Documente Academic
Documente Profesional
Documente Cultură
Service Information
# E 105/01 E
Range of applicability
This test and setting instruction refers to the E1P type control, i. e.
-electro-hydraulic control E1 and maximum pressure regulation (POR) P.
Safety instructions by the machine manufacturer (OEM) must be strictly adhered
to throughout all works on the machine!
All settings have already been done on LINDE's production test rig. Should ex-
ceptional circumstances (e.g. exchange of control device) impose checking the control
device of the HPV 02 pump as well as correcting its setting, the points below have to
be adhered to!
LINDE AG
M. Zivkovic
Industrial Trucks and Hydraulics Division.
Schweinheimer Straße 34, 63743 Aschaffenburg, Telephone: 0 60 21 / 99 15 66 Department HK 1
Hanauer Landstraße 100, 63796 Kahl / Main, Telephone: 0 61 88 / 41 36 09
)*
Hydraulic Description: Date: 11.01
E1P CONTROL OF HPV-02 PUMP
Service Information TESTING AND SETTING INSTRUCTIONS Page: 2 / 6
# E 105 / 01 E
S (P) A
Ms
20
11
L
1
A B
6 2 7
D1 D2 12
B
5
3 Z
Y
D3 D4 18/1 18/2
16 17 F
18
MY MZ
19 15
Mp
X
P (S) X X
T U
3 3
18 18
2 1 2 1
3
x x x
3
Z
x Z
Y Y
Y Z Y Z
MY MZ MY MZ
16 17 16 17
x x
T T
5 5
T F A B T A B
F
13 13
(P) S (S) P S
(P) (S) P
(HP1) (HD2) (HD1) (HP2)
LINDE AG
M. Zivkovic
Industrial Trucks and Hydraulics Division.
Schweinheimer Straße 34, 63743 Aschaffenburg, Telephone: 0 60 21 / 99 15 66 Department HK 1
Hanauer Landstraße 100, 63796 Kahl / Main, Telephone: 0 61 88 / 41 36 09
ABHydraulic Description: Date: 11.01
E1P CONTROL OF HPV-02 PUMP
Service Information TESTING AND SETTING INSTRUCTIONS Page: 3 / 6
# E 105 / 01 E
E1P control T
Y Z 33b
33a 32b
35b
32a
MZ DC solenoid Y Z 34b
MY DC solenoid 34a
Z control pressure gauge port 44b
Y control pressure gauge port 35a
43b
T tank connection and vent port 43a
15 pressurizing valve Ma =15+5Nm 37
32(a/b) plug M 40 x 1,5 44a 36
33(a/b) groove nut Ma =25 Nm 173 X
34(a/b) mechanical stroke limiter threaded stud M8x1,25
35(a/b) seal nut Ma = 23 Nm X=14,75 mm
36 groove nut Ma =25 Nm
37 hollow screw
43a setting screw DA HD2 My Mz
44(a/b) seal nut Ma = 14 Nm 47
43b setting screw DA HD1
45 setting screw 46
45
46 lock nut Ma = 5 Nm 15
47 nut Ma= 9 Nm
HPV-02R E1P
My Y T Z
Mz
Flow Direction
The flow direction of the fluid is dependant upon:
- the pump direction of rotation
- the over centre direction of the swash plate
X
DRIVE SENSE OF ROTATION: right hand viewed on shaft F
Solenoid My energized > 175 mA: HP pressure in port P B A
Solenoid Mz energized > 175 mA: HP pressure in port S
X
(S)
P EXPLANATIONS
P, S High pressure port F
B Suction port boost pump
A Pressure port boost pump
F Control and boost pressure supply
T Tank and vent port
X Boost pressure gage port
Y, Z Control pressure gage port
MY, MZ Proportional solenoid
Ms, Mp High pressure gage port
U Drain, flushing return from hydr. motor
Ms
L Oil filling, tank and vent port
P (S) S (P)
Mp
LINDE AG
M. Zivkovic
Industrial Trucks and Hydraulics Division.
Schweinheimer Straße 34, 63743 Aschaffenburg, Telephone: 0 60 21 / 99 15 66 Department HK 1
Hanauer Landstraße 100, 63796 Kahl / Main, Telephone: 0 61 88 / 41 36 09
)*
Hydraulic Description: Date: 11.01
E1P CONTROL OF HPV-02 PUMP
Service Information TESTING AND SETTING INSTRUCTIONS Page: 4 / 6
# E 105 / 01 E
0
0 1 2 3 4 5 6 7 8 9
control pressure [bar]
24 Volt 175 ± 5 350 ± 20
signal current [mA]
12 Volt 350 ± 10 710 ± 40
LINDE AG
M. Zivkovic
Industrial Trucks and Hydraulics Division.
Schweinheimer Straße 34, 63743 Aschaffenburg, Telephone: 0 60 21 / 99 15 66 Department HK 1
Hanauer Landstraße 100, 63796 Kahl / Main, Telephone: 0 61 88 / 41 36 09
)*
Hydraulic Description: Date: 11.01
E1P CONTROL OF HPV-02 PUMP
Service Information TESTING AND SETTING INSTRUCTIONS Page: 5 / 6
# E 105 / 01 E
POR
100 100
displacement [%]
Vorspannventil
LINDE AG
M. Zivkovic
Industrial Trucks and Hydraulics Division.
Schweinheimer Straße 34, 63743 Aschaffenburg, Telephone: 0 60 21 / 99 15 66 Department HK 1
Hanauer Landstraße 100, 63796 Kahl / Main, Telephone: 0 61 88 / 41 36 09
)*
Hydraulic Description: Date: 11.01
E1P CONTROL OF HPV-02 PUMP
Service Information TESTING AND SETTING INSTRUCTIONS Page: 6 / 6
# E 105 / 01 E
a. High pressure valves (11 and 12) and preloading valve (15)
Gradually increase signal current to proportional solenoid , e.g. My (Mz) until set value E*
of high pressure valve is reached without further rising. This is measurable at port Mp (Ms),
example for HPV pump ,cw rotation, refer difference cw/ ccw on page 2.
The set value of the preloading valve (15) can now be read, it is measurable at port Y/Z (see
circuit diagramme). The control pressure differential delta p Y-Z/Z-Y has to be >-2,6 up to
<-3+0,2 bar . At this point of operation the system ought to be stable. Stabilization can be achiev-
ed by setting the preloading valve (15) within >- 2,6 to <-3+0,2 bar.
E* = setting value of high pressure valve according to OEM order specification (e.g.420 + 30 bar).
·High pressure valve cannot be adjusted. If the valve does not allow to reach the reference value
E* the valve cartridge (11 or 12) has to be changed as a whole. Yet before, the reference value of the
high pressure valves should also be checked without POR function.This requires blocking of the
preloading valve (15) by means of the setting screw (45)(attention: note number of revolutions).
Check reference value again. If not reached, exchange the valve cartridge. If still not reached, the
mistake is in the system, perhaps internal leakage in the closed loop.
Has the reference value already been reached after changing the valve cartridge, put the set screw
(45) of valve (15) in original postion. Check function and reference value of the valve (15). In rare
cases the high pressure valve itself may be instable. Also in this case, the whole cartridge (11 or
12) has to be exchanged.
· Preloading valve has to be set to the corresponding delta p Y - Z/Z-Y.
- Too low a set value may render the whole system unstable during the POR operation.
- If the set value has been tuned higher, a greater residual flow will bleed across the high pressure
valves. This may impair the energy consumption and thermal balance of the system.
If needed, adjustments can be made at the set screw (45). Afterwards lock the nut (47) with 9 Nm
and the locking nut (46 ) with 5 Nm.
- If the set value cannot be fixed at <3 bar , the regulation begin of the POR control is likely to be
late. Check regulation begin and correct if necessary (see description).
The above-described procedures ought to be performed rapidly, in order to avoid excessive heating-
up of the system.
LINDE AG
M. Zivkovic
Industrial Trucks and Hydraulics Division.
Schweinheimer Straße 34, 63743 Aschaffenburg, Telephone: 0 60 21 / 99 15 66 Department HK 1
Hanauer Landstraße 100, 63796 Kahl / Main, Telephone: 0 61 88 / 41 36 09
)*
Hydraulic Benennung: Date: 11.01
electrical control
check, if necessary replace
high pressure valves (11 and 12) check ref. value E*.
charge pump against load P/S.
okay not okay control solenoid/signal pressure check
okay not okay
LINDE AG M. Zivkovic
Industrial Trucks and Hydraulics Division.
Schweinheimer Straße 34, 63743 Aschaffenburg, Telephon: 0 60 21 / 99 15 66 Abteilung HK 1
Hanauer Landstraße 100, 63796 Kahl / Main, Telephon: 0 61 88 / 4 136 09