TANJUNG JATI 'B' 2 x 1000 MW COAL FIRED POWER PLANT PROJECT

(XTJB) Daily Site Report - Powertech Engineering & Construction


Date : 13 August 2019
Contractor : Sumitomo Corporation Boiler Division (SCBD) Working Time : 7 AM ~ 6 PM
Scope of Work : Erection of Boiler Steel Structure - Unit #5 & #6 Weather AM : Sunny
PM : Sunny
Boiler (Sub-contractors)
Matl. Temp.
Common - Non-
Sl. No. Description of Manpower Handling - Rigging / Scaffold. - PTJEL Facilities - Steel Pressure Total
PTJEL Pressure Piping Eqpts.
PTJEL PTJEL Structure Parts
Parts
A). Staffs
1 Site Manager - - - - 1 - - - - 1
2 Construction Manager - - - - - - - - - -
3 Field Manager / Project Manager - - - - - - - - - -
4 Manager (Section Head) - - - - - - - - - -
5 Admin Manager/Officer - - - - 1 - - - - 1
6 Finance/Purchase Officer - - - - - - - - - -
7 Planning Engineer - - - - - - - - - -
8 HSE Manager/Officer - - - - 1 - - - - 1
9 HSE Supervisor - - - - 1 - - - - 1
10 Material Manager - - - - - - - - - -
11 Material Controller / Supervisor - - - - - - - - - -
12 Superintendent - Mechanical - - - - - - - - - -
13 Lead Engineer - Mechanical - - - - - - - - - -
14 Engineer (Mechanical / Piping) - - - - 1 - - - - 1
15 Supervisor - Mechanical - - - - - - - - - -
16 Engineer - Electrical - - - - - - - - - -
17 Supervisor - Elelctrical - - - - - - - - - -
18 Engineer - QC - - - - 1 - - - - 1
19 Supervisor - QC - - - - - - - - - -
20 Supervisor / Inspector - Welding - - - - - - - - - -
21 Superintendent - Rigging - - - - - - - - - -
22 Supervisor - Rigging / Scaffolding - - - - - - - - - -
23 Supervisor - Painting - - - - 1 - - - - 1
24 Assistants / Clerk - - - - - - - - - -
25 Engineer - IT - - - - - - - - - -
26 Driver (Car, Mini Bus & Pickup) - - - - 1 - - - - 1
27 Office Boy / Girl - - - - - - - - - -
28 Security - - - - - - - - - -
Sub-Total (Staffs) - - - - 8 - - - - 8
B). Workers
1 Foreman - - - - 2 - - - - 2
2 Fitter - - - - 4 - - - - 4
3 Welder - - - - - - - - - -
4 Rigger - - - - - - - - - -
5 Scaffolder - - - - 7 - - - - 7
6 Surveyor - - - - - - - - - -
7 Store Keeper - - - - 1 - - - - 1
8 Electrician / Mechanic - - - - - - - - - -
9 Insulator - - - - - - - - - -
10 Painter - - - - 12 - - - - 12
11 General Worker - - - - - - - - - -
12 Mason / Carpenter - - - - - - - - - -
13 Operator (Crane, Forklift, Hiab, Trailor) - - - - - - - - - -
14 Operator (Bulldozer, Truck, Compactor) - - - - - - - - - -
Sub-Total (Workers) - - - - 26 - - - - 26
Grand Total (Staffs + Workers) - - - - 34 - - - - 34
C). Heavy Equipments
1 600 Ton Crawler Crane - - - - - - - - - -
2 400 Ton Crawler Crane - - - - - - - - - -
3 300 Ton Crawler Crane - - - - - - - - - -
4 260 Ton / 280 Ton Crawler Crane - - - - - - - - - -
5 250 Ton Crawler Crane - - - - - - - - - -
6 200 Ton Rough Terrain Crane - - - - - - - - - -
7 180 Ton Crawler Crane - - - - - - - - - -
8 160 Ton Rough Terrain Crane - - - - - - - - - -
9 130 Ton Rough Terrain Crane - - - - - - - - - -
10 80 Ton Rough Terrain Crane - - - - - - - - - -
11 90 / 80 Ton Crawler Crane - - - - - - - - - -
12 70 Ton Rough Terrain Crane - - - - - - - - - -
13 55 / 50 Ton Crawler Crane & Mobile Crane - - - - - - - - - -
14 50 Ton Tower Crane - - - - - - - - - -
15 Telescopic Handler - 6 Ton / Forklift - - - - - - - - - -
16 Genset / Air Compressor - - - - - - - - - -
17 Hiab Crane / Boom Truck - - - - - - - - - -
18 Trailer / Truck - - - - - - - - - -
19 Pick Up / Passenger hoist - - - - 1 - - - - 1
20 Mini Bus / Mini Van - - - - - - - - - -
21 Car - - - - 2 - - - - 2
22 Bulldozer / Compactor - - - - - - - - - -
Total for Equipments - - - - 3 - - - - 3
Today Activity (13-08-2019) Tomorrow Activity (14-08-2019)

1 Mass Tool Box Meeting All Team Boiler #5 1 Painting,Surface,Primer Coat , Mid Coat,Top Coat

Midcoad EL 22000 16G55E,11V5E-1, 16G-5E, 16V5E-1, HV5D-3, 11V5D-2, 22B7F3, 22GF7, 22B7E5, 22B7E6, 22B7E4,
2 2 Installation Scaffolding, Unloading Scaffolding
22G755E, 22B8E5, 22F5F, 22G7F, 22F5E-4, 22P7E-1, 22B7E-6, 22B7E-5, 226F7, 22B7E-3, 22675E, 2267E

Surface prepare primer coat EL 27000, EL. 65000= 65GB-2, 65GB-3, 27B4C-11, 27B4C-1, 27GC4, 27B5C-8, 27B5B-3,
3 3 Loading Material From Laydown 9 & Out Site To Boiler Site
27F5B-1, 27B4B-8, 27B4B-9, 27F5B-1, 27F4B-2

Page 1 of 16
Elevator Top Coat ,Structure Top Coat 0V5C1, 11V5D-2, 11V5D-1, 11V5E-1, 11V5C-1, 16V5E-1, 2CC676-1, 2CC476-1,
2CC671-1, 2CC471-1, 22VC471-1, 22VC471-2, 22VC671-1, 22VC671-2, 22V76C4-1, 22VC76C4-2, 22GC4-71, 22G71C-4,
4 4 Tightening Bolt & Nuts
22G676C4, 226C671, 19VC671-1, 19VC671-2, 19V76C4-1, 19V76C4-2, 19V71C4-1, 19VC471-2, 19GC-471, 19GC671,
19G76C4, 19G71C4,

5 Impact Bolt & Nuts

6 Moving Tool & Consumable Boiler to Laydown 9

7 Loading Moving Scaffolding

Grinding Plate Join Column

Site Photographs

Page 2 of 16
TANJUNG JATI 'B' 2 x 1000 MW COAL FIRED POWER PLANT PROJECT

(XTJB) Daily Site Report - Powertech Engineering & Construction


Date : 20 Maret 2019
Contractor : Sumitomo Corporation Boiler Division (SCBD) Working Time : 7 AM ~ 4 PM
Scope of Work : Erection of Boiler Steel Structure - Unit #5 & #6 Weather AM : Sunny
PM :Rain
Boiler (Sub-contractors)
Matl. Temp.
Common - Non-
Sl. No. Description of Manpower Handling - Rigging / Scaffold. - PTJEL Facilities - Steel Pressure Total
PTJEL Pressure Piping Eqpts.
PTJEL PTJEL Structure Parts
Parts
A). Staffs
1 Site Manager - - - - - - - - - -
2 Construction Manager - - - - 1 - - - - 1
3 Field Manager / Project Manager - - - - 1 - - - - 1
4 Manager (Section Head) - - - - - - - - - -
5 Admin Manager/Officer - - - - 2 - - - - 2
6 Finance/Purchase Officer - - - - - - - - - -
7 Planning Engineer - - - - - - - - - -
8 HSE Manager/Officer - - - - 1 - - - - 1
9 HSE Supervisor - - - - - - - - - -
10 Material Manager - - - - - - - - - -
11 Material Controller / Supervisor - - - - - - - - - -
12 Superintendent - Mechanical - - - - - - - - - -
13 Lead Engineer - Mechanical - - - - - - - - - -
14 Engineer (Mechanical / Piping) - - - - 1 - - - - 1
15 Supervisor - Mechanical - - - - 1 - - - - 1
16 Engineer - Electrical - - - - - - - - - -
17 Supervisor - Elelctrical - - - - - - - - - -
18 Engineer - QC - - - - 1 - - - - 1
19 Supervisor - QC - - - - 1 - - - - 1
20 Supervisor / Inspector - Welding - - - - - - - - - -
21 Superintendent - Rigging - - - - - - - - - -
22 Supervisor - Rigging / Scaffolding - - - - 1 - - - - 1
23 Supervisor - Painting - - - - - - - - - -
24 Assistants / Clerk - - - - - - - - - -
25 Engineer - IT - - - - - - - - - -
26 Driver (Car, Mini Bus & Pickup) - - - - 2 - - - - 2
27 Office Boy / Girl - - - - - - - - - -
28 Security - - - - - - - - - -
Sub-Total (Staffs) - - - - 12 - - - - 12
B). Workers
1 Foreman - - - - 9 - - - - 9
2 Fitter - - - - 34 - - - - 34
3 Welder - - - - 2 - - - - 2
4 Rigger - - - - 6 - - - - 6
5 Scaffolder - - - - 7 - - - - 7
6 Surveyor - - - - 1 - - - - 1
7 Store Keeper - - - - 3 - - - - 3
8 Electrician / Mechnic - - - - 1 - - - - 1
9 Insulator - - - - - - - - - -
10 Painter - - - - 6 - - - - 6
11 General Worker - - - - 6 - - - - 6
12 Mason / Carpenter - - - - - - - - - -
13 Operator (Crane, Forklift, Hiab, Trailor) - - - - 2 - - - - 2
14 Operator (Bulldozer, Truck, Compactor) - - - - - - - - - -
Sub-Total (Workers) - - - - 77 - - - - 77
Grand Total (Staffs + Workers) - - - - 89 - - - -
C). Heavy Equipments
1 600 Ton Crawler Crane - - - - - - - - - -
2 400 Ton Crawler Crane - - - - - - - - - -
3 300 Ton Crawler Crane - - - - - - - - - -
4 260 Ton / 280 Ton Crawler Crane - - - - - - - - - -
5 250 Ton Crawler Crane - - - - - - - - - -
6 200 Ton Rough Terrain Crane - - - - - - - - - -
7 180 Ton Crawler Crane - - - - - - - - - -
8 160 Ton Rough Terrain Crane - - - - - - - - - -
9 130 Ton Rough Terrain Crane - - - - - - - - - -
10 80 Ton Rough Terrain Crane - - - - 1 - - - - 1
11 90 / 80 Ton Crawler Crane - - - - - - - - - -
12 70 Ton Rough Terrain Crane - - - - - - - - - -
13 55 / 50 Ton Crawler Crane & Mobile Crane - - - - - - - - - -
14 50 Ton Tower Crane - - - - - - - - - -
15 Telescopic Handler - 6 Ton / Forklift - - - - - - - - - -
16 Genset / Air Compressor - - - - - - - - - -
17 Hiab Crane / Boom Truck - - - - 1 - - - - 1
18 Trailer / Truck - - - - - - - - - -
19 Pick Up / Passenger hoist - - - - 3 - - - - 3
20 Mini Bus / Mini Van - - - - - - - - - -
21 Car - - - - 2 2
22 Bulldozer / Compactor - - - - - - - - - -
Total for Equipments - - - - 7 - - - - 7
Today Activity (20-3-2019) Tomorrow Activity (21-3-2019)
1 Install Bolting line L El 59.000 59F5E-1 1 Painting
2 Surface grind 22.000 2 Cutting Plate Joint Column
3 Install stairway el;84.000 D ---E 3 Installation Scafolding
4 Cutting 40.000 F1 4 Loading material From Laydown 9 & Out Site To Boiler Site
Lifting by TC,, substair stringer n handraill el
5 5
84, R side Tightening Bolt & Nuts
6 Install stairway line F --G El.84.000 6 Installation Grating
7 Moving grating to base el 74,, BNR 7 Impact Bolt & Nuts
Assmbly substair stringer,, coloumb E to F,, R
8 8
side el 84.000 Install Handrail
9 9 Welding Handril & Grating

10 Continue to grating clips,, el 74,, BNR 10


Manual Handling
11 Install Bolting El.60.000 60G5E L side 11 Install stairway
12 Install Bolting El.62.000 62B7D-14 L side

Page 3 of 16
13 Install Handrill El.84950 HRB-1= 3 , HRB-3 = 1 ,HRB-4 = 1 ,HRB-15 =1
Site Photographs

Page 4 of 16
TANJUNG JATI 'B' 2 x 1000 MW COAL FIRED POWER PLANT PROJECT

(XTJB) Daily Site Report - Powertech Engineering & Construction


Date : 16 Maret 2019
Contractor : Sumitomo Corporation Boiler Division (SCBD) Working Time : 7 AM ~ 4 PM
Scope of Work : Erection of Boiler Steel Structure - Unit #5 & #6 Weather AM : Sunny
PM :Rain
Boiler (Sub-contractors)
Matl. Temp.
Common - Non-
Sl. No. Description of Manpower Handling - Rigging / Scaffold. - PTJEL Facilities - Steel Pressure Total
PTJEL Pressure Piping Eqpts.
PTJEL PTJEL Structure Parts
Parts
A). Staffs
1 Site Manager - - - - - - - - - -
2 Construction Manager - - - - 1 - - - - 1
3 Field Manager / Project Manager - - - - 1 - - - - 1
4 Manager (Section Head) - - - - - - - - - -
5 Admin Manager/Officer - - - - 2 - - - - 2
6 Finance/Purchase Officer - - - - - - - - - -
7 Planning Engineer - - - - - - - - - -
8 HSE Manager/Officer - - - - 1 - - - - 1
9 HSE Supervisor - - - - - - - - - -
10 Material Manager - - - - - - - - - -
11 Material Controller / Supervisor - - - - - - - - - -
12 Superintendent - Mechanical - - - - - - - - - -
13 Lead Engineer - Mechanical - - - - - - - - - -
14 Engineer (Mechanical / Piping) - - - - 1 - - - - 1
15 Supervisor - Mechanical - - - - 1 - - - - 1
16 Engineer - Electrical - - - - - - - - - -
17 Supervisor - Elelctrical - - - - - - - - - -
18 Engineer - QC - - - - 1 - - - - 1
19 Supervisor - QC - - - - 1 - - - - 1
20 Supervisor / Inspector - Welding - - - - - - - - - -
21 Superintendent - Rigging - - - - - - - - - -
22 Supervisor - Rigging / Scaffolding - - - - 1 - - - - 1
23 Supervisor - Painting - - - - - - - - - -
24 Assistants / Clerk - - - - - - - - - -
25 Engineer - IT - - - - - - - - - -
26 Driver (Car, Mini Bus & Pickup) - - - - 2 - - - - 2
27 Office Boy / Girl - - - - - - - - - -
28 Security - - - - - - - - - -
Sub-Total (Staffs) - - - - 12 - - - - 12
B). Workers
1 Foreman - - - - 9 - - - - 9
2 Fitter - - - - 31 - - - - 31
3 Welder - - - - 2 - - - - 2
4 Rigger - - - - 6 - - - - 6
5 Scaffolder - - - - 7 - - - - 7
6 Surveyor - - - - 1 - - - - 1
7 Store Keeper - - - - 3 - - - - 3
8 Electrician / Mechnic - - - - 1 - - - - 1
9 Insulator - - - - - - - - - -
10 Painter - - - - 6 - - - - 6
11 General Worker - - - - 6 - - - - 6
12 Mason / Carpenter - - - - - - - - - -
13 Operator (Crane, Forklift, Hiab, Trailor) - - - - 2 - - - - 2
14 Operator (Bulldozer, Truck, Compactor) - - - - - - - - - -
Sub-Total (Workers) - - - - 74 - - - - 74
Grand Total (Staffs + Workers) - - - - 86 - - - -
C). Heavy Equipments
1 600 Ton Crawler Crane - - - - - - - - - -
2 400 Ton Crawler Crane - - - - - - - - - -
3 300 Ton Crawler Crane - - - - - - - - - -
4 260 Ton / 280 Ton Crawler Crane - - - - - - - - - -
5 250 Ton Crawler Crane - - - - - - - - - -
6 200 Ton Rough Terrain Crane - - - - - - - - - -
7 180 Ton Crawler Crane - - - - - - - - - -
8 160 Ton Rough Terrain Crane - - - - - - - - - -
9 130 Ton Rough Terrain Crane - - - - - - - - - -
10 80 Ton Rough Terrain Crane - - - - 1 - - - - 1
11 90 / 80 Ton Crawler Crane - - - - - - - - - -
12 70 Ton Rough Terrain Crane - - - - - - - - - -
13 55 / 50 Ton Crawler Crane & Mobile Crane - - - - - - - - - -
14 50 Ton Tower Crane - - - - - - - - - -
15 Telescopic Handler - 6 Ton / Forklift - - - - - - - - - -
16 Genset / Air Compressor - - - - - - - - - -
17 Hiab Crane / Boom Truck - - - - 1 - - - - 1
18 Trailer / Truck - - - - - - - - - -
19 Pick Up / Passenger hoist - - - - 3 - - - - 3
20 Mini Bus / Mini Van - - - - - - - - - -
21 Car - - - - 2 2
22 Bulldozer / Compactor - - - - - - - - - -
Total for Equipments - - - - 7 - - - - 7
Today Activity (19-3-2019) Tomorrow Activity (20-3-2019)
1 Lifting by winchi VB n step stair, el 65.000, to el 84.000 n el 70.000 1 Painting
Continue manual handling grating el 65.000 to
2 2 Cutting Plate Joint Column
el 74.000
3 Install Scaffolding L Side El 47.000 3 Installation Scafolding
4 Re-Induction Continue All Manpower 4 Loading material From Laydown 9 & Out Site To Boiler Site
5 Install Scaffolding L Side El 22.000 5 Tightening Bolt & Nuts
6 Tightening line L 47.000 6 Installation Grating
7 Make storage material checkerplate 7 Impact Bolt & Nuts
8 Make safety line 8 Install Handrail

9 Primer coat(penebalan) weld join el.22.000 9


Welding Handril & Grating

10 Surface prep. Weld join el. 22.000 10


Manual Handling
11 Intermediate el.11.000

Page 5 of 16
Site Photographs

Page 6 of 16
TANJUNG JATI 'B' 2 x 1000 MW COAL FIRED POWER PLANT PROJECT

(XTJB) Daily Site Report - Powertech Engineering & Construction


Date : 16 Maret 2019
Contractor : Sumitomo Corporation Boiler Division (SCBD) Working Time : 7 AM ~ 4 PM
Scope of Work : Erection of Boiler Steel Structure - Unit #5 & #6 Weather AM : Sunny
PM :Sunny
Boiler (Sub-contractors)
Matl. Temp.
Common - Non-
Sl. No. Description of Manpower Handling - Rigging / Scaffold. - PTJEL Facilities - Steel Pressure Total
PTJEL Pressure Piping Eqpts.
PTJEL PTJEL Structure Parts
Parts
A). Staffs
1 Site Manager - - - - - - - - - -
2 Construction Manager - - - - 1 - - - - 1
3 Field Manager / Project Manager - - - - 1 - - - - 1
4 Manager (Section Head) - - - - - - - - - -
5 Admin Manager/Officer - - - - 2 - - - - 2
6 Finance/Purchase Officer - - - - - - - - - -
7 Planning Engineer - - - - - - - - - -
8 HSE Manager/Officer - - - - 1 - - - - 1
9 HSE Supervisor - - - - - - - - - -
10 Material Manager - - - - - - - - - -
11 Material Controller / Supervisor - - - - - - - - - -
12 Superintendent - Mechanical - - - - - - - - - -
13 Lead Engineer - Mechanical - - - - - - - - - -
14 Engineer (Mechanical / Piping) - - - - 1 - - - - 1
15 Supervisor - Mechanical - - - - 1 - - - - 1
16 Engineer - Electrical - - - - - - - - - -
17 Supervisor - Elelctrical - - - - - - - - - -
18 Engineer - QC - - - - 1 - - - - 1
19 Supervisor - QC - - - - 1 - - - - 1
20 Supervisor / Inspector - Welding - - - - - - - - - -
21 Superintendent - Rigging - - - - - - - - - -
22 Supervisor - Rigging / Scaffolding - - - - 1 - - - - 1
23 Supervisor - Painting - - - - - - - - - -
24 Assistants / Clerk - - - - - - - - - -
25 Engineer - IT - - - - - - - - - -
26 Driver (Car, Mini Bus & Pickup) - - - - 2 - - - - 2
27 Office Boy / Girl - - - - - - - - - -
28 Security - - - - - - - - - -
Sub-Total (Staffs) - - - - 12 - - - - 12
B). Workers
1 Foreman - - - - 9 - - - - 9
2 Fitter - - - - 31 - - - - 31
3 Welder - - - - 2 - - - - 2
4 Rigger - - - - 6 - - - - 6
5 Scaffolder - - - - 7 - - - - 7
6 Surveyor - - - - 1 - - - - 1
7 Store Keeper - - - - 3 - - - - 3
8 Electrician / Mechnic - - - - 1 - - - - 1
9 Insulator - - - - - - - - - -
10 Painter - - - - 6 - - - - 6
11 General Worker - - - - 6 - - - - 6
12 Mason / Carpenter - - - - - - - - - -
13 Operator (Crane, Forklift, Hiab, Trailor) - - - - 2 - - - - 2
14 Operator (Bulldozer, Truck, Compactor) - - - - - - - - - -
Sub-Total (Workers) - - - - 74 - - - - 74
Grand Total (Staffs + Workers) - - - - 86 - - - -
C). Heavy Equipments
1 600 Ton Crawler Crane - - - - - - - - - -
2 400 Ton Crawler Crane - - - - - - - - - -
3 300 Ton Crawler Crane - - - - - - - - - -
4 260 Ton / 280 Ton Crawler Crane - - - - - - - - - -
5 250 Ton Crawler Crane - - - - - - - - - -
6 200 Ton Rough Terrain Crane - - - - - - - - - -
7 180 Ton Crawler Crane - - - - - - - - - -
8 160 Ton Rough Terrain Crane - - - - - - - - - -
9 130 Ton Rough Terrain Crane - - - - - - - - - -
10 80 Ton Rough Terrain Crane - - - - 1 - - - - 1
11 90 / 80 Ton Crawler Crane - - - - - - - - - -
12 70 Ton Rough Terrain Crane - - - - - - - - - -
13 55 / 50 Ton Crawler Crane & Mobile Crane - - - - - - - - - -
14 50 Ton Tower Crane - - - - - - - - - -
15 Telescopic Handler - 6 Ton / Forklift - - - - - - - - - -
16 Genset / Air Compressor - - - - - - - - - -
17 Hiab Crane / Boom Truck - - - - 1 - - - - 1
18 Trailer / Truck - - - - - - - - - -
19 Pick Up / Passenger hoist - - - - 3 - - - - 3
20 Mini Bus / Mini Van - - - - - - - - - -
21 Car - - - - 2 2
22 Bulldozer / Compactor - - - - - - - - - -
Total for Equipments - - - - 7 - - - - 7
Today Activity (18-3-2019) Tomorrow Activity (19-3-2019)
1 Cutting ladder El. 22.000 1 Painting
2 Install Scaffolding di El 47.000 Line R 2 Cutting Plate Joint Column
3 Midcoat 11.000 line R 3 Installation Scafolding
4 Surface grind 22.000 line R 4 Loading material From Laydown 9 & Out Site To Boiler Site
5 Touchup layer 2 line R 22.000 5 Tightening Bolt & Nuts

6 6
Handling by winchi post column to el 65.000 Installation Grating
7 Assmbly at El65.000 7 Impact Bolt & Nuts
Manual handling grating el 65.000 to el
9 8
74.000, assmbly too at el 74.000 BKR Install Handrail

10 Loading material checkerplate,handrail,stair 9


Welding Handril & Grating

11 Install Bolting 0B5G-1 L Side 1L 10


Manual Handling
12 Install Bolting 62B1C-1 3 R El.62.000 , 65P2B-1 R Side El.65.000

Page 7 of 16
Site Photographs

Page 8 of 16
TANJUNG JATI 'B' 2 x 1000 MW COAL FIRED POWER PLANT PROJECT

(XTJB) Daily Site Report - Powertech Engineering & Construction


Date : 17 Maret 2019
Contractor : Sumitomo Corporation Boiler Division (SCBD) Working Time : 7 AM ~ 3 PM
Scope of Work : Erection of Boiler Steel Structure - Unit #5 & #6 Weather AM : Sunny
PM :Sunny
Boiler (Sub-contractors)
Matl. Temp.
Common - Non-
Sl. No. Description of Manpower Handling - Rigging / Scaffold. - PTJEL Facilities - Steel Pressure Total
PTJEL Pressure Piping Eqpts.
PTJEL PTJEL Structure Parts
Parts
A). Staffs
1 Site Manager - - - - - - - - - -
2 Construction Manager - - - - 1 - - - - 1
3 Field Manager / Project Manager - - - - - - - - - -
4 Manager (Section Head) - - - - - - - - - -
5 Admin Manager/Officer - - - - - - - - -
6 Finance/Purchase Officer - - - - - - - - - -
7 Planning Engineer - - - - - - - - - -
8 HSE Manager/Officer - - - - - - - - -
9 HSE Supervisor - - - - 1 - - - - 1
10 Material Manager - - - - - - - - - -
11 Material Controller / Supervisor - - - - - - - - - -
12 Superintendent - Mechanical - - - - - - - - - -
13 Lead Engineer - Mechanical - - - - - - - - - -
14 Engineer (Mechanical / Piping) - - - - - - - - -
15 5 - - - - 1 - - - - 1
16 Engineer - Electrical - - - - - - - - - -
17 Supervisor - Elelctrical - - - - - - - - - -
18 Engineer - QC - - - - - - - - -
19 Supervisor - QC - - - - - - - - -
20 Supervisor / Inspector - Welding - - - - - - - - -
21 Superintendent - Rigging - - - - - - - - - -
22 Supervisor - Rigging / Scaffolding - - - - 1 - - - - 1
23 Supervisor - Painting - - - - - - - - - -
24 Assistants / Clerk - - - - - - - - - -
25 Engineer - IT - - - - - - - - - -
26 Driver (Car, Mini Bus & Pickup) - - - - - - - - - -
27 Office Boy / Girl - - - - - - - - - -
28 Security - - - - - - - - - -
Sub-Total (Staffs) - - - - 4 - - - - 4
B). Workers
1 Foreman - - - - - - - - - -
2 Fitter - - - - 10 - - - - 10
3 Welder - - - - - - - - - -
4 Rigger - - - - - - - - - -
5 Scaffolder - - - - - - - - - -
6 Surveyor - - - - - - - - - -
7 Store Keeper - - - - - - - - - -
8 Electrician / Mechnic - - - - - - - - - -
9 Insulator - - - - - - - - - -
10 Painter - - - - - - - - - -
11 General Worker - - - - - - - - - -
12 Mason / Carpenter - - - - - - - - - -
13 Operator (Crane, Forklift, Hiab, Trailor) - - - - - - - - - -
14 Operator (Bulldozer, Truck, Compactor) - - - - - - - - - -
Sub-Total (Workers) - - - - 10 - - - - 10
Grand Total (Staffs + Workers) - - - - 14 - - - -
C). Heavy Equipments
1 600 Ton Crawler Crane - - - - - - - - - -
2 400 Ton Crawler Crane - - - - - - - - - -
3 300 Ton Crawler Crane - - - - - - - - - -
4 260 Ton / 280 Ton Crawler Crane - - - - - - - - - -
5 250 Ton Crawler Crane - - - - - - - - - -
6 200 Ton Rough Terrain Crane - - - - - - - - - -
7 180 Ton Crawler Crane - - - - - - - - - -
8 160 Ton Rough Terrain Crane - - - - - - - - - -
9 130 Ton Rough Terrain Crane - - - - - - - - - -
10 80 Ton Rough Terrain Crane - - - - 1 - - - - 1
11 90 / 80 Ton Crawler Crane - - - - - - - - - -
12 70 Ton Rough Terrain Crane - - - - - - - - - -
13 55 / 50 Ton Crawler Crane & Mobile Crane - - - - - - - - - -
14 50 Ton Tower Crane - - - - - - - - - -
15 Telescopic Handler - 6 Ton / Forklift - - - - - - - - - -
16 Genset / Air Compressor - - - - - - - - - -
17 Hiab Crane / Boom Truck - - - - 1 - - - - 1
18 Trailer / Truck - - - - - - - - - -
19 Pick Up / Passenger hoist - - - - 3 - - - - 3
20 Mini Bus / Mini Van - - - - - - - - - -
21 Car - - - - 2 2
22 Bulldozer / Compactor - - - - - - - - - -
Total for Equipments - - - - 7 - - - - 7
Today Activity (17-03-2019) Tomorrow Activity (18-3-2019)
1 Loading material Platform Boiler 1 Painting
2 Setting Material Platform 2 Cutting Plate Joint Column
3 Loading Unloading Material 3 Installation Scafolding
4 Prepare Material 4 Loading material From Laydown 9 & Out Site To Boiler Site
5 Tightening Bolt & Nuts
6 Installation Grating
7 Impact Bolt & Nuts
8 Install Handrail
9 Welding Handril & Grating

10
Install Grating

Site Photographs

Page 9 of 16
Page 10 of 16
TANJUNG JATI 'B' 2 x 1000 MW COAL FIRED POWER PLANT PROJECT

(XTJB) Daily Site Report - Powertech Engineering & Construction


Date : 16 Maret 2019
Contractor : Sumitomo Corporation Boiler Division (SCBD) Working Time : 7 AM ~ 4 PM
Scope of Work : Erection of Boiler Steel Structure - Unit #5 & #6 Weather AM : Sunny
PM :Sunny
Boiler (Sub-contractors)
Matl. Temp.
Common - Non-
Sl. No. Description of Manpower Handling - Rigging / Scaffold. - PTJEL Facilities - Steel Pressure Total
PTJEL Pressure Piping Eqpts.
PTJEL PTJEL Structure Parts
Parts
A). Staffs
1 Site Manager - - - - - - - - - -
2 Construction Manager - - - - 1 - - - - 1
3 Field Manager / Project Manager - - - - 1 - - - - 1
4 Manager (Section Head) - - - - - - - - - -
5 Admin Manager/Officer - - - - 2 - - - - 2
6 Finance/Purchase Officer - - - - - - - - - -
7 Planning Engineer - - - - - - - - - -
8 HSE Manager/Officer - - - - 1 - - - - 1
9 HSE Supervisor - - - - - - - - - -
10 Material Manager - - - - - - - - - -
11 Material Controller / Supervisor - - - - - - - - - -
12 Superintendent - Mechanical - - - - - - - - - -
13 Lead Engineer - Mechanical - - - - - - - - - -
14 Engineer (Mechanical / Piping) - - - - 1 - - - - 1
15 Supervisor - Mechanical - - - - 1 - - - - 1
16 Engineer - Electrical - - - - - - - - - -
17 Supervisor - Elelctrical - - - - - - - - - -
18 Engineer - QC - - - - 1 - - - - 1
19 Supervisor - QC - - - - 1 - - - - 1
20 Supervisor / Inspector - Welding - - - - - - - - - -
21 Superintendent - Rigging - - - - - - - - - -
22 Supervisor - Rigging / Scaffolding - - - - 1 - - - - 1
23 Supervisor - Painting - - - - - - - - - -
24 Assistants / Clerk - - - - - - - - - -
25 Engineer - IT - - - - - - - - - -
26 Driver (Car, Mini Bus & Pickup) - - - - 2 - - - - 2
27 Office Boy / Girl - - - - - - - - - -
28 Security - - - - - - - - - -
Sub-Total (Staffs) - - - - 12 - - - - 12
B). Workers
1 Foreman - - - - 9 - - - - 9
2 Fitter - - - - 26 - - - - 26
3 Welder - - - - 2 - - - - 2
4 Rigger - - - - 6 - - - - 6
5 Scaffolder - - - - 7 - - - - 7
6 Surveyor - - - - 1 - - - - 1
7 Store Keeper - - - - 3 - - - - 3
8 Electrician / Mechnic - - - - 1 - - - - 1
9 Insulator - - - - - - - - - -
10 Painter - - - - 6 - - - - 6
11 General Worker - - - - 6 - - - - 6
12 Mason / Carpenter - - - - - - - - - -
13 Operator (Crane, Forklift, Hiab, Trailor) - - - - 2 - - - - 2
14 Operator (Bulldozer, Truck, Compactor) - - - - - - - - - -
Sub-Total (Workers) - - - - 69 - - - - 69
Grand Total (Staffs + Workers) - - - - 81 - - - -
C). Heavy Equipments
1 600 Ton Crawler Crane - - - - - - - - - -
2 400 Ton Crawler Crane - - - - - - - - - -
3 300 Ton Crawler Crane - - - - - - - - - -
4 260 Ton / 280 Ton Crawler Crane - - - - - - - - - -
5 250 Ton Crawler Crane - - - - - - - - - -
6 200 Ton Rough Terrain Crane - - - - - - - - - -
7 180 Ton Crawler Crane - - - - - - - - - -
8 160 Ton Rough Terrain Crane - - - - - - - - - -
9 130 Ton Rough Terrain Crane - - - - - - - - - -
10 80 Ton Rough Terrain Crane - - - - 1 - - - - 1
11 90 / 80 Ton Crawler Crane - - - - - - - - - -
12 70 Ton Rough Terrain Crane - - - - - - - - - -
13 55 / 50 Ton Crawler Crane & Mobile Crane - - - - - - - - - -
14 50 Ton Tower Crane - - - - - - - - - -
15 Telescopic Handler - 6 Ton / Forklift - - - - - - - - - -
16 Genset / Air Compressor - - - - - - - - - -
17 Hiab Crane / Boom Truck - - - - 1 - - - - 1
18 Trailer / Truck - - - - - - - - - -
19 Pick Up / Passenger hoist - - - - 3 - - - - 3
20 Mini Bus / Mini Van - - - - - - - - - -
21 Car - - - - 2 2
22 Bulldozer / Compactor - - - - - - - - - -
Total for Equipments - - - - 7 - - - - 7
Today Activity (16-3-2019) Tomorrow Activity (17-3-2019)
1 Remove bongkar. El 11.000 column 1 Loading material Platform Boiler

2 Continue fitup/install handrail el;84.000

3 Midcoat FL 11.000 line R E1 F1


4 Completion n tightening 62m line R
5 Cutting plate joint kolom F2

6
Completion remaining grating el 84.032
46-08-U5-0859,46-08-U5-0873,46-08-U5-0874

7 Fitup handrail platform,, el 84.950,, R side

9 Install Bolting El.11.000 = 11G2E


10 Install Bolting El.62.000 = 62B0C2-2

Page 11 of 16
Install Bolting El.65.000 = 65GE0,65P1D-
11
1,65VB4-1
12 Painting El.11.000 = 11B1E-8, 11B1E-9,11GE1,11G2E , 11V2E-1

Site Photographs

Page 12 of 16
TANJUNG JATI 'B' 2 x 1000 MW COAL FIRED POWER PLANT PROJECT

(XTJB) Daily Site Report - Powertech Engineering & Construction


Date : 15 Maret 2019
Contractor : Sumitomo Corporation Boiler Division (SCBD) Working Time : 7 AM ~ 6 PM
Scope of Work : Erection of Boiler Steel Structure - Unit #5 & #6 Weather AM :: Sunny
PM Cloudy
Boiler (Sub-contractors)
Matl. Temp.
Common - Non-
Sl. No. Description of Manpower Handling - Rigging / Scaffold. - PTJEL Facilities - Steel Pressure Total
PTJEL Pressure Piping Eqpts.
PTJEL PTJEL Structure Parts
Parts
A). Staffs
1 Site Manager - - - - 1 - - - - 1
2 Construction Manager - - - - 1 - - - - 1
3 Field Manager / Project Manager - - - - 1 - - - - 1
4 Manager (Section Head) - - - - - - - - - -
5 Admin Manager/Officer - - - - 2 - - - - 2
6 Finance/Purchase Officer - - - - - - - - - -
7 Planning Engineer - - - - - - - - - -
8 HSE Manager/Officer - - - - 1 - - - - 1
9 HSE Supervisor - - - - 2 - - - - 2
10 Material Manager - - - - 1 - - - - 1
11 Material Controller / Supervisor - - - - - - - - - -
12 Superintendent - Mechanical - - - - - - - - - -
13 Lead Engineer - Mechanical - - - - - - - - - -
14 Engineer (Mechanical / Piping) - - - - 1 - - - - 1
15 Supervisor - Mechanical - - - - 5 - - - - 5
16 Engineer - Electrical - - - - - - - - - -
17 Supervisor - Elelctrical - - - - - - - - - -
18 Engineer - QC - - - - 1 - - - - 1
19 Supervisor - QC - - - - 1 - - - - 1
20 Supervisor / Inspector - Welding - - - - - - - - - -
21 Superintendent - Rigging - - - - - - - - - -
22 Supervisor - Rigging / Scaffolding - - - - 1 - - - - 1
23 Supervisor - Painting - - - - - - - - - -
24 Assistants / Clerk - - - - - - - - - -
25 Engineer - IT - - - - - - - - - -
26 Driver (Car, Mini Bus & Pickup) - - - - 2 - - - - 2
27 Office Boy / Girl - - - - - - - - - -
28 Security - - - - - - - - - -
Sub-Total (Staffs) - - - - 20 - - - - 20
B). Workers
1 Foreman - - - - 9 - - - - 9
2 Fitter - - - - 26 - - - - 26
3 Welder - - - - 2 - - - - 2
4 Rigger - - - - 6 - - - - 6
5 Scaffolder - - - - 7 - - - - 7
6 Surveyor - - - - 1 - - - - 1
7 Store Keeper - - - - 3 - - - - 3
8 Electrician / Mechnic - - - - 1 - - - - 1
9 Insulator - - - - - - - - - -
10 Painter - - - - 6 - - - - 6
11 General Worker - - - - 6 - - - - 6
12 Mason / Carpenter - - - - - - - - - -
13 Operator (Crane, Forklift, Hiab, Trailor) - - - - 2 - - - - 2
14 Operator (Bulldozer, Truck, Compactor) - - - - - - - - - -
Sub-Total (Workers) - - - - 69 - - - - 69
Grand Total (Staffs + Workers) - - - - 89 - - - -
C). Heavy Equipments
1 600 Ton Crawler Crane - - - - - - - - - -
2 400 Ton Crawler Crane - - - - - - - - - -
3 300 Ton Crawler Crane - - - - - - - - - -
4 260 Ton / 280 Ton Crawler Crane - - - - - - - - - -
5 250 Ton Crawler Crane - - - - - - - - - -
6 200 Ton Rough Terrain Crane - - - - - - - - - -
7 180 Ton Crawler Crane - - - - - - - - - -
8 160 Ton Rough Terrain Crane - - - - - - - - - -
9 130 Ton Rough Terrain Crane - - - - - - - - - -
10 80 Ton Rough Terrain Crane - - - - 1 - - - - 1
11 90 / 80 Ton Crawler Crane - - - - - - - - - -
12 70 Ton Rough Terrain Crane - - - - - - - - - -
13 55 / 50 Ton Crawler Crane & Mobile Crane - - - - - - - - - -
14 50 Ton Tower Crane - - - - - - - - - -
15 Telescopic Handler - 6 Ton / Forklift - - - - - - - - - -
16 Genset / Air Compressor - - - - - - - - - -
17 Hiab Crane / Boom Truck - - - - 1 - - - - 1
18 Trailer / Truck - - - - - - - - - -
19 Pick Up / Passenger hoist - - - - 3 - - - - 3
20 Mini Bus / Mini Van - - - - - - - - - -
21 Car - - - - 2 2
22 Bulldozer / Compactor - - - - - - - - - -
Total for Equipments - - - - 7 - - - - 7
Today Activity (15-3-2019) Tomorrow Activity (16-3-2019)
1 Team ScaffoldingRemove bongkar El. 6000.kolom.b.6/c.5/atas fufaliser 1 Painting

2 Install handrail el:84.000 L Side ,HRB-1,HRB-4 2 Cutting Plate Joint Column

3 . Completion n tightening 65m BNL 3 Installation Scafolding


4 Continue fitup handrail, el 84.032,, BNR 4 Loading material From Laydown 9 & Out Site To Boiler Site
5 Grinding plate joint colom El.22.000 5 Tightening Bolt & Nuts

6 6
Remove scafolding & install grating el;84.000 Installation Grating

Page 13 of 16
Install Grating el:84.000 L Side 23 =46-08-U5-
0906
24 =46-08-U5-0907
25=46-08-U5-0908
26= 46-08-U5-0909
7 27= 46-08-U5-0910 7 Impact Bolt & Nuts
28= 46-08-U5-0911
29= 46-08-U5-0912
30 = 46-08-U5-0913
31 = 46-08-U5-0914
32 = 46-08-U5-0915

9 Topcoat El.11.000 E1 G1 8 Install Handrail


Tightening Bolting Repair Join No.65B7F-1
10 9
El.65.000 L Side = 5 Welding Handril & Grating
Tightening & Completion Bolting Join
11 No.65P5B-1 =56 El.65.000 =56 10
Install Grating
12 Welding Handrill EL.79.000 R Side
13 Welding Handrill EL.28.000 BNR

Site Photographs

Page 14 of 16
TANJUNG JATI 'B' 2 x 1000 MW COAL FIRED POWER PLANT PROJECT

(XTJB) Daily Site Report - Powertech Engineering & Construction


Date : 14 Maret 2019
Contractor : Sumitomo Corporation Boiler Division (SCBD) Working Time : 7 AM ~ 6 PM
Scope of Work : Erection of Boiler Steel Structure - Unit #5 & #6 Weather AM : Sunny
PM :Sunny
Boiler (Sub-contractors)
Matl. Temp.
Common - Non-
Sl. No. Description of Manpower Handling - Rigging / Scaffold. - PTJEL Facilities - Steel Pressure Total
PTJEL Pressure Piping Eqpts.
PTJEL PTJEL Structure Parts
Parts
A). Staffs
1 Site Manager - - - - 1 - - - - 1
2 Construction Manager - - - - 1 - - - - 1
3 Field Manager / Project Manager - - - - 1 - - - - 1
4 Manager (Section Head) - - - - - - - - - -
5 Admin Manager/Officer - - - - 2 - - - - 2
6 Finance/Purchase Officer - - - - - - - - - -
7 Planning Engineer - - - - - - - - - -
8 HSE Manager/Officer - - - - 1 - - - - 1
9 HSE Supervisor - - - - 2 - - - - 2
10 Material Manager - - - - 1 - - - - 1
11 Material Controller / Supervisor - - - - - - - - - -
12 Superintendent - Mechanical - - - - - - - - - -
13 Lead Engineer - Mechanical - - - - - - - - - -
14 Engineer (Mechanical / Piping) - - - - 1 - - - - 1
15 Supervisor - Mechanical - - - - 5 - - - - 5
16 Engineer - Electrical - - - - - - - - - -
17 Supervisor - Elelctrical - - - - - - - - - -
18 Engineer - QC - - - - 1 - - - - 1
19 Supervisor - QC - - - - 1 - - - - 1
20 Supervisor / Inspector - Welding - - - - - - - - - -
21 Superintendent - Rigging - - - - - - - - - -
22 Supervisor - Rigging / Scaffolding - - - - 1 - - - - 1
23 Supervisor - Painting - - - - - - - - - -
24 Assistants / Clerk - - - - - - - - - -
25 Engineer - IT - - - - - - - - - -
26 Driver (Car, Mini Bus & Pickup) - - - - 2 - - - - 2
27 Office Boy / Girl - - - - - - - - - -
28 Security - - - - - - - - - -
Sub-Total (Staffs) - - - - 20 - - - - 20
B). Workers
1 Foreman - - - - 9 - - - - 9
2 Fitter - - - - 29 - - - - 29
3 Welder - - - - 2 - - - - 2
4 Rigger - - - - 3 - - - - 3
5 Scaffolder - - - - 7 - - - - 7
6 Surveyor - - - - 1 - - - - 1
7 Store Keeper - - - - 3 - - - - 3
8 Electrician / Mechnic - - - - 1 - - - - 1
9 Insulator - - - - - - - - - -
10 Painter - - - - 6 - - - - 6
11 General Worker - - - - 6 - - - - 6
12 Mason / Carpenter - - - - - - - - - -
13 Operator (Crane, Forklift, Hiab, Trailor) - - - - 2 - - - - 2
14 Operator (Bulldozer, Truck, Compactor) - - - - - - - - - -
Sub-Total (Workers) - - - - 69 - - - - 69
Grand Total (Staffs + Workers) - - - - 89 - - - -
C). Heavy Equipments
1 600 Ton Crawler Crane - - - - - - - - - -
2 400 Ton Crawler Crane - - - - - - - - - -
3 300 Ton Crawler Crane - - - - - - - - - -
4 260 Ton / 280 Ton Crawler Crane - - - - - - - - - -
5 250 Ton Crawler Crane - - - - - - - - - -
6 200 Ton Rough Terrain Crane - - - - - - - - - -
7 180 Ton Crawler Crane - - - - - - - - - -
8 160 Ton Rough Terrain Crane - - - - - - - - - -
9 130 Ton Rough Terrain Crane - - - - - - - - - -
10 80 Ton Rough Terrain Crane - - - - 1 - - - - 1
11 90 / 80 Ton Crawler Crane - - - - - - - - - -
12 70 Ton Rough Terrain Crane - - - - - - - - - -
13 55 / 50 Ton Crawler Crane & Mobile Crane - - - - - - - - - -
14 50 Ton Tower Crane - - - - - - - - - -
15 Telescopic Handler - 6 Ton / Forklift - - - - - - - - - -
16 Genset / Air Compressor - - - - - - - - - -
17 Hiab Crane / Boom Truck - - - - 1 - - - - 1
18 Trailer / Truck - - - - - - - - - -
19 Pick Up / Passenger hoist - - - - 3 - - - - 3
20 Mini Bus / Mini Van - - - - - - - - - -
21 Car - - - - 2 2
22 Bulldozer / Compactor - - - - - - - - - -
Total for Equipments - - - - 7 - - - - 7
Today Activity (14-3-2019) Tomorrow Activity (15-3-2019)

1 Continue assmbly grating BNR, el 84.032, locked clips grating 1 Painting

Continue fitup handrail R side, el 84.032 =


2 2 Cutting Plate Joint Column
HRB-1:16 ,HRB-16 =2
3 Team scaffolding, dismantle ev 6.000 colom B 3 Installation Scafolding
4 Grating locked el:84.000 4 Loading material From Laydown 9 & Out Site To Boiler Site

5 Fitup elbow el:84.000 5


Tightening Bolt & Nuts

6 Dismantle n reinstall scaffolding,, for handrail 6


access BNR el 84.000
Installation Grating

Painting El,11.000 :11V1E-1,11V1E-2, 11G1E


7 7
.El.22.00 :17VA5-1,17VA5-2,22B51-4,22B5A-5
Impact Bolt & Nuts

Page 15 of 16
Tightening & Completion Bolt El.32.000 :
9 8
32GG1 ,

Install Handrail

Tightening & Completion Bolt EL,22.000 :


10 22B5C-14,22B5C-15,22B5E-28,22B5E- 9
29,22B5E-30,22B5E-31,22B5E-32,22B5E-33,
Welding Handril & Grating
Tightening & Completion El,11.000 :11V1E-
11 1,11V1E-2

12 Tightening & Completion El 17.000 to 22.000:17VA5-1,17VA5

Site Photographs

Page 16 of 16