PERIMETER 138.961
N= 122
N= 94
Clamp
N= 282
Tekscrew
N= 1277
Paint 416.883
July 25, 2012
Thru :
Madam/Sir;
Submitting herewith is our Cost Proposal for designated scope for materials, labor, to
for the subject mentioned above. Comprising below are the corresponding scope of works and its corresponding amount.
Unit Cost
Item Description / Scope of Work Qty Unit
Material
I GENERAL PRELIMINARIES
I.1 Mobilization 1.00 lot
I.2 Temporary Facilities 1.00 lot
I.3 Housekeeping & Garbage Disposal 1.00 lot
I.4 Materials Testing 1.00 lot
I.5 As-Built Plans owner
I.6 Temporary Water, Power & Lighting 1.00 lot
I.7 Eng'g Supervision 1.00 lot
I.8 Project Transportation, Materials Delivery 1.00 lot
and vehicle-equipment passage fee
I.10 Bonds & Insurances owner
I.11 Permits & Licences incl. coordination provision 1.00 lot
I.12 Demobilization 1.00 lot
II CIVIL WORKS
II.A
II.a.1 Installation of Corrugated G.I. Sheet 4 x 10' 122.00 shts
II.a.2 G.I Pipe 1 1/2" Framing 116.00 lngths
II.a.3 Concrete pedestal 1.8500 m3
II.a.4 Consumables
Tekscrew 1,277.00 pcs
Hinges 4 x 4" 12.00 pcs
Welding rod 10.00 pcs
II.B
PAINTING WORKS
Painting of perimeter wall 416.88 sq.m
Prepared By:
0.00
0.00 0.0000
0.00 0.0000
0.00 0.0000
0.00 0.0000
-
0.00 0.0000
0.00 0.0000
0.00 0.0000
0.0000
-
0.00
0.00 0.0000
0.00
0.00 0.00
0.00 0.00