The document outlines the minimum testing requirements for various construction materials. It specifies the minimum number of samples required to be tested per unit of material for items like cement, asphalt, aggregates, soil, concrete pipes, hollow blocks, rebar, and other materials. It also lists the minimum quantity or volume of each material needed for each sample submitted for testing.
The document outlines the minimum testing requirements for various construction materials. It specifies the minimum number of samples required to be tested per unit of material for items like cement, asphalt, aggregates, soil, concrete pipes, hollow blocks, rebar, and other materials. It also lists the minimum quantity or volume of each material needed for each sample submitted for testing.
The document outlines the minimum testing requirements for various construction materials. It specifies the minimum number of samples required to be tested per unit of material for items like cement, asphalt, aggregates, soil, concrete pipes, hollow blocks, rebar, and other materials. It also lists the minimum quantity or volume of each material needed for each sample submitted for testing.
2. Asphalt Materials 1 (s) per 40 tonnes or 200 drums 3. Asphlat Mixes 1 (s) per 130 Tonnes 4. Aggregates 1 (s) per 1500 cu.m. a. Coarse Aggregate b. Fine Aggregate 5. Soil Aggregate 1 (s) per 1500 cu.m. a. Classification b. Routinary Tests c. Moisture Density Relation and CBR
6. Non-Reinforced Concrete Pipe 2 Pipes min. / 0.5% of no. of pipes
7. Reinforced Concrete Pipe 1 (s) per 50 pipes / 2% of no. of pipes
8. Steel Pipe (Galvanized) 1 (s) per 500 length
9. Concrete Hollow Blocks 1 (s) per 20,000 units
(Complete) a. Strength b. Moisture Content 10. Steel Bars 1 (s) per 10,000 kg or 10 tonnes 11. Steel Sheet (Galvanized) 1 (s) per 1,000 sheet 12. Wire-Strand Strap 13. Gabions
14. Paints 1 (s) per 100 cans
15. Joint Filler (Pre-mold)
16. Curing Compound 17. Concrete Cylinder 1 set of 3 cylinders for 75 cu.m. 1 set of 3 beams for 75 cu.m. or 1 18. Concrete Beam day pouring 19. Concrete Core 1 core for every 200 meters 20. Asphalt Cores 1 core for every 100 meters 21. Water Analysis a. Chemical Analysis b. Sediment Load 22. Structural Steel / Sheet 1 (s) per 50 tonnes MINIMUM QUANTITY/VOLUME OF MATERIALS FOR EACH SAMPLE SUBMITTED 10 kg 5L 20 kg (Complete)
70 kg 50 kg
20 kg 50 kg
50 kg
2 pipes
1 pipe (1m length)
2 pcs. Of 100m long taken from both
ends w/o thread
6 units
3 units 3 units 1m 1m 2m 1m x 2m 1 (4L cans) or 1 (20L cans) 1 (400mm x 400mm) 1L 1 set of 3 cylinders (6" x 12")