Findings:
Signboard at main door parking area was not
in good condition.
Corrective Action:
Install grill to prevent any incident.
Person in Charge:
TE Civil
Completion date:
18/6/2019
Findings:
Manhole cover STP was missing.
Corrective Action:
Replace with new STP cover.
Person in Charge:
FHE
Completion date:
20/6/2019
Page 1 of 5
WORKPLACE INSPECTION MONTHLY REPORT | HOSPITAL ALOR SETAR | (JUNE) (2019)
Findings:
Double bucket handle broke at Wad K2.
Corrective Action:
Replace with new double bucket handle.
Person in Charge:
FHH
Completion date:
20/6/2019
Findings:
Corrective Action:
Install aluminum ceiling frame.
Person in Charge:
FHE
Completion date:
21/6/2019
Page 2 of 5
WORKPLACE INSPECTION MONTHLY REPORT | HOSPITAL ALOR SETAR | (JUNE) (2019)
Findings:
Found that roof at unit dobi not in good
condition potential to falling.
Corrective Action:
Fix the roof .
Person in Charge:
TE Civil
Completion date:
21/6/2019
Findings:
Drain greeting cover at blok F broken and
may cause harm to user.
Corrective Action:
Fix the broken drain greeting cover.
Person in Charge:
TE Mechanical
Completion date:
25/6/2019
Page 3 of 5
WORKPLACE INSPECTION MONTHLY REPORT | HOSPITAL ALOR SETAR | (JUNE) (2019)
Findings:
Linen cabinet ware not in good condition. It
may cause harm to the worker.
Corrective Action:
Fix and repair the cabinet.
Person in Charge:
TE Civil
Completion date:
25/6/2019
Findings:
Found that fluorescent light18W was hanging
at walkway M2
Corrective Action:
The fluorescent light ware fix it back.
Person in Charge:
TE Electrical
Completion date:
25/6/2019
Page 4 of 5
WORKPLACE INSPECTION MONTHLY REPORT | HOSPITAL ALOR SETAR | (JUNE) (2019)
Findings:
Telephone wire ware hanging and not in
proper management at office J2
Corrective Action:
Fix with the proper wiring.
Person in Charge:
TE Electrical
Completion date:
24/6/2019
Findings:
Distribution Board (DB) at clinical waste was
not cover with electrical cage.
Corrective Action:
Install distribution board cage
Person in Charge:
TE Electrical
Completion date:
30/6/2019
Page 5 of 5