Session Plan
Sector : Utilities Sector

Qualification Title : Line Construction (Electric Power Distribution) NCII

Unit of Competency : Erect Distribution Line Poles

Module Title : Erecting Distribution Line Poles

Learning Outcomes:

Upon completion of this module, the trainees must be able to:


LO1 - Plan and prepare for work
LO2 - Perform pole loading, hauling and spotting
LO3 - Perform pole digging, grounding and setting/erection

A. Introduction

This unit covers the knowledge, skills and attitude required to erect distribution line poles. This unit includes competencies for installing new
distribution line pole as well as transporting pole from stockyard to jobsite, performing pole spotting, digging, grounding and pole
setting/erection. This involves working with a team.

B. Learning Activities

Page 1 of 4
LO1 - Plan and prepare for work

Learning Content Methods Presentation Practice Feedback Resources Time

Work instructions Self-pace Learning Read Information Sheet Answer Self-Check Check Answer Erecting
1.1-1 on Work instructions 1.1-1 Based on the Distribution Line
answer to Self- Poles CBLM
Check 1.1-1

Occupational health Self-pace Learning Read Information Sheet Answer Self-Check Check Answer Erecting
and safety 1.1-2 on Occupational 1.1-2 Based on the Distribution Line
requirements health and safety answer to Self- Poles CBLM
requirements Check 1.1-2

Demonstration Refer to Task Sheet 1.1-2 Perform Task Sheet Trainees rate As needed
on Occupational health 1.1-2 own
and safety requirements performance
using the
performance
criteria
checklist

LO2 - Perform pole loading, hauling and spotting

Learning Content Methods Presentation Practice Feedback Resources Time

 Job and Safety Self-pace Learning Read Information Sheet Answer Self-Check Check Answer Erecting
requirements 1.2-1 on Job and Safety 1.2-1 Based on the Distribution Line
requirements answer to Self- Poles CBLM
Check 1.2-1

 Personal Self-pace Learning Read Information Sheet Answer Self-Check Check Answer Erecting

Page 2 of 4
protective 1.2-2 on Personal 1.2-2 Based on the Distribution Line
equipment (PPE) protective equipment answer to Self- Poles CBLM
(PPE) Check 1.2-2

 Poles hauling and Self-pace Learning Read Information Sheet Answer Self-Check Check Answer Erecting
pole spotting 1.2-3 on Poles hauling and 1.2-3 Based on the Distribution Line
pole spotting answer to Self- Poles CBLM
Check 1.2-3

Demonstration Refer to Task sheet 1.2-3 Perform Task Sheet Trainees rate As needed
on perform pole loading, 1.2-3 own
handling and spotting performance
using the
performance
criteria
checklist

LO3 - Perform pole digging, grounding and setting/erection

Learning Content Methods Presentation Practice Feedback Resources Time

 Construction Self-pace Learning Read Information Sheet Answer Self-Check Check Answer Erecting
specifications 1.3-1 on Construction 1.3-1 Based on the Distribution Line
specifications answer to Self- Poles CBLM
Check 1.3-1

 Pole Self-pace Learning Read Information Sheet Answer Self-Check Check Answer Erecting
setting/erection 1.3-2 on Pole 1.3-2 Based on the Distribution Line
procedure setting/erection procedure answer to Self- Poles CBLM
Check 1.3-2

Page 3 of 4
Demonstration Refer to Task sheet 1.3-2 Perform Task Sheet Trainees rate As needed
on Perform pole digging, 1.3-2 own
grounding and performance
setting/erection using the
performance
criteria
checklist
C. Assessment Plan:

Competency must be assessed through:

 Direct observation of trainee’s application of knowledge to tasks.

 Questions related to underpinning knowledge (oral Questioning

D. Trainer’s Self- Reflection of the Session

Prepared by:

REYNALDO S. MANUEL
Line Construction (Electric Power Distribution) NCII - Trainer