Apuesta Total - Santa Clara

HVAC Load Analysis


for

Bravo&Julca

Lima

Prepared By:

E.S.S.
Grupo Vargas S.A.C

Lima

sábado, 27 de Abril de 2019


Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
Elite Software Development Apuesta Total - Santa Clara
College Station, TX 77845 Page 2

General Project Data Input


General Project Information
Project file name: C:\Users\Desktop\AT- SANTA CLARA.CHV
Project title: Apuesta Total - Santa Clara
Designed by: E.S.S.
Project date: 27/04/2019
Project location: LIMA, PERU
Client name: Bravo&Julca
Client city: Lima
Company name: Grupo Vargas S.A.C
Company representative: E.S.S.
Company city: Lima
Barometric pressure: 29.876 in.Hg.
Altitude: 42 feet
Latitude: -12 Degrees
Mean daily temperature range: 11.5 Degrees
Starting & ending time for HVAC load calculations: 9am - 10pm
Number of unique zones in this project: 1

Building Default Values


Calculations performed: Both heating and cooling loads
Lighting requirements: 2.30 Watts per square foot
Equipment requirements: 2.60 Watts per square foot
People sensible load multiplier: 580 Btuh per person
People latent load multiplier: 625 Btuh per person
Zone sensible safety factor: 10 %
Zone latent safety factor: 10 %
Zone heating safety factor: 10 %
People diversity factor: 80 %
Lighting profile number: 1
Equipment profile number: 1
People profile number: 1
Building default ceiling height: 9.0 feet
Building default wall height: 9.0 feet

Internal Operating Load Profiles (C = 100)


hr hr hr hr hr hr hr hr hr hr hr hr hr hr hr hr hr hr hr hr hr hr hr hr
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
1 C C C C C C C C C C C C C C C C C C C C C C C C
2 C C C C C C C C C C C C C C C C C C C C C C C C
3 C C C C C C C C C C C C C C C C C C C C C C C C
4 C C C C C C C C C C C C C C C C C C C C C C C C
5 C C C C C C C C C C C C C C C C C C C C C C C C
6 C C C C C C C C C C C C C C C C C C C C C C C C
7 C C C C C C C C C C C C C C C C C C C C C C C C
8 C C C C C C C C C C C C C C C C C C C C C C C C
9 C C C C C C C C C C C C C C C C C C C C C C C C
10 C C C C C C C C C C C C C C C C C C C C C C C C

C:\Users\Desktop\AT- SANTA CLARA.CHV sábado, 27 de Abril de 2019, 2:46 p.m.


Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
Elite Software Development Apuesta Total - Santa Clara
College Station, TX 77845 Page 3

General Project Data Input (cont'd)


Building-Level Design Conditions
Design Outdoor Outdoor Indoor Indoor Grains In/Outdoor
Month Dry Bulb Wet Bulb Rel.Hum Dry Bulb Diff Correction
August 85 75 50% 75 50.29 -3
Winter 58 75

Master Roofs
Roof ASHRAE Roof Dark Susp.
No. Roof# U-Fac Color Ceil
1 6 0.150 Sí Sí

Master Walls
Wall ASHRAE Wall Wall
No. Group U-Fac Color
1 E 0.350 D
2 G 0.062 L
3 G 0.032 L

Master Partitions
Partition Partition Cool Heat
No. U-Factor T-D T-D
1 0.350 14 53

Master Glass
Glass Summer Winter Glass Interior Interior
No. U-Factor U-Factor Shd.Coef. Shading Shd.Coef
1 1.000 1.000 0.400 2 0.000

Master Shading Devices


Dist Dist Dist Dist Dist Dist Ht Dist Dist Ht
Horiz Beyond Beyond Overh Right R-Fin Of Left L-Fin Of
Shade Overh Right Left Above Fin Beyond Right Fin Beyond Left
No. Projects W.Edge W.Edge Wind Proj W.Edge Fin Proj W.Edge Fin
1 2.00 0.00 0.00 0.60 0.00 0.00 0.00 0.00 0.00 0.00
2 2.00 1.00 1.00 0.60 0.00 0.00 0.00 0.00 0.00 0.00

C:\Users\Desktop\AT- SANTA CLARA.CHV sábado, 27 de Abril de 2019, 2:46 p.m.


Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
Elite Software Development Apuesta Total - Santa Clara
College Station, TX 77845 Page 4

Building Envelope Report


Envelope Report Using Summer U-Factors
Material Gross Glass Net -U- Area x Average
Types Area Area Area Factor U-Factor U-Factor
Roof 1 353.1 0.0 353.1 0.150 52.962 0.150
Tot.Roof 353.1 0.0 353.1 N/A 52.962 0.150
Wall 1 676.8 144.0 532.8 0.350 186.480 0.350
Tot.Wall 676.8 144.0 532.8 N/A 186.480 0.350
Glass 1 144.0 N/A 144.0 1.000 144.000 1.000
Tot.Glass 144.0 N/A 144.0 N/A 144.000 1.000
Totals 1,029.9 383.442 0.372

Wall Wall Glass Wall Net Wall Avg Glass Avg Glass Avg
Direction Area Area Area U-Factor U-Factor Shd.Coef
N 174.6 0.0 174.6 0.350 0.000 0.000
NE 0.0 0.0 0.0 0.000 0.000 0.000
E 163.8 0.0 163.8 0.350 0.000 0.000
SE 0.0 0.0 0.0 0.000 0.000 0.000
S 174.6 144.0 30.6 0.350 1.000 0.400
SW 0.0 0.0 0.0 0.000 0.000 0.000
W 163.8 0.0 163.8 0.350 0.000 0.000
NW 0.0 0.0 0.0 0.000 0.000 0.000
Totals 676.8 144.0 532.8 0.350 1.000 0.400

C:\Users\Desktop\AT- SANTA CLARA.CHV sábado, 27 de Abril de 2019, 2:46 p.m.


Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
Elite Software Development Apuesta Total - Santa Clara
College Station, TX 77845 Page 5

Building Summary Loads


Building peaks in August at 6pm.
Bldg Load Area Sen %Tot Lat Sen Net %Net
Descriptions Quan Loss Loss Gain Gain Gain Gain
Roof 353 990 9.89 0 2,724 2,724 8.18
Wall 533 3,487 34.83 0 6,765 6,765 20.31
Glass 144 2,693 26.90 0 3,062 3,062 9.19
Floor Slab 75 703 7.02 0 0 0 0.00
Skin Loads 7,873 78.65 0 12,550 12,550 37.67
Lighting 812 0 0.00 0 3,048 3,048 9.15
Equipment 918 0 0.00 1,100 3,446 4,546 13.65
People 5 0 0.00 3,300 3,062 6,362 19.10
Partition 0 0 0.00 0 0 0 0.00
Cool. Pret. 0 0 0.00 0 0 0 0.00
Heat. Pret. 0 0 0.00 0 0 0 0.00
Cool. Vent. 64 0 0.00 2,050 489 2,538 7.62
Heat. Vent. 45 825 8.24 0 0 0 0.00
Cool. Infil. 0 0 0.00 0 0 0 0.00
Heat. Infil. 0 0 0.00 0 0 0 0.00
Draw-Thru Fan 0 0 0.00 0 1,581 1,581 4.74
Blow-Thru Fan 0 0 0.00 0 0 0 0.00
Reserve Cap. 0 0 0.00 0 757 757 2.27
Reheat Cap. 0 0 0.00 0 0 0 0.00
Supply Duct 0 875 8.74 0 1,286 1,286 3.86
Return Duct 0 437 4.37 0 643 643 1.93
Misc. Supply 0 0 0.00 0 0 0 0.00
Misc. Return 0 0 0.00 0 0 0 0.00
Building Totals 10,011 100.00 6,450 26,862 33,312 100.00

Building Sen %Tot Lat Sen Net %Net


Summary Loss Loss Gain Gain Gain Gain
Ventilation 825 8.24 2,050 489 2,538 7.62
Infiltration 0 0.00 0 0 0 0.00
Pretreated Air 0 0.00 0 0 0 0.00
Zone Loads 7,873 78.65 4,400 22,863 27,263 81.84
Plenum Loads 0 0.00 0 0 0 0.00
Fan & Duct Loads 1,312 13.11 0 3,510 3,510 10.54
Building Totals 10,011 100.00 6,450 26,862 33,312 100.00

Check Figures
Total Building Supply Air (based on a 20° TD): 1,171 CFM
Total Building Vent. Air (5.43% of Supply): 64 CFM
Total Conditioned Air Space: 353 Sq.ft
Supply Air Per Unit Area: 3.3174 CFM/Sq.ft
Area Per Cooling Capacity: 127.1904 Sq.ft/Ton
Cooling Capacity Per Area: 0.0079 Tons/Sq.ft
Total Heating Required With Outside Air: 10,011 Btuh
Total Cooling Required With Outside Air: 2.78 Tons

C:\Users\Desktop\AT- SANTA CLARA.CHV sábado, 27 de Abril de 2019, 2:46 p.m.


Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
Elite Software Development Apuesta Total - Santa Clara
College Station, TX 77845 Page 6

Air Handler #1 - Sala De Ventas - Summary Loads


Zn Description Area Htg.Loss Sen.Gain Lat.Gain Htg.O.A. Clg.O.A.
No Peak Time People Htg.CFM Clg.CFM S.Exh Req.CFM Req.CFM
Volume CFM/Sqft CFM/Sqft W.Exh Act.CFM Act.CFM
1 Sala De Ventas 353 7,873 22,872 5,225 7.5/P 0.18/ft²
6pm August 6 406 1,172 0 45 64
3,178 1.15 3.32 0 45 64
Runout duct size: 6in. dia, Diffusers: 9, CFM/runout: 130, Velocity: 663.1 ft/min, Pressure drop: 0.280 in.wg./100ft
Zone Peak Totals: 353 7,873 22,872 5,225
Total Zones: 1 6 406 1,172 0 45 64
Unique Zones: 1 3,178 1.15 3.32 0 45 64
Main trunk duct size: 16in. h x 14in. w, Velocity: 838.9 ft/min, Pressure drop: 0.086 in.wg./100ft

C:\Users\Desktop\AT- SANTA CLARA.CHV sábado, 27 de Abril de 2019, 2:46 p.m.


Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
Elite Software Development Apuesta Total - Santa Clara
College Station, TX 77845 Page 7

Air Handler #1 - Sala De Ventas - Total Load Summary


Air Handler Description: Sala De Ventas Constant Volume - Sum of Peaks
Supply Air Fan: Draw-Thru with program estimated horsepower of 0.62 HP
Fan Input: 65% motor and fan efficiency with 2.2 in. water across the fan
Sensible Heat Ratio: 0.85 --- This system occurs 1 time(s) in the building. ---
Air System Peak Time: 6pm in August.
Outdoor Conditions: 83° DB, 74° WB, 115.48 grains
Summer: Ventilation controls outside air, ----- Winter: Ventilation controls outside air.
Zone Space sensible loss: 7,873 Btuh
Infiltration sensible loss: 0 Btuh 0 CFM
Outside Air sensible loss: 825 Btuh 45 CFM
Supply Duct sensible loss: 875 Btuh
Return Duct sensible loss: 437 Btuh
Return Plenum sensible loss: 0 Btuh
Total System sensible loss: 10,011 Btuh
Heating Supply Air: 8,748 / (.998 X 1.08 X 20) = 406 CFM
Winter Vent Outside Air (11.1% of supply) = 45 CFM
Zone space sensible gain: 22,106 Btuh
Infiltration sensible gain: 0 Btuh
Draw-thru fan sensible gain: 1,581 Btuh
Supply duct sensible gain: 1,286 Btuh
Reserve sensible gain: 757 Btuh
Total sensible gain on supply side of coil: 25,730 Btuh
Cooling Supply Air: 25,730 / (.998 X 1.1 X 20) = 1,171 CFM
Summer Vent Outside Air (5.4% of supply) = 64 CFM
Return duct sensible gain: 643 Btuh
Return plenum sensible gain: 0 Btuh
Outside air sensible gain: 489 Btuh 64 CFM
Blow-thru fan sensible gain: 0 Btuh
Total sensible gain on return side of coil: 1,132 Btuh
Total sensible gain on air handling system: 26,862 Btuh
Zone space latent gain: 4,400 Btuh
Infiltration latent gain: 0 Btuh
Outside air latent gain: 2,050 Btuh
Total latent gain on air handling system: 6,450 Btuh
Total system sensible and latent gain: 33,312 Btuh

Check Figures
Total Air Handler Supply Air (based on a 20° TD): 1,171 CFM
Total Air Handler Vent. Air (5.43% of Supply): 64 CFM
Total Conditioned Air Space: 353 Sq.ft
Supply Air Per Unit Area: 3.3174 CFM/Sq.ft
Area Per Cooling Capacity: 127.1904 Sq.ft/Ton
Cooling Capacity Per Area: 0.0079 Tons/Sq.ft
Total Heating Required With Outside Air: 10,011 Btuh
Total Cooling Required With Outside Air: 2.78 Tons

C:\Users\Desktop\AT- SANTA CLARA.CHV sábado, 27 de Abril de 2019, 2:46 p.m.


Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
Elite Software Development Apuesta Total - Santa Clara
College Station, TX 77845 Page 8

Zone Detailed Loads (At Zone Peak Times)


Load Unit -SC- CLTD U.Fac Sen. Lat. Htg. Htg.
Description Quan CFAC SHGF -CLF- Gain Gain Mult. Loss
Zone 1-Sala De Ventas peaks (sensible) in August at 6pm, Air Handler 1 (Sala De Ventas), Group 0, 18.2 x
19.4, Construction Type: 5 (Light)
Roof-1-6-Susp.C-D 353 1.00 46.8 0.150 2,476 2.550 900
Wall-1-E-E-D 164 1 27.8 0.350 1,591 5.950 975
Wall-2-W-E-D 164 1 38.8 0.350 2,222 5.950 975
Wall-3-N-E-D 175 1 35.8 0.350 2,185 5.950 1,039
Wall-4-S-E-D 31 1 14.3 0.350 153 5.950 182
Gls-S-1-90-Tran 144.0 1.000 9 1.000 1,332 17.000 2,448
0%S-1-NS-Solar 144.0 0.400 30 0.840 1,452
Lights-Prof=1 812 1.000 2,771
Equipment-Prof=1 918 1.000 3,132 1,000
People-Prof=1 6.0 1.000 3,480 3,750
Floor slab 75 8.500 639
Sub-total 20,793 4,750 7,158
Safety factors: +10% +10% +10%
--------- --------- ---------
Total w/ safety factors: 22,872 5,225 7,873

C:\Users\Desktop\AT- SANTA CLARA.CHV sábado, 27 de Abril de 2019, 2:46 p.m.


Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
Elite Software Development Apuesta Total - Santa Clara
College Station, TX 77845 Page 9

Air System #1 (Sala De Ventas) Psychrometric Analysis


System Load Analysis Latent Grains Sensible Temp CFM
Leaving Coil Condition 59.208 55.000
Draw-Thru Fan 1,581 1.229 72
Misc Load on Supply Side 0 0.000 0
Supply Air Duct 1,286 1.000 59
Zone Loads 4,400 5.533 22,106 17.183 1,006
Sensible Reserve 757 0.588 34
Zone Condition 4,400 64.740 25,730 75.000 1,171
Return Air Duct 643 0.500
Return Air Plenum 0 0.000
Misc Load on Return Side 0 0.000
Vent Air 64 CFM 2,050 2.666 489 0.353
Blow-Thru Fan 0 0.000
Entering Coil Condition 6,450 67.406 26,862 75.853 1,171

General Psychrometric Equations Used In Analysis:


PR = (Barometric pressure of site / Standard ASHRAE pressure of 29.921)
TSH = PR x 1.10 x CFM x (DB entering - DB leaving)
TLH = PR x 0.68 x CFM x (Grains entering - Grains leaving)
GTH = PR x 4.50 x CFM x (Enthalpy entering - Enthalpy leaving)

TSH = 0.998 x 1.10 x 1,171 x( 75.853 - 55.000 )= 26,827 Btuh


TLH = 0.998 x 0.68 x 1,171 x( 67.406 - 59.208 )= 6,520 Btuh
----------
SUM = 33,347 Btuh
GTH = 0.998 x 4.50 x 1,171 x( 28.748 - 22.382 )= 33,500 Btuh
Total System Load = 33,312 Btuh

Chilled and Hot Water Flow Rates and Steam Requirement


Cooling GPM = 33,500 / ( 10.00 x 500 ) = 6.7 GPM
Heating GPM = 10,011 / ( 20.00 x 500 ) = 1.0 GPM
Steam Req. = 10,011 / 970 = 10.3 lb./hr

Entering Cooling Coil Conditions Entering Heating Coil Conditions


Dry bulb temperature: 75.85 Dry bulb temperature: 72.22
Wet bulb temperature: 63.40
Relative humidity: 50.56
Enthalpy: 28.75 Btu/lbm

Leaving Cooling Coil Conditions Leaving Heating Coil Conditions


Dry bulb temperature: 55.00 Dry bulb temperature: 95.00
Wet bulb temperature: 53.66
Relative humidity: 91.96
Enthalpy: 22.38 Btu/lbm

C:\Users\Desktop\AT- SANTA CLARA.CHV sábado, 27 de Abril de 2019, 2:46 p.m.


Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
Elite Software Development Apuesta Total - Santa Clara
College Station, TX 77845 Page 10

Air System #1 (Sala De Ventas) Psychrometric Chart


ZC Zone Condition OC Outdoor Condition
LC Leaving Coil Condition EC Entering Coil Condition
SD Supply Duct Temperature Rise RD Return Duct Temperature Rise
DTF Draw Through Fan Sensible Gain BTF Blow Through Fan Sensible Gain
RE Reserve or Reheat Sensible Gain PL Return Air Plenum Sensible Gain
SM Supply Side Miscellaneous Sensible Gain RM Return Side Miscellaneous Gain
PRE Pretreated Air Condition

C:\Users\Desktop\AT- SANTA CLARA.CHV sábado, 27 de Abril de 2019, 2:46 p.m.


Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
Elite Software Development Apuesta Total - Santa Clara
College Station, TX 77845 Page 11

Building Pie Charts


Building peaks in August at 6pm.

Return Duct - 1.93%


Roof - 8.18% Supply Duct - 3.86%
Reserve Cap. - 2.27%
Draw-Thru Fan - 4.74%

Cool. Vent. - 7.62%


Wall - 20.31%

Building
Net
Gain
33,312
Btuh People - 19.10%

Glass - 9.19%

Lighting - 9.15%
Equipment - 13.65%

Roof - 9.89% Return Duct - 4.37%


Supply Duct - 8.74%

Heat. Vent. - 8.24%

Building
Floor - 7.02%
Loss
10,011 Wall - 34.83%
Btuh

Glass - 26.90%

C:\Users\Desktop\AT- SANTA CLARA.CHV sábado, 27 de Abril de 2019, 2:46 p.m.


Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
Elite Software Development Apuesta Total - Santa Clara
College Station, TX 77845 Page 12

Air Handler #1 Pie Charts


Air Handler #1 peaks in August at 6pm.

Return Duct - 1.93%


Roof - 8.18% Supply Duct - 3.86%
Reserve Cap. - 2.27%
Draw-Thru Fan - 4.74%

Cool. Vent. - 7.62%


Wall - 20.31%
Air
Handler
#1
Net
Gain
33,312 People - 19.10%
Btuh
Glass - 9.19%

Lighting - 9.15%
Equipment - 13.65%

Roof - 9.89% Return Duct - 4.37%


Supply Duct - 8.74%

Heat. Vent. - 8.24%

Air
Handler
Floor - 7.02%
#1
Loss Wall - 34.83%
10,011
Btuh

Glass - 26.90%

C:\Users\Desktop\AT- SANTA CLARA.CHV sábado, 27 de Abril de 2019, 2:46 p.m.