Session Plan
Sector : Utilities Sector
Learning Outcomes:
A. Introduction
This unit covers the knowledge, skills and attitude required to erect distribution line poles. This unit includes competencies for installing new
distribution line pole as well as transporting pole from stockyard to jobsite, performing pole spotting, digging, grounding and pole
setting/erection. This involves working with a team.
B. Learning Activities
Page 1 of 4
LO1 - Plan and prepare for work
Work instructions Self-pace Learning Read Information Sheet Answer Self-Check Check Answer Erecting
1.1-1 on Work instructions 1.1-1 Based on the Distribution Line
answer to Self- Poles CBLM
Check 1.1-1
Occupational health Self-pace Learning Read Information Sheet Answer Self-Check Check Answer Erecting
and safety 1.1-2 on Occupational 1.1-2 Based on the Distribution Line
requirements health and safety answer to Self- Poles CBLM
requirements Check 1.1-2
Demonstration Refer to Task Sheet 1.1-2 Perform Task Sheet Trainees rate As needed
on Occupational health 1.1-2 own
and safety requirements performance
using the
performance
criteria
checklist
Job and Safety Self-pace Learning Read Information Sheet Answer Self-Check Check Answer Erecting
requirements 1.2-1 on Job and Safety 1.2-1 Based on the Distribution Line
requirements answer to Self- Poles CBLM
Check 1.2-1
Personal Self-pace Learning Read Information Sheet Answer Self-Check Check Answer Erecting
Page 2 of 4
protective 1.2-2 on Personal 1.2-2 Based on the Distribution Line
equipment (PPE) protective equipment answer to Self- Poles CBLM
(PPE) Check 1.2-2
Poles hauling and Self-pace Learning Read Information Sheet Answer Self-Check Check Answer Erecting
pole spotting 1.2-3 on Poles hauling and 1.2-3 Based on the Distribution Line
pole spotting answer to Self- Poles CBLM
Check 1.2-3
Demonstration Refer to Task sheet 1.2-3 Perform Task Sheet Trainees rate As needed
on perform pole loading, 1.2-3 own
handling and spotting performance
using the
performance
criteria
checklist
Construction Self-pace Learning Read Information Sheet Answer Self-Check Check Answer Erecting
specifications 1.3-1 on Construction 1.3-1 Based on the Distribution Line
specifications answer to Self- Poles CBLM
Check 1.3-1
Pole Self-pace Learning Read Information Sheet Answer Self-Check Check Answer Erecting
setting/erection 1.3-2 on Pole 1.3-2 Based on the Distribution Line
procedure setting/erection procedure answer to Self- Poles CBLM
Check 1.3-2
Page 3 of 4
Demonstration Refer to Task sheet 1.3-2 Perform Task Sheet Trainees rate As needed
on Perform pole digging, 1.3-2 own
grounding and performance
setting/erection using the
performance
criteria
checklist
C. Assessment Plan:
Prepared by:
REYNALDO S. MANUEL
Line Construction (Electric Power Distribution) NCII - Trainer