Documente Academic
Documente Profesional
Documente Cultură
HASIL PENGUKURAN
WATER KETERANGAN
NO. TANKI CAPACITY LEVEL / ROTO GAUGE PRESS. (Density eks
(LITER) TEMP (°C) BPP/Struk
KANAN KIRI RATA2 (Kg/cm²) Timbangan/Surat
Jalan)
TT 1 108,600 - - 60.00 23.00 8.00 0.5437
DIAMETER INSIDE DIA. INSIDE AREA INSIDE AREA INSIDE AREA VOLUME PANJANG VOLUME DENCITY BERAT
No.
( inch ) ( inch ) ( inch² ) ( m² ) ( m³ / mtr ) ( ltr / m ) (m) ( ltr ) 15° C ( kg )
1 0.5 0.5460 0.2342 0.0002 0.0002 0.1511 32.40 4.8962 0.5437 2.66
2 1.5 1.5000 1.7679 0.0011 0.0011 1.1406 23.00 26.2327 0.5437 14.26
3 2.0 1.9390 2.9541 0.0019 0.0019 1.9058 23.00 43.8344 0.5437 23.83
4 3.0 2.9000 6.6079 0.0043 0.0043 4.2631 48.00 204.6300 0.5437 111.26
5 4.0 3.8260 11.5015 0.0074 0.0074 7.4203 2.00 14.8406 0.5437 8.07
6 6.0 5.7610 26.0772 0.0168 0.0168 16.8239 22.00 370.1268 0.5437 201.24
LAPORAN STOCK TABUNG MILIK SPPBE PT. MITRA TRIO ARBA PUTRA
Tabung LPG 3 Kg Tabung LPG 12 Kg Tabung LPG 50 Kg
BAIK RUSAK JUMLAH BAIK RUSAK JUMLAH BAIK RUSAK JUMLAH
2,000 2,000 - - - - - -
NETT LITRES TEMP. PRESSURE PRESS. FACT TEMP. FACT DENSITY VAPOUR KILOGRAM
KILOGRAM
TANK No. OF PRODUCT °C kg/cm² P ob's + 1,033 273 kg/dm³ VAPOUR
(4-5) (=3) (dari Tank Ticket) 1,033 T ob's + 273 (0,0024) (12 x 15 x 16 x 17)(LIQUID + VAPOUR)
11 13 14 15 16 17 18 19
1 43,440.00 23.00 8.00 8.74 0.92 0.0024 840.82 35,490
2 56,394.00 23.50 8.00 8.74 0.92 0.0024 1,089.72 28,742
3 28,840.00 27.00 6.00 6.81 0.91 0.0024 428.83 429
4 28,840.00 27.70 7.70 8.45 0.91 0.0024 531.25 531
5 28,840.00 25.50 6.20 7.00 0.91 0.0024 443.24 443
VAPOU 6 28,840.00 29.50 7.00 7.78 0.90 0.0024 485.76 486
R 7 28,840.00 26.00 6.30 7.10 0.91 0.0024 448.62 449
8 28,840.00 26.00 7.50 8.26 0.91 0.0024 522.03 522
9 29,474.00 27.00 6.00 6.81 0.91 0.0024 438.26 438
10 29,474.00 25.50 6.50 7.29 0.91 0.0024 471.78 472
11 29,474.00 24.00 6.20 7.00 0.92 0.0024 455.28 455
12 28,840.00 26.00 5.70 6.52 0.91 0.0024 411.91 412
13 29,428.00 30.00 7.20 7.97 0.90 0.0024 507.17 507
14
15
Mengetahui,
Petugas Stock Opname Manager SPPBE
Sr. Administrator DSP Palu
Noval
Angga Purnama Arifin
PENERIMAAN BPP
DARI PERTAMINA
SPPBE PT. MITRA TRIO ARBA PUTRA
Noval
LAPORAN PERSEDIAAN TABUNG LPG
DALAM GUDANG
SPPBE PT. MITRA TRIO ARBA PUTRA
Tabung LPG 12 Kg - - - -
Tabung LPG 12 Kg Rusak Valve - - - -
Tabung LPG 12 Kg Rusak / Berkarat - - - -
Tabung LPG 12 Kg Bocor - - - -
Tabung LPG 12 Kg Rusak + Isi - - - -
Total LPG 12 Kg - - - -
Tabung LPG 50 Kg - - - -
Tabung LPG 50 Kg Rusak Valve - - - -
Tabung LPG 50 Kg Rusak / Berkarat - - - -
Tabung LPG 50 Kg Bocor - - - -
Tabung LPG 50 Kg Rusak + Isi - - - -
Total LPG 50 Kg - - - -
PADA TANGKI TIMBUN
SPPBE PT. Mitra Trio Arba Putra
Nomor Berat Rotor Gauge Mano - Thermo - Jam Jam Sebelum Bongkar Sesudah Bongkar
No. Tanggal Ket.
Nama Sopir Polisi Netto Kiri Kanan Meter Meter Mulai Selesai Magnetic ManometerThermometer Magnetic ManometerThermometer
Density
Kendaraan ( kg ) (%) (%) ( Bar ) ( °C ) ( Wita ) ( Wita ) Level ( % ) ( Bar ) ( °C ) Level ( % ) ( Bar ) ( °C )
1 17-08-19 Hamdan DN 8975 CU 13,130 84 85 7 26.5 10.15 11:50 20 5,7 26 45 7' 28,5 0.5447
2 17-08-19 Mahmud B 9706 TFU 13,120 85 85 6.9 30 13:10 14:45 12 6.5 23.5 37 7,5 26 0.5447
3 17-08-19 Sarif B 9213 TFA 13,100 85 87 6 30 15:10 16:20 43 6 27,5 68 7,8 28,5 0.5437
4 17-08-19 Adil DP 8682 TB 13,000 85 85 7 30 16:30 18:16 47 6 29 71 7,9 28',5 0.5437
5 17-08-19 Syahril DP 8858 TA 12,990 87 87 7.7 30 19:00 20:35 32.5 6,7 25 59 8 26 0.5437
6
7
8
9
SPPBE PT. Mitra Trio Arba Putra
Noval
,