00 100.00
135.00 0.00
4.3 4.5 0.00 100.00
112.50 0.00
3.5 6.5 0.00 100.00
75.00 0.00
4.5 4.5 0.00 100.00
90.00 0.00
4 4
105.00 0.00
4 3 0.00 100.00
135.00 0.00
4.8 2.5 0.00 100.00
135.00 0.00
4 3 0.00 100.00
150.00 0.00
4.3 3 0.00 100.00
150.00 0.00
./Y.:-2075/ 076
6 1 0 100
81 0
4.3 2.3 0 100
108 0
4.4 1.5 0 100
102 0
4.7 1.5 0 100
105 0
4.5 3 0 100
123.75 0
5 2 0 100
127.51 0
4.8 2 0 100
./Y.:-2075/ 076
180 0
4 2.5 0 100
153.76 0
4 2.8 0 100
97.5 0
4 3 0 100
120 0
5 0.8 0 100
5 1
5 4 0 100
105.75 0
4.3 2.5 0 100
115.5 0
4.8 1.5 0 100
141 0
4 1 0 100
150 0
4.3 1.5 0 100
168 0
4 1 0 100
156 0
4 2.5 0 100
5628.79 5628.79
2.5
1
Kathekhola Rural Municipality
Office Of The Rural Municipality Executive
Bihunkot , Baglung
Gandaki Province, Nepal
#VALUE! #VALUE!
5.33
Kathekhola Rural Municipality
Office Of The Rural Municipality Executive
Bihunkot , Baglung
Gandaki Province, Nepal
S.N. Description of items NO. Length Breadth Height Quantity Unit Remarks
1 E/W excavation for
gabion wall 0.5 18 1 1 9 m3
Volume/
Volume
2 Gabion box Size gabion No
(m3)
( m3)
Breadth Height
4 2
93.15 0.00
4.5 1 0.00 100.00
77.70 0.00
Y.:-2075/ 076
135.00 0.00
4.3 3 0.00 100.00
135.00 0.00
4.4 2 0.00 100.00
123.76 0.00
4 1.5 0.00 100.00
124.50 0.00
3.8 2 0.00 95.00
170.25 0.00
4 5 0.00 100.00
163.65 0.00
5 2.2 0.00 100.00
148.80 0.00
4.8 2 0.00 100.00
157.50 0.00
4.3 2.5 0.00 100.00
174.00 0.00
4 1.5 0.00 100.00
77.35 0.00
4 0.8 0.00 100.00
6 1 0 100
103.5 0
4.3 2.3 0 100
129 0
4.4 1.5 0 100
105.75 0
4.7 1.5 0 100
90 0
4.5 3 0 100
74.25 0
Y.:-2075/ 076
5 2 0 100
85.51 0
4.8 2 0 100
99 0
4 2.5 0 100
130.5 0
4 2.8 0 100
137.25 0
4 3 0 100
157.5 0
5 0.8 0 100
5 1
5 4 0 100
184.5 0
4.3 2.5 0 100
183 0
4.8 1.5 0 100
138 0
4 1 0 100
108.45 0
4.3 1.5 0 100
119.4 0
4 1 0 100
91.51 0
4 2.5 0 100
Y.:-2075/ 076
13712.75 13712.75
2.5
1
Kathekhola Rural Municipality
Office Of The Rural Municipality Executive
Bihunkot , Baglung
Gandaki Province, Nepal
#VALUE! #VALUE!
5.33