ITEM DESCRIPTION QTY UNIT Unit Cost

1 ADDITIONAL WORKS

1.01 Aquarium Framing 1.00 lot 4,000.00

1.02 Concrete Sadle for Water Tank & Cabinet 1.00 lot 3,500.00

1.03 Dropped Wall @ Garage 1.00 lot 6,000.00

1.04 Column Rectification (Plumbness) 1.00 lot 2,500.00

1.05 Painting Works @ Kitchen 1.00 lot 6,000.00

Leveling, Compaction & Arrangement of Concrete


1.06 1.00 lot 8,000.00
Blocks from Lanai to Kitchen

1.07 Patio Gutter & Downspout 1.00 lot 1,500.00

1.08 Main Door Ceiling Canopy 1.00 lot 1,500.00

1.09 Catwalk Railings for Aircondensing Unit 1.00 lot 5,000.00

1.1 Electrical Works @ Garage 1.00 lot 3,000.00

1.11 Preparation for Epoxy Injection 26.50 sqm. 150.00

Chipping & Restoration with Zocalo of Sliding Door


1.12 1.00 lot 4,000.00
Opening @ Balcony

1.13 Concreting of Balcony 26.50 sqm. 250.00

1.14 Tile Works @ Balcony 26.50 sqm. 500.00


1.15 Painting Works @ Balcony 1.00 lot 4,000.00

1.16 Purchase of Materials and Professional Fee 1.00 lot 6,000.00

GRAND TOTAL
AMOUNT

4,000.00

3,500.00

6,000.00

2,500.00

6,000.00

8,000.00

1,500.00

1,500.00

5,000.00

3,000.00

3,975.00

4,000.00

6,625.00

13,250.00
4,000.00

6,000.00

78,850.00