PT. SMCC Utama Indonesia
Project : Nippon Shokubai Indonesia
Location : Cilegon, Banten, Indonesia.
Re-bar Ratio

Backfill & Compaction


Pile Head Treatment

Base Compaction

Concrete Casting
Lean Concrete

Trowel Finish
Plastic Sheet
Soil Disposal

Gravel Layer

Form Work
Excavation

Sub Total

Re-bar

Form
D-10

D-13

D-16

D-19

D-22

D-25

D-29

D-32
OBJECT
Dimension
Code w h/t l nos nos m3 m3 m3 m3 m2 m2 m3 m2 m3 m2 kg kg kg kg kg kg kg kg kg kg/m3 m2/m3

1 PUW RCK 02A F1 With Pedestal 1 8.00 50.18 24.74 25.44 4.14 27.62 0.00 1.33 21.82 20.61 24.50 144.13 0.00 147.28 1,564.98 0.00 0.00 0.00 0.00 1,856.39 90.09 1.06

F2 With Pedestal 2 4.00 18.08 13.11 4.97 0.97 6.48 0.00 0.29 12.91 4.03 4.41 74.61 0.00 79.63 454.08 0.00 0.00 0.00 0.00 608.32 150.94 3.20

Tie Beam 1 0.00 3.54 2.13 1.40 0.41 2.77 0.00 0.12 5.53 1.11 1.58 12.03 35.36 0.00 121.31 0.00 0.00 0.00 0.00 168.70 152.53 5.00

PUW RCK 02A Total 12.00 71.80 39.98 31.82 5.53 36.87 0.00 1.73 40.27 25.74 30.49 230.77 35.36 226.91 2,140.37 0.00 0.00 0.00 0.00 2,633.41 102.30 1.56

Page 1 of 7 Pages
433737407.xls (Summary)
PT. SMCC Utama Indonesia
Project : Nippon Shokubai Indonesia
Location : Cilegon, Banten, Indonesia.
Re-bar Ratio

Backfill & Compaction


Pile Head Treatment

Base Compaction

Concrete Casting
Lean Concrete

Trowel Finish
Plastic Sheet
Soil Disposal

Gravel Layer

Form Work
Excavation

Sub Total

Re-bar

Form
D-10

D-13

D-16

D-19

D-22

D-25

D-29

D-32
OBJECT
Dimension
Code w h/t l nos nos m3 m3 m3 m3 m2 m2 m3 m2 m3 m2 kg kg kg kg kg kg kg kg kg kg/m3 m2/m3

Page 2 of 7 Pages
433737407.xls (Sub Summary)
PT. SMCC Utama Indonesia
Project : Nippon Shokubai Indonesia
Location : Cilegon, Banten, Indonesia.
Re-bar Ratio

Backfill & Compaction


Pile Head Treatment

Base Compaction

Concrete Casting
Lean Concrete

Trowel Finish
Plastic Sheet
Soil Disposal

Gravel Layer

Form Work
Excavation

Sub Total

Re-bar

Form
D-10

D-13

D-16

D-19

D-22

D-25

D-29

D-32
OBJECT
Dimension
Code w h/t l nos nos m3 m3 m3 m3 m2 m2 m3 m2 m3 m2 kg kg kg kg kg kg kg kg kg kg/m3 m2/m3

1 PUW RCK 02A F1 1.05 0.80 2.10 1 8.00 50.18 24.74 25.44 4.14 27.62 0.00 1.33 16.16 19.60 24.50 24.68 0.00 0.00 1,352.50 1,377.18 70.26 0.82
Pile Head Treatment 8 0.30 0.33 22.90 147.28 170.18 508.54 0.91
Pedestal 0.50 0.67 0.50 4 5.36 0.67 96.55 0.00 0.00 212.47 309.03 461.24 8.00

8.00 50.18 24.74 25.44 4.14 27.62 0.00 1.33 21.82 20.61 24.50 144.13 0.00 147.28 1,564.98 0.00 0.00 0.00 0.00 1,856.39 90.09 1.06

F2 1.05 0.80 2.10 2 4.00 18.08 13.11 4.97 0.97 6.48 0.00 0.29 10.08 3.53 4.41 14.88 0.00 0.00 347.84 362.72 102.81 2.86
Pile Head Treatment 4 0.15 0.17 11.45 79.63 91.08 544.34 0.91
Pedestal 0.50 0.67 0.50 2 2.68 0.34 48.28 0.00 0.00 106.24 154.51 461.24 8.00

4.00 18.08 13.11 4.97 0.97 6.48 0.00 0.29 12.91 4.03 4.41 74.61 0.00 79.63 454.08 0.00 0.00 0.00 0.00 608.32 150.94 3.20

Beam B1 0.50 0.70 5.00 1 3.54 2.13 1.40 0.41 2.77 0.00 0.12 5.53 1.11 1.58 12.03 35.36 121.31 168.70 152.53 5.00

0.00 3.54 2.13 1.40 0.41 2.77 0.00 0.12 5.53 1.11 1.58 12.03 35.36 0.00 121.31 0.00 0.00 0.00 0.00 168.70 152.53 5.00

PUW RCK 02A Total 12.00 71.80 39.98 31.82 5.53 36.87 0.00 1.73 40.27 25.74 30.49 230.77 35.36 226.91 2,140.37 0.00 0.00 0.00 0.00 2,633.41 102.30 1.56

Page 3 of 7 Pages
433737407.xls (Sub Summary)
PT. SMCC Utama Indonesia
Project : Nippon Shokubai Indonesia
Location : Cilegon, Banten, Indonesia.
Re-bar Ratio

Backfill & Compaction


Pile Head Treatment

Base Compaction

Concrete Casting
Lean Concrete

Trowel Finish
Plastic Sheet
Soil Disposal

Gravel Layer

Form Work
Excavation

Sub Total

Re-bar

Form
D-10

D-13

D-16

D-19

D-22

D-25

D-29

D-32
OBJECT
Dimension
Code w h/t l nos nos m3 m3 m3 m3 m2 m2 m3 m2 m3 m2 kg kg kg kg kg kg kg kg kg kg/m3 m2/m3

Page 4 of 7 Pages
433737407.xls (Foundation & Pedestal)

PT. SMCC Utama Indonesia


Project : Nippon Shokubai Indonesia
Location : Cilegon, Banten, Indonesia.
TYPE Total Bottom of Found. =GL. (m) -1.20 Foundation ( F1 ) W-Pedestal Pedestal RE - BAR CALCULATION
No Foundation ( F1 ) W-Pedestal Member Lean Conc. Thick (m) 0.05 Dimension C.Spacer 0.08 Dimension C.Spacer 0.05 DESCRIPTION BAR USING BAR FABRICATION BAR CONSUMPTION
( Base & Pedestal ) Dop Place L. Conc. Each Space (m) 0.10 W L H/D Side Place W L/D H Side Place Code Cutting Position Total Total By Diameter (Kg.) Total By
Existing GL = FL ??? -0.3 (Nos.) Gravel Thick (m) 0.15 (m) (m) (m) ( Nos. ) ( Nos. ) (m) (m) (m) ( Nos. ) ( Nos. ) Type Section Position D. Distance Length Pcs Layer Side Place Pcs Length Weight 6 8 10 12 13 16 19 22 25 32 Section
1 Ground Slab Thick 0 1 Excav. Depth (m) 1.40 4.05 6.05 0.80 2 1 0.50 0.50 0.67 2 4 (mm) (@) (m) (Nos.) (Nos.) (Nos.) (Nos.) (Nos.) (m) (Kg) (mm) (mm) (mm) (mm) (mm) (mm) (mm) (mm) (mm) (mm) (kg)
Item of Work Quantity Width Length Height Side Quantity Width Length Height Side Quantity
Excavation Space PC. Pile Dia. 350mm nos 8.00 8.00 Foundati Lower Long Straight 19 190 7.25 21 1 1 21 152.25 2.23 339.52 339.52
Left Right Filling m3 0.00 4.65 6.65 0.00 0.00 Wide Straight 19 195 5.25 31 1 1 31 162.75 2.23 362.93 362.93
Top 0.72 0.72 Excavation m3 50.18 5.07 7.07 1.40 50.18 Middle Bar Spacer 19 1200 0.85 17 1 1 17 14.46 2.23 32.25 32.25
Bottom 0.30 0.30 Gravel Lay m3 4.14 4.35 6.35 0.15 4.14 Upper Long Straight 19 190 6.52 21 1 1 21 136.92 2.23 305.33 305.33
Average 0.51 0.51 Base Compaction m2 27.62 4.35 6.35 27.62 Wide Straight 19 195 4.52 31 1 1 31 140.12 2.23 312.47 312.47
Plastic Sheet m2 0.00 4.25 6.25 Ring / Hor. Outside 10 400 19.90 2 1 1 1 2 39.80 0.62 24.68 24.68
Forming = 1.06 m2 / m3 Lean concrete m3 1.33 4.25 6.25 0.05 1.33 Pedestal Vertical Inside 19 135 1.99 12 1 1 4 48 95.28 2.23 212.47 212.47
Re - Bar = 83.18 Kg / m3 Forming ( Wall Side ) m2 21.52 4.05 6.05 0.80 2 16.16 0.50 0.50 0.67 2 5.36
Concrete = 0.83 m3 / m2 Chamfer m1 4.05 6.05 0.80 2 23.40 0.50 0.50 0.67 2 18.72 Middle Bar Spacer
Wire Mesh m2 0.00 4.05 6.05 Horizontal
Re - Bar Ratio, According Design section Re-bar kg ### ### 309.03 Outside / Rin 10 200 1.80 8 1 1 4 32 57.60 0.62 35.71 35.71
Foundation (= 2,940.30 Kg Concrete m3 20.27 4.05 6.05 0.80 19.60 0.50 0.50 0.67 0.67 Other Others/AddInside RingLong Straight 10 200 1.53 8 1 1 4 32 49.07 0.62 30.42 30.42
Pedestal = 234.50 Kg Trowel finish m2 24.50 4.05 6.05 23.50 0.50 0.50 1.00 Wide Straight 10 200 1.53 8 1 1 4 32 49.07 0.62 30.42 30.42
Total = 3,174.80 Kg Backfill & Compaction m3 24.74 24.74
= 156.61 Kg / m3 Disposal m3 25.44 4.05 6.05 0.80 25.07 0.50 0.50 0.37 0.37
Bottom Foundation Are m2 24.50 4.05 6.05 24.50
Rebar ( Break Down ) Dia. 6 8 10 12 13 16 19 22 25 32
Foundation ( F1 ) W- kg ### 0.00 0.00 24.68 0.00 0.00 0.00 ### 0.00 0.00 0.00 121.23 ### ###
Pedestal kg 248.19 0.00 0.00 35.71 0.00 0.00 0.00 212.47 0.00 0.00 0.00
Other kg 60.84 0.00 0.00 60.84 0.00 0.00 0.00 0.00 0.00 0.00 0.00
TOTAL Kg ### 121.23 ###
TYPE Total Bottom of Found. =GL. (m) -1.20 Foundation ( F2 ) W-Pedestal Pedestal RE - BAR CALCULATION
No Foundation ( F2 ) W-Pedestal Member Lean Conc. Thick (m) 0.05 Dimension C.Spacer 0.08 Dimension C.Spacer 0.05 DESCRIPTION BAR USING BAR FABRICATION BAR CONSUMPTION
( Base & Pedestal ) Dop Place L. Conc. Each Space (m) 0.10 W L H/D Side Place W L/D H Side Place Code Cutting Position Total Total By Diameter (Kg.) Total By
Existing GL = FL ??? -0.3 (Nos.) Gravel Thick (m) 0.15 (m) (m) (m) ( Nos. ) ( Nos. ) (m) (m) (m) ( Nos. ) ( Nos. ) Type Section Position D. Distance Length Pcs Layer Side Place Pcs Length Weight 6 8 10 12 13 16 19 22 25 32 Section
2 Ground Slab Thick 0 2 Excav. Depth (m) 1.40 1.05 2.10 0.80 2 2 0.50 0.50 0.67 2 2 (mm) (@) (m) (Nos.) (Nos.) (Nos.) (Nos.) (Nos.) (m) (Kg) (mm) (mm) (mm) (mm) (mm) (mm) (mm) (mm) (mm) (mm) (kg)
Item of Work Quantity Width Length Height Side Quantity Width Length Height Side Quantity
Excavation Space PC. Pile Dia. 350mm nos 4.00 2.00 Foundati Lower Long Straight 19 175 3.30 6 1 2 12 39.60 2.23 88.31 88.31
Left Right Filling m3 0.00 1.65 2.70 0.00 0.00 Wide Straight 19 185 2.25 11 1 2 22 49.50 2.23 110.39 110.39
Top 0.72 0.72 Excavation m3 18.08 2.07 3.12 1.40 18.08 Middle Bar Spacer 19 1200 0.85 2 1 2 3 2.60 2.23 5.80 5.80
Bottom 0.30 0.30 Gravel Lay m3 0.97 1.35 2.40 0.15 0.97 Upper Long Straight 19 175 2.57 6 1 2 12 30.84 2.23 68.77 68.77
Average 0.51 0.51 Base Compaction m2 6.48 1.35 2.40 6.48 Wide Straight 19 185 1.52 11 1 2 22 33.44 2.23 74.57 74.57
Plastic Sheet m2 0.00 1.25 2.30 Ring / Hor. Outside 10 400 6.00 2 1 1 2 4 24.00 0.62 14.88 14.88
Forming = 3.30 m2 / m3 Lean concrete m3 0.29 1.25 2.30 0.05 0.29 Pedestal Vertical Inside 19 135 1.99 12 1 1 2 24 47.64 2.23 106.24 106.24
Re - Bar = 133.90 Kg / m3 Forming ( Wall Side ) m2 12.76 1.05 2.10 0.80 2 10.08 0.50 0.50 0.67 2 2.68
Concrete = 0.88 m3 / m2 Chamfer m1 1.05 2.10 0.80 2 19.00 0.50 0.50 0.67 2 9.36 Middle Bar Spacer
Wire Mesh m2 0.00 1.05 2.10 Horizontal
Re - Bar Ratio, According Design section Re-bar kg 517.24 362.72 154.51 Outside / Rin 10 200 1.80 8 1 1 2 16 28.80 0.62 17.86 17.86
Foundation (= 529.20 Kg Concrete m3 3.86 1.05 2.10 0.80 3.53 0.50 0.50 0.67 0.34 Other Others/AddInside RingLong Straight 10 200 1.53 8 1 1 2 16 24.53 0.62 15.21 15.21
Pedestal = 117.25 Kg Trowel finish m2 4.41 1.05 2.10 3.91 0.50 0.50 0.50 Wide Straight 10 200 1.53 8 1 1 2 16 24.53 0.62 15.21 15.21
Total = 646.45 Kg Backfill & Compaction m3 13.11 13.11
= 167.34 Kg / m3 Disposal m3 4.97 1.05 2.10 0.80 4.79 0.50 0.50 0.37 0.19
Bottom Foundation Are m2 4.41 1.05 2.10 4.41
Rebar ( Break Down ) Dia. 6 8 10 12 13 16 19 22 25 32
Foundation ( F2 ) W- kg 362.72 0.00 0.00 14.88 0.00 0.00 0.00 347.84 0.00 0.00 0.00 63.16 454.08 517.24
Pedestal kg 124.09 0.00 0.00 17.86 0.00 0.00 0.00 106.24 0.00 0.00 0.00
Other kg 30.42 0.00 0.00 30.42 0.00 0.00 0.00 0.00 0.00 0.00 0.00
TOTAL Kg 517.24 63.16 454.08

Page 5 of 7 Pages
433737407.xls (Ground Beam)
PT. SMCC Utama Indonesia
Project : Nippon Shokubai Indonesia
Location : Cilegon, Banten, Indonesia.
TYPE Total Bottom of Found. =GL. (m) -1.10 Tie Beam ( TB-1 ) Rett. Wall RE - BAR CALCULATION
No Beam (B1) for F2 Member Lean Conc. Thick (m) 0.05 Dimension C.Spacer 0.08 Dimension C.Spacer 0.05 Description BAR CONSUMPTION
As ( As ? ~ ? ) Place L. Conc. Each Space (m) 0.10 W L H/D Side Place W L/D H Side Place Bar Use Bar Fabrication Total By Diameter (Kg.) Total By
( L ) Span Axis to Axis 5.00 (Nos.) Gravel Thick (m) 0.15 (m) (m) (m) ( Nos. ) ( Nos. ) (m) (m) (m) ( Nos. ) ( Nos. ) Object Break Down Distance Cutting List Position Total of Weight 6 8 10 12 13 16 19 22 25 32 Section
1 ( t ) Thickness of Slab 0.00 1 Excav. Depth (m) 1.30 0.40 3.95 0.70 2 1 0.15 3.95 0.30 2 0 Type Section Position D Left Middle Right For Length ( m1 ) Pcs Lay Side Unit Pcs Length (Kg) (mm) (mm) (mm) (mm) (mm) (mm) (mm) (mm) (mm) (mm) (kg)
Item of Work Quantity Width Length Height Side Quantity Width Length Height Side Quantity
Excavation Space Tie Beam ( TB-Upper Top 19 Direct 6.80 4 1 1 4 27.20 2.23 60.66 60.66
Left Right Filling m3 0.00 1.00 4.25 0.00 0.00 Extra 1.79 1.79 0 0 1 1 0 0.00 0 0.00
Top 0.80 0.80 Excavation m3 3.54 1.60 1.70 1.30 3.54 Middle 10 Direct 6.20 1 2 1 2 12.40 0.62 7.69 7.69
Bottom 0.40 0.40 Gravel Lay m3 0.41 0.70 3.95 0.15 0.41 Lower Bottom 19 Direct 6.80 4 1 1 4 27.20 2.23 60.66 60.66
Average 0.60 0.60 Base Compaction m2 2.77 0.70 3.95 2.77 Extra 1.98 0 1 1 0 0.00 0 0.00
Plastic Sheet m2 0.00 0.00 0.00 Ring 13 200 200 200 Main 1.70 20 1 1 20 34.00 1.04 35.36 35.36
Object Size Lean concrete m3 0.12 0.60 3.95 0.05 0.12 Wide Hor. 10 200 200 200 Plus 0.35 20 1 1 20 7.00 0.62 4.34 4.34
Left Right Forming ( Both Side ) m2 5.53 0.40 3.95 0.70 2 5.53 0.15 3.95 0.30 2 0.00 Rett. Wall Vertical Inside 10 200 1.30 20 1 0 0 0.00 0.62 0.00 0.00
Column 0.50 0.50 Chamfer m1 0.00 Outside 10 200 1.30 20 1 0 0 0.00 0.62 0.00 0.00
Pile Cap 1.05 1.05 1.05 1.05 Wire Mesh m2 0.00 Bar Spacer 10 1000 0.25 2 1 0 0 0.00 0.62 0.00 0.00
(W) (L) (W) (L) Re-bar kg 168.70 168.70 0.00 Horizontal Inside 10 200 4.35 2 1 0 0 0.00 0.62 0.00 0.00
Concrete m3 1.11 0.40 3.95 0.70 1.11 0.15 3.95 0.30 0.00 Outside 10 200 4.35 2 1 0 0 0.00 0.62 0.00 0.00
Forming = 5.00 m2 / m3 Trowel finish m2 1.58 0.40 3.95 1.58 0.15 3.95 0.00 Others
Re - Bar = 152.53 Kg / m3 Backfill & Compaction m3 2.13 2.13
Concrete = 0.70 m3 / m2 Disposal m3 1.40 0.40 3.95 0.55 1.40
Re - Bar Ratio, According Design section Forming (Bottom Beam m2 1.58 0.40 3.95 1.58
Tie Beam ( TB-= 276.50 Kg Rebar ( Break Down ) Dia. 6 8 10 12 13 16 19 22 25 32 Span Total 3.95
Rett. Wall = 0.00 Kg Tie Beam ( TB-1 ) kg 168.70 0.00 0.00 12.03 0.00 35.36 0.00 121.31 0.00 0.00 0.00 Length of direct bar 5.47 0.00 12.03 35.36 121.31 0.00 ###
Total = 276.50 Kg Rett. Wall kg 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Overlap of direct bar 0.00 0.00 0.00 0.00 0.00 0.00
= 250.00 Kg / m3 Others kg 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
TOTAL Kg 168.70 12.03 35.36 121.31

Page 6 of 7 Pages
433737407.xls Pile Head Dia.350mm

PT. SMCC Utama Indonesia


Project : Nippon Shokubai Indonesia
Location : Cilegon, Banten, Indonesia.
Pi 3.14 Total Outside Diameter (A+B)(mm) 350 Type (1B) RE - BAR CALCULATION
No Pile Head Treatment (F1) D1 1.10 Member Inside Diameter (A) (mm) 220 Dimension C.Spacer 0.05 Dimension C.Spacer Bar Fabrication BAR CONSUMPTION
Type (1B) D2 0.69 Place Length of L1 (mm) 650 W L H/D Side Place W L/D H Side Place Cutting List Total Total By Diameter (Kg.) Total By
Outside Diameter = 350mm r1 0.18 (Nos.) Length of L2 (mm) 1,100 (m) (m) (m) ( Nos. ) ( Nos. ) (m) (m) (m) ( Nos. ) ( Nos. ) Object Break Down Bar Use Length Pcs Layer Unit Pcs Length Weight 6 8 10 12 13 16 19 22 25 32 Section
1 Section / Bar Shape r2 0.11 8 Length of L3 (mm) 192 0.39 0.39 1.10 1 8 Type Section Position D Space (m) (Nos.) (Nos) (Nos.) (Nos.) (m) (Kg) (mm) (mm) (mm) (mm) (mm) (mm) (mm) (mm) (mm) (mm) (kg)
Item of Work Quantity Width Length Height Side Quantity Width Length Height Side Quantity
Type (1B) Direct (1) 16 1.94 6 1 8 48 93.22 1.58 147.28 147.28
Filling m3 0.00 (2) 0 0 1 8 0 0.00 0 0.00
Excavation m3 0.00 Extra 0 0.95 8 1 8 64 60.80 0 0.00
Gravel Lay m3 0.00 0 0 1 8 0 0.00 0 0.00
Base Compaction m2 0.00 Ring Main 10 150 0.58 8 1 8 64 36.94 0.62 22.90 22.90
Plastic Sheet m2 0.00
Forming = 0.91 m2 / m3 Lean concrete m3 0.00 r r
Re - Bar = 508.54 Kg / m3 Forming m2 0.304 0.11 0.11 1 0.30
Concrete = 3.04 m3 / m2 Chamfer m1 0.00
Wire Mesh m2 0.00
Re - Bar Ratio, According Design section Re-bar kg 170.18 170.18
Type (1B) = 117.13 Kg Concrete m3 0.335 0.11 0.11 1.10 0.33
0 = Kg Trowel finish m2 0.00
Total = 117.13 Kg Backfill & Compaction m3 0.00
= 350.00 Kg / m3 Disposal m3 0.00

Rebar ( Break Down ) Dia. 6 8 10 12 13 16 19 22 25 32


Type (1B) kg 170.18 0.00 0.00 ### 0.00 0.00 147.28 0.00 0.00 0.00 0.00 0.00 22.90 0.00 0.00 0.00 ###
0 kg 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 147.28 0.00 0.00

TOTAL Kg 170.18 ### 147.28


Pi 3.14 Total Outside Diameter (A+B)(mm) 350 Type (2) RE - BAR CALCULATION
No Pile Head Treatment (F2) D1 1.10 Member Inside Diameter (A) (mm) 220 Dimension C.Spacer 0.05 Dimension C.Spacer Bar Fabrication BAR CONSUMPTION
Type (2) D2 0.69 Place Length of L1 (mm) 650 W L H/D Side Place W L/D H Side Place Cutting List Total Total By Diameter (Kg.) Total By
Outside Diameter = 350mm r1 0.18 (Nos.) Length of L2 (mm) 1,100 (m) (m) (m) ( Nos. ) ( Nos. ) (m) (m) (m) ( Nos. ) ( Nos. ) Object Break Down Bar Use Length Pcs Layer Unit Pcs Length Weight 6 8 10 12 13 16 19 22 25 32 Section
2 Section / Bar Shape r2 0.11 4 Length of L3 (mm) 350 0.39 0.39 1.10 1 4 Type Section Position D Space (m) (Nos.) (Nos) (Nos.) (Nos.) (m) (Kg) (mm) (mm) (mm) (mm) (mm) (mm) (mm) (mm) (mm) (mm) (kg)
Item of Work Quantity Width Length Height Side Quantity Width Length Height Side Quantity
Type (2) Direct (1) 16 2.10 6 1 4 24 50.40 1.58 79.63 79.63
Filling m3 0.00 (2) 0 0 1 4 0 0.00 0 0.00
Excavation m3 0.00 Extra 0 0.95 8 1 4 32 30.40 0 0.00
Gravel Lay m3 0.00 0 0 1 4 0 0.00 0 0.00
Base Compaction m2 0.00 Ring Main 10 150 0.58 8 1 4 32 18.47 0.62 11.45 11.45
Plastic Sheet m2 0.00
Forming = 0.91 m2 / m3 Lean concrete m3 0.00 r r
Re - Bar = 544.34 Kg / m3 Forming m2 0.152 0.11 0.11 1 0.15
Concrete = 1.52 m3 / m2 Chamfer m1 0.00
Wire Mesh m2 0.00
Re - Bar Ratio, According Design section Re-bar kg 91.08 91.08
Type (2) = 58.56 Kg Concrete m3 0.167 0.11 0.11 1.10 0.17
0 = Kg Trowel finish m2 0.00
Total = 58.56 Kg Backfill & Compaction m3 0.00
= 350.00 Kg / m3 Disposal m3 0.00

Rebar ( Break Down ) Dia. 6 8 10 12 13 16 19 22 25 32


Type (2) kg 91.08 0.00 0.00 ### 0.00 0.00 79.63 0.00 0.00 0.00 0.00 0.00 11.45 0.00 0.00 0.00 91.08
0 kg 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 79.63 0.00 0.00

TOTAL Kg 91.08 ### 79.63

Page 7 of 7 08/19/2019 04:37:15