BILL OF QUANTITIES
HEATING, VENTILATION
AIR-CCONDITIONING SYSTEM
DECEMBER 2011
BILL OF QUANTITIES (HVAC)
PROJECT : CENTRO HOTEL
Supply, installation a complete HVAC system as per ASHRAE, SMACNA and NFPA
standards
Chillers
Supply & installation of air cooled screw chiller with screw compressors with two
refrigeration circuits at least and an environemental refrigerant and copper to copper
condenser , and outdoor temperature of 120ْ F &Electrical voltage (380V-3PH-60Hz)
completed with isolating valves and double regulating valves with accessories, isolators,
protection and safety tools, and microcomputer control center & all nessary acorrding to
specfication & drawings .
Supply & installation Air Handling Units (AHU) constant air volume type. Complete w/ all
gate, balancing & modulating valves, strainers, gauges, fittings & all required
accessories for proper operation as per specification, drawings & equipments schedule
To Collection
DIV.15/2
BILL OF QUANTITIES (HVAC)
PROJECT : CENTRO HOTEL
Supply & installation chilled water centrifugal pump (end suction type) complete w/ all
valves, strainers, vibration insulation & accessories required for proper work including
expansion tank and water softener as per specification, drawings & equipment schedule.
Supply and installation of Variable air volume Box complete w/ all accessories for
proper operation as per mentioned in specification, drawings and equipment schedule
DIV.15/3
BILL OF QUANTITIES (HVAC)
PROJECT : CENTRO HOTEL
To Collection
Duct Work
Supply, installation, testing, balancing, and commissioning of air ducts from galvanized
steel complete with insulation 1 inch & density 24 Kg/M 3 for internal &2 inch ,density 48
Kg/M3 and Aluminum cladding 0.6 mm for external ducts .The ducts should be complete
A 19,500 Kg.
with volume dampers,fire dampers, sound attenuators, smoke dampers,accessories
,supports, preinsulated flexible connections & all nessasry as per drawings
,specifications& international codes (ASHRAE,SMACNA).
KITCHEN HOOD
Supply, installation, and testing of Stainless steel hood according to actual kitchen
B dimensions complete with accessories ,supports , staniless steel duct and all necessary 1 SET
as per specifications& drawings .
AIR OUTLETS
Supply & installation of Supply Square Ceiling Diffusers as mentioned in Specifications &
as shown on drawings & equipment schedule
AIR INLETS
Supply & installation of Return Square Ceiling Diffusers as mentioned in Specifications &
as shown on drawings & equipment schedule
DIV.15/4
BILL OF QUANTITIES (HVAC)
PROJECT : CENTRO HOTEL
To Collection
Return linear Slot Diffusers as shown in specifications, drawings and schedule of
equipments
R ø4" 40 L.M.
DIV.15/5
BILL OF QUANTITIES (HVAC)
PROJECT : CENTRO HOTEL
T ø8" 80 L.M.
To Collection
A Supply, installation of Building Management System for the whole electrical and
mechanical equipments for the future extension as shown in the mechanical and
electrical drawings. Also the price include supply and installation of DDC's, wires,
junction boxes and all accessories for the proper operation as per specifications and Item Item
drawings for the fourth, the fifth, and the sixth floor.
Testing, commissioning and balancing of the installed HVAC Systems for the future
B Item Item
extension as per ASHRAE Standard Regulations.
DIV.15/6
BILL OF QUANTITIES (HVAC)
PROJECT : CENTRO HOTEL
To Collection
Collection
A Page 1/6
B Page 2/6
C Page 3/6
D Page 4/6
E Page 5/6
DIV.15/7
BILL OF QUANTITIES (HVAC)
PROJECT : CENTRO HOTEL
To Collection
DIV.15/8