Refill the tube CO2 gas whenever the system shows low gas alarm•
Attending the training courses in calibration procedures, fault finding and rectification of
the fault with the system Automation•
Verifying the aircraft types to each system memory as per requirements of particular
stand type•
Testing the operation of VDGS in the correct detecting aircrafts and stopping them at the
correct stop position•
Installing the Gate Operating System (GOS) at the tower for the Air Traffic Controllers
(ATC) in order to use and train them for the proper use of the system•
Providing solution to critical issues during the meetings. I was responsible to prevent any
project delay due to technical issues pertinent to Electrical Engineering field. •
Reviewing and providing solution for problems involved. I had to review the project
aspects multiple times during the project progress, taking into account the cost, safety, the
economic aspects along with other necessary requirements•
Analyzing the project and predicting the possible problems and providing plans for
bypassing them. •
Finding the new and updated solutions though research, making sure that the final project
is according to new standards is well equipped for long run.
Design and preparing drawings for the parts which did not have drawing during design
phase and also compensating shortage of documents•
Supervising pipe jacking operation, design and conducting guard structures in order to
increase safety levels of construction