RATES OF MAN, MATERIAL AND MARK-UPS

SL Items Rate Unit


1 MARK-UPS
1 Contractor's Profit 10.00%
2 Contractor's Overhead Expenses 3.50%
3 VAT 5.50%
4 Additional Incidental Expenses for Gas Line Installation Works 10.00%
SL Items Rate Unit
C1 MAN-POWER: EACH PER DAY
1 Head mason / Head mosaic mistry 493.00 Per day
2 Mason 389.00 Per day
3 Skilled labour 303.00 Per day
4 Ordinary labour 245.00 Per day
5 Field Engineer (min BSc in Engg exp 3yrs OR Diploma in eng exp 8 yrs) . 1,500.00 Per day
6 Skilled technician 700.00 Per day
7 Semi skilled technician 450.00 Per day
8 Foreman / Supervisor 567.00 Per day
9 Electrician 493.00 Per day
10 Asstt. Electrician 356.00 Per day
11 Rod binder 421.00 Per day
12 Mosaic mistry 415.00 Per day
13 Plumber 440.00 Per day
14 Painter 423.00 Per day
15 Carpenter 423.00 Per day
16 Welder 423.00 Per day
17 Polish mistry 544.00 Per day
18
Helper to carpenter/painter/plumber/rod binder/electrician/polish mistry/rig Operators 304.00 Per day
19 Machine operator 423.00 Per day
20 Pile rig operator 499.00 Per day
21 Diesel hammer mounted rig operator 732.00 Per day
22 Helper to diesel hammer mounted rig operator 388.00 Per day
23 rig operator in/c site allowances for soil exploration 489.00 Per day
24 Asstt. Laboratory technician 450.00 Per day
25 Laboratory technician / diploma engg in relevant field, min 3 yrs exp . 1,200.00 Per day
26 Laboratory engineer, min BSc in relevant field, min 3yrs exp. . 1,500.00 Per day
27 Ghorami 397.00 Per day
28 Sweeper for Odd Job 808.00 Per day
29 Tube-well mistry 389.00 Per day
30 Tube-well head mistry 499.00 Per day
31 Surveyor 10yrs Exp / diploma Engineer trained in survey . 1,200.00 Per day
32 Helper to surveyor 750.00 Per day
C2 EQUIPMENT, TOOLS & PLANT, VEHICLE, SCAFFOLDING ETC.
33 Scaffolding 7.20 Per sft.
34 Carrying charge of earth by 5-ton capacity truck in Dhaka city k 1,300.00 Per trip
35 do in Narayanganu / Chittagong / Sylhet k. 1,000.00 Per trip
36 do in Rajshahi / Barishal / Khulna metropolitan area k. 850.00 Per trip
37 do in all districts except Dhaka / Ctg. Rajshahi / Barishal / Khulna and N'ganj. k. 700.00 Per trip
38 Carriage of earth by any means for site development in Dhaka city 6.78 cft
39 Carriage of earth by any means for site development in Narayanganj / Chittagong / Sylhet
city 5.22 cft
40
Carriage of earth by any means for site development in Rajshahi / Barishal / Khulna city 4.43 cft
41 Carriage of earth by any means for site development in all districts except Dhaka, Ctg, and 3.65 cft
N'ganj
42 5-ton capacity truck -fare in Dhaka city in/c loading, unloading k. 1,300.00 Per rtip
43 Concrete mixer machine k. 1,000.00 Per day
44 Concrete vibrator k. 500.00 Per day
45 Hire charge of water pump for concreting or similar purposes k. 432.00 Per day
46 Hire charge of diesel operated 1/4 cusec water pump k. 588.00 Per day
47 Hire charge of electricity operated 1 cusec water pump k. 760.00 Per day
48 Hire charge of 1 cusec diesel operated water pump k. 1,030.95 Per day
49 Fuel, lubricant for mixer machine, vibrator and pump etc. k. 1,051.00 Per day
50 Mosaic cutting machine k. 300.00 Per day
51 Marble cutting and shaping in/c cutting disc. k. 300.00 Per day
52 Marble polishing machine in/c polishing stone k. 400.00 Per day
53 Hire charge of marble cutting disk k. 775.14 Per day
54 Hire charge of electric grinding machine k. 206.00 Per day
55 hire charge of cast in situ pile boring complete rig set in/c operational expenses k. 8,820.00 Per day
56 Hire charge of per-cast pile driving complete rig set in/c -do-do-etc. k. 10,550.00 Per day
57 Hire charge of per-cast micro pile driving complete rig set in/c-do-do-etc. k. 5,500.00 Per day
58 Hire charge of load testing devices in/c hydraulic fluid: up to 125 ton capacity k. 10,642.00 Per test
59 do-do up to 275 ton capacity k. 12,519.00 Per test
60 Hire charge of diesel hammer mounted completed rig set. k. 23,707.00 Per day
61 Lifting and movement of crane for diesel mounted hammer up to site k. 50,000.00 per set
62 Truck fare for carrying diesel hammer mounted rig k. 12,000.00 Per trip
63 Hire charge for 8 - 12 ton road roller k. 5,063.00 Per day
64 Hire-charge of chain dozer k. 12,774.45 Per day
65 Fuel & lubricants, spares, maintenance, driver etc. for 8-12 ton road roller. k. 1,268.00 Per day
66 Hire charge of paint spray machine . 4.00 Per day
67 Small boat k. 688.00 Per day
68 Drum (defects free) k. 1,605.20 each
69 Hire charge of boring rig for soil exploration k. 5,313.00 Per day
70 Machine charge for cutting terrazzo tiles k. 406.00 per % sft.
71 Chisel for heavy duty power hammer (100 sft. Capacity) k. 1,594.00 each
72 Hire charge of heavy duty chisel machine k. 634.00 Per day
73 Shuttering in/c prop for partial dismantling of R.C.C k. 20.00 Per sft.
74 Hire charge of welding machine k. 695.38 Per day
75 Hire charge of survey instrument (Level / Theodolite etc.) k. 884.00 Per day
C3 WORK RATE EXCLUDING COST OF MATERIALS
76 Breaking 50 mm downgraded brick chips k. 719.00 per % sft.
77 Breaking 20 mm downgraded brick chips k. 894.00 per % sft.
78 Breaking 12 mm (1/2'') downgraded brick chips k. 1,091.88 per % sft.
79 Breaking 20 mm downgraded stone chips k. 1,531.07 per % sft.
80 Breaking 12 mm downgraded stone chips k. 2,025.14 per % sft.
81 Placing and removing shutter for form-work . 12.00 Per sft.
82 Making steel shutter for form-work . 69.17 Per sft.
83 Making steel door-window frame and shutter . 58.00 Per sft.
84 Making fixed steel glazed frame . 46.91 Per sft.
85 Making steel grill . 45.71 Per sft.
86 Filling and stitching gunny bags . 8.64 Per bag
87 Load testing result sheet preparation k. 6,250.00 Per test
88 Carrying cost of timber . 37.53 per cft.
89 Seasoning timber in plant k. 333.00 per cft.
90 Carrying cost of steel door and window . 53.30 each
91 Fabrication and erection of mild steel truss k. 1,891.23 Per cwt.
92 Fabrication of light section steel k. 275.85 Per cwt.
C4 WORK RATE INCLUDING COST OF MATERIALS
93 Point welding . 3.25 Per point
94 Line welding at field . 5.00 Per inch
95 Bitumenous coating for damp proof course (D.P.C) k. 822.00 per % sft.
96 Coal-tar over timber surface . 6.00 Per sft.
97 Glass pan fitting in/c putty . 15.46 Per sft.
98 Making form work water-tight . 2.25 Per sft.
C5 BRICKS AND SCREEN BLOCKS
99 1st class/Picked jhama standard bricks: BDS k. 7,500.00 Per % 0 Nos.
100 Automatic Machine Made 1st class standard Bricks: BDS k. 9,000.00 Per % 0 Nos.
101 1st class 10 holes machine made 9.5"x4.5"x2.75" ceramic bricks k. 17,500.00 Per % 0 Nos.
102 9.5" x 4.5" x 2.75" size machine made solid klinker facing bricks k. 13,125.00 Per % 0 Nos.
103
9.5" x 4.5" x 2.75" size 10 hole machine made Rock-face/textured klinker facing bricks k. 13,067.83 Per % 0 Nos.
104 9.5" x 4.5" x 2.75" size 3 hole machine made reinforcing facing bricks k. 20,000.00 Per % 0 Nos.
105 200 x 100 x 50 mm/8" x 4" x 2" machine made hard pressed klinker facing bricks k. 18,500.00 Per % 0 Nos.
106 200 x 50 x 50 mm/8" x 2" x 2" machine made kklinker facing RED or Maroon Strips k. 14,000.00 Per % 0 Nos.
107 200 x 62 x 16.51 mm/8" x 2.5" x 0.65" machine made klinker red strips k. 16,750.00 Per % 0 Nos.
108 4" x 4" x 4" fancy screen block k. 28,000.00 Per % 0 Nos.
109 5.5" x5.5" x44" fancy screen block k. 28,000.01 Per % 0 Nos.
110 6" x 6" x 4" fancy screen block Tk. 32,000.00 Per % 0 Nos.
111 190 mm x 190 mm size glass bricks k. 328.83 each
C6 CEMENT
112 Ordinary Portland Cement, BDS-EN-197-1 CEM1, 52.5N (52.5MPa) / ASTM C- 150 Type-l, k. 470.00 Per bag
50 kg bag
113 Portland Composite Cement / CEM-ll/A-M, 42.5N (42.5MPa) (6-20% constituents other k. 440.00 Per bag
than clinker) : 50 kg bag
114 White Cement . 25.00 Per kg
C7 STONE / BOULDER / MOSAIC CHIPS, BITUMEN / ADMIXTURE / MEMBRANE
115 Uncrushed boulder k. 12,500.00 Per % cft.
116 19 mm (3/4") downgraded crushed stone chips k. 14,500.00 Per % cft.
117 12 mm (1/2") downgraded stone chips k. 13,500.00 Per % cft.
118 Stone shingles k. 8,100.00 Per % cft.
119 Pea-gravel k. 5,500.00 Per % cft.
120 Slaked lime . 19.00 Per kg
121 Surki from 1st class brick . 58.00 Per cft.
122 Pakistan origin (onix) mosaic chips . 19.00 Per kg
123 Indian origin (deradun) mosaic chips . 17.00 Per kg
124 Pumice stone for finishing mosaic work . 60.00 each
125 Minar stone for finishing mosaic work k. 400.00 each
126 Color pigment . 55.00 Per lbs
127 20 mm x 50 mm glass strip . 8.00 Per frt.
128 80 / 20 Bitumen for road work Tk. 65,333.33 Per M.ton
129 Water - proofing PVC membrane k. 605.00 Per sqm.
130 Primer for laying PVC membrane on wall k. 500.00 Per litre
131 Water reducing admixture in concrete. Type-A k. 150.00 Per litre
132 Retarding admixture in concrete : Type-B k. 155.00 Per litre
133 Accelerating admixture in concrete : Type-C k. 160.00 Per litre
134 Water-reducing and retarding admixture in concrete: Type: D k. 145.00 Per litre
135 Water- reducing and accelerating admixture in concrete: Type-E k. 165.00 Per litre
136 Water- reducing high range admixture in concrete: Type-F k. 180.00 Per litre
137 Water-reducing high range retarding admixture in concrete: Type-G k. 147.00 Per litre
138 Micro Fiber for concrete k. 725.00 Per kg
C8 EARTH / SAND
139 Royalty of earth k. 700.00 Per % 0 cft.
140 Royalty of sand Tk. 6,875.00 Per % 0 cft.
141 Royalty of turf k. 9.00 per % sft.
142 Sand (F.M.0.8) k. 900.00 per % sft.
143 Sand (F.M.1.2) Tk. 1,700.00 per % sft.
144 Sand (F.M.2.2) Tk. 3,000.00 per % sft.
C9 TIMBER / BOARD / TIMBER PRODUCT
145 Garjan / Jam / local Sal Tk. 2,000.00 per cft.
146 Mehgani k. 119.00 per cft.
147 Silkarai / Chikrashi k. 2800.00 per cft.
148 Teak-Chambal k. 3,100.00 per cft.
149 Chittagong teak k. 4,500.00 per cft.
150 Kathal k. 2,250.00 per cft.
151 Gamari k. 1,950.00 per cft.
152 Chapalish k. 2,100.00 per cft.
153 Timber for form-work k. 470.00 per cft.
154 Bamboo . 12.00 per cft.
155 Shal ballah (avg. dia 6") for driving k. 120.00 per cft.
156 Burma teak veneered flush door shutter k. 335.69 per cft.
157 Champ veneered flush door shutter k. 240.61 per cft.
158 Chapalish veneered flush door shutter k. 239.59 per cft.
159 Garjan veneered flush door shutter k. 216.42 per cft.
160 12 mm tick Plain Particle board: 500kg / m3 . 35.34 per cft.
161 Melamine board (12 mm tick): 8" -0 x 4' -0" size : 700 kg / m3 k. 1,946.50 per cft.
162 9 mm thick gypsum board . 25.98 per cft.
163 9 mm thick perforated gypsum board . 30.57 per cft.
164 12 mm thick laminated vinyl board : 550kg / m3 . 46.88 per cft.
165 12 mm thick Burma Teak veneered board : 550kg / m3 k. 110.42 per cft.
166 Burma teak k. 5,571.38 per cft.
167 50 mm thick glass wool k. 197.48 per cft.
168 Rubber gum k. 602.71 per cft.
169 PVC water stopper k. 206.12 per cft.
C10 STEEL : Ductility Class D, ratio of fu to fy = or ≥ 1.25
170 Grade 300 (300Mpa / 300N/mm2 ≈ 43500psi/40 Grade): BDS - 6935 - 2006 - B300 and k. 59,000.00 Per M.ton
Ratio fy to fu = > 1.25, fy not exceeding 314 MPa
171 Grade 400 (400Mpa / 400N/mm2 ≈ 60900psi/60 Grade): BDS - 6935 - 2006 - B400: and k. 61,500.00 Per M.ton
Ratio fy to fu = > 1.25, fy not exceeding 318 MPa
172 M.S sheet / plate k. 85,000.00 Per M.ton
173 M.S. angle, T and Z - section, Channel etc. k. 62,500.00 Per M.ton
174 M.S. plain bar and F.I bar (non-structural use) k. 56,000.00 Per M.ton
175 Solid square bar k. 63,000.00 Per M.ton
176 0.45 mm thick C.I sheet: k. 90,500.00 Per M.ton
177 0.45 mm thick colored C.I sheet: k. 91,000.00 Per M.ton
178 0.27 mm thick 6'-0" x 18" ridging: k. 315.00 Per pc.
179 0.27 mm thick 6'-0" x 18" colored ridging: k. 364.96 Per pc.
C11 GLAZED / MARBLE / TERAZZO TILES
180 18 mm thick marble stone, Black/white (India) k. 395.00 Per sft.
181 16 mm thick marble stone, Black/white (India) k. 350.00 Per sft.
182 12 mm thick marble stone, Black/white (India) k. 315.00 Per sft.
183 18 mm thick stone, colored / grey marble (India) k. 410.00 Per sft.
184 16 mm thick stone, colored / grey marble (India) k. 360.00 Per sft.
185 12 mm thick stone, colored / grey marble (India) k. 345.00 Per sft.
186 18 mm thick stone, colored / grey marble (Italian) k. 550.00 Per sft.
187 Wall tiles less than, equal or equivalent to 250mm x 330 mm in sizes . 46.00 Per sft.
188 Wall tiles more than 205 x 330 mm & less than 310 x 510 mm in sizes or equivalen. 54.00 Per sft.
189 Wall tiles more than 310 x 510 mm in sizes or equivalent . 75.00 Per sft.
190 GP (Gress Porcellanato) - Glazed Homogeneous 300 x 300 mm floor tiles . 64.00 Per sft.
191 GP (Gress Homogeneous) 400 x 400 mm floor tiles . 74.00 Per sft.
192 GP (Mirror Polished) 300 x 300 mm floor tiles . 78.00 Per sft.
193 GP (Mirror Polished) 400 x 400 mm floor tiles . 88.00 Per sft.
194 GP (Mirror Polished) 400 x 400 mm floor tiles k. 107.00 Per sft.
195 GP 300 x 300 mm floor tiles . 70.00 Per sft.
196 Unglazed Homogeneous Floor Tiles 300 x 300 mm . 68.00 Per sft.
197 Unglazed Homogeneous Floor Tiles 400 x 400 mm . 75.00 Per sft.
198 Pasting Tiles Adhesive . 16.00 Per kg
199 Tiles grout / Joint filler . 75.00 Per kg
200 Acid stone k. 384.00 each
201 Water Proofing Paper (12 Size) . 17.00 each
202 Water Proofing Paper (320 Size) . 20.00 each
C12 PROPS / PIPES / l-SECTION / BOX CHANNEL FOR CONCRETING WORK
203 Bamboo prop in/c supports k. 110.00 each
204 Salballah prop in/c top supports k. 933.00 each
205 50 mm/2" dia M.S. pipe k. 135.00 Per sft.
206 38 mm/1.5" dia M.S. pipe k. 110.00 Per sft.
207 50 mm/2" dia G.I pipe k. 175.00 Per sft.
208 38 mm/1.5" dia G.I. pipe k. 140.00 Per sft.
209 19 mm/3/4" dia G.I. pipe . 70.00 Per sft.
210 13 mm1/2" dia G.I. pipe . 50.00 Per sft.
211 Adjustable mechanism in/c top and bottom plate k. 550.00 Per set
212 l-section joist to support inclined prop k. 482.00 Per sft.
213 4" x 2" M.S. box channel with 1/8" thick M.S. sheet k. 450.00 Per sft.
214 Steel prop with adjustable mechanism in/c top and bottom plate k. 1,680.00 Per set
215 Turn-buckle in/c tie rod k. 487.00 Per set
C13 PAINT / POLISHING
216 Cement paint / Cement Coating . 90.00 Per kg
217 Weather coat / Acrylic based exterior emulsion k. 318.40 Per litre
218 Weather coat sealer (Exterior) k. 209.60 Per litre
219 Silicon based paint / coating k. 322.22 Per litre
220 Ready -mix putty (Exterior-interior) water based . 76.00 Per litre
221 Seale for ready-mix putty (Exterior-interior) k. 228.00 Per litre
222 Synthetic Enamel paint (alkyd based) k. 310.00 Per litre
223 Synthetic Enamel Under-coat k. 149.00 Per litre
224 Thinner for oil-based paint (Turpentine) for general purpose k. 140.00 Per litre
225 Synthetic Polyvinyl (S.P.) Distemper k. 116.66 Per litre
226 Synthetic Ployviny (S.P.) Distemper Primer / sealer k. 209.60 Per litre
227 Acrylic Plastic Emulsion Paint k. 247.25 Per litre
228 Acrylic Plastic Emulsion Paint sealer k. 205.00 Per litre
229 Acrylic Emulsion Paint k. 228.70 Per litre
230 Acrylic Emulsion Paint Primer/under-coat k. 226.60 Per litre
231 Chlorinated Rubber Paint k. 700.00 Per litre
232 Chlorinated Rubber sealer k. 545.00 Per litre
233 Chlorinated Rubber Paint Thinner k. 212.00 Per litre
234 Textured Coating in/c sealer, top coat, gloss finish k. 288.93 Per litre
235 Wood varnishing: Yacht (alkyd based) k. 250.00 Per litre
236 Wood varnishing: Egg-sheel (alkyd based) k. 250.00 Per litre
237 Wood varnishing: Matt (alkyd based) k. 250.00 Per litre
238 Thinner for alkyd based wood varnishing k. 104.00 Per litre
239 Oxalic acid . 95.00 Per litre
240 Wax for polishing k. 299.00 Per Kg
241 Red/black oxide k. 197.25 Per litre
242 De salts 01 Tk. Per litre
243 Foam lub Tk. Per litre
C14 French-Polishing
244 French Powder . 40.00
245 Spirit . 92.00
246 Gala k. 1,600.00
247 Karpa k. 500.00
248 Sand paper . 11.33
249 Putty . 78.00
250 Markin cloth . 15.00
251 Cotton . 75.00
C15 ALUMINUM: Anodized coated other than Powder coated
Rate
l. Aluminum Channel / Sections: Rate per rft. Unit
Bronze Silver S.S. Color
252 101.60 mm, 44.45 mm wall frame of 1.2 mm thick 117.60 115.50 119.70 Per rft.
253 54 mm, 46 mm wall frame of 1.8 mm shutter side 2.3 mm
thick . 130.20 126.00. 132.30 Per rft.
254 16.54 mm, 15.49 mm Door glass bit of 0.99 mm thick . 15.75 14.70 . 16.80 Per rft.
255 101.54 mm, 42.93 mm closure system of 1.8 mm thick . 123.90 120.75. 126.00 Per rft.
256 101.60 mm closure cover of 1.2 mm thick 47.25 43.20 . 48.30 Per rft.
257 101.60 mm, 12.70 mm floor bottom of 4 mm thick . 133.35 129.15. 135.45 Per rft.
258 82.60 mm, 43.99 mm door shutter bottom of 1.8 mm thi. 158.55 154.35. 161.70 Per rft.
259 51 mm, 43.99 mm door shutter top of 1.8 mm thick . 130.20 126.00. 132.30 Per rft.
260 101.60 mm, 38.10 mm, 25.4 mm door handle (short) of 2.3
mm, 2.3 mm, 4.01 mm thick . 175.35 170.10. 178.50 Per rft.
261 101.60 mm, 44.45 mm top & side 1.8 mm thick . 151.20 147.00. 154.35 Per rft.
262 101.35 mm, 44.45 mm bottom of 1.2 mm thick k. 112.35 109.20. 114.45 Per rft.
263 44.32 mm, 19.61 mm fixed bottom cover of 1.2 mm thickk. 42.00 40.95 k. 43.05 Per rft.
264 83.21 mm, 16.00 mm fixed grouve cover of 1.2 mm thick k. 65.10 64.05 k. 66.15 Per rft.
265 39.09 mm, 14.8 mm fixed glass protector of 1.0 mm thickk. 25.20 24.15 k. 26.25 Per rft.
266 15.75 mm, 14.81 mm fixed glass protector bit of 0.99 mm
thick k. 16.80 16.80 k. 17.85 Per rft.
267 75.50 mm, 17.79 mm outer low bottom Of 1.2 mm thickk. 61.95 58.80Tk. 63.00 Per rft.
268 75.5 mm, 26.8 mm outer top of 1.2 mm thick k. 86.10 82.95 k. 88.20 Per rft.
269 33 mm, 26.80 mm, 22 mm shutter top of 1.2 mm thick k. 57.75 55.65 k. 58.80 Per rft.
270 60 mm, 24 mm shutter bottom of 1.2 mm thick k. 81.90 79.80 k. 84.00 Per rft.
271 75.50 mm, 19.90 mm outer side of 1.2 mm thick k. 67.20 65.10 k. 68.25 Per rft.
272 49.20 mm, 26.20 mm shutter lock of 1.2 mm thick k. 75.60 73.50 k. 77.70 Per rft.
273 34.40 mm, 32.10 mm, 25.40 shutter inter lock of 1.2 mm thick k. 79.80 77.70 k. 81.90 Per rft.
274 31.75 mm shutter divider of 1.2 mm thick k. 63.00 60.90 k. 64.05 Per rft.
275 31.00 mm, 26.00 mm sliding fixed side of k. 48.30 46.20 k. 49.35 Per rft.
276 7.14 mm spandrel of 1.4 mm to 1.2 mm thick k. 70.35 68.25 k. 72.45 Per rft.
277 75.50 mm, 32 mm outer bottom (high) of 1.2 mm thick k. 78.75 76.65 k. 80.85 Per rft.
278 75.5 mm, 26.80 mm outer top of 1.2 mm thick k. 86.10 82.95 k. 88.20 Per rft.
279 37.78 mm, 37.78 mm bottom cover of 1.2 mm thick k. 33.60 32.55Tk. 34.65 Per rft.
280 76.20 mm, 38.10 mm, grouve cover of 1.2 mm thick k. 84.00 81.90 k. 86.10 Per rft.
281 57.15 mm, 15.80 mm grouve cover of 1.2 mm thick k. 49.35 48.30 k. 50.40 Per rft.
282 76.20 mm, 38.10 mm, 57.15 mm fixed top & side of 1.2 mm Tk.
thick . 101.85 98.70 Tk. 103.95 Per rft.
283 38.88 mm, 36.63 mm casement outer 1.2 mm thick k. 54.60 52.50 k. 55.65 Per rft.
284 47.62 mm, 28.63 mm, 40.82 mm casement shutter of 1.9 mm Tk.
Tk. 95.55 Per rft.
thick 92.40 Tk. 97.65
285 Tk.
18.87 mm, 27.00 mm casement shutter top of 1.245 mm thick Tk. 26.25 Per rft.
25.20 Tk. 27.30
286 57.15 mm, 15.80 mm grouve cover of 1.2 mm thick Tk. 49.35 Tk. 49.35 Tk. 50.40 Per rft.
287 17.40 mm, 31.78 mm bottom cover of 1.2 mm thick Tk. 33.60 Tk.
32.55 Tk. 34.65 Per rft.
288 76.20 mm, 38.10 mm fixed bottom cover of 1.2 mm thick Tk. Tk. Per rft.
84.00 81.90 Tk. 86.10
289 57.15 mm, 38.10 mm top mm wall frame of 1.2 mm thic Tk. 101.85 Tk. Tk. 103.95 Per rft.
98.70
290 76.00 mm, 38.10 mm wall frame of 1.2 mm thick Tk. 75.60 Tk. Tk. 77.70 Per rft.
73.50
291 55.02 mm, 37.39 mm louver Z-section of 1.2 mm thick Tk. 31.50 Tk.
30.45 Tk. 32.55 Per rft.
292 39.67 mm, 15.06 mm louver U-section of 1.2 mm thick Tk. 36.75 Tk.
35.70 Tk. 37.80 Per rft.
293 95.00 mm, 38.00 mm outer bottom of 1.2 mm thick Tk. Per rft.
Tk 103.95 100.80 Tk. 106.5
294 95.00 mm, 28.50 mm outer top of 1.2 mm thick Tk. 107.10 Tk. Tk. 109.20 Per rft.
103.95
295 95.00 mm, 19.50 mm outer side of 1.2 mm thick Tk. 81.90 Tk. Tk. 84.00 Per rft.
79.80
296 4.2 mm, 13.2 mm net section of 1.2 mm thickness Tk. 53.55 Tk.
51.45 Tk. 54.60 Per rft.
297 1" x 1" square pipe Tk. 50.40 Tk.
48.30 Tk. 51.45 Per rft.
298 7.14 mm span drel of 1.2 mm thick (0.70 kg/m) Tk. Per rft.
Tk. 70.35 68.25 Tk. 72.45
299 Mosquito net (fiver net) (per sft.) Tk. 15.75 Tk. Tk. 16.80 Per rft.
15.75
300 T-section (main T) for false ceiling Tk. 22.05 Tk. Tk. 23.10 Per rft.
21.00
301 T-section (cross T) for false ceiling Tk. 22.05 Tk.
21.00 Tk. 23.10 Per rft.
302 L-section for wall and ceiling Tk. 22.05 Tk.
21.00 Tk. 23.10 Per rft.
303 Aluminum curtain rail in/c hard-wares and fitting Tk. Per rft.
Tk. 22.05 21.00 Tk. 23.10
304 44 mm, 44 mm, 1.20 box Tk. 72.45 Tk. Tk. 74.55 Per rft.
70.35
305 25 mm, 25 mm, 1.20 angle Tk. 22.05 Tk. Tk. 23.10 Per rft.
21.00
306 25 mm, 25 mm, 1.20 fitting angle Tk. 38.85 Tk.
37.80 Tk. 39.90 Per rft.
307 Aluminum composite Panel Tk. 238.73 Tk.
236.25 Tk. 242.55 Per rft.
308 Curtain wall sub mullimum (100mm x 50mm x 2.00mm) Tk. Tk. Per rft.
324.45 315.00 Tk. 329.70
309 Curtain wall sub mullimum (50mm x 50mm x 1.50mm) Tk. 206.85 Tk. Tk. 211.05 Per rft.
200.55
310 Casement outer section (29mm x 20mm x 1.20mm) Tk. 33.60 Tk. Tk. 34.65 Per rft.
34.65
311 Casement outer section (52mm x 22mm x 40mmx1.5mm) Tk. 155.40 Tk.
152.25 Tk. 158.55 Per rft.
312 Aluminum angle (50mm x 50mm x 6mm) Tk. 180.60 Tk.
178.50 Tk. 183.75 Per rft.
313 Aluminum cover (50mm x 6 mm x 1.5mm) Tk. Tk. 66.15 Per rft.
Tk. 64.54 61.95
314 50mm x 6mm x 1.5mm angle for casement shutter Tk. 55.26 Tk. Tk. 56.70 Per rft.
57.75
315 38mm x 38mm Aluminum frame (Wall box) of 1.5 mm Tk. 41.30 Tk. Tk. 42.00 Per rft.
42.00
316 38mm x 12mm and 1.5 mm thick Aluminum frame of Netting Tk.
Tk. 51.80 Tk. 53.55 Per rft.
shutter top bottom & side 50.40
317 20 mm Aluminum pipe Tk. 88.20 Tk.
86.10 Tk. 90.30 Per rft.
ll. Accessories for aluminium door-window works
318 Swing door clouser Tk. 2,627.03 Set
319 Swing door lock Tk. 572.70 Set
320 Swing door Mohiar Tk. 4.25 rft.
321 Fixed Neoprene Tk. 3.21 rft.
322 Flush bolt Tk. 307.43 set
323 Sliding door lock Tk. 172.98 set
324 Sliding door / window wheel Tk. 43.26 No.
325 Sliding door / window Mohiar Tk. 1.36 rft.
326 Sliding Neoprene Tk. 2.73 rft.
327 Sealant Tk. 2.47 gm.
328 Sliding window key lock Tk. 67.28 set
329 Bolts and Screws in/c sealants Tk. 52.86 LS
330 4-bar hinge Tk. 529.97 No.
331 Casement handle Tk. 266.75 No.
332 Rivet Tk. 4.62 No.
333 S.S.screw Tk. 1.91 No.
334 Screws Tk. 0.94 No.
335 5 mm tinted glass Tk. 82.77 sft.
336 5 mm clear glass Tk. 65.60 sft.
337 Rubber gasket Tk. 2.14 sft.
338 Aluminium sheet Tk. 335.18 Kg.
339 Protector bit (Single) Tk. 19.93 sft.
340 Protector bit (Double) Tk. 26.31 sft.
341 Silicon (1 piece 300 mm) Tk. 312.19 each
342 Steel rowel bolt Tk. 35.34 each
343 Rivets (Big) Tk. 1.86 each
344 Norton Tap Tk. 25.71 each
345 Masking tape Tk. 23.78 each
346 Structural sealant Tk. 9.00 each
347 Casement 4-bar huge Tk. 501.51 each
348 Casement handle Tk. 206.45 each
349 Sealant Gum Tk. 340.79 each
350 Arm lock Tk. 375.04 each
351 M.S. angle Tk. 90.22 each
lll. Vertical Venetian Blinds
352 Head rail, Aluminium Tk. 8.34 Per rft.
353 Rod tilt / Hexagon Aluminium Rod Tk. 8.05 Per rft.
354 End cap set / End closure set Tk. 61.20 Per set
355 Weight plate / Weight bar Tk. 9.23 each
356 Link Chain / Weight Chain Tk. 9.04 Per rft.
357 Ball Chain / Plastic Chain Tk. 8.99 Per rft.
358 Plastic Washer / Fabric upper clip Tk. 2.20 each
359 Spacer (Link) / Plastic Runner Spring Tk. 7.41 each
360 Handling Cord / Nylon cord Tk. 2.84 Per rft.
361 Thread bar Tk. 7.79 each
362 Angle Clip Tk. 7.04 each
363 Plastic Runner Tk. 3.32 each
364 Glass fiber Fabrics (special quality, foreign made) Tk. 88.62 Per rft.
365 Angle Tk. 4.17 each
366 Fitting-fixing charge Tk. 3.15 Per sft.
lV. Horizontal Venetian Blind
367 Head rail Tk. 6.22 Per rft.
368 Bottom rail Tk. 4.05 Per rft.
369 Aluminium Strips (special quality, foreign made) Tk. 74.42 Per rft.
370 Rod till / hexagon Aluminium Rod Tk. 5.43 Per rft.
371 Gear Box / Tilter Tk. 8.81 each
372 Support and Cord Drum Tk. 5.48 each
373 Cord Lock Tk. 5.42 each
374 Stop ring Tk. 7.16 each
375 Tassel Tk. 4.22 each
376 Ladder Cord Tk. 3.14 Per rft.
377 Stick / Tilt Wand Tk. 7.87 each
378 Bracket / Metal Intermediate Bracket Tk. 7.02 each
379 Bottom cap / End Cap for head rail Tk. 9.97 each
380 Tape holder Tk. 5.51 each
381 Steel Washer Tk. 7.44 each
382 Head Cap set Tk. 11.89 each
383 Handling Cord Tk. 3.34 Per rft.
384 Labour cost Tk. 2.72 Per rft.
C16 PVC Per rft.
l. uPVC Pipe for Electric Conduit Per rft.
385 Wall grade 3/4" dia pipe, 1.2 mm thick Tk. 3.92 Per rft.
386 Wall grade 1" dia pipe, 1.2 mm thick Tk. 5.48 Per rft.
387 Roof grade 3/4" dia pipe, 1.5 mm thick Tk. 4.97 Per rft.
388 Roof grade 1" dia pipe, 1.5mm thick Tk. 6.19 Per rft.
389 Roof grade 1.25" dia pipe, 1.5 mm thick Tk. 8.84 Per rft.
ll. Fittings for uPVc Pipe for Electric Conduit
390 3/4" Socket Tk. 26.63 Per dzn.
391 1" Socket Tk. 35.12 Per dzn.
392 1.25" Socket Tk. 52.35 Per dzn.
393 3/4" Pain bend Tk. 52.35 Per dzn.
394 1 Plain bend Tk. 41.04 Per dzn.
395 1.25" Plain bend Tk. 91.51 Per dzn.
396 3/4" Circular box single Tk. 57.11 Per dzn.
397 3/4" Circular box double Tk. 69.99 Per dzn.
398 1" Circular box single Tk. 67.65 Per dzn.
399 1" Circular box double Tk. 84.79 Per dzn.
400 Solvent cement for jointing Tk. 2.25 Per grm
lll. Plastic Door, Windows & Partition
401 PVC door frame thickness min 2.5 mm Tk. 104.69 Per Meter
402 G.I inner joint (76.2 mm x 38.1 mm) clamp Tk. 11.22 each
403 G.I inner joint (72.2 mm x 76.2 mm) clamp Tk. 13.02 each
404 G.I outer clamp Tk. 11.77 each
405 G.I wall clamp (216 x 19 mm) Tk. 13.20 each
406 Rivet Ø 3.17 Ø 3 x ≈ 12.17 mm Tk. 1.10 each
407 Garjan wood 25.4 x 22.22 mm Tk. 26.39 Per rm.
408 uPVC side clip 2.5 mm Tk. 862.40 Per Meter
409 uPVC side clip 2.5 mm Tk. 25.44 Per Meter
410 Screw 25.5 mm Tk. 3.08 each
411 Tower bolt Ø 9.38 x 152.4 mm Tk. 56.00 each
412 Plastic handle 146 mm long Tk. 52.51 each
413 Hinges 76.2 x 57.15 mm Tk. 47.32 each
414 Hasp bolt Ø 25 x ≈ 254 mm Tk. 183.96 each
415 Round lock normal (China/Korea/Taiwan) Tk. 435.31 each
416 Rod Ø 9.52 mm x 3 Pcs. Tk. 36.96 each
417 Nut with washer 6 Pcs. Tk. 11.73 each
418 Rowel plug Tk. 0.71 each
419 T-frame Tk. 128.58 Per rm.
420 L-frame Tk. 132.24 Per rm.
421 Hollow bit Tk. 58.32 Per rm.
422 Screw for hollow partition Tk. 1.59 each
423 T-inner joint clamp Tk. 8.50 each
424 L-inner joint clamp Tk. 12.88 each
425 Glass bit Tk. 59.46 Per rm.
426 Round rubber bit Tk. 18.37 Per rm.
427 Rubber bit Tk. 7.68 Per rm.
428 Adhesive Tk. 183.60 Per kg.
429 5 mm glass for partition wall Tk. 684.31 per sqm.
lV. Plastic Door, Windows & Partition
430 8 mm thick PVC sheet Tk. 1,475.64 Per pc.
431 Partition frame (Profile) Tk. 53.37 Per rft.
432 4" New sash (Profile) Tk. 136.66 Per rft.
433 Sliding glass bead (Profile) Tk. 19.77 Per rft.
434 Partition frame (Reinforcement) Tk. 25.60 Per rft.
435 Rubber Tk. 6.73 Per rft.
436 Screw Tk. 3.45 Per pc.
437 Hinge Tk. 46.33 Per pc.
438 Sitkani Tk. 62.34 each
439 Handle Tk. 50.65 each
440 Steel clamp (8") Tk. 8.42 each
441 Partition glass bit Tk. 8.94 Per rft.
442 Sliding frame Tk. 30.86 Per rft.
443 Sliding sash Tk. 36.08 Per rft.
444 Sliding interlock Tk. 12.57 Per rft.
445 Brush Tk. 9.13 Per rft.
446 Lock 2") Tk. 31.17 each
447 Sliding frame: reinforcement Tk. 25.82 Per rft.
448 Sliding sash: reinforcement Tk. 27.29 Per rft.
449 5 mm clear glass Tk. 81.31 Per rft.
450 3 mm thick plastic wood Tk. 666.14 Per pc.
451 2" Screw Tk. 109.65 Per pack
452 Wall bit (9/64) Tk. 38.23 Per pc.
453 Super bit Tk. 154.86 Per pc.
454 sun-star Glue Tk. 107.55 Per liter
455 Tarpin Tk. 184.44 Per gallon
456 Super Glue Tk. 26.76 Per pc.
457 6 mm thick plastic wood Tk. 1,264.27 Per pc.
458 12 mm thick plastic wood Tk. 2,411.99 Per pc.
459 2" Magnet Tk. 36.19 each
460 Chain Hing (kabja) Tk. 120.27 each
461 Metal Handle Tk. 185.31 each
462 Cloth Tk. 16.48 Per yrds.
463 Rowl plug (10 Nos. per pack) Tk. 18.43 Per pack
464 1" Aluminium main Tee Tk. 26.05 Per rft.
465 1" Aluminium Cross Tee Tk. 22.62 Per rft.
466 1" Aluminium L-section Tk. 22.72 Per rft.
C17 GAS CONNECTION WORK
1.50 PSI API 5L, Grade-B ERW M.S. Pipe
467 75 mm ND (88.90 mm OD) Tk. 272.12 Per rft.
468 50 mm ND (60.30 mm OD) Tk. 163.28 Per rft.
469 25 mm ND ( 33.40 mm OD) Tk. 122.37 Per rft.
470 20 mm ND (26.70 mm OD) Tk. 51.30 Per rft.
ll. Consumable
471 4" x 400' Black tape Tk. 5,323.13 Per roll
472 2" 200' Black tape Tk. 1,145.93 Per roll
473 Printer Tk. 276.33 Per liter
474 75 mm ND (88.90 mm OD) Tk. 130.22 each
475 50 mm ND (60.30 mm OD) Tk. 110.66 each
476 25 mm ND ( 33.40 mm OD) Tk. 86.72 each
477 20 mm nD (26.70 mm OD) Tk. 74.19 each
478 50 x50 x 50 mm N.D. Tee CD 40 Tk. 201.35 each
479 50 x50 x 25 mm N.D. Tee CD 40 Tk. 224.61 each
480 25 x25 x 25 mm N.D. Tee CD 40 Tk. 127.60 each
481 50 mm x 90 0 Elbow Tk. 164.93 each
482 25 mm 900 Elbow Tk. 47.84 each
483 50 mm 450 0 Elbow Tk. 71.12 each
484 50 x 25 mm Reducer Tk. 78.86 each
485 20 mm Plug/Socket Tk. 197.96 each
486 50 x 20 mm Saddle Tk. 173.19 each
487 50 mm dia End Cap Tk. 73.65 each
488 25 mm dia End Cap Tk. 64.90 each
489 50 x 50 mm Equal Tee Tk. 14,079.19 each
490 50 x 50 x 25 mm N.D. Tee CD40 Tk. 224.61 each
491 25 x 25 x 25 mm Service Tee Tk. 1,503.33 each
492 50 x 25 mm Service Tee Tk. 2,817.40 each
493 50 mm insulating kits Tk. 1,831.67 each
494 50 mm flange W/n 150 R/F Tk. 752.74 each
495 5/8" x 3" long nut bolt in/c washer Tk. 95.61 each
496 Value Pit (Titas Gas T&D Co. Ltd. design plan.) (for 2"dia above) Tk. 15,154.70 each
497 M.S. Sheet cover supplied by Titas Gas T & D Co. Ltd. (for 2" dia above) Tk. 13,492.37 each
498 Testing & purging Tk. 18.97 Per Meter
499 50 mm ND dia ball valve class 150 R.F. Tk. 7,000.40 each
500 25 mm ND dia plug valve class 150 R.F. Tk. 4,540.80 each
501 25 mm dia flange W/N 150 R.F. Tk. 396.06 each
502 50 mm dia flange W/N 150 R.F. Tk. 752.74 each
503 50 mm dia gasket Tk. 242.74 each
504 25 mm dia gasket (asbestos) Tk. 39.67 each
505 1/2" x 2.5" nut-bolt Tk. 29.35 each
506 3/4" dia G.I pipe (NTL or eqv.) Tk. 60.80 Per rft.
507 1/2" dia G.I. pipe (NTL) or eqv.) Tk. 51.25 Per rft.
508 12 x 6 mm gas stop cock Tk. 167.83 each
509 20 x 20 mm gas stop cock Tk. 268.31 each
C18 TERMITE TREATMENT
510 DURS BAN 20 EC Tk. 654.73 Per liter
511 NEOCIDOL-60 Tk. 125.90 Per % ml
512 Kerosene / Diesel Tk. 68.00 Per liter
C19 CONCRETE HOLLOW BLOCKS AND PAVING STONE WORKS
513 70 mm non load bearing concrete hollow block Tk. 21.23 each
514 Transportation 70 mm block Tk. 3.18 each
515 Mortar mix Tk. 244.42 Per liter
516 90 mm non load bearing concrete hollow block Tk. 24.00 each
517 Transportation 90 mm block Tk. 3.14 each
518 140 mm non load bearing concrete hollow block Tk. 33.46 each
519 Transportation 140/190 mm block Tk. 6.84 each
520 140 mm load bearing concrete hollow block Tk. 48.75 each
521 190 mm load bearing concrete hollow block Tk. 59.61 each
522 150 mm concrete ceiling block Tk. 56.41 each
523 Transportation 150/200 mm ceiling block Tk. 7.60 each
524 200 mm concrete ceiling block Tk. 81.75 each
525 External plaster mix Tk. 249.19 Per liter
526 60 mm grey Uniblock: 15 N/mm2 Tk. 9.62 each
527 60 mm colored Uniblock: 15 N/mm2 Tk. 14.00 each
528 Transportation 60/80 mm Uniblock / Rec-block Tk. 1.79 each
529 60 mm grey Uniblock: 49 N/mm2 Tk. 15.23 each
530 60 mm colored Uniblock: 49 N/mm2 Tk. 16.71 each
531 80 mm grey Uniblock: 49 N/mm2 Tk. 20.19 each
532 80 mm colored Uniblock: 49 N/mm2 Tk. 25.39 each
533 Rectangulary grey block Tk. 18.05 each
534 Rectangular colored block Tk. 21.42 each
535 250 x 250 mm Grey Engraved CC tiles Tk. 40.57 Per sft.
536 250 x 250 mm colored Engraved CC tiles Tk. 49.14 Per sft.
537 Transportation of 250 x 250 mm tiles Tk. 1.65 Per sft.
538 Roof Engraved Tile Tk. 31.85 Per sft.
539 Solid block (215 x 100 x 65) mm Tk. 7.98 each
540 Transportation Solid block (215 x 100 x 65) mm Tk. 1.64 each
541 200 x 92 x 37.5 mm grey solid colid caldding block Tk. 12.19 each
542 Transportation solid cladding block Tk. 2.01 each
543 200 x 92 x 37.5 mm colored solid cladding block Tk. 8.96 each
544 400 x 92 x 50 mm grey split cladding Tk. 16.61 each
545 Transportation split cladding Tk. 2.49 each
546 400 x 92 x 50 mm colored facial cladding Tk. 18.65 each
547 420 x 300 x 15 mm colored facial cladding Tk. 30.62 each
548 418 x 330 x 17 mm colored facial cladding Tk. 41.07 each
549 Transportation roof tiles Tk. 3.00 each
550 J-hook with nut and washer Tk. 9.00 each
551 418 x 330 x 17 mm oriental color roof tiles Tk. 37.01 each
552 418 x 330 x 17 mm antique red color roof tiles Tk. 42.65 each
553 418 x 330 x 17 mm green color roof tiles Tk. 46.40 each
554 600 x 300 x 100 mm kerb stone Tk. 121.66 each
555 Transportation kerb stone Tk. 27.12 each
556 100 mm non-load bearing concrete hollow block Tk. 26.68 each
557 Transportaion 100 mm hollow block Tk. 3.26 each
558 250 mm concrete ceilling block Tk. 82.13 each
559 Transportation 250 mm ceiling block Tk. 7.61 each
560 300 mm concrete ceiling block Tk. 99.79 each
561 Transportation 300 mm ceiling block Tk. 11.50 each
562 100 mm concrete ceiling block Tk. 32.45 each
563 Transportation 100 mm ceiling block Tk. 4.66 each
564 418 x 330 x 17 mm brown color roof tiles Tk. 43.00 each
565 418 x 330 x 17 mm Navy blue roof tiles Tk. 45.97 each
566 418 x 330 x 17 mm Mahogany color roof tiles Tk. 43.08 each
567 418 x 330 x 17 mm Rust Gold color roof tiles Tk. 42.97 each
568 All type Concrete Ridge: red color Tk. 130.95 each
569 60 mm gray Trihex Tk. 16.37 each
570 60 mm color Trihex Tk. 22.49 each
C20 SANITARY AND WATER SUPPLY WORK
l. Misc. items
571 Water sealed heavy type 18" dia C.I.M.H. cover having locking arrangement Tk. 1,026.84 each
572 RCC Tees Tk. 436.03 each
573 Cl brackets Tk. 113.45 Per pair
574 Heavy type Cl brackets Tk. 138.05 Per pair
575 Nuts with Washer Tk. 22.21 each
576 Clamp Tk. 45.56 each
577 50 mm Screw & Rowel plug Tk. 8.58 each
578 75 mm Screw, Rowel plug & Washer Tk. 12.76 each
579 Plastic Clip Tk. 13.61 each
580 Solvent Cement Tk. 1.63 Per grm.
581 Hem Tk. 1.84 Per grm.
582 Hem Tk. 27.36 Per grm.
583 Scaffolding Tk. 2.26 Per rft.
584 Teflon Tk. 1.82 Per rft.
585 Nipples with Jum-nuts Tk. 66.14 each
ll. Fixtures & Accessories
586 White 465 x 340 x 415 mm Commode Tk. 1,330.00 each
587 Colored Commode: -do- Tk. 1,400.00 each
588 Special colored Commode: -do- Tk. 1,470.00 each
589 Seat cover: -do- Tk. 718.20 each
590 White 490 x 190 x 350 mm low-down Tk. 1,240.00 each
591 Colored Low-down: -do- Tk. 1,550.00 each
592 Special colored Low-down: -do- Tk. 1,860.00 each
593 32 mm dia plastic pipe for low-down connection Tk. 79.77 each
594
White Combicloset, Size (mm) 700 x 410 x 795. (BISF Item No. 115A/415A or equivalent) Tk. 3,622.50 each
595 Colored Combicloset: -do- Tk. 3,622.50 each
596 Special Colored Combicloset: -do- Tk. 4,818.50 each
597 White Combicloset, 725 x 360 x 840, 42.7kg Tk. 15,500.00 each
598 Colored Combicloset: -do- Tk. 20,925.00 each
599 Special Colored Combicloset: -do- Tk. 23,250.00 each
600 Flushing equipment: Tk. 1,012.27 each
601 Flushing equipment: Tk. 883.29 each
602 White long pan, Size Tk. 1,147.00 each
603 Colored long pan: -do- Tk. 1,204.50 each
604 Special colored long pan: -do- Tk. 1,265.00 each
605 White long pan, Size approx. 585 x 445 x 290, 15.5 kg Tk. 484.15 each
606 Colored long pan: -do- Tk. - each
607 Special colored long pan: -do- Tk. - each
608 White / colored foot-rest, Size (mm) 260 x 227 x 25. 280 x 140x30, 1.5kg Tk. 80.50 Per pair
609 BISF White W-basin, 600 x 465 x 225, 14 kg 580 x 445 x 235. Tk. 1,147.00 each
610 Colored W-basin: -do- Tk. 1,212.00 each
611 Special colored W-basin: -do- Tk. 1,430.00 each
612 White W-basin in/c pedastal, Size (mm) 656 x 510 x 485 x 870, 34kg 500 x 440 x 2 Tk. 4,000.00 each
613 Colored W-basin: -do- Tk. 5,200.00 each
614 Special colored W-basin: -do- Tk. 6,000.00 each
615 White W-basin in/c pedastal, Size (mm) approx. 650 x 485 x 870, 34kg 500x440 x 2 Tk. 7,200.00 each
616 Colored W-basin: -do- Tk. 9,360.00 each
617 Special colored W-basin: -do- Tk. 10,800.00 each
618 Grating with brass coupling Tk. 277.75 each
619 32 mm dia PVC waste pipe for W-Basin connection Tk. 158.75 each
620 CP chain with rubber plug Tk. 48.43 each
621 BISF White Pedestal, Size (mm) approx. 670x186x170, 6.5kg 652x200x205 Tk. 763.00 each
622 Colored Pedestal: -do- Tk. 801.00 each
623 Special colored Pedestal: -do- Tk. 842.00 each
624 BISF White Bowl Urinal: -do- Tk. 943.00 each
625 Colored Bowl Urinal: -do- Tk. 1,116.00 each
626 Special colored Bowl Urinal: -do- Tk. 1,317.00 each
627 White Flat/Squat. Urinal, Size (mm) approx 510x380x85 Tk. 869.00 each
628 Colored Flat/Squatting Bowl Urinal: -do- Tk. 914.00 each
629 Special colored Flat/Squatting Bowl Urinal: -do- Tk. 959.00 each
630 White porcelain Sink, Size (mm) 635x480x195, 19.5kg Tk. 2,024.00 each
631 Colored Porcelain Sink: -do- Tk. 2,125.00 each
632 Stainless steel, Single Bowl Sink: Singapore/M'Asia, Size (mm) 450 x 1050 Tk. 2,596.49 each
633 Stainless steel, double bowl Sink: Singapore/M'Asia Tk. 4,906.22 each
634 450 x 600 x 5 mm mirror Tk. 492.00 each
635 450 x350 x 4 mm mirror Tk. 336.00 each
636 Super quality steel frame with brackets for 600 x 125 x 5 mm size Glass Shelf Tk. 586.08 each
637 Super quality colored Glass for -do- Tk. 326.00 each
638 Medium quality CP iron frame with brackets for 600 x 125 x 5 mm size GlassShelf. Tk. 305.00 each
639 Medium quality Glass for -do- Tk. 133.00 each
640 Super Quality 600 x 20 mm dia size CP Towel Rail. Tk. 417.44 each
641 Medium Quality CP Towel Rail -do- Tk. 330.00 each
642 BISF White Porcelain Toilet Paper Holder, Size (mm) 150 x 150 x 126 Tk. 126.00 each
643 Special Porcelain Toilet Paper Holder: -do- Tk. 155.00 each
644 Standard size Stainless Steel Toilet Paper Holder with Cover Tk. 270.96 each
645 Standard size CP Toilet Paper Holder with Plastic Holder rod Tk. 216.02 each
646 125mm dia Stainless Steel Floor-Grating Tk. 114.24 each
647 62mm dia Stainless-steel Floor-Grating Tk. 85.27 each
648 150 x 150 mm size Plastic-Grating with hinged Cover Tk. 187.18 each
649 Plastic low down complete set in/c internal and external fittings Tk. 1,066.59 Per set
650 Internal and external fittings for plastic low down Tk. 568.91 Per set
651 CP Soap tray Tk. 124.00 each
652 Porcelain soap tray: white Tk. 215.59 each
653 Porcelain soap tray: colored Tk. 260.62 each
654 Stainless steel soap tray Tk. 227.11 each
lll. Pipes & Accessories
(a) HCl
655 50 mm dia HCl pipe: 1.83 m long Tk. 1,005.10 Per pc.
656 51 mm dia HCl bend / off set / cowl Tk. 221.36 each
657 50 mm dia HCl Tee / T-Y/Y (50 x 50mm) Tk. 626.35 each
658 100 mm dia HCl pipe: 1.83 m long Tk. 2,095.26 Per 6'-0" pc.
659 100 mm dia HCl bend / off set Tk. 450.08 each
660 100 mm dia HCl Tee / T-Y/Y (100 x100mm) Tk. 788.83 each
661 150 mm dia HCl Pipe: 1.83 m long Tk. 2,899.65 Per pc.
662 150 mm dia HCl bend / off set Tk. 1,013.81 each
663 150 mm dia HCl Tee/T-Y/Y (50 x 50 mm) Tk. 1,424.70 each
664 100 mm dia HCl P-trap Tk. 751.72 each
665 HCl 100 x 100 or 100 x 50 mm or T-Y Cleanout Tk. 785.85 each
666 HCl 150 x 150 or 150 x 100 mm or T-Y or Y-Cleanout Tk. 813.74 each
667 50 mm HCl Trap Tk. 543.48 each
(b) uPVC
668 12 mm dia uPVC pipe Tk. 13.45 Per rft.
669 12 mm dia uPVC Plain Tee Tk. 17.55 each
670 12 mm dia uPVC Plain Elbowpipe Tk. 16.57 each
671 12 mm dia uPVC Faucel Elbow Tk. 21.06 each
672 12 mm dia uPVC Plain Socket Tk. 11.58 each
673 12 mm dia uPVC thread Plug Tk. 11.11 each
674 19 mm dia uPVC Pipe Tk. 23.30 Per rft.
675 19 mm dia uPVC Plain Elbow Tk. 25.61 each
676 19 mm dia uPVC Plain Elbow Tk. 20.90 each
677 19 mm dia uPVC Plain Socket Tk. 15.18 each
678 19 mm x 12 mm dia uPVC Rd. Tee Tk. 28.38 each
679 19 mm x 12 mm dia uPVC Rd. Elbow Tk. 30.64 each
680 25 mm x 19 mm dia uPVC Pipe Tk. 28.08 Per rft.
681 25 mm x 19 mm dia Rd. Tee Tk. 49.52 each
682 32 mm dia uPVC pipe Tk. 34.90 Per rft.
683 32 mm dia uPVC Tee Tk. 75.47 each
684 32 mm dia uPVC Socket Tk. 60.13 each
685 32 mm dia Elbow Tk. 59.65 each
686 32 mm plain bend 900 Tk. 62.29 each
687 37 mm dia uPVC pipe Tk. 45.76 Per rft.
688 37 mm dia uPVC Tee Tk. 99.51 each
689 37 mm dia uPVC Socket Tk. 61.59 each
690 50 mm dia uPVC Elbow Tk. 83.86 each
691 50 mm dia uPVC Pipe: 20 rft (6m) long Tk. 896.75 Per rft.
692 50 mm dia uPVC bend / offset Tk. 136.44 each
693 50 mm dia uPVC Tee/T-Y/Y (50 x 50 mm) Tk. 209.24 each
694 60 mm dia uPVC Pipe Tk. 47.82 Per rft.
695 60 mm Tee Tk. 161.04 each
696 60 mm Socket Tk. 89.83 each
697 60 mm Elbow Tk. 131.61 each
698 75 mm dia uPVC pipe Tk. 74.52 Per rft.
699 75 mm dia Tee Tk. 188.52 each
700 75 mm dia Socket Tk. 120.12 each
701 75 mm dia Elbow Tk. 157.72 each
702 88 mm dia uPVC pipe Tk. 68.57 Per rft.
703 88 mm dia Tee Tk. 411.06 each
704 88 mm dia Socket Tk. 200.91 each
705 88 mm dia Elbow Tk. 316.22 each
706 114 mm dia uPVC pipe Tk. 85.76 Per rft.
707 114 mm dia Tee Tk. 753.93 each
708 114 mm dia Socket Tk. 290.63 each
709 114 mm dia Elbow Tk. 476.13 each
710 100 mm dia uPVC Pipe: 20 rft (6m) long Tk. 2,083.78 Per Pc.
711 100 mm dia uPVC bend / offset Tk. 292.00 each
712 100 mm dia uPVC Tee/T-Y/Y (50 x 50 mm) Tk. 457.94 each
713 110 mm dia uPVC pipe Tk. 82.23 Per rft.
714 110 mm dia door Tee (Back) Tk. 400.73 each
715 110 mm dia uPVC plain bend 900 Tk. 207.72 each
716 110 mm dia uPVC long Trap Tk. 414.83 each
717 110 mm dia round Grating Tk. 319.79 each
718 110 mm dia uPVC vent Cowl Tk. 108.29 each
719 150 mm dia uPVC Pipe: 20 rft (6m) long Tk. 2,719.83 Per Pc.
720 150 mm dia uPVC bend / offset / cowl Tk. 494.55 each
721 150 mm dia uPVC Tee/T-Y/Y (50 x 50 mm) Tk. 1,048.44 each
722 150 mm dia uPVC fof under-ground Tk. 211.47 Per rft.
723 200 mm dia uPVC pipe for under-dround Tk. 289.14 Per rft.
724 250 mm dia uPVC pipe for under-ground Tk. 419.11 Per rft.
725 280 mm dia uPVC pipe for under-ground Tk. 525.55 Per rft.
726 315 mm dia uPVC pipe for under-ground Tk. 755.23 Per rft.
(b) CPVC
727 12 mm dia CPVC pipe Tk. 33.91 Per rft.
728 12 mm dia CPVC plain Tee Tk. 29.76 each
729 12 mm dia CPVC Plain Elbow Tk. 24.42 each
730 12 mm dia CPVC Faucet Elbow Tk. 28.73 each
731 12 mm dia CPVC Plain Socket Tk. 19.41 each
732 12 mm dia CPVC thread Plug Tk. 13.02 each
733 19 mm dia CPVC pipe Tk. 41.81 Per rft.
734 19 mm dia CPVC plain Tee Tk. 64.61 each
735 19 mm dia CPVC Plain Elbow Tk. 48.59 each
736 19 mm dia CPVC Plain Socket Tk. 32.37 each
737 19 mm x 12 mm dia CPVC Rd. Tee Tk. 58.57 each
738 19 mm x 12 mm dia CPVC Rd. Elbow Tk. 88.47 each
739 25 mm dia CPVC pipe Tk. 55.94 Per rft.
740 25 mm x 19 mm dia Rd. Tee Tk. 123.68 each
741 32 mm dia CPVC Pipe Tk. 74.51 each
742 32 mm dia CPVC Tee Tk. 193.15 each
743 32 mm dia CPVC Socket Tk. 91.04 Per rft.
744 32 mm dia Elbow Tk. 152.32 each
745 37 mm dia CPVC pipe Tk. 98.79 Per rft.
746 37 mm dia CPVC Tee Tk. 282.84 each
747 37 mm dia CPVC Socket Tk. 140.40 each
748 37 mm dia CPVC Elbow Tk. 207.19 each
749 50 mm dia CPVC pipe Tk. 142.34 Per rft.
750 50 mm dia CPVC Tee Tk. 586.60 each
751 50 mm dia CPVC Socket Tk. 286.67 each
752 50 mm dia CPVC Elbow Tk. 466.09 each
(b) ABS
753 12 mm dia ABS pipe Tk. 55.39 Per rft.
754 12 mm dia ABS Plain Tee Tk. 40.83 each
755 12 mm dia ABS Plain Elbow Tk. 34.66 each
756 12 mm dia ABS Plain Socket (Coupling) Tk. 24.46 each
757 12 mm dia ABS thread Plug (Adapter) Tk. 270.82 each
758 19 mm dia ABS pipe Tk. 63.77 Per rft.
759 19 mm dia ABS plain Tee Tk. 82.36 each
760 19 mm dia ABS Plain Elbow Tk. 64.30 each
761 19 mm dia ABS Plain Socket Tk. 41.76 each
762 19 mm x 12 mm dia ABS Rd. Tee Tk. 24.30 each
763 19 mm x 12 mm dia ABS Rd. Elbow Tk. 139.72 each
764 25 mm dia ABS pipe Tk. 84.21 Per rft.
765 25 mm x 19 mm dia Rd. Tee Tk. 40.74 each
766 32 mm dia ABS pipe Tk. 125.99 Per rft.
767 32 mm dia ABS Tee Tk. 257.86 each
768 32 mm dia ABS Socket Tk. 67.84 each
769 32 mm dia Elbow Tk. 208.07 each
770 37 mm dia ABS pipe Tk. 162.49 Per rft.
771 37 mm dia ABS Tee Tk. 364.54 each
772 37 mm dia ABS Socket Tk. 180.70 each
773 37 mm dia ABS Elbow Tk. 297.92 each
774 50 mm dia ABS pipe Tk. 263.86 Per rft.
775 50 mm dia ABS Tee Tk. 798.83 each
776 50 mm dai ABS Socket Tk. 393.72 each
777 50 mm dia ABS Elbow Tk. 634.92 each
778 ABS Adhesive Solution Tk. 3.09 gm
(c) G.I. Pipe & Fittings
779 12 mm dia GI Pipe Tk. 53.61 Per rft.
780 12 mm dia Elbow Tk. 23.59 each
781 12 mm dia Nipple Tk. 26.24 each
782 12 mm dia Nipple Tk. 19.79 each
783 12 mm dia Plug Tk. 15.82 each
784 12 mm dia Socket Tk. 18.79 each
785 20 mm dia GI pipe Tk. 74.07 Per rft.
786 20 mm dia Elbow Tk. 30.07 each
787 20 mm dia Tee Tk. 40.99 each
788 20 mm dia Nipple Tk. 28.22 each
789 20 mm dia Plug Tk. 19.69 each
790 20 mm dia Reducer Tk. 34.83 each
791 20 mm dia Socket Tk. 24.01 each
792 25 mm dia GI Pipe Tk. 99.61 Per rft.
793 25 mm dia Elbow Tk. 38.66 each
794 25 mm dia Tee Tk. 46.27 each
795 25 mm dia Nipple Tk. 36.70 each
796 25 mm dia Plug Tk. 25.27 each
797 25 mm dia Reducer Tk. 48.42 each
798 25 mm dia Socket Tk. 37.93 each
799 32 mm dia GI Pipe Tk. 124.90 Per rft.
800 32 mm dia Elbow Tk. 65.28 each
801 32 mm dia Tee Tk. 87.28 each
802 32 mm dia Nipple Tk. 63.52 each
803 32 mm dia Plug Tk. 34.43 each
804 32 mm dia Reducer Tk. 72.19 each
805 32 mm dia Socket Tk. 61.52 each
806 40 mm dia GI Pipe Tk. 169.31 Per rft.
807 40 mm dia Tee Tk. 81.73 each
808 40 mm dia Tee Tk. 103.49 each
809 40 mm dia Nipple Tk. 69.22 each
810 40 mm dia Plug Tk. 48.61 each
811 40 mm dia reducer Tk. 103.23 each
812 40 mm dia Socket Tk. 64.90 each
813 50 mm dia GI Pipe Tk. 197.33 Per rft.
814 50 mm dia Elbow Tk. 115.59 each
815 50 mm dia Tee Tk. 162.01 each
816 50 mm dia Nipple Tk. 91.15 each
817 50 mm dia Plug Tk. 60.91 each
818 50 mm dia reducer Tk. 105.56 each
819 50 mm dia Socket Tk. 97.92 each
820 62 mm dia GI pipe Tk. 277.79 Per rft.
821 62 mm dia Elbow Tk. 196.98 each
822 62 mm dia Tee Tk. 223.18 each
823 62 mm dia Nipple Tk. 155.88 each
824 62 mm dia Plug Tk. 91.75 each
825 62 mm dia reducer Tk. 144.45 each
826 62 mm dia socket Tk. 133.32 each
827 75 mm dia GI pipe Tk. 330.99 Per rft.
828 75 mm dia Elbow Tk. 352.01 each
829 75 mm dia Tee Tk. 400.01 each
830 75 mm dia Nipple Tk. 239.50 each
831 75 mm dia Plug Tk. 156.54 each
832 75 mm reducer Tk. 216.85 each
833 75 mm dia socket Tk. 194.56 each
834 100 mm dia G.I. pipe Tk. 433.02 Per rft.
835 100 mm dia Elbow Tk. 487.23 each
836 100 mm dia Tee Tk. 538.84 each
837 100 mm dia Nipple Tk. 354.18 each
838 100 mm dia Plug Tk. 307.75 each
839 100 mm dia reducer Tk. 336.88 each
840 100 mm dia socket Tk. 344.21 each
841 62 mm dia stainless steel (2 mm thick) pipe Tk. 304.54 Per rft.
842 50 mm dia stainless steel (2 mm thick) pipe Tk. 250.85 Per rft.
843 40 mm dia stainless steel (2 mm thick) pipe Tk. 198.68 Per rft.
844 25 mm dia stainless steel (2 mm thick) pipe Tk. 136.19 Per rft.
845 20 mm dia stainless steel (2 mm thick) pipe Tk. 93.91 Per rft.
846 12 mm dia stainless steel (2 mm thick) pipe Tk. 83.65 Per rft.
847 6 mm dia stainless steel (1.5 mm thick) pipe Tk. 70.79 Per rft.
848 25 mm x 25 mm SS square solid bar Tk. 105.72 Per rft.
849 Top cap for 40 mm dia SS Pipe Tk. 263.53 each
850 bottom cap for 40 mm dia SS Pipe Tk. 116.06 each
851 65 mm x 55 mm x 6 mm SS Plate Tk. 552.47 each
852 50 mm x 25 mm x 2 mm SS box Tk. 256.57 Per rft.
853 SS Welding rod Tk. 301.54 Per lb
854 50 mm dia SS bend Tk. 89.28 each
855 50 mm dia end socket Tk. 59.71 each
856 40 mm dia end socket Tk. 50.56 each
857 25 mm dia socket Tk. 38.57 each
(d) RCC Pipes
858 150 mm dia RCC pipe (stone-chips, 40 mm thickness. 6'-0" long) Tk. 1,017.00 each (6'-0")
859 225 mm dia RCC pipe: -do- Tk. 1,575.00 each (6'-0")
860 300 mm dia RCC pipe (stone-chips, 50 mm thickness. 6'-0") Tk. 2,743.00 each (6'-0")
861 375 mm dia RCC pipe (stone-chips, 100 mm thickness. 6'-0") Tk. 3,580.00 each (6'-0")
862 900 mm dia RCC pipe (stone-chips, 100 mm thickness. 6'-0") Tk. 13,190.00 each (6'-0")
lV. G.I. Union
863 12 mm dia Union Tk. 40.00 each
864 20 mm dia Union Tk. 60.00 each
865 25 mm dia Union Tk. 72.00 each
866 32 mm dia Union Tk. 95.00 each
867 40 mm dia Union Tk. 140.00 each
868 50 mm dia Union Tk. 190.00 each
869 62 mm dia Union Tk. 420.00 each
870 75 mm dia Union Tk. 550.00 each
871 100 mm dia Union Tk. 800.00 each
V.G.I. Gate-Valve
872 12 mm dia Gate-Valve Tk. 220.00 each
873 20 mm dia Gate-Valve Tk. 380.00 each
874 25 mm dia Gate-Valve Tk. 450.00 each
875 32 mm dia Gate-Valve Tk. 650.00 each
876 40 mm dia Gate-Valve Tk. 700.00 each
877 50 mm dia Gate-Valve Tk. 1,250.00 each
878 62 mm dia Gate-Valve Tk. 2,600.00 each
879 75 mm dia Gate-Valve Tk. 3,500.00 each
880 100 mm dia Gate-Valve Tk. 5,800.00 each
VI. G.I. Glove-Valve
881 12 mm dia Globe-Valve Tk. 219.93 each
882 20 mm dia Globe-Valve Tk. 324.45 each
883 25 mm dia Globe-Valve Tk. 563.10 each
884 32 mm dia Globe-Valve Tk. 877.97 each
885 40 mm dia Globe-Valve Tk. 1,014.63 each
886 50 mm dia Globe-Valve Tk. 1,574.58 each
887 62 mm dia Globe-Valve Tk. 2,653.14 each
888 75 mm dia Globe-Valve Tk. 3,663.35 each
889 100 mm dia Globe-Valve Tk. 5,056.60 each
VII. G.I. Check-Valve
890 12 mm dia Check-Valve Tk. 250.00 each
891 20 mm dia Check-Valve Tk. 300.00 each
892 25 mm dia Check-Valve Tk. 450.00 each
893 32 mm dia Check-Valve Tk. 650.00 each
894 40 mm dia Check-Valve Tk. 750.00 each
895 50 mm dia Check-Valve Tk. 1,250.00 each
896 62 mm dia Check-Valve Tk. 2,200.00 each
897 75 mm dia Check-Valve Tk. 3,050.00 each
898 100 mm dia Check-Valve Tk. 5,056.60 each
VIII. Float-Valve
899 12 mm dia Float-Valve Tk. 234.22 each
900 20 mm dia Float-Valve Tk. 317.10 each
901 25 mm dia Float-Valve Tk. 348.93 each
902 32 mm dia Float-Valve Tk. 618.07 each
903 40 mm dia Float-Valve Tk. 817.36 each
IX. Drainage Pipe Fittings:
904 100 mm dia HCI P-trap Tk. 766.03 each
905 HCI 100 x 100 or 100 x 50 mm or T-Y cleanout Tk. 749.58 each
906 HCI 150 x 150 or 150 x 100 mm T-Y or Y cleanout Tk. 1,139.22 each
907 50 mm HCI trap Tk. 1,094.02 each
908 50 mm Plastic Y or T-Y cleanout Tk. 340.88 each
909 100 mm Plastic "P" or "S" trap Tk. 360.62 each
910 100 mm "Y" or "T-Y" plastic cleanout Tk. 426.58 each
911 50 mm Plastic P or S trap Tk. 342.30 each
X . Faucets
912 12 mm CP bib cock (normal) Tk. 517.64 each
913 12 mm CP bib cock (medium) Tk. 774.62 each
914 12 mm special quality CP bip cock Tk. 834.91 each
915 12 mm plastic bip cock with internal brass thread Tk. 136.80 each
916 12 mm CP medium quality Pillar cock Tk. 649.72 each
917 12 mm CP special heavy duty pillar cock Tk. 764.43 each
918 12 mm CP medium heavy duty Pillar cock Tk. 687.39 each
919 12 mm CP concealed fixed Sink cock Tk. 716.50 each
920 12 mm CP concealed moving sink cock (medium) Tk. 742.86 each
921 12 mm CP concealed moving sink cock (special) Tk. 1,027.13 each
922 CP basin mixture (medium) Tk. 1,823.01 each
923 CP basin mixture (special) Tk. 2,209.89 each
924 Cp single handle basin mixture (medium) Tk. 1,485.97 each
925 CP single handle basin mixture (special) Tk. 2,711.46 each
926 CP shower mixture n/c shower head Tk. 2,648.68 each
927 CP shower mixture in/c shower head & faucet Tk. 3,866.37 each
928 CP bath-tub mixture with shower head Tk. 4,068.67 each
929 CP self closing pillar cock Tk. 734.04 each
930 12 mm ordinary type (brass) for surface mount CP stop cock Tk. 229.54 each
931 12 mm medium quality CP stop cock Tk. 292.28 each
932 12 mm special quality CP stop cock Tk. 739.70 each
933 Stip cock: concealed Tk. 822.09 each
934 Stop cock: concealed (medium) Tk. 870.95 each
935 Stip cock: concealed (heavy) Tk. 952.15 each
936 Surface mounted angle stop cock Tk. 630.95 each
937 12 mm CP concealed angle stip cock Tk. 662.98 each
938 12 mm medium quality concealed angle stip cock Tk. 636.47 each
939 Special stop cock Tk. 806.90 each
940 Special concealed type heavy stop cock Tk. 766.53 each
941 12 mm CP medium quality surface & heavy type angle stip cock Tk. 512.50 each
942 12 mm CP surface special heavy type stop cock Tk. 399.97 each
943 100 mm dia CP fixed type cleansing shower rose Tk. 435.21 each
944 100 mm dia CP moving type cleansing shower rose Tk. 652.79 each
945 CP Moving hand shower Tk. 2,126.03 each
946 CP Moving push shower Tk. 685.90 each
XI. Water Tank, Water Purifier
947 16 BWG GI 1200 x 1200 x 1200 mm size over-head water - tank Tk. 10,753.51 each
948 18 BWG GI 1200 x 1200 x 1200 mm size over-head water - tank Tk. 10,706.72 each
949 1000 liter food-grade Plastic cover-head water-tank Tk. 9,800.00 each
950 1500 liter food-grade Plastic cover-head water-tank Tk. 14,700.00 each
951 2000 liter food-grade Plastic cover-head water-tank Tk. 19,600.00 each
952 150 liter capacity plastic mini tank (loft tank) Tk. 1,950.00 each
953 300 liter capacity plastic mini tank (loft tank) Tk. 3,690.00 each
954 500 liter capacity plastic mini tank (loft tank) Tk. 5,000.00 each
955 500 liter capacity stainless steel water tank Tk. 7,640.93 each
956 1000 liter food-grade stainless steel water tank Tk. 14,036.63 each
957 2000 liter food-grade stainless steel water-tank Tk. 24,056.59 each
958 4000 liter food-grade stainless steel water tank Tk. 49,191.06 each
959 6000 liter food-grade stainless steel water tank Tk. 53,481.79 each
960 400 Gallon capacity Ferro-cement water tank Tk. 6,320.92 each
961 450 mm long metal cover connection pipe Tk. 266.46 each
962 600 mm long metal cover connection pipe Tk. 307.52 each
963 1/2" or 3/4" dia ball cock for water tank Tk. 231.50 each
964 3/4" dia overflow pipe with jam-nut for plastic water tank Tk. 122.37 each
965 12 mm dia & 450 mm long plastic flexible connection pipe Tk. 48.74 each
966 12 mm dia & 600 mm long plastic flexible connection pipe Tk. 57.62 each
967 11 liter capacity / 50 GPD Reverse osmosis water Purifier Tk. 16,998.58 each
968 10 liter capacity / 75 GPD Reverse Osmosis water Purifier (without meter) Tk. 20,063.85 each
969 10 liter capacity / 75 GPD Reverse Osmosis water Purifier (with meter) Tk. 21,205.04 each
970 17 liter capacity / 75 GPD Reverse Osmosis water Purifier: (hot, cold, warm options) Tk. 63,809.24 each
971 400 gal capacity ferro-cement water tank in/c installation Tk. 7,251.45 each
C21 ARBORICULTURE WORK
972 Alluvial Loamy silty Soil Tk. 1,200.00 Per % cft.
973 Well decomposed cow dung Tk. 2,000.00 Per % cft.
974 Possible Tk. 35.00 Per % cft.
975 Urea fertilizer Tk. 20.00 Per kg.
976 16'-0" ling muli bamboo (For split) Tk. 75.00 each
977 25'-0" ling muli bamboo (Full size) Tk. 130.00 each
978 Borrak bamboo (For post) Tk. 10.00 Per rft.
979 Borrak bamboo (Full size) Tk. 300.00 each
980 8" size earthen tub Tk. 20.00 each
981 10" size earthen tub Tk. 26.00 each
982 12" size earthen tub Tk. 40.00 each
983 14" size earthen tub Tk. 70.00 each
984 16" size earthen tub Tk. 120.00 each
985 12" size earthen plate Tk. 20.00 each
986 Mustard oil cake Tk. 35.00 Per kg.
987 Bone mele Tk. 30.00 Per kg.
988 Urea Fertilizer Tk. 20.00 Per kg.
989 Murate of potash Tk. 30.00 Per kg.
990 Triple Super Phosphate (TSP) Tk. 30.00 Per kg.
991 Spade (kodal) Tk. 300.00 each
992 Spray Machine (plaotic), 5 ltr capacity Tk. 1,200.00 each
993 Steel funna, 18" size with wooden handle Tk. 200.00 each
994 Hand hoe, 6" size Tk. 50.00 each
995 Standard Steel hand trolly Tk. 5,000.00 each
996 Hedge scissors Tk. 800.00 each
997 10" size Secature Tk. 509.00 each
998 22 BWG G.I. water can (2.5 gallon) Tk. 250.00 each
999 12" size G.I bucket Tk. 200.00 each
1000 3/4" dia
plastic hose pipe Tk. 15.00 each
1001 3.75 h.p. 22" blade 4 stroke, finger trip Lawn Mower Machine: YARDMAN No. Tk. 40,000.00 each
1002 16" blade hand Lawn Mower, Model No. 1403 - 16(USA) Tk. 10,500.00 each
C22 DEEP TUBE-WELL
I. For Test boring & design
1003 Mobilization of equipment for drilling 38 dia test and observation well Tk. 5,856.91 L.S.
1004 Boring by using 100 mm dia cutter (0 m to 50 m) Tk. 128.00 meter
1005 Best quality heavy type hand type pump No. 6 Tk. 2,182.00 each
1006 2.91 mm wall thick 38 mm dia G.I. pipe Tk. 486.41 meter
1007 38 mm dia water grade PVC pipe (D-Class or eqv.) in/c carriage Tk. 95.56 meter
1008 36 mm dia water grade PVC Strainer (D-Class or eqv.) in/c carriage Tk. 111.80 meter
1009 38 mm dia socket adopter Tk. 60.18 each
1010 Best quality 38 mm dia PVC Cap. Tk. 43.00 each
1011 Complete development of the tube-well (test boring) up to 200 m depth. Tk. 5,150.37 L.S.
1012 Design of production well up to 200 m Tk. 6,963.97 L.S.
1013 Design of Production well beyond 200 m Tk. 11,171.94 L.S.
1014 Disinfections of tube-well using bleaching power Tk. 316.00 L.S.
1015 Maintaining and filling and sealing test bore Tk. 2,961.76 each bore
ll. For Production well
1016 Mobilization of drilling rig for shrouded production wells of depth up to 100 m Tk. 29,392.65 L.S.
1017 325 mm dia boring: up to 50 m depth. Tk. 624.24 meter
1018 350 mm dia boring: up to 50 m depth. Tk. 658.92 meter
1019 400 mm dia boring: up to 50 m depth. Tk. 693.60 meter
1020 600 mm dia boring: up to 50 m depth. Tk. 849.08 meter
1021 800 mm dia boring: up to 50 m depth. Tk. 946.76 meter
1022 50 mm dia C-Grade Tk. 135.21 meter
1023 75 mm dia C-Grade Tk. 240.17 meter
1024 100 mm dia C-Grade Tk. 373.13 meter
1025 150 mm dia C-Grade Tk. 848.00 meter
1026 50 mm dia PVC cap Tk. 55.00 each
1027 100 mm dia PVC cap Tk. 144.91 each
1028 100 mm dia PVC cap Tk. 375.07 each
1029 125 mm x 50 mm PVC reducer Tk. 4986.00 each
1030 150 mm x 75 mm PVC reducer Tk. 621.00 each
1031 200 mm x 100 mm PVC reducer Tk. 697.00 each
1032 200 mm x 150 mm PVC reducer Tk. 807.00 each
1033 125 mm dia PVC housing pipe Tk. 593.00 meter
1034 150 mm dia PVC housing pipe Tk. 774.00 meter
1035 200 mm dia PVC housing pipe Tk. 1,369.17 meter
1036 PVC Tape Tk. 91.85 each
1037 PVC Solution / gum Tk. 601.83 No.
1038 Petrol Tk. 83.81 liter
1039 Diesel Tk. 53.11 liter
1040 M.S split centralizer Tk. 410.71 meter
1041 S. S. split centralizer Tk. 1,296.19 meter
1042
Complete development of the tube-well up to 200 m depth (50 x 150 mm tube-well) Tk. 18,573.48 L.S.
1043
Complete development of the tube-well up to 200 m depth. (75 x 150 mm tube-well) Tk. 23,243.18 L.S.
1044
Complete development of the tube-well up to 200 m depth. (100 x 200 mm tube-well) Tk. 29,243.18 L.S.
1045
Complete development of the tube-well tu to 200 m depth. (150 x 200 mm tube-well) Tk. 34,814.71 L.S.
1046
Complete development of the tube-well up to 200 m depth. (300 x 200 mm tube-well) Tk. 32,177.78 L.S.
1047 Hire charge of pump in/c spare and maintenance Tk. 230.24 Hour
1048
Disinfections of tube-well using bleaching power (for 50 mm x 125 mm tube-well) Tk. 920.45 L.S.
1049 150 mm dia and 4 mm thick M.S. pipe Tk. 1,952.98 meter
1050 200 mm dia and 6 mm thick M.s. pipe welded Tk. 2,900.27 meter
1051 200 mm dia and 6 mm thick M.S. pipe seamless Tk. 3,200.93 meter
1052 4 mm thick 200 mm dia plate Tk. 987.20 each
1053 5 mm thick 250 mm dia plate Tk. 1,158.86 each
1054 6 mm thick 150 mm dia M.S.Cap Tk. 990.23 each
1055 6 mm thick 200 mm dia M.S.Cap Tk. 1,296.74 each
1056 150 mm dia 4.85 mm thick G.I. pipe Tk. 2,462.74 meter
1057 200 mm dia 6 mm thick G.I. pipe Tk. 5,770.75 meter
1058 150 mm dia stainless steel strainer of continuous slot Tk. 12,117.41 meter
1059 150 mm dia 2.5 mm thick stainless steel bridge type strainer Tk. 8,644.03 meter
1060 200 mm dia stainless steel strainer of continuous slot Tk. 13,856.05 meter
1061 200 mm dia 2.5 mm thick stainless steel bridge type strainer Tk. 8,831.97 meter
1062 75 mm dia 2.5 mm thick stainless steel bridge type strainer Tk. 5,618.07 meter
1063 100 mm dia 2.5 mm thick stainless steel bridge type strainer Tk. 5,546.52 meter
1064 50 mm dia 2.5 mm thick stainless steel bridge type strainer Tk. 4,549.91 meter
1065 75 mm dia 2.5 mm thick stainless steel bridge type strainer Tk. 6,179.02 meter
1066 150 mm x 300 mm dia 6 mm thick M.S. reducer Tk. 8,688.87 each
1067 200 x 300 mm dia M.S. reducer Tk. 10,823.91 each
1068 50 x 150 mm dia M.S reducer Tk. 1,865.73 each
1069 75 x 150 mm dia M.s. reducer Tk. 4,179.70 each
1070 100 x 200 mm dia M.S. reducer Tk. 4,586.39 each
1071 (i) 300 mm dia 6 mm thick M.S. Housing pipe welded Tk. 5,037.14 meter
1072 (ii) 300 mm dia 6 mm thick M.S. Housing pipe seamless Tk. 8,178.48 meter
1073 (iii) 400 mm dia 6 mm thick M.S. Housing pipe welded Tk. 9,017.14 meter
1074 (iv) 400 mm dia 6 mm thick M.S. Housing pipe seamless Tk. 11,042.23 meter
1075 150 mm dia 6 mm thick M.S. Housing pipe welded Tk. 2,549.97 meter
1076 150 mm dia 6 mm thick M.S. Housing pipe seamless Tk. 2,639.54 meter
1077 350 mm dia 6 mm thick M.S. Cap Tk. 1,400.80 each
1078 40 mm dia "D" grade pipe Tk. 32.57 rft
1079 50 mm dia C-Class water-grade pipe Tk. 78.32 rft
1080 3 m long 40 mm dia VPC strainer Tk. 263.00 each
1081 EPI / RFL (medium) brand No. 6 Pump with necessary fittings etc. Tk. 2,277.00 each
1082 50 mm x 40 mm socket (reducer) Tk. 62.86 each
1083 40 mm dia pipe nipple Tk. 99.69 each
1084 4'-0" long cylinder Tk. 168.05 each
1085 Tie foot ball Tk. 30.00 Pair
1086 Tie plunger Tk. 59.84 each
1087 3/8" dia socket Tk. 15.33 each
1088 3/8" dia nut Tk. 14.00 each
1089 Solution big size Tk. 283.00 each
1090 Tape Tk. 22.00 each
1091 60 Grade M.S. rod Tk. 61,500.00 Per M. ton
III. Testing of water in/c arsenic, collected from the test bore in BUET Laboratory
1092 pH/ Hydrogen lon density Tk. 259.00 Per test
1093 Color (filtered) Tk. 270.00 Per test
1094 Carbon dioxide (CO2) Tk. 259.00 Per test
1095 Chlorine (CI) Tk. 534.00 Per test
1096 Fluorine (FI) Tk. 509.00 Per test
1097 Iron (Fe) Tk. 634.00 Per test
1098 Manganese (Mn) Tk. 692.00 Per test
1099 Nitrate-Nitrogen (NO3-N) Tk. 505.00 Per test
1100 Total Alkalinity Tk. 250.00 Per test
1101 Total hardness Tk. 519.00 Per test
1102 Total dissolved solids (TDS) Tk. 648.00 Per test
1103 Arsenic (As) Tk. 1,034.00 Per test
1104 Turbidity Tk. 265.00 Per test
1105 Sieve analysis for sand from different layer Tk. 1,123.00 Per test
C23 SUB-SOIL INVESTIGATION WORK
I. Operational cost
1106 Truck fare within 20 km in/c loading & un-loading Tk. 1,000.00 Per trip
1107 Temporary camp at site for soil investigation work Tk. 1,053.00 Per site
1108 Field Engineer in/c site allowances: 1-3yrs Exp, Membership with IEB Tk. 1,438.00 Per day
1109 Foundation Engineer: 5-10 yrs exp, Membership with IEB Tk. 2,156.00 Per day
1110 Foreman in/c site allowances Tk. 670.00 Per day
1111 Rig operators in/c site allowances Tk. 603.00 Per day
1112 helper to rig operators/c site allowances Tk. 375.00 Per day
1113 Unskilled labour in/c site allowances Tk. 313.00 Per day
1114 Asstt laboratory technician Tk. 427.00 Per day
1115 Laboratory technician Tk. 575.00 Per day
1116 Laboratory Engineer Tk. 875.00 Per day
1117 Conveyance within 25 km Tk. 63.00 Per day
1118 Wooden plank (mango) Tk. 526.00 Per cft.
1119 Rope Tk. 45.00 Per kg.
1120 Small boat Tk. 688.00 Per day
1121 Drum (defects free) Tk. 995.00 each
1122 Hire charge of boring rig Tk. 2,750.00 Per day
II. Laboratory Charge for Sub-Soil Investigation Work
1123 Sp. Gr. Test Tk. 125.00 Per test
1124 Hydrometer, sieve analysis & sp. Gr., & Classification according to ASTM Tk. 875.00 Per test
1125 Linear shrinkage Tk. 500.00 Per test
1126 Shrinkage limit Tk. 500.00 Per test
1127 Liquid limit Tk. 250.00 Per test
1128 Plastic limit Tk. 250.00 Per test
1129 Standard proctor Tk. 1,500.00 Per test
1130 Modified proctor Tk. 1,625.00 Per test
1131 Unit weight (wet & dry) Tk. 188.00 Per test
1132 Void ratio Tk. 625.00 Per test
1133 Moisture content Tk. 125.00 Per test
1134 Organic matter content Tk. 938.00 Per test
1135 Loss on ignition Tk. 719.00 Per test
1136 Sand equivalent test Tk. 1,000.00 Per test
1137 Permeability (cohesive) Tk. 1,250.00 Per test
1138 Permeability (non-cohesive sample) Tk. 2,500.00 Per test
1139 Consolidation Tk. 1,375.00 Per test
1140 Consolidated drain test (direct shear test) Tk. 1,000.00 Per test
1141 Consolidated drained tri-axial test Tk. 1,250.00 Per test
1142 Consolidated quick test (direct shear test) Tk. 875.00 Per test
1143 Consolidated un-drained tri-axial test with pore pressure Tk. 2,875.00 Per test
1144 Consolidated un-drained tri-axial test without pore pressure Tk. 875.00 Per test
1145 Unconfined compression Tk. 750.00 Per test
1146 Unconsolidated quick test (direct shear test) Tk. 1,000.00 Per test
1147 Unconsolidated un-drained tri-axial test (without pore pressure) Tk. 1,000.00 Per test
1148 Field density in/c field visit (for non-cohesive soil) Tk. 1,875.00 Per test
1149 Field Vanshear test in cohesive soil (ASTM D-2573-72,1978) Tk. 1,750.00 Per test
1150 Ground water level location Tk. 2,000.00 Per test
1151 One dimensional swelling / settlement potential of co-hesive soil Tk. 1,875.00 Per test
1152 Non-repetitive static plate load test of soil (ASTM S-1196-64, reapproved in 1977) Tk. 1,750.00 Per test
1153 Visual Inspection & Classification of soil for engineering purposes Tk. 94.00 Per test
1154 Plate load test Tk. 16,250.00 Per test
C24 FITTINGS
I. Fittings for Wooden Door-windows / Hard wares / Glass / Cl sheet
1155 10" long iron tower bolt Tk. 39.00 each
1156 10" long brass tower bolt Tk. 321.00 each
1157 8" long brass tower bolt Tk. 275.00 each
1158 10" long SS tower bolt Tk. 150.00 each
1159 8" socket bolt Tk. 28.00 each
1160 8" long brass socket bolt Tk. 259.00 each
1161 8" long SS socket bolt Tk. 122.00 each
1162 Hatch bolt Tk. 354.00 each
1163 4" long hinges nickel plated Tk. 73.00 each
1164 4" long brass hinge Tk. 117.00 each
1165 3" long brass hinge Tk. 95.00 each
1166 4" longs SS hinge Tk. 93.00 each
1167 3" longs SS hinge Tk. 93.00 each
1168 Nickel plated handle Tk. 48.00 each
1169 Brass handle Tk. 67.00 each
1170 SS handle Tk. 57.00 each
1171 Iron screws Tk. 16.00 Per doz.
1172 Hinged cleats. Tk. 10.00 each
1173 SS Hinged cleats. Tk. 8.00 each
1174 Screws for Hinged cleats. Tk. 8.00 each
1175 Hinged cleats and buffer block Tk. 58.00 each
1176 plastic / rubber buffer block Tk. 4.00 each
1177 door viewer Tk. 104.00 each
1178 Konb catchment Tk. 25.00 each
1179 Best quality round lock / rim lock Tk. 610.00 each
1180 Best quality security lock Tk. 825.00 each
1181 2.5" dia iron rings Tk. 14.00 each
1182 10" long & 1/2 dia tower bolt Tk. 34.00 each
1183 6" Socket bolt Tk. 27.00 each
1184 3" long Iron hinges Tk. 5.00 each
1185 9" long catch hook Tk. 20.00 each
1186 6" long brass tower & socket bolt Tk. 241.00 each
1187 3" long brass hinges Tk. 89.00 each
1188 6" long catch hooks Tk. 10.00 each
1189 Heavy type nickel plated handle Tk. 46.00 each
1190 Brass screw/ 1.5" screw Tk. 22.00 Per doz.
1191 5 mm thick clear glass Tk. 86.00 Per sft.
1192 10 mm thick clear glass Tk. 180.00 Per sft.
1193 5 mm thick ambush / frosted glass Tk. 77.00 Per sft.
1194 5 mm thick tinted glass Tk. 105.00 Per sft.
1195 6 mm thick reflected glass Tk. 101.00 Per sft.
1196 3 mm thick clear glass Tk. 41.00 Per sft.
1197 1.5 mm thick corrugated fiber glass Tk. 77.00 Per sft.
1198 1.5 mm thick fiber glass sheet ridging Tk. 117.00 Per rft.
Tempered Glass Door
1199 10 mm thick tempered glass Tk. 333.00 Per sft.
1200 10 mm thick non-tempered glass Tk. 163.00 Per sft.
1201 Auto closer set Tk. 5,231.00 Per set
1202 Top and bottom clamping device Tk. 1,014.00 Per set
1203 Locking device Tk. 2,355.00 Per set
1204 Top hinge Tk. 1,043.00 Per set
1205 Handle Tk. 2,293.00 Per set
I. Hardware for Steel door-window
1206 Stopper handle Tk. 22.00 each
1207 12" long iron cleats Tk. 26.00 each
1208 2" long pin hinges Tk. 24.00 each
1209 4" ling iron hinges Tk. 24.00 each
1210 Hand lock Tk. 27.00 each
1211 6" ling clamp Tk. 28.00 each
C25 MISCELLENEOUS ITEMS
1212 Nails and wires Tk. 73.04 Per kg.
1213 G.I. wire Tk. 110.00 Per kg.
1214 Chalk powder Tk. 38.00 Per kg.
1215 1.5" x 1.5" x 1/4" brass Tk. 267.00 rft
1216 Polythene sheet Tk. 207.00 Per % sft.
1217 Nut-bolts, J-hooks etc. Tk. 133.00 Per kg.
1218 Empty gunny bags / Polymer bag to fill sand for load test Tk. 9.00 each
1219 Salballah for driving Tk. 57.00 Per rft.
1220 Copper sheet for expansion joint Tk. 198.00 Per sft.
1221 Aluminum sheet for expansion joint Tk. 144.00 Per sft.
1222 Counter-sunk rivets for shoe-plate Tk. 44.00 each
1223 100 mm dia HCI rain pipe Tk. 1,719.00 Per 6'-0"
1224 20 mesh 24 BWG wire mesh Tk. 24.00 Per sft.
1225 9" dia RCC pipe Tk. 160.00 Per rft.
1226 12" dia RCC pipe Tk. 212.00 Per rft.
1227 12 BWG barbed wife Tk. 111,250.00 Per M. ton
1228 Rivet, washer, wire nails etc. Tk. 76.00 Per kg.
1229 1.5" dia M.S. wheel for collapsible gate Tk. 23.00 each
1230 3"-6" M.S. clamp Tk. 25.00 each
1231 Electrodes in/c electricity Tk. 10.00 each
1232 Grease / lubricant etc. Tk. 56.00 Per lb.
1233 1.5" dia iron ring Tk. 9.00 each
1234 1.5 inch dia heavy type gate wheel Tk. 145.00 each
1235 Clamp with huskel dumney Tk. 120.00 each
1236 Heavy duty gate locking arrangement Tk. 229.00 each
1237 5" M.S. hinges Tk. 38.00 each
1238 5/8" socket bolt Tk. 164.00 each
1239 China made spring for rolling shutter Tk. 24.00 Per lb.
1240 Spring box for rolling shutter Tk. 103.00 each
1241 1/2 dia nut-bolt Tk. 9.00 each
1242 Coal-tar Tk. 19.00 Per kg.
1243 6" long brass tower & socket bolt Tk. 403.00 each
1244 3" long brass hinges Tk. 89.00 each
1245 6" ling catch hooks Tk. 8.00 each
1246 Screws Tk. 15.00 Per doz.
1247 24 BWG wire-net Tk. 18.00 Per sft.
1248 Gum Tk. 115.00 Per kg.
1249 Blue Tk. 163.00 Per kg.
1250 Pigment for color washing Tk. 182.00 Per kg.
1251 12" long brass hasp bolt Tk. 293.00 each
1252 Hydraulic door closer Tk. 1,917.00 each
1253 Mortice door lock Tk. 1,167.00 each
1254 Rim (round) door lock Tk. 619.00 each
1255 Magnetic door-shock absorber Tk. 45.00 each
1256 Used and empty Bitumen drum Tk. 318.00 each
1257 Fire-wood Tk. 194.00 Per mound
1258 Bleaching powder Tk. 97.00 Per kg.
1259 Fly proof wire-net Tk. 228.00 Per sqm
1260 1" expanded metal net Tk. 155.00 Per sqm
1261 Bamboo darma Tk. 33.00 Per sqm
1262 Single layer double bamboo tarja Tk. 121.00 Per sqm
1263 10/20 grade bitumen Tk. 60.00 Per kg.
1264 2 ply petroleum asphalt (Chinese) Tk. 7.00 Per sft.
1265 Coal Tk. 5.00 Per kg.
1266 2.44 m x 1.22 m size hard board Tk. 588.00 Per piece
1267 PVC water stopper Tk. 138.00 Per rft.
1268 100 btu Air cooler Tk. 60,000.00 each
1269 Installation of Air cooler Tk. 1,360.00 each
1270 Sing board in/c material, painting. Lettering etc all complete Tk. 200.00 sft
1271 AutoCAD operator Tk. 550.00 Per day
1272 Printing of drawing Tk. 16.50 sft
1273 As built work survey & report Tk. 1,500.00 Per day
1274 Providing Expertised Architectect 5 years exp with registration in respective professional Tk. 60,000.00 per month
body
1275 Providing Expertised Architectect 10 years exp with reg istration in respective professional Tk.100,000.00 per month
body
1276 Providing Pick up (double Cabined) Tk. 65,000.00 per month
1277 Photographer Tk. 1,000.00 Per day
1278 Photo print, post card sizes Tk. 5.00 each
1279
Engineer, Expertise in Microsoft MS Project / Primavera and experience by min 5 years Tk.100,000.00 per month
1280 Engineer, min graduate in relevant field Tk. 1,200.00 Per day
1281 Diploma Engineer, min 5 yrs Exp Tk. 1,200.00 Per day
1282 Diploma engineer, min 1 yrs Exp Tk. 750.00 Per day
1283 Royality of Earth Tk. 700.00 Per thousand cft

1284 Royality of Dredge material in the water body Tk. 650.00 Per thousand cft

1285
PDA Test: Striking hammer, guide, trip gear et in/c carriage, saftey & insurance Tk. 20,000.00 each Per day
1286 PDA Test: Lifting device including carriage, safety & insurance Tk. 20,000.00 each Per day
1287 PDA Test: Date acquisition unit, sensors etc including carriage, safety & insurance Tk. 50,000.00 Per rft.
1288 Arc welding at workshop / factory Tk. 20.00 tk / rft
1289 Cutting by oxy-ace of 1/2" M/S plate, tip & bott plate Tk. 15.00 tk / rft
1290 1/2 th MS Plate Grinding to V bevel top & plate Tk. 100.000 p/nos
1291 1" dia Hole in 1/2" M.S plate Tk. 20.00 tk / rft
1292 Cutting by shearing Grinding and hole for steel jacket, 1/4" plate on 2U x (top & bott) -C or Tk. 10.00 tk / rft
U form
1293 1/4 th MS Plate Grinding to V bevel on faces of U legs for top & bott Tk. 60.00 tk / rft
1294 Charge to bend 1/4" MS Plates Tk. 10.00 tk / rft
1295 2" dai Hole in 1/4" M.S plate Tk. 15.00 p/nos
1296 1.5" G.I / MS pipe for dowel bar Tk. 160.00 tk / rft
1297 Fabrication: Bending of 20 mm bar in U Tk. 5,658.00 p/ Mton
1298 Date logging Engineer at Hydraulic pile driver Tk. 1,500.00 Per day
1299 Chief Mechanic, at Hydraulic pile drive Tk. 1,200.00 Per day
1300 Helper to mechanic, at Hydraulic pile driver Tk. 388.00 Per day
1301 Foreman, at Hydraulic pile driver Tk. 567.00 Per day
1302 Crane Operator, at Hydraulic pile driver Tk. 1,000.00 Per day
1303 Asst. Crane Operator, at Hydraulic pile driver Tk. 732.00 Per day
1304 Machine Operator, at Hydraulic pile driver Tk. 1,000.00 Per day
1305 Asst machine operator, at Hydraulic pile driver Tk. 732.00 Per day
1306 Helper to carne operator, at Hydraulic pile driver Tk. 388.00 Per day
1307 Helper to machine operator, at Hydraulic pile driver Tk. 388.00 Per day
1308 Generator Operator, at Hydraulic pile driver Tk. 732.00 Per day
1309 Surveyer to pile layout, at Hydraulic pile driver Tk. 1,000.00 Per day
1310 Helper to surveyer, at Hydraulic pile driver Tk. 732.00 Per day
1311 Skilled Labour, at Hydraulic pile driver Tk. 303.00 Per day
1312 ordinary labor, at Hydraulic pile driver Tk. 245.00 Per day
1313 Compilation of driving Report, Pile Capacity log & submission to PE on singing it on Tk. 10,000.00 Per day
Hydraulic pile driver
1314 Each additional copy, at Hydraulic pile driver Tk. 500.00 Per day
1315 Per 100km
PIT: Mobilization, Demobilization, Accommodation +12 pile PIT 20000
within Dha
beyond 100 km from Dhaka 25 Pe km

Pile Integrity Test (PIT) 1000 Per pile after


1st 12 pile
1316 PIT Expert Engineer graduated in Civil Engg. And in Geotech. Engg by profession, 10 years
Exp 120000 per month
1317 Asst to PIT Expert Engineer: Civil Engr / Geotech Engineer by profession, 5 yrs Exp 75000 per month
1318 GLASS: Float / Anealed
1319 Float / annealed Glass thickness: 2.5 mm 28 sft
1320 Float / annealed Glass thickness : 3.0 mm 41 sft
1321 Float / annealed Glass thickness: 3.5 mm 45 sft
1322 Float / annealed Glass thickness: 4.0 mm 53 sft
1323 Float / annealed Glass thickness: 5.0 mm 56 sft
Float / annealed Glass thickness: 6.0 mm 77 sft
Float / annealed Glass thickness: 8.0 mm 100 sft
Float / annealed Glass thickness: 10.0 mm 140 sft
Float / annealed Glass thickness: 12.0 mm 160 sft
1324 GLASS: Tempered Glass
Tempered Glass thickness 5.0 mm 175 sft
1324

Tempered Glass thickness 6.0 mm 200 sft


Tempered Glass thickness 8.0 mm 260 sft
Tempered Glass thickness 10.0 mm 300 sft
Tempered Glass thickness 12.0 mm 400 sft
Tempered Glass thickness 15.0 mm 1000 sft
Tempered Glass thickness 19.0 mm 1300 sft
Twin in one bib Cock 12.0mm 1580 sft
1325 Laboratory Charges for Testing Materials: Please fin the Division 32 A and 32 B.
C26 CARRIAGE OF MATERIALS
1
Carriage of materials except bricks and bats by motor trucks bullock carts or any other
means, in/c, loading, unloading at both ends and stacking properly at site as per direction
of the Engineer.
(a) Up to 1.5 Kilometer Tk. 169.00
(b) Up to 3.0 kilometer Tk. 234.00
(c ) Up to 5.0 kilometer Tk. 300.00
(d) For each additional km beyond 5.0 kilometer and up to 30.0 kilometer Tk. 16.00
(e) For each additional km beyond 30.0 kilometer and up to 80.0 kilometer Tk. 11.00
(f) Beyond 80.0 kilometer Tk. 8.00
2 Weighing at both ends for items of steel materials only Tk. 94.00

Carriage of bricks or bats by motor trucks, bullock carts or any other means, in/c, loading ,
unloading at both ends and stacking properly at site as per direction of the Engineer.

(a) Up to 1.5 Kilometer Tk. 281.00


(b) Up to 3.0 kilometer Tk. 375.00
(c ) Up to 5.0 kilometer Tk. 445.00
(d) For each additional km beyond 5.0 kilometer and up to 30.0 kilometer Tk. 23.00
(e) For each additional km beyond 30.0 kilometer and up to 80.0 kilometer Tk. 16.00
(f) Beyond 80.0 kilometer Tk. 5.00

SCHEDULE OF RATES FOR CIVIL WORKS


FOURTEENTH EDITION: 2013

DIVISION 01: GENERAL AND SITE FACILITIES

Item No. Description of Item Unit Unit Rate


DIVISION 32 A : LABORATORY TEST OF ENGINEERING MATERIALS
Qualification guide to enter in tender documents.
Every tender shall bear related items from this division

Instruction to procuring Entity

a) The following table is provided as one of many quality controlling factory with the objective of estimating cost of materials test and to ensure quality leading to durable and safe structure. Sampling
of construction materials and products considerd to be tested shall be done under the direct control and guidence of procuring Entity. Representative of the contractors shall be liable to collect or
prepare etc. send to testing laboratories in an acceptable manner and collect authenticate copy / copies of test results/ report and duly submitted to the office of the procuring entity. procuring entity
shall recommend the contractor to prepare bill for payment. It is to be noted that material and products to be tested and its frequencies described here are merely as minimum and procuring entity
may consider for more tests from table A of this division

b) Test are to be done in the nearest laboratory as far as possible

c) Procuring entity may include any other materials or test in their estimate with intimation to convener, shcedule of Rates Committee, PWD

d) Laboratory testing service provider :


1 HBRI : Housing and building Research Institute. 120/3 Darus Salam, Mirpur, Dhaka. Phone +88 02-8060989
2 BUET (BRTC) : Bangladesh University of Engineering & Technology. Dhaka - 1000. (Bureau of Research, Testing & Consultation) phone : +8802-966650-56
3 KUET (CRTS) : Khulna University of Engineering & Technology. Khulna - 9203 (centre for Research, Testing & Consultation) phone : +88041-77480
4 RUET (DCE) : Rajshahi University of Engineering & Technology. (Department of Civil Engineering) phone : +88721-750742-3
5 SUST(CRTC) : Shahjalal University of Science & Technology. Sylhet - 3114 (centre for Research, Testing & Consultation) phone : +880821-713491
6 CUET (BRTC) : Chittagong University of Engineering & Technology. Chittagong - 4349 (Bureau of Research, Testing & Consultation) phone : +880031-714948
7 DUET (BRTC) : Dhaka University of Engineering & Technology. Gazipur-1700 (Department of Civil Engineering) phone : +8802-9204703

Item Description of item


Conducting laboratory test of Engineering Materials during construction in prograssive manner well fitted with physical prograss of work, by the procuring entity with all logistic support
supposed to be given by the contractor ; where sampling, sample sending to laboratory and collecting test results from the samples to laboratory shall be under strict control and guidance of
procurin entity following the norms elucidated in respective materials like BDS, EN, ASTM, ISO, IS etc. and paid to the contractor after complete and proper documentation on

32.0
1) laboratory test results in original
2) evidence of receiving samples in the laboratory in correct order
3) Forwarding letter of procuring entity address to laboratory for testing

4) Evidence of receiving "forwarding letter" with re


5) Conformation on sample tested that sent in sealed condition bearing the signature and date of procuring entity
6) ensurance documents of sealing, signing and sending the samples
Structural Components & Testing Frequency UNIT RATES PER SET OF TEST IN BDT
Lab test
Item No. Slab, Beam, Remarks BUET KUET RUET SUST CUET DUET
items Column wall/Brick wall others
Foudation HBRI (BRTC) (CRTS) (DCE) (CRTC) (BRTC) (DCE)

1 2 3 4 5 6 7 8 9 10 11 12 13 14
CONCRETE
Average
Compressive
strength, f'cr
₋ ₋ ₋ ₋ ₋ ₋ ₋ ₋ ₋ ₋ ₋ ₋
32.1
Compressive 7 days strength : 1 7 days strength : 1 7 days strength : 1 set
strength : set of 3 samples set of 3 samples per of 3 samples per floor
32.1.1.1

Concrete cylinders per Building unit Building unit per Building unit
100 x 200 ₋ ₋ 2,090 1,568 3,659 ₋ 1,960 ₋
mm
32.1.1

Compressive 28 days strength : 28 days strength : 1 28 days strength : 1 set


strength : 1 set of 3 samples set of 3 samples per of 3 samples per 1500
32.1.1.2

Concrete cylinders per 1500 sft or less 3000 sft or less of sft or less of PLA per 1. Any one of 100 x
100 x 200 of PLA PLA per floor floor ₋ 200 mm and 150 x ₋ 2,090 1,568 3,659 ₋ 1,960 ₋
mm 300 mm cylinder
may be tested
2. In
case of brand
Compressive 7 days strength : 1 7 days strength : 1 7 days strength : 1 set change non
strength : set of 3 samples set of 3 samples per of 3 samples per floor compliance of test
32.1.2.1

Concrete cylinders per Building unit Building unit per Building unit results etc.
150 x 300 ₋ contractor will be ₋ 3,790 2,352 16,989 ₋ 3,659 ₋
mm liable for additional
test and cost
32.1.2

Compressive 28 days strength : 28 days strength : 1 28 days strength : 1 set


strength : 1 set of 3 samples set of 3 samples per of 3 samples per 1500
Concrete cylinders per 1500 sft or less 3000 sft or less of sft or less of PLA per
32.1.2.2

150 x 300 of PLA PLA per floor floor


mm ₋ ₋ 3,790 2,352 16,989 ₋ 3,659 ₋

In situ core More test might


cutting & setting 1 set of 3 samples 1 set of 3 samples per be needed as and
32.1.3 without Scanning, ₋ per Building unit Building unit ₋ when deemed by ₋ 6,665 ₋ ₋ ₋ ₋ ₋
excluding field the design office
visit
Structural Components & Testing Frequency UNIT RATES PER SET OF TEST IN BDT
Lab test
Item No. Slab, Beam, Remarks BUET KUET RUET SUST CUET DUET
items Column wall/Brick wall others
Foudation HBRI (BRTC) (CRTS) (DCE) (CRTC) (BRTC) (DCE)

1 2 3 4 5 6 7 8 9 10 11 12 13 14

In situ core
cutting & setting
This test is not a
32.1.4 without Scanning, ₋ ₋ ₋ general
₋ 13068.8 ₋ ₋ ₋ ₋ ₋
excluding field
visit requirment
however need to
be carried out as
and when deemed
by the design
office
Slump test at field

₋ ₋ ₋ ₋ ₋ ₋ ₋ ₋ ₋
Randomly once per Randomly once per Randomly once per 500
32.1.5 500 sft or PLA 500 sft or PLA sft or PLA
32.2 CEMENT
Compressive Once for getting Once for getting Once for getting
Strength ( 3 and approval of cement approval of cement approval of cement
28 days ) type & brand , per type & brand , per type & brand , per 5000 In case of brand
5000 sft or less of 5000 sft or less of sft or less of PLA per change non
PLA PLA per floor floor compliance of test
results etc.
32.2.1 contractor will be 2352.38 9409.52 2875.13 8625.4 5881 8625.4 ₋
liable for additional
test and costIn
case

Setting time : Once for getting Once for getting Once for getting
Initial & Final approval of cement approval of cement approval of cement
type & brand , per type & brand , per type & brand , per 5000
5000 sft or less of 5000 sft or less of sft or less of PLA per In case of brand
PLA PLA per floor floor change non
compliance of test
results etc.
32.2.2 contractor will be 1306.88 3528.57 2483.07 3267.2 ₋ ₋ ₋
liable for additional
test and costIn
case

Structural Components & Testing Frequency UNIT RATES PER SET OF TEST IN BDT
Lab test
Item No. Slab, Beam, Remarks BUET KUET RUET SUST CUET DUET
items Column wall/Brick wall others
Foudation HBRI (BRTC) (CRTS) (DCE) (CRTC) (BRTC) (DCE)
Lab test
Item No. Slab, Beam, Remarks BUET KUET RUET SUST CUET DUET
items Column wall/Brick wall others
Foudation HBRI (BRTC) (CRTS) (DCE) (CRTC) (BRTC) (DCE)

1 2 3 4 5 6 7 8 9 10 11 12 13 14
32.2.3 Finness Once per brand Once per brand Once per brand 1306.88 2875.13 1698.94 2613.76 1045.5 2613.8

In case of brand
change non
compliance of test
results etc.
contractor will be
liable for additional
test and costI.

32.2.4 Soundness Once per brand Once per brand Once per brand Consult
lab
In case of brand
change non
compliance of test
results etc. ₋ ₋ ₋ ₋ ₋ ₋
contractor will be
liable for additional
test and costI.

32.2.5 Composition Once per brand Once per brand Once per brand Consult
analysis lab
In case of brand
change non
compliance of test
results etc. ₋ ₋ ₋ ₋ ₋ ₋
contractor will be
liable for additional
test and costI.

32.3 REBER
TENSILE Strength 1 set of 3 samples. 1 set of 3 samples. 1 set of 3 samples.
TEST : Yield 2000 sft or less of 12000 sft or less of 4800 sft or less of In case of brand
strenth, Ultimate PLA. Minimum 1 PLA/floor Minimum PLA/floor Minimum 1 change non
strength % set additional set 1 set additional set set additional set for compliance of test
Elongation etc for each change in for each change in each change in brand results etc.
32.3.1 brand brand contractor will be 2483.07 2613.76 2352.38
liable for additional
test and costIn
case

Structural Components & Testing Frequency UNIT RATES PER SET OF TEST IN BDT
Lab test
Item No. Slab, Beam, Remarks BUET KUET RUET SUST CUET DUET
items Column wall/Brick wall others
Foudation HBRI (BRTC) (CRTS) (DCE) (CRTC) (BRTC) (DCE)

1 2 3 4 5 6 7 8 9 10 11 12 13 14
32.3.2 Bend 1 set of 3 samples. 1 set of 3 samples. 1 set of 3 samples. 3528.57 3005.81 3789.95 1176.19 3267.2 1176.2
2000 sft or less of 12000 sft or less of 4800 sft or less of
PLA. Minimum 1 PLA/floor Minimum PLA/floor Minimum 1 In case of brand
set additional set 1 set additional set set additional set for change non
for each change in for each change in each change in brand compliance of test
brand brand ₋ results etc. ₋
contractor will be
liable for additional
test and costI.

32.3.3 Rebend test 1 set of 3 samples. 1 set of 3 samples. 1 set of 3 samples. 4312.71 3789.95 4051.33 1437.57 6142.3 1437.6
2000 sft or less of 12000 sft or less of 4800 sft or less of In case of brand
PLA. Minimum 1 PLA/floor Minimum PLA/floor Minimum 1 change non
set additional set 1 set additional set set additional set for compliance of test
for each change in for each change in each change in brand
brand brand ₋ results etc. ₋
contractor will be
liable for additional
test and costI.

32.3.4 Fatigue test Consult Laboratory


Only of damage by
₋ ₋ ₋ ₋ the design office ₋

32.3.5 Composition Consult Laboratory


analysis
Only of damage by
₋ ₋ ₋ ₋ the design office ₋

32.3.6 Composition Consult Laboratory


analysis
Only of damage by
₋ ₋ ₋ ₋ the design office ₋

32.4 COARSE AGGREGATE


Sieve Analysis 1 set of 3 samples. 1 set of 3 samples. 1 set of 3 samples.
1500 sft or less of 2500 sft or less of 3000 sft or less of In case of non
PLA. Minimum 1 PLA. Minimum 1 set PLA./Building unit compliance of test
set Minimum 1 set results etc.
32.4.1 ₋ contractor will be 1045.5 3528.57 2875.13 3528.57 1306.9 3136.5
liable for additional
test and cost

Structural Components & Testing Frequency UNIT RATES PER SET OF TEST IN BDT
Lab test
Item No. Slab, Beam, Remarks BUET KUET RUET SUST CUET DUET
items Column wall/Brick wall others
Foudation HBRI (BRTC) (CRTS) (DCE) (CRTC) (BRTC) (DCE)

1 2 3 4 5 6 7 8 9 10 11 12 13 14
32.4.2 Unit Weight 1 set of 3 samples. 1 set of 3 samples. 1 set of 3 samples. 653.44 2875.13 2091.01 2613.76 2613.8
1500 sft or less of 2500 sft or less of 3000 sft or less of
PLA. Minimum 1 PLA. Minimum 1 set PLA./Building unit In case of non
set Minimum 1 set compliance of test
results etc.
contractor will be
liable for additional
test and cost

32.4.3 Absorption and 1 set of 3 samples. 1 set of 3 samples. 1 set of 3 samples. 1,307 4051.32 3397.88 3920.63 3659.3
Specific Gravity 1500 sft or less of 2500 sft or less of 3000 sft or less of
PLA. Minimum 1 PLA. Minimum 1 set PLA./Building unit In case of non
set Minimum 1 set compliance of test
results etc.
contractor will be
liable for additional
test and cost

32.4.4 Aggregate 1 set of 3 samples. 1 set of 3 samples. 1 set of 3 samples. 1960.32 4182.01 3397.88 3920.63 2613.8 3920.6
Crushing Value 1500 sft or less of 2500 sft or less of 3000 sft or less of
(ACV) PLA. Minimum 1 PLA. Minimum 1 set PLA./Building unit
set Minimum 1 set In case of non
compliance of test
results etc.
contractor will be
liable for additional
test and cost

32.4.5 Salt Content for 1 set of 3 samples. 1 set of 3 samples. 1 set of 3 samples. 2091.01 2613.76 1568.3 2221.7
Sulphete content 1500 sft or less of 2500 sft or less of 3000 sft or less of
PLA. Minimum 1 PLA. Minimum 1 set PLA./Building unit
set Minimum 1 set In case of non
compliance of test
results etc.
contractor will be
liable for additional
test and cost

Structural Components & Testing Frequency UNIT RATES PER SET OF TEST IN BDT
Lab test
Item No. Slab, Beam, Remarks BUET KUET RUET SUST CUET DUET
items Column wall/Brick wall others
Foudation HBRI (BRTC) (CRTS) (DCE) (CRTC) (BRTC) (DCE)

1 2 3 4 5 6 7 8 9 10 11 12 13 14
32.4.6 C.B.R 1 set of 3 samples. 2 set of 3 times per 3 set of 3 times per
3000 sft 3000 sft (Applicable 3000 sft (Applicable to
37768.8 31887.8 39206.4 34632
(Applicable to road to road work) road work)
work) In case of non
compliance of test
results etc.
contractor will be
liable for additional
test and cost

32.4.7 LOS ANGELES 1 set of 3 samples. 1 set of 3 times per 1 set of 3 times per 1568.25 3789.95 4706.76 2613.8 4835.5
ABRATION 3000 sft 3000 sft (Applicable 3000 sft (Applicable to
(Applicable to road to road work) road work)
TEST work) In case of non
compliance of test
results etc.
contractor will be
liable for additional
test and cost

32.5 FINE AGGREGATE

32.5.1 Sieve Analysis 1 set of 3 samples. 1 set of 3 samples. 1 set of 3 samples. 1045.5 2091.01 1568.25 1960.32 1960.3
1500 sft or less of 2500 sft or less of 3000 sft or less of
PLA. Minimum 1 PLA. Minimum 1 set PLA./Building unit
set Minimum 1 set In case of non
compliance of test
results etc.
contractor will be
liable for additional
test and cost

Structural Components & Testing Frequency UNIT RATES PER SET OF TEST IN BDT
Lab test
Item No. Slab, Beam, Remarks BUET KUET RUET SUST CUET DUET
items Column wall/Brick wall others
Foudation HBRI (BRTC) (CRTS) (DCE) (CRTC) (BRTC) (DCE)

1 2 3 4 5 6 7 8 9 10 11 12 13 14
32.5.2 Unit weight 1 set of 3 samples. 2 set of 3 times per 3 set of 3 times per 653.44 2091.01 1829.63 2221.69 1960.3
3000 sft 3000 sft (Applicable 3000 sft (Applicable to In case of non
(Applicable to road to road work) road work) compliance of test
work) results etc.
₋ contractor will be
liable for additional
test and cost
32.5.3 Absorption and 1 set of 3 samples. 1 set of 3 samples. 1 set of 3 samples. 1306.88 4051.32 3397.88 3920.63 3659.3
Specific Gravity 1500 sft or less of 2500 sft or less of 3000 sft or less of In case of non
PLA. Minimum 1 PLA. Minimum 1 set PLA./Building unit compliance of test
set Minimum 1 set results etc.
₋ contractor will be
liable for additional
test and cost

32.5.4 Bulking of sand Once per Building Once per floor of Once per floor of 5619.58 3920.63 4704.76 4574.1
unit Building unit Building unit In case of non
compliance of test
results etc.
₋ contractor will be
liable for additional
test and cost

32.5.5 Salt Content for Once per Building Once per floor of Once per floor of 2091.01 2613.76 1568.3 2221.7
Sulphete content unit Building unit Building unit In case of non
compliance of test
results etc.
₋ contractor will be
liable for additional
test and cost

32.5.6 Mica 9801.59 4182.01 5227.51 4574.1

Only demanded by
design office or felt
₋ ₋ ₋ by PE on visit site
sample/source

Structural Components & Testing Frequency UNIT RATES PER SET OF TEST IN BDT
Lab test
Item No. Slab, Beam, Remarks BUET KUET RUET SUST CUET DUET
items Column wall/Brick wall others
Foudation HBRI (BRTC) (CRTS) (DCE) (CRTC) (BRTC) (DCE)

1 2 3 4 5 6 7 8 9 10 11 12 13 14
32.5.7 Organic 1960.32 2483.07 3267.2 3920.63 1568.3 2221.7
Impurities
Only demanded by
design office or felt
₋ ₋ ₋ by PE on visit site ₋
sample/source

32.5.8 Clay lump and 1306.88 3267.2 2744.44 3267.2 3005.8


friable particles
Only demanded by
design office or felt
₋ ₋ ₋ by PE on visit site ₋
sample/source
32.6 BRICKS
32.6.1 Crushing Strength Once when Once per floor of 1 set of 3 samples. 1568.25 3659.26 3528.57 3528.57 3397.9
building Unit in Building unit 2500 sft or less of PLA.
brick work Minimum 1 set In case of brand
change, non
compliance of test
results etc. ₋
contractor will be
liable for additional
test and cost

32.6.2 Water Absorption Once when Once per floor of 1 set of 3 samples. 9801.59 4182.01 5227.51 4574.1
building Unit in Building unit 2500 sft or less of PLA.
brick work Minimum 1 set
In case of brand
change, non
compliance of test
results etc. ₋
contractor will be
liable for additional
test and cost

Structural Components & Testing Frequency UNIT RATES PER SET OF TEST IN BDT
Lab test
Item No. Slab, Beam, Remarks BUET KUET RUET SUST CUET DUET
items Column wall/Brick wall others
Foudation HBRI (BRTC) (CRTS) (DCE) (CRTC) (BRTC) (DCE)

1 2 3 4 5 6 7 8 9 10 11 12 13 14
32.6.3 Unit Weight Once when Once per floor of 1 set of 3 samples. 3136.51 2613.76 3005.82 1960.3 2875.1
building Unit in Building unit 2500 sft or less of PLA.
brick work Minimum 1 set In case of brand
change, non
compliance of test
results etc. ₋
contractor will be
liable for additional
test and cost

32.6.4 Size & Shape Once when Once per floor of 1 set of 3 samples. 784.13 3005.82 2483.07 3005.82 1960.3 2613.8
building Unit in Building unit 2500 sft or less of PLA.
brick work Minimum 1 set
In case of brand
change, non
compliance of test
results etc. ₋
contractor will be
liable for additional
test and cost
32.6.5 Efflorscence Once when Once per floor of 1 set of 3 samples. 1306.88 3659.26 3136.51 3920.63 2352.4 3267.2
building Unit in Building unit 2500 sft or less of PLA.
brick work Minimum 1 set
In case of brand
change, non
compliance of test
results etc. ₋
contractor will be
liable for additional
test and cost

Structural Components & Testing Frequency UNIT RATES PER SET OF TEST IN BDT
Lab test
Item No. Slab, Beam, Remarks BUET KUET RUET SUST CUET DUET
items Column wall/Brick wall others
Foudation HBRI (BRTC) (CRTS) (DCE) (CRTC) (BRTC) (DCE)

1 2 3 4 5 6 7 8 9 10 11 12 13 14
32.7 HOLLOW BRICKS
32.7.1 Absorption 1 set of 3 samples. In case of brand 2091.01 1698.94 1960.32 1960.3
3000 sft or less of PLA. change, non
Minimum 1 set compliance of test
results etc.
contractor will be
liable for additional
test and cost
₋ ₋ ₋ ₋

32.7.2 Unit weight 1 set of 3 samples. 2875.13 2352.38 2875.13 2613.8


3000 sft or less of PLA.
Minimum 1 set

In case of brand
change, non
compliance of test
₋ ₋ results etc. ₋ ₋
contractor will be
liable for additional
test and cost
32.7.2 Compressive 1 set of 3 samples. 3528.57 3005.32 3920.63
Strength 3000 sft or less of PLA.
Minimum 1 set
In case of brand
change, non
compliance of test
₋ ₋ results etc. ₋
contractor will be
liable for additional
test and cost

Structural Components & Testing Frequency UNIT RATES PER SET OF TEST IN BDT
Lab test
Item No. Slab, Beam, Remarks BUET KUET RUET SUST CUET DUET
items Column wall/Brick wall others
Foudation HBRI (BRTC) (CRTS) (DCE) (CRTC) (BRTC) (DCE)

1 2 3 4 5 6 7 8 9 10 11 12 13 14
32.8 TILES (FLOOR & WALLS)
32.8.1 Size & Shape 1 set of 3 samples. In case of brand 2091.01 1829.63
2000 sft or less of PLA. change, non
Minimum 1 set compliance of test
results etc.
contractor will be
liable for additional
test and cost

32.8.2 Absorption 1 set of 3 samples. 2091.01 1829.63


2000 sft or less of PLA. In case of brand
Minimum 1 set change, non
compliance of test
results etc.
contractor will be
liable for additional
test and cost

32.8.3 Modulus of 1 set of 3 samples. Consult Laboratory


Rupture 2000 sft or less of PLA.
Minimum 1 set
In case of brand
change, non
compliance of test
results etc.
contractor will be
liable for additional
test and cost
Structural Components & Testing Frequency UNIT RATES PER SET OF TEST IN BDT
Lab test
Item No. Slab, Beam, Remarks BUET KUET RUET SUST CUET DUET
items Column wall/Brick wall others
Foudation HBRI (BRTC) (CRTS) (DCE) (CRTC) (BRTC) (DCE)

1 2 3 4 5 6 7 8 9 10 11 12 13 14
32.8 TILES (FLOOR & WALLS)
32.8.4 Flexural 1 set of 3 samples. In case of brand 2875.13 2352.38
2000 sft or less of PLA. change, non
Minimum 1 set compliance of test
results etc.
contractor will be
liable for additional
test and cost

32.8.5 Wrape 1 set of 3 samples. 1698.94


2000 sft or less of PLA. In case of brand
Minimum 1 set change, non
compliance of test
results etc.
contractor will be
liable for additional
test and cost

Structural Components & Testing Frequency UNIT RATES PER SET OF TEST IN BDT
Lab test
Item No. Slab, Beam, Remarks BUET KUET RUET SUST CUET DUET
items Column wall/Brick wall others
Foudation HBRI (BRTC) (CRTS) (DCE) (CRTC) (BRTC) (DCE)

1 2 3 4 5 6 7 8 9 10 11 12 13 14
32.9 PAINT
32.9.1 Resistance to 1 set of 3 samples/ In case of brand Consult Laboratory
heat 2000 sft or less of PLA. change, non
Minimum 1 set compliance of test
results etc.
contractor will be
liable for additional
test and cost
32.9.2 Resistance to 1 set of 3 Consult Laboratory
water samples/2000 sft or In case of brand
less of PLA. Minimum 1 change, non
set compliance of test
results etc.
contractor will be
liable for additional
test and cost

32.9.3 Spreading 1 set of 3 Consult Laboratory


capacity samples/2000 sft or In case of brand
less of PLA. Minimum 1 change, non
set compliance of test
results etc.
contractor will be
liable for additional
test and cost

32.9.4 Washability 1 set of 3 Consult Laboratory


samples/2000 sft or
less of PLA. Minimum 1
set In case of brand
change, non
compliance of test
results etc.
contractor will be
liable for additional
test and cost

Structural Components & Testing Frequency UNIT RATES PER SET OF TEST IN BDT
Lab test
Item No. Slab, Beam, Remarks BUET KUET RUET SUST CUET DUET
items Column wall/Brick wall others
Foudation HBRI (BRTC) (CRTS) (DCE) (CRTC) (BRTC) (DCE)

1 2 3 4 5 6 7 8 9 10 11 12 13 14
32.9.5 Weight per 10 1 set of 3 samples/ In case of brand Consult Laboratory
liter 2000 sft or less of PLA. change, non
Minimum 1 set compliance of test
results etc.
contractor will be
liable for additional
test and cost

32.1 METAL MADE GRILLS


32.10.1 Tensile strength As an when Consult Laboratory
required by the PE
32.10.2 Member Size & Consult Laboratory
shape
To be recorded

32.11 UPVC PIPE


32.11.1 1/2" - 4"
32.11.1.1 Pressure Test
As an when
required by the PE 3920.63

32.11.1.2 Dimension test


As an when
required by the PE 1960.32

32.11.1.3 Aceton test


As an when
required by the PE 980.16

32.11.1.4 Impact test


As an when
required by the PE 1960.32

Structural Components & Testing Frequency UNIT RATES PER SET OF TEST IN BDT
Lab test
Item No. Slab, Beam, Remarks BUET KUET RUET SUST CUET DUET
items Column wall/Brick wall others
Foudation HBRI (BRTC) (CRTS) (DCE) (CRTC) (BRTC) (DCE)

1 2 3 4 5 6 7 8 9 10 11 12 13 14
32.11.1.5 Heat Reversion
test As an when
required by the PE 980.16

32.11.1.6 Tensile test


As an when
required by the PE 980.16

32.11.1.7 Filter test


As an when
required by the PE 3920.63

32.11.2 5" - 6"


32.11.2.1 Pressure Test As an when
5227.51
required by the PE
32.11.2.1 Dimension test As an when
1960.32
required by the PE
32.11.2.1 Aceton test As an when
980.16
required by the PE
32.11.2.1 Impact test As an when
1960.32
required by the PE
32.11.2.5 Heat Reversion
test As an when
980.16
required by the PE

32.11.2.6 Tensile test


As an when
required by the PE 980.16

32.11.2.7 Filter test


As an when
required by the PE 7841.27

Structural Components & Testing Frequency UNIT RATES PER SET OF TEST IN BDT
Lab test
Item No. Slab, Beam, Remarks BUET KUET RUET SUST CUET DUET
items Column wall/Brick wall others
Foudation HBRI (BRTC) (CRTS) (DCE) (CRTC) (BRTC) (DCE)

1 2 3 4 5 6 7 8 9 10 11 12 13 14
32.11.3 7" - 8"
32.11.3.1 Pressure Test As an when
6534.39
required by the PE
32.11.3.2 Dimension test As an when
1960.32
required by the PE
32.11.3.3 Aceton test As an when
980.16
required by the PE
32.11.3.4 Impact test As an when
1960.32
required by the PE
32.11.3.5 Heat Reversion As an when
980.16
test required by the PE
32.11.3.6 Tensile test As an when
980.16
required by the PE
32.11.3.7 Filter test As an when
required by the PE
32.11.4 10"
32.11.4.1 Pressure Test As an when
7841.27
required by the PE
32.11.4.2 Dimension test As an when
2613.76
required by the PE
32.11.4.3 Aceton test As an when
980.16
required by the PE
32.11.4.4 Impact test As an when
1960.32
required by the PE
Structural Components & Testing Frequency UNIT RATES PER SET OF TEST IN BDT
Lab test
Item No. Slab, Beam, Remarks BUET KUET RUET SUST CUET DUET
items Column wall/Brick wall others
Foudation HBRI (BRTC) (CRTS) (DCE) (CRTC) (BRTC) (DCE)

1 2 3 4 5 6 7 8 9 10 11 12 13 14
32.11.3 7" - 8"
32.11.4.5 Heat Reversion As an when
980.16
test required by the PE
32.11.4.6 Tensile test As an when
980.16
required by the PE
32.11.4.7 Filter test As an when
required by the PE
32.11.5 12"
32.11.5.1 Pressure Test As an when
9148.15
required by the PE
32.11.5.2 Dimension test As an when
2613.76
required by the PE
32.11.5.3 Aceton test As an when
980.16
required by the PE
32.11.5.4 Impact test As an when
1960.32
required by the PE
32.11.5.5 Heat Reversion As an when
980.16
test required by the PE
32.11.5.6 Tensile test As an when
980.16
required by the PE
32.11.5.7 Filter test As an when
required by the PE

Structural Components & Testing Frequency UNIT RATES PER SET OF TEST IN BDT
Lab test
Item No. Slab, Beam, Remarks BUET KUET RUET SUST CUET DUET
items Column wall/Brick wall others
Foudation HBRI (BRTC) (CRTS) (DCE) (CRTC) (BRTC) (DCE)

1 2 3 4 5 6 7 8 9 10 11 12 13 14
32.11.6 14"
32.11.6.1 Pressure Test
As an when
required by the PE 10455.03

32.11.6.2 Dimension test


As an when
required by the PE 2613.76
32.11.6.3 Aceton test
As an when
required by the PE 980.16

32.11.6.4 Impact test


As an when
required by the PE 1960.32

32.11.6.5 Heat Reversion


test As an when
required by the PE 980.16

32.11.6.6 Tensile test


As an when
required by the PE 980.16

32.11.6.7 Filter test


As an when
required by the PE

Structural Components & Testing Frequency UNIT RATES PER SET OF TEST IN BDT
Lab test
Item No. Slab, Beam, Remarks BUET KUET RUET SUST CUET DUET
items Column wall/Brick wall others
Foudation HBRI (BRTC) (CRTS) (DCE) (CRTC) (BRTC) (DCE)

1 2 3 4 5 6 7 8 9 10 11 12 13 14
32.11.7 16"
32.11.7.1 Pressure Test As an when
13068.78
required by the PE
32.11.7.2 Dimension test As an when
2613.76
required by the PE
32.11.7.3 Aceton test As an when
980.16
required by the PE
32.11.7.4 Impact test As an when
1960.32
required by the PE
32.11.7.5 Heat Reversion As an when
980.16
test required by the PE
32.11.7.6 Tensile test As an when
980.16
required by the PE
32.11.7.7 Filter test As an when
required by the PE

Note : Follow Division 32 B: LABORATORY CHARGE FOR TESTING OF MATERIALS OR consukt laboratory for the Rates of test items not found here
DIVISION 32B : LABORATORY CHARGE FOR TESTING OF MATERIALS
sample RATE
Materials and name of test size
SL NO HBRI BRTC BUET CRTS, KUET DCE, RUET CRTS, SUST BRTC, CUET DCE, DUET
1 2 3 4 5 6 7 8 9 10
AGGREGATES

1 Absorption and specific gravity 1 1306.88 4051.32 3397.88 3920.63 ₋ 3659.26 ₋

2 Aggregate crushing value (ACV) 1 1960.32 4182.01 3397.88 3920.63 2613.76 3920.63 ₋

3 Aggregate impact value 1 ₋ 3528.57 3136.51 3920.63 2613.76 3267.2 ₋

4 Angularity Number in/c sp. Gr 1 ₋ 4182.01 3397.88 4312.7 ₋ 3920.63 ₋

5 Bulking of sand 1 ₋ 5619.58 3920.63 4704.76 ₋ 4574.07 ₋

6 CBR of base and sub base material 1 ₋ 37768.78 31887.83 36206.35 ₋ 34632.28 ₋

7 Clay lump and friable particles 1 1306.88 3267.2 2744.44 3267.2 ₋ 3005.82 ₋

8 Coal and lignite 1 ₋ 3267.2 2613.76 3267.2 ₋ 2875.13 ₋

9 Elongation Index (EI) 1 1306.88 3528.57 2744.44 3267.2 ₋ 3267.2 ₋

10 Flakiness Index (FI) 1 1306.88 4182.01 3397.88 4312.7 ₋ 3920.63 ₋

11 L.A Abrasion (ASTM C 535 or ASTM C131 1 1568.25 3789.95 4704.76 2613.76 4835.45 ₋

12 Mica content 1 ₋ 9801.59 4182.01 5227.51 ₋ 4574.07 ₋

13 Organic impurities 1 1960.32 2483.07 3267.2 3920.63 1568.25 2221.69 ₋

14 Effect organic impurities 1 ₋ 13591.53 11369.84 14375.66 ₋ 11761.9 ₋

15 Standard proctor test of aggregate (MDD) 1 ₋ 14767.72 12807.41 15682.54 ₋ 13722.22 ₋

16 Modified proctor or vibrating 1 ₋ 22608.99 19080.42 23523.81 ₋ 20910.05 ₋

17 Salt content or sulphet content 1 ₋ ₋ 2091.01 2613.76 1568.25 2221.69 ₋

18 Sieve analysis 1 1045.5 3528.57 2875.13 3528.57 1306.88 3136.51 ₋

19 Sieve analysis (Ballast) 1 ₋ 4182.01 3397.88 4312.7 ₋ ₋ ₋

20 Sieve analysis (FA) 1 1045.5 2091.01 1568.25 1960.32 ₋ 1960.32 ₋

21 wash Sieve analysis 1 ₋ 2875.13 1960.32 2352.38 ₋ 2613.76 ₋


sample RATE
Materials and name of test size
SL NO HBRI BRTC BUET CRTS, KUET DCE, RUET CRTS, SUST BRTC, CUET DCE, DUET

1 2 3 4 5 6 7 8 9 10
22 Soundness with Na2SO4 1 7841.27 12676.72 10455.03 13722.22 ₋ 11108.47
23 Soundness with Mg2SO4 1 7841.27 16074.6 13068.78 15682.54 ₋ 13068.78
24 10% fines 1 3920.63 7057.14 5227.51 6273.02 2613.76 6534.39
25 Unit weight of aggregate (CA) 1 653.44 2875.13 2091.01 2613.76 ₋ 2613.76
26 Unit weight of aggregate (FA) 1 653.44 2091.01 1829.63 2221.69 ₋ 1960.32
27 Void Ratio (Porosity) 1 653.44 4835.45 31887.83 3920.63 1568.25 3789.95
CEMENT CONCRETE
Compressive strength : Concrete cylinder (100 x
28 3 ₋ ₋ ₋
200 x0 mm 2091.01 1568.25 3659.26 1960.32
Compressive strength : Concrete cylinder (150 x
29 300 x0 mm 3 ₋ ₋ ₋
3789.65 2352.38 16989.42 3659.26
30 Concrete spun 3 ₋ ₋ ₋ ₋
3267.2 2613.76
31 Concrete cylinder casting & testing 3 ₋ ₋ ₋
784.13 19080.42 7187.83 16989.42
32 Concrete beam in flexure 3 ₋
3920.63 8233.33 6534.39 6534.39 3920.63 7187.83
33 Concrete slab in flexure 3 ₋ 11369.84 9148.15 ₋ ₋

Design of concrete (trial) mixes without


34 1 ₋ ₋ ₋
admixture 60769.84 45740.74 58809.52 54888.89
35 Design of concrete (trial) mixes using admixture 1 ₋ ₋ ₋
67826.98 52275.13 58809.52 54888.89
36 Concrete mixes design (single mix) 1 ₋ ₋ ₋ ₋ ₋ ₋ ₋

Concrete mixes design using admixture(single


37 1 ₋ ₋ ₋ ₋ ₋ ₋ ₋
mix)

38 Cube (<200 mm) 3 ₋ ₋ ₋


3267.2 2352.38 3005.82 3005.82
39 Cube (>200 mm-300 mm) 3 ₋ 3920.63 2613.76 3659.26

sample RATE
Materials and name of test
SL NO size HBRI BRTC BUET CRTS, KUET DCE, RUET CRTS, SUST BRTC, CUET DCE, DUET
1 2 3 4 5 6 7 8 9 10

40 Cubes (>300 x 300 mm ) for per core cutting each 1 ₋ ₋ ₋ ₋


7057.14 3267.2 6534.39
a. In situ core cutting & testing without scaning,
41 1 ₋ ₋ ₋ ₋ ₋ ₋
excluding fiels visit 6665.08
b. In situ core cutting & testing with scaning, 1 ₋ ₋ ₋ ₋ ₋ ₋
excluding fiels visit
13068.78
c. In lab supplied core testing (3 Nos) 1 ₋ ₋ ₋ ₋ ₋ ₋
2744.44
a. In situ per spot impact hammer test (3 test )
42 1 ₋ ₋ ₋ ₋ ₋ ₋ ₋
excluding field visit
b. In situ winsor pin test (per spot 3 test excluding 1 ₋ ₋ ₋ ₋ ₋ ₋ ₋
field visit
CEMENT
43 Compressive strength 3 & 7 days 1 ₋ ₋ ₋ ₋
5750.26
44 Compressive strength 3 , 7 & 28 days 1 2352.38 9409.52 2875.13 8625.4 5880.95 8625.4 ₋

45 Fineness 1 1306.88 2875.13 1698.94 2613.76 1045.5 2613.76 ₋


46 Setting time 1 1306.88 3528.57 2483.07 3267.2 ₋
47 Normal Consistency 1 653.44 2875.13 2352.38 1045.5 3920.63
48 Density/Sp.Gr 1 1306.88 4182.01 ₋ ₋ ₋ 3920.63
BITUMEN
49 Bitumen content 1 ₋ ₋
1306.88 13852.91 8886.77 11761.9 11108.47
50 Coating and striping tesst 1 ₋ ₋ ₋ ₋ ₋ ₋
3136.51
51 Design of A.C mixes (Marshall) 1 ₋ 51491.01 39206.35 45740.74 ₋ 45740.74 ₋

52 Disstillation 1 ₋ ₋ ₋
9278.84 7187.63 8494.71 7841.27

sample RATE
Materials and name of test size
SL NO HBRI BRTC BUET CRTS, KUET DCE, RUET CRTS, SUST BRTC, CUET DCE, DUET
1 2 3 4 5 6 7 8 9 10
53 Ductillity 1 ₋ 3005.82 2091.01 2613.76 ₋ 2483.07 ₋

54 Flash and fire points 1 ₋ 3005.82 2091.01 2613.76 ₋ 2483.07 ₋

55 Float test 1 ₋ 3005.82 2091.01 2613.76 1568.25 2483.07 ₋

56 Loss on heating 1 ₋ ₋
3005.82 2091.01 2613.76 1568.25 2483.07
57 Softening point (R & B) 1 ₋ 3005.82 2091.01 2613.76 1568.25 2483.07 ₋
58 Solubility 1 1306.88 3005.82 2091.01 2613.76 1568.25 2483.07 ₋
59 Specific gravity 1 1306.88 3005.82 2091.01 2613.76 1568.25 2483.07 ₋
60 spot test 1 3005.82 2091.01 2613.76 ₋
61 Standard penestration 1 1306.88 3005.82 2091.01 2613.76 1568.25 2483.07 ₋
62 Theorotical max Sp. Gr. Ac mixes 1 ₋ 4312.7 3397.88 3920.63 ₋
63 Thin film oven 1 ₋ 3659.26 2483.07 3005.82 ₋
64 Viscosity (S.F) 1 ₋ 5619.58 4443.39 4704.76 2613.76 4574.07 ₋
65 Viscosity (Kinemetice) 1 ₋ 7710.58 6011.64 6534.39 ₋ 6534.39 ₋

66 Water content 1 ₋ 6795.77 5227.51 6273.02 ₋ 6273.02 ₋

67 Any test on residue from loss on heating test 1 ₋ 5096.83 3920.63 4966.14 ₋ 4574.07 ₋

68 any test on residue from thin film oven test 1 ₋ ₋ ₋ ₋


5880.95 4443.39 5227.51
69 Ash content / inorganic matter 1 ₋ ₋ ₋
1306.88 5619.58 4443.39 5227.51
70 In situ core cutting & test excluding field visit 1 ₋ ₋ 15290.48 ₋ ₋ ₋ ₋

BRICKS
71 Absorption 5 784.13 1960.32 1698.94 1960.32 1306.88 1829.63 ₋

72 Crushing strength 5 1568.25 3659.26 3528.57 3528.57 3397.88 ₋

sample RATE
Materials and name of test size
SL NO HBRI BRTC BUET CRTS, KUET DCE, RUET CRTS, SUST BRTC, CUET DCE, DUET
1 2 3 4 5 6 7 8 9 10
73 Effloroscence 10 1306.88 3659.26 3136.51 3920.63 2352.38 3267.2 ₋

74 Size and shape 5 ₋


784.13 3005.82 2483.07 3005.82 1960.32 2613.76
75 Unit weight 5 ₋ 3136.51 2613.76 3005.82 1960.32 2875.13 ₋

76 Acid Resistance (Vitroil) 5 ₋ ₋ 7318.52 8494.71 ₋ ₋ ₋

HOLLOW / SPECIAL BRICKS BLOCKS


Compressive strength of hollow bricks, paver,
77 3 ₋ ₋ ₋ ₋
concrete blocks etc. 3528.57 3005.82 3920.63
78 Compressive strength of Road kerb stone 3 ₋ 4312.7 3397.88 3920.63 ₋ ₋ ₋

79 Absorption 3 ₋ 2091.01 1698.94 1960.32 ₋ 1960.32 ₋

80 Unit weight 3 ₋ ₋ ₋
2875.13 2352.38 2875.13 2613.76

Compressive strength of hollow bricks, paver, concrete


81 blocks etc.in/c unit weight 3 ₋ ₋ ₋ ₋ ₋ ₋
5880.95

GAUGES (Calibration)

82 Pressure gauge / dial gauge 1 ₋ 5227.51 4443.39 5227.51 ₋ 5227.51 ₋

83 Hydraulic jack with pressure gauge regular 1 ₋ 24438.62 15682.54 27444.44 ₋ 20910.05 ₋

84 Hydraulic jack with pressure gauge large 1 ₋ 32410.58 ₋ ₋ ₋


85 1 ₋ ₋ ₋ ₋ ₋ ₋ ₋

86 Deflection dial 1 ₋ 3659.26 3136.51 3267.2 ₋ 3267.2 ₋

87 Proving ring (< 100 kn) 1 ₋ 5619.58 3789.95 3920.63 ₋ 3920.63 ₋

88 Proving ring (< 100 kn - 500 kn) 1 ₋ 6403.7 4835.45 5227.51 ₋ 5227.51 ₋

89 Proving ring (>500 kn) 1 ₋ 7710.58 6273.02 7187.83 ₋ 6534.39 ₋

Compression testing machine excluding field visit 1 ₋ ₋ ₋


90 12676.72 17904.23 7841.27
91 Dynameter 1 ₋ 10455.03 8494.71 11761.9 ₋ 10455.03 ₋

sample RATE
SL NO Materials and name of test size HBRI BRTC BUET CRTS, KUET DCE, RUET CRTS, SUST BRTC, CUET DCE, DUET

1 2 3 4 5 6 7 8 9 10
92 Balance up to 20 kg 1 ₋ 7187.83 8494.71 ₋ 8494.71 ₋

93 Blaine Apparatus 1 ₋ 9540.21 ₋ 8494.71 ₋ ₋ ₋

94 Vibration machine 1 ₋ ₋ ₋ ₋ ₋ ₋ ₋
RCC PIPES (MAX Length of size is 2'-6")
95 Pipes (dia up to 600 mm) 1 ₋ 7057.14 5227.51 5880.95 ₋ ₋ ₋
96 Pipes (dia above 600 & up to 900 mm) 1 ₋ 7710.58 5880.95 7841.27 ₋ ₋ ₋
97 Pipes (dia above 900 & up to 1200 mm) 1 ₋ 9932.28 7187.83 10455.03 ₋ ₋ ₋
98 Pipes (dia above 1200 & up to 1524mm) 1 ₋ 12676.72 9932.28 ₋ ₋ ₋ ₋
99 In -situ pipe testing excluding field visit 1 ₋ ₋ 15029.1 ₋ ₋ ₋ ₋

STEEL
100 Tension (Deformed bar up to 25 mm) 3 ₋ 2483.07 2613.76 2352.38 ₋ ₋
101 Tension (plain bar up to 25 mm) 3 ₋ 2352.38 ₋ ₋
102 Tension (Deformed bar > 25 mm) 3 ₋ 3659.26 3397.88 3267.2 ₋ ₋
103 Tension (plain bar > 25 mm) 3 ₋ 3397.38 3136.51 ₋ ₋
104 Bend test (up to 25 mm) 3 ₋ 1176.19 914.81 1306.88 ₋ 1045.5 ₋
105 Re-Bend test (up to 25 mm) 3 ₋ 1437.57 1176.19 1306.88 ₋ 2352.38 ₋
106 Bend test (above 25 mm) 3 ₋ 1306.88 1045.5 1568.25 ₋ 1176.19 ₋
107 Re-Bend test (above 25 mm) 3 ₋ 1568.25 1306.88 1568.25 ₋ 2613.76 ₋
108 Shear test 3 ₋ 1960.32 3267.2 ₋ 3528.57 ₋
109 Hardness test 3 ₋ 2483.07 2091.01 2352.38 ₋ 2352.38 ₋
110 Impact 3 ₋ 3659.26 3136.51 2352.38 3659.26 ₋
111 Stress - strain curves (Modulus of elasticity) 3 1960.32 8494.71 7187.83 9148.15 4574.07 7841.27 ₋
112 Deformation measurement 3 ₋ 3267.2 1698.94 2352.38 ₋ 1960.32 ₋
113 Spring test 3 ₋ 3136.51 2613.76 3136.51 ₋ 2875.13 ₋
114 Tension (eye hooks, Anchor bolt) 3 ₋ 5096.83 4443.39 ₋ ₋ 4704.76 ₋
115 Weight 3 261.38 ₋ ₋ 980.16 914.81 914.81 ₋
116 H.T Wire 3 ₋ 7841.21 3920.63 4704.76 ₋ ₋ ₋
117 Strand 3 ₋ 14114.29 11108.47 11108.47 ₋ ₋ ₋
118 Angle/Plate 3 ₋ ₋ ₋ ₋ ₋ ₋ ₋
sample RATE
SL NO Materials and name of test size HBRI BRTC BUET CRTS, KUET DCE, RUET CRTS, SUST BRTC, CUET DCE, DUET
1 2 3 4 5 6 7 8 9 10
TILES
119 Size and shape 5 ₋ 2091.01 1829.63 ₋ ₋ ₋ ₋
120 Absorption 5 ₋ 2091.01 1829.63 ₋ ₋ ₋ ₋
121 Flexural 5 ₋ 2875.13 2352.38 ₋ ₋ ₋ ₋
122 Wrape 5 ₋ 1698.94 ₋ ₋ ₋ ₋
SOIL
123 CBR of soils (Three points) 1 ₋ 15682.54 20910.05 10455.03 20910.05 ₋
Field density (8 spot + 2 proctor + 2
124 1 ₋ ₋
sieves/hydrometer excluding field visit 25484.13 7841.27 6534.39 7841.27
125 Specific gravity 1 ₋ 2221.69 1960.32 2352.38 1568.25 2091.01 ₋
126 Hydrometer, sieve analysis. & sp. Gr 1 ₋ 5619.58 4835.45 5880.95 3920.63 ₋
127 Linear shrinkage 1 ₋ 2091.01 1698.94 1960.32 1306.88 1960.32 ₋
128 Shrinkage limit 1 ₋ 1698.94 1437.57 2613.76 1306.88 1568.25 ₋
129 Liquid limit/ plastic limit 1 ₋ 3528.57 2744.44 3267.2 1306.88 3267.2 ₋
130 Standard proctor 1 ₋ 7057.14 5619.58 6534.39 6534.39 ₋
131 Modified proctor 1 ₋ 8494.71 6273.02 7841.27 4574.07 7841.27 ₋
132 Unit weight (Wet & dry) 1 ₋ 2091.01 1829.63 1960.32 1568.25 1960.32 ₋
133 Void ratio (Sp. Gr & Unit weight) 1 ₋ 3528.57 3136.51 3267.2 2613.76 3267.2 ₋
134 Moistur content 1 ₋ 1045.5 784.13 980.16 784.13 914.81 ₋
135 Organic matter content 1 ₋ 3659.26 3136.51 3920.63 2613.76 3397.88 ₋
136 Loss on ignition 1 ₋ 3136.51 2613.76 3005.82 ₋ 2875.13 ₋
137 Grain size analysis 1 ₋ ₋ ₋ 1960.32 ₋ ₋ ₋
138 Grain size analysis of wash seiving 1 ₋ 2875.13 2091.01 2352.38 1568.25 ₋
139 Sand equivalent test 1 ₋ 4704.76 3920.63 4966.14 ₋ 4312.7 ₋
140 Permeability 1 ₋ 14767.72 5227.51 6534.39 ₋ 13722.22 ₋

Permeability - falling for non - cohesive sample 1 ₋ ₋ ₋


141 7057.14 3136.51 3267.2 5880.95
142 One dimentional consolidation full 1 ₋ ₋ ₋ ₋ ₋ ₋ ₋
143 One dimentional consolidation( e - loss p) 1 ₋ 14767.72 13068.78 14375.66 ₋ 13722.22 ₋
144 Consolidated drain test (direct shear test) 3 ₋ 8494.71 7841.27 ₋ 7318.52 ₋
145 Consolidated drained tri - axial test 3 ₋ 8494.71 32671.96 ₋ ₋ ₋
146 Consolidated quick test (direct shear test) 3 ₋ 7057.14 6534.39 ₋ ₋ ₋
sample RATE
SL NO Materials and name of test size HBRI BRTC BUET CRTS, KUET DCE, RUET CRTS, SUST BRTC, CUET DCE, DUET
1 2 3 4 5 6 7 8 9 10
147 Consolidated un- drained tri - axial test with pore ₋ ₋ ₋ ₋ ₋
pressure 3 28228.57 26137.57
Consolidated un- drained tri - axial test without 3 ₋ ₋ ₋ ₋
148 pore pressure 28228.57 26137.57 26137.57
149 Unconfined compression 1 ₋ 4182.01 3397.88 3920.63 3136.51 3920.63 ₋
150 Unconsolidated quick test (direct shear test) 3 ₋ 5619.58 3920.63 5227.51 ₋ 5227.51 ₋
Unconsolidated un- drained tri - axial test without 3 ₋ ₋ ₋
151 pore pressure 14114.29 10455.03 11761.9 11761.9
152 Max. and minimum density of cohesionless soil 3 ₋ 6403.7 5619.58 6534.39 ₋ ₋ ₋

GEOTEXTILE
Apparent/Effective opening size (AOS/EOS) or
153 3 ₋ ₋ ₋
pore size 4704.76 3920.63 4574.07 4312.7
154 Burst test index 3 ₋ 3528.57 2875.13 4574.07 ₋ 3267.2 ₋
155 Index puncture resistance of CBR puncture 3 ₋ 3528.57 2875.13 3267.2 ₋ ₋
156 Cone penetration test 3 ₋ 3528.57 2875.13 3267.2 ₋ ₋
157 Grabe Tensile test 3 ₋ 4704.76 3920.63 4574.07 ₋ 4312.7 ₋

Hor. Water permeability under 2 KN/m² pressure 3 ₋ ₋ ₋ ₋


158 9932.28 5227.51 6534.39
159 Seam strength 3 ₋ 4704.76 3920.63 4574.07 ₋ ₋
160 thickness 3 ₋ 1437.57 1045.5 1306.88 ₋ 1306.88 ₋
161 Trapizoidal tearing strength 3 ₋ 4704.76 3920.63 4966.14 ₋ 4312.7 ₋
162 Unit weight/Mass 3 ₋ 2221.69 1960.32 2352.38 ₋ 2091.01 ₋
Ver.Permeability under 2 KN/m² and 200 KN/m² 3 ₋ ₋ ₋ ₋
163 9148.15 7841.27 9148.15
164 Ver.Permeability under 2 KN/m² pressure 3 ₋ 5619.58 4835.45 5880.95 ₋ ₋ ₋
165 Water permeability by permitivity 3 ₋ 4706.76 3920.63 4574.07 ₋ ₋ ₋
166 Horizontal water permeability test 3 ₋ 10324.34 5227.51 6534.39 ₋ ₋ ₋

Strip/wide - wide tensile test (tensile elongation 3 ₋ ₋ ₋ ₋


167 5619.58 3920.63 3267.2
MISCELLANEOUS
Rubber /Plastic / PVC materials
168 Tension 5 ₋ 3397.88 2875.13 3267.2 ₋ 3136.51 ₋

sample RATE
SL NO Materials and name of test
size HBRI BRTC BUET CRTS, KUET DCE, RUET CRTS, SUST BRTC, CUET DCE, DUET
169 Hardness 1 ₋ 2091.01 1698.94 1960.32 ₋ ₋ ₋
170 Flexture 5 ₋ 4051.32 3397.88 3920.63 ₋ 3789.95 ₋
171 Compression test 1 ₋ 4051.32 3397.88 4574.07 ₋ 3789.95 ₋
172 Compression stiffness 1 ₋ 5619.58 4835.45 5227.51 ₋ 5227.51 ₋
OTHERS
173 Tension test on bolt hooks 3 ₋ ₋ ₋ ₋ ₋ ₋
174 Compression of fibre glass (one sample) 1 ₋ ₋ 1698.94 ₋ ₋ ₋ ₋
175 Compression of timber 1 ₋ ₋ 12023.28 ₋ ₋ ₋ ₋

176 Design of deep tube well (depth up to 600') inc 8 1 ₋ ₋ ₋ ₋ ₋ ₋


nos sand test 14114.29
Design of deep tube well (depth above 600') inc 1 ₋ ₋ ₋ ₋ ₋ ₋
177 11 nos sand test 33456.08
178 Flexture test of timber 1 ₋ 8494.71 7318.52 ₋ ₋ ₋ ₋
179 Load test on man-hole cover (<18 inch dia) 1 ₋ 7057.14 4704.76 ₋ ₋ ₋ ₋
180 Load test on man-hole cover (>18 inch dia) 1 ₋ 7710.58 5096.83 ₋ ₋ ₋ ₋
181 Tension test of fibre glass strain pipes 1 ₋ ₋ 3920.63 ₋ ₋ ₋ ₋
Elastomeric Bearing
Vulcanize rubber and thermoplastic elastomer in
182 3 ₋ ₋ ₋ ₋
tension & elongation at break ASTM D412 5880.95 5750.26 5880.95
Short duration compression test on plain and
steel laminated elastomeric bearing for bridge, 1 ₋ ₋ ₋ ₋
183 ASTM D 4014 5750.26 5619.58 5880.95
lomg duration compression test on plain and steel
184 laminated elastomeric bearing for bridge, ASTM D 1 ₋ ₋ ₋ ₋
4014 11631.22 11239.15 11761.9
185 Determination of shear modulus, ASTM D 4014 3 ₋ ₋ 8102.65 ₋ ₋ 9148.15 ₋
186 Test for compression set, ASTM D 395 4 ₋ ₋ 7318.52 ₋ ₋ 6011.64 ₋

Determination durometer hardness ASTM D 2240 1 ₋ ₋ ₋ ₋


187 2483.07 2483.07
Test for rubber dutability- deterioration in an air
188 3 ₋ 4966.14 4835.45 ₋ ₋ 4835.45 ₋
oven, ASTM D573
Test fo determining the adhesion on rigid 1 ₋ ₋ ₋ ₋ ₋
189 substrates, ASTM D429 4051.32 3920.63
₋ ₋ ₋ ₋
sample RATE
SL NO Materials and name of test size HBRI BRTC BUET CRTS, KUET DCE, RUET CRTS, SUST BRTC, CUET DCE, DUET
1 2 3 4 5 6 7 8 9 10

Dimentional test (External and internal ) giving


190 number and thickness of steel plates, elastomer 1
parallelism, elastomer thickness, ASTM D4014
2483.07 2483.07
191 Ash content 1 4051.32 3920.63 3920.63
WATER
192 Water (Drink + As) Total package free 1 ₋ ₋ 8625.4 7971.96 ₋

Water (Drink + As + TC & FC ) Total package free 1 ₋ ₋ ₋ ₋


193 10455.03 9148.15
194 pH/Hydrogen lon density 1 653.44 392.06 392.06 ₋ 392.06 ₋
195 Color (filtered) 1 ₋ 261.38 392.06 ₋ 392.06 ₋
196 Carbon dioxide (CO2) / Acidity 1 ₋ 261.38 261.38 392.06 ₋ 261.38 ₋
197 Chlorine (Cl) 1 ₋ 653.44 914.81 ₋ 914.81 ₋
198 Fluride (Fl) 1 ₋ 653.44 653.44 980.16 ₋ 653.44 ₋
199 Iron (Fe) 1 ₋ 784.13 1568.25 ₋ 1568.25 ₋
200 Manganese (Mn) 1 ₋ 1960.32 1568.25 1829.63 ₋ 1829.63 ₋
201 Nitrate - Nitrogen (NO3-N) 1 ₋ 784.13 653.44 784.13 ₋ 784.13 ₋
202 Alkalinity / Bicarbonate 1 653.44 653.44 392.06 653.44 ₋ 653.44 ₋
203 Total hardness 1 653.44 1045.5 718.78 914.81 ₋ 914.81 ₋
204 Total dissolved solids (TDS) 1 653.44 1176.19 914.81 ₋ 1045.5 ₋
205 Arsenic 1 ₋ 1960.32 1568.25 1960.32 ₋ 1829.63 ₋
206 Turbidity 1 ₋ 392.06 326.72 392.06 261.38 392.06 ₋
207 Feacal Coliform (FC) 1 1437.57 1045.5 ₋ ₋ ₋ ₋ ₋
208 Total coliform (TC) 1 1437.57 1045.5 1306.88 ₋ ₋ ₋ ₋
209 Manganese density (Mg) 1 3528.57 2091.01 ₋ ₋ ₋ ₋
210 Sodium (Na) density (SAR) 1 4966.14 ₋ ₋ ₋ ₋ ₋ ₋
Pollution study
Bio chemical oxygen demand (BOD) drinking 1 ₋ ₋ ₋
211 water 1829.63 2352.38 653.44 2091.01
Bio chemical oxygen demand (BOD) waste water 1 ₋ ₋ ₋ ₋ ₋ ₋
212 2875.13
213 chemical oxygen demand (COD) Dichromate 1 ₋ ₋ 2091.01 2352.38 653.44 2221.69 ₋
214 Dissolved oxygen (DO) 1 ₋ ₋ ₋ ₋ ₋ 653.44 ₋
215 Sulphate 1 ₋ ₋ 718.78 784.13 392.06 784.13 ₋
sample RATE
SL NO Materials and name of test size HBRI BRTC BUET CRTS, KUET DCE, RUET CRTS, SUST BRTC, CUET DCE, DUET
1 2 3 4 5 6 7 8 9 10
216 Color (Scanning) 1 ₋ ₋ 784.13 784.13 ₋
Miscellaneous Parameters
217 Selenioum (Se) 1 ₋ 3920.63 ₋ ₋ ₋ ₋ ₋
218 Carbonate (CO3) 1 ₋ 653.44 326.72 1176.19 261.38 1176.19 ₋
219 Ammonia nitrogen (NH3-N) 1 ₋ 1306.88 1045.5 1045.5 ₋ 784.13 ₋
220 Nitrate - Nitrogen (NO2-N) 1 ₋ 784.13 653.44 1045.5 ₋ 4574.07 ₋
221 Aliminium (Al) 1 ₋ 4966.14 4574.07 4966.14 ₋ 1829.63 ₋
222 Arsenic (As) 1 ₋ 1960.32 1960.32 1568.25 1829.63 ₋
223 Bromine content (Br) 1 ₋ 653.44 653.44 784.13 ₋ 653.44 ₋
224 Total chlorine content Cl2) 1 ₋ 784.13 653.44 784.13 ₋ 653.44 ₋
225 Free chlorine, Cl2 1 ₋ 784.13 653.44 784.13 ₋ 653.44 ₋
226 Break point chlorination 1 ₋ 9932.28 7449.21 9148.15 3267.2 9148.15 ₋
227 Hydrogen sulphide 1 ₋ 1045.5 784.13 784.13 653.44 784.13 ₋
228 Iodine content (i) 1 ₋ 653.44 653.44 784.13 ₋ 653.44 ₋
229 Mercury 1 ₋ 5619.58 4051.32 5880.95 ₋ 5227.51 ₋
230 Phosphate content (PO4) 1 ₋ 4182.01 914.81 980.16 522.75 914.81 ₋
231 Sulphite (SO3) 1 ₋ 784.13 849.47 980.16 ₋ 784.13 ₋
232 Silica content (SiO2) 1 ₋ 1306.88 914.81 980.16 ₋ 1176.19 ₋
233 Ba/Ca/Cr/Cu/Cd/K/Na/Ni/Pb/Zn 1 ₋ 1960.32 1829.63 ₋ 1829.63 ₋
234 Oil and grease content in water 1 ₋ 3659.26 3267.2 ₋ 1568.25 ₋ ₋
235 Oil and grease content inwasrte water 1 ₋ ₋ ₋ ₋ ₋ ₋ ₋
236 Organic matter 1 ₋ 2744.44 2352.38 2613.76 ₋ 2613.76 ₋
237 Boron 1 ₋ 3528.57 1960.32 1829.63 ₋ 1829.63 ₋
238 Electrical conductivity 1 ₋ 653.44 653.44 653.44 130.69 ₋
239 Total solids (TS) 1 ₋ 2352.38 914.81 980.16 653.44 1045.5 ₋
240 (TSS or TSS+TDSS) 1 ₋ 2352.38 1829.63 1960.32 ₋ 2091.01 ₋
241 Pb or Cd release of Tableware 1 ₋ 2352.38 1829.63 1960.32 ₋ 2091.01 ₋
242 Extraction charge for oil 1 ₋ 1829.63 ₋ ₋ 2613.76 ₋
243 Extraction charge for salt 1 ₋ ₋ ₋ 2613.76 ₋
Extraction of TCLP (Toxic charscteristic leaching 1 ₋ ₋ ₋ ₋ ₋ ₋ ₋
244 procedure) excluding metal test

sample RATE
SL NO Materials and name of test size HBRI BRTC BUET CRTS, KUET DCE, RUET CRTS, SUST BRTC, CUET DCE, DUET
1 2 3 4 5 6 7 8 9 10
Environmental Quality of soil
245 pH 1 ₋ 522.75 261.38 653.44 130.69 392.06 ₋
246 Boron (B) 1 ₋ ₋ 3267.2 3528.57 ₋ 3267.2 ₋
247 Electrical conductivity (EC) 1 ₋ 1045.5 653.44 980.16 130.69 1045.5 ₋
248 Organic matter for solid, sludge 1 ₋ 2875.13 1568.25 1960.32 ₋ 1960.32 ₋
249 Organic matter (Wet Combustion method) 1 ₋ 3397.88 2875.13 3920.63 ₋ 3267.2 ₋
250 Ammonia - Nitrogen (NH3-N) 1 ₋ 1306.88 1045.5 1437.57 ₋ 1306.88 ₋
251 Phosphate content (PO4) 1 ₋ ₋ 914.81 1437.57 ₋ 2613.76 ₋
252 Exchangeable sodium (Na) 1 ₋ ₋ 3267.2 3920.63 ₋ 3267.2 ₋
253 Aluminum (Al) 1 ₋ 4966.14 4574.07 5227.51 ₋ 4704.76 ₋
254 Arsenic (As) 1 ₋ 1960.32 1568.25 2613.76 ₋ 2091.01 ₋
255 Murcury (Hg) 1 ₋ 5619.58 4574.07 5227.51 ₋ 4574.07 ₋
256 Sulphite (SO3) 1 ₋ 784.13 1829.63 2613.76 ₋ 3267.2 ₋
257 Ca, Cd, Cl, K, Mg, Na, Pb 1 ₋ 1960.32 2417.72 2352.38 ₋ ₋ ₋
258 Toxiz Characteristics leaching procedure 1 ₋ 7057.14 7187.83 8886.77 ₋ ₋ ₋
259 TOC 1 ₋ ₋ 8102.65 7187.83 ₋ 2352.38 ₋
260 Other metals 1 ₋ ₋ 1829.63 2352.38 ₋ ₋ ₋
261 Oil and grease 1 ₋ ₋ ₋ ₋ ₋ ₋ ₋
Sampling
Sampling for bacteriological Analysis excluding 1 ₋ ₋ ₋ ₋ ₋ ₋
262 field visit 18949.74
Sampling for physical and chemical Analysis 1 ₋ ₋ ₋ ₋ ₋ ₋
263 excluding field visit 18949.74
Parametric Analysis of water
Concreting : pH, Turbidity, Total Dissolved, Solids,
264 Chloride, Alkalinity, organic matter, inorganic 1 ₋ ₋ ₋ ₋
matter, SO4
4312.7 5880.95 7841.27
Swimming pool : pH, Alkalinity, color, Turbidity,
265 total suspended solids, Chloride, TC, FC, Fe, NO3, 1 ₋ ₋ ₋ ₋
PO4 6273.02 8886.77 8494.71
Textile (only dying) pH,Alkalinity, Turbidity,
266 hardness, chemical oxygen demand (kmnO) Total 1 ₋ ₋ ₋ ₋
Chlorine, NO3, NO2, Fe, Mn, cu, Ts
6795.77 8886.77 8494.71

sample RATE
SL NO Materials and name of test size HBRI BRTC BUET CRTS, KUET DCE, RUET CRTS, SUST BRTC, CUET DCE, DUET
1 2 3 4 5 6 7 8 9 10
Textile (Boiler) pH,Alkalinity, Turbidity, hardness,
267 chemical oxygen demand (kmnO) Total 1 ₋ ₋ 6534.39 8886.77 ₋ 8494.71 ₋
Chlorine,Ca, NO2, Fe, Mn, SiO2, SO4
Tanning : pH,Alkalinity, Turbidity, hardness, Fe,
268 1 ₋ ₋ 3005.82 3528.57 ₋ ₋
Mn,

Cooling : pH,Alkalinity, Turbidity, hardness, Total


269 1 ₋ ₋ 4443.39 5880.95 ₋ 5227.51 ₋
Dissolved, Solids, Fe, Mn, COD, (KMnO4), PO4

Paper and pulp (Ground wood) : pH,Alkalinity,


270 Turbidity, hardness, Total Dissolved, Solids, Fe, 1 ₋ ₋ 4574.07 6273.02 ₋ 5227.51 ₋
Mn, SiO2, CO2

Boiler Feed water (including oil and grease) :


pH,Alkalinity, color, P-Alkalinity, M-Alkalinity,
271 1 ₋ ₋ 5750.26 7841.27 ₋ 6534.39 ₋
Turbidity, hardness, Total Dissolved, Solids,Total
suspended solids

Boiler Feed water (excluding oil and grease) :


pH,Alkalinity, color, P-Alkalinity, M-Alkalinity,
272 1 ₋ ₋ ₋ ₋ ₋ ₋ ₋
Turbidity, hardness, Total Dissolved, Solids,Total
suspended solids
Air Pollution
273 (CO, SO, NO, CH4) excluding visit 3 ₋ ₋ ₋ ₋ ₋ ₋ ₋
274 SPM per three spot 3 ₋ ₋ ₋ ₋ ₋ ₋ ₋
Pile load test
Test supervision and report (per pile) excluding
275 1 ₋ ₋ ₋ ₋ ₋ ₋ ₋
field visit
Pile Integrity test
Pile integrity test up to 10 per pile excluding visit
276 1 ₋ ₋ ₋ ₋ ₋ ₋ ₋
and transportation & overstay cost
277 Per pile integrity test beyond 10 piles 1 ₋ ₋ ₋ ₋ ₋ ₋ ₋
Soil Boring
Soil boring + Relevent test + (per bore inside 1 ₋ ₋ ₋ ₋ ₋ ₋ ₋
278 Dhaka )depth up to 60' - 0"
Soil boring + Relevent test + (per bore inside 1 ₋ ₋ ₋ ₋ ₋ ₋ ₋
279 Dhaka )depth up to 100' - 0"

sample RATE
SL NO Materials and name of test size HBRI BRTC BUET CRTS, KUET DCE, RUET CRTS, SUST BRTC, CUET DCE, DUET
1 2 3 4 5 6 7 8 9 10
Soil boring + Relevent test + (per bore outside
280 Dhaka )depth up to 60' - 0" 1 ₋ ₋ ₋ ₋ ₋ ₋ ₋

Soil boring + Relevent test + (per bore outside


281 1 ₋ ₋ ₋ ₋ ₋ ₋ ₋
Dhaka )depth up to 100' - 0"
Site Visit
282 Site visit inside Dhaka 1 ₋ ₋ ₋ ₋ ₋ ₋ ₋
Site visit inside Dhaka (for concrete core cutting 1 ₋ ₋ ₋ ₋ ₋ ₋ ₋
283 /scanning /load cell
284 Field visit within greater Dhaka 1 ₋ ₋ ₋ ₋ ₋ ₋ ₋
285 Field visit outside greater Dhaka 1 ₋ ₋ ₋ ₋ ₋ ₋ ₋
286 Field visit remote area 1 ₋ ₋ ₋ ₋ ₋ ₋ ₋
uPVC pipe
½” - 4"
Pressure Test ₋ ₋ ₋ ₋ ₋ ₋
288 3920.63
Dimension test ₋ ₋ ₋ ₋ ₋ ₋
289 1960.32
Aceton test ₋ ₋ ₋ ₋ ₋ ₋
290 980.16
Impact test ₋ ₋ ₋ ₋ ₋ ₋
291 1960.32
Heat Reversion test ₋ ₋ ₋ ₋ ₋ ₋
292 980.16
Tensile test ₋ ₋ ₋ ₋ ₋ ₋
293 980.16
Filter test ₋ ₋ ₋ ₋ ₋ ₋
294 3920.63
5"- 6"
Pressure Test ₋ ₋ ₋ ₋ ₋ ₋
295 5227.51
Dimension test ₋ ₋ ₋ ₋ ₋ ₋
296 1960.32
Aceton test ₋ ₋ ₋ ₋ ₋ ₋
297 980.16
Impact test ₋ ₋ ₋ ₋ ₋ ₋
298 1960.32
Heat Reversion test ₋ ₋ ₋ ₋ ₋ ₋
299 980.16
Tensile test ₋ ₋ ₋ ₋ ₋ ₋
300 980.16
Filter test ₋ ₋ ₋ ₋ ₋ ₋
301 7841.27

sample RATE
SL NO Materials and name of test size HBRI BRTC BUET CRTS, KUET DCE, RUET CRTS, SUST BRTC, CUET DCE, DUET
1 2 3 4 5 6 7 8 9 10
7"- 8"
Pressure Test ₋ ₋ ₋ ₋ ₋ ₋
302 6534.39
Dimension test ₋ ₋ ₋ ₋ ₋ ₋
303 1960.32
Aceton test ₋ ₋ ₋ ₋ ₋ ₋
304 980.16
Impact test ₋ ₋ ₋ ₋ ₋ ₋
305 1960.32
Heat Reversion test ₋ ₋ ₋ ₋ ₋ ₋
306 980.16
Tensile test ₋ ₋ ₋ ₋ ₋ ₋
307 980.16
Filter test ₋ ₋ ₋ ₋ ₋ ₋
308
10"
Pressure Test ₋ ₋ ₋ ₋ ₋ ₋
309 7841.27
Dimension test ₋ ₋ ₋ ₋ ₋ ₋
310 2613.76
Aceton test ₋ ₋ ₋ ₋ ₋ ₋
311 980.16
Impact test ₋ ₋ ₋ ₋ ₋ ₋
312 1960.32
Heat Reversion test ₋ ₋ ₋ ₋ ₋ ₋
313 980.16
Tensile test ₋ ₋ ₋ ₋ ₋ ₋
314 980.16
Filter test ₋ ₋ ₋ ₋ ₋ ₋
315
12"
Pressure Test ₋ ₋ ₋ ₋ ₋ ₋
316 9148.15
Dimension test ₋ ₋ ₋ ₋ ₋ ₋
317 2613.76
Aceton test ₋ ₋ ₋ ₋ ₋ ₋
318 980.16
Impact test ₋ ₋ ₋ ₋ ₋ ₋
319 1960.32
Heat Reversion test ₋ ₋ ₋ ₋ ₋ ₋
320 980.16
Tensile test ₋ ₋ ₋ ₋ ₋ ₋
321 980.16
Filter test ₋ ₋ ₋ ₋ ₋ ₋
322

sample RATE
SL NO Materials and name of test size HBRI BRTC BUET CRTS, KUET DCE, RUET CRTS, SUST BRTC, CUET DCE, DUET
1 2 3 4 5 6 7 8 9 10
14"
Pressure Test ₋ ₋ ₋ ₋ ₋ ₋
323 10455.03
Dimension test ₋ ₋ ₋ ₋ ₋ ₋
324 2613.76
Aceton test ₋ ₋ ₋ ₋ ₋ ₋
325 980.16
Impact test ₋ ₋ ₋ ₋ ₋ ₋
326 1960.32
Heat Reversion test ₋ ₋ ₋ ₋ ₋ ₋
327 980.16
Tensile test ₋ ₋ ₋ ₋ ₋ ₋
328 980.16
Filter test ₋ ₋ ₋ ₋ ₋ ₋
329
16"
Pressure Test ₋ ₋ ₋ ₋ ₋ ₋
330 13068.78
Dimension test ₋ ₋ ₋ ₋ ₋ ₋
331 2613.76
Aceton test ₋ ₋ ₋ ₋ ₋ ₋
332 980.16
Impact test ₋ ₋ ₋ ₋ ₋ ₋
333 1960.32
Heat Reversion test ₋ ₋ ₋ ₋ ₋ ₋
334 980.16
Tensile test ₋ ₋ ₋ ₋ ₋ ₋
335 980.16
Filter test ₋ ₋ ₋ ₋ ₋ ₋
336
NOTE -1 (as of BUET):
TABLE - 1: PWD PLAR 2014 SUBSTRUCTURE, Founation up to plinth level
Shallow foundation Deep foundation

Storey(basement shall be counted as storey


f'c = 19 to 21 Mpa, conrete with Brick chips f'c = 25 Mpa, f'cr = 30 Mpa, Concrete wirth crushed stone chips, cement content to nominal mix ratio 1:1.5:3
Lebel index

BRICK MASONARY STRUCTURE INDIVIDUAL OR COMBIND SYSTEM MICRO PILE PILE FOUNDATION*3,4 MAT FOUND
Without with 300 mm Without basement with 300 mm infill
Bearing capacity approx 1.0 sf Allowable Bearing capacity, qa basement infill basement floor basement slab
floor slab
Non Residential Residential A1 qa = 2.0 ksf qa=2.50 ksf qa = 3.0 ksf qa =3.5 ksf qa = 40 ksf qa =4.5 ksf qa = 5.0 ksf df=1.25m df=3.0m df=1.25m df=3.0m df=3.0m
A1
Per sqm Per sqm Per sqm Per sqm Per sqm Per sqm Per sqm Per sqm Per sqm Per sqm Per sqm Per sqm Per sqm Per sqm
1 2 3 4 5 6 7 8 9 10 11 12 13 14
1 3924 4094 7206 7002 6880 6800 6744 6703 6672 5177 11306 17266 21537 8117 1
2 4041 4213 8544 7967 7621 7393 7234 7118 7030 6437 12275 18081 22351 11263 2
3 4163 4343 10274 9215 8578 8160 7868 7655 7494 8050 13572 18956 23226 13583 3
4 4288 4473 12323 10693 9721 9068 8619 8290 8042 9882 15001 20360 24586 15642 4
5 4416 4607 14870 12530 11121 10197 9552 9081 8724 12012 16545 21489 25648 17524 5
6 17719 14584 12698 11459 10595 9964 9487 14340 18194 23927 27929 19272 6
7 16599 14244 12698 11619 10831 10235 15403 19939 27534 31379 20917 7
8 15904 14028 12718 11762 11039 17499 21774 30084 33773 22477 8
9 17672 15444 13889 12753 11894 19678 23692 34581 38046 23966 9
10 19542 16941 15127 13801 12799 21937 25691 38225 41465 25395 10
11 21507 18515 16428 14903 13750 24272 27765 43335 46352 26772 11
12 23564 20162 17789 16056 14745 26679 29911 48073 50866 28104 12
13 21880 19209 17258 15783 29156 32127 51929 54499 29395 13
14 23665 20684 18508 16861 31700 34410 55786 58132 30650 14
15 22213 19803 17979 34308 36757 60443 62565 31872 15
16 23794 21141 19134 64353 66251 33065 16
17 25425 22522 20327 70531 72205 34231 17
18 27105 23945 21554 74575 76025 35912 18
19 25407 22817 78618 79845 38595 19
20 26909 24113 85330 86333 41353 20
21 25442 89507 90286 44184 21
22 94858 95413 47086 22
23 99088 99419 50057 23
24 103318 103426 53097 24
25 109549 109433 56203 25
26 113860 113520 59374 26
27 118890 118326 62610 27
28 123227 122440 65909 28
29 127564 126553 69269 29
30 131901 130666 72690 30
31 137065 135606 76171 31
32 142283 140600 79710 32
33 147554 145647 83308 33
34 152878 150747 86963 34
35 158255 155901 90673 35
36 163686 161108 94440 36
TABLE 2: PWD PLAR 2014 - SUPER STRUCTURE
ADD STRUCTURAL MEMBER WEIGHTAGE RATES (TABLE - 3) IN ADDITION TO THE RATES OF THIS TABLE
BUILDING CATEGORY

Lebel index
Lebel index

Load bearing brick wall system : f'c = 19 to 23 Mpa RCC frame structure : f'c = 19 to 21 mpa RCC frame structure : f'c = 22 to 25 mpa Add 5%
NON RESIDENTIAL:NRLB A2 RESIDENTIAL:RLB A2 NON RESIDENTIAL:NRRCB A2 RESIDENTIAL:RRCB A2 NON RESIDENTIAL:NRRCS A2 RESIDENTIAL:RRCS A2
FLOOR

concrete with Brick chips concrete with Brick chips concrete with Brick chips concrete with Brick chips concrete with stone chips concrete with stone chips
Standard supaer superior Standard supaer superior Standard supaer superior Standard supaer superior Standard supaer superior Standard supaer superior
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21
1 GF Park 9030 9632 10595 9450 10080 11088 9815 10470 11517 10271 10956 12052 1
1 Gf habitation 13367 14096 15506 13829 14751 16226 15922 16983 18682 16662 17772 19550 16257 18267 24112 17228 19318 21408 1
2 1st floor 12540 13376 14714 13123 13998 15397 15109 16116 17727 15811 16865 18551 15427 17334 22880 16348 18331 20315 2
3 2nd floor 12728 13577 14935 13320 14208 15628 15335 16358 17993 16048 17118 18829 15658 17594 23224 16838 18606 20924 3
4 3rd floor 12919 13780 15159 13519 14421 15863 15565 16603 18263 16289 17374 19112 15893 17857 23572 17343 18885 21552 4
5 4th floor 13113 13987 15386 13722 14637 16101 15799 16852 18537 16533 17635 19399 16132 18125 23925 17864 19169 22198 5
6 5th floor 13310 14197 15617 13928 14857 16342 16036 17105 18815 16781 17900 19690 16374 18397 22284 18400 19456 22864 6
7 6th floor 16196 17276 19003 16949 18079 19886 16537 18581 24527 18584 19651 23550 7
8 7th floor 15246 16263 17889 15955 17018 18720 15567 17491 23089 16497 18498 20457 8
9 8th floor 15361 16385 18023 16074 17146 18861 15684 17623 23262 16620 18637 20611 9
10 9th floor 15476 16508 18158 16195 17275 19002 15802 17755 23436 16745 18777 20765 10
11 10th floor 15920 17888 23612 16871 18918 20921 11
12 11th floor 16040 18022 23789 16997 19059 21078 12
13 12th floor 16160 18157 23968 17125 19202 21236 13
14 13th floor 16281 18293 24147 17253 19346 21395 14
15 14th floor 16403 18431 24328 17383 19491 21556 15
16 15th floor 16526 18569 24511 17513 19638 21718 16
17 16th floor 16650 18708 24695 17644 19785 21880 17
18 17th floor 16775 18848 24880 17777 19933 22045 18
19 18th floor 16901 18990 25067 17910 20083 22210 19
20 19th floor 17028 19132 25255 18044 20233 22376 20
21 20th floor 17241 19371 25570 18270 20486 22656 21
22 21st floor 17456 19614 25890 18498 20742 22939 22
23 22nd floor 17674 19859 26214 18637 21002 23226 23
24 23rd floor 17895 20107 26541 18777 21264 23516 24
25 24th floor 18119 20358 26873 18917 21530 23810 25
26 25th floor 18345 20613 27209 19059 21799 24108 26
27 26th floor 18575 20870 27549 19202 22072 24409 27
28 27th floor 18807 21131 27893 19346 22348 24714 28
29 28th floor 19042 21395 28242 19491 22627 25023 29
30 29th floor 19280 21663 28595 19638 22910 25336 30
31 30th floor 19521 21934 28952 19785 23196 25653 31
32 31st floor 19765 22208 29314 19933 23486 25974 32
33 32nd floor 20012 22485 29681 20083 23780 26298 33
34 33rd floor 20262 22767 30052 20233 24077 26627 34
35 34th floor 20515 23051 30427 20385 24378 26960 35
36 35th floor 20772 23339 30808 20538 24683 27297 36
Roof top LC 2135 2278 2506 2135 2278 2506 2135 2278 2506 2235 2384 2622 2156 2591 2865 2156 2591 2865
Porch 4857

*1. Cost or remaining walls etc include in table-4

TABLE - 3 : PWD PLAR 2014 - STRUCTURAL MEMBER WEIGHTAGE


ADDITIONAL COST PER SQUARE METER IN BDT
Lebel index

Lebel index
35 34 33 32 31 30 29 28 27 26 25 24 23 22 21 20 19 18 17 16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1

Basement 6667 6471 6275 6079 5883 5686 5490 5294 5098 4902 4706 4510 4313 4117 3921 3725 3529 3333 3136 2940 2744 2548 2352 2156 1959 1763 1567 1371 1175 979 782 586 390 194 Basement
GF 6670 6473 6277 6081 5885 5689 5493 5296 5100 4904 4708 4512 4316 4119 3923 3727 3531 3335 3139 2942 2746 2550 2354 2158 1962 1765 1569 1373 1177 981 785 588 392 6667 GF
1st floor 6473 6277 6081 5885 5689 5493 5296 5100 4904 4708 4512 4316 4119 3923 3727 3531 3335 3139 2942 2746 2550 2354 2158 1962 1765 1569 1373 1177 981 785 588 392 196 1st floor
2nd floor 6277 6081 5885 5689 5493 5296 5100 4904 4708 4512 4316 4119 3923 3727 3531 3335 3139 2942 2746 2550 2354 2158 1962 1765 1569 1373 1177 981 785 588 392 196 2nd floor
3rd floor 6081 5885 5689 5493 5296 5100 4904 4708 4512 4316 4119 3923 3727 3531 3335 3139 2942 2746 2550 2354 2158 1962 1765 1569 1373 1177 981 785 588 392 196 3rd floor
4th floor 5885 5689 5493 5296 5100 4904 4708 4512 4316 4119 3923 3727 3531 3335 3139 2942 2746 2550 2354 2158 1962 1765 1569 1373 1177 981 785 588 392 196 4th floor
5th floor 5689 5493 5296 5100 4904 4708 4512 4316 4119 3923 3727 3531 3335 3139 2942 2746 2550 2354 2158 1962 1765 1569 1373 1177 981 785 588 392 196 5th floor
6th floor 5493 5296 5100 4904 4708 4512 4316 4119 3923 3727 3531 3335 3139 2942 2746 2550 2354 2158 1962 1765 1569 1373 1177 981 785 588 392 196 6th floor
7th floor 5296 5100 4904 4708 4512 4316 4119 3923 3727 3531 3335 3139 2942 2746 2550 2354 2158 1962 1765 1569 1373 1177 981 785 588 392 196 7th floor
8th floor 5100 4904 4708 4512 4316 4119 3923 3727 3531 3335 3139 2942 2746 2550 2354 2158 1962 1765 1569 1373 1177 981 785 588 392 196 8th floor
9th floor 4904 4708 4512 4316 4119 3923 3727 3531 3335 3139 2942 2746 2550 2354 2158 1962 1765 1569 1373 1177 981 785 588 392 196 9th floor
10th floor 4708 4512 4316 4119 3923 3727 3531 3335 3139 2942 2746 2550 2354 2158 1962 1765 1569 1373 1177 981 785 588 392 196 10th floor
11th floor 4512 4316 4119 3923 3727 3531 3335 3139 2942 2746 2550 2354 2158 1962 1765 1569 1373 1177 981 785 588 392 196 11th floor
12th floor 4316 4119 3923 3727 3531 3335 3139 2942 2746 2550 2354 2158 1962 1765 1569 1373 1177 981 785 588 392 196 12th floor
13th floor 4119 3923 3727 3531 3335 3139 2942 2746 2550 2354 2158 1962 1765 1569 1373 1177 981 785 588 392 196 13th floor
14th floor 3923 3727 3531 3335 3139 2942 2746 2550 2354 2158 1962 1765 1569 1373 1177 981 785 588 392 196 14th floor
15th floor 3727 3531 3335 3139 2942 2746 2550 2354 2158 1962 1765 1569 1373 1177 981 785 588 392 196 15th floor
16th floor 3531 3335 3139 2942 2746 2550 2354 2158 1962 1765 1569 1373 1177 981 785 588 392 196 16th floor
17th floor 3335 3139 2942 2746 2550 2354 2158 1962 1765 1569 1373 1177 981 785 588 392 196 17th floor
18th floor 3139 2942 2746 2550 2354 2158 1962 1765 1569 1373 1177 981 785 588 392 196 18th floor
19th floor 2942 2746 2550 2354 2158 1962 1765 1569 1373 1177 981 785 588 392 196 19th floor
20th floor 2746 2550 2354 2158 1962 1765 1569 1373 1177 981 785 588 392 196 20th floor
21st floor 2550 2354 2158 1962 1765 1569 1373 1177 981 785 588 392 196 21st floor
22nd floor 2354 2158 1962 1765 1569 1373 1177 981 785 588 392 196 22nd floor
23rd floor 2158 1962 1765 1569 1373 1177 981 785 588 392 196 23rd floor
24th floor 1962 1765 1569 1373 1177 981 785 588 392 196 24th floor
25th floor 1765 1569 1373 1177 981 785 588 392 196 25th floor
26th floor 1569 1373 1177 981 785 588 392 196 26th floor
27th floor 1373 1177 981 785 588 392 196 27th floor
28th floor 1177 981 785 588 392 196 28th floor
29th floor 981 785 588 392 196 29th floor
30th floor 785 588 392 196 30th floor
31st floor 588 392 196 31st floor
32nd floor 392 196 32nd floor
33rd floor 196 33rd floor
34th floor 34th floor
FLOOR

22
GF Park
Gf habitation
1st floor
2nd floor
3rd floor
4th floor
5th floor
6th floor
7th floor
8th floor
9th floor
10th floor
11th floor
12th floor
13th floor
14th floor
15th floor
16th floor
17th floor
18th floor
19th floor
20th floor
21st floor
22nd floor
23rd floor
24th floor
25th floor
26th floor
27th floor
28th floor
29th floor
30th floor
31st floor
32nd floor
33rd floor
34th floor
35th floor
WORKED OUT EXAMPLE ON PREPATATION OF
ROUGH ESTIMATE

Building type : Residential


Building category : Super (1800 sft/flat, 2 flat per floor)
Type of structure : RCC frame structure with 1:1.5:3 concrete (stone chips)
Soil type : Bearing capacity of soil = 3Ksf
Foundation : Shallow foundation, 6 story
Plinth area : 4003.93 sft (371.97)

Ground floor : parking


Site : Other than coastal area

A. FOUNDATION COST
Qnty/Amount Unir rate (Tk.) Total Amount
1 Soil Investigation : L.S or actual cost (BH Nos. as 5 Nos Tk. 16,364.00 /No Tk. 81,820.00
primary, say)

2 Foundation cost: from PLAR table-1, (For B.C qa = 371.59 sqm Tk. 12,697.59 / sqm Tk. 4,723,120.00
3 ksf) 371.97 sqm @tk. 12,697.59 per sqm

3 Add extra 2% cost for wind (other than coastal Tk. 4,723,120.98 2% Tk. 94,462.00
area)& earthquake load : 2% on tk 47,23,102.98

B. SUPER STURCTURE COST.

4 (i) Ground floor as parking (from PLAR table- 371.97 sqm Tk. 12051.67 sqm Tk. 4482857.86
2) 371.97 sqm @ tk. 12051.67

(ii) Add extra cost for member weightage 371.97 sqm 978.56 sqm Tk. 363995.28
(M.W)from PLAR table-3) 371.97 sqm @
tk. 978.56 per sqm

5 (i) 1st floor (from PLAR table-2) 371.97 sqm 371.97 sqm Tk. 20314.60 sqm Tk. 7556423.27
@ tk. 20314.6 per sqm

(ii) Add extra cost for member weightage 371.97 sqm Tk. 980.82 sqm Tk. 364834.40
(M.W)from PLAR table-3) 371.97 sqm @
tk. 980.82per sqm

6 (i) 2nd floor (from PLAR table-2) 371.97 sqm 371.97 sqm Tk. 20924.04 sqm Tk. 7783115.97
@ tk. 20924.04 per sqm
(ii) Add extra cost for member weightage 371.97 sqm Tk. 784.65 sqm Tk. 291867.52
(M.W)from PLAR table-3) 371.97 sqm @
tk. 784.65 per sqm
7 (i) 3rd floor (from PLAR table-2) 371.97 sqm 371.97 sqm
@ tk. 21551.76 per sqm
Tk. 21551.76 sqm Tk. 8016609.45
(ii) Add extra cost for member weightage 371.97 sqm
(M.W)from PLAR table-3) 371.97 sqm @
tk. 588.49 per sqm
Tk. 588.49 sqm Tk. 218900.64
8 4th floor (from PLAR table-2) 371.97 sqm 371.97 sqm
@ tk. 22198.32 per sqm
tk. 22198.32 sqm Tk. 8257107.73
Add extra cost for member weightage 371.97 sqm
(M.W)from PLAR table-3) 371.97 sqm @
tk. 392.33 per sqm
tk. 392.33 sqm Tk. 145933.76
9 5th floor (from PLAR table-2) 371.97 sqm 371.97 sqm
@ tk. 22864.27 per sqm
Tk. 22864.27 sqm Tk. 8504820.96
"B" = Tk. 45986466.86

C. ADDITIONAL SUPER STRUCTURE COST


10 Add extra cost super structure cost 2% for wind Tk. 45986466 Tk. 2% Tk. 919,729.34
(other than costal area) and earthequake
resisting structure) 2% on Tk
45986466.86

11 Extra cost for rooftop and chillakotha (from PLAR 371.97 sqm Tk. 2,865.35 sqm Tk. 1,065,824.00
Table-2 ) 371.97 sqm @Tk.2685.35 per sqm

12 Extra cost for rooftop RCC parapet (from 77.14 sqm Tk. 2,547.00 sqm Tk. 196,424.64
additional cost chart item-4) 4x19.28=77.14 sqm
@Tk.2547.00 per sqm

13 Extra cost for rooftop RCC water tank (from 2000 gallon Tk. 142.00 gal Tk. 284,000.00
additional cost chart item-5) 2000 gal. @Tk.
142.00 per gal

"C" = Tk. 2,465,977.98

D. OTHER BUILDING COST


14 Internal sanitary and water supply (from 2045.84 sqm Tk. 1,519.60 sqm Tk. 3,108,850.87
additional cost cahrt item - 6) Consider G.F
parking area cost 50%.

5.5 x371.97 sqm @ tk 1519.60 per sqm


15 Internal Electrification (from additional cost cahrt 2045.84 sqm Tk. 2,134.40 sqm Tk. 4,366,630.22
item - 7 Consider G.F parking area cost 50%
5.5x371.97sqm
@Tk. 2134.40 per sqm

16 External water supply


(i) Construction of under ground water 1000 gallon Tk. 71.00 gal Tk. 710,000.00
reservoir (from additional cost cahrt item
- 9-(i) : 10000 gal @Tk. 71.00 per gal

(ii) Sinking of deep tube well/distribution 1 No. M M


line, water pump, pump house,
wasa/municipal charge as per
requirement. Actual cost
17 External Electrification
(i) Sub-station building
(ii) Sub-station equipment/transformer
(iii) Pump and motor ser in/c installation
(iv) HT/LT line
(v) d
(vi) Stand by power source 1 No. N N
(vii) Earthing system
(viii) Overhead transmission
(ix) Underground cable laying

Compound light, wiring system & other


(x) safety system
18 Electro-mechanical component
(i) Lift not required
(ii) Air condition not required 1 No. P P
19 Gas connection
Ground floor (from additional cost cahrt item
- 8 (i) consider 50% cost as parking.
(i) 0.50x371.97 sqm @ tk. 342.20 per sqm 185.99 sqm Tk. 342.20 sqm Tk. 63,644.07
Other floor (from additional cost cahrt item -
8 (ii) 5x371.97 @ tk. 136.88 per sqm
(ii) 1859.85 sqm Tk. 136.88 sqm Tk. 254,576.27
Construction of compound drain Cost
on running meter basis. Actual cost
20 Q
Approach road
as per required (from additional cost chart-12-i/ii

21 R
Boundary wall as per requirment (from
additional cost chart-11-i/ii/ii)
22 (i)
Gate ,Actual cost (as per practical cost)
(ii) S
23 Site improvement T
24 Testing of materials as per requirement U
25 Arboriculture/landscape (as per requirment) V
26 Fire fighting (as per requirment) W
sum of cost from item
Total "D" = 14 to 26
Sub-total "X" = (A+B+C+D)
27 Quality assurane, material sample collection & testing (1 % of x) "Y" = 1% of "X"
28 Contingency (5% of X) or actual need) 5% of "X" or actual
"Z" = need

Grand total = (X+Y+Z)


Annexure-C
STANDARD FINISH SCHEDULE FOR RESIDENTIAL BUILDING
FLAT TYPE 'A' (500 sft), 'B' (600 sft),& 'C' (800 sft)
NAME OF THE INTERIOR FINISH MATERIALS
Floor SPACE FLOORS WALLS CEILINGS DOORS WINDO
parking rough casting plaster with plaster with
white wash white wash

Ground
Stair lobby Patent stone with net plaster with plaster with
cement finishing white wash white wash Main door-Door frame of
timber, shutter solid
wooden door with enamel Grill - 5 mm x
paint flat bar with
paint
Main door-Door frame of
timber, shutter solid
Master Bed Patent stone with net plaster with plaster with wooden door with enamel Grill - 5 mm x
cement finishing white wash white wash paint flat bar with
paint
Others BeD Patent stone with net plaster with plaster with
cement finishing white wash white wash

Drawing Patent stone with net plaster with plaster with


cement finishing white wash white wash

Dining Patent stone with net plaster with plaster with


cement finishing white wash white wash

Kitchen Local best quality floor Local ceramic plaster with Other Doors- door frame of Shutter M.S an
timber, Shutter particle with gla
tiles/Terrazzo (in situ or wall tile upto white
tiles) 2100 mm wash/Enamel board flush door with
garjan veneer with enamel
paint
Typical
Toilet Local best quality floor Local ceramic plaster with
tiles/Terrazzo (in situ or wall tile white wash
tiles) /terrazzo (in
situ) upto false
ceiling

Stair lobby Patent stone with net plaster with plaster with
cement finishing white wash white wash
Window fram
angle with e
Stair Patent stone with net plaster with plaster with paint
cement finishing & iron white wash white wash
nosing

Corridoor/p Patent stone with net plaster with plaster with


assage cement finishing white wash white wash
Main gate-M.S sheet with
M.S angle

SUPER FINISH SCHEDULE FOR RESIDENTIAL BUILDING


FLAT TYPE 'D' (1000) sft), 'E' (1250 sft),
NAME OF THE INTERIOR FINISH MATERIALS
Floor SPACE
FLOORS WALLS CEILINGS DOORS WINDO
parking rough casting/patterned plaster with plaster with
paving block plastic paint Distemper

Stair lobby Local best quality plaster with plaster with


Ground homogenous glazed floor plastic paint Distemper
tiles/terrazzo (in situ or Main door-Door frame of Grill - 5 mm x
tiles) timber, shutter solid flat bar with
wooden door with enamel
paint paint
Master Bed Local best quality plaster with plaster with
homogenous glazed floor plastic paint Distemper
tiles/terrazzo (in situ or
tiles)

Others BeD Local best quality plaster with plaster with


homogenous glazed floor plastic paint Distemper
tiles/terrazzo (in situ or
tiles)

Drawing Local best quality plaster with plaster with


homogenous glazed floor plastic paint Distemper Shutter M.S an
tiles/terrazzo (in situ or with gla
tiles) Other Doors- door frame of
timber, Shutter particle
Dining Local best quality plaster with plaster with board flush door with
homogenous glazed floor plastic paint Distemper garjan veneer with enamel
tiles/terrazzo (in situ or paint
tiles)

Typical
Kitchen Local best quality floor Local best plaster with
Typical tiles/Terrazzo (in situ or quality ceramic Distemper
tiles) wall tile/terrazzo
(in situ or tile)
upto 2100 mm

Toilet Local best quality floor Local ceramic plaster with


tiles wall tiles upto Distemper
false ceiling

Stair lobby Local best quality floor plaster with plaster with
tiles/Terrazzo (in situ or plastic paint Distemper Window fram
tiles) Main gate-M.S sheet with angle with e
M.S angle paint
Stair Local best quality plaster with plaster with
homogenous glazed floor plastic paint Distemper
tiles/terrazzo (in situ or
tiles) with brass or bronze
nosing

Corridoor/p Local best quality floor plaster with plaster with


assage tiles/Terrazzo (in situ or plastic paint Distemper Bathroom door- wooden
tiles) door with lacquer coating
(inside)

SUPERIOR FINISH SCHEDULE FOR RESIDENTIAL BUILDING


FLAT TYPE 'F' (1500) sft), AND Superior 1800 sft
NAME OF THE INTERIOR FINISH MATERIALS
Floor SPACE
FLOORS WALLS CEILINGS DOORS WINDO
parking rough casting/patterned plaster with plaster with
paving block plastic paint plastic paint

Ground Stair lobby Local best quality plaster with plaster with Main door-Door frame of
homogenous mirror plastic paint plastic paint timber, shutter solid
polished floor tiles Grill - 5 mm x
wooden (teak or other flat bar with
timber approved quality) paint
Master Bed Local best quality plaster with plaster with decorative door with best
homogenous floor plastic paint plastic paint quality polish
tiles/terrazzo (in situ or
tiles)

Others BeD Local best quality plaster with plaster with


homogenous floor plastic paint plastic paint
tiles/terrazzo (in situ or
tiles)
Other Doors- door frame of
Drawing Local best quality plaster with plaster with timber, (teak or other
homogenous floor plastic paint plastic paint timber approved quality)
Shutter -sl
tiles/terrazzo (in situ or aluminum fab
tiles) with glass s

Dining Local best quality plaster with plaster with


homogenous floor plastic paint plastic paint
tiles/terrazzo (in situ or
tiles)

Kitchen Local best quality Local best plaster with Shutter particle board
homogenous floor quality ceramic plastic paint flush door with best quality
tiles/terrazzo (in situ or wall tile/terrazzo polish
Typical
tiles) (in situ or tile)
upto 2100 mm

Toilet Local best quality ceramic Local ceramic plaster with


floor tiles wall tiles upto plastic paint
false ceiling

Windo
framealum
Main gate-M.S sheet with fabricated
M.S angle/SS sheet with SS
Stair lobby Local best quality plaster with plaster with Windo
homogenous mirror plastic paint plastic paint framealum
polished floor tiles Main gate-M.S sheet with fabricated
M.S angle/SS sheet with SS
pipe as per design.
Stair Local best quality plaster with plaster with
homogenous glazed floor plastic paint plastic paint
tiles/terrazzo (in situ or
tiles) with brass or bronze
nosing

Corridoor/p Local best quality floor plaster with plaster with


assage tiles/Terrazzo (in situ or plastic paint plastic paint Bathroom door- wooden
tiles) door with lacquer coating
(inside)

SPACIAL FINISH SCHEDULE FOR RESIDENTIAL BUILDING


FLAT TYPE -2500 sft AND ABOVE
NAME OF THE
Floor SPACE FLOORS SKIRTING WALL CEILING DOOR
Drive way & Rough & textured Plastic paint of Plasterd & painted with
Parking concrete tile of approved approved color white plastic paint
color design and size

Stair Homogeneous tiles of Homogeneous Plastic paint of Plasterd & painted with Solid
approved color with tiles of stair approved color white plastic paint wooden
nosing strips/terrazzo with color door of
brass nosing approve
d design
in roof
top

Lift Lobby Mirror polished local best local best quality plastic paint of
quality homogeneous homogeneous approved color
tiles of approved color tiles of floor
and patterned design color

Sub-Station patent stone layer with plaster and white plaster and white M.S grill
& Generator net cement finishing wash wash door of
Ground floor approve
d design

Toilet Ceramic floor tiles (non - Ceramic wall tiles plaster and white wash wooden
skid) of approved color of approved door with
lacquer
and size color & size upto coating
bottom of false (inside)
ceiling water
proof of
solid PVC
door of
approved
color &
design
Drivers patent stone layer with Plasterd & net Plasterd and plaster and white wash wooden
waiting/ net cement finishing cement finishing painted with door
water
storage white plastic proof of
paint solid PVC
door of
approved
color &
design

Guard room patent stone layer with Net cement Plasterd and plaster and white wash wooden
net cement finishing finishing painted with door
water
white plastic proof of
paint solid PVC
door of
approved
color &
design

Foyer Local best quality 100 mm high Plastic paint of plaster and white wash
homogeneous tiles of skirting Local approved color
approved color best quality on plaster upto
homogeneous false ceiling
tiles of approved
color solid wooden
design door
with check
viewer,
security chain,
door knocker,
apartment
number plat,
mortice lock,
tower bolt and
magnetic door
stopper inside
room
Living room Mirror polished local best quality 100 mm high skirting Plastic paint of Plasterd & painted with all
homogeneous tiles of approved with homogeneous approved color on white plastic paint aluminum
color and patterned design tiles of approved color plaster upto false sliding door
ceiling

Dining Mirror polished local best quality 100 mm high skirting Plastic paint of Plasterd & painted with
homogeneous tiles of approved mirror polished with approved color on white plastic paint
color and patterned design homogeneous tiles of plaster upto false
approved color ceiling

Bed rooms homogeneous tiles of approved 100 mm high skirting Plastic paint of Plasterd & painted with
color and design mirror polished with approved color on white plastic paint
homogeneous tiles of plaster upto false
approved color ceiling

Toilet Ceramic floor tiles (non - skid) Ceramic wall tiles of Plasterd & painted with
of approved color and size approved color & size white plastic paint
upto bottom of false
ceiling

kitchen Homogeneous tiles/terrazzo 100 mm high skirting Ceramic wall tiles of Plasterd & painted with
(in situ or tile) of approved mirror polished with approved color & size white plastic paint
color homogeneous tiles of upto2100 mm height
approved color
verandah Local best quality 101 mm high skirting Plastic paint o Plasterd & painted with
homogeneous non skid glossy mirror polished with approved color on white plastic paint
tiles of approved color homogeneous tiles of plaster
approved color

NAME OF THE MATERIAL BRAND AS USER GUIDE


(Subject to satisfy the standard test and approval by PWD
SL Name of the Material and standard Brand name Manufacturer
ANCHOR Olympic cement ltd. Green
grandeur, 58/E, kemal
ataturk avenue (11th floor)
banani, Dhaka-1213,
Phone: 9821503

1.1
BASHUNDHARA Bashundhara industrial
complex, Bashundhara
industrial headquarterrs,
plot

1.2
1.3 CAMEL BRAND
1.4 CROWN
1.5 DIMOND BRAND
1.6 FIVE RINGS
1.7 FRESH
1.8 HOLCEM
1.9 KING BRAND
1.10 LION
1.11 MIR CEMENT
1.12 PREMIER
1.13 ROYEL
1.14 SEVEN RING
1.15 SHAH CEMENT
1.16 TIGER BRAND
1.17
1.18
1.19
1.20
EXTERIOR REMARKS
NDOW

mm x 19 mm
with enamel
aint
mm x 19 mm
with enamel
aint

S angle plate Plaster with M.S stair railing


h glass weather
coat/exposed brick with wooden
hand rail
with pointing

frame M.S
th enamel
aint

EXTERIOR REMARKS
NDOW

mm x 19 mm
with enamel
aint

S angle plate
h glass

Plaster with Kitchen with


weather cabinet and
coat/exposed brick ordinary hood
with pointing
coat/exposed brick ordinary hood
with pointing

frame M.S
th enamel
aint

EXTERIOR REMARKS
NDOW

mm x 19 mm
with enamel
aint

Kitchen with
cabinet and
foreign made
hood

r -sliding
m fabricated
ass shutter

Plaster with
weather
coat/exposed brick
with pointing

M.S box or G.I


stair railing with
wooden / G.I
hand rail of
ndow approved design
luminum
ted frame
wooden / G.I
hand rail of
ndow approved design
luminum
ted frame

WINDOW COMMENTS

Aluminum sliding window Stainless steel


with 6 mm x 25 mm flat railing of
M.S bar grill as per design. approved
Fly roof net. frame: silver design with
color andonized. Glass: light wooden or SS
brown tinted type . Grill hand rail
color: of approved enamel
paint

mirror
polished
homogeneou
s tiles of
approved
color and
patterned
design only
on lift wall

M.S louver window color:


of approved enamel paint

Aluminum sliding window with 75 mm high


6 mm x 25 mm flat M.S bar grill door sill
as per design. Fly roof net.
frame: silver color andonized.
Glass: light brown tinted type .
Grill color: of approved enamel
paint
Aluminum sliding window with
6 mm x 25 mm flat M.S bar grill
as per design. Fly roof net.
frame: silver color andonized.
Glass: light brown tinted type .
Grill color: of approved enamel
paint

Aluminum sliding window with


6 mm x 25 mm flat M.S bar grill
as per design. Fly roof net.
frame: silver color andonized.
Glass: light brown tinted type .
Grill color: of approved enamel
paint

Aluminum sliding window with


6 mm x 25 mm flat M.S bar grill
as per design. Fly roof net.
frame: silver color andonized.
Glass: light brown tinted type .
Grill color: of approved enamel
paint

Aluminum sliding window with 6


mm x 25 mm flat M.S bar grill as
per design. Fly roof net. frame:
silver color andonized. Glass: light
brown tinted type . Grill color: of
approved enamel paint
Aluminum sliding window with 6
mm x 25 mm flat M.S bar grill as
per design. Fly roof net. frame:
silver color andonized. Glass: light
brown tinted type . Grill color: of
approved enamel paint

Aluminum sliding window with 6


mm x 25 mm flat M.S bar grill as
per design. Fly roof net. frame:
silver color andonized. Glass: light
brown tinted type . Grill color: of
approved enamel paint

Aluminum sliding window with 6 wooden garjan or


mm x 25 mm flat M.S bar grill as other timber of
per design. Fly roof net. frame: approved quality)
silver color andonized. Glass: light louverd cat door
directly above door
brown tinted type . Grill color: of with same width upto
approved enamel paint ceiling painted with
enamel paint of wall
color and fly proof
net inside.

Aluminum sliding window with 6 kitchen with


mm x 25 mm flat M.S bar grill as cabinet and
per design. Fly roof net. frame: foreign made
silver color andonized. Glass: light hood
brown tinted type . Grill color: of
approved enamel paint
Stainless steel
railing of
approved design
with 25 mm high
door sill
ral
and
stru
ctu Annexture -A
NOTES ON ral
PLINTH AREA RATES (PLAR)
Des
not
ign
ava
1 is
ilab
le

2 PLAR are formulated by studying huge variable, data and assumption only provide hints on the cost
of construction over a couple years

3 A wide range variation of actual cost from PLAR directs to study (i) Architectural & Structural (ii) site
condition (iii) decision build up

4 Exclusive work related to high density of cost like glazed curtain wall, alluminum composite curtain
wall/ clading are beyond the scope of PLAR

5 PLAR never resemble an actual cost; instead it’s a probabilistic cost for fund conformity after time
dependent tender and agreement procedure to run a smooth project

6 PLAR cost for building are to assessed after conforming the building category namely standard'
super' and 'superior'

7 Special category building are resident/office hold by constitutional posts or other building to be
decided by chief Engineer, PWD and chief Architect, Department of Architecture. The finishing
schedule and corresponding rates for these category building are to be fixed as per actual estimate

8 PLAR includes 19% extra cost for vat and other charges.

SCOPE OF PLINTH AREA

Plinth Area is the area bounded by exterior perimeter of a floor or the perimeter formed by joining the lines
on the outer faces of column in the floor, including any area kept opening what so ever, except courtyard
open to sky

SCOPE BUILDING CATEGORY

The category of building should be understood by the term standard, super, superior on their usual meaning,
but as the guide standard category of building is that, made in quality and provided with general basic
facilities and finished components are mostly of local materials, bricks, sand, cement and lime based but a
hygenic finish in toilets, lavatory and kitchen.

TABLE - 4 : PWD PLAR - 2014 : BASEMENT CONSTRUCTION *1


(Rate in BDT per sqm)
Concrete, f'c = 25 Mpa & min f'cr = 30 Mpa, fy = 400 Mpa (max. fy = 418 Mpa & Ratio fu to fy ≥ 1.25) cement BDS EN - 197 C
Element of Basement construction
Retaining piles & Bracing
Two
RCC Single Basement Basement Three Basement
Basement floor as Water proofing wall &
Retaining parking Foundation Bed
Wall
Retaining Bracing : steel (fy = 36
Retaining pile Retaining pile
pile Ksi) Truss system
Wall
Retaining Bracing : steel (fy = 36
Retaining pile Retaining pile
pile Ksi) Truss system

Tk. Per Taka per rm of Taka of


per rm Taka per rm of Taka per sqm of Taka per sqm of
sqm of Total taka/sqm perimeter perimeter Basement hor/vertical surface
wall perimeter

Rate from
structural
Tk.4956 member weitage Tk. 54895 Tk. 95593 Tk. 177914 Tk. 2059 Tk. 1549
tabel - 3+

Tk. 5384
*1 PLAR (Plinth area rate) to be calculated as sum of the cost divided by plinth area

ADDITIONAL COST CHART


1 Saline zone , to use concrete of min f'c = 25 Mpa 1% of PLAR
2 Wind (other than coastal area) & earth quake load resisting structure : 2% of PLAR
toCoastal area : affected
use concrete of min f'cby=cyclone
21 Mpa& water surge : to use concrete of
3 minimum f'c = 25 Mpa 3% of PLAR
4 Roof top of RCC parapet Tk. 2547 Per sqm
5 Roof top of RCC water tank in/c beams & supports etc : Tk. 142 per gal

6 Internal Sanitary and water supply : Rate in BDT

(i) Residential Building Standard Tk. 690.20 Per sqm


Super Tk. 1344.00 Per sqm
Superior Tk. 1519.00 Per sqm

(ii) Non-Residential Building Standard Tk. 556.80 Per sqm


Super Tk. 759.80 Per sqm
Superior Tk. 1165.80 Per sqm

7 Internal Electrification

(i) Residential Building Standard Tk. 1513.20 Per sqm


Super Tk. 1792.00 Per sqm
Superior Tk. 2134.00 Per sqm

(ii) Non-Residential Building Standard Tk. 1096.20 Per sqm


Super Tk. 1368.80 Per sqm
Superior Tk. 1653.80 Per sqm

8 Gas connection

(i) Tk. 342.20 Per sqm


(ii) Tk. 136.88 Per sqm

9
External water supply and sanitation:

(i) Underground water reservoir Tk. 71 Per gallom

(ii) Distribution line, water pump, Estimate


Pump house, wasa/ Municipal charge
as per requirment
(iii) Septic tank, Soak well, Inspection pit Estimate

10 External Electrification
(i) Sub- station building
(ii) sub- station equipment/transformer
(iii) Pump & motor set including installation
(iv) H.T/ L.T line Estimate to be prepared on the
(v) PDB /DESA/ REB charge basis of requirment
(vi) Stand by power & source
(vII) Earthing system
(viii) Over head transmission
(ix) Under ground cable laying
(x) Compound light, wiring system & other safety system

11 Boundary wall
(i)
Boundary wall 125 mm thick 250 x 250 mm brick pillar, 1.52 m in
height:
Construction of 125 mm thick boundary wall with 250 x 250 mm Tk. 4329.62 Per rm
size brick pillar @ 2.44 meter c/c , of height 1.52 meter above G.L
and 0.76 m below G.L and RCC (f'c = 19 Mpa, minimum f'cr = 24
Mpa in nominal mix 1:2:4) coping of 90 mm thick and 375 mm
width, 12 mm thick plaster (1:6) in both sides of the wall including
the cost of reinforcment and white washing etc.

(ii) Boundary wall in RCC frame, 1.52 m in height


Construction of RCC (f'c = 19 Mpa, minimum f'cr = 24 Mpa in Tk. 6890.71 Per rm
nominal mix (1:2:4) boundary wall of height 1.52 meter above G.L
and one meter below G.L with column 250 x 250 size and tie beam
250 x 250 mm at ground level , 76 mm thick and 375 mm width
RCC coping and 125 mm (1:4) brick work in between the column,
12 mm cement plaster (1:6) on the both side of brick surface and 6
mm thick cement plaster (1:4) on RCC, in all exposed surface on
both side of the boundary wall including the cost of M.S rod white
washing etc.

(iii) Barbed wire fencing over boundary wall:


Supplying, fitting and fixing 12 BWG barbed wire (2 ply, 4 points) in Tk. 824.61 Per rm
fencing work @ 150 mm c/c in both horizontally and vertically
supported by 38 x 38 x 6 mm M.S angle post (300 mm embeded in
RCC (f'c = 19 Mpa, minimum f'cr = 24 Mpa in nominal mix (1:2:4) or
in brick work with a cement concrete base of 75 x 75 x 300 mm)
600 mm vertical and 450 mm inclined or as per requirment @ 2.4
mm c/c including straightening, binding the joint with 18 BWG
wire making holes in the angle etc. in/c supplying of all necessary
materials complete in all respect and accepted by the Engineer.

(Rate exclude the cost of RCC of brick work or CC which is to


be paid as per corresponding items in the shcedule

12 Road work :

(i) R.C.C Road


Construction of RCC (minimum f'cr = 30 Mpa, satisfying a specified Tk. 2519.20 Per sqm
compressive strength f'c = 25 Mpa at 28 days on standard cylinders,
crushed stone chips as coarse aggregate, cement content relates to
mix ratio (1:1.5:3) road with 250 mm thick guide wall of height
0.30 meter, 150 mm thick RCC work over one layer 1st class brick
flat soling and polythine sheet including the cost of of reinforcment
10 mm dia M.S Rod 175 mm c/c in both direction.

(ii) Bituminous carpeting road


Construction of 38 mm thick compacted bituminous carpeted road Tk. 2154.81 Per sqm
over 150 mm thick sand surface with 75 mm thick end edging, 62
mm - 37 mm size brick bats khoa consolidation and compacted
water bound macadam of 150 mm thickness, providing tack coat
7.32 kg of bitumin per 10 sqm and seal coat 7.32 kg of bitumin per
10 sqm of road surface and also providing premixed bitumin seal
coat with 0.12 cum of pea gravels with 80 kg of bitumin per cum of
pea gravels and laid over 10 sqm of road surface.

13 Semi permanent structure:


Plinth area rate for standard semi permanent building with C.I Tk. 9775.00 Per sqm
sheet roofing on metal truss, supported on brick pillars & wall in
1:4 cement sand mortar having 75 thick D.P.C in/c earth work, back
filling in foundation and plinth <= 1 m & 125 mm thick panel brick
work in superstructure with 150 mm x 250 mm intermediate pillar
at 2.4 m to 3 m c/c, doors and windows made of best local timbers
with standard window grills, RCC work (1:2:4) in lintel, patent
stone flooring (1:2:4) , minimum 12 mm thick cement plaster (1:4)
in plinth, steps ansd dado, aesthetically accepted low cost false
ceiling, white/color washing and necessary earht work in
foundation, earth and sand filling in foundation in plinth and other
petty items as required and complete to function in all respect.

Annexure - B
GUIDELINES FOR PREPARATION OF ROUGH ESTIMATE

TYPE OF ESTIMATES :
Rough Estimate
Detail Estimate

ROUGH ESTIMATE
HEAD OF ACCOUNTS
Revenue
Development

REQUIREMENT OF ROUGH ESTIMATE


1 Request letter for requiring body
2 Approved site plan by the Department of Architecture
3 Approved building plan by the Department of Architecture
4 If approved building plan in not available, in case or urgency, rough estimate
may be prepared based on space requirment furnished by the Department
of Architecture

CHECK LIST BEFORE PREPARATION OF ROUGH ESTIMATE:


1 Apparent soil condition and approximate cost for sub soil investigation
2 Need for site improvement and approch road
3 Source of water supply
4 Surface water and sewerage disposal
5 Source of power supply
6 Source of gas supply
7 Need for spacial type boundary wall or retaining wall
8 Structure type and structural system
9 Additional cost in foundation due to poor soil condition
10 Special type foundation : Raft or pile.

COMPONENT OF ESTIMATE
1 Project profile
2 Report
3 Abstract of cost
4 Estimate
5 Site plan
6 Building plan

REPORT SHOULD CONTAIN THE FOLLOWING COMPONENTS


1 Background and objectives
2 Description of the project
3 Rate of estimate
4 Mode of finance
5 Charges
CHARGES
1 Project in Revenue head : Charge Nill
2 Project in development head:
(a) Works undertaken by PWD for ministry of housing and public works : 7.00%
(b) Work undertaken for other Ministries : 8.00%
3 Deposite works : 10.00%
DETAIL ESTIMATE
DETAIL ESTIMATE SHALL CONTAIN:
1 Report
2 Detail Building plan, Elavetion, Section, & Structural Drawing
3 Detail measurement of each individual item along with their information in drawing, site etc
4 An Abstract of cost
5 Proposed works specially boundary wall, gate, road, external water supply, sewerage line shown in red

DETAILED ESTIMATE ARE PREPARED:


1 For preparation of tender documents & bill of Quantity
2 For According Technical Sanction
3 For Receive fund through "Schedule process" from revenue budget
4 For Addministrative approval of items of works, this is not a component o approved scheme

IMPORTANT POINT TO REMEMBER:


1 Rate of item not covered by PWD's Schedule rate shall be accompanied by analysis
2 Site improvement by carted earth must be accompanied by contour map duly signed by appropriate autoruty
3 Detail estimate of approve project implemented through ADP must not be sent to chief Engineer's office for
Checking and approval. Additional chief Engineer has the full power to approve it
4 All details estimate sent to Chief Engineers office must have prior approval of respective S.E and A.C.E

ORMAT OF ROUGH ESTIMATE


1. SOIL INVESTIGATION : TK. A
2. CONSTRUCTION OF BUILDING : TK.B

A. FOUNDATION COST : from PLAR table


1 Add cost for saline zone
2 Add cost for 1:1:25:2.5 concrete with stone chips
3 Add cost for high risk costal area
4 Add additional cost for extra depth of foundation
5 Add additional cost for basement floor (Basement wall, floor Retaining piles if required)
6 Add cost for member weight age table -3 (For basement floor)
7 Add additional cost for wind and earthquake

B. SUPER STRUCTURE COST : from PLAR Table


1 Add cost for saline zone
2 Add cost for 1:1:25:2.5 concrete with stone chips
3 Add cost for high risk costal area
4 Add cost for member weight age table -3 (For basement floor)
5 Add additional cost for wind and earthquake

3. INTERNAL WATER SUPPLY AND SANITATION : TK. C

4. INTERNAL ELECTRIFICATION : TK. D

5. EXTERNAL WATER SUPPLY : TK. E


1 Construction of underground reservoir
2 Sinking of deep tube well/arranging water from WASA, Municipality if Public Health Engineering sources
3 Laying of distribution pipe lines
4 Construction of pump house
5 Supplying and installation of pupms

6. EXTERNAL ELECTRIFICATION
1 Consruction of Sub-station building : TK. F
2 Supplying and installation of Sub- station equipment/Transformer
3 Supplying and installation of pump and motor set
4 HT/LT line
5 PDB/DESA/REB connection
6 Stand by power and sources
7 Earthling system
8 Overhead transmission line
9 Underground cable laying
10 Compound light

7. ELECTRO-MECHANICAL COMPONENT : TK. G

1 Lift (…………………Passanger ………………………..Stop) : Nos x unit cost

2 Air condition and exhaust fan etc : Nos x unit cost

8. GAS CONNECTION NETWORK AND CHARGES. : TK. H

9. CONSTRUCTION OF COMPOUND DRAIN (Cost of running meter basis) : TK. I


10. CONSTRUCTION OF CULVERT/BRIDGE : TK. J

11. CONSTRUCTION OF INTERNAL / COMPOUND /APPROACH ROAD AND PAVEMENT : TK. K

12. CONSTRUCTION OF BOUNDARY WALL AND GATES RETAINING WALL. : TK. L

13. DEVELOPMENT OF SITE (Cost on approximate quantity in cum) : TK. M

14. ARBORICULTURE / LANDSCAPE / PLAY GROUND : TK. N

15. FIRE FIGHTING : TK. O

16. PRICE ESCALATION : TK. P

: TK. Q
SUB TOTAL

17. QUANTITY ASSURANCE MATERIAL SAMPLE COLLECTION & TESTING, ETC (1.00% ON Tk. Q) TK. R

18. CONTINGENCY (Probable unforeseen expenditure related to work) (5.00% on Tk. Q) TK. S

SUB TOTAL : TK. T

19. COST OF LAND : TK. U


GRAND TOTAL : TK. V
ON *1

t BDS EN - 197 CEM - l, 52.5 N

Back wall to Excavation, System


Retaining wall carrying & management
(125 mm b/w safety
(125 mm b/w safety

Taka per m
Taka per sqm of depth Taka per sqm of
per sqm
wall Basement
of basement

Tk. 1228 Tk. 881 Tk. 91

th area