Documente Academic
Documente Profesional
Documente Cultură
25
50 50 50 50 50 50 50 50 50 50 50 25
50
25
50
RL 99.447 1
RL 99.386
50
3
1200
250
50
2
50
RL 98.786
25
1
MESH REINFORCEMENT 8mm (TYPE A)
PIER - SECTION A-A
1200 DETAILS OF REINFORCEMENT
3
6500
186.5
750 2500 2500 750
25
630 50 50 50 50 50 25
A A BEARINGS
220
25
630 X 220 X 61
37
285
1200
6
50
RL 93.007 EXPANSION JOINT
50
50
#16 OF (5+5) SIDE 5 4
REINFORCEMENT
PLAN PIER CAP
25
100
MESH REINFORCEMENT 8mm (TYPE B)
200 RL 91.207
RL 91.107
800
800 3600
5200 7 C
5400 SCHEDULE OF REINFORCEMENT
6500
150
( 3+3) OF # 16 MESH JACK POINT BAR REINFORCEMENT BAR REINFORCEMENT
Side Reinforcement TYPE B MESH TYPE A RL99.386
MARK DETAILS MARK DETAILS
1 # 20 OF 60 Nos
9 6 10L #10 @ 300 C/C
(10+20+20+10) VERTICALS
1200
2 # 12 @ 200 C/C 7 7 NOS OF # 20 TOP
9 3 # 10 LINKS @ 400 C/C
VERTICAL FOR EVERY THIRD 8
7 NOS OF # 16 BOTTOM
RL98.786 BAR
PIER SECTION B-B 4
9 # 25 @ 175 C/C 9
NUMERATION PIER SECTION B-B C 6L #12 @ 175 C/C
RL 74.207 650 8
REINFORCEMENT
650 5 # 25 @ 175 C/C
5200
L/S - PIER CAP REINFORCEMENT
Note: -
7
800
600
1. Figured dimensions shall be taken. Do not scale the drawing. All Reduced levels are in meters and dimensions are in millimeters.
IA
1000 D 1200 2. The super structure shall be as per MOST standard drawings.
IA RL99.386
1200 D 3. Expansion joint shall be of the approved type.
4. Approach slab shall be as per IRC 78.
5. Concrete shall be M30 grade for Pile cap, Pier, cap and M35 grade for piles with 20mm and down size metal.
6. Reinforcement steel used shall be TMT bars Fe 500 grade conforming to IS 1139-1966 (or) 1789-1966 with upto date amendments.
(3+3) OF # 16 9 7. Dimensions of steel reinforcement shall be taken as indicated only.
Side Reinforcement 8. Lap length shall be 45 times dia of the reinforcement bar and lapping of bars shall be staggered and not more than 50% of the bars shall be lapped at a
section.
9. Clear cover to reinforcement shall be 70 mm (min) foundation, 50 mm on earth face and 40mm on other face for substructure.
RL 98.786 10. Approval of competent authority has to be obtained for extra financial implication if any before execution or for any other modifications.
11. This drawing do not bear any risk or responsibility for any field lapses or faulty workmanship.
8 SECTION C-C
12. The bar bending diagram shown are for the guidance only, The contractor should prepare the bar bending schedules subject to the approval of the
Engineer - in- charge
13. This drawing shall be read in conjunction with GAD drawing
4000
DRAWING TITLE
3600
5200
5 4
DIMENSION AND REINFORCEMENT DETAILS OF PIER -1 FOR 24.75M SPAN
B B
PROJECT
NAME OF WORK: CONSTRUCTION OF BRIDGE AT THIMMANA KUDRU IN KEMMANU, UDUPI TALUK
1200
600
800