1 Morter 1 3
2 Earth work excavation 4 -
3 Conveyance 5 -
4 Filling 6 -
5 Plain Cement Concrete 7 10
6 Reinforced Cement Concrete 11 15
7 Centering 16 23
8 Stone Masonry 24 28
9 Brick Masonry 29 30
10 Pointing 31 32
11 Flooring 33 39
12 Doors, Windows & Ventilators - Wood 40 41
13 Doors, Windows & Ventilators - Steel 42 58
14 False Ceiling 59 -
15 Roofing 60 62
16 Plastering 63 64
17 White washing & Colour washing 65 66
18 Distembering 67 -
19 Painting - Iron & wood work 68 -
20 Plastic emulsion Painting, Cement Paint 69 71
21 Varnish 72 -
22 Polishing 73 -
Miscellaneous- AC rain water pipe, Stoneware pipe, Inspection
23 chamber, HP platform, Barbed fencing, Paver block, Power 74 80
mechanical trowel, Cudappa slab
24 Pile work 81 83
25 IRC Kerb 84 87
Sanitary works- Washbasin, W.C., EWC, Urinal, Nahini & Gully
26 88 93
trap, Mirror, Towel rod, Soap tray
27 Water supply pipe line work 94 118

Index
SCMC CIVIL DATA 2018-2019
1
SALEM CITY MUNICIPAL CORPORATION
COST OF MATERIALS AT SITE FOR THE YEAR 2018-19

Sch. Conveyance
Sl. Name of Distance Cost of Total per Rate
Item Sources Incidental Conveyance Loading Unloading
No No
Materials in KM Materials amount per
charges charges charges charges
1 2 3 4 5 6 7 8 9 10 11
1 67 Lime Salem 7 Km 919.00 46.20 965.20 1 m3
2 66 Shell Lime " 7 Km 1248.00 46.20 1294.20 1 m3
3 Cement Local 0 Km 5530.00 - 5530.00 1 MT
4 Steel " 0 Km 44190.00 - 44190.00 1 MT
Sand for Pettapalay
5 59 90Km 168.00 642.10 810.10 1 m3
Mortar am
Sand for
6 60 Local 10 Km 168.00 96.20 264.20 1 m3
Filling
48- 3mm ISS Panamarat
7 10 Km 538.00 96.20 634.20 1 m3
XI Gauge HBGS hupatty
48- 6mm ISS
8 " 10 Km 598.00 96.20 694.20 1 m3
X Gauge HBGS
48- 10mm ISS
9 " 10 Km 883.00 96.20 979.20 1 m3
IX Gauge HBGS
48-
12mm ISS
10 VII " 10 Km 1200.00 96.20 1296.20 1 m3
Gauge HBGS
I
48- 20mm ISS
11 " 10 Km 1293.00 96.20 1389.20 1 m3
VII Gauge HBGS
48- 25mm ISS
12 " 10 Km 799.00 96.20 895.20 1 m3
VI Gauge HBGS
48- 40mm ISS
13 " 10 Km 929.00 96.20 1025.20 1 m3
V Gauge HBGS
14 27 Rough stones " 10 Km 413.00 96.20 509.20 1 m3
15 42 Bond stones " 10 Km 595.00 96.20 691.20 1 m3
Cut stone
slab for
39-
16 a culvert one " 10 Km 3885.00 96.20 3981.20 1 m3
B
line dressing
upto 1.20m
Cut stone
slab for
16 39-
culvert one " 10 Km 4275.00 96.20 4371.20 1 m3
b A
line dressing
above 1.20m
Cut stone
16 c 35 slab roughly " 10 Km 4060.00 96.20 4156.20 1 m3
dressed

Cost-Materials
SCMC CIVIL DATA 2018-2019
2
Sch. Conveyance
Sl. Name of Distance Cost of Total per Rate
Item Sources Incidental Conveyance Loading Unloading
No No
Materials in KM Materials amount per
charges charges charges charges
1 2 3 4 5 6 7 8 9 10 11

Second class
Ground
moulded Omalur
1000
17 2-B chamber Kadayampa 25 Km 5925.00 300.80 6225.80
Nos
burnt bricks tty
(9"x4 3/8"x2
3/4")
Terrace
1000
18 4-C bricks 15 x " 25 Km 890.00 300.80 1190.80
Nos
7.5 x 2.5
Brick jelly
10-
19 40mm ISS " 25 Km 635.00 300.80 935.80 1 m3
A
Gauge
Brick jelly
10-
20 20mm ISS " 25 Km 707.00 300.80 1007.80 1 m3
B
Gauge
Pressed Tiles-
11- 1000
21 20cm x 20cm Salem 10 Km 10400.00 108.20 10508.20
A Nos
x 20mm

Fly ash Omalur


3A- 1000
22 bricks 230 x Kottagound 25 Km 5925.00 300.80 6225.80
A Nos
110 x 70MM ampatty
57-
23 Well Gravel Local 7 Km 154.00 67.34 221.34 1 m3
A

Cost-Materials
SCMC CIVIL DATA 2018-2019
3
RATE OF WORKS - 2018-2019

5%
Sl. Sch. Rate Total
Item Details Unit Extra
No. No Rs. Rs. Rs.

Annexure-III., Dismantling, Clearing away


and carefully stacking materials useful for
reuse for any thickness of walls

Brick or stone masonry in cement mortar, wall under


1 14 1m3 146.80 7.34 154.14
3m high up

2 20 Removal of cutstone slabs & RCC cover slabs 1m2 266.00 13.30 279.30

3 22 Refixing cut stone slab RCC Cover slab 1m2 291.00 14.55 305.55

4 25 Asbestas cement sheet roof without roof timbers 1m2 9.30 0.47 9.77

5 106 Clean removal of cement plaster from wall 1m2 4.50 0.23 4.73

6 37 Dismantling plain cement concrete 1m3 252.00 12.60 264.60

7 38 Dismantling RCC concrete 1m3 3820.00 191.00 4011.00

38-
8 Pressed tiles and weathering course 1m2 23.80 1.19 24.99
D

Labour charges for fixing Cudapah slab to Cup


9 171 1m2 42.60 2.13 44.73
board(Annexure-VI)

Rate-Works
SCMC CIVIL DATA 2018-2019
4
Rates for 2018-19
Rate of Labour
Sch.I
Sl.
tem Description
Labour 5% Rate for
Per
No. No
Rate extra Labour

Annexure-III

1 Q-1 Grinding lime mortar charges 210.40 10.52 220.92 1 m3

2 Q-3 Mixing cement mortar by manual 65.90 3.30 69.20 1 m3

3 50 Earth work excavation in ordinary soil (SS 20B) 42.50 2.13 44.63 1 m3
4 62 Earth work excavation in Hard soil (SS 20B) 63.60 3.18 66.78 1 m3
5 85 Refilling with excavated earth (other than sand) 22.20 1.11 23.31 1 m3
6 84 Refilling with excavated sand 19.50 0.98 20.48 1 m3
Annexure-I

7 37 Mason I Class 567.00 28.35 595.35 each

8 37-A Mason II Class 508.00 25.40 533.40 each

9 39-A Mazdoor C I 355.00 17.75 372.75 each

10 39-B Mazdoor C II 320.00 16.00 336.00 each

11 11 Carpenter I Class 555.00 27.75 582.75 each

12 12 Carpenter II Class 508.00 25.40 533.40 each

13 38 Mason for Stone work - I Class 567.00 28.35 595.35 each

14 38-A Stone cutter I Class 508.00 25.40 533.40 each

15 20 Fitter I Class for (binding & tying/pipe line) 493.00 24.65 517.65 each

16 19 Fitter I Class 501.00 25.05 526.05 each

17 20-A Fitter II Class (binding & tying/pipe line) 458.00 22.90 480.90 each

18 19-A Fitter II Class 467.00 23.35 490.35 each

19 21 Floor polisher 437.00 21.85 458.85 each

20 44 Painter I - Class 454.00 22.70 476.70 each

21 47 Plumber class I (for fixing the pipe) 493.00 24.65 517.65 each

22 47-A Plumber class II 458.00 22.90 480.90 each

23 R-1 Labour for manufacturing the shutter 31.50 0.96 32.46 Kg

Material Rate
SCMC CIVIL DATA 2018-2019
5
Annexure-III

3
24 0-1 Labour for wrought and put up door frame 7770.00 388.50 8158.50 m

2
25 O-2 Labour for door shutter 878.00 43.90 921.90 m

O-21- 2
26 Fixing in position of shutter (Single leaf) 122.00 6.10 128.10 m
A

3
27 O-11 Labour for window shutter 878.00 43.90 921.90 m

2
28 Labour for fixing the slab as per SI (CSC slab) 232.00 11.60 243.60 m

29 Testing charges for 150mm dia pipe 23.30 23.30 3 RM

30 Testing charges for 100mm dia pipe 17.20 17.20 3 RM

3
31 H-2 Vibrating charges for RCC works 53.50 2.68 56.18 m

3
32 H-1 Vibrating charges for CC works 39.70 1.99 41.69 m

Material Rate
SCMC CIVIL DATA 2018-2019
6
Rates for 2018-19
Cost of Materials Annexure-II
Sl. Rate for
Description Per
No. Materials
1 111 Cost of MS sheet of size 90cm x 60cm 40.50 Kg
2 112 MS angles 25 x 25 x 3mm 40.50 Kg
2
3 114 Cost of 1.60mm thick GI sheet 30cm wide 299.00 m
3
4 78B Cost of silver oak plank 40mm thick 16856.00 m
Cost of silver oak joist of size 10cm x 6.5cm at 90cm 3
5 77D Scantling 14847.00 m
c/c
6 90B Casurina poles 10cm to 13cm dia 24.00 RM
78- 3
7 Country wood 40mm thick boarding as per SI 37555.00 m
III
3
8 77-I Cost of country wood (Pillamarudu) scantling below 4m in length 32751.00 m
3
9 Cost of country wood joists as per SI at about 90cm c/c upto 4m in length 19300.00 m
3
10 74 Cost of TW scantling below 2m length 94672.00 m
11 76-I Cost of TW reeper 5 x 2.5cm size 72.60 Rm
3
12 77-D Cost of silver oak scantling 14847.00 m
13 113 Cost of binding wire 43.00 1 Kg.
3 1 3
14 3-A Fly Ash bricks of 230 x 110 x 70mm (8 /4" x 4 /4" x 2 /4") 5925.00 1000 Nos
2
15 175 Supply of Vetrified tiles 600x600x8mm ( Annexure-VI) 900.00 m
2
16 Supply of Marbonite tiles 3' x 3' (Quotation) 667.00 m
17 10 Colour cement for pointing ( Annexure-VI) 25.40 Kg
18 Supply of Eurocon grip tiles (Quotation) 60.00 each
19 Supply of Eurocon plain tiles (Quotation) 58.00 each
20 9 White cement ( Annexure-VI) 22.00 Kg
Paving the floor with Tandon Shagbad green stone slab of size 610 x 610 x 2
21 15 295.00 m
20mm and below ( Annexure-VI)
Paving the floor with Rajesthan kotta stone slab of size 20mm thick below 2
22 17 450.00 m
2'x2'( Annexure-VI)
23 Cement slurry 5.60 Kg
24 172 Hire charges for polishing machine ( Annexure-VI) 212.00 day
25 173 Electricity ( Annexure-VI) 11.10 unit
26 32 Cotton waste for polishing ( Annexure-VI) 9.70 1 Kg.
Supply of first quality design ceramic tiles of all colours 200x200x6mm (
27 4-II 19.80 each
Annexure-VI)
Supply of first quality plainceramic tiles of all colours 200x200x6mm (
28 5-II 14.40 each
Annexure-VI)
Supply of 305mm x 305mm x6mm size 1st quality design ceramic tilesof all
29 4-I 45.00 each
colours ( Annexure-VI)
Cost of AC big six corrugated sheet 6mm thick ( 2
30 55 175.50 m
Annexure-VI)
31 1 Water proofing compound ( Annexure-VI) 39.60 Kg
32 111 Cost of distemper ( Annexure-VI) 78.90 Kg

Material Rate
SCMC CIVIL DATA 2018-2019
7
33 117 Cost of paint (for iron work) ( Annexure-VI) 211.00 litre

Material Rate
SCMC CIVIL DATA 2018-2019
8
Sl. Rate for
Description Per
No. Materials

(Annexure-
34 115 Cost of paint (for wood work) ( Annexure-VI) 221.00 litre
VI)

(Annexure-
35 114 Cost of wood primer 136.50 litre
VI)

(Annexure-
36 116 Cost of red oxide primer 126.70 litre
VI)

37 Cost of aluminium paint (Quotation) 341.00 litre

38 Cost of black board paint (Quotation) 264.00 litre

(Annexure-
39 113 Cost of plastic emulsion paint 274.00 litre
VI)

(Annexure-
40 112 Cost of primer (Plastic emulsion) 136.50 litre
VI)

(Annexure-
41 109 Cost of cement paint 46.20 Kg
VI)

(Annexure-
42 31 Cost of best varnish 251.90 litre
VI)

43 Cost of linseed oil boiled 62.00 litre

(Annexure-
44 30 Cost of Lac polish 245.00 litre
VI)

(Annexure-
45 49 100mm dia Asbestos cement pipe 133.30 3 RM
VI)

(Annexure-
46 50 100mm dia Asbestos cement shoe 42.30 each
VI)

(Annexure-
47 51 100mm dia Asbestos cement plain bend 48.40 each
VI)

(Annexure-
48 126 AC pipe Clamp (Cast iron) 11.40 each
VI)

(Annexure-
49 130-I Cost of W.C. set (white) 2860.00 each
VI)

(Annexure-
50 149 Spun yarn 12.20 Kg
VI)

Solid core flush shutters with teak ply on both side with teak wood lipping
51 93 2090.00 1 m2
alround 35mm thick
(Annexure-
52 77-A Aluminium Hinges 125mm x 30mm 74.70 Each
VI)

(Annexure-
53 79-B Aluminium altrop 250mm long and 16mm dia 150.70 Each
VI)

(Annexure-
54 78-C Aluminium towerbolt 250mm long and 12mm dia 81.50 Each
VI)

(Annexure-
55 80-B Aluminium Handle 150mm long 48.00 Each
VI)

(Annexure-
56 83 Ruber bush 40mm dia and 60mm long 21.50 Each
VI)

(Annexure-
57 82 Aluminium door stopper with rubber bush 43.80 Each
VI)

Material Rate
SCMC CIVIL DATA 2018-2019
9
(Annexure- 2
58 129 Chicken mesh 31.10 m
II)

(Annexure-
59 103 Cost of barbed wire 57.50 Kg
VI)

3
60 Cost of M20 Ready mix concrete (Quotation) 4295.00 m

3
61 Cost of M15 Ready mix concrete (Quotation) 4085.00 m

(Annexure- 2
62 12-I Marble Slabs 4x2 feet 1300.00 m
VI)

(Annexure-
63 87-D T.W. Beading 15 x 12 mm (ordinary) 45.70 Rm
VI)

Material Rate
SCMC CIVIL DATA 2018-2019
10
Sl. Rate for
Description Per
No. Materials
(Annexure- 2
64 105 Pin headed glass panes (3mm Thick) 210.00 m
VI)

169- (Annexure-
65 welding charges - 50mm 1.95 Each
A VI)

MDF Bd IS: 12406/1989 exterior grade Door shutter 35mm thick both side 2
66 92-A 1775.00 m
teak ply

67 T.W Lipping 35x12 mm thick 44.60 RM

68 61-A Cost of Alu.Section with 15 micron (A) (Natural colour Matt finish (Annexure-VI) 287.00 Kg

(Annexure-
69 63 Rubber beading for Alu. Glazed door 35.50 RM
VI)

(Annexure-
70 64 Rubber beading for Alu. Glazed Window 27.10 RM
VI)

(Annexure- 2
71 105 3mm thick pinheaded Glass 210.00 m
VI)

(Annexure- 2
72 106 4 mm thick Glass 284.00 m
VI)

(Annexure- 2
73 107 5.5 mm thick Glass 336.00 m
VI)

(Annexure-
74 65 PVC FELT for Alu doors 6mm thick 7.20 RM
VI)

75 69 Locking Arrangements for Alu door (Annexure-VI) 251.00 each

(Annexure-
76 78-E 150 mm length Tower Bolt - Alu door 54.00 each
VI)

(Annexure-
77 67 Door Closer of ISI make - Alu door 890.00 each
VI)

(Annexure-
78 82 Door Stopper 43.80 each
VI)

(Annexure-
79 80-C Handle for Alu window 100mm 29.50 each
VI)

(Annexure- 2
80 126-I Weld mesh 7.5x2.5mm 10gauge 290.00 m
II)

(Annexure-
81 86-B 25 x 12mm TW Beeding 24.20 RM
VI)

196- (Annexure-
82 Supply of TAMIN paver block of size 60mm 47.80 each
A VI)

83 196-B Supply of TAMIN paver block of size 80mm 57.20 each

84 85.76 each

2
85 Cost of Zib board 10 mm plain 817.00 m

189- 2
86 Bituminous compound 12mm thick pad 445.00 m
A

2
87 Pre painted Galvalum sheet corrugated 0.47mm thick 271.00 m

Material Rate
SCMC CIVIL DATA 2018-2019
11
88 213-J 110mm dia PVC pipe 4ksc
164.60 RM

89 110mm dia PVC shoe (3m/10.5) 4ksc


77.80 each

90 110mm dia PVC bend 4ksc


116.70 each
(Annexure-
91 54 CI Grating (3m / 10.50)
VI) 29.80 each
(Annexure-
92 165 PVC clamp
VI) 7.90 each
(Annexure- 2
93 44 GI sheet 0.8mm thick (22 Gauge) m
VI) 338.00

94 Labour charges for fixing of door with frame Kg


12.60
FRP sheet white or colour 0.047mm, width 1.060m 2
95 m
thick 634.00

96 168 Manhole cover 60 x 60cm (Heavy duty) with frame each


1725.00
15cm diameter blue-gum props or casurina props or best quality bamboo props
97 90-A RM
(Annexure-II) 31.50

Material Rate
SCMC CIVIL DATA 2018-2019
12
SUB DATA FOR MORTAR
1) Lime Mortar 1: 1.5 mix - 1 m3
Sl.
Qty Descriptionof work Rate Per Amount
No.
1 2 3 4 5 6
3 3
0.67 m Supply of lime at site 965.20 1 m 646.68

1 m3 Supply of sand at site 810.10 1 m3 810.10

1 m3 Grinding mortar charges as per SI 220.92 1 m3 220.92

LS Sundries LS 0.09
3
Total for 1 M 1677.80

2) Lime Mortar 1: 2 mix - 1 m3


1 2 3 4 5 6
3 3
0.50 m Supply of lime at site 965.20 1 m 482.60

1 m3 Supply of sand at site 810.10 1 m3 810.10

1 m3 Grinding mortar charges as per SI 220.92 1 m3 220.92

LS Sundries LS 0.18
3
Total for 1 M 1513.80

3) Cement Mortar 1: 1.5 mix - 1 m3


1 2 3 4 5 6
960 Kg Supply of Cement at site 5530.00 Tonne 5308.80

1 m3 Supply of sand at site 810.10 1 m3 810.10

1 m3 Mixing cement mortar by manual 69.20 1 m3 69.20

LS Sundries LS 0.1
3
Total for 1 M 6188.20

4) Cement Mortar 1: 2 mix - 1 m3

1 2 3 4 5 6
720 Kg Supply of Cement at site 5530.00 Tonne 3981.60

1 m3 Supply of sand at site 810.10 1 m3 810.10

1 m3 Mixing cement mortar by manual 69.20 1 m3 69.20

LS Sundries LS 0.1
3
Total for 1 M 4861.00

Mortar
SCMC CIVIL DATA 2018-2019
164
5) Cement Mortar 1: 3 mix - 1 m3

1 2 3 4 5 6

480 Kg Supply of Cement at site 5530.00 Tonne 2654.40

1 m3 Supply of sand at site 810.10 1 m3 810.10

1 m3 Mixing cement mortar by manual 69.20 1 m3 69.20

LS Sundries LS 0.1
3
Total for 1 M 3533.80

6) Cement Mortar 1: 4 mix - 1 m3

1 2 3 4 5 6
360 Kg Supply of Cement at site 5530.00 Tonne 1990.80

1 m3 Supply of sand at site 810.10 1 m3 810.10

1 m3 Mixing cement mortar by manual 69.20 1 m3 69.20

LS Sundries LS 0.1
3
Total for 1 M 2870.20

7) Cement Mortar 1: 5 mix - 1 m3

1 2 3 4 5 6
288 Kg Supply of Cement at site 5530.00 Tonne 1592.64

1 m3 Supply of sand at site 810.10 1 m3 810.10

1 m3 Mixing cement mortar by manual 69.20 1 m3 69.20

LS Sundries LS 0.06
3
Total for 1 M 2472.00

8) Cement Mortar 1: 6 mix - 1 m3

1 2 3 4 5 6
240 Kg Supply of cement at site 5530.00 Tonne 1327.20

1 m3 Supply of sand at site 810.10 1 m3 810.10

1 m3 Mixing cement mortar by manual 69.20 1 m3 69.20

LS Sundries LS 0.1
3
Total for 1 M 2206.60
Mortar
SCMC CIVIL DATA 2018-2019
164
9) Cement Mortar 1: 8 mix - 1 m3
1 2 3 4 5 6
180 Kg Supply of cement at site 5530.00 Tonne 995.40

1 m3 Supply of sand at site 810.10 1 m3 810.10

1 m3 Mixing cement mortar by manual 69.20 1 m3 69.20

LS Sundries LS 0.1
3
Total for 1 M 1874.80

Mortar
SCMC CIVIL DATA 2018-2019
164
EARTH WORK FOR FOUNDATION
1) Earth work excavation for foundation in ordinary soil, light black cotton sandy loam and dry silt
including shoring, strutting, baling or pumping out water wherever necessary and refilling the sides
of foundation with excavated earth in layers of 15cm thick and depositing the surplus earth at
places as directed by the departmental officers with initial lead and lift - 10 m 3

1 2 3 4 5 6
Sch.No

1 49 m3 Rate as per page 25 44.60 1 m3 44.60


ADD for narrow trench 44.60
LS Sundries LS 0.8
3
Total for 1 M 90.00
3
Rate for 1 M 90.00

a) For Drain work Rs. 44.60 + 22.30 = 66.90 Say Rs.66.90

2) Earth work excavation for foundation in hard stiff clay, stiff black cotton, hard red earth, shabs
murams and ordinary gravel and hard dravel including shoring, strutting, baling or pumping out water
wherever necessary and refilling the sides of foundation with excavated earth in layers of 15cm
thick and depositing the surplus earth at places as directed by the departmental officers with
initial lead and lift - 10 m3

1 2 3 4 5 6
3 3
1 61 m Rate as per page no.26 67.80 1 m 67.80
ADD for narrow trench 67.80
LS Sundries LS 0.41
3
Total for 1 M 136.00
3
Rate for 1 M 136.00

a) For Drain work Rs.67.80 + 33.90 = 101.70 say Rs. 101.70

Earth
SCMC CIVIL DATA 2018-2019
4
CONVEYANCE OF EARTH

1) Conveyance of excavated earth and clearing away from site to a lead of 1KM from site
etc., complete (Annexure-V) P.NO.35

1 2 3 4 5 6
3 3
1m Incidential charges 9.62 1m 9.62
3 3
1m Unloading charges 30.10 1 m 30.10
LS Sundries LS 0.28
3
Total for 1M 40.00
3
Rate for 1 M 40.00

2) Conveyance of excavated earth and clearing away from site to a lead of 2KM from site
etc., complete

1 2 3 4 5 6
1 m3 Incidential charges 19.24 1 m3 19.24
1 m3 Unloading charges 30.10 1 m3 30.10
LS Sundries LS 0.66
3
Total for 1M 50.00
3
Rate for 1 M 50.00

3) Conveyance of Cutstone slabs including stacking at places as directed by departmental


officers to a lead of 1KM from site etc., complete

1 2 3 4 5 6
1 m3 Incidential charges 9.62 1 m3 9.62
3 3
1m Unloading charges 30.10 1 m 30.10
LS Sundries LS 0.28
3
Total for 1M 40.00
3
Rate for 1 M 40.00

3) Conveyance of Cutstone slabs including stacking at places as directed by departmental


officers to a lead of 2KM from site etc., complete

1 2 3 4 5 6
1 m3 Incidential charges 19.24 1 m3 19.24
1 m3 Unloading charges 30.10 1 m3 30.10
LS Sundries LS 0.66
Total for 1M
3
50.00
3
Rate for 1 M 50.00

Conveyance of Earth
SCMC CIVIL DATA 2018-2019
5
FILLING

1) Filling in basement with excavated earth (other than sand) in layers of 15cm
rammed watered and consolidated as per standard specification in 1 m 3

1 2 3 4 5
Sch No
85 1 m3 Rate as per page no. 26 23.31 1 m3
LS Sundries LS
3
Total for 1 M
3
Rate for 1 M

2) Supplying and filling in basement with river sand in layers of 15cm thick including
and ramming to consolidation 1 m3

1 2 3 4 5
1 m3 Supply of sand for filling at site 810.10 1 m3

Labour for filling watering and ramming


1 m3 20.48 1 m3
to consolidation as per SI.84, page no.

LS Sundries LS
3
Total for 1 M
3
Rate for 1 M
3) Supplying and filling in basement with Well gravel in layers of 15cm thick including
and ramming to consolidation 1 m3

1 2 3 4 5
1 m3 Supply of well gravel for filling at site 221.34 1 m3
Labour for filling watering and ramming
3
1m to consolidation as per SI.84, page no. 20.48 1 m3
(13.00 + 5%)
LS Sundries LS
3
Total for 1 M
3
Rate for 1 M

Filling
SCMC CIVIL DATA 2018-2019
6
15cm thick well

23.31
0.69
24.00
24.00

including watering

6
810.10

20.48

0.42
831.00
831.00
including watering

6
221.34

20.48

0.18
242.00
242.00

Filling
SCMC CIVIL DATA 2018-2019
7
SUB DATA FOR MORTAR
1) Lime Mortar 1: 1.5 mix - 1 m3
Sl.
Qty Descriptionof work Rate Per Amount
No.
1 2 3 4 5 6
3 3
0.67 m Supply of lime at site 965.20 1m 646.68

1 m3 Supply of sand at site 810.10 1 m3 810.10

1 m3 Grinding mortar charges as per SI 220.92 1 m3 220.92

LS Sundries LS 0.29
3
Total for 1 M 1678.00

2) Lime Mortar 1: 2 mix - 1 m3


1 2 3 4 5 6
3 3
0.50 m Supply of lime at site 965.20 1m 482.60

1 m3 Supply of sand at site 810.10 1 m3 810.10

1 m3 Grinding mortar charges as per SI 220.92 1 m3 220.92

LS Sundries LS 0.38
3
Total for 1 M 1514.00

3) Cement Mortar 1: 1.5 mix - 1 m3


1 2 3 4 5 6
960 Kg Supply of Cement at site 5530.00 Tonne 5308.80

1 m3 Supply of sand at site 810.10 1 m3 810.10

1 m3 Mixing cement mortar by manual 69.20 1 m3 69.20

LS Sundries LS 0.9
3
Total for 1 M 6189.00

4) Cement Mortar 1: 2 mix - 1 m3

1 2 3 4 5 6
720 Kg Supply of Cement at site 5530.00 Tonne 3981.60

1 m3 Supply of sand at site 810.10 1 m3 810.10

1 m3 Mixing cement mortar by manual 69.20 1 m3 69.20

LS Sundries LS 0.1
3
Total for 1 M 4861.00

Mortar
SCMC CIVIL DATA 2018-2019
1
5) Cement Mortar 1: 3 mix - 1 m3

1 2 3 4 5 6

480 Kg Supply of Cement at site 5530.00 Tonne 2654.40

1 m3 Supply of sand at site 810.10 1 m3 810.10

1 m3 Mixing cement mortar by manual 69.20 1 m3 69.20

LS Sundries LS 0.3
3
Total for 1 M 3534.00

6) Cement Mortar 1: 4 mix - 1 m3

1 2 3 4 5 6
360 Kg Supply of Cement at site 5530.00 Tonne 1990.80

1 m3 Supply of sand at site 810.10 1 m3 810.10

1 m3 Mixing cement mortar by manual 69.20 1 m3 69.20

LS Sundries LS 0.9
3
Total for 1 M 2871.00

7) Cement Mortar 1: 5 mix - 1 m3

1 2 3 4 5 6
288 Kg Supply of Cement at site 5530.00 Tonne 1592.64

1 m3 Supply of sand at site 810.10 1 m3 810.10

1 m3 Mixing cement mortar by manual 69.20 1 m3 69.20

LS Sundries LS 0.06
3
Total for 1 M 2472.00

8) Cement Mortar 1: 6 mix - 1 m3

1 2 3 4 5 6
240 Kg Supply of cement at site 5530.00 Tonne 1327.20

1 m3 Supply of sand at site 810.10 1 m3 810.10

1 m3 Mixing cement mortar by manual 69.20 1 m3 69.20

LS Sundries LS 0.5
3
Total for 1 M 2207.00

Mortar
SCMC CIVIL DATA 2018-2019
2
9) Cement Mortar 1: 8 mix - 1 m3
1 2 3 4 5 6
180 Kg Supply of cement at site 5530.00 Tonne 995.40

1 m3 Supply of sand at site 810.10 1 m3 810.10

1 m3 Mixing cement mortar by manual 69.20 1 m3 69.20

LS Sundries LS 0.3
3
Total for 1 M 1875.00

Mortar
SCMC CIVIL DATA 2018-2019
3
DESIGN MIX - CEMENT CONCRETE
1) Vibrated Cement Concrete M25 design mix using ISS size HBG graded metal including
cost and conveyance of all materials to worksite and cement at site including all labour
charges for fixing concrete, laying, vibrating, hire charges for tools and plants,
compacting, curing will all leads for soft water, including all other incidental charges
formwork cost of remolded expansion joints and fixing the same in posistion etc.
complete for wearing coat of 75mm uniform thickness over pavement.
1 2 3 4 5 6
Sub data

6.70 m3 Cost of 40mm IRC metal 1025.20 1 m3 6868.84

3.30 m3 Cost of 20mm IRC metal 1389.20 1 m3 4584.36

4.50 m3 Cost of CM 1:5 6189.00 1 m3 27850.50


3.50 Nos Mason II Class 533.40 Each 1866.90
21.20 Nos Mazdoor C I 372.75 Each 7902.30
35.30 Nos Mazdoor C II 336.00 Each 11860.80
10.00 m³ Vibreration charges 56.18 m³ 561.75
3
Total for 10 M 61495.46
3
Rate for 1 M 6149.55
Main data
1.00 m3 Cost of CC M25 6149.55 1 m3 6149.55
2.01 m² Form work and Centering 258.85 1 m² 520.29
Soft water LS 15.00
Curing Concrete LS 28.00
Hire charges for T&P LS 40.00
0.16
3
Total for 1 M 6753.00

PCC-DMix
SCMC CIVIL DATA 2018-2019
4
PLAIN CEMENT CONCRETE
1) Plain cement concrete 1:2:4 mix (One cement two sand and four aggregate) using
20mm size ISS gauge HBBG metal including mixing, laying, consolidating, curing, cost
and conveyance of all materials to site and all labour charges etc., complete as per
standard specification - 1 m3 (detailed data for 10 m3 )
1 2 3 4 5 6
9.0 m3 Supply of 20mm ISS Gauge 1389.20 1 m3 12502.80
HBBG metal at site
4.5 m3 Cement mortar 1: 2 mix 4861.00 1 m3 21874.50
1.8 Nos Mason II Class 533.40 Each 960.12
17.7 Nos Mazdoor C I 372.75 Each 6597.68
14.1 Nos Mazdoor C II 336.00 Each 4737.60
LS Sundries LS 0.3
3
Total for 10 M 46672.99
3
Rate for 1 M 4667.00
3
Cement 324.00 Kg / m
2) Plain cement concrete 1:3:6 mix (One cement three sand and six aggregate) using
20mm size ISS gauge HBBG metal including mixing, laying, consolidating, curing, cost
and conveyance of all materials to site and all labour charges etc., complete as per
standard specification - 1 m3 (detailed data for 10 m3 )
1 2 3 4 5 6
9.0 m 3 Supply of 20mm ISS Gauge 1389.20 1m 3
12502.80
HBBG metal at site
4.5 m3 Cement mortar 1: 3 mix 3533.80 1 m3 15902.10
1.8 Nos Mason II Class 533.40 Each 960.12
17.7 Nos Mazdoor C I 372.75 Each 6597.68
14.1 Nos Mazdoor C II 336.00 Each 4737.60
LS Sundries LS 0.1
3
Total for 10 M 40700.40
3
Rate for 1 M 4070.00

3) Plain cement concrete 1:4:8 mix (One cement four sand and eight aggregate) using
40mm size ISS gauge HBBG metal including mixing, laying, consolidating, curing, cost
and conveyance of all materials to site and all labour charges etc., complete as per
standard specification - 1 m3 (detailed data for 10 m3 )
1 2 3 4 5 6
9.0 m 3 Supply of 40mm ISS Gauge 1025.20 1m 3
9226.80
HBBG metal at site
3
4.5 m Cement mortar 1: 4 mix 2870.20 1 m3 12915.90
1.8 Nos Mason II Class 533.40 Each 960.12
17.7 Nos Mazdoor C I 372.75 Each 6597.68
14.1 Nos Mazdoor C II 336.00 Each 4737.60
LS Sundries LS 0.05
3
Total for 10 M 34438.15
3
Rate for 1 M 3444.00

PCC
SCMC CIVIL DATA 2018-2019
5
4) Plain cement concrete 1:5:10 mix (One cement five sand and ten aggregate) using
40mm size ISS gauge HBBG metal including mixing, laying, consolidating, curing, cost
and conveyance of all materials to site and all labour charges etc., complete as per
standard specification - 1 m3 (detailed data for 10 m3 )
1 2 3 4 5 6
9.0 m 3 Supply of 40mm ISS Gauge 1025.20 1m 3
9226.80
HBBG metal at site
4.5 m3 Cement mortar 1: 5 mix 2472.00 1 m3 11124.00
1.8 Nos Mason II Class 533.40 Each 960.12
17.7 Nos Mazdoor C I 372.75 Each 6597.68
14.1 Nos Mazdoor C II 336.00 Each 4737.60
LS Sundries LS 0.05
3
Total for 10 M 32646.25
3
Rate for 1 M 3265.00
3
Cement 129.60 Kg / m

Plain Cement Concrete


Concrete Concrete 1:2:4 mix - Below Ground Level
Additional
Sl.No. Description of Ht. Rate Total Rate
rate
1 Above 1.50m depth and up to 4.50m below 4667.00 58.60 4726.00
2 Above 4.50m depth and up to 9.00m below 4726.00 117.40 4843.00
Concrete Concrete 1:2:4 mix - Above Ground Level

Additional
Sl.No. Description of Ht. Rate Total Rate
rate
Add to basic rate upto 4.50m height in G.F. ie
1 4667.00 59.40 4727.00
Plinth level
Add for works in every upper floor over the rate
2 4727.00 117.00 4844.00
of proceding floor

PCC
SCMC CIVIL DATA 2018-2019
6
Reinforced Cement Concrete (ready mix concrete)
5) Providing and laying in position of ready mix concrete M20 (1:1.5:3) mix using portlend cement
with water cement ratio not exceeding 0.45 including the use of plastidizer of approved make
and dosage required grade at all location and levels using 20mm ISS gauge HBBG metal and
down graded aggregates in all type of works including hire charges for pump and pumping
charges to required location. machine, vibrating, tapping, curing as specified charges
conveyance for ready mixed concrete from RMC plant to site or required ( excluding cost of
reinforcement, fabrication charges centering and shuttering ) mix design details to be got
approval before commencement of works adopting pour card system by depatmental officers
etcc complete as per IS 4926 of 1976/1990
1 2 3 4 5 6
Cost of M20 Ready mix
10 m3 4295.00 m
3
42950.00
concrete
3.5 Nos Mason II class 533.40 Each 1866.90
6.36 Nos Mazdoor - C - I 372.75 Each 2370.69
10.59 No Mazdoor - C - II 336.00 Each 3558.24
Vibrating charges for RCC
10 m3 56.18 m
3
370.10
works
Sundries 0.05
3
Total for 10M 51115.98
3
Rate for 1M = 5111.00

Plain Cement Concrete (ready mix concrete)


6) Providing and laying in position of ready mix concrete M20 (1:1.5:3) mix using portlend cement
with water cement ratio not exceeding 0.45 including the use of plastidizer of approved make
and dosage required grade at all location and levels using 20mm ISS gauge HBBG metal and
down graded aggregates in all type of works including hire charges for pump and pumping
charges to required location. machine, vibrating, tapping, curing as specified charges
conveyance for ready mixed concrete from RMC plant to site or required ( excluding cost of
reinforcement, fabrication charges centering and shuttering ) mix design details to be got
approval before commencement of works adopting pour card system by depatmental officers
etcc complete as per IS 4926 of 1976/1990
1 2 3 4 5 6
Cost of M20 Ready mix
10 m3 4295.00 m
3
42950.00
concrete
3.5 Nos Mason II class 533.40 Each 1866.90
6.36 Nos Mazdoor - C - I 372.75 Each 2370.69
10.59 No Mazdoor - C - II 336.00 Each 3558.24

10 m3 Vibrating charges for CC works 41.69 m


3
416.85

Sundries 0.05
3
Total for 10M 51162.73
3
Rate for 1M = 5116.00

PCC
SCMC CIVIL DATA 2018-2019
7
Reinforced Cement Concrete (ready mix concrete)
7) Providing and laying in position of ready mix concrete M15 (1:2:4) mix using portlend cement
with water cement ratio not exceeding 0.45 including the use of plastidizer of approved make
and dosage required grade at all location and levels using 20mm ISS gauge HBBG metal and
down graded aggregates in all type of works including hire charges for pump and pumping
charges to required location. machine, vibrating, tapping, curing as specified charges
conveyance for ready mixed concrete from RMC plant to site or required ( excluding cost of
reinforcement, fabrication charges centering and shuttering ) mix design details to be got
approval before commencement of works adopting pour card system by depatmental officers
etcc complete as per IS 4926 of 1976/1990
1 2 3 4 5 6
10 m 3 Cost of M15 Ready mix 4085.00 3
40850.00
m
concrete
3.5 Nos Mason II class 533.40 Each 1866.90
6.36 Nos Mazdoor - C - I 372.75 Each 2370.69
10.59 No Mazdoor - C - II 336.00 Each 3558.24
Vibrating charges for RCC
10 m3 56.18 m
3
561.75
works
Sundries 0.02
3
Total for 10M 49207.60
3
Rate for 1M = 4921.00

Plain Cement Concrete (ready mix concrete)


8) Providing and laying in position of ready mix concrete M15 (1:2:4) mix using portlend cement
with water cement ratio not exceeding 0.45 including the use of plastidizer of approved make
and dosage required grade at all location and levels using 20mm ISS gauge HBBG metal and
down graded aggregates in all type of works including hire charges for pump and pumping
charges to required location. machine, vibrating, tapping, curing as specified charges
conveyance for ready mixed concrete from RMC plant to site or required ( excluding cost of
reinforcement, fabrication charges centering and shuttering ) mix design details to be got
approval before commencement of works adopting pour card system by depatmental officers
etcc complete as per IS 4926 of 1976/1990
1 2 3 4 5 6
3 Cost of M15 Ready mix 3
10 m 4085.00 m 40850.00
concrete
3.5 Nos Mason II class 533.40 Each 1866.90
6.36 Nos Mazdoor - C - I 372.75 Each 2370.69
10.59 No Mazdoor - C - II 336.00 Each 3558.24

10 m3 Vibrating charges for CC works 41.69 m


3
416.85

Sundries 0.05
3
Total for 10M 49062.73
3
Rate for 1M = 4906.00

PCC
SCMC CIVIL DATA 2018-2019
8
REINFORCED CEMENT CONCRETE
1) Reinforced cement concrete 1:1y:3 mix (One cement one and half sand three aggregate)
using 20mm ISS gauge HBBG metal from the approved quarry including mixing, laying,
consolidating, curing cost and conveyance of all materials to site and all labour charges
3
etc., complete as per standard specification - 1 m
(detailed data for 10 m3 )
1 2 3 4 5 6
Supply of 20mm ISS Gauge HBBG
9.0 m3 1389.20 1 m3 12502.80
chips at site
4.5 m3 Supply of Sand for mortar at site 810.10 1 m3 3645.45
4308 Kg Supply of Cement at site 5530.00 Tonne 23823.24
3.5 Nos Mason II Class 533.40 Each 1866.90
21.2 Nos Mazdoor C I 372.75 Each 7902.30
35.3 Nos Mazdoor C II 336.00 Each 11860.80
LS Sundries LS 0.51
3
Total for 10 M 61602.00
3
Rate for 1 M 6161.10
3
Cement 430.80 Kg / m
2) Reinforced cement concrete 1:2:4 mix (One cement two sand and four aggregate) using
20mm ISS gauge HBBG metal from the approved quarry including mixing, laying,
consolidating, curing cost and conveyance of all materials to site and all labour charges
3
etc., complete as per standard specification - 1 m
(detailed data for 10 m3 )
1 2 3 4 5 6
Supply of 20mm ISS Gauge HBBG
9.0 m3 1389.20 1 m3 12502.80
chips at site
4.5 m3 Supply of Sand for mortar at site 810.10 1 m3 3645.45
3231 Kg Supply of Cement at site 5530.00 Tonne 17867.43
3.5 Nos Mason II Class 533.40 Each 1866.90
21.2 Nos Mazdoor C I 372.75 Each 7902.30
35.3 Nos Mazdoor C II 336.00 Each 11860.80
LS Sundries LS 0.02
3
Total for 10 M 55645.70
3
Rate for 1 M 5565.00
3
Cement 323.10 Kg / m

RCC
SCMC CIVIL DATA 2018-2019
9
3) Reinforced cement concrete skirting 50mm thick using cement mortar 1:3mix without chips
but with chickenmesh excluding cost of reinforcement grills in position but including strutting
laying curing and finishing etc. complete - 1M2
Detailed data for 1 Rm. :-
2
Labour for 25 Sq.Ft. say 2.32 M
1 2 3 4 5 6
1 Nos Mason I - Class 595.35 Each 595.35
1.5 Nos Mason II - Class 533.40 Each 800.10
1.5 Nos Mazdoor - C - I 372.75 Each 559.13
3 Nos Mazdoor - C - II 336.00 Each 1008.00
2
Total for 2.32 M 2962.58
2
Rate for 1 M 1276.97
3 3
0.03 m Cement mortar 1:3mix 3533.80 m 106.01
2 2
0.6 m Chicken mesh 31.10 m 18.66
2 2
0.6 m Labour charges 1276.97 m 766.18
Sundries for scaffolding,
LS LS 0.12
shuttering and curing etc.
2
Total for 0.60 M 890.98
2
Rate for 1 M = Rs. 1485.00

4) Wearing coat with cement concrete of 1 : 1y : 3 mix using 65% of 25mm ISS gauge HBBG
chips 25% of 12mm ISS gauge HBBG chips and 10% of 6mm ISS gauge HBBG chips
including cost and conveyance of all materials and labour charges etc., complete

65% of 25mm size ISS gauge HBBG chips = 9.00 m3 x 65/100 = 5.85 m
3

25% of 12mm size ISS gauge HBBG chips = 9.00 m3 x 25/100 = 2.25 m
3

10% of 6mm size ISS gauge HBBG chips = 9.00 m3 x 10/100 = 0.90 m
3

1 2 3 4 5 6
3 3
5.85 m 25mm size ISS gauge HBBG chips 895.20 1 m 5236.92
3 3
2.25 m 12mm size ISS gauge HBBG chips 1296.20 1 m 2916.45
0.9 m3 6mm size ISS gauge HBBG chips 694.20 1 m3 624.78
3 3
4.5 m Cement mortar 1:1.5 mix 6188.20 1 m 27846.88
1.8 Nos Mason Class - II 533.40 Each 960.12
17.7 Nos Mazdoor - C - I 372.75 Each 6597.68
14.1 Nos Mazdoor - C - II 336.00 Each 4737.60
LS Sundries LS 0.07
3
Total for 10 M 48920.51
3
Rate for 1 M 4892.00

RCC
SCMC CIVIL DATA 2018-2019
10
5) Plain cement concrete 1:2:4 (one cement, two sand & four aggregates) mix using 10mm ISS
gauge HBGG metal including cost of materials and all labour charges etc., complete and
fixing broken glass pieces on concrete
1 2 3 4 5 6
Supply of 10mm ISS gauge HBBG
9 m3 979.20 m
3
8812.80
chips
4.5 m3 CM 1:2 mix 4861.00 m
3
21874.50
1.8 Nos Mason II class 533.40 Each 960.12
17.7 Nos Mazdoor - C - I 372.75 Each 6597.68
14.10 No Mazdoor - C - II 336.00 Each 4737.60
Sundries 0.06
3
Total for 10M 42982.76
3
Rate for 1M = 4298.00

50mm thick
3
1.00 x 1.00 x0.05 = 0.05m
0.05 m3 PCC 1:2:4 50mm thick 4298.00 214.90

MAIN DATA
2 2
1 m PCC 1:2:4 50mm thick 214.90 m 214.90
2 kg Broken glass (quotation) 30.00 kg 60.00
for fixing brocken glass
0.1 Nos Mason II class 533.40 each 53.34
0.2 Nos Mazdoor II class 336.00 each 67.20
sundries 0.56
Total for 1m2 396.00

RCC
SCMC CIVIL DATA 2018-2019
11
Foundation Basement
RCC 1:1y:3 = 6161.10
RCC 1:2:4 = 5565.00

Upto 4.50m height (plinth level to 4.50m ht)


RCC 1:1y:3 = 6161.10 + 59.40 = 6221.00
RCC 1:2:4 = 5565.00 + 59.40 = 5625.00

First floor (Above 4.50m ht from plinth level)


RCC 1:1y:3 = 6221.00 + 117.00 = 6338.00
RCC 1:2:4 = 5625.00 + 117.00 = 5742.00

Second floor
RCC 1:1y:3 = 6338.00 + 117.00 = 6455.00
RCC 1:2:4 = 5742.00 + 117.00 = 5859.00

Third floor
RCC 1:1y:3 = 6455.00 + 117.00 = 6572.00
RCC 1:2:4 = 5859.00 + 117.00 = 5976.00

RCC
SCMC CIVIL DATA 2018-2019
12
Supplying and fixing RCC 1:2:4 mix using 20mm ISS gauge HBBG chips for precast post of height
2.25m and 0.15 x 0.15m size at bottom and 0.10 x 0.10m at top including cost of reinforcement and
cost of moulding, casting, finishing and fixing in position etc., complete
RCC 1:2:4 mix precast post 2.25m height
Volume of concrete : 2.25 x (0.15x0.15) + (0.10x0.10) = 0.037 m3
2
Mould : 2 x 2.25 x (0.15+0.10)
: 0.563 m2
2
1 x 1 x 0.15 x 0.15 : 0.023 m2
1 x 1 x 0.10 x 0.10 : 0.010 m2
0.596m2 x 0.04 : 0.024 m3
Labour for Wrought & putup
1 2 3 4 5 6
4.50 nos Carpenter I class 582.75 Each 2622.38
13.20 nos Carpenter II class 533.40 Each 7040.88
8.80 nos Mazdoor I class 372.75 Each 3280.20
Total 12943.46
Cost of Mould
1 2 3 4 5 6
3 3
0.0240 m Cost of silver oak scantling 14847 1m 356.33
3 Labour for wood work wrought and put
0.0240 m 12943.46 1 m3 310.64
up
LS Sundries for nails LS 0
Total 666.97
Assume for 5 users as silver oak used 133.39
Steel
Main rod 8mm dia = 1x4x2.20m 8.80m x 0.395Kg/m 3.48 Kg
Stirrups 6mm dia = 1x5x0.52m = 2.60m
6mm dia = 1x5x0.44m = 2.20m
6mm dia = 1x5x0.32m = 1.60m
6.40m x 0.22Kg/m 1.41 Kg
Total 4.89 Kg
RCC 1:2:4 mix using 20mm ISS HBBG
0.037 m3 5565.00 1 m3 205.91
chips
1 No Cost of mould 133.39 Each 133.39
4.89 Kg Steel 6273.90 1 Qtl 306.79
Labour for fixing the RCC post in
position
0.100 No Mason II class 533.40 Each 53.34
0.100 No Mazdoor I class 372.75 Each 37.28
LS Sundries for oiling the mould & curing LS 3.31
Total for Each 740.00
Rate for Each = Rs. 740.00
Cement : 11.95 Kg / each

RCC
SCMC CIVIL DATA 2018-2019
13
CENTERING
1) Supplying, errecting of steel centering and shuttering with necessary strutting
2
arrangements for sides and soffits of RCC slab, lintel etc., complete - 1 m
1 Weight of MS sheet (10gauge) 7.85 x 0.54 = 4.329 m2
for each set
(4.239 m2 x = 13.46 Kgs
3.175)
2 Weight of MS angles 25 x 25 x 3mm 3.60 m x 1.10 = 3.96 Kgs
for each set
Sub Data - I
1 2 3 4 5 6
Cost of MS sheet of size 90cm x
13.46 Kgs 40.50 1 Kg 545.13
60cm
4 Kgs MS angles 25 x 25 x 3mm 40.50 1 Kg 162.00
ADD for cutting, bending, wedging
LS LS 21.92
and making holes etc.,
Total for each 729.05

Sub Data - II
19 Nos Cost of angles and sheets 729.05 Each 13851.95
Adopting 40 uses of sheets and
346.30
angles

Cost of silver oak joist of size


0.12 m3 14847.00 1 m3 1781.64
10cm x 6.5cm at 90cm c/c
98.50 RM Casurina props 10cm to 13cm dia 24.00 1 RM 2364.00
Total 4145.64
Adopting 5 uses 829.13
Main Data
1 2 3 4 5 6
1 use Cost of MS sheet and angles 346.30 Each 346.30
1 use C.W. joist and casurina props 829.13 Each 829.13
3.8 Nos Carpenter I Class 582.75 Each 2214.45
5.4 Nos Mazdoor C I 372.75 Each 2012.85
1 Nos Fitter II Class 480.90 Each 480.90
LS ADD for vedges and nails etc., LS 18.00
LS Periodical cleaning of sheets LS 35.00
LS For silver oak plants etc., LS 7.55
2
Total for 10 M 5944.16
2
Rate for 1 M 594.42
2
For column and sunshade 20% of Rs.591.30 = Rs. 713.30 / m

Centering
SCMC CIVIL DATA 2018-2019
14
2) Centering for soffits of RC slab including strutting 3m high - 10 m 2
1 2 3 4 5 6
Country wood 40mm thick boarding
0.4 m3 37555.00 1 m3 15022.00
as per SI
Cost of country wood joists as per
0.12 m3 19300.00 1 m3 2316.00
SI at about 90cm c/c
Cost of 10 to 13cm dia casurina
98.5 RM post at 75cm centres and braces as 24.00 1 RM 2364.00
per SI
Total (A) 19702.00
Cost of materials for each use A/5 3940.4
3.8 Nos Carpenter 1st Class 582.75 Each 2214.45
5.4 Nos Mazdoor C I 372.75 Each 2012.85
21.5 Nos Cost of Vedges 3.00 Each 64.50
For coir, nails, etc and lead for
LS LS 6.10
materials
2
Total for 10 M 8238.30
2
Rate for 1 M - Rs. 823.83
2
3) Strutting only - 10 m
1 2 3 4 5 6
Cost of 10 to 13cm dia casurina
98.5 RM post at 75cm centres and braces as 24.00 1 RM 2364.00
per SI
For each use (5 uses) 472.80
0.3 Nos Carpenter 1st Class 582.75 Each 174.83
0.3 Nos Mazdoor C I 372.75 Each 111.83
Casurina props - 10cm to 13cm dia
1 use 472.80 Each 472.80
at 75cm centres
Sundries for Coir, nails, etc., and
LS LS 7.68
load for materials
2
Total for 10 M 767.13
2
Rate for 1 M - Rs. 76.71
Centering without strutting = 594.42 76.71 517.70
_- =Rs.
Upto 3.00m Centering for curved surface (15%) per m 2
Rs. 683.58
Ht.
Centering for Plain surface per m2 Rs. 594.42

Centering for Column & Sunshade


per m2 Rs. 713.30
(20%)
Centering without strutting above 1m
per m2 Rs. 517.70
height
Centering without strutting below 1m
per m2 Rs. 258.85
height

Centering
SCMC CIVIL DATA 2018-2019
15
Strutting to Centering for RCC Works per Rm.
1 2 3 4 5 6
0.3333 m2 Struting to centering for RCC slabs 767.13 10 m2 255.68

Total for 1 M
2
25.57

Add for
Sl. No. Description of Height Basic Rate Total
Strutting
1 Upto 3.30m 594.42 0.00 594.42
2 3.30m to 4.30m 594.42 25.57 619.98
3 4.30m to 5.30m 619.98 25.57 645.55
4 5.30m to 6.30m 645.55 25.57 671.12
5 6.30m to 7.30m 671.12 25.57 696.69
6 7.30m to 8.30m 696.69 25.57 722.25
7 8.30m to 9.3m 722.25 25.57 747.82

3) Providing two legged scaffolding using 15cm diameter blue-gum props or casurina props or
best quality bamboo props of 4m overall length (3m height + 0.50m into the ground +
0.50m projection) the distance between the two rows being 2m in both the rows with two
horizontal props with 0.50m overlap on either side and braces at 2m c/c including
longitudinal and transverse middle braces to step up and providing a platform with country
wood planks of 40mm thick and 1m width etc complete from using coir and nails etc
complete.

1 2 3 4 5 6
15cm diameter blue-gum props or
70.00 RM casurina props or best quality 31.50 1 RM 2205.00
bamboo props
0.30 m3 Country wood 40mm thick 37555.00 1 m3 11266.50
Total cost of material (for 10 uses) 13471.50
Cost per operation 1347.15
Detailed Data
1 use Cost of material per one operation 1347.15 Each 1347.15
2 Nos Mazdoor C I 372.75 Each 745.50
LS Coirs & nails LS 6.70
Total for 6Rm 2100.00
Rate for 1 Rm 350.00

Centering
SCMC CIVIL DATA 2018-2019
16
Rate for scafolding for a height of 3m, and length of every additional height of 2.5m,
b)
taking 6m run
1 2 3 4 5 6
58.33 RM Vertical props 31.50 1 RM 1837.40
0.25 m3 Country wood planks 40mm thick 37555.00 1 m3 9388.75
Total cost of material (for 10 uses) 11226.15
Cost per operation 1122.61
Detailed Data
1 use Cost of material per one operation 1122.61 Each 1122.61
2 Nos Mazdoor C I 372.75 Each 745.50
LS Coirs & nails LS 2.04
Total for 6m run 1870.15

Rate for 1Rm & every additional height of 2.5m 311.69


_- =Rs.
Rate upto 3m height 350.00

Rate upto 5.5m height 350.00 + 311.69 661.69

Rate upto 8m height 661.69 + 311.69 973.38

Rate upto 10.5m height 973.38 + 311.69 1285.08

Centering
SCMC CIVIL DATA 2018-2019
17
CENTERING WORK
Note : The centering charges will be calculated taking into account the following
consideration
For curved surface 1.5 times the rate for plane surface and for round
a)
column twice the rate for square column shall be allowed.
In case of the beam floors and bridge slab to allow for extra cost of
b) bewels etc., the whole area of the slab shall be considered i.e., without
deducting for the thickness of the beams.
Where the beams are so closely spaced the joists below the centering
plants may be supported from the flages or sides of beam i.e., wihtout
c) strutting from below the rate for centering Sl. No. shall be less
by the amount of strutting 3m high. But in the case of cantilever slabs
in similar cases No. deducting need be made.
For special precase ornamental works the rates for centering may be
d)
worked out the references to the particular type of work required.
RCC 1:2:4 mix for jali 5cm thick of approved design using 20mm ISS gauge HBBG chips excluding
cost of reinforcement grills in position but including moulding, casting, finishing and fixing in
position etc., complete 1 m2
Size of Jali : 1.20 x 0.60 - 5 cm thick : area of jali : 1.20 x 0.60 = 0.72

a) Teak wood required for mould


3
Outer frame 3.80 x 0.05 x 0.05 = 0.0096 m
Solid wood for cutting to the required design
3
1.20 x 0.60 x 0.05 = 0.0360 ( 0.0096 + 0.0360) = 0.0456 m
Reeper of size 50mm x 25mm required to fix the design brook in
5 Nos x 0.70 = 3.50 RM
b) Labour wrought and put up
1 2 3 4 5 6
4.5 Nos Carpenter I Class 582.75 Each 2622.38
13.2 Nos Carpenter II Class 533.40 Each 7040.88
8.8 Nos Mazdoor C I 372.75 Each 3280.20
3
Total for 1M 12943.46

c) Cost of Mould
1 2 3 4 5 6
0.0456 m3 Cost of TW scantling below 2m height 94672.00 1m 3
4317.04

3.5 RM Cost of TW reeper 5 x 2.5cm size 72.60 1 RM 254.10


Labour charges for making mould
3
0.0456 m double the rate of labour wrought and 25886.91 1 m3 1180.44
put up for skilled work
Sundries for nails including cutting and
LS LS 0.02
fixing reepers in position
Assuming for 10 uses using teakwood 5751.61
Cost of one use = Rs 575.16
Centering
SCMC CIVIL DATA 2018-2019
18
d) Quantity of concrete required 1.20 x 0.60 x 0.05 = 0.036 m 3
Assuming 60 % solid volume = 0.036 x 60% = 0.022 m3
Final Data
0.0220 m3 Cement concrete 1:2:4 mix 5565.00 1 m3 122.43
1 No Moulding charges 575.16 Each 575.16
For finishing and fixing in position
LS LS 0.08
including oiling the mould
2
Total for 0.72 M LS 697.67
2
Rate for 1 M = 968.99
2
Cement 9.87 Kg / m

RCC 1:2:4 mix using 20mm ISS gauge HBBG chips for slab of the following thickness excluding
cost of reinforcement grills in position but including moulding, casting, finishing and fixing in
position etc., complete 1 m2
a) 100mm thick slab
Size of slab : 3.00 m x 0.60 m = 1.80 m2
Volume of concrete : 3.00 x 0.60 x 0.10 = 0.18 m 3
Mould : 2 x 3.40 x 0.04 x 0.10 = 0.0272 m3
Mould : 2 x 1.00 x 0.04 x 0.10 = 0.008 m3 0.0352 m3
Cost of Moulding
1 2 3 4 5 6
0.0352 m3 Cost of silver oak scantling 14847.00 1 m3 522.61
Labour for wood work wrought and put
0.0352 m3 12943.46 1 m3 455.61
up
LS Sundries for nails LS 0.04
Total 978.26
Assume for 5 users as silver oak used 195.65

CC 1:2:4 mix using 20mm ISS HBBG


0.18 m3 5565.00 1 m3 1001.70
chips
1 No Cost of mould 195.65 Each 195.65
Labour for fixing the slab in position 15.00

LS Sundries for oiling the mould & curing LS 0.16


2
Total for 1.80 M 1212.51
2
Rate for 1 M = Rs. 673.61
Cement : 32.31 Kg / m2

Centering
SCMC CIVIL DATA 2018-2019
19
b) 75mm thick slab
Size of slab : 3.00 m x 0.60 m = 1.80 m2
Volume of concrete : 3.00 x 0.60 x 0.075 = 0.135 m 3
Mould : 2 x 3.40 x 0.04 x 0.075 = 0.0204 m3
Mould : 2 x 1.00 x 0.04 x 0.075 = 0.0060 m3 0.0264 m3
Cost of Moulding
1 2 3 4 5 6
0.0264 m3 Cost of silver oak scantling 14847.00 1 m3 391.96
Labour for wood work wrought and put
0.0264 m3 12943.46 1 m3 341.71
up
LS Sundries for nails LS 0.04
Total 733.70
Assume for 5 users as silver oak used 146.74
CC 1:2:4 mix using 20mm ISS HBBG
0.135 m3 5565.00 1 m3 751.28
chips
1 No Cost of mould 146.74 Each 146.74
Labour for fixing the slab in position 15.00
LS Sundries for oiling the mould & curing LS 0.37
2
Total for 1.80 M 913.38
2
Rate for 1 M = Rs. 507.44
2
Cement : 24.23 Kg / m
b) 50mm thick slab
2
Size of slab : 3.00 m x 0.60 m = 1.80 m
3
Volume of concrete : 3.00 x 0.60 x 0.05 = 0.09 m
Mould : 2 x 3.00 x 0.04 x 0.05 = 0.012 m3
Mould : 2 x 1.00 x 0.04 x 0.05 = 0.004 m3 0.016 m3
Cost of Moulding
1 2 3 4 5 6
0.016 m3 Cost of silver oak scantling 14847.00 1 m3 237.55
Labour for wood work wrought and put
0.016 m3 12943.46 1 m3 207.10
up
LS Sundries for nails LS 0.00
Total 444.65
Assume for 5 users as silver oak used 88.93

CC 1:2:4 mix using 20mm ISS HBBG


0.09 m3 5565.00 1 m3 500.85
chips
1 No Cost of mould 88.93 Each 88.93

Labour for fixing the slab in position 15.00

LS Sundries for oiling the mould & curing LS 0.42


2
Total for 1.80 M 605.20
Rate for 1 M2 = Rs. 336.22
2
Cement : 16.16 Kg / m

Centering
SCMC CIVIL DATA 2018-2019
20
Supplying, cutting, bending, tying and fixing in position mild steel and RTS grills for reinforced
cement concrete works including cost of steel and binding wire etc., complete 1 Quintal
1 2 3 4 5 6
1 Qtl Cost of steel at site 44190.00 1 MT 4419.00
1 Kg Cost of binding wire 43.00 1 Kg 43.00

3.5 Nos Fitter I Class for binding and tying 517.65 Each 1811.78

LS Sundries LS 0.12
Total for One Quintal 6273.90
Rate for One Quintal = Rs. 6273.90 62.74
3
Note : The quantity of steel required per m of concrete in the case of
beams etc., depends upon the working stress permitted in the steel with
3
t = 1400 Kg/m the following quantity of steel may be provided for in
the data
3
a) 60 to 90 Kg/m Concrete slab
3
b) 60 to 150 Kg/m of Concrete lintels
3
c) 150 to 225 Kg/m of concrete beams and columns

Centering
SCMC CIVIL DATA 2018-2019
21
STONE MASONRY
Note :
The rate for stone masonry as per standard data will apply to foundation and
a)
basement only (Basic rate)
ADD Rs. Per cu.m to the above basic rate of stone masonry for
b) masonry up to 4.50 m height in ground floor (height to be reckoned from
floor level i.e., plinth level in ground floor)
ADD extra Rs. Per cu.m to the above rate for every upper floor
c)
over the rate of proceeding floor.
For the extra height of masonry above 4.50 m in individiual floor, the rate of
d)
next upper floor may be taken
1) Random rubble masonry in cement mortar 1:5 mix with blue granite rough stones for
foundation and basement 10 m3
1 2 3 4 5 6
10 m3 Supply of rough stones at site 509.20 1 m 3
5092.00
3
1m Supply of bond stones at site 691.20 1 m3 691.20
3.4 m3 Cement mortar 1:5 mix 2472.00 1 m 3
8404.79
7.1 Nos Mason I Class (including stone cutter) 595.35 Each 4226.99

10.6 Nos Mason II Class 533.40 Each 5654.04

14.1 Nos Mazdoor - C - I 372.75 Each 5255.78

14.1 Nos Mazdoor - C - II 336.00 Each 4737.60

LS Sundries LS 0.04
3
Total for 10 M 34062.43
3
Rate for 1 M = Rs. 3406.24
3
Cement : 97.92 Kg / m
1- Random rubble masonry in cement mortar 1:5 mix with using old blue granite rough stones for
a) foundation and basement 10 m3

1 2 3 4 5 6
3.4 m3 Cement mortar 1:5 mix 2472.00 1 m 3
8404.79
7.1 Nos Mason I Class (including stone cutter) 595.35 Each 4226.99

10.6 Nos Mason II Class 533.40 Each 5654.04

14.1 Nos Mazdoor - C - I 372.75 Each 5255.78

14.1 Nos Mazdoor - C - II 336.00 Each 4737.60

LS Sundries LS 0.04
3
Total for 10 M 28279.23
3
Rate for 1 M = Rs. 2827.92
3
Cement : 97.92 Kg / m

Stone Masonry
SCMC CIVIL DATA 2018-2019
22
2) Supply and fixing in position of cut stone cover slabs neatly dressed in all sides except
bottom one line dressing including fixing in position with cement mortar 1:3 mix and pointing
with the same mortar etc., complete 1 m3
1 2 3 4 5 6
1 m3 Supply of cut stone at site 3981.20 1 m3 3981.20
0.16 m3 Cement mortar 1:3 mix 3533.80 1 m3 565.41
3 3
1m Labour for fixing the slab as per SI 243.60 1 m 243.60
LS Sundries LS 0
3
Total for 1 M 4790.21
3
Rate for 1 M = Rs. 4790.21
3
Cement : 76.80 Kg / m

3) Removing and re-fixing the existing C.S. / C.C. slabs including fixing in position with cement
mortar 1:3 mix and pointing with the same mortar etc., complete 1 m3

Rate as per SI.20,21 - Removal of CSS and


3
1m Refixing CSS (176.30+192.00=368.30, 584.85 1 m3 584.85
368.30 x 5%=386.72)

0.16 m3 Cement mortar 1:3 mix 3533.80 1 m3 565.41


LS Sundries LS 0.04
3
Total for 1 M 1150.31
3
Rate for 1 M = Rs. 1150.31
3
Cement : 76.80 Kg / m
4) Providing cut stone paving slab 75mm to 100mm thick of required sizes neatly dressed in all
sides except bottom one line dressing pointing with cement mortar 1:3 mix for full depth of
the slab and earth work excavation in all soils 15cm thick sectioning and levelling including
supplying and filling of sand 50mm thick cushion for paving the slab - 1 m 2
Sub Data
Pointing with Cement Mortar 1:3mix to paving stone flooring - 10m 2
1 2 3 4 5 6
3 3
0.01 m Cement mortar 1:3 mix 3533.80 1 m 35.34
1.6 Nos Mason II Class 533.40 Each 853.44
0.5 Nos Mazdoor - C - I 372.75 Each 186.38
1.1 Nos Mazdoor - C - II 336.00 Each 369.60
LS Sundries LS 0.03
2
Total for 10 M 1444.77

Stone Masonry
SCMC CIVIL DATA 2018-2019
23
Main Data
1 2 3 4 5 6
Earth work excavation in all soils with initial 3
2
10m x0.15 =1.5m 3
44.63 1m 66.94
lead and lift
10m2x0.0875
Supply of cut stone at site 3981.20 1 m3 3483.55
3
=0.875m
Supplying and filling with river sand
10m2x0.05
including watering and ramming to 831.00 1 m3 415.50
=0.50m3
consolidation etc.,
Labour for paving the slab
1.1 Nos Mason I Class 595.35 Each 654.89
1.1 Nos Mason II Class 533.40 Each 586.74
2.2 Nos Mazdoor - C - I 372.75 Each 820.05
1.1 Nos Mazdoor - C - II 336.00 Each 369.60
2 2
10 m Pointing with CM 1:3 mix as per SI 1444.77 10 m 1444.77
LS Sundries LS 0.07
2
Total for 10 M 7842.12
2
Rate for 1 M = Rs. 784.21
2
Cement : 4.80 Kg / m
5) Removing and re-fixing cut stone paving slabs including pointing with cement mortar 1:3 mix
for full depth of the slab and supplying and filling of sand 25mm thick cushion for paving the
slab - 10 m2
1 2 3 4 5 6
Labour for removing the slab
0.5 Nos Mazdoor C - I 372.75 Each 186.38
0.5 Nos Mazdoor C - II 336.00 Each 168.00
River sand including watering and ramming
0.25 m3 831.00 1 m3 207.75
to consolidation
Labour for paving the slabs
1.1 Nos Mason I Class 595.35 Each 654.89
1.1 Nos Mason II Class 533.40 Each 586.74
2.2 Nos Mazdoor - C - I 372.75 Each 820.05
1.1 Nos Mazdoor - C - II 336.00 Each 369.60
2 2
10 m Pointing with CM 1:3 mix as per SI 1444.77 10 m 1444.77
LS Sundries LS 0.02
2
Total for 10 M 4438.20
2
Rate for 1 M = Rs. 443.82
2
Cement : 4.80 Kg / m

Stone Masonry
SCMC CIVIL DATA 2018-2019
24
6) Providing old cut stone paving slab 75mm to 100mm thick of required sizes and pointing with
cement mortar 1:3 mix for full depth of the slab supplying and filling of sand 50mm thick
cushion for paving the slab - 1 m2
Sub Data
Pointing with Cement Mortar 1:3mix to paving stone flooring - 10m 2
1 2 3 4 5 6
3 3
0.01 m Cement mortar 1:3 mix 3533.80 1 m 35.34
1.6 Nos Mason II Class 533.40 Each 853.44
0.5 Nos Mazdoor - C - I 372.75 Each 186.38
1.1 Nos Mazdoor - C - II 336.00 Each 369.60
LS Sundries LS 0.02
2
Total for 10 M 1444.77
Main Data
1 2 3 4 5 6
Supplying and filling with river sand
10m2x0.05
including watering and ramming to 831.00 1 m3 415.50
=0.50m3
consolidation etc.,
Labour for paving the slab
1.1 Nos Mason I Class 595.35 Each 654.89
1.1 Nos Mason II Class 533.40 Each 586.74
2.2 Nos Mazdoor - C - I 372.75 Each 820.05
1.1 Nos Mazdoor - C - II 336.00 Each 369.60
10 m2 Pointing with CM 1:3 mix as per SI 1444.77 10 m2 1444.77
LS Sundries LS 0.05
2
Total for 10 M 4291.61
2
Rate for 1 M = Rs. 429.16
2
Cement : 4.80 Kg / m

Stone Masonry
SCMC CIVIL DATA 2018-2019
25
7) Providing cut stone kerb stone of size 60cm x 10cm x 37.5cm with all faces neatly dressed
oneline dressing with chambered edge on the road side including earth work excavation in all
soils for 10cm width and 22.5cm depth and fixing the stone in position including grouting the
joints with cement mortar 1:3 mix etc., complete
1 2 3 4 5 6
10x0.10x0.225 Earth work excavation in all soils with initial
44.63 1 m3 10.04
=0.225m3 lead and lift
10x0.10x0.375
Supply of cut stone at site 3981.20 1 m3 1492.95
=0.375m3
3
0.375 m Labour for fixing cut stone 443.82 1 m3 166.43
10x0.25 = 2.50 m2 Pointing with CM 1:3 mix as per SI 1444.77 10 m2 361.19

LS Sundries LS 0.01
Total for 10 RM 2030.64
Rate for 1 RM = Rs. 203.06
Cement : 10.80 Kg / 10RM

8) Providing Cut stone kerb stone using old cutstone paving slabs with all faces neatly dressed
one line dressing with chambered edge on the road side including earth work excavation in all
soils for 0.23 width and 45cm depth and fixing the stone in position including grouting the
joints with cement mortar 1:3 mix etc., complete
1 2 3 4 5 6
10x0.23x0.225 Earth work excavation in all soils with initial
3 44.63 1 m3 23.12
=0.518m lead and lift
10x0.10x0.60
Labour for fixing cut stone 443.82 1 m3 266.29
3
=0.60m
10x0.60 = 6.00 m2 Pointing with CM 1:3 mix as per SI 1444.77 10 m2 866.86

LS Sundries for packing and refilling LS 0


Total for 10 RM 1156.27
Rate for 1 RM = Rs. 115.63
Cement : 2.88 Kg / 10RM

Stone Masonry
SCMC CIVIL DATA 2018-2019
26
BRICK MASONRY
The rate for brick work as per standard data will apply to foundation and basement only
Note : a)
( basic rate)
ADD Rs. Per cu.m to the above basic rate of brick work for walls up to 4.50 m
b)
height in ground floor (height to be reckoned from floor level i.e., plinth level in ground
ADD extra Rs. Per cu.m to the above rate for every upper floor over the
c)
rate of proceeding floor.
For the extra height of masonry above 4.50 m in individiual floor, the rate of next upper
d)
floor may be taken
1) Brick work in cement mortar 1:5 mix using country bricks of size 9"x4 3/8"x2 3/4" for
foundation and basement - 1m3
1 2 3 4 5 6
Second class Ground moulded chamber burnt
4876 Nos 6225.80 1000 Nos 30357.00
bricks (9"x4 3/8"x2 3/4")
2.50 m3 cement mortar 1:5 mix 2472.00 1 m3 6180.00
3.50 Nos Mason I Class 595.35 Each 2083.73
7.10 Nos Mason II Class 533.40 Each 3787.14
7.10 Nos Mazdoor - C - I 372.75 Each 2646.53
14.10 Nos Mazdoor - C - II 336.00 Each 4737.60
LS Sundries LS 0
3
Total for 10 M 49791.99
3
Rate for 1 M = Rs. 4979.20
Cement : 72.00 Kg / m3

Upto 4.50m
height (from = 4979.20 + 39.20 = 5018.40
plinth level)
1st floor = 5018.40 + 78.90 = 5097.30

2nd floor = 5097.30 + 78.90 = 5176.20

3rd floor = 5176.20 + 78.90 = 5255.10

2) Brick work in cement mortar 1:5 mix using Fly Ash bricks of 230x110x70mm (8 3/4" x 41/4" x
23/4") including cost of materials and labour charges etc. as per std. specification - 1m 3
1 2 3 4 5 6
Supply of 230mmx110mx70m fly ash bricks
4876 Nos 5925.00 1000 Nos 28890.30
at site
2.50 m3 cement mortar 1:5 mix 2472.00 1 m3 6180.00
3.50 Nos Mason I Class 595.35 Each 2083.73
7.10 Nos Mason II Class 533.40 Each 3787.14
7.10 Nos Mazdoor - C - I 372.75 Each 2646.53
14.10 Nos Mazdoor - C - II 336.00 Each 4737.60
LS Sundries LS 0.04
3
Total for 10 M 48325.34
3
Rate for 1 M = Rs. 4832.53
Cement : 72.00 Kg / m3

Brick Masonry
SCMC CIVIL DATA 2018-2019
27
Upto 4.50m
height (from = 4832.53 + 39.20 = 4871.73
plinth level)
1st floor = 4871.73 + 78.90 = 4950.63

2nd floor = 4950.63 + 78.90 = 5029.53

3rd floor = 5029.53 + 78.90 = 5108.43

3) Damp proof course with cement mortar 1:4mix (one cement and four sand) 12mm thick mixed
with approved quality water proofing compound conforming to Indian standard specification as
specified by departmental officers at 2% by weight of cement used etc. complete
1 2 3 4 5 6
3 3
0.14 m Cement mortar 1:4 mix 2870.20 1 m 401.83

1.00 Kg Water proofing compound 39.60 1 Kg 39.60


1.10 Nos Mason I Class 595.35 Each 654.89
0.50 Nos Mazdoor - C - I 372.75 Each 186.38
1.10 Nos Mazdoor - C - II 336.00 Each 369.60
LS Sundries LS 0.01
2
Total for 10 M 1652.30
2
Rate for 1 M = Rs. 165.23
Cement : 5.04 Kg / m2

4) Honey comb brick work in cement mortar 1:5mix (one cement and five sand) using country
bricks of size 8 3/4" x 41/4" x 23/4" etc. complete
1 2 3 4 5 6
3 1 3
585 Nos Country bricks of size 8 /4" x 4 /4" x 2 /4" 6225.80 1000 Nos 3642.09
0.10 m3 Cement mortar 1:5 mix 2472.00 1 m3 247.20
2.10 Nos Mason I Class 595.35 Each 1250.24
6.50 Nos Mason II Class 533.40 Each 3467.10
1.10 Nos Mazdoor - C - I 372.75 Each 410.03
4.30 Nos Mazdoor - C - II 336.00 Each 1444.80
LS Sundries LS 0.04
2
Total for 10 M 10461.50
2
Rate for 1 M = Rs. 1046.15
Cement : 2.88 Kg / m2

Brick Masonry
SCMC CIVIL DATA 2018-2019
28
POINTING
1) Pointing with cement mortar 1:3 mix, flush pointing to brick work - 1 m 2
1 2 3 4 5 6
0.06 m3 Cement mortar 1:3 mix 3533.80 1 m3 212.03
1.6 Nos Mason II - Class 533.40 Each 853.44
0.50 Nos Mazdoor - C - I 372.75 Each 186.38
1.10 Nos Mazdoor - C - II 336.00 Each 369.60
LS Sundries LS 0.04
2
Total for 10 M 1621.48
2
Rate for 1 M = Rs. 162.15
2
Cement : 28.80 Kg /10 m

2) Pointing with cement mortar 1:3 mix, flush pointing to random rubble masonry - 1 m2
1 2 3 4 5 6
0.09 m3 Cement mortar 1:3 mix 3533.80 1 m3 318.04
1.6 Nos Mason II - Class 533.40 Each 853.44
0.50 Nos Mazdoor - C - I 372.75 Each 186.38
1.10 Nos Mazdoor - C - II 336.00 Each 369.60
LS Sundries LS 0.08
2
Total for 10 M 1727.54
2
Rate for 1 M = Rs. 172.75
2
Cement : 43.20 Kg /10 m

3) Pointing with cement mortar 1:3 mix, to full depth of tiles (marble slabs, pressed tiles,
ornamental tiles) - 1 m2
1 2 3 4 5 6
0.04 m3 Cement mortar 1:3 mix 3533.80 1 m3 141.35
2.2 Nos Mason II - Class 533.40 Each 1173.48
0.50 Nos Mazdoor - C - I 372.75 Each 186.38
1.10 Nos Mazdoor - C - II 336.00 Each 369.60
LS Sundries LS 0.04
2
Total for 10 M 1870.85
2
Rate for 1 M = Rs. 187.08
2
Cement : 19.20 Kg /10 m

Pointing
SCMC CIVIL DATA 2018-2019
29
4) Pointing with cement mortar 1:3 mix, to cuddapha slab to full depth - 10 m 2
1 2 3 4 5 6
3 3
0.01 m Cement mortar 1:3 mix 3533.80 1m 35.34
1.6 Nos Mason II - Class 533.40 Each 853.44
0.50 Nos Mazdoor - C - I 372.75 Each 186.38
1.10 Nos Mazdoor - C - II 336.00 Each 369.60
LS Sundries LS 0.02
2
Total for 10 M 1444.77
2
Rate for 1 M = Rs. 144.48
2
Cement : 4.80 Kg /10 m

5) Pointing with cement mortar 1:3 mix, to paving stone flooring - 10 m 2

1 2 3 4 5 6
3 3
0.01 m Cement mortar 1:3 mix 3533.80 1m 35.34
1.6 Nos Mason II - Class 533.40 Each 853.44
0.50 Nos Mazdoor - C - I 372.75 Each 186.38
1.10 Nos Mazdoor - C - II 336.00 Each 369.60
LS Sundries LS 0.02
2
Total for 10 M 1444.77
2
Rate for 1 M = Rs. 144.48
2
Cement : 4.80 Kg /10 m

Pointing
SCMC CIVIL DATA 2018-2019
30
FLOORING
1) Flooring with 20mm thick cement concrete 1:3 mix (no sand to be used) using 3mm to 10mm
ISS gauge HBBG chips and the surface rubbed hard and finished smooth with neat cement
Ellise pattern surface 1 sort - 1m2
1 2 3 4 5 6
Supply of 3mm to 10mm ISS gauge HBBG
0.24 m3 806.70 1 m3 193.61
chips at site (509.00+783.00/2=646.00)

117 Kg Supply of Cement at site 5530.00 Tonne 647.01


0.50 Nos Mason I Class 595.35 Each 297.68
1.10 Nos Mazdoor - C - I 372.75 Each 410.03
4.30 Nos Mazdoor - C - II 336.00 Each 1444.80
LS Sundries LS 0.05
2
Total for 10 M 2993.17
2
Rate for 1 M = Rs. 299.00
2
Cement : 117.00 Kg /10 m

2) Flooring with Vetrified flooring tiles of size 600 x 600 x 8mm of approved colour and
quality of required size laid in cement mortar 1:3 mix 20mm thick and pointing with the
same mortar complete and finish very neatly etc complete
1 2 3 4 5 6
Pointing with cement Colour
4 Kg Colour cement for pointing 25.40 1 Kg 101.60
1.6 Nos Mason II - Class 533.40 Each 853.44
0.5 Nos Mazdoor C - I 372.75 Each 186.38
1.1 Nos Mazdoor C - II 336.00 Each 369.60
Sundries 0.04
Total for 10 M2 1511.06
Main Data
2
10.00 m Supply of Vetrified tiles 900.00 1 m2 9000.00
3 3
0.21 m Cement mortar 1:3 mix 3533.80 1 m 742.10
1.1 Nos Mason I - Class 595.35 Each 654.89
1.1 Nos Mason II - Class 533.40 Each 586.74
2.2 Nos Mazdoor C - I 372.75 Each 820.05
2.2 Nos Mazdoor C - II 336.00 Each 739.20
2 2
10.00 m Pointing with cement Colour 1511.06 10 m 1511.06
Sundries 0.06
2
Total for 10 M 14054.09
2
Rate for 1 M = Rs. 1405.00
Cement : 100.80 Kg /10 m2
Flooring
SCMC CIVIL DATA 2018-2019
31
3) Flooring with Eurocon grip tiles of size 30 x 30 x 1cm of approved colour and quality
(Endura industrial tiles) in cement mortar 1:3 mix and pointing with the same mortar etc.
complete and finish very neatly
1 2 3 4 5 6
Pointing with cement morter 1:3 mix
0.04 m3 Cement mortar 1:3 mix 3533.80 1 m3 141.35
2.2 Nos Mason II - Class 533.40 Each 1173.48
0.5 Nos Mazdoor C - I 372.75 Each 186.38
1.1 Nos Mazdoor C - II 336.00 Each 369.60
Sundries 0.03
Total for 10 M2 1870.84
Main Data
111 Nos Supply of Eurocon grip tiles 60.00 Each 6660.00
0.12 m3 Cement mortar 1:3 mix 3533.80 1 m3 424.06
10.00 m 2 Pointing with cement Colour 1870.84 10 m 2
1870.84
1.1 Nos Mason I - Class 595.35 Each 654.89
1.9 Nos Mason II - Class 533.40 Each 1013.46
1.7 Nos Mazdoor C - I 372.75 Each 633.68
0.9 Nos Mazdoor C - II 336.00 Each 302.40
Sundries 0.01
2
Total for 10 M 11559.33
2
Rate for 1 M = Rs. 1156.00
Cement : 100.80 Kg /10 m2

4) Flooring with Eurocon plain tiles of size 30 x 30 x 1cm of approved colour and quality
(Endura industrial tiles) in cement mortar 1:3 mix and pointing with the same mortar etc.
complete and finish very neatly
1 2 3 4 5 6
Pointing with cement morter 1:3 mix
0.04 m3 Cement mortar 1:3 mix 3533.80 1 m3 141.35
2.2 Nos Mason II - Class 533.40 Each 1173.48
0.5 Nos Mazdoor C - I 372.75 Each 186.38
1.1 Nos Mazdoor C - II 336.00 Each 369.60
Sundries 0.03
Total for 10 M2 1870.84

Flooring
SCMC CIVIL DATA 2018-2019
32
Main Data
111 Nos Supply of Eurocon grip tiles 58.00 Each 6438.00
3 3
0.12 m Cement mortar 1:3 mix 3533.80 1 m 424.06
10.00 m 2 Pointing with cement Colour 1870.84 10 m2
1870.84
1.1 Nos Mason I - Class 595.35 Each 654.89
1.9 Nos Mason II - Class 533.40 Each 1013.46
1.7 Nos Mazdoor C - I 372.75 Each 633.68
0.9 Nos Mazdoor C - II 336.00 Each 302.40
Sundries 0.01
Total for 10 M2 11337.33
2
Rate for 1 M = Rs. 1134.00
Cement : 100.80 Kg /10 m2

5) Dadooing the walls with Vetrified tiles of size 600 x 600 x 8mm thick laid in cement
mortar 1:2 mix 10mm thick and pointing with white cement using 0.40 kg./cm 2 including
finishing the joint and pointing flush with tile surface etc.
1 2 3 4 5 6
10 m2 Supply of Vetrified tiles 900.00 m
2
9000.00
0.10 m3 Cement mortar 1:2 mix 4861.00 1 m3 486.10
4.00 Kg White cement 22.00 1 Kg. 88.00
1.1 Nos Mason I - Class 595.35 Each 654.89
4.1 Nos Mason II - Class 533.40 Each 2186.94
2.7 Nos Mazdoor C - I 372.75 Each 1006.43
3.3 Nos Mazdoor C - II 336.00 Each 1108.80
Sundries 0.04
2
Total for 10 M 14531.19
2
Rate for 1 M = Rs. 1453.00
Cement : 72.00 Kg /10 m2

Flooring
SCMC CIVIL DATA 2018-2019
33
6) Paving the floor with best approved quality fine polished Tandon Shagbad green stone slab
of size 610 x 610 x 20mm laid over a cement mortar 1:3 mix, fixing the slab in true tight
angles with minimum possible width of joints and polishing the joints with cement mortar 1:3
mix and polishing with floor polisher to a high degree to finish and curing etc. complete as
directed by depat. officers.
1 2 3 4 5 6
10.50 m2 Paving the floor with Tandon Shagbad green 295.00 2
3097.50
m
stone slab of size 610 x 610 x 20mm
0.21 m3 Cement mortar 1:3 mix 3533.80 1 m3 742.10
64.00 Kg Cement slurry 5.60 1 Kg. 358.40
3 Nos Mason I - Class 595.35 Each 1786.05
1.25 Nos Mason II - Class 533.40 Each 666.75
5 Nos Mazdoor C - I 372.75 Each 1863.75
4 Nos Mazdoor C - II 336.00 Each 1344.00
1 day Hire charges for polishing machine 212.00 day 212.00
1.1 Nos Floor polisher 458.85 Each 504.74
2 unit Electricity 11.10 unit 22.20
0.5 Kg. Cotton waste for polishing 9.70 1 Kg. 4.85
LS Sundries L.S. 0.03
2
Rate for 10 M 10602.37
2
Rate for 1 M = Rs. 1060.00
Cement : 100.80 Kg /10 m2
7) Paving the floor with best approved quality fine polished Rajesthan kotta stone slab of size
20mm with machine cut edges of size below 2'0" x 2'0" laid over a cement mortar 1:3 mix,
fixing the slab in true tight angles with minimum possible width of joints and polishing the
joints with cement mortar 1:3 mix and polishing with floor polisher to a high degree to
finish and curing etc. complete as directed by depat. officers.
1 2 3 4 5 6
2 Paving the floor with Rajesthan kotta stone slab 2
10.50 m 450.00 m 4725.00
of size 20mm thick
0.21 m3 Cement mortar 1:3 mix 3533.80 1 m3 742.10
64.00 Kg Cement slurry 5.60 1 Kg. 358.40
3 Nos Mason I - Class 595.35 Each 1786.05
1.25 Nos Mason II - Class 533.40 Each 666.75
5 Nos Mazdoor C - I 372.75 Each 1863.75
4 Nos Mazdoor C - II 336.00 Each 1344.00
1 day Hire charges for polishing machine 212.00 day 212.00
1.1 Nos Floor polisher 458.85 Each 504.74
2 unit Electricity 11.10 unit 22.20
0.5 Kg. Cotton waste for polishing 9.70 1 Kg. 4.85
LS Sundries L.S. 0.03
2
Rate for 10 M 12229.87
2
Rate for 1 M = Rs. 1223.00
Cement : 100.80 Kg /10 m2
Flooring
SCMC CIVIL DATA 2018-2019
34
8) Dadooing walls with Ceramic tiles of size 20cm x 20cm x 6mm first quality design tiles of
all colours laid in cement mortar 1:2 mix, 10mm thick and pointing with white cement using
0.40 kg/1m2 including finishing the joint and pointing flush with tile surface etc., complete
- 1 m2
1 2 3 4 5 6
250 Nos Supply of first quality design tiles of all 19.80 Each 4950.00
colours
0.10 m3 Cement mortar 1:2 mix 4861.00 1 m3 486.10
4 Kg White cement 22.00 1 Kg 88.00
1.1 Nos Mason I - Class 595.35 Each 654.89
4.1 Nos Mason II Class 533.40 Each 2186.94
2.70 Nos Mazdoor - C - I 372.75 Each 1006.43
3.30 Nos Mazdoor - C - II 336.00 Each 1108.80
LS Sundries LS 0.09
2
Total for 10 M 10481.24
2
Rate for 1 M = Rs. 1048.00
2
Cement : 72.00 Kg /10 m
9) Flooring with ceramic tiles of approved Colour and quality of size 305mm x 305mm x 6mm
laid first quality design of all colours in cement mortar 1:3 mix, 20mm thick and pointing
with the same mortar etc., completely and finish very neatly
Sub Data
Pointing with same Colour cement
1 2 3 4 5 6
4 Kg Colour cement for pointing 25.40 1 m3 101.60
1.60 Nos Mason class II 533.40 Each 853.44
0.50 Nos Mazdoor C - I 372.75 Each 186.38
1.10 Nos Mazdoor C - II 336.00 Each 369.60
LS Sundries LS 0.04
2
Total for 10 M 1511.06
Main Data
Supply of 305mm x 305mm x6mm size 1st
108 Nos 45.00 Each 4860.00
quality design ceramic tilesof all colours
0.21 m3 Cement mortar 1:3 mix 3533.80 1 m3 742.10
1.10 Nos Mason Class I 595.35 Each 654.89
1.10 Nos Mason Class II 533.40 Each 586.74
2.20 Nos Mazdoor class I 372.75 Each 820.05
2.20 Nos Mazdoor class II 336.00 Each 739.20
2 2
10 m Pointing with cement (Colour) 1511.06 10 m 1511.06
LS Sundries LS 0.06
2
Total for 10 M 9914.09
2
Rate for 1 M = Rs. 992.00
2
Cement : 100.80 Kg /10 m
Flooring
SCMC CIVIL DATA 2018-2019
35
10) Flooring with first quality plain ceramic tiles of approved Colour and quality of size 305mm
x 305mm x 6mm laid in cement mortar 1:3 mix, 20mm thick and pointing with the same
mortar etc., completely and finish very neatly

Sub Data
Pointing with same Colour cement
1 2 3 4 5 6
4 Kg Colour cement for pointing 25.40 1 m3 101.60
1.60 Nos Mason class II 533.40 Each 853.44
0.50 Nos Mazdoor C - I 372.75 Each 186.38
1.10 Nos Mazdoor C - II 336.00 Each 369.60
LS Sundries LS 0.04
2
Total for 10 M 1511.06
Main Data
Supply of 305mm x 305mm x6mm size 1st
108 Nos 14.40 Each 1555.20
quality design ceramic tilesof all colours
0.21 m3 Cement mortar 1:3 mix 3533.80 1 m3 742.10
1.10 Nos Mason Class I 595.35 Each 654.89
1.10 Nos Mason Class II 533.40 Each 586.74
2.20 Nos Mazdoor class I 372.75 Each 820.05
2.20 Nos Mazdoor class II 336.00 Each 739.20
2 2
10 m Pointing with cement (Colour) 1511.06 10 m 1511.06
LS Sundries LS 0.06
2
Total for 10 M 6609.29
2
Rate for 1 M = Rs. 661.00
2
Cement : 100.80 Kg /10 m

Flooring
SCMC CIVIL DATA 2018-2019
36
11) Paving the floor with marble slabs : Flooring with Adanga Marble slabs of size 4'x2' feet
free from all defects in all floors overs a base layer of CM 1:20mm thick. The marble slab
shall be laid over the cement mortar by applying white cement slurry in between base
mortar and marble slab. The marble slabs are to be laid that there shall be in line with
another joint and uniform by using marble cutting machine without any damage to the sides
of corners of the marble slab. The entire area at themarble flooring so laid shall be
pointed with white cement neatly including apolishing with polishing stone of grade 80 for
rough, grade 200 for medium, and grade 360 for nice using necessary oxalic acid etc., soa
as to glassy and smooth and including hire charges for polishing machine and power
consumption charges etc., The Adanga marble slabs, polishing stones, oxolic acid, tin oxide
etc., proposed for the work shall be shown to the departmental officers and got approved
by them before use in the work etc., complete
1 2 3 4 5 6
10 m2 Marble Slabs 18mm thick 1300.00 1 m2 13000.00

0.21 m3 Cement mortar 1:3 mix 3533.80 1 m3 742.10


18 Kg White cement 22.00 1 Kg 396.00
3.0 Nos Mason I - Class 595.35 Each 1786.05
1.25 Nos Mason II Class 533.40 Each 666.75
0.50 Nos Stone cutter I Class 533.40 Each 266.70
8.00 Nos Mazdoor - C - I 372.75 Each 2982.00
7.00 Nos Mazdoor - C - II 336.00 Each 2352.00
LS Cutting blades at 12% of labour charges LS 966.42
1.25 Nos Rough (80) 60.50 Each 75.63
0.75 Nos Medium (200) 84.70 Each 63.53
0.3 Nos Nice (300) 96.80 Each 29.04
1 Kg Oxalic acid 39.80 Each 39.80
0.25 Kg Tin Oxide 30.00 Kg 7.50
1 Kg Marble Powder 4.80 1 Kg 4.80
0.5 Kg Cotton Waste 9.70 1 Kg 4.85
1 m2 Kithan Bag 9.90 1 m2 9.90
1 day Hire charges for polishing machine 212.00 1 day 212.00
2 unit Electricity 11.10 1 unit 22.20
Sundries 0.55
2
Total for 10 M 23627.83
2
Rate for 1m 2363.00

Flooring
SCMC CIVIL DATA 2018-2019
37
12) Providing Granolythic finish of 25mm thich with PCC 1:2:4 (One cement, two sand and four
jelly) using 10mm to 12.50mm HBG jelly etc complete
1 2 3 4 5 6
Sub Data
9 m3 10mm to 12.50mm HBG Jelly 1137.70 1 Kg 10239.30
3
4.5 m Cement mortar 1:2 mix 4861.00 Each 21874.50
1.8 Nos Mason II - Class 533.40 Each 960.12
17.7 Nos Mazdoor C - I 372.75 Each 6597.68
14.1 Nos Mazdoor C - II 336.00 Each 4737.60
Sundries 0.07
Total for 10 M2 44409.26
Main Data

for 25mm thick - 10m2


0.25 m3 Cement concrete 1:2:4 44409.26 10 m3 1110.23
Add for rubbing the top smooth and thread
L.S. L.S. 30.39
lining if necessary etc
Total for 10 M2 1140.62
2
Rate for 1 M = Rs. 114.00
Cement : 80.78 Kg /10 m2

Flooring
SCMC CIVIL DATA 2018-2019
38
DOORS, WINDOWS AND VENTILATORS
1) Supplying and fixing in position of country wood (Pillamarudu) frames for door, windows and
ventilators below 4m in length including wrought and put up in position etc., complete
1 2 3 4 5 6
Cost of country wood (Pillamarudu) scantling
1 m3 32751.00 1 m3 32751.00
below 4m in length as per SI
1 m3 Labour for wrought and put up 8158.50 1 m3 8158.50
Sundries for lead 0.1
3
Total for 1m 40909.60
3
Rate for 1m = Rs. 40910.00

i) Supplying and fixing MS grills for windows & ventilators etc : Rs. 65.00 / 1Kg.

ii) Supplying and fixing MS angles & flats of required size etc. : Rs. 68.21 / 1Kg.

2) Supplying and fixing solid core flush shutters both side teak wood ply of 35mm thick and
necessary furniture fitting like aluminium altrop, hinges, tower bolts, door stopper, rubber bush
etc including cost of materials and labour charges etc complete
1 2 3 4 5 6
Solid core flush shutters with teak ply on
1.92 m2 both side with teak wood lipping alround 2090.00 1 m2 4012.80
35mm thick
3 Nos. Aluminium Hinges 125mm x 30mm 74.70 Each 224.10
1 Aluminium altrop 250mm long and 16mm dia 150.70 Each 150.70
Nos.
Aluminium towerbolt 250mm long and 12mm
2 81.50 Each 163.00
Nos. dia
2 Nos. Aluminium Handle 150mm long 48.00 Each 96.00
1 No. Ruber bush 40mm dia and 60mm long 21.50 Each 21.50
1 No. Aluminium door stopper with rubber bush 43.80 Each 43.80
0.8 No. Carpenter I class 582.75 Each 466.20
1.5 Nos. Mazdoor I class 372.75 Each 559.13
Sundries 0.05
Total for 1.92m 2
5737.28
Rate for 1 m2 5737.28
1.92
1 m2 Rate = 2988.00

D-W-V
SCMC CIVIL DATA 2018-2019
39
3) Supplying and fixing in position of 20 BWG GI plain sheet shutter door of size 70 x 160 cm
framed with alround MS angle iron of size 30 x 30 x 5mm with one ledge and two braces made
out of MS flat 30 x 5mm size without door frame but with necessary gudjin pins and locking
arrangements on both sides complete. The 20 BWG GI plain sheet should cover the MS angle
frame alround in such a way that there would not be any exposition of the angles to avoid any
rusting. The fastening of the GI sheet with the angle iron frame must be with aluminium rivets
at 25cm C/C. The entire shutter door must be painted with one coat of red oxide paint and
the shutter properly fixed in position etc., complete - Each

Size of shutter : 70 x 160 cm

L angle frame 30 x 30 x 5mm Vertical - (2 x 1.60) = 3.20 RM


Horizontal - ( 2 x 0.70) = 1.40 RM
MS flat (30 x 5mm) ledges - (1 x 0.70) = 0.70 RM
braces - (2 x 1.10) = 2.20 RM
2
Shutter area = 0.70 x 1.60 = 1.12 m
Painting (1.12 m2 x 2.25(c) = 2.52 m2
MS angle = 4.60 x 2.20 Kg / 1 RM = 10.12 Kg
MS flat = 2.90 x 1.4 kg / 1 RM = 4.06 Kg
Wastage = 0.82 Kg
= 15.00 Kg
1mm thick GI = 1.12 m2 x 12.548 kg / 1 m2 = 14.05 Kg
sheet Say 14 Kg
Total wt= 15+14=29 Kg

1 2 3 4 5 6
15 Kg Cost of MS angle and flat 40.50 1 Kg 607.50
1.12 m2 Cost of 1.60mm thick GI sheet 299.00 1 m2 334.88
29 Kg Labour for manufacturing the shutter 32.46 1 Kg 941.34
2 2
2.52 m Painting with a coat of priming coat 51.00 1m 128.53
Barrel bolt 150mm long 2 Nos and gudjin pin
LS LS 91.85
2 Nos
25 Nos Aluminium rivets 0.80 Each 20.00
Sundries inclusive of fixing the shutter in
LS LS 0.29
position
Total for Each 2124.39
Rate for Each = Rs. 2124.44

Rate for 1m2= 1897.28

D-W-V
SCMC CIVIL DATA 2018-2019
40
Sl.
Quantity Description Rate Per Amount Remarks
No
4) STEEL GLAZED WINDOWS
Manufacturing,supplying & fixing in position Steel windows glazed with openable
shutter frame and shutter frame made out of steel section confirming to IS
7452/ 1990.The outer frames of windows made of Z section (F7D) of size 25 x
20 x 3 mm confirming to IS7452/1992 mullions are made of (F4B) of section size
46x25x3mm confirming to IS7452/1990.The shutters are individual and each of
them can be operated separately. Sash bars are made of 'T'section (T2) of size
25x22x3m, 2nos of sturdy hinges and one numbers of handle cum slatch of special
type are fixed for with openable shutter. Suitable opening is left for its any
operation. One number of adjustable stay with locking bracket of sufficient length
shall be provided for each shutter 4 nos. of 40x40x3mm anngle hold fast 230mm
length are welded to the outer frame at appropriate point.M.S square bars of 12mm
size is welded to the inner face of the window at equal intervals not excluding 10cm
spacings, 5.5mm pin headed glass is used for glazing and the glass panes shall be
fixed with good quality.T.W.beeding size 15x15mm with screws for fixing. Grill
members are painted with one coat of primer. Also rate is inclusive of cost of all
materials, labour charges for fixing, one coat of primer, welding charges
transportations to the work site, loading unloading and all other incidental charges
(Consider a window of size 1.0 m X 1.3
m) 2 Panels. 1 1 1.00 1.30 1.30
MAIN DATA
"z" Section for frames 2 1 1.00 2.00
do 2 1 1.30 2.60
Shuttering 2 2 1.73 6.92
subtotal 11.52 Rm.
subtotal 16.3469 Kg
"J" Section for Centre frame 1.3 m at
2.28 Kg/m 1 1 1.30 2.96 Kg
"T" Section 2 3 0.43 2.67 Kg
12 mm sqr rod 12 1 1.00 13.56 Kg
TOTAL 35.54 Kg
Cost of Special steel such as F-7d,F-
4B & 12 mm sq rod including one coat
35.54 Kg of primer 40.50 Kg 1439.37
Cost of hold fast fixing 4 nos. Handles
2 Nos. Latches 2Nos adjustable
LS windsly 2 Nos., hinges Nos.pin 8 Nos. LS 155.00
including fabrication charges etc., not
exceeding 10% of cost of above item

10.67 RM T.W. Beading 15 x 12 mm 45.70 RM 487.62


2 2
1.30 M Pin headed glass panes (5.5mm Thick) 210.00 M 273.00
0.40 No. Carpenter I st class 582.75 No. 233.10
0.75 No. Mason I st class 595.35 No. 446.51

Steel Door Windows


SCMC CIVIL DATA 2018-2019
41
Sl.
Quantity Description Rate Per Amount Remarks
No
0.75 No. Muzdoor category I 372.75 No. 279.56
0.33 No. Stone Cutter I st class 533.40 No. 176.02
35.54 kg welding charges 1.95 Kg 69.30
Sundries for fixing the window in
LS position etc. LS 2.28
2
Rate for 1.3m 3561.77
2
Rate for 1m 2740.00
5) Manufacturing,supplying & fixing in position Steel windows of MS sheet 20 gauge
thick with openable shutter frame and shutter frame made out of steel section
confirming to IS 7452/ 1990.The outer frames of windows made of Z section
(F7D) of size 25 x 20 x 3 mm confirming to IS7452/1992 mullions are made of
(F4B) of section size 46x25x3mm confirming to IS7452/1990.The shutters are
individual and each of them can be operated separately. Sash bars are made of
'T'section (T2) of size 25x22x3m, 2nos of sturdy hinges and one numbers of
handle cum slatch of special type are fixed for with openable shutter. Suitable
opening is left for its any operation. One number of adjustable stay with locking
bracket of sufficient length shall be provided for each shutter 4 nos. of
40x40x3mm anngle hold fast 230mm length are welded to the outer frame at
appropriate point.M.S square bars of 12mm size is welded to the inner face of the
window at equal intervals not excluding 10cm spacings ,20gauge MS sheet is used
for covering the shutter. Grill members are painted with one coat of primer. Also
of cost of all materials, labour charges for fixing, one coat of primer, welding
charges transportations to the work site, loading unloading and all other incidental
charges etc.,complete.
(Consider a window of size 1.0 m X 1.3
m) 2 Panels. 1 1 1.00 1.30 1.30
MAIN DATA
"z" Section for frames 2 1 1.00 2.00
do 2 1 1.30 2.60
Shuttering 2 2 1.73 6.92
subtotal 11.52 Rm.
subtotal 16.3469 Kg
"J" Section for Centre frame 1.3 m at
2.28 Kg/m 1 1 1.30 2.96 Kg
"T" Section 2 3 0.43 2.67 Kg
12 mm sqr rod 12 1 1.00 13.56 Kg
TOTAL 35.54 Kg

Steel Door Windows


SCMC CIVIL DATA 2018-2019
42
Sl.
Quantity Description Rate Per Amount Remarks
No
Cost of Special steel such as F-7d,F-
4B & 12 mm sq rod including one coat
35.54 Kg of primer 40.50 Kg 1439.37
Cost of hold fast fixing 4 nos. Handles
2 Nos. Latches 2Nos adjustable
LS windsly 2 Nos., hinges Nos.pin 8 Nos. LS 155.00
including fabrication charges etc., not
exceeding 10% of cost of above item

2
MS sheet 20 Gauge 1.30M =10.20 Kg. 2
10.20 Kg 40.50 M 413.10
0.75 No. Mason I st class 595.35 No. 446.51
0.75 No. Muzdoor category I 372.75 No. 279.56
0.33 No. Stone Cutter I st class 533.40 No. 176.02
45.74 kg welding charges 1.95 LS 89.19
Sundries for fixing the window in
LS position etc. LS 12.64
2
Rate for 1.3m 3011.40
2
Rate for 1m 2317.00
STEEL DOOR
6) Fabricating Supply and fixing and position of MS doors with single leave. The door
outer frame will be 40x40x6mm MS angle, the shutter frame will be 35x35x6 mm,
MS angle intermediate stiffner will be 35x35x6 mm with cross stiffner 25x 25x5
mm flats covered with 18 gauge M.S. sheet with necessary hinges, tower bolts,
aldrop length 30mm and hold fast etc., complete with one coat red oxideprimer.

Consider a door of size of 0.9 x 2.1m 1.89 M


2

Frame size 40x40x6 mm @ 3.5 kg / m


Alround 1 5.10 5.10 17.85 KG
Shutter frame 35x35x6mm@3 kg / m
Alround 2 3 6.00 18.00 KG
Cost of stiffners'T' Section 25x25x5
mm@1.8 kg/m 4 0.90 3.60 6.48 KG
For Hold fast with Locking box 6.00 KG
subtotal 48.33 KG
Total Weight of MS Angle including
wastage 5% 50.75 KG
MS Sheet 18 Gauge
2
1.89M x 9.8 kg / m2 1 0.90 2.10 1.89
subtotal 18.52 KG
Total Weight of MS Sheet including
wastage 5% 19.45 KG

Steel Door Windows


SCMC CIVIL DATA 2018-2019
43
Sl.
Quantity Description Rate Per Amount Remarks
No
MAIN DATA
50.75 KG Cost of MS Angle 40.50 KG 2055.38
19.45 KG Cost of MS sheet 40.50 KG 787.73
70.20 KG Labour Charges for welding 1.95 KG 136.89
3 Nos. Hinges 150 mm(Iron Oxidised) 29.00 Nos. 87.00
2 Nos. Tower bolt 300 mm 44.00 Nos. 88.00
1 Nos. Aldrop 33.00 Nos. 33.00
2 Nos. MS Handle 19.00 Nos. 38.00
Provision for conveyance, dismantling,
fixing & re doing the work, T.W.Plug,
LS scaffolding charges etc., LS 15.66
2
Total for 1.89 M 3241.65
Rate for 1 m2 1715.00
Rate for 1 m2 1715.00
7) Fabricating Supply and fixing and position of MS doors with double leave made out
of 18 gauge M.S. sheet, outer frame 35x35x5mm angle, inner frame 25x25x5mm
angle, cross stiffner with MS flat 25x5mm, altrop tower bolts 2 Nos. two handles
and six holdfasts completed welded and rivetted and one coat of red oxide painting
including cost of all materials and labour etc., complete
Consider a door of size of 0.9 x 2.1 m 1.89 M
2

L' angle of size 35x35x5mm


Outer frame =2 x (2.10+0.90) 6.00 Rm
Holdfast 6 Nos. x 0.20 1.20 Rm
7.20 Rm
7.20 Rm @ 2.60 Kg/Rm 18.72 KG
L' angle of size 25x25x5mm
Inner frame =2 x
(2.05+0.43+2.05+0.43) 9.92 Rm
9.92 Rm @ 1.80 Kg/Rm 17.86 KG
ADD 5% wastage (18.72+17.86) 1.83 KG
38.41 KG
MS flat 25x5mm
Horizontal stiffner = 4x0.43 1.72 Rm
Braching stiffner = 2x3x0.80 4.80 Rm
Door centre (vertical)=1x1x2.05 2.05 Rm
8.57 Rm
8.57 Rm @ 1.20 Kg / Rm 10.28 Kg
ADD 5% wastage 0.51 KG
10.79 KG

Steel Door Windows


SCMC CIVIL DATA 2018-2019
44
Sl.
Quantity Description Rate Per Amount Remarks
No
MS Sheet 18 Gauge for door shutter=
2x(0.43x2.05)=1.763 m
2 1.763 x 9.80Kg= 17.28 KG
ADD 5% wastage 0.86 KG
18.14 KG
MAIN DATA
38.41 KG Cost of MS Angle 40.50 KG 1555.61
18.14 KG Cost of MS sheet 40.50 KG 734.67
10.79 KG Cost of MS flat 40.50 KG 437.00
49.20 KG Labour Charges for cutting&welding 1.95 KG 95.94
4 Nos. Parlimentary Hinges 150 mm 32.00 Nos. 128.00
2 Nos. Tower bolts 52.00 Nos. 104.00
1 Nos. Aldrop 48.00 Nos. 48.00
2 2
3.88 m Cost of priming coat red oxide 51.00 m 197.89
Labour charges for fixing of door with
18.14 kg frame (12.00 + 0.60) 12.60 Kg 228.56
LS Provision for conveyance to work site LS 5.32
2
Total for 1.89 M 3534.99
Rate for 1 m2 1870.17
Rate for 1 m2 1870.17
8) MDF DOOR SHUTTERS
Supplying & fixing door shutters for Medium Density Fiber Board of exterior grade
35mm thick, single leaf conforming to IS:12406/1989 with 35x12 mm T.W.Lipping
on all edges with necessary adhesives and CP screws complying with standard
specification. The rate is inclusive of three coats of best quality varnish but
including cost of furniture fittings. such as 125mm x 30mm Hinges 3 Nos, 300mm
tower bolt 2nos, 200mm tower bolt I no. 300mm Aldrop 1 No. Alu handle ornamental
type 2 Nos, and 1 No. Door stopper etc complete. consider a door shutters of size
MDF Bd IS: 12406/1989 exterior
2 2
2.52 M grade Door shutter 1775.00 M 4473.00
6.60 Rm T.W Lipping 35x12 mm thick 44.60 Rm 294.36
Sub Total 4767.36
1.00 No Alu door stopper 44.40 Each 44.40
2.00 Nos. 300mm long and 12mm dia 101.60 Each 203.20
1.00 No 200mm long and 12mm dia 64.05 Each 64.05
1.00 No 300mm Altrop and 16mm dia 183.70 Each 183.70
3.00 Nos. 125mm x 30mm hinges 69.85 Each 209.55
1.00 No Alu Handle Ornamental 150mm long 101.60 Each 101.60
cost of screws, nails, putty, fevicol,
varnish, colouring agent
Ls thinner etc., - 2% Ls 95.35
Conveyance charges to work site -
Ls 0.50% Ls 23.84

Steel Door Windows


SCMC CIVIL DATA 2018-2019
45
Sl.
Quantity Description Rate Per Amount Remarks
No
Labour wrought and putup in position
2 2
2.52 M for flush shutter 80.20 M 202.10
Total for 2.52 M2 5895.14
sundries 0.05
Total 5895.19
Rate for 1 m2 2339.00 say 2652.00

9) Supplying, fabricating and fixing in position of Alumi.Anod.natural colour matt finish


door half glazed and half PLB board using 12 mm thick PLB board and 5.5 mm thick
glazed door using rectangular Alu.Box section of following sizes for frame and
shutter with necessary accessories such as rubber beading, Al. Clips, Best double
action floor springs, Aluminium Handles on both sides,floor stopper,Tower bolt,
Locks and glass including all materials, Labour, power consemption charges required
for fabrication if necessary chipping, dismantling making necessary holes in RCC
Coloums, Beams or Masonry wherever necessary with power drill to the extent
required and made good to the original conditions after fixing etc.,complete.
The Alumi. surface must be anodised with matt finish under electrically controlled
condition in accordance with IS specification 1868 / 1962 of Anodic filthickness of
not less than 15 Microns (Fifteen) for all sections.All the materials should be got
approved by the Engineer - In -charge before fixing as directed.
Area of Door 2.10 sqm
1 Consider a frame
section:101.60x44.45x3.18mm@2.399
kg/m
Vertical Style 1 2 2.15 4.30
Horizontal piece 1 1 1.00 1.00
subtotal 5.30
subtotal in weight 12.71 Kg
2 Shutter Sections:-
Top & Middle = 50x 44.45 x 2.5 mm
@1.292 Kg/m
Bottom =100x 44.45x 2.5
mm @ 1.974 Kg/m
Vedrtical style =50 x 44.45 x 2.5
mm @ 1.292 Kg/m
MEASUREMENT DETAILS
Vertical style For shutter 1 2 2.06 4.11
Top & Middle 1 2 0.91 1.82
subtotal 5.93
subtotal in weight 7.66 Kg
Bottom 1 1 0.91 0.91
subtotal in weight 1.798 Kg
Clips of size 17.15 X 17.27 X 1.5 mm @
0.176 kg/m
(0.911-0.04445-0.04445=0.822) 2 4 0.82 6.58
(2.055-0.04445-0.04445-0.10=1.866) 2 2 1.87 7.46

Steel Door Windows


SCMC CIVIL DATA 2018-2019
46
Sl.
Quantity Description Rate Per Amount Remarks
No
subtotal 14.04
subtotal in weight 2.47 Kg
Handle Section size 100 x 30 mm @
0.988 kg/m 1 2 0.91 1.82
subtotal in weight 1.800 Kg
Door Frame 12.71 Kg
Vertical style Top & Middle 7.66 Kg
Bottom 1.80 Kg
Clips 2.47 Kg
Handle section 1.80 Kg
A Total Weight of Aluminium Section 26.44 Kg
B PVC FELT (2.06+0.82)X2 2 2.88 5.75 RM
2
C Patical Board size 12 mm thick 0.82 0.88 0.72 M
2
D Glass 5.5 mm thick size 0.82 0.98 0.81 M
E Rubber beading = (.822+.98)x2@0.2
kg/rm 2.00 1.80 0.72 Kg
MAIN DATA
Cost of Alu.Section with 15 micron (A)
26.4 Kg (Natural colour Matt finish 287.00 Kg 7588.28
PLB Board 12 mm thick Exterior Grade
0.72 sqm (Quotation)(OSL) board 459.54 sqm 330.87
0.81 sqm 5.5 mm thick Glass 336.00 sqm 272.16
8 Nos. Alu. "L" Angle(Quotation) 22.00 Nos. 176.00
0.72 Kg Rubber beading for Alu. Glazed door 35.50 Kg 25.56
32 Nos. 19mm x 8mm screws 1.15 Nos. 36.80
PVC FELT (PWD Local market rate -
5.75 RM 2013.14) 7.20 RM 41.40
Ls Wastage of Alu. @ 5 % Ls 386.02
Ls Wastage of Glass. @ 5 % Ls 15.68
Ls Wastage of P.L.B. @ 5 % Ls 16.54
Locking Arrangements (PWD Local
1 No. market rate - 2013.14) 251.00 No. 251.00
2 No. 150 mm length Tower Bolt 54.00 No. 108.00
1 No. Door Closer of ISI make 890.00 No. 890.00
5.5 No. Fitter I st Class 526.05 No. 2893.28
Door Stopper (PWD Local market rate
1 No. - 2013.14) 54.00 No. 54.00
2 Nos. Ornamental handle 101.60 Nos. 203.20
3 Nos. Butt Hinges 125mm x 30mm 69.85 Nos. 209.55
subtotal 13498.34
Provision for Conveyance, dismantling &
redoing the work T.W. Plugs
Ls Ls 6.40
scaffolding charges etc.,
Rate per 2.1 M2 13504.74
Rate for 1 m2 6431.00

Steel Door Windows


SCMC CIVIL DATA 2018-2019
47
Sl.
Quantity Description Rate Per Amount Remarks
No
10) Supplying, fabricating and fixing in position of Alumi.Anod.natural colour matt finish
door with fully PLB board 12 mm thick using rectangular Alu.Box section of
following sizes for frame and shutter with necessary accessories such as Al. Clips,
Best double action floor springs, Aluminium Handles on both sides,floor
stopper,Tower bolt, Locks and glass including all materials, Labour, power
consemption charges required for fabrication if necessary chipping, dismantling
making necessary holes in RCC Coloums, Beams or Masonry wherever necessary with
power drill to the extent required and made good to the original conditions
after fixing etc.,complete. The Alumi. surface must be anodised with matt finish
under electrically controlled condition in accordance with IS specification 1868 /
1962 of Anodic filthickness of not less than 15 Microns (Fifteen) for all sections.All
the materials should be got approved by the Engineer - In -charge before fixing
Area of Door 2.10 sqm
1 Consider a frame
section:101.60x44.45x3.18mm@2.399
kg/m
Vertical Style 1 2 2.15 4.30
Horizontal piece 1 1 1.00 1.00
subtotal 5.30
subtotal in weight 12.71 Kg
2 Shutter Sections:-
Top & Middle = 50x 44.45 x 2.5 mm
@1.292 Kg/m
Bottom =100x 44.45x 2.5
mm @ 1.974 Kg/m
Vedrtical style =50 x 44.45 x 2.5
mm @ 1.292 Kg/m
MEASUREMENT DETAILS
Vertical style For shutter 1 2 2.06 4.11
Top & Middle 1 2 0.91 1.82
subtotal 5.93
subtotal in weight 7.66 Kg
Bottom 1 1 0.91 0.91
subtotal in weight 1.798 Kg
Clips of size 17.15 X 17.27 X 1.5 mm @
0.176 kg/m
(0.911-0.04445-0.04445=0.822) 2 4 0.82 6.58
(2.055-0.04445-0.04445-0.10=1.866) 2 2 1.87 7.46
subtotal 14.04
subtotal in weight 2.47 Kg
Handle Section size 100 x 30 mm @
0.988 kg/m 1 2 0.91 1.82
subtotal in weight 1.800 Kg
Door Frame 12.71 Kg
Vertical style Top & Middle 7.66 Kg
Bottom 1.80 Kg

Steel Door Windows


SCMC CIVIL DATA 2018-2019
48
Sl.
Quantity Description Rate Per Amount Remarks
No
Clips 2.47 Kg
Handle section 1.80 Kg
A Total Weight of Aluminium Section 26.44 Kg
B PVC FELT (2.06+0.82)X2 2 2.88 5.75 RM
2
C Patical Board size 12 mm thick 0.82 1.86 1.53 M
MAIN DATA
Cost of Alu.Section with 15 micron (A)
26.4 Kg (Natural colour Matt finish 287.00 Kg 7588.28
PLB Board 12 mm thick Exterior Grade
1.53 sqm (Quotation)(OSL) board 459.54 sqm 703.10
8 Nos. Alu. "L" Angle(Quotation) 22.00 Nos. 176.00
32 Nos. 19mm x 8mm screws 1.15 Nos. 36.80
PVC FELT (PWD Local market rate -
5.75 RM 2013.14) 7.20 RM 41.40
Ls Wastage of Alu. @ 5 % Ls 386.02
Ls Wastage of P.L.B. @ 5 % Ls 42.74
Locking Arrangements (PWD Local
1 No. market rate - 2013.14) 251.00 No. 251.00
2 No. 150 mm length Tower Bolt 54.00 No. 108.00
1 No. Door Closer of ISI make 890.00 No. 890.00
5.5 No. Fitter I st Class 526.05 No. 2893.28
Door Stopper (PWD Local market rate
1 No. - 2013.14) 54.00 No. 54.00
2 Nos. Ornamental handle 101.60 Nos. 203.20
3 Nos. Butt Hinges 125mm x 30mm 69.85 Nos. 209.55
subtotal 13583.36
Provision for Conveyance, dismantling &
redoing the work T.W. Plugs
Ls Ls 4.48
scaffolding charges etc.,
Rate per 2.1 M2 13587.84
Rate for 1 m2 6470.00

Steel Door Windows


SCMC CIVIL DATA 2018-2019
49
Sl.
Quantity Description Rate Per Amount Remarks
No
11) Supplying, fabricating and fixing in position of Alumi.Anod.natural colour matt finish
door fully glazed using 5.5 mm thick using rectangular Alu.Box section of following
sizes for frame and shutter with necessary accessories such as rubber beading, Al.
Clips, Best double action floor springs, Aluminium Handles on both sides,floor
stopper,Tower bolt, Locks and glass including all materials, Labour, power
consemption charges required for fabrication if necessary chipping, dismantling
making necessary holes in RCC Coloums, Beams or Masonry wherever necessary with
power drill to the extent required and made good to the original conditions
after fixing etc.,complete. The Alumi. surface must be anodised with matt finish
under electrically controlled condition in accordance with IS specification 1868 /
1962 of Anodic filthickness of not less than 15 Microns (Fifteen) for all sections.All
the materials should be got approved by the Engineer - In -charge before fixing
Area of Door 2.10 sqm
1 Consider a frame
section:101.60x44.45x3.18mm@2.399
kg/m
Vertical Style 1 2 2.15 4.30
Horizontal piece 1 1 1.00 1.00
subtotal 5.30
subtotal in weight 12.71 Kg
2 Shutter Sections:-
Top & Middle = 50x 44.45 x 2.5 mm
@1.292 Kg/m
Bottom =100x 44.45x 2.5
mm @ 1.974 Kg/m
Vedrtical style =50 x 44.45 x 2.5
mm @ 1.292 Kg/m
MEASUREMENT DETAILS
Vertical style For shutter 1 2 2.06 4.11
Top & Middle 1 2 0.91 1.82
subtotal 5.93
subtotal in weight 7.66 Kg
Bottom 1 1 0.91 0.91
subtotal in weight 1.798 Kg
Clips of size 17.15 X 17.27 X 1.5 mm @
0.176 kg/m
(0.911-0.04445-0.04445=0.822) 2 4 0.82 6.58
(2.055-0.04445-0.04445-0.10=1.866) 2 2 1.87 7.46
subtotal 14.04
subtotal in weight 2.47 Kg
Handle Section size 100 x 30 mm @
0.988 kg/m 1 2 0.91 1.82
subtotal in weight 1.800 Kg

Steel Door Windows


SCMC CIVIL DATA 2018-2019
50
Sl.
Quantity Description Rate Per Amount Remarks
No
Door Frame 12.71 Kg
Vertical style Top & Middle 7.66 Kg
Bottom 1.80 Kg
Clips 2.47 Kg
Handle section 1.80 Kg
A Total Weight of Aluminium Section 26.44 Kg
B PVC FELT (2.06+0.82)X2 2 2.88 5.75 RM
2
C Glass 5.5 mm thick size 0.82 1.86 1.53 M
D Rubber beading = (.822+.98)x2@0.2
kg/rm 2.00 1.80 0.72 Kg
MAIN DATA
Cost of Alu.Section with 15 micron (A)
26.4 Kg (Natural colour Matt finish 287.00 Kg 7588.28
1.53 sqm 5.5 mm thick Glass 336.00 sqm 514.08
8 Nos. Alu. "L" Angle(Quotation) 22.00 Nos. 176.00
0.72 Kg Rubber beading for Alu. Glazed door 35.50 Kg 25.56
32 Nos. 19mm x 8mm screws 1.15 Nos. 36.80
PVC FELT (PWD Local market rate -
5.75 RM 2013.14) 7.20 RM 41.40
Ls Wastage of Alu. @ 5 % Ls 386.02
Ls Wastage of Glass. @ 5 % Ls 15.68
Locking Arrangements (PWD Local
1 No. market rate - 2013.14) 251.00 No. 251.00
2 No. 150 mm length Tower Bolt 54.00 No. 108.00
1 No. Door Closer of ISI make 890.00 No. 890.00
5.5 No. Fitter I st Class 526.05 No. 2893.28
Door Stopper (PWD Local market rate
1 No. - 2013.14) 54.00 No. 54.00
2 Nos. Ornamental handle 101.60 Nos. 203.20
3 Nos. Butt Hinges 125mm x 30mm 69.85 Nos. 209.55
subtotal 13392.86
Provision for Conveyance, dismantling &
redoing the work T.W. Plugs
Ls Ls 4.77
scaffolding charges etc.,
Rate per 2.1 M2 13397.63
Rate for 1 m2 6380.00

Steel Door Windows


SCMC CIVIL DATA 2018-2019
51
Sl.
Quantity Description Rate Per Amount Remarks
No
12) Aluminium Three Track window size 1.80 x 1.30m
Supplying and fabrication and fixing in position of anodised natural colour matt
finish sliding window in three track in all floors with following sizes. All the three
shutters with slinding arrangements, the bottom section should have Gutter
arrangements so as to drain the water entering and made with extruded aluminium
section for outer frames as shown below with necessary accessories such rubber
beading. Aluminium clips, rubber beading,handle and fixing 4mm thick clear sheet
glass including all required for fabrication etc., complete.Necessary dismantling
making holes in RCC columns, beams, masonry wherever necessary with power drill
to the extent required and made good to the original conditions after fixing as
directed by the departmental officers.The Al.Surfaces is to be anodised with matt
finish under electrically condition in accordance with ISI 1868/1962 specification
for an average anodic film thick of not less than 15 microns. (All materials should be
got approved by the Executive Engineer before fixing in position)
Frame:-
Bottom Track 92x38 @ 1.742 Kg / m.
Side and Top 92x31.5 mm @ 0.981 Kg /
m.
2
AREA OF SHUTTER 2.34 M
Shutter Sections:-
Bottom & Top 40x18 mm @ 0.38 Kg /
m.
Plain side vertical
40x18mm@0.38Kg/m.
Interlocking
vertical40x18mm@0.632Kg/m.
Detailed mesurement:-
Frame sections 1 1.80 1.742 3.136
Side & Top { 1.8+(2*1.3)} 1 4.40 0.981 4.316
Shutter Top &
Bottom 2 3.00 0.60 0.380 1.368
Plain side section 1 2.00 1.23 0.380 0.935
Interlocking section 1 4.00 1.23 0.632 3.109
subtotal 12.86
Glass required 1 3.00 0.60 1.17 2.11
" U" Rubber Beeding required
(3[0.60+1.17) x 2 1 3.00 3.54 10.62
SubTotal 2.12

Steel Door Windows


SCMC CIVIL DATA 2018-2019
52
Sl.
Quantity Description Rate Per Amount Remarks
No
MAIN DATA
Cost of Alu.Section with 15 micron (A)
12.9 Kg (Natural colour Matt finish 287.00 Kg 3690.82
2.11 sqm 4 mm thick Glass 284.00 sqm 599.24
Rubber beeding for window (PWD Local
2.12 RM market rate - 2013.14) 27.10 RM 57.45
Ls Wastage of Alu. @ 5 % Ls 184.54
Ls Wastage of Glass. @ 5 % Ls 29.96
5.50 No. Fitter I st Class 526.05 No. 2893.28
Lock, Wheel'L' Angle screws and pvc
Ls roller etc.,-10% Ls 375.51
conveyance, dismantling and redoing
Ls scasslting etc., Ls 78.21
3 No. Handle 100mm ornamental 56.10 No 168.30
2
Rate for 2.34 M 8077.40
2
Rate for 1 m 3451.88
13) Aluminium Two Track window size 1.20 x 1.30m
Supplying and fabrication and fixing in position of anodised natural colour matt
finish sliding window in two track in all floors with following sizes. All the three
shutters with slinding arrangements, the bottom section should have Gutter
arrangements so as to drain the water entering and made with extruded aluminium
section for outer frames as shown below with necessary accessories such rubber
beading. Aluminium clips, rubber beading,handle and fixing 4mm thick clear sheet
glass including all required for fabrication etc., complete.Necessary dismantling
making holes in RCC columns, beams, masonry wherever necessary with power drill
to the extent required and made good to the original conditions after fixing as
directed by the departmental officers.The Al.Surfaces is to be anodised with matt
finish under electrically condition in accordance with ISI 1868/1962 specification
for an average anodic film thick of not less than 15 microns. (All materials should be
got approved by the Executive Engineer before fixing in position)

Frame:-
Bottom Track .62x37 @ 1.218 Kg /
m.
Side and Top 62x31.5 mm @ 0.788 Kg /
m.
2
AREA OF SHUTTER 1.56 M
Shutter Sections:-
Bottom & Top 40x18 mm @ 0.38 Kg /
m.
Plain side vertical
40x18mm@0.38Kg/m.
Interlocking
vertical40x18mm@0.632Kg/m.

Steel Door Windows


SCMC CIVIL DATA 2018-2019
53
Sl.
Quantity Description Rate Per Amount Remarks
No
Detailed mesurement:-
Frame sections 1 1.00 1.20 1.218 1.462
Side & Top { 1.2+(2*1.3)} 1 3.80 0.788 2.994
Shutter Top & Bottom 1 4.00 0.60 0.380 0.912
Plain side section 1 2.00 1.23 0.380 0.935
Interlocking section 1 2.00 1.23 0.632 1.555
subtotal 7.858
Glass required 1 1.00 1.20 1.17 1.40
" U" Rubber Beeding required (1.17+0.6)
*4 1 4.00 1.77 7.08
SubTotal 1.42
MAIN DATA
Cost of Alu.Section with 15 micron (A)
7.858 Kg (Natural colour Matt finish 287.00 Kg 2255.25
1.40 sqm 4 mm thick Glass 284.00 sqm 397.60
Rubber beeding (PWD Local market
1.42 RM rate - 2013.14) 27.10 RM 38.48
Ls Wastage of Alu. @ 5 % Ls 114.73
Ls Wastage of Glass. @ 5 % Ls 19.88
4.50 No. Fitter I st Class 526.05 No. 2367.23
Ls Lock, Wheel'L' Angle screws etc., 10% Ls 229.45
conveyance, dismantling and redoing
Ls Ls 32.98
scasslting etc.,
2.00 No. Handle 100mm ornamental 56.10 No 112.20
Rate for 1.56 M2 5567.80
Rate for 1 m2 3569.10
14) Aluminium Openable Type window size 1.20 x 1.30m
Manufacturing, supplying and fixing in position of anodised natural colour matt
finish with openable type window with extruded Alu. sections with two pannels of
the folowing sizes with necessary accessories such as rubber beedings best quality
best quality of lock handle hinges, stays and fixing 4mm thick plain / frosted / pin
headed glass including cost of all materials, labour, electrical consumption required
for drilling holes in RCC columns, beams, masonry wherever necessary with power
drill to the extent required and made good to the original conditions after fixing as
directed by the departmental officers.The Al.Surfaces is to be anodised with matt
finish under electrically condition in accordance with ISI 1868/1962 specification
for an average anodic film thick of not less than 15 microns. (All materials should be
got approved by the Executive Engineer before fixing in position)
2
AREA OF SHUTTER 1.56 M
Frame:-
Aluminium section outer frame
38x32x21x2.4mm @ 0.615 Kg / m.

Steel Door Windows


SCMC CIVIL DATA 2018-2019
54
Sl.
Quantity Description Rate Per Amount Remarks
No
Shutter Sections:-
Bottom & Top 38.5x33x24.5x3&4mm @
0.706 Kg / m.
Interlocking vertical section
59x33x25x2.5mm @ 1.135 Kg/m.
Detailed mesurement:-
Outer frame vertical 1 2 1.30 0.615 1.60
Outer frame horizontal 1 2 1.20 0.615 1.48
shutter frame vertical 1 4 1.23 0.706 3.47
shutter frame horizontal 1 4 0.55 0.706 1.55
Interlocking Mullion 1 1 1.30 1.135 1.48
Glassing clip [1.164 + 0.484] x 2 2 1 3.30 0.101 0.67
subtotal 10.24 Kg
Rubber beeding 1 2 3.30 0.20 1.32 Kg
L' Angle 4.00 Nos
Glass 4mm thick (plain) (1.174x0.494) 2 1.17 0.49 1.16
0.80
MAIN DATA
Cost of Alu.Section with 15 micron (A)
10.24 Kg (Natural colour Matt finish 287.00 Kg 2938.88
1.16 sqm 4 mm thick Glass 284.00 sqm 329.44
Rubber beeding (PWD Local market
1.32 Kg rate - 2013.14) 27.10 Kg 35.77
Ls Wastage of Alu. @ 5 % Ls 146.94
Ls Wastage of Glass. @ 5 % Ls 16.47
4.50 No. Fitter I st Class 526.05 No. 2367.23
4.00 Nos. L'Angle Alu 22.00 No. 88.00
2.00 Nos. Hinges (I Max) 160.00 Ls 320.00

Handle 200mm
2.00 Nos. 56.50 Ls 113.00
2.00 Nos. 250mm Long stays 72.00 Ls 144.00
2
Rate for 1.56 M 6499.73
2
Rate for 1 m 4167.00

Steel Door Windows


SCMC CIVIL DATA 2018-2019
55
Sl.
Quantity Description Rate Per Amount Remarks
No
15) Aluminium Openable Type window (Three leaves) size 1.30 x 1.80m
Manufacturing, supplying and fixing in position of anodised natural colour matt
finish with openable type window with extruded Alu. sections with two pannels of
the folowing sizes with necessary accessories such as rubber beedings best quality
best quality of lock handle hinges, stays and fixing 4mm thick plain / frosted / pin
headed glass including cost of all materials, labour, electrical consumption required
for drilling holes in RCC columns, beams, masonry wherever necessary with power
drill to the extent required and made good to the original conditions after fixing as
directed by the departmental officers.The Al.Surfaces is to be anodised with matt
finish under electrically condition in accordance with ISI 1868/1962 specification
for an average anodic film thick of not less than 15 microns. (All materials should be
got approved by the Executive Engineer before fixing in position)
2
AREA OF SHUTTER 2.34 M
Frame:-
Aluminium section outer frame
38x32x21x2.4mm @ 0.615 Kg / m.
Shutter Sections:-
Bottom & Top 38.5x33x24.5x3&4mm @
0.706 Kg / m.
Interlocking vertical section
59x33x25x2.5mm @ 1.135 Kg/m.
Detailed mesurement:-
Outer frame vertical
(38x32x21x2.4mm @ 0.615 Kg / m.) 1 2 1.30 0.615 1.60
Outer frame horizontal
(38x32x21x2.4mm @ 0.615 Kg / m.) 1 2 1.80 0.615 2.21
Interlocking Mullion (59x33x25x2.5mm
@ 1.135 Kg/m.) 1 2 1.30 1.14 2.95
shutter frame vertical
(38.5x33x24.5x3&4mm @ 0.706 Kg /
m.) 3 2 1.23 0.706 5.21
do 3 2 0.57 0.706 2.41
Glassing clip [1.164 + 0.504] x 2 3 1 3.34 0.10 1.00
subtotal 15.39 Kg
Rubber beeding 3 1 3.34 0.20 2.00 Kg
L' Angle 12.00 Nos
Glass 4mm thick (plain) (1.174x0.514) 3 1.174 0.514 1.81

Steel Door Windows


SCMC CIVIL DATA 2018-2019
56
Sl.
Quantity Description Rate Per Amount Remarks
No
MAIN DATA
15.39 Kg Cost of Alu.Section 287.00 Kg 4416.93
Ls Wastage of Alu. @ 5 % Ls 220.85
1.81 sqm 4 mm thick Glass 284.00 sqm 514.04
Ls Wastage of Glass. @ 5 % Ls 25.70
Rubber beeding (PWD Local market
2.00 Kg rate - 2013.14) 27.10 Kg 54.20
6.00 No. Fitter I st Class 526.05 No. 3156.30
Sub total 8388.02
3.00 Nos. Hinges (I Max) 160.00 Ls 480.00

Handle 200mm
3.00 Nos. 56.50 Ls 169.50
3.00 Nos. 250mm Long stays 72.00 Ls 216.00
2
Rate for 2.34 M 9253.52
2
Rate for 1 m 3955.00
16) Louvered Ventilator
Supplying and fixing in position of Aluminium anodised colour matt finish Louvered
Ventilator. The outer frame will be 62 x 38 x 2mm @ 1.17 Kg/m and louvers with
moving arrangements will be made with Alu. channel of size 60 x 30 x 4mm @ 1.27
Kg/m with necessary glass pans for louvers 4mm thick Al. clips, including all
materials, labour & electrical consumption charges required for fabrication if
necessary chipping dismantling making holes in RCC columns, beams, masonry
wherever necessary with power drill to the extent required and made good to the
original conditions after fixing etc complete. The Al.Surfaces is to be anodised with
matt finish under electrically condition in accordance with ISI 1868/1962
specification for an average anodic film thick of not less than 15 microns. (All
materials should be got approved by the Executive Engineer before fixing in
2
AREA OF SHUTTER 0.54 M
Frame:-
Aluminium section 62 x 38 x 2mm @
1.17 Kg / m.
Alu. Channels for louvers 60 x 38 x
2mm @ 1.27 Kg / m.
Alu. Clips 19.05 x 17.27 x 11.05 x
0.075mm @ 0.169 Kg/m.
Detailed mesurement:-
Frame vertical 1 2 0.60 1.20
Frame horizontal 1 2 0.90 1.80
Sub total 3.00 3.52
Channel for louvers 1 2 0.52 1.27 1.32
Alu. Clips 2 2 0.52 0.169 0.35
subtotal 5.19 Kg
Glass to be fixed @ 50mm c/c 10 1.00 0.040 0.328 sqm
Alu. 'L' Angle 1 4.00 4.00 Nos

Steel Door Windows


SCMC CIVIL DATA 2018-2019
57
Sl.
Quantity Description Rate Per Amount Remarks
No
MAIN DATA
5.19 Kg Cost of Alu.Section 287.00 Kg 1489.53
Ls Wastage of Alu. @ 5 % Ls 74.48
0.33 sqm 4 mm thick Glass 284.00 sqm 93.72
Ls Wastage of Glass. @ 5 % Ls 4.69
4.00 Nos. Alu 'L'angle 22.00 No. 88.00
20.00 Nos. 19 x 8mm screw 1.15 No. 23.00
1.40 No. Fitter I st Class 526.05 No. 736.47
Provision for conveyance, dismantling &
redoing the work, TW plug, scaffolding
Ls charges etc Ls 12.60
2
Rate for 0.54 M 2522.48
2
Rate for 1 m 4671.00
17) N type ventilators :
Fabrication, Supply and fixing in position of 'N'' type ventilators using M.S. angle
of size 25x25x5 mm for frame and M.S. flat of size 20x3 mm for fixing the weld
mesh and using 25X 22X 3 MM ' T ' section for frame glass. Special type of Hold
fast welded to the frame of 45 degree inclined towards centre for wall and fixing
the weldmesh 25mm square including cost of 3mm thick pinheaded glass panes for
all panels and fixing the glass panels with necessary clips & putties with required
bolts,nuts and washers and one coat of red oxide primer etc., including necessary
dismantling,making holes in RCC columns, beams,masonry wherever necessary with
power drill to the extent required and made good to the original conditions after
Consider a Size of Ventilator 2.5 x 0.6 1.50 M2
L ' Angle 25x25x5 mm
Horizontal member 4 2.50 10.00
Vertical 4 0.35 1.40
Hold fast 4 0.15 0.60
subtotal 12.00 RM
Total weight of 'L'Angle @1.8 kg/rm 21.60 Kg
25 X 22 X 3 MM ' T 'Section
@1.03kg/rm 2 4 0.35 2.8
subtotal 2.88 Kg
M.S. Flat @0.5kg/rm 2 4 0.20 1.6
subtotal 0.80 Kg
Alround @0.5kg/rm 2.50 2 1.00 5.00 Kg
subtotal 2.50 Kg
Total 27.78 Kg
Weld mesh 2.50 0.20 0.50 M2
Glass 10 0.50 0.30 1.5 M2

Steel Door Windows


SCMC CIVIL DATA 2018-2019
58
Sl.
Quantity Description Rate Per Amount Remarks
No
MAIN DATA
27.78 Kg M.S. Angle & Flats 40.50 Kg 1125.09
0.50 sqm Weld mesh 7.5x2.5mm 10 gauge 290.00 sqm 145.00
1.50 sqm 3mm thick pinheaded Glass 210.00 sqm 315.00
Ls Wastage of material & glass 5% Ls 92.95
27.78 Kg Labour charges 1.95 Kg 54.10
subtotal 1,732.14
Conveyance, dismantling & redoing
charges etcFor putty , primer & glass
Ls pins Ls 137.18
Total for 1.50 M2 1,869.32
Rate for 1 m2 1246.00
18) Aluminium Partition
Supplying and fixing in position of Alu. Anodised Partition with 62x38x2mm
extruded box section at bottom vertical and horizontal members. The vertical
member are spaced at 90 cm c/c and to horizontal members are spaced at 1.2M,
2.1M and 2.4M height the bottom panels should be covered with 12mm thick PLB
exterior grade and the top and middle panels should be fixed at 4mm thick glass
with necessary glassing clips. Rubber beading, etc., including necessary dismantling
holes in RCC columns, beams masonry wherever necessary with power drill to the
extent required and made good to the original conditions after fixing as directed
by the departmental officer. All the Aluminium sections should be anodised to
1.5microns as per ISI specification 1868/1962 and should be got approved by the
Executive Engineer before use.
Consider Alu. Partition Size 6.30m x 15.12
2
2.40m M
Consider Alu. Section 62x38x2mm
@1.174 Kg/m
PLB exterion grade 12mm thick
Glass partition 4 mm thick
Alu. Clips 19.05 x 17.27 x 11.05 x 0.75
mm @ 0.169 Kg/m
Detailed mesurement:-
Vertical sections 1 8.00 2.44 19.52
Horizontal sections 4 1.00 6.30 25.20
44.72
Extra height 45.00 1.174 52.50 Kg.
Alu. Clips
Verticals 2 2 7.00 1.12 31.36
Verticals 2 2 7.00 0.86 24.08
Verticals 2 2 7.00 0.26 7.28
Horizontal 16 2 7.00 0.86 192.64
255.36
255.36 x 0.169 43.16
Total Aluminium section = 52.50 +
43.16 = 95.66 95.657 Kg.

Steel Door Windows


SCMC CIVIL DATA 2018-2019
59
Sl.
Quantity Description Rate Per Amount Remarks
No
2
PLB required 7 1.12 0.860 6.74 M
Glass required for partiotion 4 mm
thick 7 0.86 0.860 5.18
Glass required for partiotion 4 mm
thick 7 0.86 0.260 1.57
6.74
Rubber beeding required 7 3.44 24.08
Rubber beeding required 7 2.24 15.68
Sub total 39.76
Sub total 7.95 Rm
Alu. L angle required 12 7.00 84.00 No.
MAIN DATA
Cost of Alu.Section with 15 micron (A)
95.7 Kg (Natural colour Matt finish 287.00 Kg 27454.42
Ls Wastage of Alu. @ 5 % Ls 1396.64
6.74 sqm PLB required (Quotation) 459.54 sqm 3097.30
6.74 sqm 4 mm thick Glass 284.00 sqm 1914.16
Ls Wastage of Glass @ 5 % Ls 110.10
Rubber beeding (PWD Local market
7.95 Kg rate - 2011.12) 27.10 RM 215.45
84 No. Alu. L angle required (Quotation) 22.00 Each 1848.00
12.80 No. Fitter I st Class 526.05 No. 6733.44
conveyance, dismantling and redoing
Ls scantling etc., Ls 66.59
2
Rate for 15.12 M 42836.09
2
Rate for 1 m 2833.00
19) Wall Pannelling
Providing wall paneling butting to the wall and ceiling with new wall paneling in all
floors using Country wood scantlings of size 100x50mm for forming of grid of size
0.60m x 0.60 m. Country wood runners as stiffness using 50mm x 50mm for
required length spaced at 0.2m intervals on both directing and fixing to the exiting
wall portion and ceiling. Over the frame 12mm thick anti terminate water proofing
ply wood using nails etc., and adhesive pasting the 4mm thick veneer ply with
grooves using fevicol, nails. The rates inclusive of labour for wrought and put up and
two coat of best varnishing, neat finishing, fixing in position etc., and complete
complying with standard specification and as directed by the departmental
officers.
Consider Size 7.10 x 2.40 = 17.04 M
2
7.10 2.40 17.04
12mm Thick water proof Antitermite
ply 7.10 2.40 17.04
CW Scantling - Vertical 2.40 13.00 0.05 0.05 0.078
CW Scantling - Horizontal 7.10 5.00 0.05 0.05 0.089
0.167
4mm thick Venner Ply 7.10 2.40 17.04

Steel Door Windows


SCMC CIVIL DATA 2018-2019
60
Sl.
Quantity Description Rate Per Amount Remarks
No
MAIN DATA
3 3
0.167 M CW Scantling 32751 M 5469.42 PWD rate
12mm Thick water proof Antitermite
17.04 sqm ply 628.33 sqm 10706.74 Quotation
Ls Wastage @ 5 % Ls 535.34
17.04 sqm 4mm thick Venner Ply 1183.00 sqm 20158.32 Quotation
Ls Wastage @ 5 % Ls 1007.90
17.04 sqm Matt finish using sprayer system 360.00 sqm 6134.40 Quotation
2 Kg Fevicol 175.00 Kg 350.00 Quotation
84 No. Screws 2.00 Each 168.00
17 sqm Labour charges for shutter 606.17 sqm 10329.14 PWD rate
14.20 Rm 25 x 12mm TW Beeding 24.20 Rm 343.64 PWD rate
Ls conveyance, sundries etc., 2% Ls 60.09
2
Rate for 17.04 M 55262.99
2
Rate for 1 m 3243.00
20) Supplying of holdfast of MS flat of overall size of 330mm x 50mm x 6mm suitably
folded to the required 'l' shape have two end flap of 50mm long each and the over
all length of the horizontal portion as 230mm and including making necessary
grooves in two end to accommodate screws etc complete
Consider one holdfast of total length
of 2"+9"+2"
Total weight= 0.33 x 2.40Kg/m 0.792 Kg
MAIN DATA
0.79 Kg Cost of MS flat 40.50 Kg 32.08
Add for folding the flat, drilling holes,
Ls screws Ls 2.92
Rate for Each = Rs. 35.00

Steel Door Windows


SCMC CIVIL DATA 2018-2019
61
SI.
Quantity Description of work Rate per AMOUNT DETAILS
No
1) Supplying and fixing in position of FALSE CEILING
ARRANGEMTNS with aluminium anodised T section
and L angle frame work of grid size 60x60cm with
aluminium T section and L angle of size 25x25x2mm
thick and the same is supported at suitable intervals
adjustable type 6mm dia MS road with suitable
threaded nuts suspended roads hung from celing at
100cm c/c in both directions and fixing
60x60cm10mm thick Zib board in grid so as to give a
seat to false ceiling including painting the 6 mm dia
MS road etc complete complying with standard
specification necessary opening and arrangments for
fixing electrical fittings should be provided with
suitable frame work etc complete
Alu L angle section 25x25x2mm at 0.272 kg/m
Alu . T section 25x25x2.80mm at 0.37kg/m
Grid size 100GS x 50cm
6MM rod = 60cm length
Zib board = 20mm
alu L section required 1x1 1 2 2.00
1x1 1 2 2.00
Total 4.00 4.90 kg
alu T section required 1x1 1 2 2.00
1x1 1 11 11.00
Total 13.00 16.65 kg
Total weight of alu Section 21.55 kg
6mm MS roads 1x1 7 4 28.00
Total 28.00 3.70 kg
Zib board - 20mm thick 1x1 6 3 18.00
Total 18.00 18 M2
Cost of Alu.Section with 15 micron (A) (Natural colour
21.55 kg 287.00 KG 6184.85
Matt finish
Wastage 10% on cost of aluminium section 618.49
3.7 kg Cost of 6mm Ms rod 44.19 KG 163.50
Wastage 5% on cost of 16.35
Cost of Zib board 10 mm plain (PWD SR 2013.14)
18 m2 817.00 M2 14706.00
including erecting and fixing
Wastage 10% on cost zib 1470.60
28 Nos cost of adjustable screws 1.50 Each 42.00
28 Nos cost of ms hooks 2.50 Each 70.00
4 Nos Fitter I class 526.05 Each 2104.20
1 Nos Carpenter I Class 582.75 Each 582.75
3 Nos Maz door I Class 372.75 Each 1118.25
Provision for conveyance , dismantling and redoring
Ls 628.83
the work, TW plug scaffolding charges etc
TOTAL FOR 18 M2 27705.82
TOTAL FOR 1 M2 1539.00

F.Ceiling
SCMC CIVIL DATA 2018-2019
62
ROOFING

1) Roofing with AC fully corrugated sheet grey 6mm thick with necessary bolts nuts and washers
etc., completed with ridges - 1m2
1 2 3 4 5 6
11 m2 Cost of AC fully corrugated sheet 175.50 1 m2 1930.50
Cost of J bolts and nuts 20 Nos with bitumen
20.00 Nos 4.80 Each 96.00
washers (3.60 + 1.20)
2.20 Nos Fitter II Class 490.35 Each 1078.77
1.10 Nos Carpentar I Class 582.75 Each 641.03
3.20 Nos Mazdoor C - I 372.75 Each 1192.80
Sundries for white lead and lead for AC
LS LS 0.53
sheet
2
Total for 10 M 4939.63
2
Rate for 1 M = Rs. 494.00

2) Roofing with plain GI sheet 1.65mm thick with necessary bolts nuts and washers etc.,
completed with ridges - 1m2
1 2 3 4 5 6
11 m2 Cost of GI sheet roof 338.00 1 m2 3718.00
Cost of J bolts and nuts 20 Nos with bitumen
20.00 Nos 4.80 Each 96.00
washers (3.60 + 1.20)
2.20 Nos Fitter II Class 490.35 Each 1078.77
1.10 Nos Carpentar I Class 582.75 Each 641.03
3.20 Nos Mazdoor C - I 372.75 Each 1192.80
Sundries for white lead and lead for AC
LS LS 0.43
sheet
2
Total for 10 M 6727.03
2
Rate for 1 M = Rs. 673.00

3) Roofing with Pre painted Galavalume sheet 0.47mm thick with necessary bolt and nuts and
washers including allmaterials and labour charges etc complete - 10m2

1 2 3 4 5 6
11 m2 Cost of Galavalume sheet 271.00 1 m2 2981.00
Cost of J bolts and nuts 20 Nos with bitumen
20.00 Nos 4.80 Each 96.00
washers (3.60 + 1.20)
2.20 Nos Fitter II Class 490.35 Each 1078.77
1.10 Nos Carpentar I Class 582.75 Each 641.03
3.20 Nos Mazdoor C - I 372.75 Each 1192.80
Sundries for white lead and lead for Galvanium
LS LS 0.43
sheet
2
Total for 10 M 5990.03
2
Rate for 1 M = Rs. 599.00

Roofing
SCMC CIVIL DATA 2018-2019
63
4) Finishing the top with one course of pressed tiles of size 20cm x 20cm x 20mm size laid in cm
1:3 mix mixed with water proofing compound as per Indian standard 2% by weight of cement
used and pointed with the same mortar etc., complete - 10m2
Sub Data
1 2 3 4 5 6
0.04 m3 Cement mortar 1:3 mix 3533.80 1 m3 141.35
2.20 Nos Mason II - Class 533.40 Each 1173.48
0.50 Nos Mazdoor C - I 372.75 Each 186.38
1.10 Nos Mazdoor C - II 336.00 Each 369.60
LS Sundries LS 0.99
2
Total for 10 M 1871.80
Main Data
Supply of pressed tiles at site - 20cm x 20cm x
250 Nos 10508.20 1000 Nos 2627.05
20mm
0.12 m3 Cement mortar 1:3 mix 3533.80 1 m3 424.06
1.152 Kg Water proofing compound 39.60 1 Kg 45.62

10 m2 Rate for pointing with CM 1:3 mix as per SI 1871.80 10 m2 1871.80

1.10 Nos Mason I - Class 595.35 Each 654.89


2.10 Nos Mason II - Class 533.40 Each 1120.14
2.20 Nos Mazdoor C - I 372.75 Each 820.05
1.10 Nos Mazdoor C - II 336.00 Each 369.60
LS Sundries LS 0.98
2
Total for 10 M 7934.18
2
Rate for 1 M = Rs. 794.00
2
Cement : 76.80 Kg /10 m

5) Weathering course with concrete broken brick jelly 20mm size in pure slaked lime (no sand to
be used) over RCC roof slab the proportion of broken brick jelly to lime being 32:12.5 well
beaten with wooden beaters giving required slopes and thickness etc., complete - 10m 2
(Detailed data for 1 m3)
1 2 3 4 5 6
3 3
12.8 m Supply of 20mm gauge brick jelly at site 1007.80 1 m 12899.84
5.00 m3 Supply of slaked lime at site 965.20 1 m3 4826.00
1.80 Nos Mason I - Class 595.35 Each 1071.63
17.70 Nos Mazdoor C - I 372.75 Each 6597.68
14.10 Nos Mazdoor C - II 336.00 Each 4737.60
LS Sundries LS 0.94
3
Total for 10 M 30133.69
3
Rate for 1 M = Rs. 3013.00

Roofing
SCMC CIVIL DATA 2018-2019
64
6) Providing through vertical joint with 15mm space filed with bituminous compound running from
bottom of foundation upto the top of parapet wall as directed - 10m 2
1 2 3 4 5 6
3 3
0.16 m Cement mortar 1:3 mix (15mm thick) 3533.80 1 m 565.41
1.50 Nos Mason I - Class 595.35 Each 893.03
0.50 Nos Mazdoor C - I 372.75 Each 186.38
1.90 Nos Mazdoor C - II 336.00 Each 638.40
10.00 m2 Bituminous compound 15mm thick pad 445.00 1 m2 4450.00
LS Sundries LS 0.05
2
Total for 10 M 6733.26
2
Rate for 1 M = Rs. 673.00
7) Providing through vertical joint from bottom of foundatoin to top of parapet wall by building one
abutting face vertical and plastering the same with cement mortar 1:3 mix, 20mm thick first
coat and lime mortar 1:2 mix using shell lime for second coat of plastering 6mm thick the
abutting face being built carefully without damage to the plaster and neatly packed with mortar
the joint to be dead vertical - 10m2
1 2 3 4 5 6
0.21 m3 Cement mortar 1:3 mix 3533.80 1 m3 742.10
0.08 m3 Lime mortar 1:2 mix 1513.80 1 m3 121.10
2.70 Nos Mason I - Class 595.35 Each 1607.45
0.50 Nos Mazdoor C - I 372.75 Each 186.38
3.50 Nos Mazdoor C - II 336.00 Each 1176.00
Extra for careful wash and time lags between
LS LS 0.17
two plasterings
2
Total for 10 M 3833.19
2
Rate for 1 M = Rs. 383.00

8) Roofing with FRB sheet white or colour 0.047mm, width 1.060m thick with necessary bolts nuts
and washers etc., completed - 1m2
1 2 3 4 5 6
11 m2 Cost of FRB sheet white or colour 634.00 1 m2 6974.00
Cost of J bolts and nuts 20 Nos with bitumen
20.00 Nos 4.80 Each 96.00
washers (3.60 + 1.20)
2.20 Nos Fitter II Class 490.35 Each 1078.77
1.10 Nos Carpentar I Class 582.75 Each 641.03
3.20 Nos Mazdoor C - I 372.75 Each 1192.80
Sundries for white lead and lead for AC
LS LS 0.63
sheet
2
Total for 10 M 9983.23
2
Rate for 1 M = Rs. 998.00

Roofing
SCMC CIVIL DATA 2018-2019
65
PLASTERING
1) Plastering with Cement mortar 1:2 mix, 12mm thick - 1 m 2
1 2 3 4 5 6
3 3
0.14 m Cement mortar 1:2 mix 4861.00 1m 680.54
1.10 Nos Mason I - Class 595.35 Each 654.89
0.50 Nos Mazdoor - C - I 372.75 Each 186.38
1.10 Nos Mazdoor - C - II 336.00 Each 369.60
LS Sundries LS 0.05
2
Total for 10 M 1891.46
2
Rate for 1 M = Rs. 189.00

2) Plastering with cement mortar 1:3 mix, 12mm thick - 1 m 2


1 2 3 4 5 6
0.14 m3 Cement mortar 1:3 mix 3533.80 1 m3 494.73
1.10 Nos Mason I - Class 595.35 Each 654.89
0.50 Nos Mazdoor - C - I 372.75 Each 186.38
1.10 Nos Mazdoor - C - II 336.00 Each 369.60
LS Sundries LS 0.01
2
Total for 10 M 1705.61
2
Rate for 1 M = Rs. 171.00
2
Cement : 67.20 Kg /10 m

3) Plastering with cement mortar 1:3 mix, 20mm thick - 1 m 2


1 2 3 4 5 6
0.22 m3 Cement mortar 1:3 mix 3533.80 1 m3 777.43
2.20 Nos Mason I - Class 595.35 Each 1309.77
0.50 Nos Mazdoor - C - I 372.75 Each 186.38
3.20 Nos Mazdoor - C - II 336.00 Each 1075.20
LS Sundries LS 0.02
2
Total for 10 M 3348.80
2
Rate for 1 M = Rs. 335.00
2
Cement : 105.60 Kg /10 m

4) Plastering with cement mortar 1:4 mix, 12mm thick - 1 m 2


1 2 3 4 5 6
0.14 m3 Cement mortar 1:4 mix 2870.20 1 m3 401.83
1.10 Nos Mason I - Class 595.35 Each 654.89
0.50 Nos Mazdoor - C - I 372.75 Each 186.38
1.10 Nos Mazdoor - C - II 336.00 Each 369.60
LS Sundries LS 0.04
2
Total for 10 M 1612.74
2
Rate for 1 M = Rs. 161.00
2
Cement : 50.40 Kg /10 m
Plastering
SCMC CIVIL DATA 2018-2019
66
5) Special Ceiling Plastering for RC slabs and beams with cement mortar 1:3 mix 10mm thick
including hacking etc., complete 10 m2
1 2 3 4 5 6
0.1 m3 Cement Mortar 1:3 mix 3533.80 1 m3 353.38

1.1 Nos Mason I Class 595.35 Each 654.89


Mazdoor (including for hacking the area) -
1.1 Nos 372.75 Each 410.03
CI
1.1 Nos Mazdoor C II 336.00 Each 369.60
LS Sundries LS 0.03
2
Total for 10 M 1787.93
2
Rate for 1 M 179.00
2
Cement 48.00 Kg / m

6) Plastering with cement mortar 1:5 mix, 12mm thick - 1 m 2


1 2 3 4 5 6
3 3
0.14 m Cement mortar 1:5 mix 2472.00 1m 346.08
1.10 Nos Mason I - Class 595.35 Each 654.89
0.50 Nos Mazdoor - C - I 372.75 Each 186.38
1.10 Nos Mazdoor - C - II 336.00 Each 369.60
LS Sundries LS 0.04
2
Total for 10 M 1556.99
2
Rate for 1 M = Rs. 156.00
2
Cement : 40.32 Kg /10 m

7) Strucco plastering 12mm thick using HBBG chips of size 10mm and below over a base
2
plastering with cement mortar 1:5 mix, 12mm thick - 1 m
1 2 3 4 5 6
Rate for plastering with CM 1:5 mix, 12mm
10 m2 156.00 1 m2 1559.99
thick
Supply of below 10mm size granite chips at
0.15 m3 979.20 1 m3 146.88
site
72 Kg Supply of cement at site 5530.00 1 MT 398.16
14.5 Kg Supply of cement at site for slurry 5530.00 1 MT 80.19
1.60 Nos Mason I - Class 595.35 Each 952.56
0.50 Nos Mazdoor - C - I 372.75 Each 186.38
1.10 Nos Mazdoor - C - II 336.00 Each 369.60
LS Sundries LS 0.03
2
Total for 10 M 3693.78
2
Rate for 1 M = Rs. 369.00
2
Cement : 126.82 Kg /10 m

Plastering
SCMC CIVIL DATA 2018-2019
67
WHITE WASHING AND COLOUR WASHING
1) White washing one coat using best shell lime - 1 m 2 (Detailed data for 100 m2 )
1 2 3 4 5 6
3 3
0.05 m Supply of fine shell lime at site 1294.20 1 m 64.71
Gum, conjee water or prickly pear juice
LS LS 7.00
including necessary fire wood
1.1 Nos Mason II - Class 533.40 Each 586.74
0.30 Nos Mazdoor - C - I 372.75 Each 111.83
1.90 Nos Mazdoor - C - II 336.00 Each 638.40
LS Sundries LS 1.59
2
Total for 100 M 1410.27
2
Rate for 1 M = Rs. 14.00

2) White washing two coat using best shell lime - 1 m 2


1 2 3 4 5 6
0.07 m3 Supply of fine shell lime at site 1294.20 1 m3 90.59
Gum, conjee water or prickly pear juice
LS LS 7.00
including necessary fire wood
1.6 Nos Mason II - Class 533.40 Each 853.44
0.50 Nos Mazdoor - C - I 372.75 Each 186.38
2.70 Nos Mazdoor - C - II 336.00 Each 907.20
LS Sundries LS 0.65
2
Total for 100 M 2045.26
2
Rate for 1 M = Rs. 21.00

3) Colour washing one coat using best shell lime - 1 m 2


1 2 3 4 5 6
10 m2 Rate for white washing one coat 14.00 1 m2 140.03
ADD : Extra 50% of above for Colouring
LS LS 70.01
pigments sundries
2
Total for 10 M 210.04
2
Rate for 1 M = Rs. 21.00

4) Colour washing two coat with approved Colour using best shell lime - 1 m 2

1 2 3 4 5 6
10 m2 Rate for white washing two coat 21.00 1 m2 210.03
ADD : Extra 50% of above for Colouring
LS LS 105.01
pigments sundries
2
Total for 10 M 315.04
2
Rate for 1 M = Rs. 32.00

W-Colour
SCMC CIVIL DATA 2018-2019
68
5) Colour washing one coat of approved Colour over a coat of white washing using best shell
lime - 1 m2
1 2 3 4 5 6
10 m2 Rate for white washing two coat 21.00 1 m2 210.03
10 m2 Rate for white washing one coat 14.00 1 m2 140.03
2 2
10 m Difference for white washing 2nd coat 7.00 1 m 70.00
2 2
10 m Add : 50% for Colour pigments 3.50 1 m 35.00
10 m2 Rate for one coat of Colour washing 21.00 1 m2 210.09
2 2
10 m Rate for one coat of white washing 14.00 1 m 140.03
LS Sundries LS 0.50
2
Total for 10 M 805.67
2
Rate for 1 M = Rs. 81.00

W-Colour
SCMC CIVIL DATA 2018-2019
69
DISTEMPERING

1) Distempering one coat with oil bound distemper of approved Colour - 1 m 2

1 2 3 4 5 6
0.8 Kg Cost of distemper 78.90 1 Kg 63.12
0.25 Nos Painter I - Class 476.70 Each 119.18
0.25 Nos Mazdoor - C - I 372.75 Each 93.19
0.40 Nos Mazdoor - C - II 336.00 Each 134.40
LS Sundries for brushes etc., LS 0.16
2
Total for 10 M 410.04
2
Rate for 1 M 41.00

2) Distempering two coats with oil bound distemper of approved Colour - 1 m 2

1 2 3 4 5 6
1.34 Kg Cost of distemper 78.90 1 Kg 105.73
0.5 Nos Painter I - Class 476.70 Each 238.35
0.5 Nos Mazdoor - C - I 372.75 Each 186.38
0.8 Nos Mazdoor - C - II 336.00 Each 268.80
LS Sundries for brushes etc., LS 0.14
2
Total for 10 M 799.39
2
Rate for 1 M = Rs. 80.00

Distembering
SCMC CIVIL DATA 2018-2019
70
1) Painting with best synthetic enamel paint of approved Colour and high quality one / two coats to old / new iron works

One Coat Two coat


Sl. Rate Per New iron work Old iron work New iron work Old iron work
Description
No Amount Amount Amount Amount
Qty Qty Qty Qty
(Rs.) (Rs.) (Rs.) (Rs.) (Rs.)
1 Cost of paint 211.00 1 Lit 1.33 Lit 280.63 1.11 Lit 234.21 2.20 Lit 464.20 1.89 Lit 398.79

2 Painter I - Class 476.70 Each 0.70 Nos 333.69 0.70 Nos 333.69 1.10 Nos 524.37 1.10 Nos 524.37
Sundries including brush, soap
3 LS 5.5 LS 5.93 LS 5.14 LS 3.82
putty etc., complete

Total for 10 m2 619.82 573.83 993.71 926.99

Rate for 1 m2 62.00 57.00 99.00 93.00

2) Painting with best synthetic enamel paint of approved Colour and high quality one / two coats to old / new wood works

One Coat Two coat


Sl. Rate Per New wood work Old wood work New wood work Old wood work
Description
No Amount Amount Amount Amount
Qty Qty Qty Qty
(Rs.) (Rs.) (Rs.) (Rs.) (Rs.)
1 Cost of paint 221.00 1 Lit 1.44 Lit 318.24 1.33 Lit 293.93 2.55 Lit 563.55 2.22 Lit 490.62

2 Painter I - Class 476.70 Each 0.70 Nos 333.69 0.70 Nos 333.69 1.20 Nos 572.04 1.20 Nos 572.04
Sundries including brush, soap
3 LS 4.74 LS 4.69 LS 4.86 LS 4.72
putty etc., complete

Total for 10 m2 656.67 632.31 1140.45 1067.38

Rate for 1 m2 66.00 63.00 114.00 107.00

Painting-1
SCMC CIVIL DATA 2018-2019
71
PAINTING

1) Painting priming coat on new wood work :


Sl.No. Qty Descriptionof work Rate Per Amount
1 2 3 4 5 6
1.44 Lit Cost of wood primer 136.50 1 Litre 196.56

0.7 Nos Painter - I - Class 476.70 Each 333.69

LS Sundries for brushes, soap putty etc., LS 2.92

Total for 10 M2 533.17

Rate for 1 M2 = Rs. 53.00

2
2) Painting priming coat on new iron work - 1 m

1 2 3 4 5 6
1.33 Lit Cost of red oxide 126.70 1 Litre 168.51

0.7 Nos Painter - I - Class 476.70 Each 333.69

LS Sundries for brushes, soap putty etc., LS 2.12

Total for 10 M2 504.33

Rate for 1 M2 = Rs. 51.00

2
3) Painting with aluminium paint one coat to iron works - 1 m

1 2 3 4 5 6
0.5 Lit Cost of aluminium paint 341.00 1 Litre 170.50

0.7 Nos Painter - I - Class 476.70 Each 333.69

LS . LS 2.70

Total for 10 M2 506.89

Rate for 1 M2 = Rs. 51.00

2
4) Painting with aluminium paint two coats to iron works - 1 m

1 2 3 4 5 6
1 Lit Cost of aluminium paint 341.00 1 Litre 341.00

1.2 Nos Painter - I - Class 476.70 Each 572.04

LS Sundries for brushes, soap putty etc., LS 2.78

Total for 10 M2 915.82

Rate for 1 M2 = Rs. 92.00

Painting-2
SCMC CIVIL DATA 2018-2019
72
2
5) Painting with black board paint one coat - 1 m

1 2 3 4 5 6
1.33 Lit Cost of black board paint 264.00 1 Litre 351.12

0.7 Nos Painter - I - Class 476.70 Each 333.69

LS Sundries for brushes, soap putty etc., LS 2.38

Total for 10 M2 687.19

Rate for 1 M2 = Rs. 69.00

2
6) Painting with black board paint two coats - 1 m

1 2 3 4 5 6
2.55 Lit Cost of black board paint 264.00 1 Litre 673.20

1.2 Nos Painter - I - Class 476.70 Each 572.04

LS Sundries for brushes, soap putty etc., LS 2.58

Total for 10 M2 1247.82

Rate for 1 M2 = Rs. 125.00

7) Painting two coats with ready mixed plastic emulsion paint of 1st class quality and of
approved color over a priming coat including through scraping clean removal of dirt etc.,
2
complete and including necessary plaster of paris putty wherever required - 1 m

1 2 3 4 5 6
1.4 Lit Cost of plastic emulsion paint 274.00 1 Litre 383.60
0.98 Lit Cost of primer 136.50 1 Litre 133.77
2.20 Nos Painter - I - Class 476.70 Each 1048.74
Sundries for brushes, sand paper, plaster
LS LS 3.25
of paris etc.,
Total for 10 M2 1569.36
Rate for 1 M = Rs. 157.00
2

8) Painting one coat with ready mixed plastic emulsion paint of 1st class quality and of
approved color over old surface including clean removal of dirt, plaster, of paris and putty
2
wherever required - 1 m
1 2 3 4 5 6
0.98 Lit Cost of plastic emulsion paint 274.00 1 Litre 268.52
0.7 Nos Painter - I - Class 476.70 Each 333.69
Sundries for brushes, sand paper, plaster
LS LS 3.77
of paris etc.,
Total for 10 M2 605.99
2
Rate for 1 M = Rs. 61.00

Painting-2
SCMC CIVIL DATA 2018-2019
73
9) Painting two coats with approved cement paint over cement plastered surface ceiling
and other new surface including cleaning prepering the surface and curing etc.,
2
complete - 1 m
1 2 3 4 5 6
Rate for cleaning the plastered surface
10 m2 4.73 1 m2 47.22
SI
0.5 Nos Painter - I - Class 476.70 Each 238.35
3.23 Kg Cost of cement paint 46.20 1 Kg 149.23
0.5 Nos Mazdoor - C - I 372.75 Each 186.38
0.8 Nos Mazdoor - C - II 336.00 Each 268.80
LS Sundries for brushes etc., LS 3.89
Total for 10 M2 893.87
Rate for 1 M2 = Rs. 89.00

10) Painting one coat with approved cement paint over old surface including cleaning and curing
2
etc., complete - 1 m
1 2 3 4 5 6
1.94 Kg Cost of cement paint 46.20 1 Kg 89.63
0.25 Nos Painter - I - Class 476.70 Each 119.18
0.25 Nos Mazdoor - C - I 372.75 Each 93.19
0.40 Nos Mazdoor - C - II 336.00 Each 134.40
LS Sundries for brushes etc., LS 3.67
Total for 10 M2 440.05
2
Rate for 1 M = Rs. 44.00

11) Painting new wood work with two finishing coats of synthetic enamel ready mixed paint of
approved quality and colour over one coat priming coat in all floors including the cost of
primer etc., complete complying with standard specification (The make, quality and colour of
2
paint should be got approved) - 1 m
1 2 3 4 5 6
1.00 m2 Wood work Priming coat 53.00 1 m2 53.00
1.00 m2 Ready mixed paint for wood work 114.00 1 m2 114.00
Total 166.99
Rate for 1 M = Rs. 167.00
2

12) Painting new iron work with two finishing coats of synthetic enamel ready mixed paint of
approved quality and colour over one coat priming coat in all floors including the cost of
primer etc., complete complying with standard specification (The make, quality and colour of
2
paint should be got approved) - 1 m
1 2 3 4 5 6
1.00 m2 Iron work Priming coat 51.00 1 m2 51.00
1.00 m2 Ready mixed paint for Iron work 99.00 1 m2 99.00
Total 150.00
Rate for 1 M = Rs. 150.00
2

Painting-2
SCMC CIVIL DATA 2018-2019
74
VARNISHING
1) Best varnishing to wood work one coat - 1 m2
1 2 3 4 5 6
0.77 Lit Cost of best varnish 251.90 1 Litre 193.96
0.6 Lit Cost of linseed oil boiled 62.00 1 Litre 37.20
0.7 Nos Mazdoor - C - I 372.75 Each 260.93
0.7 Nos Painter - I - Class 476.70 Each 333.69
LS Sundries including brushes etc., LS 2.00
2
Total for 10 M 827.78
2
Rate for 1 M = Rs. 83.00

2) Best varnishing to wood work two coats - 1 m2


1 2 3 4 5 6
1.2 Lit Cost of best varnish 251.90 1 Litre 302.28
0.6 Lit Cost of linseed oil boiled 62.00 1 Litre 37.20
1.1 Nos Mazdoor - C - I 372.75 Each 410.03
1.1 Nos Painter - I - Class 476.70 Each 524.37
LS Sundries including brushes etc., LS 2.21
2
Total for 10 M 1276.09
2
Rate for 1 M = Rs. 128.00

Varnish
SCMC CIVIL DATA 2018-2019
75
POLISHING

1) Best Lac polishing one coat to old work - 1 m2


1 2 3 4 5 6
1 Lit Cost of Lac polish 245.00 1 Litre 245.00
0.7 Nos Painter - I - Class 476.70 Each 333.69
0.7 Nos Mazdoor - C - I 372.75 Each 260.93
Sundries including brushes sand paper glue
LS LS 5.05
bees wax, turpentine etc.,
Total for 10 M2 844.67
Rate for 1 M2 = Rs. 85.00

2) Best Lac polishing two coats to new work - 1 m2

1 2 3 4 5 6
1.6 Lit Cost of Lac polish 245.00 1 Litre 392.00
0.7 Nos Painter - I - Class 476.70 Each 333.69
1.1 Nos Mazdoor - C - I 372.75 Each 410.03
Sundries including brushes sand paper glue
LS LS 5.10
bees wax, turpentine etc.,
Total for 10 M2 1140.82
2
Rate for 1 M = Rs. 114.00

Polish
SCMC CIVIL DATA 2018-2019
76
MISCELLANEOUS

1) Supplying and fixing 100mm dia Asbestos Cement rain water down fall pipe including cost of
100mm dia asbestos cement pipe, shoe, bond, brackets, teakwood plugs, etc.,
complete - 1 m2
1 2 3 4 5 6
Detailed data for 3 RM
3 RM 100mm dia Asbestos cement pipe 133.30 3 RM 133.30
1 No 100mm dia Asbestos cement shoe 42.30 Each 42.30
1 No 100mm dia Asbestos cement plain bend 48.40 Each 48.40
2 Nos Clamp (iron) 11.40 Each 22.80
4 Nos Teakwood plugs & screws 8.40 Each 33.60
1 No Plumber for fixing the pipe 517.65 Each 517.65
LS Sundries LS 1.60
Total for 3 RM 799.65
Rate for 1 RM = Rs. 267.00

2) Supplying and fixing 110mm dia PVC rain water down fall pipe including cost of pipe, shoe,
bond, brackets, teakwood plugs, etc., complete - 1 m2
1 2 3 4 5 6
Detailed data for 3 RM
3 RM 110mm dia PVC pipe 4ksc 164.60 1 RM 493.80
0.29 No 110mm dia PVC shoe (3m/10.5) 6ksc 77.80 Each 22.56
0.29 No 110mm dia PVC bend 4ksc 116.70 Each 33.84
0.29 Nos CI grating (3m / 10.50) 29.80 Each 8.64
2 Nos PVC clamp 7.90 Each 15.80
1 No Plumber I class 517.65 Each 517.65
LS Sundries for adhesive LS 0.10
Total for 3 RM 1092.40
Rate for 1 RM = Rs. 364.00

Miscelleneous
SCMC CIVIL DATA 2018-2019
77
3 a) Laying and jointing SW pipes of the following sizes with necessary bend and Tee with yarn
and cement joint in dry condition and testing with water conveyance of water not exceeding
a distance of 200m including cost of jointing materials and labour charges but excluding cost
of SW pipes and specials etc., complete
1 2 3 4 5 6
150mm dia SW pipes - 1 RM
68 Kg Cost of cement at site 5530.00 1000 Kg 376.04
3 3
0.07 m Cost of sand at site 810.10 1 m 56.71
5.45 Kg Cost of spun yarn 12.20 1 Kg 66.49
3 Nos Mason I - Class 595.35 Each 1786.05
6 Nos Mazdoor - C - I 372.75 Each 2236.50
2 Nos Fitter - C - II 480.90 Each 961.80
3 Nos Mazdoor - C - II 336.00 Each 1008.00
30 RM Testing charges 23.30 3 RM 233.00
LS Sundries inclusive of lead for pipes LS 2.41
Total for 30 RM 6727.00
Rate for 1 RM = Rs. 224.00
Cement : 2.27 kg / 1 RM

3 b) Laying and jointing SW pipes of the following sizes with necessary bend and Tee with yarn
and cement joint in dry condition and testing with water conveyance of water not exceeding
a distance of 200m including cost of jointing materials and labour charges but excluding cost
of SW pipes and specials etc., complete
1 2 3 4 5 6
100mm dia SW pipes - 1 RM
48 Kg Cost of cement at site 5530.00 1000 Kg 265.44
3 3
0.04 m Cost of sand at site 810.10 1 m 32.40
3.63 Kg Cost of spun yarn 12.20 1 Kg 44.29
2 Nos Mason I - Class 595.35 Each 1190.70
5 Nos Mazdoor - C - I 372.75 Each 1863.75
1 Nos Fitter - C - II 480.90 Each 480.90
2 Nos Mazdoor - C - II 336.00 Each 672.00
30 RM Testing charges 17.20 3 RM 172.00
LS Sundries inclusive of lead for SW LS 0.79
Total for 30 RM 4722.27
Rate for 1 RM = Rs. 158.00
Cement : 1.50 kg / 1 RM

Miscelleneous
SCMC CIVIL DATA 2018-2019
78
4) Construction of inspection chamber of size 1'-1 1/2" x 1' - 1 1/2" of TD No.13/1944 and
of the following description. The foundation of inspection chamber to be cement concrete
1:5:10 mix using 40mm ISS gauge HBBG metal, the wall will be of brick work in cm 1:5
mix, using country bricks and plastered with cement mortar 1:4 mix, 12mm thick on both
sides. The sewer channel in the chamber to be formed in CC 1:3:6 mix using 20mm ISS
gauge chips and finished with 1:2 mix cement mortar 12mm thick. The channel must be
formed well by construction at site for the alignment in including excavating earth work in
all soils, shoring strutting and baling out water wherever necessary etc., - Each

1 2 3 4 5 6
Plastering with cm 1:2 mix - 12mm thick
0.14 m3 Cement mortar 1:2 mix 4861.00 1 m3 680.54
1.1 Nos Mason I - Class 595.35 Each 654.89
0.5 Nos Mazdoor - C - I 372.75 Each 186.38
1.1 Nos Mazdoor - C - II 336.00 Each 369.60
LS Sundries LS 0.09
2
Total for 10 m 1891.51
2
Rate for 1 M = Rs. 189.00
3
0.25 m Earth work excavation 44.63 1 m3 11.16
Cement concrete 1:5:10 mix using 40mm
0.05 m3 3265.00 1 m3 163.25
metal (ISS gauge)
Cement concrete 1:3:6 mix using 20mm
0.04 m3 4070.00 1 m3 162.80
ISS gauge chips
Brick work in cement mortar 1:5 mix using
0.13 m3 4979.20 1 m3 647.30
country bricks
1.39 m2 Plastering with CM 1:4 mix, 12mm thick 161.00 1 m2 223.80
0.16 m2 Plastering with CM 1:2 mix, 12mm thick 189.00 1 m2 30.24
LS Sundries for forming sewer channel LS 1.86
Total for Each 1240.40
Rate for Each=Rs. 1240.00
Cement : 34.97 Kg / Each

5) 2 metre outer dia circular platform with 2 metre width side drain for hand pump - Each

1 2 3 4 5 6
1.45 m3 Earth work excavation (open) 44.63 1 m3 64.71
0.45 m3 Earth work excavation (narrow) 90.00 1 m3 40.50
2 2
4.63 m Steel centering without strutting 517.70 1 m 2396.95
1.32 m3 CC 1:2:4 mix, using 20mm metal 4667.00 1 m3 6160.44
2 2
5.96 m Plastering with CM 1:3 mix, 12mm thick 171.00 1 m 1019.17
LS Sundries LS 0.06
Total for Each 9681.83
Rate for Each = Rs. 9682.00

Miscelleneous
SCMC CIVIL DATA 2018-2019
79
6) Providing barbed wire fencing using 10.00 gauge 2 ply 4 pronged galvanised barbed wire 5
rows in horizontal ways and 30cm C/C on vertical ways 1.75m height tying with necessary
binding wire etc., complete
REQUIREMENT OF BARBED WIRE
Horizontal 1 x 5 x 50.00 m 250.00
Vertical 1 x 167 x 1.75 m 292.25
Sundries for wastage 2.75
Total 545.00
6.00 RM = 1 Kg
545 RM = 545 x 1 / 6.00 = 90.83 kg (or) 91.00 kg
91 Kg Cost of barbed wire - 10gauge 57.50 1 Kg 5232.50

1 Nos Fitter Class - I 517.65 Each 517.65

3 Nos Fitter Class - II 480.90 Each 1442.70

6 Nos Mazdoor - C - I 372.75 Each 2236.50


Sundries for binding wire and lead for
LS LS 2.55
materials
Total for 50 RM 9431.90

Rate for 1 RM = 189.00

7) Providing and laying of 63mm thick high strength type of interlocking pavement block in M20
grade size 23 x 13 x 6.3cm grey colour and red or green colour of required sizes with
minimum compressive strength of 20 N/mm2 in uniform shape of approved make to be laid in
lorrying bone pattern with approved non sticking surface in the top and the rate including
leveling the base, preparation of sub base with sand cushion 100mm thick, laying out the
pavement, cut the pieces to fit the edge, vibrating the pavers, sweeping the sand grouting,
providing transporting, loading unloading and laying of paver block as per standard
specification.
1 2 3 4 5 6
Supply of Grey paver block of size 23cm
167 Nos 47.80 Each 7982.60
x 13cm
Supply of Red paver block of size 23cm x
167 Nos 57.20 Each 9552.40
13cm
1 m3 Supplying of Crushed Stone Sand 456.00 m
3
456.00
1.2 Nos Mason I class 595.35 Each 714.42
1 Nos Mason II class 533.40 Each 533.40
1.5 Nos Mazdoor - C - I 372.75 Each 559.13
1 No Mazdoor - C - II 336.00 Each 336.00
Hire charges for machinery and labour
LS LS 15.41
charges
2
Total for 10M 20149.37
2
Rate for 1M = 2015.00

Miscelleneous
SCMC CIVIL DATA 2018-2019
80
8) Providing and laying of 63mm thick high strength type of interlocking pavement block in M20
grade size 23 x 13 x 6.3cm grey colour of required sizes with minimum compressive strength
of 20 N/mm2 in uniform shape of approved make to be laid in lorrying bone pattern with
approved non sticking surface in the top and the rate including leveling the base, preparation
of sub base with sand cushion 100mm thick, laying out the pavement, cut the pieces to fit
the edge, vibrating the pavers, sweeping the sand grouting, providing transporting, loading
unloading and laying of paver block as per standard specification.

1 2 3 4 5 6
Supply of Grey paver block of size 23cm
334 Nos 47.80 Each 15965.20
x 13cm
1 m3 Supplying and filling with river sand 456.00 m
3
456.00
1.2 Nos Mason I class 595.35 Each 714.42
1 Nos Mason II class 533.40 Each 533.40
1.5 Nos Mazdoor - C - I 372.75 Each 559.13
1 No Mazdoor - C - II 336.00 Each 336.00
Hire charges for machinery and labour
LS LS 15.14
charges
2
Total for 10M 18579.29
2
Rate for 1M = 1858.00

9) Providing and laying of 80mm thick high strength type of interlocking pavement block in M40
grade size 26 x 12 x 8cm other than grey colour of required sizes with minimum compressive
strength of 40 N/mm2 in uniform shape of approved make to be laid in lorrying bone pattern
with approved non sticking surface in the top and the rate including leveling the base,
preparation of sub base with sand cushion 100mm thick, laying out the pavement, cut the
pieces to fit the edge, vibrating the pavers, sweeping the sand grouting, providing
transporting, loading unloading and laying of paver block as per standard specification.

1 2 3 4 5 6
Supply of other than Grey paver block of
321 Nos 85.76 Each 27528.96
size 26cm x 12cm
1 m3 Supplying and filling with river sand 456.00 m
3
456.00
1.2 Nos Mason I class 595.35 Each 714.42
1 Nos Mason II class 533.40 Each 533.40
1.5 Nos Mazdoor - C - I 372.75 Each 559.13
1 No Mazdoor - C - II 336.00 Each 336.00
Hire charges for machinery and labour
LS LS 15.14
charges
2
Total for 10M 30143.05
2
Rate for 1M = 3014.00

Miscelleneous
SCMC CIVIL DATA 2018-2019
81
10) Extra for laying and finishing the concrete pavement with surface vibrators, side centering
with MS channel, dewatering equipments, mechanical trowel finisher to have smooth finish as
per the directions of the department officer - Rate per 1 M 2
Turn over for laying of RCC 1:2:4 mix 20mm thick using surface vibration with necessary
arrangements as per actual per day - 45.00 m x 2.50 m = 112.50 M 2
1 2 3 4 5 6
Sub Data - I
Market rate including surface vibrator,
dewatering and mechanical trowel
2
1m finishing (excluding water and electrical 29.59 Each 29.59
charges like generator) rate as per NIT,
Trichy

Sub Data - II
Rate for actual execution of work per day
1 m2
2
- 112.50 M
Hire charges for 10KVA 3 phase
generator including transport to the work
site
1 Day Hire charges 1000.00 Day 1000.00
7 liter Diesel (fuel) 54.55 x Each 381.85
2
Total for 112.50M 1381.85
2
Rate for 1M = 12.28

Sub Data - III


Labour for handling surface vibrators,
from one day to another day for
2
1m expansion joint at every - 3m side
centering with MS channel, dewatering
equipments, mechanical trowel finisher
2 Nos Mazdoor I class 372.75 Day 745.50
2 Nos Mazdoor II class 336.00 Day 672.00
2
Total for 112.50M 1417.50
2
Rate for 1M = 12.60

Miscelleneous
SCMC CIVIL DATA 2018-2019
82
1 2 3 4 5 6
Main Data
Extra for laying and finishing the
concrete pavement with surface
vibrators, side centering with MS
channel, dewatering equipments,
2 2
1m mechanical trowel finisher to have 29.59 m 29.59
smooth finish as per the directions of the
department officer. Excluding water and
electrical charges like generator
(As per sub data-I)
Hire charges for 10KVA 3 phase
generator including transport to the work
1 m2 12.28 m
2
12.28
site
(As per sub data-II)
Labour for handling surface vibrators,
from one day to another day for
expansion joint at every - 3m side
1 m2 centering with MS channel, dewatering 12.60 m
2
12.60
equipments, mechanical trowel finisher
etc.
(As per sub data-III)
2
Total for 1 M 54.47
2
Rate for 1M = say 50.00

11) Supplying and fixing of Cudappa slab of 20/30/40/50mm thick for Cup board including cost
of materials and labour etc complete

1 2 3 4 5 6
50mm thick slab
1 m2 Cost of Cudappa slab 342.00 m
2
342.00
1 m2 Labour charges for fixing 36.38 m
2
36.38
2
Rate for 1M = 378.00
38/40mm thick slab
2 2
1m Cost of Cudappa slab 330.00 m 330.00
2 2
1m Labour charges for fixing 36.38 m 36.38
2
Rate for 1M = 366.00
20/30mm thick slab
2 2
1m Cost of Cudappa slab 304.00 m 304.00
1 m2 Labour charges for fixing 36.38 m
2
36.38
2
Rate for 1M = 340.00

Miscelleneous
SCMC CIVIL DATA 2018-2019
83
PILE FOUNDATION
1) Providing cast in situ cement concrete 1: 2 : 4 (one cement, two sand and four coarse
aggregate) using 20mm size HBBG metal for 30cm dia pile including cost of materials labour,
hire charges for machinery for earth work for forming 30cm dia bore hole to the required
depth before concreting excluding cost of steel reinforcement (Data for 4.50 RM)

1 2 3 4 5 6
LS Hire charges for equipment LS 550.00
Labour charges for hoisting the
LS LS 250.00
equipment
9 Nos Mazdoor - C - I 372.75 Each 3354.75
1 Nos Mazdoor - C - II 336.00 Each 336.00
0.5 Nos Plumber - I 517.65 Each 258.83
3 3
0.403 m RCC 1: 2 : 4 mix 5565.00 1m 2242.70
2
π d /4 x ( I + 4 D)
2
π x 0.30 /4 x (4.50 + 4 x 0.30)
Total for 4.50 RM 6992.27
Rate for 1 RM = 1554.00

2) Providing cart in situ cement concrete 1: 11/2 : 3 (one cement, one and half sand and three
coarse aggregate) using 20mm size HBBG metal for 30cm dia pile including cost of materials
labour, hire charges for machinery for earth work for forming 30cm dia bore hole to the
required depth before concreting excluding cost of steel reinforcement (Data for 4.50 RM)

1 2 3 4 5 6
LS Hire charges for equipment LS 550.00
Labour charges for hoisting the
LS LS 250.00
equipment
9 Nos Mazdoor - C - I 372.75 Each 3354.75
1 Nos Mazdoor - C - II 336.00 Each 336.00
0.5 Nos Plumber - I 517.65 Each 258.83
3 1 3
0.403 m RCC 1: 1 /2 : 3 6161.10 1m 2482.92
2
π d /4 x ( I + 4 D)
2
π x 0.30 /4 x (4.50 + 4 x 0.30)
Total for 4.50 RM 7232.51
Rate for 1 RM = 1607.00

Pile
SCMC CIVIL DATA 2018-2019
84
3) Providing cart in situ cement concrete 1: 2 : 4 (one cement, two sand and four coarse
aggregate) using 20mm size HBBG metal for 23cm dia pile including cost of materials labour,
hire charges for machinery for earth work for forming 23cm dia bore hole to the required
depth before concreting excluding cost of steel reinforcement (Data for 4.50 RM)

1 2 3 4 5 6
LS Hire charges for equipment LS 550.00
Labour charges for hoisting the
LS LS 250.00
equipment
9 Nos Mazdoor - C - I 372.75 Each 3354.75
1 Nos Mazdoor - C - II 336.00 Each 336.00
0.5 Nos Plumber - I 517.65 Each 258.83
3 3
0.225 m RCC 1: 2 : 4 mix 5565.00 1m 1252.13
2
π d /4 x ( I + 4 D)
2
π x 0.23 /4 x (4.50 + 4 x 0.23)
Total for 4.50 RM 6001.70
Rate for 1 RM = 1334.00

4) Providing cart in situ cement concrete 1: 11/2 : 3 (one cement, one and half sand and three
coarse aggregate) using 20mm size HBBG metal for 23cm dia pile including cost of materials
labour, hire charges for machinery for earth work for forming 23cm dia bore hole to the
required depth before concreting excluding cost of steel reinforcement (Data for 4.50 RM)

1 2 3 4 5 6
LS Hire charges for equipment LS 550.00
Labour charges for hoisting the
LS LS 250.00
equipment
9 Nos Mazdoor - C - I 372.75 Each 3354.75
1 Nos Mazdoor - C - II 336.00 Each 336.00
0.5 Nos Plumber - I 517.65 Each 258.83
0.225 m3 1
RCC 1: 1 /2 : 3 mix 6161.10 1 m3 1386.25
2
π d /4 x ( I + 4 D)
2
π x 0.23 /4 x (4.50 + 4 x 0.23)
Total for 4.50 RM 6135.82
Rate for 1 RM = 1364.00

Pile
SCMC CIVIL DATA 2018-2019
85
5) Providing cart in situ cement concrete 1: 11/2 : 3 (one cement, one and half sand and three
coarse aggregate) using 20mm size HBBG metal for 45cm dia pile including cost of materials
labour, hire charges for machinery for earth work for forming 45cm dia bore hole to the
required depth before concreting excluding cost of steel reinforcement (Data for 4.50 RM)

1 2 3 4 5 6
LS Hire charges for equipment LS 550.00
Labour charges for hoisting the
LS LS 250.00
equipment
9 Nos Mazdoor - C - I 372.75 Each 3354.75
1 Nos Mazdoor - C - II 336.00 Each 336.00
0.5 Nos Plumber - I 517.65 Each 258.83
1.00 m3 1
RCC 1: 1 /2 : 3 6161.10 1 m3 6161.10
2
π d /4 x ( I + 4 D)
2
π x 0.45 /4 x (4.50 + 4 x 0.45)
Sundries 0.04
Total for 4.50 RM 10910.72
Rate for 1 RM = 2425.00

6) Providing cart in situ cement concrete 1: 2 : 4 (one cement, two sand and four coarse
aggregate) using 20mm size HBBG metal for 45cm dia pile including cost of materials labour,
hire charges for machinery for earth work for forming 45cm dia bore hole to the required
depth before concreting excluding cost of steel reinforcement (Data for 4.50 RM)

1 2 3 4 5 6
LS Hire charges for equipment LS 550.00
Labour charges for hoisting the
LS LS 250.00
equipment
9 Nos Mazdoor - C - I 372.75 Each 3354.75
1 Nos Mazdoor - C - II 336.00 Each 336.00
0.5 Nos Plumber - I 517.65 Each 258.83
1.00 m3 RCC 1: 2 : 4 mix 5565.00 1 m3 5565.00
2
π d /4 x ( I + 4 D)
2
π x 0.45 /4 x (4.50 + 4 x 0.45)
Sundries 0.12
Total for 4.50 RM 10314.70
Rate for 1 RM = 2292.00

Pile
SCMC CIVIL DATA 2018-2019
86
KERB
Qty Description Rate Per Amount
Cement concrete 1:2:4 mix using 20mm ISS gauge HBBG chips including labour for moulding

Labour for moulding


3.50 Nos Mason C-I 595.35 each 2083.73
3.50 Nos Mason C-II 533.40 each 1866.90
21.20 Nos Mazdoor C-I 372.75 each 7902.30
7.10 Nos Mazdoor C-II 336.00 each 2385.60
Sundries 0.24
Total for 10m3 14238.77
3
Rate for 1m 1,424.00
2
a) Rendering smooth with cement using 10kg of cement per 10m including curing, etc., complete
10 Kg Supply of cement at sige 5530.00 1 MT 55.30
0.30 Nos Mason C-I 595.35 each 178.61
2.20 Nos Mazdoor C-II 336.00 each 739.20
Sundries 0.07
Total for 10m2 973.18
2
Rate for 1m 97.00
b) Manufacturing foot path and centre madian kerb as per high ways design of size 450x200x375 in
cement concrete 1:2:4mix using 20mm ISS gauge HBBG chips including rendering smooth with cement,
curing etc., complete
Cement concrete 1:2:4 mix including labour for
3.375 m3 moulding (100x0.45x0.20x0.375) (3660.69+914.33) 6091.00 m3 20557.11
2 2
23.375 m Rendering smooth with 10kg at cement 973.18 10 m 2274.81
LS Cost of moulding 5% LS 1141.60
Sundries 0.37
Total for 100 Nos 23973.88
Rate for each 240.00
c) Manufacturing rain water gutter kerb of size 450 x 300 x 150 mm on road side and 100mm on IRC
kerb side in cemetn concrete 1:2:4 mix using 20mm ISS gauge HBBG chips including rendering smooth
with cement, curing etc., complete
Cement concrete 1:2:4 mix including labour for
moulding-100Nos =
100x(0.45x0.15x0.10+0.45x0.075x0.10+0.15/2+0.45x0.
1.603 6091.00 m3 9763.88
075x0.15=1.603)
Rendering smooth with 10kg at cement top only
13.50 (100x0.45x0.30=13.50) 973.18 10 m2 1313.80
Cost of moulding 5% LS 553.88
Sundries 0.16
Total for 100 Nos 11631.71
Rate for each 116.00
d) Labour for fixing the IRC kerb to proper level and alignment-30m
4 Nos Mazdoor C-I 372.75 each 1491.00
2 Nos Mazdoor C-II 336.00 each 672.00
1 Nos Mason C-I 595.35 each 595.35
Rate for 30 RM 2758.35

Kerb
SCMC CIVIL DATA 2018-2019
87
e) Labour for fixing the rain water gutter kerb, to proper level and alignment
30RM = 67 Nos of kerb - (Concrete quantity
(100x0.45x0.20x0.375 =3.375M3)
67 Nos of kerb = (3.375x67)/100 = 2.26m3
Hence 2.26m3 (or) 30RM labour rate for fixing = 2758.35
3
1m labour rate for fixing 2758.35
= 1221.00
2.26
Qty Description Rate Per Amount
f) Labour rate for fixing the rain water gutter kerb to proper level and alignment- 45RM
No. of rain water kerb required 45/0.45 100 Nos
Required cement concrete for 100 Nos 1.603 m3
Rate for fixing the kerb per 1m3 1221.00
100x(0.45x0.15x0.10+0.45x0.075x0.10+0.15/2+0.45x0.
075x0.15=1.603)
For 1.603m3 - fixing rate = 783.78 x 1.603 1256.40
Rate for fixing the kerb per 1m3 or 45m Rs. 1256.40
g) Pointing and inserting the joints with cement mortar 1:3 mix 6mm thick to roll depth of cement
concrete kerb (or) rain water gutter kerb including necessary curing of the joints, pointed etc.,
complete
0.01 m3 Cement mortar 1:3 mix 3533.80 m3 35.34
1.60 Nos Mason II class 533.40 each 853.44
0.50 Nos Mazdoor I class 372.75 each 186.38
1.10 Nos Mazdoor II class 336.00 each 369.60
Sundries 0.02
Total for 10m2 1444.77
2
Rate for 10m 1445.00
h) Packing with cement mortar 1:3 mix 20mm thick etc., complete
0.22 m3 Cement morat 1:3 mix 3533.80 m3 777.43
2.20 Nos Mason class I 595.35 each 1309.77
0.50 Nos Mazdoor Class I 372.75 each 186.38
3.20 Nos Mazdoor class II 336.00 each 1075.20
Sundries 0.04
Total for 10m2 3348.82
2
Rate for 10m 3349.00

Kerb
SCMC CIVIL DATA 2018-2019
88
Main Data Fixing of IRC Kerb in cement concrete 1:2:4 mix using 20mm ISS gauge HBBG metal
of size 450 x 200 x 375mm along with rain water kerb in Cement concrete 1:2:4 mix using 20mm ISS
gauge HBBG metal of size 450 x 300 x 150mm on road side and 100mm kerb side including moulding
casting curing of finishing with necessary earth work for fixing the IRC Kerb along with rain water
Suttor kerb in proper level alignment including pointing and inserting the joint with CM 1:3 mix 6mm
thick to full depth threaded lining curing with both side and bottom fixing of the kerb with CM 1:3
mix – 20MM thick Including coat of best synthetic enamel paint over a coat of priming coat etc.
complete.
Qty Description Rate Per Amount
Earth work excavation for foundation in ordinary soil
3.78 M3 with initial lead and lift (45.00 x 90.00 M3 340.20
3
(0.02+0.20+0.02+0.30+0.02)x 0.15=3.78m )
Cost of IRC Kerb of size 450mmx200mmx375mm
100 Nos. 240.00 Each 24000.03
45.00/0.45=100Nos
Cost of IRC rain water gutter Kerb of size
100 Nos. 450mmx300mmx150mm on road side and 100mm on 116.00 Each 11599.42
kerb side 45.00/0.45=100Nos
45 Rm Fixing of IRC kerb to proper level and alignment 2758.35 30 Rm 4137.53
Fixing of IRC rain water gutter kerb to proper level
45 Rm 1256.40 45 Rm 1256.40
and alignment
Pointing and inserbing the joints with cement mortar
1:3 mix 6mm thick to full depth threaded lining (IRC
23.63 M 2 kerb portion) 45.00x0.375 =16.875 1445.00 10 M2 3414.30
RW Gutter 45.00x0.15 = 6.75
Total = 23.625M2
Packing with cement mortar 1:3 mix 20mm thick on
both sides and bottom of the kerb
45.00(0.15+0.02+0.20+0.02+0.30+0.02+0.15)=38.70
43.20 M2 3349.00 10 M2 14467.68
between kerb & RW gutter
45.00x0.10 = 4.50
Total = 43.20M2
Painting 2 coats with best synthetic enamel paint of
approved colour and high quality over one coat of
23.18 M 2
primer coat 45.00(0.20+0.14+0.10)= 19.80M2 121.40 M2 2814.05
RW gutter 45.00x0.075 = 3.38
Total = 23.18M2 (80.30 + 41.10=121.40)
Sundries 1.11
Total for 45Rm 62030.72
Rate for 1 Rm 1379.00

Kerb
SCMC CIVIL DATA 2018-2019
89
Main Data Fixing of IRC Kerb in cement concrete 1:2:4 mix using 20mm ISS gauge HBBG metal
of size 450 x 200 x 375mm including moulding casting curing of finishing with necessary earth work
for fixing the IRC Kerb in proper level alignment including pointing and inserting the joint with CM 1:3
mix 6mm thick to full depth threaded lining curing with both side and bottom fixing of the kerb with
CM 1:3 mix – 20MM thick Including coat of best synthetic enamel paint over a coat of priming coat
etc. complete.
Qty Description Rate Per Amount
Earth work excavation for foundation in ordinary soil
1.62 M3 with initial lead and lift (45.00 x (0.02+0.20+0.02)x 90.00 M3 145.80
3
0.15=3.78m )
Cost of IRC Kerb of size 450mmx200mmx375mm
100 Nos. 240.00 Each 24000.03
45.00/0.45=100Nos
45 Rm Fixing of IRC kerb to proper level and alignment 2758.35 30 Rm 4137.53
Pointing and inserting the joints with cement mortar
1:3 mix 6mm thick to full depth threaded lining (IRC
16.88 M2 1445.00 10 M2 2438.91
kerb portion) 45.00x0.375 =16.875
Total = 16.875M2
Packing with cement mortar 1:3 mix 20mm thick on
both sides and bottom of the kerb
24.30 M2 3349.00 10 M2 8138.07
45.00(0.15+0.02+0.20+0.02+0.15)=24.30
Total = 24.30M2
Painting 2 coats with best synthetic enamel paint of
approved colour and high quality over one coat of
19.80 M2 121.40 M2 2403.72
primer coat 45.00(0.20+0.14+0.10)= 19.80M2
Total = 19.80M2 (80.30 + 41.10=121.40)

Sundries 0.55
Total for 45Rm 41264.62

Rate for 1 Rm 917.00

Kerb
SCMC CIVIL DATA 2018-2019
90
Rate List
SR Labour/
Labour
NO. Description 5% Material
Rate
Rate
56 Stone cutter I class 436.00 21.80 457.80
56A Stone cutter II class 403.00 20.15 423.15
47 Plumber I class 493.00 24.65 517.65
47A Plumber II class 458.00 22.90 480.90
39A Mazdoor I class 355.00 17.75 372.75
39B Mazdoor II class 320.00 16.00 336.00
19 Fitter I class 501.00 25.05 526.05
37 Mason I class 567.00 28.35 595.35
37A Mason II class 508.00 25.40 533.40
12 Carpenter II class 508.00 25.40 533.40
Shellac (ANNEXURE. P.49 SL.NO.127) 17.20 17.20
Thread ball (ANNEXURE. P.49 SL.NO.128) 3.35
PVC adhesive (ANNEXURE. P.68 SL.NO.219) 32.10
Cement mortar 1:3 mix 3533.80
Sand filling 264.20
White cement 22.00
Cost of Wash hand basin without pedestal -
1550.00
white(ANNEXURE.VI. P.132 SL.NO.1)

Cost of Wash hand basin without pedestal -colour


2075.00
(ANNEXURE.VI. P.132 SL.NO.II)

40mm broaken brick jelly 1025.20


lime mortor 1:2 1513.80
Cost of W.C. set oriya white (ANNEXURE.VI. P.49
1119.00
SL.NO.129)

Cost of W.C. set oriya colour (ANNEXURE.VI. P.49


1425.00
SL.NO.129)

100mm dia CI pipe (ANNEXURE.VI. P.51 SL.NO.145.II) 566.00

Cement 5.53
Spun yarn (ANNEXURE.VI. P.52 SL.NO.149) 12.20
Cost of European W.C. set white with 10litre flush tank
2860.00
(ANNEXURE.VI. P.49 SL.NO.130.I)
Cost of European W.C. set colour with 10litre flush tank
3230.00
(ANNEXURE.VI. P.49 SL.NO.130.II)
Lipped mouth porceliain flat back urinal white
870.00
(ANNEXURE.VI. P.50 SL.NO.136.I)

Sanitary
SCMC CIVIL DATA 2018-2019
91
Lipped mouth porceliain flat back urinal colour
997.00
(ANNEXURE.VI. P.50 SL.NO.136.II)
Cost of PVC Nahni trapwith PVC grading 100mm x
143.00
75mm(ANNEXURE.VI. P.50 SL.NO.144.I)
Cost of stoneware gully trap of size 150x100mm with CI double grading
157.70
(ANNEXURE.VI. P.142 SL.NO.130)

Sanitary
SCMC CIVIL DATA 2018-2019
92
Sanitary arrangements
Sl.
Qty Description of work Rate Per Amount
No
1) Supplying and fixing in position best quality approved make white glazed earthen ware
wash hand basin size 550mm x 400mm with a pair of cast iron brackets including cost
of 15mm Φ brass chromium plated pillar tap, 32mm Φ C.P. waste, 32mm Φ PVC
waste pipe with rubber plugs and chain, 15mm Φ G.M. Wheel valve 15mm Φ brass
nipple, 15mm Φ Nylon connections etc. Including fixing the wash hand basin in the wall
in position with a pair of C.I. Brackets with teak wood plugs and screws and giving
necessary water supply connection and painting the brackets with two coats of paint
over a priming coat of anticorrosive paint including testing for leakage etc. complete
as per standard specifications.
a) 1 No Cost of Wash hand basin set without pedestal (White) 1550.00 Each 1550.00
1 No Plumber I class 517.65 Each 517.65
0.10 Nos Plumber II class 480.90 Each 48.09
0.50 Nos Mason I class 595.35 Each 297.68
1 No Mazdoor I class 372.75 Each 372.75
6 Nos Tapering wooden screws 2.20 Each 13.20
6 Nos 38mm Brass screws 3.30 Each 19.80
10 Grm Shellac 17.200 Grm 172.00
0.25 Nos Thread ball 3.35 Each 0.84
Sundries 0.73
Total 2993.00
Total for Each 2993.00

b) 1 No Cost of Wash hand basin set without pedestal (colour) 2075.00 Each 2075.00
Sundries 0.58
(2339.00-0.73-1510.00) 1442.27
Total for Each 3518.00

2) Supply and fixing in position of white glazed indian oriya type water closet 580 x
440mm size white glazed earthernware of approved quality with S or P trap confirming
to IS: 2556-part XII with sand cusion and forming flooring around the closet using
40mm broaken brick jelly in lime concrete 1:4:8 mix, 100mm thick using 20mm ISS
gauge brick jelly and finished the top to required slop and including giving necessary
connection to cast iron soil pipes by dismantling brick masonry, RCC/ floor slab and
making good of the disturbed portion to original condition without leakage etc.
complete complying with std. specifications and as directed by dept. officers. (the WC
should got approved by the Exe. Engineer before use on works)
Brick jelly lime concrete
9.50 m3 40mm broaken brick jelly 1025.20 m3 9739.40
3.80 m3 lime mortor 1:2 1513.80 m3 5752.44
1.80 No Mason II class 533.40 Each 960.12
17.70 No Mazdoor I class 372.75 Each 6597.68
14.10 No Mazdoor II class 336.00 Each 4737.60
Total for 10M 3 27787.24

Sanitary
SCMC CIVIL DATA 2018-2019
93
Sl.
Qty Description of work Rate Per Amount
No
Total for 1M3 2779.00

Sanitary
SCMC CIVIL DATA 2018-2019
94
Sl.
Qty Description of work Rate Per Amount
No
a) 1.00 No Cost of W.C. set (White) 1119.00 Each 1119.00
0.11 m 3
Brick jelly lime concrete 1:4:8 mix using 20mm size ISS
2779.00 m3 305.69
HBBG metal
0.60 Rm 100mm dia CI pipe 566.00 Rm 339.60
0.45 m Sand filling
3
264.20 m 3 118.89
1 No Plumber I class 517.65 Each 517.65
1 No Mason I class 595.35 Each 595.35
0.25 No Plumber II class 480.90 Each 120.23
1 No Mazdoor I class 372.75 Each 372.75
1 Kg White cement 22.00 Kg 22.00
6 Kg Cement 5.53 Kg 33.18
0.4 Grm Spun yarn 12.20 Kg 4.88
Sundries 0.79
Total for Each 3550.00

b) 1 No Cost of W.C. set (Colour) 1425.00 Each 1425.00


Sundries 0.82
(2789.00-0.82-1089) 2430.18
Total for Each 3856.00

3) Supply and fixing in position of European water closet with 'S' (or) 'P' trap of approved
color and quality with dauble flapped rigid PVC sheet cover the CP brass hinges etc.,
complete complying with standard specification including supply and fixing in position of
10litre capacity glazed porcelain low level flushing tank on wall including 2 Nos of 15mm
& brass nipple, 15mm dia PVC brass connection, 15mm dia GI wheel value, 15mm dia
Nylon connection and giving necessary water supply connection etc., complete complying
with standard specification
a) 1.00 No Cost of European W.C. set (White) 2860.00 Each 2860.00
0.60 Rm 100mm dia CI pipe 566.00 Rm 339.60
0.50 Nos Mason II class 533.40 Each 266.70
0.5 No Plumber I class 517.65 Each 258.83
0.10 Nos Plumber II class 480.90 Each 48.09
1 No Mazdoor I class 372.75 Each 372.75
0.5 No Mazdoor II class 336.00 Each 168.00
1 Kg White cement 22.00 Kg 22.00
6 Kg Cement 5.53 Kg 33.18
0.4 Grm Spun yarn 12.20 Grm 4.88
4.00 Nos T.W. plugs 2.00 Each 8.00
4.00 Nos Brass screws 3.30 Each 13.20
Sundries 0.77
Total for Each 4396.00

Sanitary
SCMC CIVIL DATA 2018-2019
95
Sl.
Qty Description of work Rate Per Amount
No
Fixing low level PVC Flushing Tank 10 litre capacity
0.3 No Plumber I class 517.65 Each 155.30
0.3 No Stone worker II class 533.40 Each 160.02
0.6 No Mazdoor I class 372.75 Each 223.65
2 set T.W. plugs Brass screw (50x6mm) 10.50 set 21.00
10 Grm Shellac 17.200 Grm 172.00
2 Kg White cement 22.00 Kg 44.00
0.50 No Thred ball 3.35 Each 1.68
Sundries 0.38
Total for Each 778.02

EWC - 4396.00
Labour for fixing Procelain tank - 778.02
Total - 5174.00
b) 1 No Cost of European W.C. set (Colour) 3230.00 Each 3230.00
(4363.00-2785.00) 2314.00
Total for Each 5544.00

4) Supply & fixing in position of Indian make white glazed earthernware lipped mouth
porceliain flat back urinal with all accessories such as 32mm dia bell mouth PVC
connection, 15mm dia GM wheel valve, fixing the urinal to the wall in position with
necessary TW plugs, clamps, screws, shellac etc including dismantling brick masonry if
necessary and making good of the disturbed portion to original condition, fixing 15mm
GI pipe connection and wheel valve, painting the pipe with two coats of approved paint
over one coat of primer and check without any leakage etc. complete complying with
std. specifications and as directed by dept. officers. (the Urinal should got approved
by the Exe. Engineer before use on works)
a) 1 No Lipped mouth porceliain flat back urinal (White) 870.00 No 870.00
0.50 Nos Plumber I class 517.65 Each 258.83
0.50 Nos Mason I class 595.35 Each 297.68
0.50 Nos Mazdoor I class 372.75 Each 186.38
2 set T.W. plugs & screws 10.50 set 21.00
10 Grm Shellac 17.200 Grm 172.00
0.50 Nos Thread ball 3.35 Nos 1.68
1 set Special clamp for waste pipe, T.W. plugs & screws 10.50 set 10.50
Sundries 0.25
Total for Each 1818.00

b) 1 No Lipped mouth porceliain flat back urinal (Colour) 997.00 Each 997.00
(1359.00-847.00) 948.00
Total for Each 1945.00

Sanitary
SCMC CIVIL DATA 2018-2019
96
Sl.
Qty Description of work Rate Per Amount
No
5) Supplying and fixing in position of CI Nahni trap/ PVC with best stainless steel gratings
of approved brand and quality, fixed over a bed of brick jelly lime concrete 1:2:5 mix
using 40mm brick jelly and finished with C.M.1:3 mix including dismantling brick
masonry wherever found necessary and making good of the disturbed portion to
original condition and giving connections to the cast iron pipe as directed etc complete
complying with std. specifications (the Nahni trap should got approved by the Exe.
Engineer before use on works)
1 No Cost of PVC Nahni trapwith PVC grading 100mmx75mm 143.00 No 143.00
0.20 Nos Plumber I class 517.65 Each 103.53
0.20 Nos Stone worker II class 423.15 Each 84.63
0.2 No Mason II class 533.40 Each 106.68
0.005 m 3
Brick jelly lime concrete 1:2:5 mix using 40mm size brick
jelly 2779.00 m3 13.90
3 3
0.002 m Cement mortar 1: 3 mix 3533.80 m 7.07
Sundries 0.01
Total for Each 459.00

6) Supplying and fixing in position of stoneware gully trap with best stainless steel
gratings of approved brand and quality, fixed over a bed of brick jelly lime concrete
1:2:5 mix using 40mm brick jelly and finished with C.M.1:3 mix including dismantling
brick masonry wherever found necessary and making good of the disturbed portion to
original condition and giving connections to the cast iron pipe as directed etc complete
complying with std. specifications (the Nahni trap should got approved by the Exe.
Engineer before use on works)
1 No Cost of stoneware gully trap 157.70 No 157.70
0.20 Nos Plumber I class 517.65 Each 103.53
0.20 Nos Stone worker II class 423.15 Each 84.63
0.2 No Mason II class 533.40 Each 106.68
0.01 m 3
Brick jelly lime concrete 1:2:5 mix using 40mm size brick
jelly 2779.00 m3 13.90
3 3
0 m Cement mortar 1: 3 mix 3533.80 m 7.07
Sundries 0.01
Total for Each 474.00

Sanitary
SCMC CIVIL DATA 2018-2019
97
2018-19
Water supply Works
INPUT
S R No.

38 Stone worker I class (Stone cutter) 567.00 28.35 595.35


38A Stone worker II class (Stone cutter) 508.00 25.40 533.40
47 Plumber I class 493.00 24.65 517.65
47A Plumber II class 458.00 22.90 480.90
39A Mazdoor I class 355.00 17.75 372.75
39B Mazdoor II class 320.00 16.00 336.00
19 Fitter I class (Pipe laying) 501.00 25.05 526.05
19A Painter II class 421.00 21.05 442.05
12 Carpenter II class 508.00 25.40 533.40
Shellac (ANNEXURE. P.49 SL.NO.127) 17.20

Thread ball (ANNEXURE. P.49 SL.NO.128) 3.35

PVC adhesive (ANNEXURE. P.68 SL.NO.219) 32.100

Gunny Tap (ANNEXURE. P.52 SL.NO.151) 11.00

Tar (ANNEXURE. P.52 SL.NO.152) 38.00

Cement mortar 1:3 mix 3533.80

Painting (new iron work one coat) 62.00

Cost of GI pipe 15mm(ANNEXURE. P.46 SL.NO. 118) 65.90

Cost of GI pipe 20mm 93.10

Cost of GI pipe 25mm 120.80

Cost of GI pipe 32mm 142.80

Cost of GI pipe 40mm 153.90

Cost of GI pipe 50mm 197.80

Cost of GI pipe 65mm 230.80


Cost of Gun metal Gate valve 20mm (ANNEXURE. P.46
SL.NO. 121) 325.00

Cost of Gun metal Gate valve 25mm 550.00

Cost of Gun metal Gate valve 32mm 704.00

Cost of Gun metal Gate valve 40mm 906.00

Cost of Gun metal Gate valve 50mm 1150.00

Cost of Gun metal Gate valve 65mm 1410.00

Cost of GM Wheel valve 15mm 159.00

Cost of GM Wheel valve 20mm 224.00

Cost of GM Wheel valve 25mm 326.00

Water Supply
SCMC CIVIL DATA 2018-2019
98
Cost of GM Wheel valve 32mm 476.00

Cost of GM Wheel valve 40mm 604.00

Cost of SD Tap 211.00

Cost of Pillar tap 302.00


Cost of Stop cock 15mm (ANNEXURE. P.49 SL.NO.
123) 140.00

Cost of GI union 15mm (ANNEXURE. P.46 SL.NO. 119) 54.90

Cost of GI union 20mm 65.90

Cost of GI union 25mm 93.10

Cost of GI union 32mm 120.30

Cost of GI union 40mm 186.30

Cost of GI union 50mm 251.20


Cost of GI Elbow 50mm (ANNEXURE. P.46 SL.NO. 119-
B) 120.80

Cost of GI Elbow 40mm 93.10

Cost of GI Elbow 32mm 82.10

Cost of GI Elbow 25mm 54.90

Cost of GI Elbow 20mm 24.00

Cost of GI Elbow 15mm 15.10


Cost of GI bend 50mm (ANNEXURE. P.46 SL.NO. 119-
C) 109.80

Cost of GI bend 40mm 82.10

Cost of GI bend 32mm 65.90

Cost of GI bend 25mm 49.10

Cost of GI bend 20mm 21.90

Cost of GI bend 15mm 12.90

Cost of GI Tee 50mm (ANNEXURE. P.47 SL.NO. 119-D)


131.90

Cost of GI Tee 40mm 104.00

Cost of GI Tee 32mm 93.10

Cost of GI Tee 25mm 76.80

Cost of GI Tee 20mm 32.80

Cost of GI Tee 15mm 27.10


Water Supply
SCMC CIVIL DATA 2018-2019
99
Cost of GI Coupling 50mm (ANNEXURE. P.47 SL.NO.
119-E) 65.90

Cost of GI Coupling 40mm 54.39

Cost of GI Coupling 32mm 43.90

Cost of GI Coupling 25mm 27.10

Cost of GI Coupling 20mm 15.10

Cost of GI Coupling 15mm 12.90

Indian make bewelled edge mirror 600 x 450 x 5.5mm


(ANNEXURE. P.50 SL.NO. 141 )
440.00

Cost of brass Chromium Plated Towel Rail 600mm


(ANNEXURE. P.50 SL.NO. 139) 248.80

Cost of Aluminium anodised Towel Rail 600mm 128.00

CP soap tray 150 x 150mm 254.00

CP soap tray 150 x 100mm 152.70

Cutting 15mm (ANNEXURE.III P.30 SL.NO. 125 ) 5.40

Cutting 20mm 5.40

Cutting 25mm 6.50

Cutting 32mm 7.80

Cutting 40mm 10.50

Cutting 50mm 13.40

Threading 15mm 7.60

Threading 20mm 7.80

Threading 25mm 16.00

Threading 32mm 21.60

Threading 40mm 24.30

Threading 50mm 27.00

Rawal plugs for false ceiling 8.90

Brass CP screws (30 x 6mm) (ANNEXURE.VI. P.53


2.25
SL.NO. 162 )

T.W. plugs (ANNEXURE. P.53 SL.NO. 166 ) 1.00

Cost of PVC pipe 15mm (10Kg/m2) (ANNEXURE.VI P.62


SL.NO. 213 ) 13.90

Water Supply
SCMC CIVIL DATA 2018-2019
100
Cost of PVC pipe 20mm (10Kg/m2) 20.60

Cost of PVC pipe 25mm (10Kg/m2) 35.10

Cost of PVC pipe 32mm (10Kg/m2) 52.50

Cost of PVC pipe 40mm (10Kg/m2) 82.20


2
Cost of PVC pipe 50mm (10Kg/m ) 122.90

Cost of PVC pipe 63mm (6Kg/m2) 111.30

Water Supply
SCMC CIVIL DATA 2018-2019
101
Water supply Works
Sl.
Qty Description of work Rate Per Amount
No.
1 Internal Water Supply - Above Ground Level open
Suppllying Laying and jointing G.I. pipes of the following size including fixing G.I. specials
but excluding cost of such specials cutting and threading of pipes and fixing to wall with
necessary teak wood plugs, clamps and screws making holes on the wall on drilling holes and
making good the dismantled portions to original condition with necessary brick work and
concrete and plastering work wherever necessary with scaffolding arrangements charges
the pipes are to be painted with two coats of over a priming coat of red oxide primer etc.,
complete

A Laying pipe line of dia 15mm, 20mm & 25mm (½”, ¾” & 1")
Sub Data
Labour charges for 10 Rm
0.30 Nos Stone worker I class 595.35 Each 178.61
0.75 Nos Plumber I class 517.65 Each 388.24
0.10 Nos Plumber II class 480.90 Each 48.09
0.60 Nos Mazdoor I class 372.75 Each 223.65
Total for 10 M 838.59
Labour for 1 Rm 83.86
Sub Data
Sundries for 1 Rm
8.33 Grm Shellac 17.2000 Grm 143.28
1.66 set Clamps, plugs and screws 12.10 set 20.09
1.66 Nos Thread ball 3.35 Nos 5.56
Sundries for 1 Rm 168.93

Main Data
For Laying GI pipe line of Dia 15mm 20mm 25mm
Cost of GI pipe per Rm 65.90 93.10 120.80
Labour charges 83.86 83.86 83.86
Sundries 168.93 168.93 168.93
Add for painting 2.30 2.30 2.30
Total per 1 Rm 320.99 348.19 375.89
or Say 159.00 184.00 230.00

Water Supply
SCMC CIVIL DATA 2018-2019
102
Sl.
Qty Description of work Rate Per Amount
No.
B Laying pipe line of dia 32mm, 40mm (1¼ , 11/2")
Sub Data
Labour charges for 10 Rm
0.45 Nos Stone worker I class 595.35 Each 267.91
1.15 Nos Plumber I class 517.65 Each 595.30
0.15 Nos Plumber II class 480.90 Each 72.14
0.90 Nos Mazdoor I class 372.75 Each 335.48
0.45 Nos Mazdoor II class 336.00 Each 151.20
Total for 10 M 1422.03
Labour for 1 Rm 142.20
Sub Data
Sundries for 1 Rm
10 Grm Shellac 17.2000 Grm 172.00
1 set Clamps, plugs and screws 12.10 set 12.10
0.50 Nos Thread ball 3.35 Nos 1.68
Total for 1 RM 185.78

Main Data
For Laying GI pipe line of Dia 32mm 40mm
Cost of GI pipe per Rm 142.80 153.90
Labour charges 142.20 142.20
Sundries 185.78 185.78
Add for painting 2.30 2.30
Total per 1 Rm 473.00 484.00
or Say 473.00 484.00
C Laying pipe line of dia 50mm, 65mm (2", 2 /4") 1

Sub Data
Labour charges for 10 Rm
0.60 Nos Stone worker I class 595.35 Each 357.21
1.50 Nos Plumber I class 517.65 Each 776.48
0.20 Nos Plumber II class 480.90 Each 96.18
1.20 Nos Mazdoor I class 372.75 Each 447.30
0.60 Nos Mazdoor II class 336.00 Each 201.60
Total for 10 M 1878.77
Labour for 1 Rm 188.00

Water Supply
SCMC CIVIL DATA 2018-2019
103
Sl.
Qty Description of work Rate Per Amount
No.
Sub Data
Sundries for 1 Rm
15 Grm Shellac 17.2000 Grm 258.00
1 set Clamps, plugs and screws 12.10 set 12.10
0.75 Nos Thread ball 3.35 Nos 2.51
Total for 1 RM 272.61
Main Data
For Laying GI pipe line of Dia 50mm 65mm
Cost of GI pipe per Rm 197.80 230.80
Labour charges 188.00 188.00
Sundries 272.61 272.61
Add for painting 2.59 2.59
Total per 1 Rm 661.00 694.00
or Say 661.00 694.00
2 External Water Supply - Above Ground Level open
A Laying pipe line of dia 15mm, 20mm & 25mm (1/2”, ¾” & 1")
Sub Data
Labour charges for 10 Rm
0.35 Nos Stone worker I class 595.35 Each 208.37
0.85 Nos Plumber I class 517.65 Each 440.00
0.10 Nos Plumber II class 480.90 Each 48.09
0.70 Nos Mazdoor I class 372.75 Each 260.93
0.35 Nos Mazdoor II class 336.00 Each 117.60
Total for 10 M 1075.00
Labour for 1 Rm 107.50
Sub Data
Sundries for 1 Rm
8.33 Grm Shellac 17.2000 Grm 143.28
1 set Clamps, plugs and screws 12.10 set 12.10
1.11 Nos Thread ball 3.35 Nos 3.72
Sundries for 1 Rm 159.09

Water Supply
SCMC CIVIL DATA 2018-2019
104
Sl.
Qty Description of work Rate Per Amount
No.

Main Data
For Laying GI pipe line of Dia 15mm 20mm 25mm
Cost of GI pipe per Rm 65.90 93.10 120.80
Labour charges 107.50 107.50 107.50
Sundries 159.09 159.09 159.09
Add for painting 2.51 2.31 2.61
Total per 1 Rm 335.00 362.00 390.00
or Say 335.00 362.00 390.00
B Laying pipe line of dia 32mm, 40mm (1¼ , 11/2)
Sub Data
Labour charges for 10 Rm
0.55 Nos Stone worker I class 595.35 Each 327.44
1.3 Nos Plumber I class 517.65 Each 672.95
0.15 Nos Plumber II class 480.90 Each 72.14
1.05 Nos Mazdoor I class 372.75 Each 391.39
0.55 Nos Mazdoor II class 336.00 Each 184.80
Total for 10 M 1648.72
Labour for 1 Rm 164.87
Sub Data
Sundries for 1 Rm
10 Grm Shellac 17.2000 Grm 172.00
1.11 set Clamps, plugs and screws 12.10 set 13.43
1.50 Nos Thread ball 3.35 Nos 5.03
Total for 1 RM 190.46

Main Data
For Laying GI pipe line of Dia 32mm 40mm
Cost of GI pipe per Rm 142.80 153.90
Labour charges 164.87 164.87
Sundries 190.46 190.46
Add for painting 2.87 2.76
Total per 1 Rm 501.00 512.00
or Say 501.00 512.00

Water Supply
SCMC CIVIL DATA 2018-2019
105
Sl.
Qty Description of work Rate Per Amount
No.
C Laying pipe line of dia 50mm, 65mm (2", 21/4)
Sub Data
Labour charges for 10 Rm
0.70 Nos Stone worker I class 595.35 Each 416.75
1.70 Nos Plumber I class 517.65 Each 880.01
0.20 Nos Plumber II class 480.90 Each 96.18
1.40 Nos Mazdoor I class 372.75 Each 521.85
0.70 Nos Mazdoor II class 336.00 Each 235.20
Total for 10 M 2149.98
Labour for 1 Rm 215.00
Sub Data
Sundries for 1 Rm
15 Grm Shellac 17.2000 Grm 258.00
1.5 set Clamps, plugs and screws 12.10 set 18.15
2.00 Nos Thread ball 3.35 Nos 6.70
Total for 1 RM 282.85

Main Data
For Laying GI pipe line of Dia 50mm 65mm
Cost of GI pipe per Rm 197.80 230.80
Labour charges 215.00 215.00
Sundries 282.85 282.85
Add for painting 2.35 2.35
Total per 1 Rm 698.00 731.00
or Say 698.00 731.00

NOTE : For every additional floor (not less than 3


metre height) upto 3rd floor level, the labour
component is to be increased by 30% for each floor

Water Supply
SCMC CIVIL DATA 2018-2019
106
Sl.
Qty Description of work Rate Per Amount
No.
3 External Water Supply - Below Ground Level open
Supplying, Laying and jointing G.I. pipes of the following size including fixing G.I. specials
but excluding cost of such specials cutting and threading of pipes and fixing to wall with
necessary teak wood plugs, clamps and screws making holes on the wall on drilling holes and
making good the dismantled portions to original condition with necessary brick work and
concrete and plastering work wherever necessary with scaffolding arrangements charges
the pipes are to be painted with two coats of over a priming coat of red oxide primer etc.,
complete
A Laying pipe line of dia 15mm, 20mm & 25mm
(1/2”, ¾” & 1")
Sub Data
Labour charges for 10 Rm
0.85 Nos Plumber I class 517.65 Each 440.00
0.70 Nos Mazdoor I class 372.75 Each 260.93
0.35 Nos Mazdoor II class 336.00 Each 117.60
0.25 Nos painter II class 442.05 Each 110.51
Total for 10 M 929.05
Labour for 1 Rm 92.91
Sub Data
Sundries for 1 Rm
8.33 Grm Shellac 17.2000 Grm 143.28
0.50 Nos Thread ball 3.35 Nos 1.68
1.2 sq.m. Gunny Tape 11.00 sq.m. 13.20
2.5 Kg Tar 38.00 Kg 95.00
Sundries for 1 Rm 253.15
Main Data
For Laying GI pipe line of Dia 15mm 20mm 25mm
Cost of GI pipe per Rm 65.90 93.10 120.80
Labour charges 92.91 92.91 92.91
Materials 253.15 253.15 253.15
Total per 1 Rm 412.00 439.00 467.00
or Say 412.00 439.00 467.00
B Laying pipe line of dia 32mm, 40mm (1¼ , 11/2)
Sub Data
Labour charges for 10 Rm
1.3 Nos Plumber I class 517.65 Each 672.95
1.05 Nos Mazdoor I class 372.75 Each 391.39
0.55 Nos Mazdoor II class 336.00 Each 184.80
0.3 Nos painter II class 442.05 Each 132.62
Total for 10 M 1381.76
Labour for 1 Rm 138.18

Water Supply
SCMC CIVIL DATA 2018-2019
107
Sl.
Qty Description of work Rate Per Amount
No.
Sub Data
Sundries for 1 Rm
10 Grm Shellac 17.2000 Grm 172.00
1.50 Nos Thread ball 3.35 Nos 5.03
1.8 sq.m. Gunny Tape 11.00 sq.m. 19.80
4 Kg Tar 38.00 Kg 152.00
Sundries for 1 Rm 348.83

Main Data
For Laying GI pipe line of Dia 32mm 40mm
Cost of GI pipe per Rm 142.80 153.90
Labour charges 138.18 138.18
Sundries 348.83 348.83
Total per 1 Rm 630.00 641.00
or Say 630.00 641.00
C Laying pipe line of dia 50mm, 65mm (2", 2 /4) 1

Sub Data
Labour charges for 10 Rm
1.70 Nos Plumber I class 517.65 Each 880.01
1.40 Nos Mazdoor I class 372.75 Each 521.85
0.70 Nos Mazdoor II class 336.00 Each 235.20
0.40 Nos painter II class 442.05 Each 176.82
Total for 10 M 1813.89
Labour for 1 Rm 181.39
Sub Data
Sundries for 1 Rm
15 Grm Shellac 17.2000 Grm 258.00
2.00 Nos Thread ball 3.35 Nos 6.70
3 sq.m. Gunny Tape 11.00 sq.m. 33.00
6 Kg Tar 38.00 Kg 228.00
Sundries for 1 Rm 525.70

Main Data
For Laying GI pipe line of Dia 50mm 65mm
Cost of GI pipe per Rm 197.80 230.80
Labour charges 181.39 181.39
Sundries 525.70 525.70
Total per 1 Rm 905.00 938.00
or Say 905.00 938.00

Water Supply
SCMC CIVIL DATA 2018-2019
108
Sl.
Qty Description of work Rate Per Amount
No.
4 Supply, Fixing in position of gate valve of following sizes including cost of shellac, thread,
etc., including labour for cutting and threading of G.I. Pipes etc., complete. including labour
for cutting and threading of G.I. Pipes etc., complete. Complying with standard specification
for both internal and external water supply arrangements.
A Fixing GM Gate valve 20mm & 25mm ( ¾” & 1")

Sub Data
Labour charges
0.25 Nos Fitter I class 526.05 Each 131.51
0.25 Nos Mazdoor I class 372.75 Each 93.19
10 Grm Shellac 17.2000 Grm 172.00
0.30 Nos Thread ball 3.35 Nos 1.01
Total for Each 397.71

Main Data
Gun metal Gate valve 20mm 25mm
Cost of Gun metal Gate valve 325.00 550.00
Labour charges 397.71 397.71
Total per 1 No. 723.00 948.00
or Say 723.00 948.00
B
Fixing GM Gate valve 32mm & 40mm (1¼" , 1 1/2")

0.33 Nos Fitter I class 526.05 Each 173.60


0.33 Nos Mazdoor I class 372.75 Each 123.01
18 Grm Shellac 17.2000 Grm 309.60
0.70 Nos Thread ball 3.35 Nos 2.35
Total for Each 608.55

Main Data
Gun metal Gate valve 32mm 40mm
Cost of Gun metal Gate valve 704.00 906.00
Labour charges 608.55 608.55
Total per 1 No. 1313.00 1515.00
or Say 1313.00 1515.00
C Fixing GM Gate valve 50mm, 65mm (2", 2 /4") 1

0.50 Nos Fitter I class 526.05 Each 263.03


0.50 Nos Mazdoor I class 372.75 Each 186.38
30 Grm Shellac 17.2000 Grm 516.00
1.00 Nos Thread ball 3.35 Nos 3.35
Total for Each 968.75

Water Supply
SCMC CIVIL DATA 2018-2019
109
Sl.
Qty Description of work Rate Per Amount
No.
Main Data
Gun metal Gate valve 50mm 65mm
Cost of Gun metal Gate valve 1150.00 1410.00
Labour charges 968.75 968.75
Total per 1 No. 2119.00 2379.00
or Say 2119.00 2379.00
5 Supply, Fixing in position of Wheel valve of following sizes including cost of shellac, thread,
etc., including labour for cutting and threading of G.I. Pipes etc., complete. including labour
for cutting and threading of G.I. Pipes etc., complete. Complying with standard specification
for both internal and external water supply arrangements.

A Fixing GM Wheel valve 15mm, 20mm & 25mm


(1/2", ¾” & 1")
Sub Data
Labour charges
0.25 Nos Fitter I class 526.05 Each 131.51
0.25 Nos Mazdoor I class 372.75 Each 93.19
10 Grm Shellac 17.2000 Grm 172.00
0.30 Nos Thread ball 3.35 Nos 1.01
Total for Each 397.71

Main Data
Gun metal Wheel valve 15mm 20mm 25mm
Cost of Gun metal Wheel valve 159.00 224.00 326.00
Labour charges 397.71 397.71 397.71
Total per 1 No. 557.00 622.00 724.00
or Say 557.00 622.00 724.00
B
Fixing GM Wheel valve 32mm & 40mm (1¼" , 1 1/2")

0.33 Nos Fitter I class 526.05 Each 173.60


0.33 Nos Mazdoor I class 372.75 Each 123.01
18 Grm Shellac 17.2000 Grm 309.60
0.70 Nos Thread ball 3.35 Nos 2.35
Total for Each 608.55
Main Data
Gun metal Wheel valve 32mm 40mm
Cost of Gun metal Wheel valve 476.00 604.00
Labour charges 608.55 608.55
Total per 1 No. 1085.00 1213.00
or Say 1085.00 1213.00

Water Supply
SCMC CIVIL DATA 2018-2019
110
Sl.
Qty Description of work Rate Per Amount
No.
6 Supply & Fixing in position of 15mm Φ diameter brass CP screw down tap / Pillar Tap
(heavy duty) of approved make conforming to BIS specification and quality including cost of
shellac, thread etc., complying with standard specification and including cutting and
threading wherever necessary etc., complete. tap

0.10 Nos Fitter I class 526.05 Each 52.61


0.10 Nos Mazdoor I class 372.75 Each 37.28
10 Grm Shellac 17.2000 Grm 172.00
0.25 Nos Thread ball 3.35 Nos 0.84
Sundries 0.28
Total for Each 263.00
Main Data
Pillar
PVC Screw Half turn SD Tap Stop cock
down tap tap tap
Cost of Tap 60.50 52.00 211.00 302.00 140.00
Labour charges 59.84 59.84 263.00 263.00 263.00
Total per 1 No. 120.34 111.84 474.00 565.00 403.00
or Say 120 111 474.00 565.00 403.00
7 Supply and Fixing in position of G.I. Unions of heavy duty of approved quality and good
variety of various sizes including necessary cutting and threading of G.I Pipes for jointing
the union and providing two coats of painting with good variety and approved quality of
synthetic enamel paint over a coat of priming coat in case of pipe line above ground level and
one coat of tar in case of below ground level for both internal and external water supply
arrangements. (Various sizes)
Labour charges
0.20 Nos Fitter I class 526.05 Each 105.21
0.20 Nos Mazdoor I class 372.75 Each 74.55
10 Grm Shellac 17.2000 Grm 172.00
0.25 Nos Thread ball 3.35 Nos 0.84
Total for Each 352.60
Main Data
Dia of GI union 15mm 20mm 25mm
Cost of GI union 54.90 65.90 93.10
Labour charges 352.60 352.60 352.60
Total per 1 No. 407.50 418.50 445.70
or Say 408.00 419.00 446.00
Main Data
Dia of GI union 32mm 40mm 50mm
Cost of GI union 120.30 186.30 251.20
Labour charges 352.60 352.60 352.60
Total per 1 No. 472.90 538.90 603.80
or Say 473.00 540.00 604.00

Water Supply
SCMC CIVIL DATA 2018-2019
111
Sl.
Qty Description of work Rate Per Amount
No.
8 Supply and Fixing in position of the folowing G.I. specials of heavy duty of approved quality
and good variety including fixing charges but including necessary cutting and threading of
G.I Pipes for jointing the GI specials and painting with good variety and approved quality of
synthetic enamel paint over a coat of priming coat in case of pipe line above ground level and
one coat of tar in case of below ground level for both internal and external water supply
arrangements.
I GI Elbow
a 50mm dia
1.00 No Cost of Elbow 120.80 Each 120.80
1.00 No Cutting 13.40 Each 13.40
2.00 Nos Threading 27.00 Each 54.00
Sundries for painting / shellac
Total for Each 188.20
Say 188.00
b 40mm dia
1.00 No Cost of Elbow 93.10 Each 93.10
1.00 No Cutting 10.50 Each 10.50
2.00 Nos Threading 24.30 Each 48.60
Sundries for painting / shellac
Total for Each 152.20
Say 152.00
c 32mm dia
1.00 No Cost of Elbow 82.10 Each 82.10
1.00 No Cutting 7.80 Each 7.80
2.00 Nos Threading 21.60 Each 43.20
Sundries for painting / shellac
Total for Each 133.10
Say 133.00
d 25mm dia
1.00 No Cost of Elbow 54.90 Each 54.90
1.00 No Cutting 6.50 Each 6.50
2.00 Nos Threading 16.00 Each 32.00
Sundries for painting / shellac
Total for Each 93.40
Say 93.00
e 20mm dia
1.00 No Cost of Elbow 24.00 Each 24.00
1.00 No Cutting 5.40 Each 5.40
2.00 Nos Threading 7.80 Each 15.60
Sundries for painting / shellac
Total for Each 45.00
Say 45.00

Water Supply
SCMC CIVIL DATA 2018-2019
112
Sl.
Qty Description of work Rate Per Amount
No.
f 15mm dia
1.00 No Cost of Elbow 15.10 Each 15.10
1.00 No Cutting 5.40 Each 5.40
2.00 Nos Threading 7.60 Each 15.20
Sundries for painting / shellac
Total for Each 35.70
Say 36.00
II GI Bend
a 50mm dia
1.00 No Cost of Bend 109.80 Each 109.80
1.00 No Cutting 13.40 Each 13.40
2.00 Nos Threading 27.00 Each 54.00
Sundries for painting / shellac
Total for Each 177.20
Say 177.00
b 40mm dia
1.00 No Cost of Bend 82.10 Each 82.10
1.00 No Cutting 10.50 Each 10.50
2.00 Nos Threading 24.30 Each 48.60
Sundries for painting / shellac
Total for Each 141.20
Say 141.00
c 32mm dia
1.00 No Cost of Bend 65.90 Each 65.90
1.00 No Cutting 7.80 Each 7.80
2.00 Nos Threading 21.60 Each 43.20
Sundries for painting / shellac
Total for Each 116.90
Say 117.00
d 25mm dia
1.00 No Cost of Bend 49.10 Each 49.10
1.00 No Cutting 6.50 Each 6.50
2.00 Nos Threading 16.00 Each 32.00
Sundries for painting / shellac
Total for Each 87.60
Say 88.00

Water Supply
SCMC CIVIL DATA 2018-2019
113
Sl.
Qty Description of work Rate Per Amount
No.
e 20mm dia
1.00 No Cost of Bend 21.90 Each 21.90
1.00 No Cutting 5.40 Each 5.40
2.00 Nos Threading 7.80 Each 15.60
Sundries for painting / shellac
Total for Each 42.90
Say 43.00
f 15mm dia
1.00 No Cost of Bend 12.90 Each 12.90
1.00 No Cutting 5.40 Each 5.40
2.00 Nos Threading 7.60 Each 15.20
Sundries for painting / shellac
Total for Each 33.50
Say 34.00
III GI Tee
a 50mm dia
1.00 No Cost of Tee 131.90 Each 131.90
2.00 Nos Cutting 13.40 Each 26.80
3.00 Nos Threading 27.00 Each 81.00
Sundries for painting / shellac
Total for Each 239.70
Say 240.00
b 40mm dia
1.00 No Cost of Tee 104.00 Each 104.00
2.00 No Cutting 10.50 Each 21.00
3.00 Nos Threading 24.30 Each 72.90
Sundries for painting / shellac
Total for Each 197.90
Say 198.00
c 32mm dia
1.00 No Cost of Tee 93.10 Each 93.10
2.00 No Cutting 7.80 Each 15.60
3.00 Nos Threading 21.60 Each 64.80
Sundries for painting / shellac
Total for Each 173.50
Say 174.00

Water Supply
SCMC CIVIL DATA 2018-2019
114
Sl.
Qty Description of work Rate Per Amount
No.
d 25mm dia
1.00 No Cost of Tee 76.80 Each 76.80
2.00 No Cutting 6.50 Each 13.00
3.00 Nos Threading 16.00 Each 48.00
Sundries for painting / shellac
Total for Each 137.80
Say 138.00
e 20mm dia
1.00 No Cost of Tee 32.80 Each 32.80
2.00 No Cutting 5.40 Each 10.80
3.00 Nos Threading 7.80 Each 23.40
Sundries for painting / shellac
Total for Each 67.00
Say 67.00
f 15mm dia
1.00 No Cost of Tee 27.10 Each 27.10
2.00 No Cutting 5.40 Each 10.80
3.00 Nos Threading 7.60 Each 22.80
Sundries for painting / shellac
Total for Each 60.70
Say 61.00
IV GI Coupling
a 50mm dia
1.00 No Cost of Coupling 65.90 Each 65.90
1.00 No Cutting 13.40 Each 13.40
2.00 Nos Threading 27.00 Each 54.00
Sundries for painting / shellac
Total for Each 133.30
Say 133.00
b 40mm dia
1.00 No Cost of Coupling 54.39 Each 54.39
1.00 No Cutting 10.50 Each 10.50
2.00 Nos Threading 24.30 Each 48.60
Sundries for painting / shellac
Total for Each 113.49
Say 113.00

Water Supply
SCMC CIVIL DATA 2018-2019
115
Sl.
Qty Description of work Rate Per Amount
No.
c 32mm dia
1.00 No Cost of Coupling 43.90 Each 43.90
1.00 No Cutting 7.80 Each 7.80
2.00 Nos Threading 21.60 Each 43.20
Sundries for painting / shellac
Total for Each 94.90
Say 95.00
d 25mm dia
1.00 No Cost of Coupling 27.10 Each 27.10
1.00 No Cutting 6.50 Each 6.50
2.00 Nos Threading 16.00 Each 32.00
Sundries for painting / shellac
Total for Each 65.60
Say 66.00
e 20mm dia
1.00 No Cost of Coupling 15.10 Each 15.10
1.00 No Cutting 5.40 Each 5.40
2.00 Nos Threading 7.80 Each 15.60
Sundries for painting / shellac
Total for Each 36.10
Say 36.00
f 15mm dia
1.00 No Cost of Coupling 12.90 Each 12.90
1.00 No Cutting 5.40 Each 5.40
2.00 Nos Threading 7.60 Each 15.20
Sundries for painting / shellac
Total for Each 33.50
Say 34.00
9 Supplying and fixing in position Indian make bewelled edge mirror of approved quality and
brand PVC / Fibre Glass framed of size 600mm x 450mm x 5.5mm with necessary plastic
back PVC frame with bottom stand of approved colour with brass screws, Rawal plugs etc.,
complete as per standard specifications.

1 No Indian make bewelled edge mirror 440.00 No 440.00


0.33 Nos Carpenter II class 533.40 Each 176.02
0.33 No Mazdoor I class 372.75 Each 123.01
3 Nos TW plugs 1.00 Each 3.00
3 Nos Brass CP screws (30 x 6mm) 2.25 Each 6.75
Sundries 0.22
Total for Each 749.00

Water Supply
SCMC CIVIL DATA 2018-2019
116
Sl.
Qty Description of work Rate Per Amount
No.
10 Supplying and fixing best approved quality brass chromium Plated Towel Rail 600mm long
and 20mm dia with brackets of some material including cost of teak wood plugs. CP Screws
etc., Complete.

1 No Cost of brass Chromium Plated Towel Rail 248.80 No 248.80


0.15 Nos Fitter I class 526.05 Each 78.91
0.15 No Mazdoor I class 372.75 Each 55.91
6 Nos T.W. plugs 1.00 Each 6.00
6 Nos Brass CP screws ( 30 x 6mm) 2.25 Each 13.50
Sundries 0.02
Total for Each 403.14

Say 403.00
11 Supplying and fixing best approved quality Aluminium anodised Towel Rail 600mm long and
20mm dia with brackets of some material including cost of teak wood plugs. CP Screws etc.,
Complete.

1 No Cost of Aluminium anodised Towel Rail 128.00 No 128.00


0.15 Nos Fitter I class 526.05 Each 78.91
0.15 No Mazdoor I class 372.75 Each 55.91
6 Nos T.W. plugs 1.00 Each 6.00
6 Nos Brass CP screws ( 30 x 6mm) 2.25 Each 13.50
Sundries 0.02
Total for Each 282.34

Say 282.00
12 Supply and fixing of best approved quality brass CP soap tray of size 150 x 150mm including
Cost of Teak wood Plugs Screws etc., Complete.

1 No CP soap tray 254.00 No 254.00


0.10 Nos Carpenter II class 533.40 Each 53.34
0.10 No Mazdoor II class 336.00 Each 33.60
2 Nos T.W. plugs 1.00 Each 2.00
2 Nos Brass CP screws ( 30 x 6mm) 2.25 Each 4.50
Sundries 0.56
Total for Each 348.00

Water Supply
SCMC CIVIL DATA 2018-2019
117
Sl.
Qty Description of work Rate Per Amount
No.
13 Supplying, Laying and jointing G.I. pipes of the following size including fixing G.I. specials
but excluding cost of such specials cutting and threading of pipes and fixing to wall with
necessary teak wood plugs, clamps and screws making holes on the wall on drilling holes and
making good the dismantled portions to original condition with necessary brick work and
concrete and plastering work wherever necessary with scaffolding arrangements charges
the pipes are to be painted with two coats of over a priming coat of red oxide primer etc.,
complete
1
a) /2”, ¾” & 1" (15mm, 20mm & 25mm) GI Pipe
Internal concealed
0.30 Nos Stone worker II class 533.40 Each 160.02
0.75 Nos Plumber I class 517.65 Each 388.24
0.10 Nos Plumber II class 480.90 Each 48.09
0.60 Nos Mazdoor I class 372.75 Each 223.65
Total for 10 M 820.00
Rate for 1 M 82.00
8.33 Grm Shellac 17.2000 Grm 143.28
1.66 set Clamps, plugs and screws 9.20 set 15.27
1.66 Nos Thread ball 3.35 Nos 5.56
Total for 1 RM 246.11
Additional labour for concealed
0.70 Nos Stone worker II class 533.40 Each 373.38
0.30 Nos Mazdoor II class 336.00 Each 100.80
20.00 Nos L' clamp for holding the pipes 5.00 Each 100.00
0.01 m 3
Cement mortar 1:3 mix 3533.80 m 3
35.34
Total for 10 RM 609.52
Rate for 1 M 60.95
Total = 73.21 + 38.29 = 111.50 307.06
Total for 1 RM =Rs. 307.06 say Rs. 112.00
Main Data
Dia of GI pipe 15mm 20mm 25mm
Cost of GI pipe 65.90 93.10 120.80
Labour charges 112.00 112.00 112.00
Total per 1 No. 177.90 205.10 232.80
or Say 178.00 205.00 233.00

Water Supply
SCMC CIVIL DATA 2018-2019
118
Sl.
Qty Description of work Rate Per Amount
No.
b) 1¼ , 11/2 (32mm, 40mm) GI Pipe Internal concealed
0.45 Nos Stone worker II class 533.40 Each 240.03
1.15 Nos Plumber I class 517.65 Each 595.30
0.15 Nos Plumber II class 480.90 Each 72.14
0.90 Nos Mazdoor I class 372.75 Each 335.48
0.45 Nos Mazdoor II class 336.00 Each 151.20
Total for 10 M 1394.14
Rate for 1 M 139.41
10 Grm Shellac 17.2000 Grm 172.00
1 set Clamps, plugs and screws 9.20 set 9.20
0.50 Nos Thread ball 3.35 Nos 1.68
Total for 1 RM 322.29
Additional labour for concealed
0.75 Nos Stone worker II class 533.40 Each 400.05
0.30 Nos Mazdoor II class 336.00 Each 100.80
20.00 Nos L' clamp for holding the pipes 5.00 Each 100.00
0.03 m 3
Cement mortar 1:3 mix 3533.80 m 3
106.01
Total for 10 RM 706.87
Rate for 1 M 70.69
Total = 99.06 + 45.31 = 144.37 392.98
Total for 1 RM =Rs. 392.98 say Rs. 144.00
Main Data
Dia of GI pipe 32mm 40mm
Cost of GI pipe 142.80 153.90
Labour charges 144.00 144.00
Total per 1 No. 286.80 297.90
or Say 287.00 298.00
c) 1
2", 2 /4 (50mm, 65mm) GI Pipe Internal concealed
0.60 Nos Stone worker II class 533.40 Each 320.04
1.50 Nos Plumber I class 517.65 Each 776.48
0.20 Nos Plumber II class 480.90 Each 96.18
1.20 Nos Mazdoor I class 372.75 Each 447.30
0.60 Nos Mazdoor II class 336.00 Each 201.60
Total for 10 M 1841.60
Rate for 1 M 184.16
15 Grm Shellac 17.2000 Grm 258.00
1 set Clamps, plugs and screws 9.20 set 9.20
0.75 Nos Thread ball 3.35 Nos 2.51
Total for 1 RM 453.86

Water Supply
SCMC CIVIL DATA 2018-2019
119
Sl.
Qty Description of work Rate Per Amount
No.
Additional labour for concealed
0.80 Nos Stone worker II class 533.40 Each 426.72
0.40 Nos Mazdoor II class 336.00 Each 134.40
20.00 Nos L' clamp for holding the pipes 5.00 Each 100.00
0.06 m3 Cement mortar 1:3 mix 3533.80 m3 212.03
Total for 10 RM 873.15
Rate for 1 M 87.31
541.18
Total for 1 RM =Rs. 541.18
Main Data
Dia of GI pipe 50mm 65mm
Cost of GI pipe 197.80 230.80
Labour charges 541.18 541.18
Total per 1 No. 738.98 771.98
or Say 738.98 771.98
14 Supplying, Laying and jointing PVC pipes of approved quality and best variety comforming to
ISS and with ISI mark of following sizes including cutting threading and fixing PVC
specials but excluding cost of such specials and fixing to wall with necessary teak wood
plugs, clamps and screws making holes on the wall on drilling holes and making good the
dismantled portions to original condition with necessary brick work and concrete and
plastering work wherever necessary with scaffolding arrangements charges.
1
a) /2”, ¾” & 1" (15mm, 20mm & 25mm) PVC Pipe Internal Open
0.30 Nos Stone worker II class 533.40 Each 160.02
0.45 Nos Plumber I class 517.65 Each 232.94
0.10 Nos Plumber II class 480.90 Each 48.09
0.40 Nos Mazdoor I class 372.75 Each 149.10
0.30 Nos Mazdoor II class 336.00 Each 100.80
Total for 10 M 690.95
Rate for 1 M 69.10
8.33 Grm PVC adhesive 32.10 Grm 267.37
1.66 set PVC Clamps, plugs and screws 9.20 set 15.27
Sundries 0.00
Total for 1 RM 351.73
Main Data
Dia of PVC pipe (10Kg/cm2) 15mm 20mm 25mm
Cost of PVC pipe 13.90 20.60 35.10
Labour charges 351.73 351.73 351.73
Total per 1 No. 365.63 372.33 386.83
or Say 365.63 372.33 386.83

Water Supply
SCMC CIVIL DATA 2018-2019
120
Sl.
Qty Description of work Rate Per Amount
No.
b) 1¼ , 11/2 (32mm, 40mm) PVC Pipe Internal Open
0.45 Nos Stone worker II class 533.40 Each 240.03
0.7 Nos Plumber I class 517.65 Each 362.36
0.15 Nos Plumber II class 480.90 Each 72.14
0.60 Nos Mazdoor I class 372.75 Each 223.65
0.45 Nos Mazdoor II class 336.00 Each 151.20
Total for 10 M 1049.38
Rate for 1 M 104.94
10 Grm PVC adhesive 32.10 Grm 321.00
1 set PVC Clamps, plugs and screws 9.20 set 9.20
Sundries 0.00
Total for 1 RM 435.14
Main Data
Dia of PVC pipe (10Kg/cm2) 32mm 40mm
Cost of PVC pipe 52.50 82.20
Labour charges 435.14 435.14
Total per 1 No. 487.64 517.34
or Say 487.64 517.34
c) 2", 21/4 (50mm, 63mm) PVC Pipe Internal Open
0.60 Nos Stone worker II class 533.40 Each 320.04
0.90 Nos Plumber I class 517.65 Each 465.89
0.20 Nos Plumber II class 480.90 Each 96.18
0.75 Nos Mazdoor I class 372.75 Each 279.56
0.60 Nos Mazdoor II class 336.00 Each 201.60
Total for 10 M 1363.27
Rate for 1 M 136.33
15 Grm PVC adhesive 32.10 Grm 481.50
1 set PVC Clamps, plugs and screws 9.20 set 9.20
Total for 1 RM 627.03
Main Data
Dia of PVC pipe (6Kg/cm2) 50mm 63mm
Cost of PVC pipe 122.90 111.30
Labour charges 627.03 627.03
Total per 1 No. 749.93 738.33
or Say 749.93 738.33

Water Supply
SCMC CIVIL DATA 2018-2019
121
Sl.
Qty Description of work Rate Per Amount
No.
15 Supplying, Laying and jointing PVC pipes of approved quality and best variety comforming to
ISS and with ISI mark of following sizes including cutting threading and fixing PVC
specials but excluding cost of such specials and fixing to wall with necessary teak wood
plugs, clamps and screws making holes on the wall on drilling holes and making good the
dismantled portions to original condition with necessary brick work and concrete and
plastering work wherever necessary with scaffolding arrangements charges.
a) 1
/2”, ¾” & 1" (15mm, 20mm & 25mm) PVC Pipe Internal Concealed
0.30 Nos Stone worker II class 533.40 Each 160.02
0.45 Nos Plumber I class 517.65 Each 232.94
0.10 Nos Plumber II class 480.90 Each 48.09
0.40 Nos Mazdoor I class 372.75 Each 149.10
0.30 Nos Mazdoor II class 336.00 Each 100.80
Total for 10 M 690.95
Rate for 1 M 69.10
8.33 Grm PVC adhesive 32.10 Grm 267.39
1.66 set PVC Clamps, plugs and screws 9.20 set 15.27
Sundries 0.01
Total for 1 RM 351.76
Additional labour for concealed
0.70 Nos Stone worker II class 533.40 Each 373.38
0.30 Nos Mazdoor II class 336.00 Each 100.80
20.00 Nos L' clamp for holding the pipes 5.00 Each 100.00
0.01 m3 Cement mortar 1:3 mix 3533.80 m3 35.34
Sundries 0.13
Total for 10 RM 609.65
Rate for 1 M 60.96
Total = 60.50 + 38.30 = 98.80 412.74
Total for 1 RM =Rs. 412.74
Main Data
Dia of PVC pipe (10Kg/cm2) 15mm 20mm 25mm
Cost of PVC pipe 13.90 20.60 35.10
Labour charges 412.74 412.74 412.74
Total per 1 No. 426.64 433.34 447.84
or Say 426.64 433.34 447.84

Water Supply
SCMC CIVIL DATA 2018-2019
122
Sl.
Qty Description of work Rate Per Amount
No.
b) 1¼ , 11/2 (32mm, 40mm) PVC Pipe Internal Concealed
0.45 Nos Stone worker II class 533.40 Each 240.03
0.7 Nos Plumber I class 517.65 Each 362.36
0.15 Nos Plumber II class 480.90 Each 72.14
0.60 Nos Mazdoor I class 372.75 Each 223.65
0.45 Nos Mazdoor II class 336.00 Each 151.20
Total for 10 M 1049.37
Rate for 1 M 104.94
10 Grm PVC adhesive 32.10 Grm 321.00
1 set PVC Clamps, plugs and screws 9.20 set 9.20
Total for 1 RM 435.14
Additional labour for concealed
0.75 Nos Stone worker II class 533.40 Each 400.05
0.30 Nos Mazdoor II class 336.00 Each 100.80
20.00 Nos L' clamp for holding the pipes 5.00 Each 100.00
0.03 m 3
Cement mortar 1:3 mix 3533.80 m 3
106.01
Total for 10 RM 706.87
Rate for 1 M 70.69
Total = 76.96 + 45.31 = 122.27 505.82
Total for 1 RM =Rs. 505.82
Main Data
Dia of PVC pipe (10Kg/cm2) 32mm 40mm
Cost of PVC pipe 52.50 82.20
Labour charges 505.82 505.82
Total per 1 No. 558.32 588.02
or Say 558.32 588.02
1
c) 2", 2 /4 (50mm, 63mm) PVC Pipe Internal Concealed
0.60 Nos Stone worker II class 533.40 Each 320.04
0.90 Nos Plumber I class 517.65 Each 465.89
0.20 Nos Plumber II class 480.90 Each 96.18
0.75 Nos Mazdoor I class 372.75 Each 279.56
0.60 Nos Mazdoor II class 336.00 Each 201.60
Total for 10 M 1363.27
Rate for 1 M 136.33
15 Grm PVC adhesive 32.10 Grm 481.50
1 set PVC Clamps, plugs and screws 9.20 set 9.20
Total for 1 RM 627.03

Water Supply
SCMC CIVIL DATA 2018-2019
123
Sl.
Qty Description of work Rate Per Amount
No.
Additional labour for concealed
0.80 Nos Stone worker II class 533.40 Each 426.72
0.40 Nos Mazdoor II class 336.00 Each 134.40
20.00 Nos L' clamp for holding the pipes 5.00 Each 100.00
0.06 m 3
Cement mortar 1:3 mix 3533.80 m 3
212.03
Total for 10 RM 873.15
Rate for 1 M 87.31
714.34
Total for 1 RM =Rs. 714.34
Main Data
Dia of PVC pipe (6Kg/cm2) 50mm 63mm
Cost of PVC pipe 122.90 111.30
Labour charges 714.34 714.34
Total per 1 No. 837.24 825.64
or Say 837.24 825.64

Water Supply
SCMC CIVIL DATA 2018-2019
124
SALEM CITY MUNICIPAL CORPORATION
SALEM DISTRICT
CIVIL DATA 2018 -2019
S.
Description RATE
No
Earthwork Excavation
Earth work excavation for foundation in ordinary soil, light black cotton sandy
loam and dry silt including shoring, strutting, baling or pumping out water
1 wherever necessary and refilling the sides of foundation with excavated earth
in layers of 15cm thick and depositing the surplus earth at places as directed
by the departmental officers with initial lead and lift
For Foundation 90.00
For Drain 66.90
Earth work excavation for foundation in hard stiff clay, stiff black cotton, hard
red earth, shabs murams and ordinary gravel and hard dravel including
shoring, strutting, baling or pumping out water wherever necessary and
2
refilling the sides of foundation with excavated earth in layers of 15cm thick
and depositing the surplus earth at places as directed by the departmental
officers with initial lead and lift
For Foundation 136.00
For Drain 101.70

Conveyance of Earth
Conveyance of excavated earth and clearing away from site to a lead of 1KM
3 40.00
from site etc., complete
Conveyance of excavated earth and clearing away from site to a lead of 2KM
4 50.00
from site etc., complete
Conveyance of Cut stone slabs including stacking at places as directed by
5 40.00
departmental officers to a lead of 1 KM from site etc., complete
Conveyance of Cut stone slabs including stacking at places as directed by
6 50.00
departmental officers to a lead of 2 KM from site etc., complete

Filling
Filling in basement with excavated earth (other than sand) in layers of 15cm
7 24.00
thick well rammed watered and consolidated as per standard specification

Collection,supply and filling of sand from approved quarry to work site and
stocking to the Departmental gauge for premeasurement as directed by the
8 Departmental Engineer, to required depth not more than 15cm depth 831.00
including cost and Conveyance of sand to site and all labour charges for
filling etc., Complete complying with Standard Specification

Collection,supply and filling of Well gravel from approved quarry to work site
and stocking to the Departmental gauge for premeasurement as directed by
9 the Departmental Engineer, to required depth not more than 15cm depth 242.00
including cost and Conveyance of gravel to site and all labour charges for
filling etc., Complete complying with Standard Specification

Oneline-Rate
SCMC CIVIL DATA 2018-2019
125
Plain Cement Concrete
Plain cement concrete 1:2:4 mix (One cement two sand and four aggregate)
using 20mm size ISS gauge HBBG metal including mixing, laying,
10 4667.00
consolidating, curing, cost and conveyance of all materials to site and all
labour charges etc., complete as per standard specification
Below Ground Level
Above 1.50m depth and up to 4.50m below 4726.00
Above 4.50m depth and up to 9.00m below 4843.00
Above Ground Level
Add to basic rate upto 4.50m height in G.F. ie Plinth level 4727.00
Add for works in every upper floor over the rate of proceding floor 4844.00
Plain cement concrete 1:3:6 mix (One cement three sand and six aggregate)
using 20mm size ISS gauge HBBG metal including mixing, laying,
11 4070.00
consolidating, curing, cost and conveyance of all materials to site and all
labour charges etc., complete as per standard specification
Plain cement concrete 1:4:8 mix (One cement four sand and eight aggregate)
using 40mm size ISS gauge HBBG metal including mixing, laying,
12 3444.00
consolidating, curing, cost and conveyance of all materials to site and all
labour charges etc., complete as per standard specification
Plain cement concrete 1:5:10 mix (One cement five sand and ten aggregate)
using 40mm size ISS gauge HBBG metal including mixing, laying,
13 3265.00
consolidating, curing, cost and conveyance of all materials to site and all
labour charges etc., complete as per standard specification

Ready Mix Concrete


Providing and laying in position of ready mix concrete M20 (1:1.5:3) mix
using portlend cement with water cement ratio not exceeding 0.45 including
the use of plastidizer of approved make and dosage required grade at all
location and levels using 20mm ISS gauge HBBG metal and down graded
aggregates in all type of works including hire charges for pump and pumping
14 charges to required location. machine, vibrating, tapping, curing as specified 5111.00
charges conveyance for ready mixed concrete from RMC plant to site or
required ( excluding cost of reinforcement, fabrication charges centering and
shuttering ) mix design details to be got approval before commencement of
works adopting pour card system by depatmental officers etcc complete as
per IS 4926 of 1976/1990

Providing and laying in position of ready mix concrete M20 (1:1.5:3) mix
using portlend cement with water cement ratio not exceeding 0.45 including
the use of plastidizer of approved make and dosage required grade at all
location and levels using 20mm ISS gauge HBBG metal and down graded
aggregates in all type of works including hire charges for pump and pumping
15 charges to required location. machine, vibrating, tapping, curing as specified 5116.00
charges conveyance for ready mixed concrete from RMC plant to site or
required ( excluding cost of reinforcement, fabrication charges centering and
shuttering ) mix design details to be got approval before commencement of
works adopting pour card system by depatmental officers etcc complete as
per IS 4926 of 1976/1990

Oneline-Rate
SCMC CIVIL DATA 2018-2019
126
Providing and laying in position of ready mix concrete M15 (1:2:4) mix using
portlend cement with water cement ratio not exceeding 0.45 including the use
of plastidizer of approved make and dosage required grade at all location and
levels using 20mm ISS gauge HBBG metal and down graded aggregates in
all type of works including hire charges for pump and pumping charges to
16 required location. machine, vibrating, tapping, curing as specified charges 4921.00
conveyance for ready mixed concrete from RMC plant to site or required (
excluding cost of reinforcement, fabrication charges centering and shuttering
) mix design details to be got approval before commencement of works
adopting pour card system by depatmental officers etcc complete as per IS
4926 of 1976/1990

Providing and laying in position of ready mix concrete M15 (1:2:4) mix using
portlend cement with water cement ratio not exceeding 0.45 including the use
of plastidizer of approved make and dosage required grade at all location and
levels using 20mm ISS gauge HBBG metal and down graded aggregates in
all type of works including hire charges for pump and pumping charges to
17 required location. machine, vibrating, tapping, curing as specified charges 4906.00
conveyance for ready mixed concrete from RMC plant to site or required (
excluding cost of reinforcement, fabrication charges centering and shuttering
) mix design details to be got approval before commencement of works
adopting pour card system by depatmental officers etcc complete as per IS
4926 of 1976/1990

Reinforced Cement Concrete


Reinforced cement concrete 1:1½:3 mix (One cement one and half sand
three aggregate) using 20mm ISS gauge HBBG metal from the approved
18 quarry including mixing, laying, consolidating, curing cost and conveyance of
all materials to site and all labour charges etc., complete as per standard
specification
Foundation Basement 6161.10
Upto 4.50m height (plinth level to 4.50m ht) 6221.00
First floor (Above 4.50m ht from plinth level) 6338.00
Second floor 6455.00
Third floor 6572.00
Reinforced cement concrete 1:2:4 mix (One cement two sand and four
aggregate) using 20mm ISS gauge HBBG metal from the approved quarry
19 including mixing, laying, consolidating, curing cost and conveyance of all
materials to site and all labour charges etc., complete as per standard
specification
Foundation Basement 5565.00
Upto 4.50m height (plinth level to 4.50m ht) 5625.00
First floor (Above 4.50m ht from plinth level) 5742.00
Second floor 5859.00
Third floor 5976.00
Reinforced cement concrete skirting 50mm thick using cement mortar 1:3mix
20 without chips but with chickenmesh excluding cost of reinforcement grills in 1485.00
position but including strutting laying curing and finishing etc. complete
Wearing coat with cement concrete of 1:1½:3 mix using 65% of 25mm ISS
gauge HBBG chips 25% of 12mm ISS gauge HBBG chips and 10% of 6mm
21 4892.00
ISS gauge HBBG chips including cost and conveyance of all materials and
labour charges etc.
Oneline-Rate
SCMC CIVIL DATA 2018-2019
127
Plain cement concrete 1:2:4 (one cement, two sand & four aggregates) mix
22 using 10mm ISS gauge HBGG metal including cost of materials and all 4298.00
labour charges etc., complete and fixing broken glass pieces on concrete
Supplying and fixing RCC 1:2:4 mix using 20mm ISS gauge HBBG chips for
precast post of height 2.25m and 0.15 x 0.15m size at bottom and 0.10 x
23 740.00
0.10m at top including cost of reinforcement and cost of moulding, casting,
finishing and fixing in position etc., complete

Centering
Supplying and errecting centering to sides and soffits including supports and
strutting for drainage sides and culvert body wall sides using M.S Sheets of
size 90cm x 60cm and B.G 10stifened with welded mild steel angles of size
24 25mm x 25mm x 3mm for boarding laid over( silver oak joists ) of size 10cm
x 6.50cm spread at about 90cm including all labour charges and cost and
conveyance of all materials to site etc. complete Complying with Standard
Specification
Centering for curved surface (15%) 683.58
Centering for Plain surface 594.42
Centering for Column & Sunshade (20%) 713.30
Centering without strutting above 1m height 517.70
Centering without strutting below 1m height 258.85
3.30m to 4.30m 619.98
4.30m to 5.30m 645.55
5.30m to 6.30m 671.12
6.30m to 7.30m 696.69
7.30m to 8.30m 722.25
8.30m to 9.3m 747.82
Providing two legged scaffolding using 15cm diameter blue-gum props or
casurina props or best quality bamboo props of 4m overall length (3m height
+ 0.50m into the ground + 0.50m projection) the distance between the two
rows being 2m in both the rows with two horizontal props with 0.50m overlap
25
on either side and braces at 2m c/c including longitudinal and transverse
middle braces to step up and providing a platform with country wood planks
of 40mm thick and 1m width etc complete from using coir and nails etc
complete.
Rate for scafolding for a height of 3m, and length of every additional
311.69
height of 2.5m, taking 6m run
Rate upto 3m height 350.00
Rate upto 5.5m height 661.69
Rate upto 8m height 973.38
Rate upto 10.5m height 1285.08
RCC 1:2:4 mix using 20mm ISS gauge HBBG chips for slab of the following
26 thickness excluding cost of reinforcement grills in position but including
moulding, casting, finishing and fixing in position etc., complete
100mm thick slab 673.61
75mm thick slab 507.44
50mm thick slab 336.22

Oneline-Rate
SCMC CIVIL DATA 2018-2019
128
Steel
Supply and fabrication and placing in position of TMT steel roads to required
size and length as directed by the departmental officers including cost of
27 binding wire, cutting, bending and tying with proper position etc., including 62.74
cost and conveyance of all materials to site and all labour charges etc.,
complete Complying with Standard Specification

Stone Masonry
Random Rubble Masonry in Cement Mortor 1:5 Mix (one cement, five sand)
using new best rough and bond stones from approved quarry including cost
28 and conveyance of all materials to site loading and unloading charges and 3406.24
labour charges for mixing,laying with simaltaneous pointingand curing etc.
complete. complying with std. specifications

Random Rubble Masonry in Cement Mortor 1:5 Mix (one cement, five sand)
using old best rough and bond stones from approved quarry including cost
29 and conveyance of all materials to site loading and unloading charges and 2827.92
labour charges for mixing ,laying with simaltaneous pointingand curing etc.
complete. Complying with std. Specifications.

Supply and fixing in position of cut stone cover slabs neatly dressed in all
30 sides except bottom one line dressing including fixing in position with cement 4790.21
mortar 1:3 mix and pointing with the same mortar etc., complete
Removing and re-fixing the existing C.S. / C.C. slabs including fixing in
31 position with cement mortar 1:3 mix and pointing with the same mortar etc., 1150.31
complete
Providing cut stone paving slab 75mm to 100mm thick of required sizes
neatly dressed in all sides except bottom one line dressing pointing with
32 cement mortar 1:3 mix for full depth of the slab and earth work excavation in 784.21
all soils 15cm thick sectioning and levelling including supplying and filling of
sand 50mm thick cushion for paving the slab
Removing and re-fixing cut stone paving slabs including pointing with cement
33 mortar 1:3 mix for full depth of the slab and supplying and filling of sand 443.82
25mm thick cushion for paving the slab
Providing old cut stone paving slab 75mm to 100mm thick of required sizes
34 and pointing with cement mortar 1:3 mix for full depth of the slab supplying 429.16
and filling of sand 50mm thick cushion for paving the slab
Providing cut stone kerb stone of size 60cm x 10cm x 37.5cm with all faces
neatly dressed oneline dressing with chambered edge on the road side
35 including earth work excavation in all soils for 10cm width and 22.5cm depth 203.06
and fixing the stone in position including grouting the joints with cement
mortar 1:3 mix etc., complete
Providing Cut stone kerb stone using old cutstone paving slabs with all faces
neatly dressed one line dressing with chambered edge on the road side
36 including earth work excavation in all soils for 0.23 width and 45cm depth and 115.63
fixing the stone in position including grouting the joints with cement mortar
1:3 mix etc., complete

Oneline-Rate
SCMC CIVIL DATA 2018-2019
129
Brick Masonry
Brick Work in Cement Mortar 1:5 Mix (one cement, five sand) using new best
II Class Bricks of size ( 9” x 4 3/8” x 23/4“) from approved quarry including
37 cost and conveyance of all materials to site. Loading and unloading charges 4979.20
and labour charges for mixing, laying and curing etc. complete. Complying
with std. specifications
Upto 4.50m height (from plinth level) 5018.40
1st floor 5097.30
2nd floor 5176.20
3rd floor 5255.10
Brick work in cement mortar 1:5 mix using Fly Ash bricks of 230x110x70mm
(8 3/4" x 41/4" x 23/4") from approved quarry including cost and conveyance
38 4832.53
of all materials to site. Loading and unloading charges and labour charges for
mixing, laying and curing etc. complete. Complying with std. specifications
Upto 4.50m height (from plinth level) 4871.73
1st floor 4950.63
2nd floor 5029.53
3rd floor 5108.43
Damp proof course with cement mortar 1:4mix (one cement and four sand)
12mm thick mixed with approved quality water proofing compound
39 165.23
conforming to Indian standard specification as specified by departmental
officers at 2% by weight of cement used etc. complete
Honey comb brick work in cement mortar 1:5mix (one cement and five sand)
using country bricks of size 8 3/4" x 41/4" x 23/4" including cost and
40 conveyance of all materials to site. Loading and unloading charges and 1046.15
labour charges for mixing, laying and curing etc. complete. Complying with
std. specifications

Pointing
Pointing in Cement Mortar 1:3 Mix (one Cement, Three sand ) flush pointing
to Brick work including cost and conveyance of all materials to site, loading
41 162.15
and unloading charges and labour charges for mixing, laying and curing etc.
complete . complying with std. specifications
Pointing in Cement Mortar 1:3 Mix (one Cement, Three sand ) flush pointing
to RR masonry including cost and conveyance of all materials to site, loading
42 172.75
and unloading charges and labour charges for mixing, laying and curing etc.
complete . complying with std. specifications
Pointing in Cement Mortar 1:3 Mix (one Cement, Three sand ) flush pointing
to full depth of tiles including cost and conveyance of all materials to site,
43 187.08
loading and unloading charges and labour charges for mixing, laying and
curing etc. complete . complying with std. specifications

Pointing in Cement Mortar 1:3 Mix (one Cement, Three sand ) flush pointing
to full depth of cuddapha slab including cost and conveyance of all materials
44 144.48
to site, loading and unloading charges and labour charges for mixing, laying
and curing etc. complete . complying with std. specifications

Pointing in Cement Mortar 1:3 Mix (one Cement, Three sand ) flush pointing
to paving stone flooring including cost and conveyance of all materials to site,
45 144.48
loading and unloading charges and labour charges for mixing, laying and
curing etc. complete . complying with std. specifications

Oneline-Rate
SCMC CIVIL DATA 2018-2019
130
Flooring
Flooring with 20mm thick cement concrete 1:3 mix (no sand to be used)
46 using 3mm to 10mm ISS gauge HBBG chips and the surface rubbed hard 299.00
and finished smooth with neat cement Ellise pattern surface
Flooring with Vetrified flooring tiles of size 600 x 600 x 8mm of approved
colour and quality of required size laid in cement mortar 1:3 mix 20mm thick
47 1405.00
and pointing with the same mortar complete and finish very neatly etc
complete
Flooring with Eurocon grip tiles of size 30 x 30 x 1cm of approved colour and
48 quality (Endura industrial tiles) in cement mortar 1:3 mix and pointing with the 1156.00
same mortar etc. complete and finish very neatly
Flooring with Eurocon plain tiles of size 30 x 30 x 1cm of approved colour
49 and quality (Endura industrial tiles) in cement mortar 1:3 mix and pointing 1134.00
with the same mortar etc. complete and finish very neatly
Dadooing the walls with Vetrified tiles of size 600 x 600 x 8mm thick laid in
50 cement mortar 1:2 mix 10mm thick and pointing with white cement using 0.40 1453.00
kg./cm2 including finishing the joint and pointing flush with tile surface etc.
Paving the floor with best approved quality fine polished Tandon Shagbad
green stone slab of size 610 x 610 x 20mm laid over a cement mortar 1:3
mix, fixing the slab in true tight angles with minimum possible width of joints
51 1060.00
and polishing the joints with cement mortar 1:3 mix and polishing with floor
polisher to a high degree to finish and curing etc. complete as directed by
depat. officers.
Paving the floor with best approved quality fine polished Rajesthan kotta
stone slab of size 20mm with machine cut edges of size below 2'0" x 2'0" laid
over a cement mortar 1:3 mix, fixing the slab in true tight angles with
52 1223.00
minimum possible width of joints and polishing the joints with cement mortar
1:3 mix and polishing with floor polisher to a high degree to finish and curing
etc. complete as directed by depat. officers.
Dadooing walls with Ceramic tiles of size 20cm x 20cm x 6mm first quality
design tiles of all colours laid in cement mortar 1:2 mix, 10mm thick and
53 1048.00
pointing with white cement using 0.40 kg/1m2 including finishing the joint and
pointing flush with tile surface etc., complete
Flooring with ceramic tiles of approved Colour and quality of size 305mm x
305mm x 6mm laid first quality design of all colours in cement mortar 1:3 mix,
54 992.00
20mm thick and pointing with the same mortar etc., completely and finish
very neatly
Flooring with first quality plain ceramic tiles of approved Colour and quality of
55 size 305mm x 305mm x 6mm laid in cement mortar 1:3 mix, 20mm thick and 661.00
pointing with the same mortar etc., completely and finish very neatly

Oneline-Rate
SCMC CIVIL DATA 2018-2019
131
Paving the floor with marble slabs : Flooring with Adanga Marble slabs of size
4'x2' feet free from all defects in all floors overs a base layer of CM 1:20mm
thick. The marble slab shall be laid over the cement mortar by applying white
cement slurry in between base mortar and marble slab. The marble slabs
are to be laid that there shall be in line with another joint and uniform by using
marble cutting machine without any damage to the sides of corners of the
marble slab. The entire area at themarble flooring so laid shall be pointed
56 2363.00
with white cement neatly including apolishing with polishing stone of grade 80
for rough, grade 200 for medium, and grade 360 for nice using necessary
oxalic acid etc., soa as to glassy and smooth and including hire charges for
polishing machine and power consumption charges etc., The Adanga marble
slabs, polishing stones, oxolic acid, tin oxide etc., proposed for the work shall
be shown to the departmental officers and got approved by them before use
in the work etc., complete

Providing Granolythic finish of 25mm thich with PCC 1:2:4 (One cement, two
57 114.00
sand and four jelly) using 10mm to 12.50mm HBG jelly etc complete

Doors, Windows and Ventilators


Supplying and fixing in position of country wood (Pillamarudu) frames for
58 door, windows and ventilators below 4m in length including wrought and put 40910.00
up in position etc., complete
Supplying and fixing solid core flush shutters both side teak wood ply of
35mm thick and necessary furniture fitting like aluminium altrop, hinges,
59 2988.00
tower bolts, door stopper, rubber bush etc including cost of materials and
labour charges etc complete
Supplying and fixing in position of 20 BWG GI plain sheet shutter door of size
70 x 160 cm framed with alround MS angle iron of size 30 x 30 x 5mm with
one ledge and two braces made out of MS flat 30 x 5mm size without door
frame but with necessary gudjin pins and locking arrangements on both sides
complete. The 20 BWG GI plain sheet should cover the MS angle frame
60 1897.28
alround in such a way that there would not be any exposition of the angles to
avoid any rusting. The fastening of the GI sheet with the angle iron frame
must be with aluminium rivets at 25cm C/C. The entire shutter door must be
painted with one coat of red oxide paint and the shutter properly fixed in
position etc., complete

Oneline-Rate
SCMC CIVIL DATA 2018-2019
132
Steel doors and windows
Manufacturing,supplying & fixing in position Steel windows glazed with
openable shutter frame and shutter frame made out of steel section
confirming to IS 7452/ 1990.The outer frames of windows made of Z
section (F7D) of size 25 x 20 x 3 mm confirming to IS7452/1992 mullions are
made of (F4B) of section size 46x25x3mm confirming to IS7452/1990.The
shutters are individual and each of them can be operated separately. Sash
bars are made of 'T'section (T2) of size 25x22x3m, 2nos of sturdy hinges and
one numbers of handle cum slatch of special type are fixed for with openable
61 2740.00
shutter. Suitable opening is left for its any operation. One number of
adjustable stay with locking bracket of sufficient length shall be provided for
each shutter 4 nos. of 40x40x3mm anngle hold fast 230mm length are
welded to the outer frame at appropriate point.M.S square bars of 12mm size
is welded to the inner face of the window at equal intervals not excluding
10cm spacings, 5.5mm pin headed glass is used for glazing and the glass
panes shall be fixed with good quality.T.W.beeding size 15x15mm with
screws for fixing.

Manufacturing,supplying & fixing in position Steel windows of MS sheet 20


gauge thick with openable shutter frame and shutter frame made out of steel
section confirming to IS 7452/ 1990.The outer frames of windows made of
Z section (F7D) of size 25 x 20 x 3 mm confirming to IS7452/1992 mullions
are made of (F4B) of section size 46x25x3mm confirming to
IS7452/1990.The shutters are individual and each of them can be operated
separately. Sash bars are made of 'T'section (T2) of size 25x22x3m, 2nos of
62 sturdy hinges and one numbers of handle cum slatch of special type are fixed 2317.00
for with openable shutter. Suitable opening is left for its any operation. One
number of adjustable stay with locking bracket of sufficient length shall be
provided for each shutter 4 nos. of 40x40x3mm anngle hold fast 230mm
length are welded to the outer frame at appropriate point.M.S square bars of
12mm size is welded to the inner face of the window at equal intervals not
excluding 10cm spacings ,20gauge MS sheet is used for covering the
shutter. Grill members are painted with one coat of primer.
Fabricating Supply and fixing and position of MS doors with single leave. The
door outer frame will be 40x40x6mm MS angle, the shutter frame will be
35x35x6 mm, MS angle intermediate stiffner will be 35x35x6 mm with cross
63 1715.00
stiffner 25x 25x5 mm flats covered with 18 gauge M.S. sheet with necessary
hinges, tower bolts, aldrop length 30mm and hold fast etc., complete with one
coat red oxideprimer.
Fabricating Supply and fixing and position of MS doors with double leave
made out of 18 gauge M.S. sheet, outer frame 35x35x5mm angle, inner
frame 25x25x5mm angle, cross stiffner with MS flat 25x5mm, altrop tower
64 1870.17
bolts 2 Nos. two handles and six holdfasts completed welded and rivetted
and one coat of red oxide painting including cost of all materials and labour
etc., complete

Oneline-Rate
SCMC CIVIL DATA 2018-2019
133
Supplying & fixing door shutters for Medium Density Fiber Board of exterior
grade 35mm thick, single leaf conforming to IS:12406/1989 with 35x12 mm
T.W.Lipping on all edges with necessary adhesives and CP screws
complying with standard specification. The rate is inclusive of three coats of
65 2652.00
best quality varnish but including cost of furniture fittings. such as 125mm x
30mm Hinges 3 Nos, 300mm tower bolt 2nos, 200mm tower bolt I no.
300mm Aldrop 1 No. Alu handle ornamental type 2 Nos, and 1 No. Door
stopper etc complete. consider a door shutters of size 1.2x2.1m

Supplying, fabricating and fixing in position of Alumi.Anod.natural colour matt


finish door half glazed and half PLB board using 12 mm thick PLB board and
5.5 mm thick glazed door using rectangular Alu.Box section of following
sizes for frame and shutter with necessary accessories such as rubber
beading, Al. Clips, Best double action floor springs, Aluminium Handles on
both sides,floor stopper,Tower bolt, Locks and glass including all materials,
Labour, power consemption charges required for fabrication if necessary
66 chipping, dismantling making necessary holes in RCC Coloums, Beams or 6431.00
Masonry wherever necessary with power drill to the extent required and
made good to the original conditions after fixing etc.,complete. The
Alumi. surface must be anodised with matt finish under electrically controlled
condition in accordance with IS specification 1868 / 1962 of Anodic
filthickness of not less than 15 Microns (Fifteen) for all sections.All the
materials should be got approved by the Engineer - In -charge before fixing
as directed.

Supplying, fabricating and fixing in position of Alumi.Anod.natural colour matt


finish door with fully PLB board 12 mm thick using rectangular Alu.Box
section of following sizes for frame and shutter with necessary accessories
such as Al. Clips, Best double action floor springs, Aluminium Handles on
both sides,floor stopper,Tower bolt, Locks and glass including all materials,
Labour, power consemption charges required for fabrication if necessary
chipping, dismantling making necessary holes in RCC Coloums, Beams or
67 6470.00
Masonry wherever necessary with power drill to the extent required and
made good to the original conditions after fixing etc.,complete. The
Alumi. surface must be anodised with matt finish under electrically controlled
condition in accordance with IS specification 1868 / 1962 of Anodic
filthickness of not less than 15 Microns (Fifteen) for all sections.All the
materials should be got approved by the Engineer - In -charge before fixing
as directed.

Supplying, fabricating and fixing in position of Alumi.Anod.natural colour matt


finish door fully glazed using 5.5 mm thick using rectangular Alu.Box section
of following sizes for frame and shutter with necessary accessories such as
rubber beading, Al. Clips, Best double action floor springs, Aluminium
Handles on both sides,floor stopper,Tower bolt, Locks and glass including all
materials, Labour, power consemption charges required for fabrication if
necessary chipping, dismantling making necessary holes in RCC Coloums,
68 6380.00
Beams or Masonry wherever necessary with power drill to the extent
required and made good to the original conditions after fixing
etc.,complete. The Alumi. surface must be anodised with matt finish under
electrically controlled condition in accordance with IS specification 1868 /
1962 of Anodic filthickness of not less than 15 Microns (Fifteen) for all
sections.All the materials should be got approved by the Engineer - In -
charge before fixing as directed.
Oneline-Rate
SCMC CIVIL DATA 2018-2019
134
Aluminium Three Track window size 1.80 x 1.30m
Supplying and fabrication and fixing in position of anodised natural colour
matt finish sliding window in three track in all floors with following sizes. All
the three shutters with slinding arrangements, the bottom section should
have Gutter arrangements so as to drain the water entering and made with
extruded aluminium section for outer frames as shown below with necessary
accessories such rubber beading. Aluminium clips, rubber beading,handle
69 and fixing 4mm thick clear sheet glass including all required for fabrication 3451.88
etc., complete.Necessary dismantling making holes in RCC columns, beams,
masonry wherever necessary with power drill to the extent required and
made good to the original conditions after fixing as directed by the
departmental officers.The Al.Surfaces is to be anodised with matt finish
under electrically condition in accordance with ISI 1868/1962 specification for
an average anodic film thick of not less than 15 microns. (All materials should
be got approved by the Executive Engineer before fixing in position)

Aluminium Two Track window size 1.20 x 1.30m


Supplying and fabrication and fixing in position of anodised natural colour
matt finish sliding window in two track in all floors with following sizes. All the
three shutters with slinding arrangements, the bottom section should have
Gutter arrangements so as to drain the water entering and made with
extruded aluminium section for outer frames as shown below with necessary
accessories such rubber beading. Aluminium clips, rubber beading,handle
70 and fixing 4mm thick clear sheet glass including all required for fabrication 3569.10
etc., complete.Necessary dismantling making holes in RCC columns, beams,
masonry wherever necessary with power drill to the extent required and
made good to the original conditions after fixing as directed by the
departmental officers.The Al.Surfaces is to be anodised with matt finish
under electrically condition in accordance with ISI 1868/1962 specification for
an average anodic film thick of not less than 15 microns. (All materials should
be got approved by the Executive Engineer before fixing in position)

Aluminium Openable Type window size 1.20 x 1.30m


Manufacturing, supplying and fixing in position of anodised natural colour
matt finish with openable type window with extruded Alu. sections with two
pannels of the folowing sizes with necessary accessories such as rubber
beedings best quality best quality of lock handle hinges, stays and fixing
4mm thick plain / frosted / pin headed glass including cost of all materials,
71 labour, electrical consumption required for drilling holes in RCC columns, 4167.00
beams, masonry wherever necessary with power drill to the extent required
and made good to the original conditions after fixing as directed by the
departmental officers.The Al.Surfaces is to be anodised with matt finish
under electrically condition in accordance with ISI 1868/1962 specification for
an average anodic film thick of not less than 15 microns. (All materials should
be got approved by the Executive Engineer before fixing in position)

Oneline-Rate
SCMC CIVIL DATA 2018-2019
135
Aluminium Openable Type window (Three leaves) size 1.30 x 1.80m
Manufacturing, supplying and fixing in position of anodised natural colour
matt finish with openable type window with extruded Alu. sections with two
pannels of the folowing sizes with necessary accessories such as rubber
beedings best quality best quality of lock handle hinges, stays and fixing
4mm thick plain / frosted / pin headed glass including cost of all materials,
72 labour, electrical consumption required for drilling holes in RCC columns, 3955.00
beams, masonry wherever necessary with power drill to the extent required
and made good to the original conditions after fixing as directed by the
departmental officers.The Al.Surfaces is to be anodised with matt finish
under electrically condition in accordance with ISI 1868/1962 specification for
an average anodic film thick of not less than 15 microns. (All materials should
be got approved by the Executive Engineer before fixing in position)

Louvered Ventilator
Supplying and fixing in position of Aluminium anodised colour matt finish
Louvered Ventilator. The outer frame will be 62 x 38 x 2mm @ 1.17 Kg/m
and louvers with moving arrangements will be made with Alu. channel of size
60 x 30 x 4mm @ 1.27 Kg/m with necessary glass pans for louvers 4mm
thick Al. clips, including all materials, labour & electrical consumption charges
73 required for fabrication if necessary chipping dismantling making holes in 4671.00
RCC columns, beams, masonry wherever necessary with power drill to the
extent required and made good to the original conditions after fixing etc
complete. The Al.Surfaces is to be anodised with matt finish under electrically
condition in accordance with ISI 1868/1962 specification for an average
anodic film thick of not less than 15 microns. (All materials should be got
approved by the Executive Engineer before fixing in position)

N type ventilators :
Fabrication, Supply and fixing in position of 'N'' type ventilators using M.S.
angle of size 25x25x5 mm for frame and M.S. flat of size 20x3 mm for fixing
the weld mesh and using 25X 22X 3 MM ' T ' section for frame glass. Special
type of Hold fast welded to the frame of 45 degree inclined towards centre for
wall and fixing the weldmesh 25mm square including cost of 3mm thick
74 1246.00
pinheaded glass panes for all panels and fixing the glass panels with
necessary clips & putties with required bolts,nuts and washers and one coat
of red oxide primer etc., including necessary dismantling,making holes in
RCC columns, beams,masonry wherever necessary with power drill to the
extent required and made good to the original conditions after fising as
directed by the departmental officers.

Oneline-Rate
SCMC CIVIL DATA 2018-2019
136
Aluminium Partition
Supplying and fixing in position of Alu. Anodised Partition with 62x38x2mm
extruded box section at bottom vertical and horizontal members. The vertical
member are spaced at 90 cm c/c and to horizontal members are spaced at
1.2M, 2.1M and 2.4M height the bottom panels should be covered with 12mm
thick PLB exterior grade and the top and middle panels should be fixed at
75 4mm thick glass with necessary glassing clips. Rubber beading, etc., 2833.00
including necessary dismantling holes in RCC columns, beams masonry
wherever necessary with power drill to the extent required and made good to
the original conditions after fixing as directed by the departmental officer. All
the Aluminium sections should be anodised to 1.5microns as per ISI
specification 1868/1962 and should be got approved by the Executive
Engineer before use.

Wall Pannelling
Providing wall paneling butting to the wall and ceiling with new wall paneling
in all floors using Country wood scantlings of size 100x50mm for forming of
grid of size 0.60m x 0.60 m. Country wood runners as stiffness using 50mm x
50mm for required length spaced at 0.2m intervals on both directing and
76 fixing to the exiting wall portion and ceiling. Over the frame 12mm thick anti 3243.00
terminate water proofing ply wood using nails etc., and adhesive pasting the
4mm thick veneer ply with grooves using fevicol, nails. The rates inclusive of
labour for wrought and put up and two coat of best varnishing, neat finishing,
fixing in position etc., and complete complying with standard specification
and as directed by the departmental officers.

Supplying of holdfast of MS flat of overall size of 330mm x 50mm x 6mm


suitably folded to the required 'l' shape have two end flap of 50mm long each
77 35.00
and the over all length of the horizontal portion as 230mm and including
making necessary grooves in two end to accommodate screws etc complete

False Ceiling
Supplying and fixing in position of FALSE CEILING ARRANGEMTNS with
aluminium anodised T section and L angle frame work of grid size 60x60cm
with aluminium T section and L angle of size 25x25x2mm thick and the same
is supported at suitable intervals adjustable type 6mm dia MS road with
suitable threaded nuts suspended roads hung from celing at 100cm c/c in
78 1539.00
both directions and fixing 60x60cm10mm thick Zib board in grid so as to give
a seat to false ceiling including painting the 6 mm dia MS road etc complete
complying with standard specification necessary opening and arrangments
for fixing electrical fittings should be provided with suitable frame work etc
complete

Oneline-Rate
SCMC CIVIL DATA 2018-2019
137
Roofing
Roofing with AC fully corrugated sheet grey 6mm thick with necessary bolts
79 494.00
nuts and washers etc., completed with ridges
Roofing with plain GI sheet 1.65mm thick with necessary bolts nuts and
80 673.00
washers etc., completed with ridges
Roofing with Pre painted Galavalume sheet 0.47mm thick with necessary
81 bolt and nuts and washers including allmaterials and labour charges etc 599.00
complete
Finishing the top with one course of pressed tiles of size 20cm x 20cm x
20mm size laid in cm 1:3 mix mixed with water proofing compound as per
82 794.00
Indian standard 2% by weight of cement used and pointed with the same
mortar etc., complete
Weathering course with concrete broken brick jelly 20mm size in pure slaked
lime (no sand to be used) over RCC roof slab the proportion of broken brick
83 3013.00
jelly to lime being 32:12.5 well beaten with wooden beaters giving required
slopes and thickness etc., complete
Providing through vertical joint with 15mm space filed with bituminous
84 compound running from bottom of foundation upto the top of parapet wall as 673.00
directed
Providing through vertical joint from bottom of foundatoin to top of parapet
wall by building one abutting face vertical and plastering the same with
cement mortar 1:3 mix, 20mm thick first coat and lime mortar 1:2 mix using
85 383.00
shell lime for second coat of plastering 6mm thick the abutting face being
built carefully without damage to the plaster and neatly packed with mortar
the joint to be dead vertical
Roofing with FRB sheet white or colour 0.047mm, width 1.060m thick with
86 998.00
necessary bolts nuts and washers etc., completed

Plastering
Plastering with Cement mortar 1:2 mix, 12mm thick including cost and
conveyance of all materials to site, loading and unloading charges and labour
87 189.00
charges for mixing, laying and curing etc. complete . complying with std.
specifications
Plastering with cement mortar 1:3 mix, 12mm thick including cost and
conveyance of all materials to site, loading and unloading charges and labour
88 171.00
charges for mixing, laying and curing etc. complete . complying with std.
specifications
Plastering with cement mortar 1:3 mix, 20mm thick including cost and
conveyance of all materials to site, loading and unloading charges and labour
89 335.00
charges for mixing, laying and curing etc. complete . complying with std.
specifications
Plastering with cement mortar 1:4 mix, 12mm thick including cost and
conveyance of all materials to site, loading and unloading charges and labour
90 161.00
charges for mixing, laying and curing etc. complete . complying with std.
specifications
Special Ceiling Plastering for RCC slabs and beams with cement mortar 1:3
mix 10mm thick including cost and conveyance of all materials to site,
91 179.00
loading and unloading charges and labour charges for mixing, laying and
curing etc. complete . complying with std. specifications
Plastering with cement mortar 1:5 mix, 12mm thick including cost and
conveyance of all materials to site, loading and unloading charges and labour
92 156.00
charges for mixing, laying and curing etc. complete . complying with std.
specifications
Oneline-Rate
SCMC CIVIL DATA 2018-2019
138
Strucco plastering 12mm thick using HBBG chips of size 10mm and below
over a base plastering with cement mortar 1:5 mix, 12mm thick including cost
93 and conveyance of all materials to site, loading and unloading charges and 369.00
labour charges for mixing, laying and curing etc. complete . complying with
std. specifications

White washing, Colour washing & Distembering


White washing one coat using best freshly burnt shell lime in all floors
94 including cost of lime blue powder, fevical type gum brushes, scaffolding 14.00
charges etc., complete complying with standard specifications.

White washing two coats using best freshly burnt shell lime in all floors
95 including cost of lime blue powder, fevical type gum brushes, scaffolding 21.00
charges etc., complete complying with standard specifications.

Colour washing One Coat in all floors using best freshly burnt white shell
lime and best quality and approved variety of colouring pigments including
96 21.00
cost of lime, colouring pigments, fevical type gum, brushes and scaffolding
charges etc, complete complying with standard specifications.

Colour washing Two coats in all floors using best freshly burnt white shell
lime and best quality and approved variety of colouring pigments including
97 32.00
cost of lime, colouring pigments, fevical type gum, brushes and scaffolding
charges etc, complete complying with standard specifications.
Colour washing one coat of approved Colour over a coat of white washing
using best shell lime and best quality and approved variety of colouring
98 pigments including cost of lime, colouring pigments, fevical type gum, 81.00
brushes and scaffolding charges etc, complete complying with standard
specifications.
Distempering one coat with oil bound distemper of approved Colour and best
quality and approved variety of colouring pigments including cost of lime,
99 41.00
colouring pigments, fevical type gum, brushes and scaffolding charges etc,
complete complying with standard specifications.

Distempering two coats with oil bound distemper of approved Colour and
best quality and approved variety of colouring pigments including cost of
100 80.00
lime, colouring pigments, fevical type gum, brushes and scaffolding charges
etc, complete complying with standard specifications.

Painting
Painting one coat with best synthetic enamel paint of approved Colour for old
iron works the rate is inclusive of all materials, brushes and scaffolding
101 57.00
charges etc., complete complying with standard specification(paint should be
got approved by the Departmental Engineer befor use on work.

Painting two coats with best synthetic enamel paint of approved Colour for
old iron works the rate is inclusive of all materials, brushes and scaffolding
102 93.00
charges etc., complete complying with standard specification(paint should be
got approved by the Departmental Engineer befor use on work.

Oneline-Rate
SCMC CIVIL DATA 2018-2019
139
Painting one coat with best synthetic enamel paint of approved Colour for
new iron works the rate is inclusive of all materials, brushes and scaffolding
103 62.00
charges etc., complete complying with standard specification(paint should be
got approved by the Departmental Engineer befor use on work.

Painting two coats with best synthetic enamel paint of approved Colour for
new iron works the rate is inclusive of all materials, brushes and scaffolding
104 99.00
charges etc., complete complying with standard specification(paint should be
got approved by the Departmental Engineer befor use on work.

Painting one coat with best synthetic enamel paint of approved Colour for old
wood works the rate is inclusive of all materials, brushes and scaffolding
105 63.00
charges etc., complete complying with standard specification(paint should be
got approved by the Departmental Engineer befor use on work.

Painting two coats with best synthetic enamel paint of approved Colour for
old wood work the rate is inclusive of all materials, brushes and scaffolding
106 107.00
charges etc., complete complying with standard specification(paint should be
got approved by the Departmental Engineer befor use on work.

Painting one coat with best synthetic enamel paint of approved Colour for old
wood work the rate is inclusive of all materials, brushes and scaffolding
107 66.00
charges etc., complete complying with standard specification(paint should be
got approved by the Departmental Engineer befor use on work.

Painting two coats with best synthetic enamel paint of approved Colour for
old wood works the rate is inclusive of all materials, brushes and scaffolding
108 114.00
charges etc., complete complying with standard specification(paint should be
got approved by the Departmental Engineer befor use on work.
Painting priming coat on new wood work etc., complete complying with
109 standard specification (The make, quality and colour of paint should be got 53.00
approved)
Painting priming coat on new iron work etc., complete complying with
110 standard specification (The make, quality and colour of paint should be got 51.00
approved)
Painting with aluminium paint one coat to iron works etc., complete
111 complying with standard specification (The make, quality and colour of paint 51.00
should be got approved)
Painting with aluminium paint two coats to iron works etc., complete
112 complying with standard specification (The make, quality and colour of paint 92.00
should be got approved)
Painting with black board paint one coat etc., complete complying with
113 standard specification (The make, quality and colour of paint should be got 69.00
approved)
Painting with black board paint two coats etc., complete complying with
114 standard specification (The make, quality and colour of paint should be got 125.00
approved)
Painting two coats with ready mixed plastic emulsion paint of 1st class quality
and of approved color over a priming coat including through scraping clean
115 157.00
removal of dirt etc., complete and including necessary plaster of paris putty
wherever required
Painting one coat with ready mixed plastic emulsion paint of 1st class quality
116 and of approved color over old surface including clean removal of dirt, 61.00
plaster, of paris and putty wherever required
Oneline-Rate
SCMC CIVIL DATA 2018-2019
140
Painting two coats with approved cement paint over cement plastered
117 surface ceiling and other new surface including cleaning prepering the 89.00
surface and curing etc., complete
Painting one coat with approved cement paint over old surface including
118 44.00
cleaning and curing etc., complete
Painting new wood work with two finishing coats of synthetic enamel ready
mixed paint of approved quality and colour over one coat priming coat in all
119 167.00
floors including the cost of primer etc., complete complying with standard
specification (The make, quality and colour of paint should be got approved)

Painting new iron work with two finishing coats of synthetic enamel ready
mixed paint of approved quality and colour over one coat priming coat in all
120 150.00
floors including the cost of primer etc., complete complying with standard
specification (The make, quality and colour of paint should be got approved)

Varnishing & Polishing


Best varnishing to wood work one coat including cost of pigments, fevical
121 type gum, brushes and scaffolding charges etc, complete complying with 83.00
standard specifications.
Best varnishing to wood work two coats including cost of pigments, fevical
122 type gum, brushes and scaffolding charges etc, complete complying with 128.00
standard specifications.
Best Lac polishing one coat to old work including cost of pigments, fevical
123 type gum, brushes and scaffolding charges etc, complete complying with 85.00
standard specifications.
Best Lac polishing two coats to new work including cost of pigments, fevical
124 type gum, brushes and scaffolding charges etc, complete complying with 114.00
standard specifications.

Miscellaneous
Supplying and fixing 100mm dia Asbestos Cement rain water down fall pipe
including cost of 100mm dia asbestos cement pipe, shoe, bond, brackets,
125 267.00
teakwood plugs, etc.,
complete
Supplying and fixing 110mm dia PVC rain water down fall pipe including cost
126 364.00
of pipe, shoe, bond, brackets, teakwood plugs, etc., complete
Construction of inspection chamber of size 1'-1 1/2" x 1' - 1 1/2" of TD
No.13/1944 and of the following description. The foundation of inspection
chamber to be cement concrete 1:5:10 mix using 40mm ISS gauge HBBG
metal, the wall will be of brick work in cm 1:5 mix, using country bricks and
plastered with cement mortar 1:4 mix, 12mm thick on both sides. The sewer
127 1240.00
channel in the chamber to be formed in CC 1:3:6 mix using 20mm ISS gauge
chips and finished with 1:2 mix cement mortar 12mm thick. The channel
must be formed well by construction at site for the alignment in including
excavating earth work in all soils, shoring strutting and baling out water
wherever necessary etc.

2 metre outer dia circular platform with 2 metre width side drain for
9682.00
hand pump
Providing barbed wire fencing using 10.00 gauge 2 ply 4 pronged galvanised
128 barbed wire 5 rows in horizontal ways and 30cm C/C on vertical ways 1.75m 189.00
height tying with necessary binding wire etc.

Oneline-Rate
SCMC CIVIL DATA 2018-2019
141
Providing and laying of 63mm thick high strength type of interlocking
pavement block in M20 grade size 23 x 13 x 6.3cm grey colour and red or
green colour of required sizes with minimum compressive strength of 20
N/mm2 in uniform shape of approved make to be laid in lorrying bone pattern
129 with approved non sticking surface in the top and the rate including leveling 2015.00
the base, preparation of sub base with sand cushion 100mm thick, laying out
the pavement, cut the pieces to fit the edge, vibrating the pavers, sweeping
the sand grouting, providing transporting, loading unloading and laying of
paver block as per standard specification.
Providing and laying of 63mm thick high strength type of interlocking
pavement block in M20 grade size 23 x 13 x 6.3cm grey colour of required
sizes with minimum compressive strength of 20 N/mm2 in uniform shape of
approved make to be laid in lorrying bone pattern with approved non sticking
130 surface in the top and the rate including leveling the base, preparation of sub 1858.00
base with sand cushion 100mm thick, laying out the pavement, cut the pieces
to fit the edge, vibrating the pavers, sweeping the sand grouting, providing
transporting, loading unloading and laying of paver block as per standard
specification.
Providing and laying of 80mm thick high strength type of interlocking
pavement block in M40 grade size 26 x 12 x 8cm other than grey colour of
required sizes with minimum compressive strength of 40 N/mm2 in uniform
shape of approved make to be laid in lorrying bone pattern with approved
131 non sticking surface in the top and the rate including leveling the base, 3014.00
preparation of sub base with sand cushion 100mm thick, laying out the
pavement, cut the pieces to fit the edge, vibrating the pavers, sweeping the
sand grouting, providing transporting, loading unloading and laying of paver
block as per standard specification.
Supplying and fixing of Cudappa slab of 20/30/40/50mm thick for Cup board
132 340.00
including cost of materials and labour etc complete

Pile Foundation
Providing cast in situ cement concrete 1: 2 : 4 (one cement, two sand and
four coarse aggregate) using 20mm size HBBG metal for 30cm dia pile
133 including cost of materials labour, hire charges for machinery for earth work 1554.00
for forming 30cm dia bore hole to the required depth before concreting
excluding cost of steel reinforcement
Providing cart in situ cement concrete 1: 11/2 : 3 (one cement, one and half
sand and three coarse aggregate) using 20mm size HBBG metal for 30cm
134 dia pile including cost of materials labour, hire charges for machinery for 1607.00
earth work for forming 30cm dia bore hole to the required depth before
concreting excluding cost of steel reinforcement
Providing cart in situ cement concrete 1: 2 : 4 (one cement, two sand and
four coarse aggregate) using 20mm size HBBG metal for 23cm dia pile
135 including cost of materials labour, hire charges for machinery for earth work 1334.00
for forming 23cm dia bore hole to the required depth before concreting
excluding cost of steel reinforcement
Providing cart in situ cement concrete 1: 11/2 : 3 (one cement, one and half
sand and three coarse aggregate) using 20mm size HBBG metal for 23cm
136 dia pile including cost of materials labour, hire charges for machinery for 1364.00
earth work for forming 23cm dia bore hole to the required depth before
concreting excluding cost of steel reinforcement

Oneline-Rate
SCMC CIVIL DATA 2018-2019
142
Providing cart in situ cement concrete 1: 11/2 : 3 (one cement, one and half
sand and three coarse aggregate) using 20mm size HBBG metal for 45cm
137 dia pile including cost of materials labour, hire charges for machinery for 2425.00
earth work for forming 45cm dia bore hole to the required depth before
concreting excluding cost of steel reinforcement
Providing cart in situ cement concrete 1: 2 : 4 (one cement, two sand and
four coarse aggregate) using 20mm size HBBG metal for 45cm dia pile
138 including cost of materials labour, hire charges for machinery for earth work 2292.00
for forming 45cm dia bore hole to the required depth before concreting
excluding cost of steel reinforcement

Kerb
Fixing of IRC Kerb in cement concrete 1:2:4 mix using 20mm ISS gauge
HBBG metal of size 450 x 200 x 375mm along with rain water kerb in
Cement concrete 1:2:4 mix using 20mm ISS gauge HBBG metal of size 450
x 300 x 150mm on road side and 100mm kerb side including moulding
casting curing of finishing with necessary earth work for fixing the IRC Kerb
139 1379.00
along with rain water Suttor kerb in proper level alignment including pointing
and inserting the joint with CM 1:3 mix 6mm thick to full depth threaded lining
curing with both side and bottom fixing of the kerb with CM 1:3 mix – 20MM
thick Including coat of best synthetic enamel paint over a coat of priming coat
etc. complete.
Fixing of IRC Kerb in cement concrete 1:2:4 mix using 20mm ISS gauge
HBBG metal of size 450 x 200 x 375mm including moulding casting curing of
finishing with necessary earth work for fixing the IRC Kerb in proper level
140 alignment including pointing and inserting the joint with CM 1:3 mix 6mm 917.00
thick to full depth threaded lining curing with both side and bottom fixing of
the kerb with CM 1:3 mix – 20MM thick Including coat of best synthetic
enamel paint over a coat of priming coat etc. complete.

Sanitary Arrangements
Supplying and fixing in position best quality approved make white glazed
earthen ware wash hand basin size 550mm x 400mm with a pair of cast iron
brackets including cost of 15mm Φ brass chromium plated pillar tap,
32mm Φ C.P. waste, 32mm Φ PVC waste pipe with rubber plugs and
chain, 15mm Φ G.M. Wheel valve 15mm Φ brass nipple, 15mm Φ Nylon
141 2993.00
connections etc. Including fixing the wash hand basin in the wall in position
with a pair of C.I. Brackets with teak wood plugs and screws and giving
necessary water supply connection and painting the brackets with two coats
of paint over a priming coat of anticorrosive paint including testing for
leakage etc. complete as per standard specifications.

Supplying and fixing in position best quality approved make colour glazed
earthen ware wash hand basin size 550mm x 400mm with a pair of cast iron
brackets including cost of 15mm Φ brass chromium plated pillar tap,
32mm Φ C.P. waste, 32mm Φ PVC waste pipe with rubber plugs and
chain, 15mm Φ G.M. Wheel valve 15mm Φ brass nipple, 15mm Φ Nylon
142 3518.00
connections etc. Including fixing the wash hand basin in the wall in position
with a pair of C.I. Brackets with teak wood plugs and screws and giving
necessary water supply connection and painting the brackets with two coats
of paint over a priming coat of anticorrosive paint including testing for
leakage etc. complete as per standard specifications.

Oneline-Rate
SCMC CIVIL DATA 2018-2019
143
Supply and fixing in position of white glazed indian oriya type water closet
580 x 440mm size white glazed earthernware of approved quality with S or P
trap confirming to IS: 2556-part XII with sand cusion and forming flooring
around the closet using 40mm broaken brick jelly in lime concrete 1:4:8 mix,
100mm thick using 20mm ISS gauge brick jelly and finished the top to
143 3856.00
required slop and including giving necessary connection to cast iron soil
pipes by dismantling brick masonry, RCC/ floor slab and making good of the
disturbed portion to original condition without leakage etc. complete
complying with std. specifications and as directed by dept. officers. (the WC
should got approved by the Exe. Engineer before use on works)
Supply and fixing in position of European water closet with 'S' (or) 'P' trap of
approved color and quality with dauble flapped rigid PVC sheet cover the CP
brass hinges etc., complete complying with standard specification including
supply and fixing in position of 10litre capacity glazed porcelain low level
144 5174.00
flushing tank on wall including 2 Nos of 15mm & brass nipple, 15mm dia PVC
brass connection, 15mm dia GI wheel value, 15mm dia Nylon connection and
giving necessary water supply connection etc., complete complying with
standard specification
Cost of European W.C. set (Colour) 5544.00
Supply & fixing in position of Indian make white glazed earthernware lipped
mouth porceliain flat back urinal with all accessories such as 32mm dia bell
mouth PVC connection, 15mm dia GM wheel valve, fixing the urinal to the
wall in position with necessary TW plugs, clamps, screws, shellac etc
including dismantling brick masonry if necessary and making good of the
145 1818.00
disturbed portion to original condition, fixing 15mm GI pipe connection and
wheel valve, painting the pipe with two coats of approved paint over one coat
of primer and check without any leakage etc. complete complying with std.
specifications and as directed by dept. officers. (the Urinal should got
approved by the Exe. Engineer before use on works)
Lipped mouth porceliain flat back urinal (Colour) 1945.00
Supplying and fixing in position of CI Nahni trap/ PVC with best stainless
steel gratings of approved brand and quality, fixed over a bed of brick jelly
lime concrete 1:2:5 mix using 40mm brick jelly and finished with C.M.1:3 mix
including dismantling brick masonry wherever found necessary and making
146 459.00
good of the disturbed portion to original condition and giving connections to
the cast iron pipe as directed etc complete complying with std. specifications
(the Nahni trap should got approved by the Exe. Engineer before use on
works)
Supplying and fixing in position of stoneware gully trap with best stainless
steel gratings of approved brand and quality, fixed over a bed of brick jelly
lime concrete 1:2:5 mix using 40mm brick jelly and finished with C.M.1:3 mix
including dismantling brick masonry wherever found necessary and making
147 474.00
good of the disturbed portion to original condition and giving connections to
the cast iron pipe as directed etc complete complying with std. specifications
(the Nahni trap should got approved by the Exe. Engineer before use on
works)
Supply & Fixing in position of 15mm Φ diameter brass CP screw down tap /
Pillar Tap (heavy duty) of approved make conforming to BIS specification and
148 quality including cost of shellac, thread etc., complying with standard
specification and including cutting and threading wherever necessary etc.,
complete.
PVC screw down tap 120.34
Half turn tap 111.84
Oneline-Rate
SCMC CIVIL DATA 2018-2019
144
SD tap 474.00
Pillar tap 565.00
Stop tap 403.00
Supplying and fixing in position Indian make bewelled edge mirror of
approved quality and brand PVC / Fibre Glass framed of size 600mm x
149 450mm x 5.5mm with necessary plastic back PVC frame with bottom stand of 749.00
approved colour with brass screws, Rawal plugs etc., complete as per
standard specifications.
Supplying and fixing best approved quality brass chromium Plated Towel Rail
150 600mm long and 20mm dia with brackets of some material including cost of 403.14
teak wood plugs. CP Screws etc., Complete.
Supplying and fixing best approved quality Aluminium anodised Towel Rail
151 600mm long and 20mm dia with brackets of some material including cost of 282.34
teak wood plugs. CP Screws etc., Complete.
Supply and fixing of best approved quality brass CP soap tray of size 150 x
152 348.00
150mm including Cost of Teak wood Plugs Screws etc., Complete.

Oneline-Rate
SCMC CIVIL DATA 2018-2019
145

S-ar putea să vă placă și