xls (Summary)
PT. SMCC Utama Indonesia
Project : Nippon Shokubai Indonesia
Location : Cilegon, Banten, Indonesia.
Re-bar Ratio
Base Compaction
Concrete Casting
Lean Concrete
Trowel Finish
Plastic Sheet
Soil Disposal
Gravel Layer
Form Work
Excavation
Sub Total
Re-bar
Form
D-10
D-13
D-16
D-19
D-22
D-25
D-29
D-32
OBJECT
Dimension
Code w h/t l nos nos m3 m3 m3 m3 m2 m2 m3 m2 m3 m2 kg kg kg kg kg kg kg kg kg kg/m3 m2/m3
1 PUW RCK 02A F1 With Pedestal 1 8.00 50.18 24.74 25.44 4.14 27.62 0.00 1.33 21.82 20.61 24.50 144.13 0.00 147.28 1,564.98 0.00 0.00 0.00 0.00 1,856.39 90.09 1.06
F2 With Pedestal 2 4.00 18.08 13.11 4.97 0.97 6.48 0.00 0.29 12.91 4.03 4.41 74.61 0.00 79.63 454.08 0.00 0.00 0.00 0.00 608.32 150.94 3.20
Tie Beam 1 0.00 3.54 2.13 1.40 0.41 2.77 0.00 0.12 5.53 1.11 1.58 12.03 35.36 0.00 121.31 0.00 0.00 0.00 0.00 168.70 152.53 5.00
PUW RCK 02A Total 12.00 71.80 39.98 31.82 5.53 36.87 0.00 1.73 40.27 25.74 30.49 230.77 35.36 226.91 2,140.37 0.00 0.00 0.00 0.00 2,633.41 102.30 1.56
Page 1 of 7 Pages
433737407.xls (Summary)
PT. SMCC Utama Indonesia
Project : Nippon Shokubai Indonesia
Location : Cilegon, Banten, Indonesia.
Re-bar Ratio
Base Compaction
Concrete Casting
Lean Concrete
Trowel Finish
Plastic Sheet
Soil Disposal
Gravel Layer
Form Work
Excavation
Sub Total
Re-bar
Form
D-10
D-13
D-16
D-19
D-22
D-25
D-29
D-32
OBJECT
Dimension
Code w h/t l nos nos m3 m3 m3 m3 m2 m2 m3 m2 m3 m2 kg kg kg kg kg kg kg kg kg kg/m3 m2/m3
Page 2 of 7 Pages
433737407.xls (Sub Summary)
PT. SMCC Utama Indonesia
Project : Nippon Shokubai Indonesia
Location : Cilegon, Banten, Indonesia.
Re-bar Ratio
Base Compaction
Concrete Casting
Lean Concrete
Trowel Finish
Plastic Sheet
Soil Disposal
Gravel Layer
Form Work
Excavation
Sub Total
Re-bar
Form
D-10
D-13
D-16
D-19
D-22
D-25
D-29
D-32
OBJECT
Dimension
Code w h/t l nos nos m3 m3 m3 m3 m2 m2 m3 m2 m3 m2 kg kg kg kg kg kg kg kg kg kg/m3 m2/m3
1 PUW RCK 02A F1 1.05 0.80 2.10 1 8.00 50.18 24.74 25.44 4.14 27.62 0.00 1.33 16.16 19.60 24.50 24.68 0.00 0.00 1,352.50 1,377.18 70.26 0.82
Pile Head Treatment 8 0.30 0.33 22.90 147.28 170.18 508.54 0.91
Pedestal 0.50 0.67 0.50 4 5.36 0.67 96.55 0.00 0.00 212.47 309.03 461.24 8.00
8.00 50.18 24.74 25.44 4.14 27.62 0.00 1.33 21.82 20.61 24.50 144.13 0.00 147.28 1,564.98 0.00 0.00 0.00 0.00 1,856.39 90.09 1.06
F2 1.05 0.80 2.10 2 4.00 18.08 13.11 4.97 0.97 6.48 0.00 0.29 10.08 3.53 4.41 14.88 0.00 0.00 347.84 362.72 102.81 2.86
Pile Head Treatment 4 0.15 0.17 11.45 79.63 91.08 544.34 0.91
Pedestal 0.50 0.67 0.50 2 2.68 0.34 48.28 0.00 0.00 106.24 154.51 461.24 8.00
4.00 18.08 13.11 4.97 0.97 6.48 0.00 0.29 12.91 4.03 4.41 74.61 0.00 79.63 454.08 0.00 0.00 0.00 0.00 608.32 150.94 3.20
Beam B1 0.50 0.70 5.00 1 3.54 2.13 1.40 0.41 2.77 0.00 0.12 5.53 1.11 1.58 12.03 35.36 121.31 168.70 152.53 5.00
0.00 3.54 2.13 1.40 0.41 2.77 0.00 0.12 5.53 1.11 1.58 12.03 35.36 0.00 121.31 0.00 0.00 0.00 0.00 168.70 152.53 5.00
PUW RCK 02A Total 12.00 71.80 39.98 31.82 5.53 36.87 0.00 1.73 40.27 25.74 30.49 230.77 35.36 226.91 2,140.37 0.00 0.00 0.00 0.00 2,633.41 102.30 1.56
Page 3 of 7 Pages
433737407.xls (Sub Summary)
PT. SMCC Utama Indonesia
Project : Nippon Shokubai Indonesia
Location : Cilegon, Banten, Indonesia.
Re-bar Ratio
Base Compaction
Concrete Casting
Lean Concrete
Trowel Finish
Plastic Sheet
Soil Disposal
Gravel Layer
Form Work
Excavation
Sub Total
Re-bar
Form
D-10
D-13
D-16
D-19
D-22
D-25
D-29
D-32
OBJECT
Dimension
Code w h/t l nos nos m3 m3 m3 m3 m2 m2 m3 m2 m3 m2 kg kg kg kg kg kg kg kg kg kg/m3 m2/m3
Page 4 of 7 Pages
433737407.xls (Foundation & Pedestal)
Page 5 of 7 Pages
433737407.xls (Ground Beam)
PT. SMCC Utama Indonesia
Project : Nippon Shokubai Indonesia
Location : Cilegon, Banten, Indonesia.
TYPE Total Bottom of Found. =GL. (m) -1.10 Tie Beam ( TB-1 ) Rett. Wall RE - BAR CALCULATION
No Beam (B1) for F2 Member Lean Conc. Thick (m) 0.05 Dimension C.Spacer 0.08 Dimension C.Spacer 0.05 Description BAR CONSUMPTION
As ( As ? ~ ? ) Place L. Conc. Each Space (m) 0.10 W L H/D Side Place W L/D H Side Place Bar Use Bar Fabrication Total By Diameter (Kg.) Total By
( L ) Span Axis to Axis 5.00 (Nos.) Gravel Thick (m) 0.15 (m) (m) (m) ( Nos. ) ( Nos. ) (m) (m) (m) ( Nos. ) ( Nos. ) Object Break Down Distance Cutting List Position Total of Weight 6 8 10 12 13 16 19 22 25 32 Section
1 ( t ) Thickness of Slab 0.00 1 Excav. Depth (m) 1.30 0.40 3.95 0.70 2 1 0.15 3.95 0.30 2 0 Type Section Position D Left Middle Right For Length ( m1 ) Pcs Lay Side Unit Pcs Length (Kg) (mm) (mm) (mm) (mm) (mm) (mm) (mm) (mm) (mm) (mm) (kg)
Item of Work Quantity Width Length Height Side Quantity Width Length Height Side Quantity
Excavation Space Tie Beam ( TB-Upper Top 19 Direct 6.80 4 1 1 4 27.20 2.23 60.66 60.66
Left Right Filling m3 0.00 1.00 4.25 0.00 0.00 Extra 1.79 1.79 0 0 1 1 0 0.00 0 0.00
Top 0.80 0.80 Excavation m3 3.54 1.60 1.70 1.30 3.54 Middle 10 Direct 6.20 1 2 1 2 12.40 0.62 7.69 7.69
Bottom 0.40 0.40 Gravel Lay m3 0.41 0.70 3.95 0.15 0.41 Lower Bottom 19 Direct 6.80 4 1 1 4 27.20 2.23 60.66 60.66
Average 0.60 0.60 Base Compaction m2 2.77 0.70 3.95 2.77 Extra 1.98 0 1 1 0 0.00 0 0.00
Plastic Sheet m2 0.00 0.00 0.00 Ring 13 200 200 200 Main 1.70 20 1 1 20 34.00 1.04 35.36 35.36
Object Size Lean concrete m3 0.12 0.60 3.95 0.05 0.12 Wide Hor. 10 200 200 200 Plus 0.35 20 1 1 20 7.00 0.62 4.34 4.34
Left Right Forming ( Both Side ) m2 5.53 0.40 3.95 0.70 2 5.53 0.15 3.95 0.30 2 0.00 Rett. Wall Vertical Inside 10 200 1.30 20 1 0 0 0.00 0.62 0.00 0.00
Column 0.50 0.50 Chamfer m1 0.00 Outside 10 200 1.30 20 1 0 0 0.00 0.62 0.00 0.00
Pile Cap 1.05 1.05 1.05 1.05 Wire Mesh m2 0.00 Bar Spacer 10 1000 0.25 2 1 0 0 0.00 0.62 0.00 0.00
(W) (L) (W) (L) Re-bar kg 168.70 168.70 0.00 Horizontal Inside 10 200 4.35 2 1 0 0 0.00 0.62 0.00 0.00
Concrete m3 1.11 0.40 3.95 0.70 1.11 0.15 3.95 0.30 0.00 Outside 10 200 4.35 2 1 0 0 0.00 0.62 0.00 0.00
Forming = 5.00 m2 / m3 Trowel finish m2 1.58 0.40 3.95 1.58 0.15 3.95 0.00 Others
Re - Bar = 152.53 Kg / m3 Backfill & Compaction m3 2.13 2.13
Concrete = 0.70 m3 / m2 Disposal m3 1.40 0.40 3.95 0.55 1.40
Re - Bar Ratio, According Design section Forming (Bottom Beam m2 1.58 0.40 3.95 1.58
Tie Beam ( TB-= 276.50 Kg Rebar ( Break Down ) Dia. 6 8 10 12 13 16 19 22 25 32 Span Total 3.95
Rett. Wall = 0.00 Kg Tie Beam ( TB-1 ) kg 168.70 0.00 0.00 12.03 0.00 35.36 0.00 121.31 0.00 0.00 0.00 Length of direct bar 5.47 0.00 12.03 35.36 121.31 0.00 ###
Total = 276.50 Kg Rett. Wall kg 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Overlap of direct bar 0.00 0.00 0.00 0.00 0.00 0.00
= 250.00 Kg / m3 Others kg 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
TOTAL Kg 168.70 12.03 35.36 121.31
Page 6 of 7 Pages
433737407.xls Pile Head Dia.350mm