PROVIDE FRICTION FLOOR SYSTEM CONT. FIRE RESISTIVE JOINT FLOOR SYSTEM PROVIDE FRICTION FLOOR SYSTEM CONT. FIRE RESISTIVE JOINT FLOOR SYSTEM CONT. FIRE RESISTIVE JOINT FLOOR SYSTEM SHEET NOTES:
FIT BATT INSULATION OR ROOF DECK SYSTEM. (SEE SPEC'S.) OR ROOF DECK FIT BATT INSULATION OR ROOF DECK SYSTEM. (SEE SPEC'S.) OR ROOF DECK SYSTEM. (SEE SPEC'S.) OR ROOF DECK

R 1. SOME PARTITION TYPES AND DETAILS CONTAINED ON THIS SHEET MAY NOT BE USED ON
THIS PROJECT. REFER TO FLOOR PLANS FOR PARTITION TYPES THAT ARE USED.
1 1/2" METAL FURRING 2. CEILING HEIGHTS, SOFFIT HEIGHTS, MATERIALS AND LOCATIONS SHALL BE

1/2" CLEARANCE

1/2" CLEARANCE
@ 16" O.C. ATTACHED COORDINATED WITH REFLECTED CEILING PLANS.
TO STRUCT. MEMBER 3 5/8" METAL STUDS 3 5/8" METAL STUDS
@ 16" O.C. ATTACHED 3. PROVIDE METAL TRIM AT THE EDGES OF ALL GYPSUM BOARD WHERE IT ABUTS
@ 16" O.C. ATTACHED DISSIMILAR MATERIALS.
TO STRUCT. MEMBER TO STRUCT. MEMBER SOLID

1/2" CLEARANCE
NON-SOLID NON-SOLID
PROVIDE CONT. SLIP - PROVIDE CONT. SLIP - STRUCT. MEMBER (THREE SIDES) (THREE SIDES) STRUCTURAL 4. DIVIDE ALL GYPSUM BOARD AREAS WITH CONTROL JOINTS NOT EXCEEDING 30 FT. IN
STRUCT. MEMBER
TYPE HEAD RUNNER TYPE HEAD RUNNER (SIZE VARIES) MEMBERS EITHER HORIZONTAL OR VERTICAL DIRECTION OR AS OTHERWISE INDICATED ON
(SIZE VARIES) DRAWINGS. PROVIDE RATED CONTROL JOINTS WITHIN RATED PARTITIONS AS
CHANNEL. ATTACH TO CHANNEL. ATTACH TO (SIZE VARIES)
SCHEDULED.
METAL DECK (SEE METAL DECK (SEE
DBL. LAYER 5/8" TYPE-X DBL. LAYER 5/8" TYPE-X

1/2" CLEARANCE
SPEC'S.) SPEC'S.)

1/2" CLEARANCE
GYP. BD. ON BOTH SIDES GYP. BD. ON BOTH SIDES 5. APPROPRIATELY RATED FIRE DAMPERS ARE REQUIRED IN DUCTS WHICH PENETRATE
Q 5/8" GYP. BD. RATED PARTITIONS. DUCTS, PIPES AND CONDUIT MUST BE SEALED AT PERIMETERS OF
FOR 2 HR. RATED WALLS. FOR 2 HR. RATED WALLS. PENETRATION THRU RATED PARTITIONS.
SINGLE LAYER 5/8" TYP-X SINGLE LAYER 5/8" TYP-X
GYP. BD. FOR GYP. BD. FOR 6. PROVIDE TILE BACKER BOARD IN LIEU OF GWB ON ALL WALLS TO RECEIVE CERAMIC
1 HR. RATED WALLS. 1 HR. RATED WALLS. TILE FINISH AS SCHEDULED.
7. IN AREAS TO RECEIVE WALL TILE CONTRACTOR SHALL PROVIDE MINIMUM 20 GA.
METAL STUDS @ 16" O.C., U.N.O.
5/8" GYP. BD. ON BOTH DBL. LAYER 5/8" TYPE-X PROVIDE CONT. SLIP - PROVIDE CONT. SLIP -
PROVIDE CONT. SLIP - TYPE HEAD RUNNER TYPE HEAD RUNNER 8. CONTRACTOR SHALL PROVIDE FINISH LEVELS FOR WALL PARTITIONS AS INDICATED IN
SIDES TO BE EXTENDED GYP. BD. ON BOTH SIDES TYPE HEAD RUNNER SPECIFICATIONS.
TO UNDERSIDE OF DECK FOR 2 HR. RATED WALLS. CHANNEL. ATTACH TO CHANNEL. ATTACH TO
METAL STUDS CHANNEL. METAL DECK (SEE METAL DECK (SEE
FOR SOUND BARRIER & GYP. BD. SINGLE LAYER 5/8" TYPE-X 9. UL DESIGN NUMBERS INDICATED ARE FOR WALLS SCHEDULED TO EXTEND TO
GYP. BD. FOR VAR. VARIES SPEC'S.) SPEC'S.) STRUCTURE ONLY.
METAL STUDS (SIZE VARIES) VARIES VARIES
& GYP. BD. 1 HR. RATED WALLS.
P (SIZE VARIES)
CONT. FIRE RESISTIVE JOINT CONT. FIRE RESISTIVE JOINT
METAL STUDS 5/8" GYP. BD. METAL STUDS SYSTEM. (SEE SPEC'S.) METAL STUDS SYSTEM. (SEE SPEC'S.)
& GYP. BD. & GYP. BD. & GYP. BD.
(SIZE VARIES) (SIZE VARIES) 5/8" GYP. BD. (E.S.-1 HR.) (SIZE VARIES) 5/8" GYP. BD. (E.S.-1 HR.)
(2) 5/8" GYP. BD. (E.S.-2 HR.) (2) 5/8" GYP. BD. (E.S.-2 HR.)

NON-RATED, NON-SUSPENDED METAL STUD PARTITIONS RATED, NON-SUSPENDED METAL STUD PARTITIONS NON-RATED, NON-SUSPENDED METAL STUD PARTITIONS RATED, NON-SUSPENDED METAL STUD PARTITIONS
THAT EXTEND TO UNDERSIDE OF DECK THAT EXTEND TO UNDERSIDE OF DECK AT NON-SOLID STRUCTURAL MEMBERS AT NON-SOLID STRUCTURAL MEMBERS RATED, NON-SUSPENDED METAL STUD PARTITIONS AT SOLID STRUCTURAL MEMBERS

N
NON-RATED GYPSUM RATED GYPSUM NON-RATED GYPSUM PARTITION RATED GYPSUM PARTITION RATED GYPSUM PARTITION
N1 PARTITION N4 PARTITION N8 HEAD AT NON-SOLID N11 HEAD AT NON-SOLID N15 HEAD AT SOLID
SCALE: N.T.S. HEAD AT DECK SCALE: N.T.S. HEAD AT DECK SCALE: N.T.S. STRUCTURE SCALE: N.T.S. STRUCTURE SCALE: N.T.S. STRUCTURE
PROVIDE FRICTION FLOOR SYSTEM PROVIDE FRICTION FLOOR SYSTEM
FIT BATT INSULATION OR ROOF DECK FIT BATT INSULATION OR ROOF DECK

2 LAYERS GWB EACH SIDE*


1 LAYER GWB EACH SIDE*

1 LAYER GWB EACH SIDE*


ALLOWABLE DEFLECTION
M
CLIP ANGLE 3" x 3" x 1/4"

FRAMING GAUGE
WELDED TO TOP CHORD OF

STUD SPACING
STEEL JOIST @ 2'-0" O.C.

PARTITION

PARTITION
(SPANNING JOIST TO JOIST)

FURRING
WHERE REQ'D FOR METEL FRAMING DEPTH
STUD SUPPORT
1/2" CLEARANCE
1/2" CLEARANCE

STANDARD SYSTEMS
1/4" MIN., 1/2" MAX. JOINT METAL RUNNER CHANNEL
BETWEEN GYP. BD. ATTACH TO STEEL CHANNEL 1 5/8" 25 - (0.0179') 16" O.C. L/240 8'-3" 9'-6" 10'-6"
24" O.C. L/240 7'-3" 8'-3" 8'-9"
SOLID STRUCTURAL SOLID STRUCTURAL 5/8" GYP. BD.
MEMBERS (SIZE VARIES) MEMBERS (SIZE VARIES)
L 2 1/2" 25 - (0.0179') 16" O.C. L/240 11'-0" 12'-6" 13'-6"
24" O.C. L/240 9'-9" 10'-9" 11'-6"

2 1/2" 20 - (0.0329') 16" O.C. L/240 13'-0" 14'-0" 14'-9"


24" O.C. L/240 11'-6" 12'-3" 13'-0"

PROVIDE CONT. SLIP - PROVIDE CONT. SLIP - 3 5/8" 25 - (0.0179') 16" O.C. L/240 14'-6" 16'-0" 17'-0"
TYPE HEAD RUNNER TYPE HEAD RUNNER STEEL CHANNEL C4 x 5.4
CHANNEL. ATTACH TO CHANNEL. ATTACH TO 24" O.C. L/240 12'-9" 14'-0" 14'-9"
METAL STUDS METAL STUDS REFER TO PARTITION METAL CONTROL JOINT @ 48" O.C. WELD TO CLIP
STRUCT. MEMBER ONLY STRUCT. MEMBER ONLY TYPE FOR STUD SIZE ANGLES AT EACH END
& GYP. BD. (SEE SPEC'S.) & GYP. BD. (SEE SPEC'S.)
(SIZE VARIES) 3 5/8" 20 - (0.0329') 16" O.C. L/240 17'-3" 18'-3" 19'-0"
(SIZE VARIES) 1" CLEARANCE
K 24" O.C. L/240 15'-0" 16'-0" 16'-6"
BETWEEN STUDS
3 5/8" VERTICAL METAL
STUDS @ 16" O.C. 6" 25 - (0.0179') 16" O.C. L/240 21'-6" 23'-0" 24'-0"
24" O.C. L/240 18'-9" 20'-3" 21'-0"
5/8" GYP. BD. 5/8" GYP. BD. NOTE: SEE STRUCTURAL DRAWINGS
FOR JOIST REINFORCEMENT. 6" 20 - (0.0329') 16" O.C. L/240 25'-6" 26'-6" 27'-6"
24" O.C. L/240 22'-3" 23'-3" 24'-0"

NON-RATED, NON-SUSPENDED METAL STUD PARTITIONS NON-RATED, NON-SUSPENDED METAL STUD PARTITIONS
AT SOLID STRUCTURAL MEMBERS AT SOLID STRUCTURAL MEMBERS (OFF-SET)

RATED

RATED
NON-RATED GENERAL NOTES

2-HR.

1-HR.
J1 NON-RATED GYPSUM PARTITION HEAD AT SOLID STRUCTURE J8 CONTROL J12 TYP. SUSPENDED METAL STUDS SUPPORT SHAFT WALL SYSTEMS
J21
SCALE: N.T.S. SCALE: N.T.S. JOINT SCALE: N.T.S. SCALE: NO SCALE
2 1/2" C-H STUDS 25 - (0.0179') 24" O.C. L/240 --- 12'-1" 11'-8"

2 1/2" C-H STUDS 20 - (0.0341') 24" O.C. L/240 --- 15'-3" 14'-0"

4" C-H STUDS 25 - (0.0179') 24" O.C. L/240 --- 16'-11" 15'-10"

4" C-H STUDS 20 - (0.0341') 24" O.C. L/240 --- 18'-2" 17'-6"
PARTITION TYPE (REFER TO FLOOR PLAN & SCHEDULE)
H
METAL STUDS & GYP. BD. (SIZE VARIES) 1/4" MIN., 1/2" MAX. JOINT PARTITION HEIGHT: C (TO CEILING), A (ABOVE CEILING) OR S (TO STRUCTURE) 6" DOUBLE-E 25 - (0.0179') 24" O.C. L/240 --- 26'-3" 25'-3"
STUDS
BETWEEN GYP. BD.
FIRE RATING (IF ANY): 1, 2 OR 3 HOUR
20 - (0.0341') 24" O.C. L/240 --- 28'-0" 28'-0"
6" DOUBLE-E STUDS
ANCILLARY DESIGNATION: S= SOUND INSULATION
METAL CONTROL JOINT SEE NOTE BELOW
G= GROUND FACE
PROVIDE METAL STUDS & GYP. BD. SAFING T= SPLIT FACE
INSULATION

RATED

RATED
OPENINGS FOR 1/2" CLEARANCE ALL

2-HR.

1-HR.
AROUND MEMBER. FILL CLEARANCE B= BATT INSULATION
OPENING WITH FIRE RESISTIVE JOINT
G SYSTEM. (SEE SPEC'S.) HORIZONTAL SHAFT WALL SYSTEMS
X= FIRE-RATED GWB IN LIEU
OF STD. GWB 2 1/2" 25 - (0.0179') 24" O.C. L/240 --- 6'-0" 6'-7"

V= VAPOR BARRIER 2 1/2" 20 - (0.0341') 24" O.C. L/240 --- 9'-2" 10'-3"

W= VAPOR BARRIER
REFER TO PARTITION W/ SOUND BATT 4" 25 - (0.0179') 24" O.C. L/240 --- 7'-10" 8'-8"
NON-SOLID TYPE FOR STUD SIZE
STRUCT. MEMBER 1 5/8" CLEARANCE 1" CLEARANCE P= SCORED BLOCK PATTERN 4" 20 - (0.0341') 24" O.C. L/240 --- 13'-2" 14'-6"
(SIZE VARIES) BETWEEN STUDS BETWEEN STUDS ON CORRIDOR/STAIR SIDE
OF WALL
F DBL. LAYER 5/8" TYPE-X GYP. BD. ON N= NO ADDITIONAL
6" 25 - (0.0341') 24" O.C. L/240 --- 15'-10" 17'-5"
BOTH SIDES FOR 2 HR. RATED WALLS
SOLID STRUCTURAL SINGLE LAYER 5/8" TYPE-X GYP. BD. REQUIREMENTS
MEMBERS (SIZE VARIES) FOR 1 HR. RATED WALLS. NOTE:
NOTE: IF SOUND INSULATION OCCURS IN WALL THAT EXTENDS TO STRUCTURE THEN 1. LIMITING HEIGHT FOR 5/8" THICK PANELS AND 5 PSF UNIFORM LOAD
INSULATION GOES TO STRUCTURE. IF SOUND INSULATION OCCURS IN WALL PERPENDICULAR TO PARTITION OR FURRING.
THAT TERMINATES ABOVE CEILING THEN EXTEND INSULATION TO 6" ABOVE
2. AT FRAMING EXCEEDING 12'-0" HEIGHT, PROVIDE BRACING AT MID-HEIGHT
CEILING AND ACROSS CEILING 2'-0" ON EITHER SIDE OF PARTITION. LOCATION, NOT TO EXCEED 12'-0" MAX.

3. USE ONE-LAYER HEIGHTS FOR UNBALANCED ASSEMBLIES.


RATED METAL STUD PARTITIONS WHERE STRUCTURAL MEMBERS PASS THRU PARTITION

E
RATED PARTITION SYMBOL PARTITION
E1 RATED GYPSUM PARTITION AT STRUCTURAL MEMBERS E8 CONTROL E12 DESCRIPTION E17 FRAMING No. Revisions / Submissions Date
SCALE: N.T.S. SCALE: N.T.S. JOINT SCALE: N.T.S. SCALE: NO SCALE GUIDELINES

LWC
GYPSUM PARTITION = SINGLE LAYER
OF 5/8" GYP. BD. BOTH SIDES GYPSUM PARTITION = SINGLE LAYER
AND SOUND BATT ATTENUATION OF 5/8" GYP. BD. ONE SIDE

D I NCOR P O R ATED
METAL STUDS & GYP. BD. (SIZE VARIES) NON-RATED NON-RATED
PARTITION EXTENDS N1 & N4/G002
TYP.
434 East First Street Dayton, OH 45402 937.223.6500
TO UNDERSIDE OF
STRUCTURE AS
SEALANT 4440 Garwood Place Richmond, IN 47374 765.966.3546
REQUIRED UNDERSIDE OF
DECK S_ _ S_ _ S_ _ S_ _ S_ _ S_ _
6" TYP.

G1 G2 G3 F2 F5 F6
(1) 5/8" GWB DAYTON INTERNATIONAL AIRPORT
PROVIDE METAL STUDS & GYP.
BD. OPENING FOR 1/2" MIN.
A_ _ A_ _ A_ _ A_ _ A_ _ A_ _ 3600 TERMINAL DRIVE
CLEARANCE ALL AROUND G1 G2 G3 F2 F5 F6 VANDALIA, OH 45377
MEMBER. FILL VOIDS WITH BATT 1/2" MIN. NON-COMBUSTIBLE CEILING
C INSULATION (SEALANT NOT REQ'D.) PLYWOOD (937) 454-8209

3 1/2" SOUND ATTENUATION


BLANKET TYP. PHASE ONE CANOPY
C:\Revit\14613.00-DAY-Canopy-ARCH-2014_sbg.rvt

6" METAL
STUD
REPLACEMENT PROJECT
NON-SOLID
STRUCT. MEMBER 7 1/4" GWB ONE
SIDE
3600 TERMINAL DRIVE
(SIZE VARIES) GWB ONE GWB ONE
SIDE SIDE
B
SOLID STRUCTURAL
FLOOR LINE
SET METAL STUD RUNNER
IN SEALANT TYP. 3 3_4" 4 7_8" 7 1_4" 2 1_8" 4 1_4" 6 5_
8
" ARCHITECTURAL INTERIOR PARTITION
MEMBERS (SIZE VARIES)
T1
FLOOR LINE DETAILS
G1 G2 G3 F2 F5 F6 PROGRESS Comm. No.

14613.00
Date

JAN 15, 2015


NOTE: NOT ALL PARTITION TYPES ARE USED ON THESE DOCUMENTS.
REFER TO FLOOR PLANS FOR PARTITION TYPES USED. NOTE:
NOT ALL PARTITION TYPES ARE USED ON THESE DOCUMENTS. REFER TO FLOOR PLANS FOR PARTITION TYPES USED.
DRAWING
NON-RATED METAL STUD PARTITIONS WHERE STRUCTURAL MEMBERS PASS THRU PARTITION
NOT FOR Drawn

Author
Drawing No.

A
CONSTRUCTION
A1 NON-RATED GYPSUM PARTITION AT STRUCTURAL MEMBERS A8 TEMPORARY PARTITIONS A12 DRYWALL PARTITION TYPES 3/26/2015 Checked

Checker
A001
SCALE: N.T.S. SCALE: N.T.S. SCALE: NO SCALE 12:05:03 PM
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 © 2013 LWC, INCORPORATED
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
3/26/2015 12:10:28 PM

13'-7"
DOOR SCHEDULE
SHEET NOTES:
DOOR FRAME HARDWARE
DOOR NO. DOOR SIZE MATERIAL TYPE GLASS MATERIAL TYPE SET # FUNCTION COMMENTS
R 5'-2 3/16" 8'-4 13/16" 105NNNNNNNNNN 3'-0" X 7'-0" X 1
3/4"
FLUSH, WOOD A N/A HOLLOW METAL I

A03 3'-0" X 7'-0" X 1 FLUSH, WOOD A N/A HOLLOW METAL I CIPHER


ALUMINUM CURTAIN WALL WITH BUTT GLAZING AT 3/4"
VERTICAL MULLIONS. SEE SPEC A04 3'-0" X 7'-0" X 1 FLUSH, WOOD A N/A HOLLOW METAL I CIPHER
3/4"
A05 3'-0" X 7'-0" X 1 FLUSH, WOOD A N/A HOLLOW METAL I CIPHER
3/4"
A06 3'-0" X 7'-0" X 1 FLUSH, WOOD A N/A HOLLOW METAL I CIPHER
3'-5"

G1 G1 3/4"

3'-5"
G2 G2 G2 A10 3'-0" X 7'-0" X 1
3/4"
FLUSH, WOOD A N/A HOLLOW METAL I CIPHER

A11 3'-0" X 7'-0" X 1 FLUSH, WOOD A N/A HOLLOW METAL I CIPHER


3/4"
Q A12 3'-0" X 7'-0" X 1 FLUSH, WOOD A N/A HOLLOW METAL I STOREROOM CLOSER & ELECTRIC STRIKE
3/4"
3'-3"

G1 G1

3'-3"
B12 3'-0" X 7'-0" X 1 FLUSH, WOOD A N/A HOLLOW METAL I
G2 G2 G2 3/4"
B14 3'-0" X 7'-0" X 1 FLUSH, WOOD A N/A HOLLOW METAL I OFFICE
13'-4"

3/4"

13'-4"
B15 3'-0" X 7'-0" X 1 FLUSH, WOOD A N/A HOLLOW METAL I OFFICE
3/4"
3'-3"

B15A 3'-0" X 7'-0" X 1 FLUSH, WOOD A N/A HOLLOW METAL I


G1 G1 G2

3'-3"
G2 G2 B16A
3/4"
3'-0" X 7'-0" X 1 FLUSH, WOOD A N/A HOLLOW METAL I STOREROOM CLOSER & ELECTRIC STRIKE
3/4"
B16B PR. 3'-0" X 7'-0" X FLUSH, WOOD A N/A HOLLOW METAL 2 STOREROOM CLOSER & ELECTRIC STRIKE
1 3/4"
P B16C 3'-0" X 7'-0" X 1 FLUSH, WOOD A N/A HOLLOW METAL I
3'-5"

G1 G1 3/4"

3'-5"
G2 G2 G2 B16D 3'-0" X 7'-0" X 1
3/4"
FLUSH, WOOD A N/A HOLLOW METAL I STOREROOM CLOSER & ELECTRIC STRIKE

B17 3'-0" X 7'-0" X 1 FLUSH, WOOD A N/A HOLLOW METAL I STOREROOM CLOSER & ELECTRIC STRIKE
3/4"
B18 3'-0" X 7'-0" X 1 FLUSH, WOOD A N/A HOLLOW METAL I
3/4"
B19 PR. 3'-0" X 7'-0" X FLUSH, WOOD A N/A HOLLOW METAL 2
ALUMINUM CURTAIN WALL WITH BUTT GLAZING AT 1 3/4"
VERTICAL MULLIONS. SEE SPEC 4'-3" 8'-3" 4'-0" 4'-5 3/8"
B19A
B21 3'-0" X 7'-0" X1 FLUSH, WOOD A N/A HOLLOW METAL I
3/4"
B22 3'-0" X 7'-0" X1 FLUSH, WOOD A N/A HOLLOW METAL I PRIVACY
N 3/4"

N1 FRAME A-1 N4 FRAME A-6 B24B

B24YYYYY
3'-0" X 7'-0"
3/4"
3'-0" X 7'-0"
X1

X1
FLUSH, WOOD

FLUSH, WOOD
A

A
N/A

N/A
HOLLOW METAL

HOLLOW METAL
I

I
3/4"
SCALE: 1/4" = 1'-0" SCALE: 1/4" = 1'-0" A803 C06A 3'-0" X 7'-0"
3/4"
X1 ALUMINUM B 1/4" CLEAR SAFETY GLASS ALUMINUM I ENTRY CLOSER & WEATHERSTRIPPING

C06B 3'-0" X 7'-0" X1 ALUMINUM B 1/4" CLEAR SAFETY GLASS ALUMINUM I ENTRY CLOSER & WEATHERSTRIPPING
3/4"
C06C 3'-0" X 7'-0" X1 FLUSH, WOOD A N/A HOLLOW METAL I
25'-0" 3/4"

M 8'-4 13/16" 8'-2 5/16" 8'-4 7/8"


ALUMINUM CURTAIN WALL WITH BUTT
ALUMINUM CURTAIN WALL WITH BUTT
GLAZING AT VERTICAL MULLIONS. SEE
GLAZING AT VERTICAL MULLIONS. SEE
SPEC
SPEC
3'-5"

G1 G1 G1

3'-5"
SOUND
G1 G1 ATTENTUATION
BLANKETS
L
3'-3"

G1 G1 G1 DBL.
STUDS @
2"

10'-1"
3'-3"
3'-3"
JAMBS
13'-4"

G1 G1
GENERAL NOTES:
13'-4"

12'-1 3/16"
3'-3"

G1 G1 G1
3'-3"

G1- 1" TEMPERED, LOW -3 INSULATING GLASS. sEE SPECS

3'-5"

3 5/8"
5 7/8"
G1

5/8"
G1 G2- 1/4" CLEAR TEMPERED GLASS. SEE SPECS
3'-5"

K G1 G1 G1
3'-5"

G1
ALUMINUM CURTAIN WALL WITH BUTT GLAZING AT 5/8" DRYWALL
VERTICAL MULLIONS. SEE SPEC 6'-10 9/16" STEEL ON 3 5/8" METAL
DOOR STUDS @ 16" O.C.
FRAME

J
SEALANT
J1 FRAME A-4 J6 FRAME A-3 J9 FRAME A-7
SCALE: 1/4" = 1'-0" SCALE: 1/4" = 1'-0" SCALE: 1/4" = 1'-0" A803

5/8" DRYWALL SOUND


ON 6" METAL ATTENTUATION
STUDS @ 16" O.C. BLANKETS
H 21'-11 1/16"
2"

8'-2 5/16" 8'-2 5/16" 5'-6 7/16"

5"
DBL.
ALUMINUM CURTAIN WALL SYSTEM WITH GLAZING CAPTURED STUDS @
4 WAY sEE sPECS JAMBS
3'-5"

G1 G1 G1

8 1/4"

5/8"
G 5" 5"

6"
2'-2"

G1 G1 G1 G1
3'-3"

G1 G1 G1
13'-4"

7'-11"

5'-9"
3'-3"

G1 G1 G1
F G1 G1 G1 G1 TG STEEL 5/8" DRYWALL
DOOR ON 6" METAL

6 1/2"
3'-5"

G1 G1 G1 FRAME STUDS @ 16" O.C.

3'-6" 7'-11" 7'-11" 3'-8"


TG = TEMPERED GLASS
23'-0" 1/4" THICK
NON-INSULATED SEALANT
ALUMINUM CURTAIN WALL WITH BUTT
GLAZING AT VERTICAL MULLIONS. SEE A B
SPEC

E
E1 FRAME A-2 -RH E6 FRAME A-8 E11 DOOR TYPES E15 DOOR JAMB DETAILS
No. Revisions / Submissions Date
SCALE: 1/4" = 1'-0" SCALE: 1/4" = 1'-0" SCALE: 1/2" = 1'-0" SCALE: 3" = 1'-0"

LWC
23'-1"
21'-10 13/16"
3'-4" 6'-4" 7'-3" 8'-6"
8'-2" 8'-2" 6'-9"
5'-6 3/16" 8'-2 5/16" 8'-2 5/16" 2" 3'-0" 2" 2" 6'-0" 2" 2" 3'-0" 2" 3'-9" 2" 2" 3'-0" 2" 5'-0" 2"
D I NCOR P O R ATED
434 East First Street Dayton, OH 45402 937.223.6500
2"

2"

2"

2"
4440 Garwood Place Richmond, IN 47374 765.966.3546
3'-5"
3'-5"

G1 G1 G1 G1 G1 G1 DAYTON INTERNATIONAL AIRPORT


3600 TERMINAL DRIVE
VANDALIA, OH 45377
C
3'-3"

(937) 454-8209
3'-3"

G1 G1 G1 G1 G1 G1

6'-6"

6'-6"
7'-2"

7'-2"

7'-2"

7'-2"
13'-4"

PHASE ONE CANOPY


7'-0"

7'-0"
13'-4"
C:\Revit\14613.00-DAY-Canopy-ARCH-2014_sbg.rvt

REPLACEMENT PROJECT
3'-3"
3'-3"

G1 G1 G1 G1 G1 G1
3600 TERMINAL DRIVE
3'-5"

B TG TG
3'-5"

G1 G1 G1 G1 G1 G1
DOOR SCHEDULE & DETAILS

6"

6"
ALUMINUM CURTAIN WALL WITH BUTT
ALUMINUM CURTAIN WALL WITH BUTT
GLAZING AT VERTICAL MULLIONS. SEE
PROGRESS Comm. No.

14613.00
Date

JAN 15, 2015


DRAWING
1 2 3 4
GLAZING AT VERTICAL MULLIONS. SEE
SPEC
SPEC

NOT FOR Drawn

DCC/SBG
Drawing No.

A
CONSTRUCTION
A4 FRAME A-02 - LH A6 FRAME A-5 A11 DOOR FRAME TYPES 3/26/2015 Checked

EGS/JCF
A002
SCALE: 1/4" = 1'-0" SCALE: 1/4" = 1'-0" SCALE: 1/2" = 1'-0" 12:10:28 PM
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 © 2013 LWC, INCORPORATED
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
3/26/2015 12:11:12 PM
SHEET NOTES:

R G1- 1" TINTED, TEMPERED, LOW -3 INSULATING GLASS. sEE SPECS

G2- 1/4" TINTED TEMPERED GLASS. SEE SPECS

G1 G1 G1 G1 G1 G1 G1

M
3 FRAME A-9
SCALE: 1/4" = 1'-0"

GENERAL NOTES:
1. FEILD MEASURE AND CONFIRM OPENINGS WHERE EXISTING FRAMES ARE
BEING REFPLACED WITH NEW.

G1 G1 G1 G1 G1 G1 G1 2. AS REQUIRED, REMOVE AND REINSTALL PERIMETER TRIM AND FLASHING


TAHT REMAINS TO FACILITATE INSTALLATION OF NEW WORK.

G1 G1 G1 G1 G1 G1 G1

J
1 FRAME A-10
SCALE: 1/4" = 1'-0"

KEY PLAN:
H
EXISTING CURTAIN WALL
FRAMING AND INSTALLED GLASS

EXISTING CURTAIN WALL


FRAMING AND INSULATED
F GLASS

REMOVE AND REINSTALL


INSULATE GLASS AND
E CURTAINWALL FRAMING
IN SHADED AREA TO FACILITATE
INSTALLATION OF NEW WORK

No. Revisions / Submissions Date

D
LWC
I NCOR P O R ATED
434 East First Street Dayton, OH 45402 937.223.6500
G1 REMOVE EXISTING INSULATING GLASS 4440 Garwood Place Richmond, IN 47374 765.966.3546
AND CURTAIN WALL FRAMING
EXCEPT MAIN VERTICAL MEMBERS

DAYTON INTERNATIONAL AIRPORT


3600 TERMINAL DRIVE
VANDALIA, OH 45377
C G1 NEW CURTAIN WALL ASSEMBLY ISNTALLED TO
(937) 454-8209
EXISTING VERTICAL MEMBERS

PHASE ONE CANOPY


C:\Revit\14613.00-DAY-Canopy-ARCH-2014_sbg.rvt

REPLACEMENT PROJECT
G1 3600 TERMINAL DRIVE
B
DOOR SCHEDULE & DETAILS
G1
PROGRESS Comm. No.

14613.00
Date

JAN 15, 2015


DRAWING
NOT FOR Drawn

Author
Drawing No.

A
CONSTRUCTION
4 ADD ALT FRAME A-12 2 FRAME A-11 - BASE BID 3/26/2015 Checked

Checker
A003
SCALE: 1/4" = 1'-0" SCALE: 1/4" = 1'-0" 12:11:12 PM
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 © 2013 LWC, INCORPORATED
1 T2 2 3 T3 4 5 T3.4T3.5
T3.6 T4 6 7 T5 8 T5.1 9 10T6 T6.3
T6.4 11 12 T7 13 14 T8
8 15 16 T9 17
T9.5
9.5 18 19 20
3/26/2015 12:33:39 PM
SHEET NOTES:
FLOOR PLAN LEGEND
1. REMOVE EXISTING DOOR AND FRAME. PREP FOR NEW FINISH WORK.
R TYPICAL FOR ALL SHEETS. SEE SHEET G001 FOR ADDITIONAL SYMBOLS
2. CUT OPENING INTO EXISTING PARTITION FOR NEW DOOR OR CASED
OPENING.
3. REMOVE TRANSACTION COUNTERS AND RELATED WALLS.
EXISTING WALLS 4. REMOVE EXISTING PARTITION ENTIRELY.
5. REMOVE DOOR AND FRAME.
6. REMOVE PORTION OF EXTERIOR METAL STUD WALL. REMOVE MASONRY
CMU
VENEER WAINSCOT AND METAL PANEL SYSTEMS ABOVE. SEE SECTIONS
METAL STUDS WITH GYPSUM WALL
FOR HEIGHT. PROVIDE SHORING AND BRACING AS REQUIRED.
BOARD & SOUND ATTENUATION 7. REMOVE EXISTING CARPET TILE FLOOR COVER AND STOCKPILE FOR
BLANKETS, U.N.O. REINSTALLATION.
8. REMOVE ENTIRE COLUMN COVER. SEE STRUCTURAL DRAWINGS FOR
REMOVAL OF STEEL COLUMNS.
CONTROL JOINT
9. REMOVE ENTIRE SIDEWALK, CURB, AND RELATED PAVERS, RAMPS, AND
Q ITEMS EMBEDDED IN CONCRETE.
10. SEE CIVIL DRAWINGS FOR ADDITIONAL PAVEMENT REMOVAL AND
1.9 2 3 3.4 4 5 5.1 6 7 7.4 8 9 9.5 OVERHEAD ITEM REPLACEMENT IN THE DRIVEWAY.
11. REMOVE ENTIRE EXISTING ARCHED SKYLIGHT ASSEMBLY AND ANY
RELATED CURBS, FRAMING, METAL PANELS, AND SIMILAR ITEMS.
ITEM TO BE DEMOLISHED
12. EXISTING SLIDING DOOR ASSEMBLY AND BULKHEAD IMMEDIATELY ABOVE
IS TO REMAIN. PROTECT DURING CONSTRUCTION ACTIVITIES.
ITEM TO REMAIN 13. REMOVE ALUMINUM FRAME AND GLASS IMMEDIATELY ABOVE THE SLIDING
1 DOORS FROM THE TOP OF THE BULKHEAD TO THE BOTTOM OF THE
ARCHED SKYLIGHT.
TD D UNDERGROUND SANITARY LINE 14. REMOVE ENTIRE METAL PANEL SYSTEM AND MASONRY VENEER AND
RELATED ANCHORS FROM FACE OF EXISTING METAL STUD EXTERIOR WALL.
P 3 3 3 15. REMOVE ENTIRE EXISTING ARCHED SKYLIGHT ASSEMBLY AND ANY
CONCRETE WALK RELATED CURBS, FRAMING, METAL PANELS, AND SIMILAR ITEMS OVER THE
5 VESTIBULE. ALSO REMOVE THE VERTICAL ALUMINUM AND GLASS FROM
13
A6 13
11 OVER THE ENTRANCE DOORS. THE SLIDING DOORS AND BULKHEAD
A510
IMMEDIATELY ABOVE ARE TO REMAIN. PROTECT DURING CONSTRUCTION
12 12
7 7 7 7 7 7 ACTIVITIES.
14 2 16. REMOVE ENTIRE ARCHED SKYLIGHT CANOPY ASSEMBLY INCLUDING ALL
5 5 5 5 5 RELATED CURBS, STEEL FRAMING, COLUMNS, FOUNDATIONS, METAL PANELS,
5
SOFFIT, AND SIMILAR ITEMS.
H11 14 14 17. DISMANTLE GIFT SHOP DEMOUNTABLE WALL SYSTEM AND SALVAGE FOR
A508 14 7 REASSEMBLY.
4
4 A6 4 4 4 4 18. REMOVE ALUMINUM STOREFRONT AND GLASS SYSTEM.
A504 6 6 19. REMOVE PORTER STATIONS AND TURN OVER TO THE OWNER.
N 6 14 9 20. REMOVE EXISTING BAGGAGE CONVEYOR AND RELATED WALL OPENING
TC 7 7A6 7 7 7 7 7 FRAMES ENTIRELY.
4 21. REMOVE EXISTING CHAINLINK FENCE PARTITIONS ENTIRELY.
A505 8
8 8 C 22.
23.
SEE PLUMBING DRAWINGS FOR REMOVAL OF PLUMBING FIXTURES.
REMOVE TOILET PARTIONS AND VARIOUS TOILET ROOM ACCESSORIES.
TB.9 11 TB.9 B.9 24. PREP EXISTING FLOOR TO RECEIVE NEW FLOORING. SEE FINISH PLANS
14 6 14 6 14 14 AND DETAILS.
6 6 6
25. ILLUMINATED PIPE BOLLARDS. SEE DETAILS AND SPECS.
29 26. GRANITE BASE BELOW ALUMINUM FRAME AND METAL PANEL CLADDING.
8 SEE DETAILS.
27. METAL WALL PANEL SYSTEM. SEE SECTIONS AND DETAILS.
28. HIGH PRESSURE COMPACT LAMINATE PANEL SYSTEM. SEE SECTIONS AND
9 DETAILS.
M 1 2
A403 A403 29. INFILL OPENING WITH METAL STUDS AND GYPSUM WALLBOARD AND FINISH
A1 TO MATCH SURROUNDING SURFACES.
A501 8 30. COLUMNS COVERS. SEE DETAILS.
9
9 31. REASSEMBLE THE GIFT SHOP DEMOUNTABLE WALL SYSTEM AND RETURN TO
8 8 8 8 8 8 8
WORKING ORDER.
TB TB B 32.
33.
NEW PORTER STATION. SEE DETAILS.
EXISTING COLUMN COVERS TO REMAIN. PROTECT DURING CONSTRUCTION
9 ACTIVITIES.
9 9 34. PROVIDE 36" HIGH HPL SWING GATE WITH 1 PR SELF CLOSING HINGES AND
MAGNETIC CATCH. MOUNT GATE TO ADJACENT WALL AT 5" A.F.F.
PROVIDE CONCEALED FIRE-RETARDANT TREATED WOOD BLOCKING AT
HINGE LOCATIONS WITHIN WALL.
L 11
8

A6
A9 11 A6 10 10
A3
GENERAL NOTES:
A502
A509 A506 A503
A.THE AIRPORT SHALL REMAIN OPERATIONAL DURING THIS PROJECT.
THE CONTRACTOR SHALL PROVIDE ALL NECESSARY PROTECTIVE
J1 / A102 EQUIPMENT, SIGNAGE, LIGHTING, AND RELATED MATERIALS AS
10
REQUIRED BY THE AIRPORT AND THE CITY OF DAYTON.
B. THE CONTRACTOR SHALL NOTIFY THE OWNER IF DETERIORATED
CONDITIONS ARE DISCOVERED IN SPACES PREVIOUSLY CONCEALED
BY FINISH COMPONENTS. A DECISION ON A COURSE OF ACTION, IF
K ANY, WILL BE RENDERED BY THE OWNER SHORTLY THEREAFTER.
C. COORDINATE DEMOLITION WORK BETWEEN ALL TRADES. SEE
STRUCTURAL, PLUMBING, HVAC, AND ELECTRICAL DRAWINGS FOR
ADDITIONAL DEMOLITION RELATED WORK.

T3.4T3.5
T3.6 T5 T5.1 T6 T6.3
T6.4 T8 T9 9.5
Hb
J
J1 AREA "A" - DEMO
SCALE: 1/8" = 1'-0" A01

T3.4T3.5
T3.6 T5.1 T6 T6.3
T6.4 T8 T9 T9.5

T1 T2 T3 3.4 T4 T5 5.1 T7 T7.4 8


KEY PLAN:
H
G

VESTIBULE
A14
BAGGAGE
CLAIM
LOBBY
G A01

UNITED/AMERICAN
LOST
1.9 2 LUGGAGE
OFFICE
3 3.4 4 5 5.1 6 7 7.4 8 9 9.5 E D  F
A13 7'-9 3/8" 17'-8" 15'-0 1/2"

29
A B C
11"

D
3'-0"

TD TD
2'-6"

F
4'-11"
8'-6"

8'-6" 8'-6" 8'-6"


G2 G2 G2 STOR.
VESTIBULE
9'-8"

A02 VESTIBULE
2'-8"

34 34 STOR. SIM A08 STOR. A6 34 34 34 34


27 3'-3 1/16" 13'-2"
8'-6" A09 A14 A07 A510 8'-6"
B08
8'-6" A501 8'-6" 8'-6"
G2 G2 8'-6" G2
1'-2"

ALAMO BUDGET TYP. 27


1'-2"
5'-4 7/8"

5'-4 7/8"

G2 ENTERPRISE 27 G2
27 G2
16'-9 3/4"

A10 HERTZ A05 NATIONAL


A12

1'-2"
C

A05
A06

A04

A03
A10

A11
A11

BREAK RM L 8'-6" A06 8'-6" A04 AVIS


G2 G2 A03

1'-2"
A12

3'-2 3/16"
H11 FRAME A-8 ABOVE FRAME A-8 ABOVE
A508 A15 3'-11 1/8" 3'-0"
10'-9 1/8"

SIM 2'-11 15/16"


A508 A6 SIM

8'-0 3/16"
8'-1 15/16"

E
8'-1 9/16"

8'-1 9/16"
8'-2 1/16"

8'-0 1/4"
A504 A15 A15
8'-6" 28 8'-6" A508 8'-6" A508 28
30 26 26
G2 FRAME A-3 LH FRAME A-3 RH G2 G2
26
A6 30 30 FRAME A-3 LH
1 DD Set 11-3-2014
27
A505 No. Revisions / Submissions Date

1'-6"
C
3'-0"

TC TC
1'-6"

TB.9
1'-6"1'-6"

1'-6"
B.9

1'-6"
1'-6"
FRAME A-1 TYP. FRAME A-2 LH M9 FRAME A-2 RH FRAME A-4 FRAME A-2 LH
3'-0" 15'-9 13/16" 27 TYP. 26 26 26 TYP. 27

LWC
A506 TYP. 27 26
1'-6"

27 TB.9
SIGN TYPE S4 27
4'-0 9/16" 1'-3 7/16"
1'-6" 1'-6" 1'-6" 1'-3 7/8"
1'-3 11/16" 1'-6" 1'-6" 1'-6"
18'-9 13/16" 13'-7" 2'-6" 2'-6" 20'-8" 4'-0 5/16" 26'-11 15/16" 1'-6" 1'-6" 20'-8" 2'-6" 2'-6" 25'-0" 2'-6" 2'-6" 20'-8" 1'-4" 4'-0" 27'-0" 4'-0 1/8"

D SIM I NCOR P O R ATED


1 M9 2
A403 A506 A403 434 East First Street Dayton, OH 45402 937.223.6500
A1 4440 Garwood Place Richmond, IN 47374 765.966.3546
A501
TYP. 25

TB B
TB
DAYTON INTERNATIONAL AIRPORT
SIGN-TYPES 3600 TERMINAL DRIVE
SIGN TYPE S-5 SIGN TYPE 6'-0" 6'-0" 6'-0" 6'-0" SIGN TYPE VANDALIA, OH 45377
S-1 S-2 S-1 SIGN-TYPES
C S-5 (937) 454-8209

A6
PHASE ONE CANOPY
C:\Revit\14613.00-DAY-Canopy-ARCH-2014_sbg.rvt

A502
A509
A3 A9
A506
A2
A507
A6
A503 REPLACEMENT PROJECT
3600 TERMINAL DRIVE
T1 T2 T3 3.4 T4 T5 5.1 T7 T7.4 8

B
DEMO & NEW WORK FLOOR PLAN - AREA
"A"
PROGRESS Comm. No.

14613.00
Date

JAN 15, 2015


DRAWING
A1 AREA "A" - NEW WORK
NOT FOR Drawn

DCC/SBG
Drawing No.

CONSTRUCTION
T3.4T3.5
T3.6 T5.1 T6 T6.3
T6.4 T8 T9 T9.5
A Hb
SCALE: 1/8" = 1'-0" A01
3/26/2015 Checked

EGS/JCF
A101
12:33:39 PM
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 © 2013 LWC, INCORPORATED
1 2 3 4 5 6 7 8 9 10 11 12 13 14T16.4 15 16 17 18 19 20
3/26/2015 12:35:17 PM T9.9 T10.6
T10.9 T11.9
T12 T14
T14.2 T15.2
T15.1 T16.1 T18.1

T9.5 T10 T11 T11.8 T14.1 T15 T16 T17 T18 18.1 SHEET NOTES:
FLOOR PLAN LEGEND
TYPICAL FOR ALL SHEETS. SEE SHEET G001 FOR ADDITIONAL SYMBOLS
1. REMOVE EXISTING DOOR AND FRAME. PREP FOR NEW FINISH WORK.
R 2. CUT OPENING INTO EXISTING PARTITION FOR NEW DOOR OR CASED
OPENING.
EXISTING WALLS 3. REMOVE TRANSACTION COUNTERS AND RELATED WALLS.
4. REMOVE EXISTING PARTITION ENTIRELY.
5. REMOVE DOOR AND FRAME.
CMU
6. REMOVE PORTION OF EXTERIOR METAL STUD WALL. REMOVE MASONRY
VENEER WAINSCOT AND METAL PANEL SYSTEMS ABOVE. SEE SECTIONS
METAL STUDS WITH GYPSUM WALL
FOR HEIGHT. PROVIDE SHORING AND BRACING AS REQUIRED.
9.5 9.9
10 10.6
11 11.8 14.2 15
15.2 16 16.4 17 18 18.1 BOARD & SOUND ATTENUATION
BLANKETS, U.N.O. 7. REMOVE EXISTING CARPET TILE FLOOR COVER AND STOCKPILE FOR
REINSTALLATION.
8. REMOVE ENTIRE COLUMN COVER. SEE STRUCTURAL DRAWINGS FOR
CONTROL JOINT
17 REMOVAL OF STEEL COLUMNS.
9. REMOVE ENTIRE SIDEWALK, CURB, AND RELATED PAVERS, RAMPS, AND
Q ITEMS EMBEDDED IN CONCRETE.
OVERHEAD ITEM 10. SEE CIVIL DRAWINGS FOR ADDITIONAL PAVEMENT REMOVAL AND

D ITEM TO BE DEMOLISHED
11.
REPLACEMENT IN THE DRIVEWAY.
REMOVE ENTIRE EXISTING ARCHED SKYLIGHT ASSEMBLY AND ANY
RELATED CURBS, FRAMING, METAL PANELS, AND SIMILAR ITEMS.
12. EXISTING SLIDING DOOR ASSEMBLY AND BULKHEAD IMMEDIATELY ABOVE
11 IS TO REMAIN. PROTECT DURING CONSTRUCTION ACTIVITIES.
5 5 ITEM TO REMAIN
11 13. REMOVE ALUMINUM FRAME AND GLASS IMMEDIATELY ABOVE THE SLIDING
13 DOORS FROM THE TOP OF THE BULKHEAD TO THE BOTTOM OF THE
UNDERGROUND SANITARY LINE ARCHED SKYLIGHT.
12 14. REMOVE ENTIRE METAL PANEL SYSTEM AND MASONRY VENEER AND
5
7 4 RELATED ANCHORS FROM FACE OF EXISTING METAL STUD EXTERIOR WALL.
P 4 CONCRETE WALK 15. REMOVE ENTIRE EXISTING ARCHED SKYLIGHT ASSEMBLY AND ANY
RELATED CURBS, FRAMING, METAL PANELS, AND SIMILAR ITEMS OVER THE
VESTIBULE. ALSO REMOVE THE VERTICAL ALUMINUM AND GLASS FROM
7 7 OVER THE ENTRANCE DOORS. THE SLIDING DOORS AND BULKHEAD
7 9 11
7 5 IMMEDIATELY ABOVE ARE TO REMAIN. PROTECT DURING CONSTRUCTION
18 14
7 ACTIVITIES.
14 9 5 A1 A8 8 16. REMOVE ENTIRE ARCHED SKYLIGHT CANOPY ASSEMBLY INCLUDING ALL
A512 A501 15 RELATED CURBS, STEEL FRAMING, COLUMNS, FOUNDATIONS, METAL PANELS,
A1 6 11 8 SOFFIT, AND SIMILAR ITEMS.
A513 8
C 17. DISMANTLE GIFT SHOP DEMOUNTABLE WALL SYSTEM AND SALVAGE FOR
TB.9
4'-8"
TB.9 B.9 18.
REASSEMBLY.
REMOVE ALUMINUM STOREFRONT AND GLASS SYSTEM.
14 19. REMOVE PORTER STATIONS AND TURN OVER TO THE OWNER.
N 14 12 12 20. REMOVE EXISTING BAGGAGE CONVEYOR AND RELATED WALL OPENING
6 6 6 FRAMES ENTIRELY.
8 14 12 14 9 21. REMOVE EXISTING CHAINLINK FENCE PARTITIONS ENTIRELY.
9 19 22. SEE PLUMBING DRAWINGS FOR REMOVAL OF PLUMBING FIXTURES.
2
23. REMOVE TOILET PARTIONS AND VARIOUS TOILET ROOM ACCESSORIES.

9
3 24. PREP EXISTING FLOOR TO RECEIVE NEW FLOORING. SEE FINISH PLANS
A403 AND DETAILS.
9 25. ILLUMINATED PIPE BOLLARDS. SEE DETAILS AND SPECS.
8 8 8 8 8 8 26. GRANITE BASE BELOW ALUMINUM FRAME AND METAL PANEL CLADDING.
SEE DETAILS.
9 8 27. METAL WALL PANEL SYSTEM. SEE SECTIONS AND DETAILS.
TB 9 TB B 28. HIGH PRESSURE COMPACT LAMINATE PANEL SYSTEM. SEE SECTIONS AND
DETAILS.
M 9 9 29. INFILL OPENING WITH METAL STUDS AND GYPSUM WALLBOARD AND FINISH
9 TO MATCH SURROUNDING SURFACES.
30. COLUMNS COVERS. SEE DETAILS.
9 31. REASSEMBLE THE GIFT SHOP DEMOUNTABLE WALL SYSTEM AND RETURN TO
WORKING ORDER.
A1 32. NEW PORTER STATION. SEE DETAILS.
A516 33. EXISTING COLUMN COVERS TO REMAIN. PROTECT DURING CONSTRUCTION
ACTIVITIES.
34. PROVIDE 36" HIGH HPL SWING GATE WITH 1 PR SELF CLOSING HINGES AND
10 MAGNETIC CATCH. MOUNT GATE TO ADJACENT WALL AT 5" A.F.F.
10 PROVIDE CONCEALED FIRE-RETARDANT TREATED WOOD BLOCKING AT
ALIGN SAWCUT HINGE LOCATIONS WITHIN WALL.
L WITH CORNER
J1 / A103

16 GENERAL
A. NOTES:
THE AIRPORT SHALL REMAIN OPERATIONAL DURING THIS PROJECT.
THE CONTRACTOR SHALL PROVIDE ALL NECESSARY PROTECTIVE
T9.9 T10.9 T11.9
T12 T14
T14.2 T15.1 T16.1 T16.4 T18.1 EQUIPMENT, SIGNAGE, LIGHTING, AND RELATED MATERIALS AS
REQUIRED BY THE AIRPORT AND THE CITY OF DAYTON.
B. THE CONTRACTOR SHALL NOTIFY THE OWNER IF DETERIORATED
CONDITIONS ARE DISCOVERED IN SPACES PREVIOUSLY CONCEALED
A1 BY FINISH COMPONENTS. A DECISION ON A COURSE OF ACTION, IF
A511 - / ---
K ANY, WILL BE RENDERED BY THE OWNER SHORTLY THEREAFTER.
C. COORDINATE DEMOLITION WORK BETWEEN ALL TRADES. SEE
STRUCTURAL, PLUMBING, HVAC, AND ELECTRICAL DRAWINGS FOR
ADDITIONAL DEMOLITION RELATED WORK.

T9.5 T10 T10.6T11 T11.8 A1 T14.1 T15T15.2 T16 T17 T18 18.1
A516

J
J1 AREA "B" - DEMO
SCALE: 1/8" = 1'-0" A01

KEY PLAN:
H
G
T9.5
9.5 9.9 T9.9
T10 10.6T10.6
T10.9
10.9 T11 T11.8 T11.9
T12
11.9 12/R 14/T T14
14.1
T14.2 T14.1 T15 T15.215.2
T15.1
15.1 T16 T16.1
16.1 T16.4
16.4 T17 T18 T18.1
18.1

G 9.5 9.9
10
BAGGAGE
10.6
11 11.8 14.2 15
15.2 16 16.4 17
TICKET 18 18.1
CLAIM LOBBY
LOBBY C01
A01
E D  F

D
CENTRAL A B C
LOBBY
B01
STOR. STAIR STOR. VESTIBULE
F B07 S1 STAIR B03 B02
LOUNGE 31

1'-2"
S2 27
B06

2'-6 1/16"
FRAME A-11 & ADD ALT. A-12 ABOVE LOUNGE
B04
3'-2 9/16"

27
FRAME A-8 ABOVE

28

8'-0 3/16"
FRAME A-3- RH FRAME A-3 LH
A1 27 VESTIBULE 27 TYP.
TYP. 26 30 A512 B05 30 26

1'-6"
E A1
TB.9 A513 TB.9
C
FRAME A-2 LH SIGN TYPE FRAME A-5 LH G14
33 33
FRAME A-5 RH FRAME A-2 RH
B.9
No. Revisions / Submissions Date

1'-6"
27 27 27
26 S4 A501
TYP. 26 SIGN TYPE TYP. 26
TYP. 26 S4
1'-3 3/8"

D
2
1
A403

20'-0 7/16" 2'-6" 2'-6" 23'-1" 3'-3" 1'-10" 13'-10"


FRAME A-9 & A-10 ABOVE

41'-10" 14'-4" 1'-10" 3'-3" 23'-1" 1'-10" 3'-2" 20'-0"


4'-0 7/8"
1'-3 1/8"
1'-6" 1'-6" 26'-11 15/16" 1'-6"
3
A403
1'-6"
4'-0 7/16"
1'-3 9/16"
LWC
I NCOR P O R ATED
434 East First Street Dayton, OH 45402 937.223.6500
TB TB B 4440 Garwood Place Richmond, IN 47374 765.966.3546
TYP. 25 TYP. 25
SIGN TYPE SIGN TYPE
S-1 S-1 DAYTON INTERNATIONAL AIRPORT
A1 3600 TERMINAL DRIVE
A516 VANDALIA, OH 45377
C SIGN-TYPES
S-7 SIGN-TYPES (937) 454-8209
S-7

PHASE ONE CANOPY


C:\Revit\14613.00-DAY-Canopy-ARCH-2014_sbg.rvt

TYP. 25
REPLACEMENT PROJECT
3600 TERMINAL DRIVE
SIGN TYPE S2

B T9.9 T10.9 T11.9


T12 T14
T14.2 T15.1 T16.1 T16.4 T18.1
DEMO & NEW WORK FLOOR PLAN - AREA
"B"
PROGRESS Comm. No.

14613.00
Date

JAN 15, 2015


T9.5
9.5 9.9 T10 10.6T10.6
10.9 T11 T11.8 11.9 12/R A1 14/T 14.1 T14.1 T15 T15.215.2
15.1 T16 16.1 16.4 T17 T18 18.1 DRAWING
NOT FOR
A516
Drawn Drawing No.

DCC/SBG
A
CONSTRUCTION
A1 AREA "B" - NEW WORK 3/26/2015 Checked

EGS/JCF
A102
SCALE: 1/8" = 1'-0" A01 12:35:17 PM
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 © 2013 LWC, INCORPORATED
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
3/26/2015 12:38:11 PM
SHEET NOTES:
1. REMOVE EXISTING DOOR AND FRAME. PREP FOR NEW FINISH WORK.
R 2. CUT OPENING INTO EXISTING PARTITION FOR NEW DOOR OR CASED
OPENING.
3. REMOVE TRANSACTION COUNTERS AND RELATED WALLS.
4. REMOVE EXISTING PARTITION ENTIRELY.
5. REMOVE DOOR AND FRAME.
6. REMOVE PORTION OF EXTERIOR METAL STUD WALL. REMOVE MASONRY
VENEER WAINSCOT AND METAL PANEL SYSTEMS ABOVE. SEE SECTIONS
T19 T20 T21 T21.4 T22 T23 T23.2 T24 T25 T26 T26.2 FOR HEIGHT. PROVIDE SHORING AND BRACING AS REQUIRED.
7. REMOVE EXISTING CARPET TILE FLOOR COVER AND STOCKPILE FOR
REINSTALLATION.
8. REMOVE ENTIRE COLUMN COVER. SEE STRUCTURAL DRAWINGS FOR
REMOVAL OF STEEL COLUMNS.
9. REMOVE ENTIRE SIDEWALK, CURB, AND RELATED PAVERS, RAMPS, AND
Q ITEMS EMBEDDED IN CONCRETE.
10. SEE CIVIL DRAWINGS FOR ADDITIONAL PAVEMENT REMOVAL AND
19 20 21 21.4 22 23 23.2 24 25 26 26.2 11.
REPLACEMENT IN THE DRIVEWAY.
REMOVE ENTIRE EXISTING ARCHED SKYLIGHT ASSEMBLY AND ANY
RELATED CURBS, FRAMING, METAL PANELS, AND SIMILAR ITEMS.
12. EXISTING SLIDING DOOR ASSEMBLY AND BULKHEAD IMMEDIATELY ABOVE
IS TO REMAIN. PROTECT DURING CONSTRUCTION ACTIVITIES.
13. REMOVE ALUMINUM FRAME AND GLASS IMMEDIATELY ABOVE THE SLIDING
DOORS FROM THE TOP OF THE BULKHEAD TO THE BOTTOM OF THE
ARCHED SKYLIGHT.

5
D 14. REMOVE ENTIRE METAL PANEL SYSTEM AND MASONRY VENEER AND
RELATED ANCHORS FROM FACE OF EXISTING METAL STUD EXTERIOR WALL.
P 4 4
15. REMOVE ENTIRE EXISTING ARCHED SKYLIGHT ASSEMBLY AND ANY
3 RELATED CURBS, FRAMING, METAL PANELS, AND SIMILAR ITEMS OVER THE
5 4 11
4 VESTIBULE. ALSO REMOVE THE VERTICAL ALUMINUM AND GLASS FROM
OVER THE ENTRANCE DOORS. THE SLIDING DOORS AND BULKHEAD
13 IMMEDIATELY ABOVE ARE TO REMAIN. PROTECT DURING CONSTRUCTION
12 ACTIVITIES.
5 16. REMOVE ENTIRE ARCHED SKYLIGHT CANOPY ASSEMBLY INCLUDING ALL
4 RELATED CURBS, STEEL FRAMING, COLUMNS, FOUNDATIONS, METAL PANELS,
4 7 7 4
7 7 SOFFIT, AND SIMILAR ITEMS.
18 4 4 17. DISMANTLE GIFT SHOP DEMOUNTABLE WALL SYSTEM AND SALVAGE FOR
4 7
4 18 4 REASSEMBLY.
7 14
5 18. REMOVE ALUMINUM STOREFRONT AND GLASS SYSTEM.
7 14 19. REMOVE PORTER STATIONS AND TURN OVER TO THE OWNER.
8 8
N 5
7 20. REMOVE EXISTING BAGGAGE CONVEYOR AND RELATED WALL OPENING
8 7 6 9 8 FRAMES ENTIRELY.
7 8 21. REMOVE EXISTING CHAINLINK FENCE PARTITIONS ENTIRELY.
22. SEE PLUMBING DRAWINGS FOR REMOVAL OF PLUMBING FIXTURES.
11 C 23. REMOVE TOILET PARTIONS AND VARIOUS TOILET ROOM ACCESSORIES.
TB.9
6
TB.9 B.9 24. PREP EXISTING FLOOR TO RECEIVE NEW FLOORING. SEE FINISH PLANS
AND DETAILS.
M17 18 19 18 14 6 14 18 14 25. ILLUMINATED PIPE BOLLARDS. SEE DETAILS AND SPECS.
14 A601 6 14 6 5 26. GRANITE BASE BELOW ALUMINUM FRAME AND METAL PANEL CLADDING.
18
SEE DETAILS.
27. METAL WALL PANEL SYSTEM. SEE SECTIONS AND DETAILS.
19 28 28. HIGH PRESSURE COMPACT LAMINATE PANEL SYSTEM. SEE SECTIONS AND
9 21 DETAILS.
M 8 8 29. INFILL OPENING WITH METAL STUDS AND GYPSUM WALLBOARD AND FINISH
A5 TO MATCH SURROUNDING SURFACES.
A601 30. COLUMNS COVERS. SEE DETAILS.
9 9 9 31. REASSEMBLE THE GIFT SHOP DEMOUNTABLE WALL SYSTEM AND RETURN TO
WORKING ORDER.
8 8 8 8 8 8 32. NEW PORTER STATION. SEE DETAILS.
TB TB B 33. EXISTING COLUMN COVERS TO REMAIN. PROTECT DURING CONSTRUCTION
ACTIVITIES.
34. PROVIDE 36" HIGH HPL SWING GATE WITH 1 PR SELF CLOSING HINGES AND
MAGNETIC CATCH. MOUNT GATE TO ADJACENT WALL AT 5" A.F.F.
PROVIDE CONCEALED FIRE-RETARDANT TREATED WOOD BLOCKING AT
HINGE LOCATIONS WITHIN WALL.
L
10
10 11
10 GENERAL
A.
NOTES:
THE AIRPORT SHALL REMAIN OPERATIONAL DURING THIS PROJECT.
THE CONTRACTOR SHALL PROVIDE ALL NECESSARY PROTECTIVE
EQUIPMENT, SIGNAGE, LIGHTING, AND RELATED MATERIALS AS
REQUIRED BY THE AIRPORT AND THE CITY OF DAYTON.
10 B. THE CONTRACTOR SHALL NOTIFY THE OWNER IF DETERIORATED
CONDITIONS ARE DISCOVERED IN SPACES PREVIOUSLY CONCEALED
BY FINISH COMPONENTS. A DECISION ON A COURSE OF ACTION, IF
K ANY, WILL BE RENDERED BY THE OWNER SHORTLY THEREAFTER.
C. COORDINATE DEMOLITION WORK BETWEEN ALL TRADES. SEE
T21.4 T23.2 STRUCTURAL, PLUMBING, HVAC, AND ELECTRICAL DRAWINGS FOR
ADDITIONAL DEMOLITION RELATED WORK.

J
T26.2
J1 AREA "C" - DEMO
SCALE: 1/8" = 1'-0" A01

KEY PLAN:
H
G

T18.1
18.1 T21.4 T23.2 T26.2

T19 T20 T21 21.4 T22 T23 T24 T25 T26 26.1

E D  F

18.1 19 20 21 21.4 22 23 23.2 24 25 26 26.2


A B C

3'-6" 3'-6"
F G2 G2

TD D
TD
7'-5 3/8" 11 1/4" 9'-1 15/16" 4 7/8"

3'-6" TICKET
STOR.
STOR. G2 WHEELCHAIRS STOR. VESTIBULE
3'-6" C02 LOBBY
C06 G2 C04 C03
C08 C01
3'-1 1/16"

3'-2 9/16"

3'-2 9/16"
1'-2"

11'-7 1/8" 6'-0" 11'-7 1/8" 27


1'-2"

LOUNGE 27
C05 FRAME A8-ABOVE
E C06A C06B

SIM 3'-11 1/8" 1'-6" 3'-11 1/8"


A15 1'-6"
8'-0 3/16"

1'-6" 8'-0 3/16"

1'-6" 1'-6"
A508 No. Revisions / Submissions Date
7'-6 3/8"

5'-7 5/8"

1'-6" 5'-7 5/8"

27 28
5'-8"

30
J9 FRAME A-6 30
A601 FRAME A-3 RH 30
FRAME A-3 LH
FRAME A-3 RH 30
C
LWC
TC TC
1'-2 5/16"

1'-6"

B.9
3 1/4"

FRAME A-2 RH FRAME A-4 FRAME A-2 LH FRAME A-2 LH FRAME A-5
M17 26 27
1'-6"

26 FRAME A-7 TB.9


1'-6"

26 26 26 27
D TB.9 27 A601
27
I NCOR P O R ATED
PORTER STATION 4'-7 5/8" SIGN TYPE S3
2'-2 7/16" 4'-7 3/8"
2'-3 9/16" 2'-6" 2'-6" 2'-6" 27 1'-6"
1'-3 7/8" 27 434 East First Street Dayton, OH 45402 937.223.6500
21'-11 1/2" 2'-6 1/16" 4'-0" 8'-3" 4'-0" 25'-0" 20'-8" 1'-3 1/4" 4'-0 3/4"1'-6"
1'-6" 27'-0" 1'-6" 4'-0 1/8" 20'-8" 2'-6" 2'-6" 23'-1" 4'-5" 30'-0" 6'-0" 3'-10 3/4" 7'-0" 9'-8" 4440 Garwood Place Richmond, IN 47374 765.966.3546
32
32
A5
A601
DAYTON INTERNATIONAL AIRPORT
3600 TERMINAL DRIVE
TB B
TB VANDALIA, OH 45377
C (937) 454-8209
SIGN TYPE SIGN TYPE SIGN TYPE
S-1 S-2 S-2

PHASE ONE CANOPY


C:\Revit\14613.00-DAY-Canopy-ARCH-2014_sbg.rvt

REPLACEMENT PROJECT
SIGN-TYPES
S-8
SIGN-TYPES
S-9
SIGN-TYPES
S-10 3600 TERMINAL DRIVE
B
DEMO & NEW WORK FLOOR PLAN - AREA
"C"
T18.1
18.1 T21.4 T23.2 T26.2
PROGRESS Comm. No.

14613.00
Date

JAN 15, 2015


DRAWING
T19 T20 T21 21.4 T22 T23 T24 T25 T26 26.1

NOT FOR Drawn

DCC/ SBG
Drawing No.

A
CONSTRUCTION
A1 AREA "C" - NEW WORK 3/26/2015 Checked

EGS/JCF
A103
SCALE: 1/8" = 1'-0" A01 12:38:11 PM
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 © 2013 LWC, INCORPORATED
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
3/26/2015 1:15:31 PM T8.8 T9 T9.7 T9.9 T10 T10.2 T10.5 T10.6 T10.9 T11 T11.8 T11.9 T12
SHEET NOTES:
TJ TJ

1. REMOVE EXISTING DOOR AND FRAME. PREP FOR NEW FINISH WORK.
R TH.8 TH.8 2. CUT OPENING INTO EXISTING PARTITION FOR NEW DOOR OR CASED
OPENING.
3. REMOVE TRANSACTION COUNTERS AND RELATED WALLS.
4. REMOVE EXISTING PARTITION ENTIRELY.
ACOUSTICAL CEILING 5. REMOVE DOOR AND FRAME.
6. REMOVE PORTION OF EXTERIOR METAL STUD WALL. REMOVE MASONRY
VENEER WAINSCOT AND METAL PANEL SYSTEMS ABOVE. SEE SECTIONS
FOR HEIGHT. PROVIDE SHORING AND BRACING AS REQUIRED.
7. REMOVE EXISTING CARPET TILE FLOOR COVER AND STOCKPILE FOR
REINSTALLATION.
8. REMOVE ENTIRE COLUMN COVER. SEE STRUCTURAL DRAWINGS FOR
REMOVAL OF STEEL COLUMNS.
Q 9. REMOVE ENTIRE SIDEWALK, CURB, AND RELATED PAVERS, RAMPS, AND
GLASS TILE FEATURE WALL - ITEMS EMBEDDED IN CONCRETE.
SEE ELEVATIONS 10. SEE CIVIL DRAWINGS FOR ADDITIONAL PAVEMENT REMOVAL AND
REPLACEMENT IN THE DRIVEWAY.
SIM 11. REMOVE ENTIRE EXISTING ARCHED SKYLIGHT ASSEMBLY AND ANY
H9 TH.2 TH.2 RELATED CURBS, FRAMING, METAL PANELS, AND SIMILAR ITEMS.
CONTINUOUS BLOCKING AS SHOWN A104
12. EXISTING SLIDING DOOR ASSEMBLY AND BULKHEAD IMMEDIATELY ABOVE
IS TO REMAIN. PROTECT DURING CONSTRUCTION ACTIVITIES.
13. REMOVE ALUMINUM FRAME AND GLASS IMMEDIATELY ABOVE THE SLIDING
DOORS FROM THE TOP OF THE BULKHEAD TO THE BOTTOM OF THE
ARCHED SKYLIGHT.
22
14. REMOVE ENTIRE METAL PANEL SYSTEM AND MASONRY VENEER AND
SEALANT JOINT TO MATCH RELATED ANCHORS FROM FACE OF EXISTING METAL STUD EXTERIOR WALL.
GLASS TILE WALL - SEE ELEVATIONS
P GROUT BETWEEN TILE AND SST 15. REMOVE ENTIRE EXISTING ARCHED SKYLIGHT ASSEMBLY AND ANY
BASE RELATED CURBS, FRAMING, METAL PANELS, AND SIMILAR ITEMS OVER THE
VESTIBULE. ALSO REMOVE THE VERTICAL ALUMINUM AND GLASS FROM
SST BASE, 16 GA SS-2 ADHERED TO 3/8" MDF 3/8" EPOXY TERRAZZO FLOOR OVER THE ENTRANCE DOORS. THE SLIDING DOORS AND BULKHEAD
BACKER, FULL RETURNS AT TOP AND END 21 21 IMMEDIATELY ABOVE ARE TO REMAIN. PROTECT DURING CONSTRUCTION
FACES. COORDINATE HEIGHT OF BASE WITH TILE 1/4" WIDE SST EDGE STRIP ACTIVITIES.
SPACING. ADJUST HEIGHT OF BASE SUCH THAT 16. REMOVE ENTIRE ARCHED SKYLIGHT CANOPY ASSEMBLY INCLUDING ALL
TOP COURSE OF TILE MATCHES 8'-0 1/4" CEILING CARPETING AS SPECIFIED RELATED CURBS, STEEL FRAMING, COLUMNS, FOUNDATIONS, METAL PANELS,
HEIGHT AND EXTENDS 1/4" ABOVE SST SOFFIT, AND SIMILAR ITEMS.
ARMATURE. SST PATTERN ORIENTED TO LONG 17. DISMANTLE GIFT SHOP DEMOUNTABLE WALL SYSTEM AND SALVAGE FOR
DIRECTION. TG.5 TG.5 REASSEMBLY.
SIM 18. REMOVE ALUMINUM STOREFRONT AND GLASS SYSTEM.
EPOXY RESIN SEALANT JOINT BETWEEN SST BASE 5 19. REMOVE PORTER STATIONS AND TURN OVER TO THE OWNER.
N AND TERRAZZO D9
A104 21 20. REMOVE EXISTING BAGGAGE CONVEYOR AND RELATED WALL OPENING
DIMENSION FROM FACE OF FRAMES ENTIRELY.
3/8" EPOXY TERRAZZO FLOOR SUBSTRATE TO JOINT BTW 21. REMOVE EXISTING CHAINLINK FENCE PARTITIONS ENTIRELY.
TERRAZZO AND CARPET 22. SEE PLUMBING DRAWINGS FOR REMOVAL OF PLUMBING FIXTURES.
23. REMOVE TOILET PARTIONS AND VARIOUS TOILET ROOM ACCESSORIES.
24. PREP EXISTING FLOOR TO RECEIVE NEW FLOORING. SEE FINISH PLANS
2'-0" 4 AND DETAILS.
SIM
A9 25. ILLUMINATED PIPE BOLLARDS. SEE DETAILS AND SPECS.
A104 26. GRANITE BASE BELOW ALUMINUM FRAME AND METAL PANEL CLADDING.
SEE DETAILS.
27. METAL WALL PANEL SYSTEM. SEE SECTIONS AND DETAILS.
28. HIGH PRESSURE COMPACT LAMINATE PANEL SYSTEM. SEE SECTIONS AND
DETAILS.
M
SECT DETAIL AT TERRAZZO TO SECTION AT RESTROOM FEATURE 29. INFILL OPENING WITH METAL STUDS AND GYPSUM WALLBOARD AND FINISH

D9 SECT DETAIL AT SST BASE A9 M9 22 24 4 TO MATCH SURROUNDING SURFACES.

CARPET TRANS WALL 5


30.
31.
COLUMNS COVERS. SEE DETAILS.
REASSEMBLE THE GIFT SHOP DEMOUNTABLE WALL SYSTEM AND RETURN TO
WORKING ORDER.
SCALE: 3" = 1'-0" A104 SCALE: 3" = 1'-0" A104 SCALE: 3/4" = 1'-0" A702 23
4 32. NEW PORTER STATION. SEE DETAILS.
TF.5 TF.5 33. EXISTING COLUMN COVERS TO REMAIN. PROTECT DURING CONSTRUCTION
ACTIVITIES.
3 1/2" 34. PROVIDE 36" HIGH HPL SWING GATE WITH 1 PR SELF CLOSING HINGES AND
2 MAGNETIC CATCH. MOUNT GATE TO ADJACENT WALL AT 5" A.F.F.
SS-1 STAINLESS STEEL PROFILES W/ FULL PROVIDE CONCEALED FIRE-RETARDANT TREATED WOOD BLOCKING AT
3 1/2" 24
RETURNS AT END CONDITION AND HINGE LOCATIONS WITHIN WALL.
3/4"

ATTACHED WITH CONCEALED 24


L FASTENERS, MATCHING PROFILE 4

3/4"
BEYOND. PROFILE TO MATCH RECENT
RENOVATIONS TO OTHER CONCOURSE
TF TF
RESTROOMS.

2 GENERAL
A.
NOTES:
THE AIRPORT SHALL REMAIN OPERATIONAL DURING THIS PROJECT.
1
THE CONTRACTOR SHALL PROVIDE ALL NECESSARY PROTECTIVE
EQUIPMENT, SIGNAGE, LIGHTING, AND RELATED MATERIALS AS
SS-1 BONDED TO MDF BACKER W/ FULL REQUIRED BY THE AIRPORT AND THE CITY OF DAYTON.
RETURNS AT END CONDITION AND B. THE CONTRACTOR SHALL NOTIFY THE OWNER IF DETERIORATED
ATTACHED WITH CONCEALED CONDITIONS ARE DISCOVERED IN SPACES PREVIOUSLY CONCEALED
FASTENERS. BY FINISH COMPONENTS. A DECISION ON A COURSE OF ACTION, IF
K ANY, WILL BE RENDERED BY THE OWNER SHORTLY THEREAFTER.
1'-4"

C. COORDINATE DEMOLITION WORK BETWEEN ALL TRADES. SEE


RESTROOM SIGNAGE (NOT IN 20 STRUCTURAL, PLUMBING, HVAC, AND ELECTRICAL DRAWINGS FOR

1'-4"
CONTRACT). PROVIDE BLOCKING FOR ADDITIONAL DEMOLITION RELATED WORK.
ATTACHMENT. GC TO COORDINATE T8.8 T9.7 T10.2 T10.5
LOCATIONS.
3/8"

SS-1 STAINLESS STEEL PROFILE


TILE WALL - SEE FINISH PLANS
CONTINUOUS BLOCKING. PROVIDE
SEALANT INTERNAL WALL BLOCKING AS REQUIRED
HM FRAME PER SCHEDULE FOR ATTACHMENT.
J
3/4"

3/4"
3"
SS-1 TRIM ADHERED TO BLOCKING AT GAP ABOVE PORTAL

3/8" SST CORNER TRIM BEYOND, EXTEND ABOVE


3" FLOOR PLAN LEGEND
CEILING AS SHOWN TYPICAL FOR ALL SHEETS. SEE SHEET G001 FOR ADDITIONAL SYMBOLS

GYP BD CEILING GLASS TILE FEATURE WALL. TOP


COURSE OF TILE TO EXTEND 1/4" ABOVE
GLASS TILE FEATURE WALL BEYOND SST PROFILE. T9 T9.9 T10 T10.6 T10.9 T11 T11.8 T11.9 T12
EXISTING WALLS
H
PLAN DETAIL AT HM FRAME IN SECT DETAIL AT RESTROOM
H1 H5 H9 SECT DETAIL AT SST ARMATURE H13 RESTROOMS - DEMO
CMU

TILE WALL (TYP) PORTAL METAL STUDS WITH GYPSUM WALL


BOARD & SOUND ATTENUATION

SCALE: 3" = 1'-0" SCALE: 3" = 1'-0" A702 SCALE: 3" = 1'-0" A104 SCALE: 1/8" = 1'-0" A01 BLANKETS, U.N.O.

CONTROL JOINT
T6.8 T7.3 T8 T8.2 T8.8 T9 T9.5 T9.7 T9.9
T10 T10.2 T10.5 T10.6
T10.9
T11 T11.9
T12
T11.8
55'-7 1/4"

10'-0" 5'-0" 10'-0" 7 1/4" 30'-0" OVERHEAD ITEM


3/8" SST CORNER TRIM & SEALANT
G 3/8" SST CORNER TRIM & SEALANT TJ TJ ITEM TO BE DEMOLISHED

TILE WALL - SEE FINISH PLANS B19A


TILE WALL - SEE FINISH PLANS FOR 17'-0" 13'-0"
FOR LOCATIONS OF GLASS TILE ITEM TO REMAIN

7'-0"
LOCATIONS OF GLASS TILE VS STD TILE TH.8 TH.8
VS STD TILE

UNDERGROUND SANITARY LINE

21'-1 7/16"
CONCRETE WALK
MECHANICAL MECHANICAL

7'-0"
G3 CAR B19 B20
3/8" SST RENTAL
CORNER STORAGE
F TRIM & BAYS
SEALANT B18
1/2"

7'-1 7/16"
B19
3 1/2"
3"

TH.2 B18 TH.2


20'-0" 5'-0" 21'-3 11/16" 33'-1 1/2" 13'-3 15/16"
8"

B16B
S

7'-0"
G3 S S S S
G3 F6 G3 G3
E 5/8" PLYWOOD
B16D B24B
MISC. WOOD FRAMING

2'-0"
2'-0"
SS-1 STAINLESS STEEL VERTICAL S B16C
PROFILE. ADHERED TO MDF G3 2'-0" 10'-7 1/4" No. Revisions / Submissions Date

8'-2 3/4"
BACKER AND ATTACHED TO S
BLOCKING ENGAGED INTO LT G3
FAMILY RR
GA FRAMING B22 FAMILY RR

10'-2 3/4"
B22
BAGGAGE S CENTRAL

LWC
B21
CLAIM G2 LOBBY
S

17'-2"
A20 G3 B01
CAFE A
CORRIDOR G2
STORAGE

B21
19'-2 3/16"
B16 WOMEN'S
B17
D I NCOR P O R ATED
PLAN DETAIL AT GLASS TILE PLAN DETAIL AT SST ARMATURE TG.5 RESTROOM TG.5

D1 D5 S 12'-4 7/8"
B23
10'-8" 4'-2 7/8" 5'-0" 434 East First Street Dayton, OH 45402 937.223.6500
OUTSIDE CORNER (TYP) AT PORTAL
7'-7 3/4"
G2
4440 Garwood Place Richmond, IN 47374 765.966.3546

B17
SCALE: 3" = 1'-0" SCALE: 3" = 1'-0" A701

DAYTON INTERNATIONAL AIRPORT


3600 TERMINAL DRIVE

B15A
VANDALIA, OH 45377

3'-0"
3/8" SST CORNER TRIM & SEALANT

16'-11 15/16"
C USO RESTROOM
SST BASE
S LOUNGE LOBBY (937) 454-8209
G3 B15 B24
F17 S
A702 G2
PHASE ONE CANOPY
C:\Revit\14613.00-DAY-Canopy-ARCH-2014_sbg.rvt

REPLACEMENT PROJECT
MEN'S
G2 7'-7" RESTROOM

18'-0 3/8"
1/2"

3600 TERMINAL DRIVE


B12
SEALANT S
G2
3 1/2"

TF.5 SIM TF.5


SEALANT B16A B15 S
A12
B14
3"

S G2
G3 USO A701
B

B12
GREETERS

10'-7 1/4"
BREAK

8"
B13

12'-8 9/16"
G2
A B14
JANITOR
CLOSET
DEMO & NEW WORK - RESTROOMS
SS-1 STAINLESS STEEL S B11

2'-0"
VERTICAL PROFILE. ADHERED
TO MDF BACKER AND TF
G3
TF PROGRESS Comm. No.

14613.00
Date

JAN 15, 2015


DRAWING
ATTACHED TO BLOCKING
ENGAGED LT GA FRAMING BAGGAGE CAFE
CLAIM
NOT FOR
B10 Drawn Drawing No.
LOBBY
A01
DCC
A
PLAN DETAIL AT SST BASE CONSTRUCTION
A104
T6.8 T7.3 T8 T8.2 T8.8 T9 T9.5 T9.7 T9.9 T10 T10.2 T10.5 T10.6 T10.9 T11 T11.8 T11.9 T12

A1 A5 PLAN DETAIL AT SST ARMATURE A13 RESTROOMS - NEW WORK 3/26/2015 Checked
OUTSIDE CORNER (TYP)
SCALE: 3" = 1'-0" SCALE: 3" = 1'-0" A701 SCALE: 1/8" = 1'-0" A01 1:15:31 PM EGS/JCF
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 © 2013 LWC, INCORPORATED
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
3/26/2015 1:26:28 PM
SHEET NOTES:

R
1. EXISTING SINGLE-PLY MEMBRANE ROOFING.
2. EXISTING PARAPET WALL ABOVE ROOF IS TO REMAIN. MAINTAIN
EXISTING FLASHING, METAL CLADDING SYSTEM, COPING, AND OTHER
WEATHER RESISTANT ELEMENTS. SEE OTHER DRAWINGS FOR CLEANING
OF CLADDING. MAINTAIN SUFFICIENT FLASHING FOR SPLICING WITH
NEW ROOF MEMBRANE.
3. SPLICE NEW SINGLE-PLY MEMBRANE INTO EXISTING SARNAFIL ROOF
MEMBRANE. MAINTAIN EXISTING WARRANTY.
6 6 4. NEW SINGLE-PLY MEMBRANE ROOF. SEE SECTIONS FOR MAKEUP OF
SUBSTRATE.
4 4 5. GLASS CANOPY SYSTEM MOUNTED TO STEET FRAMEWORK.
6. PROVIDE TAPERED INSULATION TO SLOPE TO DRAINS. NET SLOPE TO
Q BE ¼” PER FOOT.
7. STEEL PIPE COLUMNS WITH STAINLESS STEEL GUYS AND CONNECTORS.
3 3 SEE STRUCTURAL DRAWINGS.
8. EXISTING ARCHED SKYLIGHT STRUCTURE.
3 3 9. PREFINISHED METAL COPING.
4 4 10. PREFINISHED METAL GRAVEL STOP.
R.D. R.D. 11. SINGLE-PLY MEMBRANE ROOFING AT CANOPY BEAM TO CREATE A
4 4
GUTTER. SEE DETAILS.
A6 O.F. O.F. 12. TAPER INSULATION TRANSITION FROM CANOPY ROOF TO INSULATED
A510 ROOF
4 4 13. TAPERED INSULATION TO CREATE SLOPE TO DRAIN 1/4" PER FOOT.
1 1

P 1
4 9 4
H11

SLOPE

SLOPE
A508
A1 A6 12
A501 A504
2
2 1 1 2 12 2
A6 12
A505 9

N 6 6 6
10
A8 G6 G6
14'-11 5/8"

A508
3
5
G5 R.D. R.D. G5
O.F.
4
R.D. O.F.
4 O.F. 2 GLASS SCHEDULE
SLOPE SLOPE SLOPE SLOPE SLOPE SLOPE 4 A403
6
G4 G4
5
1 1/4" LAMINATED GLASS WITH
7 TYP. 11 7 TYP. 11 G-3 40% COVERAGE FRIT. SEE SPECS
G3 G3
M 1 1/4" LAMINATED GLASS WITH
G-4 30% COVERAGE FRIT. SEE SPECS
1
A507 1 1/4" LAMINATED GLASS WITH
G3 G3 G3 G3 G-5 20% COVERAGE FRIT. SEE SPECS

G3 G3
5
1 1/4" LAMINATED GLASS WITH
G4 G4 TYP.
G4 G4 G-6 10% COVERAGE FRIT. SEE SPECS
5 5 G4 5
G4
TYP.

L G5 G5 G5 G5
G5 G5

A.
GENERAL NOTES:
XXX
1. THE AIRPORT SHALL REMAIN OPEN DURING THIS PROJECT. cONSTRUCTOR SHALL
PROVIDE ALL NECESSARY PROTECTIVE EQUIPMENT SIGNAGE, LIGHTING, AND RELATED
MATERIALS AS REQUIRED BY THE AIRPORT AND THE CITY OF DAYTON.
2. CONTRACTOR SHALL NOTIFY THE OWNER IF DETERIORATED ARE DISCOVERED IN
SPACES
PREVIOUSLY CONCEALED BY FINISH COMPONENTS. A DECISION ON THE COARSE OF
A6 ACTION IF ANY, WILL BE RENDERED BY THE OWNER SHORTLY THEREAFTER.
A502 A9 A2 A6
K A3 A506 A507 A503
A509

J
J1 AREA "A" - ROOF PLAN
SCALE: 1/8" = 1'-0" A01

4
3
6
KEY PLAN:
H
G
1
1 1
8
R.D.
3
3 O.F.

1 1 1 4
6
4
G 4

R.D.
2 E D  F
2

SLOPE
2 2 A8
A1
12 3 12 O.F. 3 9
A501
A512 12
A1 12
A513
A B C
SLOPE

F 9 4
G6
1 6 1 4 1 6 1
4
3 3
G5 5
R.D. O.F. R.D. 3
O.F.
A403
SLOPE SLOPE SLOPE SLOPE
4 4 G4
7 TYP. 4 4 4 4 7 TYP.
G3
E

G5
G3 G3 No. Revisions / Submissions Date
A1 G3 11
5 A516 5
G4 TYP. G4 5 G4 TYP.

LWC
G4 5

G5 G5
D G3
G5 I NCOR P O R ATED
434 East First Street Dayton, OH 45402 937.223.6500
4 4440 Garwood Place Richmond, IN 47374 765.966.3546
7 TYP.

G3
DAYTON INTERNATIONAL AIRPORT
5 3600 TERMINAL DRIVE
G4 VANDALIA, OH 45377
C (937) 454-8209

G5
PHASE ONE CANOPY
C:\Revit\14613.00-DAY-Canopy-ARCH-2014_sbg.rvt

REPLACEMENT PROJECT
A1
A511
3600 TERMINAL DRIVE
B L1 L1
ROOF PLAN - AREAS "A" & "B"
A516 A516

PROGRESS Comm. No.

14613.00
Date

JAN 15, 2015


DRAWING
NOT FOR Drawn

SBG
Drawing No.

A
CONSTRUCTION
A111
A1
A1 AREA "B" - ROOF PLAN A516

3/26/2015 Checked

SCALE: 1/8" = 1'-0" A01 1:26:28 PM EGS/JCF


A10
A205 © 2013 LWC, INCORPORATED
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
3/26/2015 1:30:48 PM
SHEET NOTES:
3
R 4
1. EXISTING SINGLE-PLY MEMBRANE ROOFING.
2. EXISTING PARAPET WALL ABOVE ROOF IS TO REMAIN. MAINTAIN
EXISTING FLASHING, METAL CLADDING SYSTEM, COPING, AND OTHER
WEATHER RESISTANT ELEMENTS. SEE OTHER DRAWINGS FOR CLEANING
OF CLADDING. MAINTAIN SUFFICIENT FLASHING FOR SPLICING WITH
NEW ROOF MEMBRANE.
R.D. 3. SPLICE NEW SINGLE-PLY MEMBRANE INTO EXISTING SARNAFIL ROOF
MEMBRANE. MAINTAIN EXISTING WARRANTY.
4 4. NEW SINGLE-PLY MEMBRANE ROOF. SEE SECTIONS FOR MAKEUP OF
9
1 O.F. SUBSTRATE.
3 5. GLASS CANOPY SYSTEM MOUNTED TO STEET FRAMEWORK.
Q 4 6. PROVIDE TAPERED INSULATION TO SLOPE TO DRAINS. NET SLOPE TO
1
BE ¼” PER FOOT.
3 3 7. STEEL PIPE COLUMNS WITH STAINLESS STEEL GUYS AND CONNECTORS.
SEE STRUCTURAL DRAWINGS.
8. EXISTING ARCHED SKYLIGHT STRUCTURE.
9. PREFINISHED METAL COPING.
10. PREFINISHED METAL GRAVEL STOP.
2 11. SINGLE-PLY MEMBRANE ROOFING AT CANOPY BEAM TO CREATE A
GUTTER. SEE DETAILS.
12. TAPER INSULATION TRANSITION FROM CANOPY ROOF TO INSULATED
9 12 12 9 12 ROOF
13. TAPERED INSULATION TO CREATE SLOPE TO DRAIN 1/4" PER FOOT.
P

M17
A601 6
G6
6 O.F. R.D.
3
R.D. O.F. R.D. G5 5 R.D. R.D. O.F.
O.F. O.F.
SLOPE SLOPE SLOPE SLOPE SLOPE SLOPE SLOPE SLOPE SLOPE
4 4
6 4 6 6
G4
N 7 TYP. 7 TYP. 7 TYP. 7 TYP.
G3

GLASS SCHEDULE
G3 G3

G3
1 1/4" LAMINATED GLASS WITH
5 5 5 G-3 40% COVERAGE FRIT. SEE SPECS
G4 TYP. G4 TYP.

M G4 G-4
1 1/4" LAMINATED GLASS WITH
30% COVERAGE FRIT. SEE SPECS

G5 G5
1 1/4" LAMINATED GLASS WITH
G-5 20% COVERAGE FRIT. SEE SPECS
G5

1 1/4" LAMINATED GLASS WITH


G-6 10% COVERAGE FRIT. SEE SPECS

A5
A601

GENERAL NOTES:
A. THE AIRPORT SHALL REMAIN OPERATIONAL DURING THIS PROJECT.
THE CONTRACTOR SHALL PROVIDE ALL NECESSARY PROTECTIVE
EQUIPMENT, SIGNAGE, LIGHTING, AND RELATED MATERIALS AS
REQUIRED BY THE AIRPORT AND THE CITY OF DAYTON.
B. THE CONTRACTOR SHALL NOTIFY THE OWNER IF DETERIORATED
CONDITIONS ARE DISCOVERED IN SPACES PREVIOUSLY CONCEALED
BY FINISH COMPONENTS. A DECISION ON A COURSE OF ACTION, IF
K ANY, WILL BE RENDERED BY THE OWNER SHORTLY THEREAFTER.
G1 AREA "C" - ROOF PLAN C. COORDINATE DEMOLITION WORK BETWEEN ALL TRADES. SEE
STRUCTURAL, PLUMBING, HVAC, AND ELECTRICAL DRAWINGS FOR
ADDITIONAL DEMOLITION RELATED WORK.

SCALE: 1/8" = 1'-0" A01

KEY PLAN:
H
G

E D  F

A1 A1
A516 A511

A B C

F
30'-5"

1 DD Set 11-3-2014
No. Revisions / Submissions Date

D
R.D.
30'-5"
R.D.
LWC
I NCOR P O R ATED
434 East First Street Dayton, OH 45402 937.223.6500
13
4440 Garwood Place Richmond, IN 47374 765.966.3546
L1 L1
A516 A516
DAYTON INTERNATIONAL AIRPORT
3600 TERMINAL DRIVE
VANDALIA, OH 45377
C R.D. R.D. (937) 454-8209

PHASE ONE CANOPY


C:\Revit\14613.00-DAY-Canopy-ARCH-2014_sbg.rvt

REPLACEMENT PROJECT
3600 TERMINAL DRIVE
A10
B A205 EXISTING CANOPY
A1
A516
ROOF
ROOF PLAN - AREA "C" & "D"
PROGRESS Comm. No.

14613.00
Date

JAN 15, 2015


DRAWING
NOT FOR Drawn

SBG
Drawing No.

A
CONSTRUCTION
A1 AREA "A" - ROOF PLAN 3/26/2015 Checked

EGS/JCF
A112
SCALE: 1/8" = 1'-0" A01 1:30:48 PM
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 © 2013 LWC, INCORPORATED
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
3/26/2015 1:33:39 PM
SHEET NOTES:

F F F F F F F F

B B B B
C C C C C C F

M
C
A A A A A A A A A A A A A A A A A A

L F E F E F E F E F E F E E F F F E F E F E F E F E F
D F F D F D
F F F
NO FIREPROOFING REQUIRED FOR NO FIREPROOFING REQUIRED FOR NO FIREPROOFING REQUIRED FOR NO FIREPROOFING REQUIRED FOR
ROOF FRAMING MEMBER OR METAL
DECK WHERE ENTIRE ROOF STRUCTURE
ROOF FRAMING MEMBER OR METAL
DECK WHERE ENTIRE ROOF STRUCTURE
ROOF FRAMING MEMBER OR METAL
DECK WHERE ENTIRE ROOF STRUCTURE
ROOF FRAMING MEMBER OR METAL
DECK WHERE ENTIRE ROOF STRUCTURE
GENERAL NOTES:
A
IS GREATER THAN 20' ABOVE THE IS GREATER THAN 20' ABOVE THE IS GREATER THAN 20' ABOVE THE IS GREATER THAN 20' ABOVE THE
FLOOR. COLUMNS STEEL RECEIVE FIREPROOFING FLOOR. COLUMNS STEEL RECEIVE FIREPROOFING FLOOR. COLUMNS STEEL RECEIVE FIREPROOFING FLOOR. COLUMNS STEEL RECEIVE FIREPROOFING
E
EXISTING STRUCTURE
NO WORK THIS AREA
K

J
1 FIREPROOFING PLAN
SCALE: 1" = 20'-0" A01

KEY PLAN:
H T7.4 T8 T8.2 T8.8 T9 T9.5 T9.7 T9.9
T10 T10.2 T10.5 T10.6
T10.9
T11 T11.9
T12
T11.8

TJ TJ
TH.8 TH.8

F
TH.2 TH.2

No. Revisions / Submissions Date

TG.5 TG.5

D
L18 A701 L15 LWC
I NCOR P O R ATED
L11
434 East First Street Dayton, OH 45402 937.223.6500
A 1.5 HOUR SPRAYED-ON FIREPROOFING OF SECONDARY STRUCTURAL 4440 Garwood Place Richmond, IN 47374 765.966.3546
STEEL ROOF BEAMS.

B 2 HOUR SPRAYED-ON FIREPROOFING OF STRUCTURAL STEEL COLUMN.


DAYTON INTERNATIONAL AIRPORT
3600 TERMINAL DRIVE
P15 VANDALIA, OH 45377
C (937) 454-8209
P11 A701
C 2 HOUR SPRAYED-ON FIREPROOFING OF PRIMARY STRUCTURAL STEEL
ROOF BEAMS CONNECTED TO COLUMNS.
A4 A702

TF.5 P7 TF.5 PHASE ONE CANOPY


C:\Revit\14613.00-DAY-Canopy-ARCH-2014_sbg.rvt

REPLACEMENT PROJECT
D 1.5 HOUR INTUMESCENT FIREPROOFING OF SECONDARY STRUCTURAL STEEL
A702 A702 K13
SLOPED GLASS SUPPORT CANTILEVER MEMBERS AND RELATED
STEEL TUBES.
F13 K17 3600 TERMINAL DRIVE
E 2 HOUR INTUMESCENT FIREPROOFING OF PRIMARY STRUCTURAL STEEL
ROOF BEAMS CONNECTED TO COLUMNS.
B TF TF

F 2 HOUR INTUMESCENT FIREPROOFING OF STRUCTURAL STEEL COLUMNS. FIREPROOFING PLAN

G 2 HOUR INTUMESCENT FIREPROOFING OF STRUCTURAL COLUMNS AND


PROGRESS Comm. No.

14613.00
Date

JAN 15, 2015


T7.4 T8 T9 T9.5 T10 T10.6T11 T11.8 BEAMS CONNECTED TO COLUMNS AND 1 1/2 HOUR INTUMESCENT
FIREPROOFING ON ALL OTHER STEEL BEAMS, JOISTS AND ROOF
DRAWING
DECK. REMOVE EXISTING FIBROUS FIREPROOFING COMPLETELY
AND PREPARE SURFACE FOR NEW INTUMESCENT COATING. NOT FOR Drawn

SBG
Drawing No.

A
CONSTRUCTION
2
T8.2
RR FIREPROOFING PLAN
T8.8 T9.7 T10.2 T10.5

3/26/2015 Checked

JCF/EGS
A120
SCALE: 1/8" = 1'-0" A01 1:33:39 PM
1 2 3 4 5 6 T9.9 7 8 T10.9 9 T11.9
T12 10 11 12 13 14 15 16 17 18 19 20 © 2013 LWC, INCORPORATED
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
3/26/2015 1:39:01 PM T2 T3 T3.4T3.5
T3.6 T4 T5 T5.1 T6 T6.3
T6.4 T7 T8
8 T9
SHEET NOTES:
REFLECTED CEILING PLAN LEGEND
TYPICAL FOR ALL SHEETS. SEE SHEET G001 FOR ADDITIONAL SYMBOLS 1. NEW SUSPENDED CEILING TO MATCH EXISTING ADJACENT HEIGHT
R AND ALIGN WITH EXISTING GRID LAYOUT.
2. GYPSUM BOARD CEILING OR SOFFIT. PAINT AS SPECIFIED.
3. ACOUSTICAL CEILING PLANK. VERIGY OVERALL DIMENSION TO FIT
RECESSED LIGHT FIXTURES LENEAR DIFFUSERS WITHOUT CUTTING METAL PANELS.
SQUARE, RECTANGULAR, ROUND 4. GYPSUM BOARD LIGHT COVER. SEE SECTION DETAIL.
5. SS-1 STAINLESS STEEL FRAME.
6. EXSTING SUSPENDED CEILING TO REMAIN.
SURFACE MOUNTED LIGHT FIXTURES 7. EXISTING BULKHEAD TO REMAIN.
8. REMOVE EXISTING SUSPENDED CEILING TILE AND GRID.
7 9. REMOVE EXISTING GYPSUM BOARD BULKHEAD AND FRAMING.
PLASTER OR DRYWALL SURFACES
10. REMOVE METAL PANEL SYSTEM ENTIRELY.
11. REMOVE SUSPENDED LINEAR METAL CEILING AND SUSPENSION
Q SYSTEM ENTIRELY.
6 12. REMOVE ENTIRE EXISTING ARCHED SKYLIGHT ASSEMBLY AND ANY
1.9 2 3 3.4 4 5 5.1 6 7 7.4 8 9 GRILLES, DIFFUSERS, REGISTERS, ETC.
13.
RELATED CURBS, FRAMING, METAL PANELS, AND SIMILAR ITEMS.
REMOVE ALUMINUM FRAME AND GLASS IMMEDIATELY ABOVE THE
SLIDING DOORS FROM THE TOP OF THE BULKHEAD TO THE BOTTOM
OF THE ARCHED SKYLIGHT.
6 6 SPEAKERS 14. REMOVE ENTIRE ARCHED SKYLIGHT CANOPY ASSEMBLY INCLUDING
7 7 ALL RELATED CURBS, STEEL FRAMING, COLUMNS, FOUNDATIONS,
METAL PANELS, SOFFIT, AND SIMILAR ITEMS.
METAL SOFFIT 15. REMOVE ENTIRE EXISTING LOWER ARCHED SKYLIGHT ASSEMBLY
D AND ANY RELATED CURBS, FRAMING, METAL PANELS, AND SIMILAR
ITEMS IMMEDIATELY OVER THE VESTIBULE. ALSO REMOVE THE
VERTICAL ALUMINUM AND GLASS FROM OVER THE ENTRANCE
P 9 9 9 ITEM TO BE DEMOLISHED DOORS. THE SLIDING DOORS AND BULKHEAD IMMEDIATELY ABOVE
ARE TO REMAIN. PROTECT DURING CONSTRUCTION ACTIVITIES.
12 16. CAREFULLY REMOVE AND SALVAGE AIRPORT SIGNAGE.
ITEM TO REMAIN DISCONNECT POWER AND COORDINATE WITH NEW ELECTRICAL
12
WORK. STORE SIGNS IN A SAFE LOCATION AND PREPARE FOR
8 20'-2 3/4" REINSTALLATION.
8

18'-5 13/16"
17. NEW LINEAR METAL SUSPENDED CEILING SYSTEM.
18. NEW 2X2 SUSPENDED ACOUSTICAL PANEL CEILING. MATCH EXISTING
IN SAME LOCATION.
19. METAL PANEL SYSTEM. SEE DETAILS.
20. GLASS CANOPY SYSTEM.
13 8 21. REMOVE ISLAND CANOPY ENTIRELY INCLUDING ALL ROOFING,
8
8 8 8 STRUCTURE, METAL CLADDING, SOFFIT, COLUMNS, FOUNDATIONS,
N 8 8 8
AND OTHER RELATED ITEMS.
22. EXISTING GYPSUM BOARD CEILING. PAINT AS SPECIIFIED
23. PREFINISHED METAL GRAVEL STOP.
C 24. EXISTING CAR PORT CANOPY
TB.9 B.9 25.
26.
EXISTING METAL PANEL
STRUCTURAL TUBE STEEL. SEE STRUCTURAL DWGS.

10

M
12

TB 12 B
11 11 11 11 16

10 16
L
10 10

GENERAL NOTES:
1. THE AIRPORT SHALL REMAIN OPEN DURING THIS PROJECT. cONSTRUCTOR SHALL
PROVIDE ALL NECESSARY PROTECTIVE EQUIPMENT SIGNAGE, LIGHTING, AND RELATED
MATERIALS AS REQUIRED BY THE AIRPORT AND THE CITY OF DAYTON.
2. CONTRACTOR SHALL NOTIFY THE OWNER IF DETERIORATED ARE DISCOVERED IN
SPACES
12 10 PREVIOUSLY CONCEALED BY FINISH COMPONENTS. A DECISION ON THE COARSE OF
10 10 10 ACTION IF ANY, WILL BE RENDERED BY THE OWNER SHORTLY THEREAFTER.

J1 / A202
30'-0"
- / ---

T3.4T3.5
T3.6 T5 T5.1 T6 T6.3
T6.4 T8 T9
Hb
J
J1 AREA "A" - RCP DEMO
SCALE: 1/8" = 1'-0" A01

KEY PLAN:
H
G

E D  F

A B C
6 6 L1
F 1
L83-5

12'-1" TYP.
17 18
A6
2 A510 12'-1" L1
18 2
L83-5

5
E H11
1'-6"
1'-6"

1'-6"
11'-9" 11'-9"
A508
19 TYP. 19 TYP.
A6
2 A504 2 2
6'-9 1/8"

A1 19 TYP.
No. Revisions / Submissions Date

6'-9"
A501 17
A6 17 17
17 A505

D
17
A8
A508
17
17
LWC
I NCOR P O R ATED
434 East First Street Dayton, OH 45402 937.223.6500
4440 Garwood Place Richmond, IN 47374 765.966.3546
2
A403

19 20 19
TYP. TYP.
TYP.
19
20
TYP. DAYTON INTERNATIONAL AIRPORT
3600 TERMINAL DRIVE
VANDALIA, OH 45377
C 1 (937) 454-8209
A507

PHASE ONE CANOPY


19
C:\Revit\14613.00-DAY-Canopy-ARCH-2014_sbg.rvt

20
TYP.
20
TYP.
20
TYP. REPLACEMENT PROJECT
20 3600 TERMINAL DRIVE
B
REFLECTED CEILING PLAN - AREA "A"
A6 A3 A6 SIM
A502 A509 A503
A2
A9
A506
A2
A507
A507 PROGRESS Comm. No.

14613.00
Date

JAN 15, 2015


A1 / A202 DRAWING
NOT FOR Drawn

SBG/DCC
Drawing No.

A
CONSTRUCTION
A1 AREA "A" - RCP NEW WORK 3/26/2015 Checked

EGS/JCF
A201
SCALE: 1/8" = 1'-0" A01 1:39:01 PM
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 © 2013 LWC, INCORPORATED
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
3/26/2015 1:44:42 PM
SHEET NOTES:

R T9 T9.5 T9.9
T10 T10.6
T10.9
T11 T11.9
T12
T11.8 T14
T14.1
T14.2 T15T15.2
T15.1 T16
T16.1 T16.4 T17 T18 T18.1
18.1 1. NEW SUSPENDED CEILING TO MATCH EXISTING ADJACENT HEIGHT
AND ALIGN WITH EXISTING GRID LAYOUT.
2. GYPSUM BOARD CEILING OR SOFFIT. PAINT AS SPECIFIED.
3. ACOUSTICAL CEILING PLANK. VERIGY OVERALL DIMENSION TO FIT
LENEAR DIFFUSERS WITHOUT CUTTING METAL PANELS.
4. GYPSUM BOARD LIGHT COVER. SEE SECTION DETAIL.
5. SS-1 STAINLESS STEEL FRAME.
6. EXSTING SUSPENDED CEILING TO REMAIN.
7. EXISTING BULKHEAD TO REMAIN.
8. REMOVE EXISTING SUSPENDED CEILING TILE AND GRID.
9. REMOVE EXISTING GYPSUM BOARD BULKHEAD AND FRAMING.
10. REMOVE METAL PANEL SYSTEM ENTIRELY.
11. REMOVE SUSPENDED LINEAR METAL CEILING AND SUSPENSION
Q 9 9.5 9.9
10 10.6
11 11.8 14.2 15
15.2 16 16.4 17 18 18.1 SYSTEM ENTIRELY.
12. REMOVE ENTIRE EXISTING ARCHED SKYLIGHT ASSEMBLY AND ANY
7 7 7 RELATED CURBS, FRAMING, METAL PANELS, AND SIMILAR ITEMS.
7 6 6 13. REMOVE ALUMINUM FRAME AND GLASS IMMEDIATELY ABOVE THE
SLIDING DOORS FROM THE TOP OF THE BULKHEAD TO THE BOTTOM
OF THE ARCHED SKYLIGHT.
14. REMOVE ENTIRE ARCHED SKYLIGHT CANOPY ASSEMBLY INCLUDING
ALL RELATED CURBS, STEEL FRAMING, COLUMNS, FOUNDATIONS,
D
METAL PANELS, SOFFIT, AND SIMILAR ITEMS.
8 15. REMOVE ENTIRE EXISTING LOWER ARCHED SKYLIGHT ASSEMBLY
8 AND ANY RELATED CURBS, FRAMING, METAL PANELS, AND SIMILAR
ITEMS IMMEDIATELY OVER THE VESTIBULE. ALSO REMOVE THE
12 VERTICAL ALUMINUM AND GLASS FROM OVER THE ENTRANCE
P 12 DOORS. THE SLIDING DOORS AND BULKHEAD IMMEDIATELY ABOVE
8 ARE TO REMAIN. PROTECT DURING CONSTRUCTION ACTIVITIES.
16. CAREFULLY REMOVE AND SALVAGE AIRPORT SIGNAGE.
8 DISCONNECT POWER AND COORDINATE WITH NEW ELECTRICAL
8
WORK. STORE SIGNS IN A SAFE LOCATION AND PREPARE FOR
REINSTALLATION.
17. NEW LINEAR METAL SUSPENDED CEILING SYSTEM.
8 18. NEW 2X2 SUSPENDED ACOUSTICAL PANEL CEILING. MATCH EXISTING
IN SAME LOCATION.
8 8 8 8 13
8 19. METAL PANEL SYSTEM. SEE DETAILS.
8 20. GLASS CANOPY SYSTEM.
TYP. 10 21. REMOVE ISLAND CANOPY ENTIRELY INCLUDING ALL ROOFING,
STRUCTURE, METAL CLADDING, SOFFIT, COLUMNS, FOUNDATIONS,
N C
AND OTHER RELATED ITEMS.
22. EXISTING GYPSUM BOARD CEILING. PAINT AS SPECIIFIED
TB.9
15
TB.9
23. B.9
PREFINISHED METAL GRAVEL STOP.
24. EXISTING CAR PORT CANOPY
14 25. EXISTING METAL PANEL
26. STRUCTURAL TUBE STEEL. SEE STRUCTURAL DWGS.

1. THE AIRPORT SHALL REMAIN OPEN DURING THIS PROJECT. cONSTRUCTOR SHALL
PROVIDE ALL NECESSARY PROTECTIVE EQUIPMENT SIGNAGE, LIGHTING, AND RELATED
12 MATERIALS AS REQUIRED BY THE AIRPORT AND THE CITY OF DAYTON.
M 12 2. CONTRACTOR SHALL NOTIFY THE OWNER IF DETERIORATED ARE DISCOVERED IN
SPACES
11 11 13 PREVIOUSLY CONCEALED BY FINISH COMPONENTS. A DECISION ON THE COARSE OF
ACTION IF ANY, WILL BE RENDERED BY THE OWNER SHORTLY THEREAFTER.
TB
11 11
TB B
16

12

16 REFLECTED CEILING PLAN LEGEND


TYPICAL FOR ALL SHEETS. SEE SHEET G001 FOR ADDITIONAL SYMBOLS
10
L
10 10
41'-10"
10 RECESSED LIGHT FIXTURES
SQUARE, RECTANGULAR, ROUND

J1 / A203
14 SURFACE MOUNTED LIGHT FIXTURES
10 10 16 - / ---
10 10
10
PLASTER OR DRYWALL SURFACES
10

T9.9 T10.9 10 T11.9


T12 T14
T14.2 T15.1 T16.1 T16.4 T18.1
K GRILLES, DIFFUSERS, REGISTERS, ETC.

SPEAKERS

METAL SOFFIT

T9.5 T10.6 T15.2 18.1 ITEM TO BE DEMOLISHED


J
J1 AREA "B" - RCP DEMO ITEM TO REMAIN

SCALE: 1/8" = 1'-0" A01


T9.5

KEY PLAN:
H
G

SIM
A2
A507
G

A1
A511
E D  F

18
12'-1" 2 17 2
18 18 18
12'-1" A B C

F 2

1'-6"
1'-6"

11'-9" 11'-9"
19
22 22 2

6'-10"
6'-10"

17 17
A8
A1 17
17 A501
A512 17
A1
A513

E
17

17
No. Revisions / Submissions Date
17

1 3
A403 A403

LWC
17 17 20

19 19
D 19 I NCOR P O R ATED
434 East First Street Dayton, OH 45402 937.223.6500
4440 Garwood Place Richmond, IN 47374 765.966.3546
19 19

A1
DAYTON INTERNATIONAL AIRPORT
A516
20
3600 TERMINAL DRIVE
20
TYP.
20
TYP.
20
VANDALIA, OH 45377
C (937) 454-8209
A1 / A203

20 26 26 20 PHASE ONE CANOPY


C:\Revit\14613.00-DAY-Canopy-ARCH-2014_sbg.rvt

2'-0 5/8"
19 19 19 19
2'-0 3/4"
REPLACEMENT PROJECT
5'-0 5/8" 2'-1" 5'-0" 2'-1" 5'-0" 2'-1" 5'-0"
3600 TERMINAL DRIVE
20

B 19 A15 / A205
REFLECTED CEILING PLAN - AREA "B"
PROGRESS Comm. No.

14613.00
Date

JAN 15, 2015


A516
A1 DRAWING
T9.5
A10 NOT FOR Drawn

SBG/DCC
Drawing No.

CONSTRUCTION
A205
A
A1 AREA "B" - RCP NEW WORK 3/26/2015 Checked

EGS/JCF
A202
SCALE: 1/8" = 1'-0" A01 1:44:42 PM
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 © 2013 LWC, INCORPORATED
T21.4 T23.2 T26.2
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
3/26/2015 1:46:03 PM
SHEET NOTES:

R 1. NEW SUSPENDED CEILING TO MATCH EXISTING ADJACENT HEIGHT


AND ALIGN WITH EXISTING GRID LAYOUT.
2. GYPSUM BOARD CEILING OR SOFFIT. PAINT AS SPECIFIED.
3. ACOUSTICAL CEILING PLANK. VERIGY OVERALL DIMENSION TO FIT
196
T19
20
6
T20
21
T21
21.4 22
6
T22
23
T23
23.2 24
6
T24
25
T25
6
26
T26
26.2 4.
LENEAR DIFFUSERS WITHOUT CUTTING METAL PANELS.
GYPSUM BOARD LIGHT COVER. SEE SECTION DETAIL.
5. SS-1 STAINLESS STEEL FRAME.
6. EXSTING SUSPENDED CEILING TO REMAIN.
7 7 7 7 7 7. EXISTING BULKHEAD TO REMAIN.
8. REMOVE EXISTING SUSPENDED CEILING TILE AND GRID.
9. REMOVE EXISTING GYPSUM BOARD BULKHEAD AND FRAMING.
10. REMOVE METAL PANEL SYSTEM ENTIRELY.

Q
D 11. REMOVE SUSPENDED LINEAR METAL CEILING AND SUSPENSION
SYSTEM ENTIRELY.
12. REMOVE ENTIRE EXISTING ARCHED SKYLIGHT ASSEMBLY AND ANY
RELATED CURBS, FRAMING, METAL PANELS, AND SIMILAR ITEMS.
8 8 6 13. REMOVE ALUMINUM FRAME AND GLASS IMMEDIATELY ABOVE THE
12 SLIDING DOORS FROM THE TOP OF THE BULKHEAD TO THE BOTTOM
OF THE ARCHED SKYLIGHT.
14. REMOVE ENTIRE ARCHED SKYLIGHT CANOPY ASSEMBLY INCLUDING
8 9 ALL RELATED CURBS, STEEL FRAMING, COLUMNS, FOUNDATIONS,
8 8 METAL PANELS, SOFFIT, AND SIMILAR ITEMS.
15. REMOVE ENTIRE EXISTING LOWER ARCHED SKYLIGHT ASSEMBLY
9 8 9 13 9 AND ANY RELATED CURBS, FRAMING, METAL PANELS, AND SIMILAR
10 ITEMS IMMEDIATELY OVER THE VESTIBULE. ALSO REMOVE THE
8 8 8 VERTICAL ALUMINUM AND GLASS FROM OVER THE ENTRANCE
P 8 8 DOORS. THE SLIDING DOORS AND BULKHEAD IMMEDIATELY ABOVE
ARE TO REMAIN. PROTECT DURING CONSTRUCTION ACTIVITIES.
8 8 8 16. CAREFULLY REMOVE AND SALVAGE AIRPORT SIGNAGE.
DISCONNECT POWER AND COORDINATE WITH NEW ELECTRICAL

12
C WORK. STORE SIGNS IN A SAFE LOCATION AND PREPARE FOR
REINSTALLATION.
B.9 17.
18.
NEW LINEAR METAL SUSPENDED CEILING SYSTEM.
NEW 2X2 SUSPENDED ACOUSTICAL PANEL CEILING. MATCH EXISTING
TB.9 IN SAME LOCATION.
19. METAL PANEL SYSTEM. SEE DETAILS.
20. GLASS CANOPY SYSTEM.
21. REMOVE ISLAND CANOPY ENTIRELY INCLUDING ALL ROOFING,
N STRUCTURE, METAL CLADDING, SOFFIT, COLUMNS, FOUNDATIONS,
AND OTHER RELATED ITEMS.
22. EXISTING GYPSUM BOARD CEILING. PAINT AS SPECIIFIED
23. PREFINISHED METAL GRAVEL STOP.
12 24. EXISTING CAR PORT CANOPY
25. EXISTING METAL PANEL
26. STRUCTURAL TUBE STEEL. SEE STRUCTURAL DWGS.

11 11 11
TB B
11

M 16 10 10

16
16

REFLECTED CEILING PLAN LEGEND


TYPICAL FOR ALL SHEETS. SEE SHEET G001 FOR ADDITIONAL SYMBOLS

L
RECESSED LIGHT FIXTURES
10 10 10 SQUARE, RECTANGULAR, ROUND

T21.4 T23.2
SURFACE MOUNTED LIGHT FIXTURES

PLASTER OR DRYWALL SURFACES

GRILLES, DIFFUSERS, REGISTERS, ETC.


K

SPEAKERS

METAL SOFFIT

T26.2 ITEM TO BE DEMOLISHED

J ITEM TO REMAIN

J1 AREA "C" - RCP DEMO


SCALE: 1/8" = 1'-0" A01

KEY PLAN:
H
G

SIM E D  F
A2
A507

7 6 7 6 7 6
A B C

2 2 6
12'-1" 17
18 18
12'-1"

1 2

6'-1 3/4" 1'-6 1/4"


11'-9" 11'-9" 11'-9"

E 19 19
17 17
17
17 17
No. Revisions / Submissions Date

D 17
17

17 17 S
LWC
I NCOR P O R ATED
3 A5 20
434 East First Street Dayton, OH 45402 937.223.6500
A403 A601
4440 Garwood Place Richmond, IN 47374 765.966.3546

TYP.
A14 TYP. TYP.
19 A601 19 19

19 DAYTON INTERNATIONAL AIRPORT


3600 TERMINAL DRIVE
VANDALIA, OH 45377
C (937) 454-8209

PHASE ONE CANOPY


C:\Revit\14613.00-DAY-Canopy-ARCH-2014_sbg.rvt

20 20 20
TYP. TYP. TYP.
REPLACEMENT PROJECT
3600 TERMINAL DRIVE
B
REFLECTED CEILING PLAN - AREA "C"
PROGRESS Comm. No.

14613.00
Date

JAN 15, 2015


DRAWING
NOT FOR Drawn

SBG/DCC
Drawing No.

A
CONSTRUCTION
A1 AREA "C" - RCP NEW WORK 3/26/2015 Checked

EGS/JCF
A203
SCALE: 1/8" = 1'-0" A01 1:46:03 PM
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 © 2013 LWC, INCORPORATED
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
3/26/2015 1:46:42 PM
SHEET NOTES:
T7.4 T8 T8.2 T8.8 T9 T9.5 T9.7 T9.9
T10 T10.2 T10.5 T10.6
T10.9
T11 T11.9
T12
T11.8

R 1. NEW SUSPENDED CEILING TO MATCH EXISTING ADJACENT HEIGHT


AND ALIGN WITH EXISTING GRID LAYOUT.
2. GYPSUM BOARD CEILING OR SOFFIT. PAINT AS SPECIFIED.
TJ TJ 3. ACOUSTICAL CEILING PLANK. VERIGY OVERALL DIMENSION TO FIT
LENEAR DIFFUSERS WITHOUT CUTTING METAL PANELS.
TH.8 TH.8 4. GYPSUM BOARD LIGHT COVER. SEE SECTION DETAIL.
5. SS-1 STAINLESS STEEL FRAME.
6. EXSTING SUSPENDED CEILING TO REMAIN.
7. EXISTING BULKHEAD TO REMAIN.
8. REMOVE EXISTING SUSPENDED CEILING TILE AND GRID.
9. REMOVE EXISTING GYPSUM BOARD BULKHEAD AND FRAMING.
10. REMOVE METAL PANEL SYSTEM ENTIRELY.
11. REMOVE SUSPENDED LINEAR METAL CEILING AND SUSPENSION
Q SYSTEM ENTIRELY.
12. REMOVE ENTIRE EXISTING ARCHED SKYLIGHT ASSEMBLY AND ANY
RELATED CURBS, FRAMING, METAL PANELS, AND SIMILAR ITEMS.
13. REMOVE ALUMINUM FRAME AND GLASS IMMEDIATELY ABOVE THE
SLIDING DOORS FROM THE TOP OF THE BULKHEAD TO THE BOTTOM
OF THE ARCHED SKYLIGHT.
14. REMOVE ENTIRE ARCHED SKYLIGHT CANOPY ASSEMBLY INCLUDING
ALL RELATED CURBS, STEEL FRAMING, COLUMNS, FOUNDATIONS,
METAL PANELS, SOFFIT, AND SIMILAR ITEMS.
15. REMOVE ENTIRE EXISTING LOWER ARCHED SKYLIGHT ASSEMBLY
TH.2 TH.2 AND ANY RELATED CURBS, FRAMING, METAL PANELS, AND SIMILAR
ITEMS IMMEDIATELY OVER THE VESTIBULE. ALSO REMOVE THE
P VERTICAL ALUMINUM AND GLASS FROM OVER THE ENTRANCE
DOORS. THE SLIDING DOORS AND BULKHEAD IMMEDIATELY ABOVE
ARE TO REMAIN. PROTECT DURING CONSTRUCTION ACTIVITIES.
16. CAREFULLY REMOVE AND SALVAGE AIRPORT SIGNAGE.
8 DISCONNECT POWER AND COORDINATE WITH NEW ELECTRICAL
WORK. STORE SIGNS IN A SAFE LOCATION AND PREPARE FOR
REINSTALLATION.
17. NEW LINEAR METAL SUSPENDED CEILING SYSTEM.
18. NEW 2X2 SUSPENDED ACOUSTICAL PANEL CEILING. MATCH EXISTING
IN SAME LOCATION.
19. METAL PANEL SYSTEM. SEE DETAILS.
8 20. GLASS CANOPY SYSTEM.
21. REMOVE ISLAND CANOPY ENTIRELY INCLUDING ALL ROOFING,
N STRUCTURE, METAL CLADDING, SOFFIT, COLUMNS, FOUNDATIONS,
AND OTHER RELATED ITEMS.
22. EXISTING GYPSUM BOARD CEILING. PAINT AS SPECIIFIED
23. PREFINISHED METAL GRAVEL STOP.
TG.5 TG.5
24. EXISTING CAR PORT CANOPY
25. EXISTING METAL PANEL
26. STRUCTURAL TUBE STEEL. SEE STRUCTURAL DWGS.

L TF.5 TF.5

GENERAL NOTES:
8

TF TF

T7.4 T8 T8.2 T8.8 T9.5 T9.7 T9.9 T10.2 T10.5 T10.6


T10.9 T11.9
T12

J
J11 RESTROOMS - RCP DEMO
SCALE: 1/8" = 1'-0" A01 REFLECTED CEILING PLAN LEGEND
TYPICAL FOR ALL SHEETS. SEE SHEET G001 FOR ADDITIONAL SYMBOLS

RECESSED LIGHT FIXTURES


SQUARE, RECTANGULAR, ROUND
H
T9.5
SURFACE MOUNTED LIGHT FIXTURES

PLASTER OR DRYWALL SURFACES

TJ TJ
GRILLES, DIFFUSERS, REGISTERS, ETC.

G
SPEAKERS

NO CEILING - OPEN TO STRUCTURE


METAL SOFFIT

8'-0"
ITEM TO BE DEMOLISHED

ITEM TO REMAIN

TH.2 TH.2

1'-0"
9'-0"

6'-7 1/16"
2
1'-4" 9'-4" 3'-6" 8'-8" 4'-5 3/4" No. Revisions / Submissions Date
9'-0"

LWC

4'-0"
TG.5 3 TG.5

9'-2"

6'-7 1/16"
D 9'-2"
I NCOR P O R ATED
NO CEILING - 4 2
OPEN TO STRUCTURE 4
9'-0" 8'-0"
434 East First Street Dayton, OH 45402 937.223.6500
4440 Garwood Place Richmond, IN 47374 765.966.3546

1'-0"
18

1'-0"
DAYTON INTERNATIONAL AIRPORT
2

5'-9 3/8" 1'-0"


10'-4"
9'-0" 3600 TERMINAL DRIVE
4
4
12'-0" VANDALIA, OH 45377
C 1'-4" 9'-4" 3'-6" 8'-8" 4'-5 3/4" (937) 454-8209

PHASE ONE CANOPY

4'-0"
9'-2" 3 9'-2" 18
C:\Revit\14613.00-DAY-Canopy-ARCH-2014_sbg.rvt

REPLACEMENT PROJECT
TF.5 TF.5
18
18
12'-0"

3600 TERMINAL DRIVE


2

6'-3"
18 10'-4" 10'-4"
8'-0"

1'-0"
8'-3"

B
TF TF REFLECTED CEILING PLAN - RESTROOMS
8'-0"

PROGRESS Comm. No.

14613.00
Date

JAN 15, 2015


DRAWING
T9.5 NOT FOR Drawn

DCC
Drawing No.

A
CONSTRUCTION
A11 RESTROOMS - RCP NEW WORK 3/26/2015 Checked

EGS/JCF
A204
SCALE: 1/8" = 1'-0" A01 1:46:42 PM
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 © 2013 LWC, INCORPORATED
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
3/26/2015 1:48:27 PM
SHEET NOTES:

R 1. NEW SUSPENDED CEILING TO MATCH EXISTING ADJACENT HEIGHT


AND ALIGN WITH EXISTING GRID LAYOUT.
2. GYPSUM BOARD CEILING OR SOFFIT. PAINT AS SPECIFIED.
10 3. ACOUSTICAL CEILING PLANK. VERIGY OVERALL DIMENSION TO FIT
LENEAR DIFFUSERS WITHOUT CUTTING METAL PANELS.
4. GYPSUM BOARD LIGHT COVER. SEE SECTION DETAIL.
5. SS-1 STAINLESS STEEL FRAME.
6. EXSTING SUSPENDED CEILING TO REMAIN.
10 10 16 7. EXISTING BULKHEAD TO REMAIN.
10 10
8. REMOVE EXISTING SUSPENDED CEILING TILE AND GRID.
10 9. REMOVE EXISTING GYPSUM BOARD BULKHEAD AND FRAMING.
10 10. REMOVE METAL PANEL SYSTEM ENTIRELY.
11. REMOVE SUSPENDED LINEAR METAL CEILING AND SUSPENSION
Q 10 SYSTEM ENTIRELY.
12. REMOVE ENTIRE EXISTING ARCHED SKYLIGHT ASSEMBLY AND ANY
RELATED CURBS, FRAMING, METAL PANELS, AND SIMILAR ITEMS.
13. REMOVE ALUMINUM FRAME AND GLASS IMMEDIATELY ABOVE THE
SLIDING DOORS FROM THE TOP OF THE BULKHEAD TO THE BOTTOM
OF THE ARCHED SKYLIGHT.
14. REMOVE ENTIRE ARCHED SKYLIGHT CANOPY ASSEMBLY INCLUDING
ALL RELATED CURBS, STEEL FRAMING, COLUMNS, FOUNDATIONS,
METAL PANELS, SOFFIT, AND SIMILAR ITEMS.
15. REMOVE ENTIRE EXISTING LOWER ARCHED SKYLIGHT ASSEMBLY
14 AND ANY RELATED CURBS, FRAMING, METAL PANELS, AND SIMILAR
ITEMS IMMEDIATELY OVER THE VESTIBULE. ALSO REMOVE THE
VERTICAL ALUMINUM AND GLASS FROM OVER THE ENTRANCE
P DOORS. THE SLIDING DOORS AND BULKHEAD IMMEDIATELY ABOVE
ARE TO REMAIN. PROTECT DURING CONSTRUCTION ACTIVITIES.
16. CAREFULLY REMOVE AND SALVAGE AIRPORT SIGNAGE.
DISCONNECT POWER AND COORDINATE WITH NEW ELECTRICAL
WORK. STORE SIGNS IN A SAFE LOCATION AND PREPARE FOR
REINSTALLATION.
17. NEW LINEAR METAL SUSPENDED CEILING SYSTEM.
21 21 18. NEW 2X2 SUSPENDED ACOUSTICAL PANEL CEILING. MATCH EXISTING
IN SAME LOCATION.
19. METAL PANEL SYSTEM. SEE DETAILS.
20. GLASS CANOPY SYSTEM.
21. REMOVE ISLAND CANOPY ENTIRELY INCLUDING ALL ROOFING,
N STRUCTURE, METAL CLADDING, SOFFIT, COLUMNS, FOUNDATIONS,
AND OTHER RELATED ITEMS.
22. EXISTING GYPSUM BOARD CEILING. PAINT AS SPECIIFIED
23. PREFINISHED METAL GRAVEL STOP.
24. EXISTING CAR PORT CANOPY
25. EXISTING METAL PANEL
26. STRUCTURAL TUBE STEEL. SEE STRUCTURAL DWGS.
12 12

21 21

EXISTING PARKING GARAGE


CANOPY COLUMNS TO REMAIN
M

EXISTING PARKING GARAGE


CANOPY TO REMAIN

L
L1 AREA "C" - RCP DEMO
SCALE: 1/8" = 1'-0" A01 GENERAL NOTES:

KEY PLAN:
H

A1 A1
A516 A511

F
26 26 20

19 19 19 19
2'-0 5/8" 2'-0 3/4"
5'-0 5/8" 2'-1" 5'-0" 2'-1" 5'-0" 2'-1" 5'-0"

20

19
E

No. Revisions / Submissions Date

19

D
L1
A516
17

L1
A516
LWC
I NCOR P O R ATED
434 East First Street Dayton, OH 45402 937.223.6500
4440 Garwood Place Richmond, IN 47374 765.966.3546

DAYTON INTERNATIONAL AIRPORT


3600 TERMINAL DRIVE
L1 VANDALIA, OH 45377
A516 19
C 26 26
(937) 454-8209

PHASE ONE CANOPY


C:\Revit\14613.00-DAY-Canopy-ARCH-2014_sbg.rvt

A10
23 19
A205
A1 REPLACEMENT PROJECT
A516
3600 TERMINAL DRIVE
B 24

REFLECTED CEILING PLAN- MAIN CANOPY


19 23
26
26 24

PROGRESS
23
Comm. No. Date
L1
A516 14613.00 JAN 15, 2015
DRAWING
NOT FOR Drawn

SBG
Drawing No.

A
CENTRAL CANOPY - RCP NEW CONSTRUCTION
A10 Detail 12 A15
WORK 3/26/2015 Checked

EGS / JCF
A205
SCALE: 1/8" = 1'-0" A111 SCALE: 1/8" = 1'-0" A01 1:48:27 PM
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 © 2013 LWC, INCORPORATED
T4

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
3/26/2015 1:56:28 PM
T1 T2 T3
T3.4T3.5
3.4
T3.6
T5
T5.1
5.1
T6 T6.3
T6.4
12 T7 T7.4
T8
12 8
SHEET NOTES:
12 4 6 6
6
1. EXISTING METAL PANEL EXTERIOR CLADDING AND RELATED
R SUBSTRATE AND INSULATION TO BE REMOVED DOWN TO EXISTING
SHEATHING ON METAL STUD WALL. THE CONTRACTOR SHALL
6 6 MAINTAIN A WEATHER BARRIER AT DEMOLISHED OPENINGS AND
OTHER CONDITIONS.
2. EXISTING MASONRY VENEER AND RELATED FLASHING AND
4 ANCHORS TO BE REMOVED DOWN TO EXISTING SHEATHING ON
METAL STUD WALL. CONTRACTOR SHALL MAINTAIN A WEATHER
BARRIER AT DEMOLISHED OPENINGS AND OTHER CONDITIONS.
3. EXTERIOR ALUMINUM FRAMES AND GLASS TO BE REMOVED. THE
CONTRACTOR SHALL SECURE OPENINGS DURING CONSTRUCTION
1 1 5 PROCESS.
TYP. 5 4. EXISTING CURTAINWALL AND GLAZED ARCHED SKYLIGHT ROOF TO
TYP.
Q BE REMOVED INCLUDED ALL RELATED STRUCTURE.
CONTRACTOR SHALL MAINTAIN A WEATHER BARRIER AT
DEMOLISHED OPENINGS AND OTHER CONDITIONS.
10 10
TYP. 5 5. CAREFULLY REMOVE AND SALVAGE AIRPORT SIGNAGE.
14 14 TYP. 14 14 DISCONNECT POWER AND COORDINATE WITH NEW ELECTRICAL
WORK. STORE SIGNS IN A SAFE LOCATION AND PREPARE FOR
REINSTALLATION.
6. EXISTING METAL PANEL CLADDING AND RELATED SUBSTRATE,
GRAVEL STOP, BLOCKING, AND FRAMING TO BE REMOVED
9
ENTIRELY.
7. REMOVED EXISTING DOOR AND FRAME ENTIRELY.
8. DEMOLISH ENTIRE EXISTING EXTERIOR TRUSS SYSTEM THAT
2 2 CONNECTS THE MAIN TERMINAL TO THE PARKING GARAGE
P J1 / A401 CANOPY, INCLUDING COLUMNS AND FOUNDATIONS. TAKE CARE TO

P1 AREA "A" - EXISTING


REMOVE FROM EXISTING STRUCTURE BUILDING STRUCTURAL
1
FRAME. PROVIDE WEATHER BARRIER AT POINT WHERE STRUCTURE
IS REMOVED FROM THE TERMINAL BUILDING.
9. PROTECT EXISTING SLIDING DOOR ENTRANCES AND BULKHEAD
SCALE: 1/8" = 1'-0" ABOVE DURING CONSTRUCTION PROCESS.
10. REMOVE EXISTING COLUMN COVER AND RELATED BASE, CAP,
AND STRUCTURE. SEE DETAILS AND STRUCTURAL DRAWINGS FOR
REMOVAL AND REPLACEMENT OF STRUCTURAL COLUMNS.
T9.9 T10.6
T10.9 T11.9
T12 T14
T14.2 T15.1
T15.2 T16.1 T16.4 T18.1
11. REMOVE EXISTING FASCIA AND FASTENERS.
12. EXISTING WALL OR PARAPET ABOVE ROOF IS TO REMAIN.
9.5 9.9 10.9 11.9 12/R 14/T 14.1 15.1 15.2 16.1 16.4 MAINTAIN EXISTING FLASHING, METAL CLADDING SYSTEM, COPING,
T9 T10 10.6 T11 T11.8 T14.1 T15 T16 T17 T18 AND OTHER WEATHER RESISTANT ELEMENTS. SEE OTHER
N DRAWINGS FOR CLEANING OF CLADDING. MAINTAIN SUFFICIENT
FLASHING FOR SPLICING WITH NEW ROOF MEMBRANE.
13. REMOVE ENTIRE ISLAND CANOPY STRUCTURE INCLUDING COLUMNS
AND FOUNDATIONS.
14. CUT OPENING INTO EXISTING METAL STUD WALL IN PREPARATION
18 FOR NEW OPENINGS. COORDINATE WITH PLANS AND SECTIONS.
PROVIDE ALL NECESSARY SHORING AND BRACING.
15. REMOVE EXISTING PORTER STATIONS.
16. REMOVE METAL CLADDING PANEL TO NEAREST JOINT WHERE
CANOPY STRUCTURE AND RELATED METAL PANELS AND
SUBSTRATE ARE BEING REMOVED. THE CONTRACTOR SHALL
MAINTAIN A WEATHER BARRIER AT DEMOLISHED OPENINGS AND
M OTHER CONDITIONS.
12 4 12 17. EXISTING BAGGAGE CONVEYOR AND OPENING TO BE REMAIN.
PROTECT DURING CONSTRUCTION. COORDINATE THE REMOVAL
AND REMOUNTING OF ELECTRICAL PANELS AND SWITCHES WITH
18.1 ELECTRICAL TRADE.
18. EXISTING GLASS CURTAINWALL TO REMAIN. SEE DETAILS FOR
REMOVAL OF SELECTED AREAS TO ACCOMMODATE NEW
CONSTRUCTION.
12 12
19. REMOVE EXISTING SITE AMENITIES SUCH AS BENCHES AND ASH
T9.5 8 RECEPTACLES.
16 12 20. COMPELTELY REMOVE EXISTING SHELTER. DISCONNECT POWER.
4 6 4

L
16
6 6
6 6 6

6 6 GENERAL NOTES:
4
6 4

1 5 3 11 11 4 11 3 1
5
TYP. 5
K 5

1 9
10 TYP. 10
TYP. 10 14 14 TYP.
14 10
14

9
J 2 2 15
9 2
9 1 E1 / A401
J1 AREA "B" - EXISTING
SCALE: 1/8" = 1'-0"

H T21.4 T23.2 T26.2

12 12 12
T19 T20 T21 21.4 T22 T23 T24 T25 T26 26.1

6 12 12
6 4 6
TYP.

G
6 6

6
5
TYP.

9 12 3 5 3
1 1 1
5 1 3 1 1 1
3
F 9
10 9 10 10 10
14 TYP. 14 14 TYP. 14 TYP. 14 TYP.

15 15 2 2 17

E
E1 AREA "C" - EXISTING
No. Revisions / Submissions Date
SCALE: 1/8" = 1'-0"

D
LWC
I NCOR P O R ATED
A1 4 434 East First Street Dayton, OH 45402 937.223.6500
A511
4440 Garwood Place Richmond, IN 47374 765.966.3546

DAYTON INTERNATIONAL AIRPORT


3600 TERMINAL DRIVE
4
4 T9.5 VANDALIA, OH 45377
C (937) 454-8209
6 6 A1 6 6
A516
A10
A205 PHASE ONE CANOPY
C:\Revit\14613.00-DAY-Canopy-ARCH-2014_sbg.rvt

REPLACEMENT PROJECT
3600 TERMINAL DRIVE
B
10 10 10 10 EXTERIOR ELEVATIONS DEMO
TYP. TYP. TYP. 5 TYP.
10
PROGRESS Comm. No.

14613.00
Date

JAN 15, 2015


20 19 19
20 10 20
19
19 DRAWING
NOT FOR Drawn

SBG
Drawing No.

A
CONSTRUCTION
A1 CENTRAL CANOPY - EXISTING A1
A516 3/26/2015 Checked

EGS/JCF
A401
SCALE: 1/8" = 1'-0" 1:56:28 PM
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 © 2013 LWC, INCORPORATED
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
3/26/2015 2:14:31 PM
A1
A501
T3.4 T3.5 T3.6
A2
T5.1 T6 T6.3 T6.4 T8 SHEET NOTES:
A3 A9 A507
A6
A509 A506 A503

R T2 T3 T4 T7 8 1. NEW METAL DOUBLE COLUMNS COATED WITH INTUMESCENT PAINT. SEE


A6 STRUCTURAL DRAWINGS FOR PLACEMENT AND DETAILING. SEE SPECS
T1 A502 T7.4 FOR COATING.
T5
2. POWER WASH EXISTING METAL PANEL CLADDING. REPAIR
DETERIORATED SEALANT JOINTS PRIOR TO CLEANING.
3. EXISTING SLIDING DOOR STOREFRONT ENTRANCES TO REMAIN.
5 8 5 PROTECT DURING CONSTRUCTION.
16
TYP. 3.4 TYP. 4. GRANITE BASE.
TYP. TYP. 5. GLASS CANOPY SYSTEM. SEE DETAILS AND SPECS.
2 2 16 6. RE-INSTALL SALVAGED AIRPORT SIGNAGE. SEE DETAILS FOR
MOUNTING.
7. ALUMINUM CURTAINWALL SYSTEM WITH VERTICAL JOINTS BUTT GLAZED.
SEE SCHEDULE FOR ENLARGED ELEVATIONS.
Q 8. NEW METAL PANEL CLADDING SYSTEM.
9. EXISTING CURTAINWALL.
10. NEW STAINLESS STEEL ILLUMINATED SECURITY BOLLARDS. REFER TO
DETAILS AND SPECS.
2 11. HIGH PRESSURE COMPACT LAMINATE PANEL SYSTEM. SEE SECTIONS
AND DETAILS.
8 12. ALUMINUM CURTAINWALL SYSTEM, CAPTURED FOUR SIDES. SEE
SCHEDULE FOR ENLARGED ELEVATIONS.
8 13. PAINT EXISTING METAL PANEL FASCIA OVER MAIN ENTRANCE DOORS.
COLOR SELECTION BY ARCHITECT.
15 8
TYP. 1 8 14. NEW METAL PANEL TO MATCH EXISTING TO PROVIDE WEATHERTIGHT
15 8 CLOSURE WHERE CANOPY STRUCTURE WAS REMOVED. PROVIDE
8 8 NECESSARY BACKUP, FLASHING, SHEATHING, AND WEATHER BARRIER
P 7 7
11
7 7 7 FOR A WATERTIGHT, AIR TIGHT INSTALLATION.
25'-0"
15. NEW LINEAR METAL SUSPENDED CEILING SYSTEM.
10 10
8 16. STRUCTURAL “T” SUPPORTS. SEE STRUCTURAL DRAWINGS AND
TYP. TYP. 25'-0"
DETAILS.
17. NEW PORTER STATION DESK. SEE DETAILS.
18. EXISTING BAGGAGE CONVEYOR AND OPENING

4 4 TYP.
1
TYP. TYP.
3
N
P1 AREA "A" - NEW WORK
SCALE: 1/8" = 1'-0" T9.9 T10.6
T10.9 T11.9
T12 T14
T14.2 T15.1
T15.2 T16.1 T16.4 T18.1

9.5 9.9 10.9 11.9 12/R


A1 14/T 14.1 15.1 15.2 16.1 16.4
A511
T9 T10 10.6 T11 T11.8 T14.1 T15 T16 T17 T18

L
18.1

8 14 14
8

TYP. 5
16
1
T9.5
16 TYP.

1 8 5 1
5 1
GENERAL NOTES:
5
5 TYP. 2 2 2 2 2
A10 2
5 A205 5 5
A1
A516

K
15
8
12 15

8 12 6 12
6 11 11 6 6
8 15 15
6 15
8 8 8
7
J 11 TYP. 1 1 TYP. 7 7
8 11
7
8
1'-8"

3
3 3 3 1 TYP. 3
1 TYP. 1 TYP.
1 TYP. 1 TYP. 10 1 TYP. 10
4 4 4 1 TYP. 4 10 1 TYP. 10
1 TYP. 4
H A1
A516

J1 AREA "B" - NEW WORK


SCALE: 1/8" = 1'-0" A803
T21.4 T23.2 T26.2

T19 T20 T21 21.4 T22 T23 T24 T25 T26 26.1
A5
G A601

1 1 5 1 1
1 1
16 2 2
TYP
5 5 1 2
. 1 1 TYP 16
TYP 16 8 TYP 16 TYP 16
. . . .

2
1
14

F
15
14

12 8
6 8 6 6 5
15 15 6 15 TYP.
15 15
15
8 8 8 14
8 11
7 7 7 7
7 8 3

8
E

No. Revisions / Submissions Date

LWC
TYP. 10 4 17 10 17 10 3 4 10 4 18
TYP
.

D I NCOR P O R ATED

E1 AREA "C" - NEW WORK 434 East First Street Dayton, OH 45402 937.223.6500
4440 Garwood Place Richmond, IN 47374 765.966.3546
SCALE: 1/8" = 1'-0" A803
T9.5 DAYTON INTERNATIONAL AIRPORT
3600 TERMINAL DRIVE
VANDALIA, OH 45377
C A1 A10
A516 A205 (937) 454-8209

PHASE ONE CANOPY


C:\Revit\14613.00-DAY-Canopy-ARCH-2014_sbg.rvt

REPLACEMENT PROJECT
3600 TERMINAL DRIVE
B
EXTERIOR ELEVATIONS NEW WORK
PROGRESS Comm. No.

14613.00
Date

JAN 15, 2015


DRAWING
A1 NOT FOR Drawn

SBG
Drawing No.

A A516
CONSTRUCTION
A1 CENTRAL CANOPY - NEW WORK 3/26/2015 Checked

EGS/JCF
A402
SCALE: 1/8" = 1'-0" 2:14:31 PM
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 © 2013 LWC, INCORPORATED
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
3/26/2015 2:25:19 PM
SHEET NOTES:
1. NEW METAL DOUBLE COLUMNS COATED WITH INTUMESCENT PAINT. SEE
R STRUCTURAL DRAWINGS FOR PLACEMENT AND DETAILING. SEE SPECS
FOR COATING.
2. POWER WASH EXISTING METAL PANEL CLADDING. REPAIR
DETERIORATED SEALANT JOINTS PRIOR TO CLEANING.
A6 A3 A2 A6 3. EXISTING SLIDING DOOR STOREFRONT ENTRANCES TO REMAIN.
A509 A9 A507 A503 PROTECT DURING CONSTRUCTION.
A502 A506
4. GRANITE BASE.
5. GLASS CANOPY SYSTEM. SEE DETAILS AND SPECS.
T3.4 T5.1 T6.3
T6.4 T8 6. RE-INSTALL SALVAGED AIRPORT SIGNAGE. SEE DETAILS FOR
MOUNTING.
T1 T2 A5 A6 T3 A7 T3.5
T3.6 T4 A8 F1 T5 F2 T6 F3 T6.8 T7 F4 T7.3 T7.4 8 T8.2 T8.8 T9 7. ALUMINUM CURTAINWALL SYSTEM WITH VERTICAL JOINTS BUTT GLAZED.
SEE SCHEDULE FOR ENLARGED ELEVATIONS.
8. NEW METAL PANEL CLADDING SYSTEM.
Q 9. EXISTING CURTAINWALL.
8
10. NEW STAINLESS STEEL ILLUMINATED SECURITY BOLLARDS. REFER TO
A1 8
5.1 DETAILS AND SPECS.
A501 11. HIGH PRESSURE COMPACT LAMINATE PANEL SYSTEM. SEE SECTIONS
2 2
AND DETAILS.
12. ALUMINUM CURTAINWALL SYSTEM, CAPTURED FOUR SIDES. SEE
SCHEDULE FOR ENLARGED ELEVATIONS.
13. PAINT EXISTING METAL PANEL FASCIA OVER MAIN ENTRANCE DOORS.
SIM
COLOR SELECTION BY ARCHITECT.
A8 17 17 14. NEW METAL PANEL TO MATCH EXISTING TO PROVIDE WEATHERTIGHT
A508
CLOSURE WHERE CANOPY STRUCTURE WAS REMOVED. PROVIDE
NECESSARY BACKUP, FLASHING, SHEATHING, AND WEATHER BARRIER
P FOR A WATERTIGHT, AIR TIGHT INSTALLATION.
15. NEW LINEAR METAL SUSPENDED CEILING SYSTEM.
16. STRUCTURAL “T” SUPPORTS. SEE STRUCTURAL DRAWINGS AND
DETAILS.
12 17. NEW PORTER STATION DESK. SEE DETAILS.
12 18. EXISTING BAGGAGE CONVEYOR AND OPENING
8

7 11 11

7 8 7 7 7
N 8
8
8

4 4 4 4 4

T9.9 T10.6
T10.9 T11.9
T12 T13 A1 T14
T14.2 T15.1
T15.2 T15.3 T15.8 T16.1 T16.3 T16.4 T17.2 T17.8
M A511

9.5 9.9 10.9 11.9 12/R 14/T 14.1 15.1 15.2 16.1 16.4
T10 10.6 T11 T11.8 T14.1 T15 T16 T17 T18

GENERAL NOTES:
2 2

K 8
8
8
2 2

14
9
14
8

12

15 15
15 15
15
11

7 7 7 7
KEY PLAN:
H 8 8 8
8 8

3
4 3 4 3 3
T18.1 T21.4 T23.2 T26.2

G 18.1 T18.3 T19 T19.1 F20 T19.5 T20 T20.3 T21 T21.1 21.4 T21.5 T22 T22.3 T23 T23.1 T23.5
B6 T24 T24.3 T25 T25.1 T26 26.1

2 2 2 2 2

A5
A601

12

15
8
8 8 8 8 8 8
11
E
7 7 7 7 7 7

8
No. Revisions / Submissions Date

D
4
4 4 4 3 3 4 4 4

LWC
I NCOR P O R ATED
434 East First Street Dayton, OH 45402 937.223.6500
1 4440 Garwood Place Richmond, IN 47374 765.966.3546
H11 A403
A508

TD TC TB.9 TB TB TB.9 TC
DAYTON INTERNATIONAL AIRPORT
SIM TB.9 TC
A8
2 A508 3600 TERMINAL DRIVE
A1 VANDALIA, OH 45377
A513

C 5 TD TC TB.9
TB.9 TC (937) 454-8209
Hb 5 4 T3.6 2
A403
A1
A512
8

A6
A510 A6 A6 PHASE ONE CANOPY
C:\Revit\14613.00-DAY-Canopy-ARCH-2014_sbg.rvt

A505
A504 8
A2
REPLACEMENT PROJECT
16
T5 A9 T4
A507
A506
8

8
10
3600 TERMINAL DRIVE
8

B 8
8 STOREFRONT ELEVATIONS NEW WORK
8

PROGRESS
7
Comm. No. Date

14613.00 JAN 15, 2015


10 10
DRAWING
NOT FOR Drawn

Author
Drawing No.

A
TYPICAL PARAPET ELEVATION TYPICAL PARPAET ELEVATION CONSTRUCTION
4 TYPICAL ELEVATION 5 TYPICAL NORTH ELEVATION 6
(EAST)
7
(NORTH)
8 MAIN CANOPY SOUTH/ NORTH 9 South Elevation 3/26/2015 Checked

Checker
A403
SCALE: 1/8" = 1'-0" A803 SCALE: 1/8" = 1'-0" SCALE: 1/8" = 1'-0" SCALE: 1/8" = 1'-0" SCALE: 1/8" = 1'-0" SCALE: 1/8" = 1'-0" 2:25:19 PM
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 © 2013 LWC, INCORPORATED
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
3/26/2015 2:39:36 PM
SHEET NOTES:
1. XXX
R
B.9
B.9 C
C

Q
TB.9 TC

EXISTING PARAPET EXISTING INSULATION


WALL TO REMAIN 1 1/2" RIGID INSULATION

PRE-FINISHED METAL PANEL


SYSTEM
N

EXISTING METAL PANELS PREFINISHED SHEETMETAL


TO REMAIN TRIM TO MATCH METAL
PANELS

FIRE RETARDANT SEALANT


TREATED 2X8
BLOCKING
EXISTING GYPSUM BOARD PREFINISHED METAL
TRIM TO MATCH STOREFRONT
M

EXISTING SINGLE PLY ROOF


MEMBRANE AND ROOF EXISTING SLIDING
STRUCTURE TO DOOR FRAME
REMAIN

TERMINATION BAR AND SEALANT


FIRE RETARDANT TREATED
ROOF INSULATION BLOCKING
EXISTING STOREFRONT FRAME
L EXISTING CONCRETE
EXISTING DECKING
NEW SINGLE PLY ROOF SINGLE PLY ROOF
MEMBRANE ROOF MEMBRANE

GENERAL NOTES:
SEE ROOF DRAWINGS
FOR REMOVAL OF EXISTING
MEMBRANE FOR NEW MEMBRANE
EXISTING 6" METAL STUD WALL
K AND FIBERGLASS INSULATION
EXISTING METAL BACKER ROD
ROOF DECKING TO REMAIN AND SEALANT

OVER LAP FLASHING


SHEATHING TO BE REMOVED AND REPLACED A. XXX
AS NEEDED FOR NEW STRUCTURAL BRACING
DEMO EXISTING EXTERIOR
METAL PANEL CEILING
NEW METAL PANEL
CLADDING SYSTEM
EXISTING GYPSUM WALL BAORD
J
1.5" RIGID INSULATION R 7.5

EXISTING INSULATION

EXISTING SHEATHING

FLUID APPLIED
WEATHER BARRIER
H
LIMIT DEMO TO WHAT IS NEEDED FOR NEW HEADER.
SEE DETAILS
GRANITE BASE BELOW
NO WALL DEMOLTION ABOVE NEW LINEAR PANEL NO WALL DEMOLTION ABOVE NEW LINEAR PANEL
CEILING SYSTEM CEILING SYSTEM

G
G14 DEMO MAIN CANOPY DOOR JAMB
SCALE: 3" = 1'-0" A102

F
11.9 14.1
11.8 14.2
EXISTING METAL PANEL
SYSTEM TO BE REMOVED

A1
A511

EXISTING
E GYPSUM BOARD

METAL PANELS EXISTING SHIM SPACE


EXISTING ALUMINUM
TO BE AND CAULKING
CURTAIN WALL
REMOVED AND
METAL PANELS TO BE
No. Revisions / Submissions Date
RECPLACED SINGLE PLY MEMBRANE
EXISTING MASONRY REMOVED AND REPLACED
ROOF SIM
VENEER TO BE REMOVED
A1 EXISTING SLIDING
A508 DOOR FRAME

LWC
SIM
A1 EXISTING
A504 METAL STUD WALL
EXISTING BARREL
DEMO EXISTING METAL STUD EXISTING 5'X5'
D WALL FOR NEW GLAZED
VAULTED SKYLIGHT
METAL PANEL TO I NCOR P O R ATED
EXISTING ALUMINUM TO BE REMOVED
REMAIN
OPENING CURTAIN WALL TO 434 East First Street Dayton, OH 45402 937.223.6500
BE REMOVED
REMOVE AND REPLACE 4440 Garwood Place Richmond, IN 47374 765.966.3546
EXISTING WALL
EXISTING 5'X5'
METAL PANEL TO
REMAIN DAYTON INTERNATIONAL AIRPORT
EXISTING SLIDING DOORS 3600 TERMINAL DRIVE
EXISTING BARREL VANDALIA, OH 45377
VAULTED
C SKYLIGHT TO BE PROVIDE SEALANT WHERE GRANITE (937) 454-8209
CONCRETE SIDEWALK REMOVED BASE MEETS
TO BE DEMOLISHED EXISTING SHEATHING EXISTING SLIDING DOOR
EXISTING GYPSUM
JAMB FACE
FOAM AND ROD SEALANT PHASE ONE CANOPY
C:\Revit\14613.00-DAY-Canopy-ARCH-2014_sbg.rvt

BOARD CEILING FLUID APPLIED


WEATHER BARRIER
REPLACEMENT PROJECT
1 1/2" RIGID INSULATION AIR GAP
PREFINISHED METAL CAP TO TRIM
HIGH COMPACT LAMINATE
SYSTEM
3600 TERMINAL DRIVE
4 1/4"

EXISTING WALL PROTECTORS HIGH PREASURE GRANITE BASE


TO REMAIN COMPACT BELOW
B LAMINATE
5" PANEL SYSTEM
EXTERIOR SECTIONS & DETAILS
PROGRESS Comm. No.

14613.00
Date

JAN 15, 2015


DRAWING
NOT FOR Drawn

SBG
Drawing No.

A
DEMO OF MAIN CANOPY SECTION CONSTRUCTION
A1 TYPICAL DEMO WALL SECTION A8
INTERIOR VIEW
A14 DEMO TO EXISTING DOOR JAMB 3/26/2015 Checked

EGS/JCF
A501
SCALE: 1" = 1'-0" A101 SCALE: 1/8" = 1'-0" A102 SCALE: 3" = 1'-0" A101 2:39:36 PM
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 © 2013 LWC, INCORPORATED
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
3/26/2015 2:52:51 PM
SHEET NOTES:

TENSION ROD
P

STEEL TUBE

SINGLE MEMBRANE AS FLASING

CONTINUOUS BEAD OF
ROOF WARRANTY EQ. SEALANT
N STAINLESS STEEL CLAMPING RING
FASTENER AND
SEAM PLATE AT 12" O.C.

BONDING ADHEASIVE
WELDED SPLICE

1
A403
L
1L ROOF PENETRATION DETAIL
SCALE: 1 1/2" = 1'-0" A502 GENERAL NOTES:

B.9
TB.9
B.9 C
TC
C

GLASS CANOPY
EXISTING 5/8" GYPSUM SYSTEM. SEE DETAILS
WALLBOARD AND SPECS
NEW STRUCTURAL EXISTING PARAPET WALL
SYSTEM- SEE STRUCTURAL NO WORK
EXISTING METAL STUD WALL DRAWINGS
WITH FIBERGLASS INSULATION STEEL COLUMN
4'-10 1/2
"
SINGLE PLY ROOF
J 4'-10 1/2
" MEMBRANE
SINGLE PLY
R 19 FIBERGLASS COVER BOARD FLASHING AT COLUMNS
ROOF DRAIN SEE
NEW LINEAR METAL 4'-10 1/2 MECH.
" EXISTING
SUSPENDED CEILING SYSTEM FLASH
COVER BOARD ROOF- NO WORK THIS
EXISTING STRUCTURAL COLUMN ROOF
NEW SINGLE PLY PENETRATION AREA
ROOFING MEMBRANE SEE DETAILS

6 MIL VAPOR BARRIER GRAVEL STOP


KEY PLAN:
H
NEW LINEAR METAL
SUSPENDED CEILING SYSTEM

1L
A502
METAL FURING

NEW METAL PANEL


PREFINISHED METAL
SYSTEM
TRIM
SEE STRUCTURAL 2x8 TREATED BLOCKING
G DWGS FOR BEAM
NEW METAL PANEL
SYSTEM NEW COLUMN COVER SIZING PREFINISHED METAL TRIM
NEW LINEAR METAL
SPENDED CEILING
1 1/2" RIGID INSULATION 3 5/8" METAL STUD
- R 7.5 SIM NEW LINEAR METAL SUSPENDED FRAMING @ 16" O.C. WITH
M6 CEILING METAL STUD KICKERS @
A503 48" O.C.
PREFINSIHED
METAL TRIM

A1
A502

GYPSUM
EXISTING METAL STUD WALL EXISTING STRUCTURAL BOARD SOFFIT
COLUMN
FLUID APPLIED NEW ACCOUSTICAL
WEATHER BARRIER SUSPENDED CEILING
E NEW METAL PANEL SYSTEM EXISTING METAL COLUMN
EXISTING SHEATHING
METAL COLUMN WRAP

1 1/2" RIGID INSULATION FLUID APPLIED WEATHER No. Revisions / Submissions Date
R7,5 BARRIER

NEW METAL PANEL SYSTEM


EXISTING METAL STUD

D
FLASHING TAPE
EXISTING GYPSUM
WALL BOARD
EXISTING SHEATHING
NEW HALF COLUMN
LWC
I NCOR P O R ATED
COVER 434 East First Street Dayton, OH 45402 937.223.6500
4440 Garwood Place Richmond, IN 47374 765.966.3546
G1
GRANITE BASE A508

5/8" GYPSUM
WEEP @ 24" EXISTING WALLBOARD DAYTON INTERNATIONAL AIRPORT
O.C. CONCRETE
FLOOR 3600 TERMINAL DRIVE
STAINLESS STEEL 1 1/2" RIGID INSULATION 5/8" GYPSUM VANDALIA, OH 45377
3/8" GROUT BED ANCHOR WALLBOARD
C (937) 454-8209
EXPANSION MATERIAL

PHASE ONE CANOPY


NEW CONCRETE METAL STUD WALL
SIDE WALK-
C:\Revit\14613.00-DAY-Canopy-ARCH-2014_sbg.rvt

SEE CIVIL FOR SLOPE

5" REINFORACED
A1
A605
GRANITE BASE
REPLACEMENT PROJECT
CONCRETE
SLAB 3600 TERMINAL DRIVE
EXISTING CONCRETE
SLAB AND FOUNDATION
B 4" AGGREGATE
BASE
EXTERIOR SECTIONS & DETAILS
Comm. No. Date
T E OF OH 14613.00 JAN 15, 2015
TA

IO
JOHN Drawn Drawing No.
CHARLES
A FABELO SBG
WALL SECTION THROUGH SECTION TRHOUGH COLUMN
A502

RE G

CT
A1 A6 11799
Checked
COLUMN COVER COVER AND KIOSK

TE
ST

I
ER HI JCF/EGS
SCALE: 1 1/2" = 1'-0" A502 SCALE: 1/2" = 1'-0" A101 E D ARC
JOHN CHARLES FABELO, LICENSE NO. 11799
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 EXPIRATION DATE: 12.31.2013
© 2013 LWC, INCORPORATED
B
1 2 3 4 5 6 7 8 9 10 11 TB 12 13 14 15 16 17 18 19 20
3/26/2015 2:59:48 PM
SHEET NOTES:

R SUNGLE PLY ROOF


MEMBRANE
1/2"COVER BOARD
GRAVEL STOP
1/4" PER FOOT SLOPE
3/4" PLYWOOD

1/2" COVERBOARD

SINGLE PLY MEMBRANE


NEW SINGLE PLY
CAULK ROOFING MEMBRANE

Q
PREASURE
TREATED 2X6
WOOD NAILERS

2'-6 15/16"
PRESSURE TREATED
3 5/8" METAL STUDS BRACE TO 2X4 NAILER
@ 16" O.C. BEAM
P
EXISTING STEEL

4'-0 3/4"
STRUCTURE

5/8" GYPSUM SHEATHING PRESSURE TREATED 2X NAILER


FLUID APPLIED
WEATHER BARRIER
PREFINSHED
N METAL TRIM

10 5/8"
NEW METAL PANEL
SYSTEM
B.9 C
SEE STRUCTURAL
DWGS FOR BEAM
SIZING

2 1/4" 4 7/8"
M
EXISTING 5/8" GYPSUM PREFINISHED METAL TRIM
EXISTING METAL STUD WALL WALLBOARD
WITH FIBERGLASS INSULATION
2'-11 13/16" 1'-0"
STEEL COLUMN

3'-11 13/16"

EXISTING
SHEATHING DEMOLITION ABOVE WINDOW
L LINE AS REQUIRED FOR
NEW STEEL

LINEAR METAL
5/8" GYPSUM WALLBOARD M6 DETAIL METAL FASCIA
R 19 FIBERGLASS
GENERAL NOTES:
TRACT
SCALE: 1 1/2" = 1'-0" A502
6 MIL VAPOR BARRIER
REMOVE TREATED
2X6 NAILER
NEW LINEAR METAL
SUSPENDED CEILING
K A6
A504

NEW LINEAR METAL


SUSPENDED CEILING

PREFINISHED METAL
TRIM 1
A403

FOAM AND ROD SEALANT


J

2X6 NAILER
GLASS CANOPY SYSTEM- SEE DETAILS AND EXISTING PARAPET
SPECIFICATION

NEW STRUCTURAL STEEL


SYSTEM

KEY PLAN:
H ALUMINUM CURTAINWALL COVER BOARD EXISTING SINGLE PLY
SYSTEM SIINGLE PLY MEMBRANE MEMBRANE ROOF
COVER COVER BOARD EXISTING ROOF

EXISTING ROOF
WITH NEW SINGLE PLY MEMBRANE

GRAVEL STOP

G M6
A503
BRACE TO
BEAM
EXISTING STRUCTURE-
SEE STRUCT. DWGS
A1
A503

NEW METAL PANEL SYSTEM


SEE STRUCTURAL
DWGS FOR BEAM NEW LINEAR METAL SUSPENDED
ALUMINUM CURTAIN WALL SIZING CEILING SYSTEM
F SYSTEM
3 5/8" METAL STUD
FRAMING @ 16" O.C. WITH
NEW LINEAR METAL SUSPENDED METAL STUD KICKERS @
CEILING SYSTEM PREFINISHED

2"
48" O.C.
METAL TRIM

1'-1 1/16"
E PREASURE TREATED
2X6 NAILER

ALUMINUM CURTAIN WALL SYSTEM No. Revisions / Submissions Date


STEEL COLUMN
GYPSUM BOARD
1'-6"
FRAMED BULLKHEAD NEW ACCOUSTICAL TILE
PREASURE TREATED 2X4
SUSTPENDED CEILING

LWC
NAILER

GRANITE SILL FOAM AND ROD SEALANT

D SOLID SURFACE
I NCOR P O R ATED
SILL
434 East First Street Dayton, OH 45402 937.223.6500

13'-4"
5/8" GYPSUM 5/8" GYPSUM 4440 Garwood Place Richmond, IN 47374 765.966.3546
BOARD WALL BOARD
SHEATHING

6 MIL VAPOR BARRIER DAYTON INTERNATIONAL AIRPORT


3600 TERMINAL DRIVE
METAL STUD@ 16" O.C. R-19 BATT FIBERGLASS
FLUID APPLIED WEATHER AND INSULATION VANDALIA, OH 45377
ILLUMINATED
FLASHING WITH WEEP @
C 24" O.C.
SECURITY BOLLARD
(937) 454-8209

PHASE ONE CANOPY


C:\Revit\14613.00-DAY-Canopy-ARCH-2014_sbg.rvt

1 1/2" RIGID INSULATION. R 7.5

REPLACEMENT PROJECT
NEW STUD WALL
BELOW NEW ALUMINUM 3600 TERMINAL DRIVE
CURTAIN WALL SYSTEM
EXISTING CONCRETE NEW CONCRETE
B SLAB AND FOUNDATION SIDE WALK
5" REINFORACED
CONCRETE
1/2" EXPANSION
MATERIAL
GRANITE BASE
EXTERIOR SECTIONS & DETAILS
SLAB
Comm. No. Date
4" AGGREGATE
T E OF OH 14613.00 JAN 15, 2015
TA
BASE

IO
JOHN Drawn Drawing No.
CHARLES
A FABELO SBG

A503

RE G

CT
A1 BUTT GLAZING WALL SECTION A6 CAR RENTAL CANOPY SECTION
11799
Checked

TE
ST

I
ER HI JCF
SCALE: 1 1/2" = 1'-0" A503 SCALE: 1/2" = 1'-0" 1 E D ARC
JOHN CHARLES FABELO, LICENSE NO. 11799
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 EXPIRATION DATE: 12.31.2013
© 2013 LWC, INCORPORATED
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
3/26/2015 3:03:15 PM
SHEET NOTES:

T5

L T3.4 T4 T5.1

A3
A509
A2
A507 GENERAL NOTES:
A9
A506 PREFINISHED METAL COPING
PREFINISHED
A1 METAL COPING
A504
SINGLE PLY
MEMBRANE ROOF
K

NEW METAL PANEL SYSTEM

EXISTING METAL STUD


NEW METAL PANEL SYSTEM
WALL WITH
T4
FLUID APPLIED FIBERGLASS BATT
WEATHER BARRIER 5/8" GYPSUM SHEATHING INSULATION
J MOISTURE RESISTANT MOISTURE RESISTANT
FLASHING TAPE GYPSUM WALL BOARD GYPSUM WALL BOARD

METAL FLASHING EXISTING METAL STUD WALL


5/8" MOISTURE
SINGLE PLY ROOF RESISTANT GYPSUM WITH FIBERGLASS BATT
MEMBRANE WALLBOARD INSULATION METAL STUD WALL
@ 16" O.C
1/2" COVERBOARD LINEAR METAL
6" METAL STUD SUSPENDEC CEILING EXISTING SINGLE PLY F1
WALL @ 16" O.C. ROOF AND DECK A504

4" RIGID INSULATION


NEW SINGLE PLY ROOF
MEMBRANE
NEW SINGLE PLY ROOF
MEMBRANE
EXISTING SINGLE
PLY ROOF
KEY PLAN:
H
,LINEAR METAL SUSPENDED
CEILING

EXISTING SINGE PLY ROOF


EXISTING CONCRETE EXISTING ROOF
ROOF DECK DECK

G
EXISTING STRUCTURE NEW METAL PANEL SYSTEM
1'-2 15/16"

5/8" GYPSUM
SHEATHING

6" METAL STUD


FRAMING @ 16" O.C. WITH
8'-9 3/8"

METAL STUD KICKERS @


48" O.C.
F
SECONDARY ENTRANCE EXISTING LINEAR METAL
F1 SUSPENDED CEILING
6" METAL STUD

ROOF FRAMING @ 16" O.C. WITH


METAL STUD KICKERS @
48" O.C.
SCALE: 1 1/2" = 1'-0" A504
T4 A9 L6
A505
2'-5 15/16"

A506

E
PRE FINSIHED
METAL COPING
SINGE PLY MEMBRANE No. Revisions / Submissions Date

1'-6 1/16" 2'-4"

LWC
2X6 PREASURE 2'-4" 1'-6 1/16"
TREATED NAILER 6" METAL STUD ALUMINUM CURTAIN WALL SYSTEM
TOP TRACK
SINGLE PLY
D ROOF MEMBRANE I NCOR P O R ATED
434 East First Street Dayton, OH 45402 937.223.6500
SIM
NEW METAL PANEL A1
OVERLAP SINGLE PLY
SYSTEM
ROOF MEMBRANE
A503 4440 Garwood Place Richmond, IN 47374 765.966.3546
FASTNER 1/2" COVERBOARD
FLUID APPLIED ALUMINUM
WEATHER BARRIER CURTAIN WALL
SYSTEM
DAYTON INTERNATIONAL AIRPORT
10'-7"

4" RIGID INSULATION


3600 TERMINAL DRIVE
METAL STUDS VANDALIA, OH 45377
METAL STUD WALL
@ 16" O.C.
C @ 16" O.C.
WITH R-19 BATT (937) 454-8209
INSULATION

PHASE ONE CANOPY


5/8"GYPSUM WALLBOARD

5/8" GYPSUM
C:\Revit\14613.00-DAY-Canopy-ARCH-2014_sbg.rvt

REPLACEMENT PROJECT
BOARD SHEATHING

3600 TERMINAL DRIVE


8" GRANITE BASE

R-19 BATT INSUALTION 6" METAL STUD


WALL @16" O.C.
WITH R-19 BATT
EXISTING STRUCTURE INSULATION
B
EXISTING CONCRETE EXTERIOR SECTIONS & DETAILS
SLAB AND FOUNDATION

Comm. No. Date


5" REINFORACED CONCRETE T E OF OH 14613.00 JAN 15, 2015
1'-0 1/2" SLAB
4" AGGREGATE BASE 8" GRANITE BASE TA

IO
JOHN Drawn Drawing No.
CHARLES
A SBG
SECTION THROUGH SECONDARY
FABELO
SECONDARY ENTRANCE TYPICAL
A504

RE G

CT
A1 A6 11799
Checked
PARPAET ENTRANCE

TE
ST

I
ER HI JCF/ EGS
SCALE: 1 1/2" = 1'-0" A501 SCALE: 1/2" = 1'-0" 1 E D ARC
JOHN CHARLES FABELO, LICENSE NO. 11799
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 EXPIRATION DATE: 12.31.2013
© 2013 LWC, INCORPORATED
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
3/26/2015 3:11:57 PM
T3.5
A3
A509 T3.6 T4 A9
A506
SHEET NOTES:

EXISTING METAL STUD WITH


FIBERGLASS INSULATION

5/8" GYPSUM
PREFINISHED BOARD SHEATHING
METAL TRIM

2X PREASURE 2X PREASURE
Q TREATED NAILER TREATED NAILER

PREFINISHED
METAL TRIM

6" METAL STUD


FRAMING @ 16" O.C. WITH
METAL STUD KICKERS @
48" O.C.

1/2"
LINEAR METAL
SUSPENDED CEILING
NEW METAL PANEL
2X6 NAILER
FOAM ROD AND SEALANT SYSTEM

N
ALUMINUM CURTAIN WALL SYSTEM

5/8" GYPSUM
BOARD SEHATHING

NEW METAL PANEL SYSTEM

NEW METAL PANEL SYSTEM

L
SECONDARY ENTRANCE SOFFIT
L6
DETAIL
SCALE: 1 1/2" = 1'-0" A504 GENERAL NOTES:
A3
T5 T4 A509

T5.1 SIM T3.6 T3.5 T3.4


1L A2 A9
A502 PREFINISHED METAL COPING
A507 A506 PREFINISHED METAL COPING
K

1/2" COVERBOARD

5/8" GYPSUM
4" RIGID INSULATION
SHEATHING NEW SINGLE PLY ROOF MEMBRANE
EXISTING METAL STUD EXISTING METAL STUD
WALL WITH FIBERGLASS 2X6 METAL STUD WALL WITH FIBERGLASS
INSULATION WALL @ 16" O.C. INSULATION

J NEW METAL PANEL


NEW METAL PANEL SYSTEM
SYSTEM

NEW SINGLE PLY ROOF


MEMBRANE NEW SINGLE PLY ROOF
FLASH AND SPLICE 5/8" GYPSUM MEMBRANE
WITH EXISTING MEMBRANE WALL BOARD FLASH AND SPLICE
SEAM WITH EXISTING MEMBRANE
SEAM
KEY PLAN:
5/8" GYPSUM
WALL BOARD
H EXISTING SINGLE A1 2X6 METAL
PLY ROOF MEMBRANE A505 STUDS @
16" O.C.

EXISTING SINGLE PLY


CONCRETE ROOF MEMBRANE
LINEAR METAL
SUSPENDED CEILING SLAB

G EXISTING
CONCRETE
DECK
EXISTING ROOF
EXISTING
CONCRETE DECK

EXISTING STEEL 6" METAL STUD


STRUCTURE FRAMING @ 16" O.C. WITH
METAL STUD KICKERS @
48" O.C.

6" METAL STUD LINEAR METAL


F FRAMING @ 16" O.C. WITH SUSPENDED
8'-8 11/16"

PREFINISHED METAL STUD KICKERS @ CEILING


METAL TRIM 48" O.C.

5/8" GYPSUM
SHEATHING

SIM
L6
A505
E
LINEAR METAL LINEAR METAL SUSPENDED
SUSPENDED CEILING SYSTEM
CEILING No. Revisions / Submissions Date
NEW METAL
PANEL SYSTEM NEW METAL PANEL

LWC
SYSTEM
T5
NEW METAL
FLUID APPLIED WEATHER PANEL SYSTEM
BARRIER 1'-6 1/16" 2'-4"
2'-4" 1'-6 1/16"
D I NCOR P O R ATED
5/8" GYPSUM 434 East First Street Dayton, OH 45402 937.223.6500
SHEATHING
SIM
ALUMINUM 4440 Garwood Place Richmond, IN 47374 765.966.3546
CURTAIN WALL
FLASHING TAPE A1 SYSTEM
A503
5/8" GYPSUM
PRE-FINISHED
METAL FLASHING
WALL BOARD DAYTON INTERNATIONAL AIRPORT
3600 TERMINAL DRIVE
VANDALIA, OH 45377
10'-8 1/2"

ALUMINUM CURTAIN
NEW METAL PANEL
C SYSTEM
WALL SYSTEM
(937) 454-8209
SINGLE PLY ROOF
PHASE ONE CANOPY
MIN 8"

MEMBRANE
C:\Revit\14613.00-DAY-Canopy-ARCH-2014_sbg.rvt

6" METAL STUDS


EXISTING ROOF
WITH NEW
@ 16" O.C.
REPLACEMENT PROJECT
SINGLE PLY
ROOF MEMBRANE
EXISTING
ROOF STRUCTURE 3600 TERMINAL DRIVE
5" REUINFORCED
CONCRETE SLAB
B
EXISTING CONCRETE
SLAB AND
4" GRAVEL AGREGATE
GRANITE BASE
EXTERIOR SECTIONS & DETAILS
FOUNDATION

Comm. No. Date


T E OF OH 14613.00 JAN 15, 2015
TA

IO
JOHN Drawn Drawing No.
CHARLES
A FABELO SBG
EXTERIOR SECONARY ENTRANCE
A505

RE G

CT
A1 ROOF CONNECTION DETAIL A6 11799
Checked
SECTION

TE
ST

I
ER HI JCF/ EGS
SCALE: 1 1/2" = 1'-0" A505 SCALE: 1/2" = 1'-0" 1 E D ARC
JOHN CHARLES FABELO, LICENSE NO. 11799
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 EXPIRATION DATE: 12.31.2013
© 2013 LWC, INCORPORATED
B.9 C
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
3/26/2015 3:14:26 PM
3'-5" SHEET NOTES:
2 1/2" 3'-0" 2 1/2"
R TB.9 TC

PREFINSIHED
METAL COPING TC TC

2 1/2"
GRANITE BASE

SIM
A1
A504 PREASURE TREATED
2X NAILER
Q
5/8" GYPSUM BAORD
SHEATHING

128'-2 1/2"
NEW METAL PANEL SYSTEM

3'-5"

3'-0"
6" METAL STUD
@ 16" O.C.
P FLUID APPLIED
WEATHER BARRIER NEW SINGLE PLY ROOF
1/2" COVERBOARD

NEW METAL PANEL 4" RIGID INSULATION , R 23


SYSTEM 6" METAL STUD
@ 16" O.C.

N
WIDE FLANGE COULMN

2 1/2"
SHEATHING
SEE STRUCTURAL
METAL STUD WALL SEE STRUCTURAL DRAWGS

NEW METAL PANEL SYSTEM


NEW METAL
PANEL SYSTEM PREFINISHED METAL
FLASHING
FLUID APPLIED A1
M WEATHER BARRIER A506
6" METAL STUD @

FLASHING TAPE
16" O.C.
M9 EXTERIOR COLUMN COVER
SINGLE PLY MEMBRANE SCALE: 1 1/2" = 1'-0" A101
SEE STRUCTURAL ROOF

1/2" COVER BOARD


6 5/16"

B.9
B.9 C
C D
D

PREFINISHED

EXISTING ROOF DECK


TB.9 TC TD METAL COPING GENERAL NOTES:
SIM
METAL COPING
EXISTING SINGLE PLY ROOF A1
WITH NEW MEMBRANE 6" METAL STUD @ A504
16" O.C. NEW SINGLE PLY ROOFING SYSTEM

K
GLASS CANOPY SYSTEM

NEW METAL PANEL SYSTEM

METAL STUD WALL

1 1/2" RIGID INSULATION R-7.5


J METAL STUD WALL
NEW METAL PANEL 5/8" GYSPSUM
SYSTEM SHEATHING R-19 BATT INSULATION
SIM
PREFINISHED R-19 BATT INSUALTION A1
METAL TRIM 1 1/2" RIGID INSULATION A505
6" METAL STUD
WALL @ 16" O.C. EXISTING SINGLE PLY ROOF
6" METAL STUDS WITH NEW MEMBRANE
@ 16" O.C. EXISTING ROOF DECK
SEE STRUCTURAL 5/8" GYPSUM WALL 5/8" GYPSUM 1/2" COVERBOARD

5/8" GYPSUM
BOARD WALL BOARD
KEY PLAN:
H SHEATHING
NEW LINEAR METAL
SUSPENDED 1'-7 1/8"
CEILING SYSTEM STEEL COLUMN
PREASURE
TREATED NEW 1 1/2" RIGID INSULATION
2X BLOCKING EXISTING ROOF
DECK

G
EXISTING BEAM

5/8" GYPSUM
SHEATHING

NEW LINEAR METAL


F NEW METAL PANEL
SUSPENDED CEILING
SYSTEM

PREFINISHED
6" METAL STUDS
METAL TRIM
@ 16" O.C.
6" METAL STUD CEILING NEW METAL PANEL
SYSTEM IN HORIZONTAL
CONFIGURATION

EXISTING WALL

E NEW METAL PANEL


SYSTEM NEW METAL PANEL
SYSTEM
NEW METAL
EXISTING STUD WALL STRUCTURE TO
EXISTING NEW METAL PANEL PANEL SYSTEM No. Revisions / Submissions Date
STEEL COLUMN REMAIN
SYSTEM
SEE STRUCTURAL

LWC
NEW METAL PANEL
SYSTEM
6" METAL STUD
EXISTING STUD WALL, INTERIOR
D GYPSUM BOARD AND EXISTING COLUMN I NCOR P O R ATED
PROVIDE BRACING
5/8" GYPSUM EXTERIOR SHEATHING TO REMAIN
SHEATHING
TO COLUMN AS NEEDED
FOR WALL SUPPORT 6" METAL STUD S 434 East First Street Dayton, OH 45402 937.223.6500
4440 Garwood Place Richmond, IN 47374 765.966.3546

NEW METAL PANEL SYSTEM


STEEL COLUMN
DAYTON INTERNATIONAL AIRPORT
3600 TERMINAL DRIVE
GRANITE BASE 6" METAL VANDALIA, OH 45377
GRANITE BASE STUD WALL
C EXISTING DOOR (937) 454-8209

PHASE ONE CANOPY


GRANITE BASE
1/2" EXPANSION MATERIAL
C:\Revit\14613.00-DAY-Canopy-ARCH-2014_sbg.rvt

5" REINFORCED
CONCRETE SLAB GRANITE BASE REPLACEMENT PROJECT
4" AGGREGATE
BASE
3600 TERMINAL DRIVE
B
EXTERIOR SECTIONS & DETAILS
Comm. No. Date
T E OF OH 14613.00 JAN 15, 2015
TA

IO
JOHN Drawn Drawing No.
CHARLES
A FABELO SBG
SECONDARY ENTRANCE WALL SECONDARY ENTRY THROUGH
A506

RE G

CT
A1 A9 11799
Checked
SECTION COLUMN COVER

TE
ST

I
ER HI JCF/ EGS
SCALE: 1 1/2" = 1'-0" A506 SCALE: 1/2" = 1'-0" A101 E D ARC
JOHN CHARLES FABELO, LICENSE NO. 11799
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 EXPIRATION DATE: 12.31.2013
© 2013 LWC, INCORPORATED
B.9
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
3/26/2015 3:27:16 PM T4

GLASS CANOPY SYSTEM


SEE STRUCTURAL FOR
COLUMN SIZING TB.9 SHEET NOTES:
1 1/2" AIRGAP
FLASH COLUMN PENETRATION
WITH SINGLE PLY ROOF
R MEMBRANE
FLUID APPLIED WEATHER
3/4" PLYWOOD SHEATHING BARRIER
PREFINISHED SINGLE PLY ROOF
METAL GRAVEL STOP MEMBRANE

FLASHING TAPE
2X 4 TREATED 3/4" PLYWOOD PREFINISHED METAL
NAILERS SHEATHING GRAVEL STOP NEW METAL PANEL SYSTEM SINGLE PLY ROOF MEMBRANE
1/2" COVER BOARD
PREFINSIHED 1/2" COVERBOARD
METAL FLASH &
FLUID APPLIED COUNTER FLASH
Q WEATHER BARRIER
FLUID APPLIED WEATHER
PREFINSIHED SHEET METAL BARRIDER
TRIM. SET IN SEALATN AND SEAL SINGLE PLY ROOF MEMEBRANE GLASS CANOPY SYSTEM
PERIMETER ADHERED TO GUTTER
1/4" STAINLESS STEEL SEE STRUCTURAL 4" RIGID
PLATE GUTTER 5/8" GYPSUM DRAWINGS STRUCTURAL BEAM
INSULATION

2"
SHEATHING SEE DRAWINGS

5/8" GYPSUM
SHEATHING RESILIENT
5/8" METAL
GASKET
PRESSURE TREATED 2X4 STUD @ 16" O.C.
3/4" PLYWOOD DECK
P BLOCKING
PREFINISHED METAL TRIM
3 5/8" METAL STUD FRAMING ATTATCH FRAMING
AT 16" O.C. TO STRUCTURAL
BEAM ALIGN TOP OF JOINT
WITH TOP OF T-BEAM
GUTTER
HUG TO BEAM STRUCTURAL BEAM NEW METAL PANEL
SEE DRAWINGS SYSTEM
SEE STRUCTURAL DRAWINGS
5/8" GYPSUM BOARD
SHEATHING NEW METAL
NEW METAL NEW METAL PANEL PANEL SYSTEM 5/8" GYPSUM SHEATHING
PANEL SYSTEM SYSTEM

7"
6" METAL STUDS @ 5/8" GYPSUM WALL
16" O.C. BOARD
5/8" GYPSUM
SHEATHING

5/8" METAL
STUD @ 16" O.C.
2 1/2" 1'-10 1/2" 1'-2 3/16" 7 3/4"
FLUID APPLIED
M
SECONDARY ENTRANCE GUTTER SECONDARY ENTRY BEAM AND WEATHER BARRIER
GLASS SYSTEM TO METAL PANEL
1 M8 M15
END GUTTER WRAP SYSTEM CONNECTION
SCALE: 1 1/2" = 1'-0" A111 SCALE: 1 1/2" = 1'-0" A507 SCALE: 1 1/2" = 1'-0" A507

TB TB.9 TC TD
L
1
A403 A6
A6 A6
GENERAL NOTES:
A504
A505 A510

K
SEE STRUCTURAL
PREFINISHED METAL COPING

METAL COPING
SIM
4'-10 1/2 M15 NEW SINGLE PLY ROOF A1
" A507
A504
4'-10 1/2
GLASS CANOPY SYSTEM "
4'-10 1/2
" GLASS CANOPY SYSTEM
J 4'-2"

4'-2"

4'-2"

1 4'-2" NEW METAL PANEL SYSTEM


A507

1 1/2" RIGID INSULATION R-19 BATT INSULATION


KEY PLAN:
H R-19 BATT INSULATION 1 1/2" RIGID INSULATION
GYPSUM WALLBOARD
MOISTURE RESISTANT
GYPSUM BOARD
NEW METAL PANEL SYSTEM MOISTURE RESISTANT GYPSUM BOARD
GYPSUM BOARD SPLICE NEW SINGLE PLY
ROOF MEMBRANE AND
M8 FLASHING INTO EXISTING
SEE STRUCTURAL A507 A8
A508
EXISTING SINGLE PLY ROOF
LINEAR METAL
MEMBRANE
LINEAR METAL SUSPENDED CEILING
G SUSPENDED CEILING

SIM
A1
A505

NEW METAL PANEL SYSTEM NEW GYPSUM BOARD


BULKHEAD
NEW METAL PANEL
SYSTEM

EXISTING METAL
E STUD WALL

1'-8" ALUMINUM CURTAIN WALL


SYSTEM
No. Revisions / Submissions Date
1'-7 1/2"

D HIGH PRESSURE COMPACT


LWC
I NCOR P O R ATED
1'-8"

LAMINATE PANEL EXISTING METAL STUD WALL


SYSTEM 434 East First Street Dayton, OH 45402 937.223.6500
4440 Garwood Place Richmond, IN 47374 765.966.3546
1'-8"

NEW METAL PANEL


SYSTEM
EXISTING SLIDING DOORS DAYTON INTERNATIONAL AIRPORT
PROTECT DURING
CONSTRUCTION ACTIVITIES 3600 TERMINAL DRIVE
VANDALIA, OH 45377
C (937) 454-8209
1'-8"

ALUMINUM
CURTAIN WALL SYSTEM
ILLUMINATED
SECURITY BOLLARDS EXISTING SLIDING DOORS PHASE ONE CANOPY
C:\Revit\14613.00-DAY-Canopy-ARCH-2014_sbg.rvt

PROTECT DURING
CONSTRUCTION ACTIVITIES
REPLACEMENT PROJECT
1'-8"

NEW METAL PANEL SYSTEM


3600 TERMINAL DRIVE
EXISTING ENTRY PROTECTION
B
1'-8"

POST EXISTING ENTRY PROTECTION

EXISTING CRASH RAIL GUARDS


POST
EXTERIOR SECTIONS AND ELEVATIONS
GRANITE BASE PROGRESS Comm. No. Date
1'-8"

14613.00 JAN 15, 2015


NEW REINFORCED
CONCRETE SLAB
4" AGGREGATE
BASE DRAWING
NOT FOR Drawn

SBG
Drawing No.

A
CONSTRUCTION
A2 SECONDARY ENTRY SECTION 3/26/2015 Checked

JCF/ EGS
A507
SCALE: 1/2" = 1'-0" A101 3:27:16 PM
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 © 2013 LWC, INCORPORATED
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
3/26/2015 3:30:30 PM
SHEET NOTES:

R PREFINISHED
METAL TRIM

TREATED 2X4
NAILER

EXISTING EXTERIOR STUD


WALL WITH FIBERGLASS
INSULATION
Q NEW LINEAR METAL
SUSPENDED CEILING

5/8" GYPSUM EXISTING GYPSUM


SHEATHING WALL BAORD

ALUMINUM CURTAIN WALL


SYSTEM
EXISTING SHEATHING

NEW METAL PANEL


SYSTEM 5/8" GYPSUM SHEATHING 6" METAL STUD
FRAMING @ 16" O.C. WITH
1 1/2" RIGID METAL STUD KICKERS @
INSULATION R 7.5 48" O.C.
NEW METAL PANEL SYSTEM

M
M13 EXTERIOR METAL PANEL SOFFIT
SCALE: 1 1/2" = 1'-0" A509

A6
1 A505 A6 GENERAL NOTES:
A403 A504
TB TB.9 TC TD

A6
A510

EXISTING METAL PANEL


SOFFIT
J

GLASS CANOPY SYSTEM SEE STRUCTURAL

SINGLE PLY ROOF MEMBRANE ROOF DRAIN SEE- MECH


OVER EXISTING 1/2" COVER BOARD KEY PLAN:
H
SPLICE AND FLASH NEW SINGLE PLY
ROOF MEMBRANE TO EXISTING
SINGLE PLY ROOF MEMBRANE EXISTING SINGLE PLY ROOF
MEMBRANE AND INSULATION

GRAVEL STOP
G
SEE STRUCTURAL

NEW METAL ROOF DECK EXISTING CONCRETE EXISTING STRUCTURE


SEE STRUCTURAL ROOF DECK

NEW METAL PANEL SYSTEM

EXISTING GYPSUM
F WALL BOARD

SIM
M6
A503 PREFINSHED
METAL TRIM

NEW LINEAR METAL SUSPENDED


3 5/8" METAL STUD
CEILING
FRAMING @ 16" O.C. WITH
METAL STUD KICKERS @
E 48" O.C.
METAL PANEL SYSTEM
M13
2'-4 1/8" A509
No. Revisions / Submissions Date

D
FLUID APPLIED
WEATHER BARRIER

3'-2 5/16"
NEW METAL
LWC
I NCOR P O R ATED
PANEL SYSTEM EXISTING STUD WALL 434 East First Street Dayton, OH 45402 937.223.6500
4440 Garwood Place Richmond, IN 47374 765.966.3546
1 1/2" RIGID INSULATION
R- 7.5

DAYTON INTERNATIONAL AIRPORT


EXISTING STUD WALL
ALUMINUM CURTAIN WALL SYSTEM WITH FIBERGLASS INSULATINO 3600 TERMINAL DRIVE
VANDALIA, OH 45377
METAL PANEL SYSTEM
C (937) 454-8209
10'-6"

PHASE ONE CANOPY


C:\Revit\14613.00-DAY-Canopy-ARCH-2014_sbg.rvt

ILLUMINATED SECURITY REPLACEMENT PROJECT


BOLLARD
3600 TERMINAL DRIVE
EXISTING DOOR

GRANITE BASE
EXTERIOR SECTIONS & DETAILS
EXISTING CONCRETE SLAB
5" REINFORCED
CONCRETE SLAB 4" BASE AGGREGATE GRANITE BASE
PROGRESS Comm. No.

14613.00
Date

JAN 15, 2015


DRAWING
NOT FOR Drawn

SBG
Drawing No.

A
SECONDARY ENTRANCE METAL CONSTRUCTION
A3
PANEL 3/26/2015 Checked

JCF/ EGS
A509
SCALE: 1/2" = 1'-0" A101 3:30:30 PM
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 © 2013 LWC, INCORPORATED
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
3/26/2015 3:30:50 PM
SHEET NOTES:

A3 A2
T3.4 T3.5 A509 T4 A507 T5 T5.1
L

GENERAL NOTES:
SIM
A1
A504
A9
A506
SIM
PPE- FINSIHED
METAL COPING
A1 SINGLE PLY MEMBRANE
A504
K 128'-5 9/16" ROOF
3.4 5.1

PREFINISHED METAL
COPING

1 1/2" RIGID INSULATION


R- 7.5

J NEW METAL PANEL SYSTEM 5/8" GYPSUM SHEATHING


FLUID APPLIED
WEATHER BARRIER 5/8" GYPSUM
WALL BOARD NEW METAL PANEL SYSTEM
6" BATT INSULATION 5/8" GYPSUM
R-19 6" METAL STUDS WALL BOARD
@ 16" O.C.
6" METAL STUDS
FLUID APPLIED WEATHER
6 MIL AIR BARRIER @ 16" O.C.
BARRIER
EXISTING SINGLE PLY ROOF

KEY PLAN:
WITH NEW MEMBRANE 6 MIL AIR BARRIER
SIM SPLICE AND FLASH NEW SINGLE PLY
H A1 SIM ROOF MEMBRANE WITH EXISTING
SPLICE AND FLASH NEW SINGLE PLY ROOF A505
EXISTING ROOF INSULATION, A1 ROOF MEMBRANE
MEMBRANE WITH WITH EXISTING SINGLE PLY A505
MEMBRANE, AND COVERBOARD
EXISTING SINGLE PLY

8 1/4"
TO BE REMOVED
ROOF

1'-4 5/8"
EXISTING LINEAR METAL
G SUSPENDED CEILING SYSTEM

EXISTING CONCRETE EXISTING CONCRETE


1'-4 5/8" ROOF DECK ROOF DECK

5/8" GYPSUM
WALL BOARD
F
5/8" GYPSUM WALL BOARD

E 1'-7"

5/8" GYPSUM WALL BOARD


1'-7"
5/8" GYPSUM WALLBOARD No. Revisions / Submissions Date

D
LWC
I NCOR P O R ATED
434 East First Street Dayton, OH 45402 937.223.6500
4440 Garwood Place Richmond, IN 47374 765.966.3546

DAYTON INTERNATIONAL AIRPORT


3600 TERMINAL DRIVE
EXISTING METAL VANDALIA, OH 45377
STUD WALL
C WITH GYPSUM WALL BOARD (937) 454-8209
EXISTING METAL STUD WALL

PHASE ONE CANOPY


WITH GYPSUM WALL BOARD
C:\Revit\14613.00-DAY-Canopy-ARCH-2014_sbg.rvt

REPLACEMENT PROJECT
EXISTING CRASH RAIL
3600 TERMINAL DRIVE
EXISTING CRASH RAIL

B
EXTERIOR SECTIONS & DETAILS
Comm. No. Date
T E OF OH 14613.00 JAN 15, 2015
EXISTING CONCRETE TA

IO
EXISTING SLIDING DOORS SLAB
PROTECT DURING CONSTRUCTION JOHN Drawn Drawing No.
CHARLES
A FABELO SBG

A510

RE G

CT
A6 INTERIOR VESTIBULE SECTION 11799
Checked

TE
ST

I
ER HI JCF/EGS
SCALE: 1/2" = 1'-0" 1 E D ARC
JOHN CHARLES FABELO, LICENSE NO. 11799
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 EXPIRATION DATE: 12.31.2013
© 2013 LWC, INCORPORATED
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
3/26/2015 3:31:25 PM
SHEET NOTES:

P
B B.9 C

N A1 A8
A1
TB TB.9 TC A513 A501
A512
EXISTING CURTAIN WALL
SYSTEM

SIM
PRE-FINSIHED A1
METAL COPING A504 PRE-FINSIHED
METAL COPING ROOF DRAIN
SINGLE PLY MEMBRANE ROOF
SEE MECH.

135'-11 1/4"
M

5/8" GYPSUM SHEATHING

FLUID APPLIED
WEATHER BARRIER 6 MIL AIR BARRIER SIM

R-19 BATT INSULATION


M15
A508
STRUCTURAL DECKING
SEE STRUCTURAL DWG.
NEW METAL PANEL SYSTEM
L

5/8" GYPSUM WALL BOARD SPANDRELL


1 1/2" RIGID INSULATION
R-7.5
GLASS
GENERAL NOTES:
SIM
H7
LINEAR METAL SUSPENDED A508
GLASS CANOPY SYSTEM CEILING
SEE STRUCTURAL
K SINGLE PLY ROOF
MEMBRANE

NEW ALUMINUM
CURTAIN WALL

10'-1 3/16"
SEE SECTION
J FOR DEMOLITION OF
EXISTING CURTAIN
WALL

NEW METAL PANEL SYSTEM GLASS CANOPY SYSTEM


SEE SUTRUCTURAL SINGLE PLY MEMBRANE ROOF

COVERBOARD
ROOF DRAIN
KEY PLAN:
H SEE MECH.
GYPSUM WALLBOARD
A1
A508 5/8" GYPSUM WALLBOARD

20'-9 7/8"
1/2" COVER BOARD 1 1/2" RIGID INSULATION, R7.5
4" RIGID INUSLATION GRAVEL
G15 STOP
6" METAL STUDS @ 16" O.C.
A508
5'-0 3/16"

5/8" GYPSUM SHEATHING


G 6" METAL STUD WALL
@ 16" O.C.
2'-10 5/16"

R-19 BATT INSULATION


NEW METAL PANEL SYSTEM NEW METAL PANEL SYSTEM

5/8" GYPSUM BOARD SHEATHING


SIM
M6
A503 LINEAR METAL SUSPENDED
CEILING
F
LINEAR METAL
SUSPENDED CEILING M1 NEW ALUMINUM 5/8" GYPSUM
NEW METAL PANEL A508
CURTAIN WALL WALL BOARD
4'-10 5/8"

SYSTEM

No. Revisions / Submissions Date

EXISTING STUD WALL


EXISTING LETTERING
GYPSUM WALL BOARD
TO BE REMOVED AND

LWC
REINSTALLED EXISTING
METAL COLUMN COVERS
PROTECT DURING CONSTRUCTION

D I NCOR P O R ATED
REMOVE EXISTING METAL 434 East First Street Dayton, OH 45402 937.223.6500
FASCIA SYSTEM AND
REPLACE NEW METAL PANEL SYSTEM
4440 Garwood Place Richmond, IN 47374 765.966.3546
WITH NEW HIGH PREASURE
COMPACT
LAMINATE PANEL SYSTEM
DAYTON INTERNATIONAL AIRPORT
3600 TERMINAL DRIVE
ILLUMINATED SECURITY
BOLLARDS
VANDALIA, OH 45377
EXISTING SLIDING
C DOORS TO BE PROTECTED (937) 454-8209
EXISTING ENTRANCE DURING CONSTRUCTINO ACTIVITIES
PROTECTION POSTS
EXISTING PHASE ONE CANOPY
C:\Revit\14613.00-DAY-Canopy-ARCH-2014_sbg.rvt

WALL PROTECTION

EXISTING SLIDING
RAIL
EXISTING ENTRANCE
PROTECTION POSTS
REPLACEMENT PROJECT
DOORS TO BE PROTECTED
DURING CONSTRUCTINO ACTIVITIES 3600 TERMINAL DRIVE
GRANITE BASE
B
EXTERIOR SECTIONS AND DETAILS
PROGRESS Comm. No.

14613.00
Date

JAN 15, 2015


DRAWING
NOT FOR Drawn

SBG
Drawing No.

A
CONSTRUCTION
A1 Section 92 3/26/2015 Checked

JCF/EGS
A511
SCALE: 1/2" = 1'-0" A102 3:31:25 PM
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 © 2013 LWC, INCORPORATED
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
3/26/2015 3:32:03 PM
SHEET NOTES:

T11.8 T11.9
11.9 T12 12/R 14/T
T14 14.1T14.1
T14.2
A1
A511
Q

EXISTING ALUMINUM
CURTAIN WALL

N
METAL
METAL PANELS
PANELS TO
TO BE
BE
METAL PANELS TO BE SINGLE PLY MEMBRANE REMOVED
REMOVED AND
AND REPLACED
REPLACED
REMOVED AND ROOF PREFINISHED METAL
RECPLACED 135'-11 1/8" COPING

PRE-FINISHED
METAL COPING

SIM
A1
M A508

3'-6 7/16"
SIM
A1 1.5" RIGID INSULATION
A504 R-7.5

L
1.5" RIGID INSULATION
R-7.5
SUSPENDED LINEAR METAL
EXISTING 5'X5'
CEILING
EXISTING 5'X5' GENERAL NOTES:
METAL PANEL TO METAL PANEL TO
15'-9 1/4"

REMAIN REMAIN

BATT INSULATION
BATT INSULATION SEE ADD. ALT R-19
K R-19 FOR REPLACEMENT OF EXISTING
FRAME A-12

NEW METAL PANEL SYSTEM

REMOVE AND REPLACE


EXISTING WALL
J NEW METAL PANEL SYSTEM

3'-4 3/4" 10 5/8"


SINGLE PLY ROOF SINGLE PLY ROOF MEMBRANE
MEMBRANE

8" MIN
8" MIN

KEY PLAN:
H

30'-10 1/2"

5/8" GYPSUM
WALL BOARD

EXISTING GYPSUM
BOARD CEILING
E
EXISTING GYPSUM
BOARD CEILING
EXISTING SOFFIT EXISTING AUTOMATIC EXISTING AUTOMATIC
SLIDING DOORS TO REMAIN SLIDING DOORS TO REMAIN EXISTING GYPSUM BOARD
PROTECT DURING CONSTRUCTION PROTECT DURING CONSTRUCTION SOFFIT No. Revisions / Submissions Date

D
LWC
I NCOR P O R ATED
434 East First Street Dayton, OH 45402 937.223.6500
4440 Garwood Place Richmond, IN 47374 765.966.3546

DAYTON INTERNATIONAL AIRPORT


3600 TERMINAL DRIVE
VANDALIA, OH 45377
C (937) 454-8209
EXISTING WALL PROTECTORS EXISTING WALL PROTECTORS
TO REMAIN TO REMAIN

PHASE ONE CANOPY


C:\Revit\14613.00-DAY-Canopy-ARCH-2014_sbg.rvt

REPLACEMENT PROJECT
3600 TERMINAL DRIVE
B
EXISTING CONCRETE FLOOR EXTERIOR SECTIONS AND DETAILS
PROGRESS Comm. No.

14613.00
Date

JAN 15, 2015


DRAWING
NOT FOR Drawn

Author
Drawing No.

A
CONSTRUCTION
A1
MAIN CANOPY SECTION INTERIOR
VIEW 3/26/2015 Checked

Checker
A512
SCALE: 1/2" = 1'-0" A102 3:32:03 PM
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 © 2013 LWC, INCORPORATED
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
3/26/2015 3:32:29 PM
SHEET NOTES:

T14.2
T14.114.1 T14 14/T 12/R T12 T11.9
11.9 T11.8

A1
N A511

SIM
A1
A504 PRE-FINISHED PREFINISHED
METAL COPING METAL COPING
SINGLE PL MEMBRANE
ROOF

M SIM
A1
A504

STRUCTURAL DECK
SEE STRUCTURAL
DRAWINGS

1.5" RIGID INSULATION

GENERAL NOTES:
STUD WALL TO BOTTOM OF BEAM

NEW LINEAR SUSPENDED METAL CEILNIG R-19 BATT INSULATION


R-19 BATT INSULATION

K
6" METAL STUDS
@ 16" O.C. 6" METAL STUD WALL
@ 16" o.c.

NEW METAL PANEL SYSTEM

NEW METAL PANEL SYSTEM

1.5" RIGID INSULATION


J

PLYWOOD SHEATHING

SIM
A5 SIM
A601
F1
A504

KEY PLAN:
H 5/8" GYPSUM
SINGLE PLY ROOF MEMBRANE WALL BOARD SINGLE PLY ROOF
21'-1 1/16"

MEMBRANE

MIN 8"
MIN 8"

6" METAL STUD WALL


@16" O.C.

G
6" METAL STUD WALL
@ 16" O.C.
5/8" GYPSUM WALLBOARD

EXISTING GYPSUM BOARD CEILING

REMOVE AND REPLACE


EIXSTING METAL STUD
WALL

No. Revisions / Submissions Date


EXISTING GYPSUM
BOARD CEILING
REMOVE AND REPLACE EIXSTING METAL STUD
WALL

LWC
EXISTING GYPSUM
BOARD SOFFIT EXISTING GYPSUM BOARD
SOFFIT

D I NCOR P O R ATED
434 East First Street Dayton, OH 45402 937.223.6500
4440 Garwood Place Richmond, IN 47374 765.966.3546

DAYTON INTERNATIONAL AIRPORT


10'-0 5/8"

EXISTING COLUMN AND COLUMN COVER TO EXISTING COLUMN AND COLUMN COVER TO
3600 TERMINAL DRIVE
REMAIN. PROTECT DURRING CONSTRUCTION REMAIN. PROTECT DURRING CONSTRUCTION
VANDALIA, OH 45377
C (937) 454-8209

PHASE ONE CANOPY


C:\Revit\14613.00-DAY-Canopy-ARCH-2014_sbg.rvt

REPLACEMENT PROJECT
EXISTING FINISHED
3600 TERMINAL DRIVE
CONCRETE FLOOR

B
EXTERIOR SECTIONS AND DETAILS
PROGRESS Comm. No.

14613.00
Date

JAN 15, 2015


DRAWING
NOT FOR Drawn

Author
Drawing No.

A
CONSTRUCTION
A1
MAIN CANOPY SECTION
EXTERIOR 3/26/2015 Checked

Checker
A513
SCALE: 1/2" = 1'-0" A102 3:32:29 PM
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 © 2013 LWC, INCORPORATED
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
3/26/2015 4:27:05 PM
SHEET NOTES:

A1
A514

P L13 PRE-FINISHED GRAVEL STOP SINGLE PLY ROOF


A514
PREFINISHED MEMBRANE
TAPPER INSULATION
GRAVEL SIM
STOP ROOF DRAIN SEE MECHANICAL L13
SINGLE PLY ROOF SYSTEM PREFINSIHED
2X8 TREATED TAPERED INSULATION A514
METAL GRAVEL STOP
NAILER
2X8 TREATED
2X4 TREATED
NAILER
NAILER
2X4 TREATED
NAILER STRUCTURAL
METAL FRAMING METAL DECK
N NEW METAL PANEL
SEE STRUCTURAL DWG
SEE STRUCTURAL
FOR BEAM SIZING
SYSTEM 5/8" GYPSUM SHEATHING DWGS

CONNECT TO STRUCTUR NEW METAL PANEL SYSTEM

LINEAR METAL SUSPENDED 5/8" GYPSUM SHEATHING


5/8" GYPSUM BOARD PREFINIHSED METAL TRIM CIELING
SHEATHING
NEW METAL PANEL
METAL FRAMING SYSTEM RECESSED LIGHTS SEE
METAL STUD FRAMING MECH.
M
2X4 TREATED
NAILER
LINEAR SUSPENEDED
A1 PREFINISHED METAL CEILING
A514 METAL TRIM

L
L1 CAR PORT SECTION L13 CAR PORT DETAIL
SCALE: 1/2" = 1'-0" A111 SCALE: 1" = 1'-0" A514 GENERAL NOTES:

J A

L1
A514

EXISTING AIRPORT
EXISTING
CANOPY ROOF
CANOPY
KEY PLAN:
H A17
A514
EXISTING METAL PANEL SIM
ROOF DRAIN L13
SEE MECH. A514
PREFINISHED GRAVEL
ROOF DRAIN SEE MECHANICAL
BELLOW EXPANSION STOP
TAPERED RIGID NEW METAL PANEL SYSTEM
JOINT INSULLATION
METAL DECK SEE STRUCTURAL

SEE STRUCTURAL DWGS


FOR SIZE
G

METAL FRAMING
A

EXISTING STRUCTURE

NEW METAL PANEL SYSTEM


F SUSPENDED LINEAR
METAL CEILING SEE STRUCTURAL
EXISTING CANOPY NEW METAL PANEL
DWGS FOR COLUMNS
CEILING SYSTEM SINGLE PLY ROOF
DIMENSIONS
MEMBRANE
EXISTING METAL PANEL
EXISITNG CANOPY
STRUCTURE
TERMINATION BAR

EXPANSION JOINT BELLOW


STRUCTURAL ROUND COLUMN
BEYOND SINGLE PLY ROOF MEMBRANE
E
1/2" COVERBOARD
4" RIGID INSULATION
No. Revisions / Submissions Date
EXISTING METAL COLUMN COVER
TO BE PROTECTED DURING CONSTRUCTION

D
TREATED BLOCKING
LWC
I NCOR P O R ATED
METAL DECK 434 East First Street Dayton, OH 45402 937.223.6500
SEE STRUCTURAL DWG. 4440 Garwood Place Richmond, IN 47374 765.966.3546

DAYTON INTERNATIONAL AIRPORT


3600 TERMINAL DRIVE
ILLUMINATED BOLALRD VANDALIA, OH 45377
NEW METAL PANEL SYSTEM

1 11/16"
C ILLUMINATED BOLLARD (937) 454-8209

EXISTING CEILING EXISTING METAL PANEL PHASE ONE CANOPY


C:\Revit\14613.00-DAY-Canopy-ARCH-2014_sbg.rvt

REPLACEMENT PROJECT
3600 TERMINAL DRIVE
4: REINFORCED CONCRETE
B SIDE WALK

CAR PORT SECTIONS


PROGRESS Comm. No.

14613.00
Date

JAN 15, 2015


DRAWING
NOT FOR Drawn

SBG
Drawing No.

A
NEW CARPORT TO EXISTING CAR CONSTRUCTION
A1 SECTION THROUGH CARPORT A17
POINT CONNECTION 3/26/2015 Checked

EGS/ JCF
A514
SCALE: 1/2" = 1'-0" A102 SCALE: 1" = 1'-0" A514 4:27:05 PM
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 © 2013 LWC, INCORPORATED
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
3/26/2015 4:40:42 PM
SHEET NOTES:

C
TC
C

ALUMINUM CURTAIN WALL


SYSTEM
1/2" ANCHORBOLT
Q
TREATED BLOCKING

GRANITE BASE
FOAM AND ROD SEALANT
CONCEAL ANCHOR

GRANITE BASE
MORTAR BED CONCEAL ANCHOR

MATCH TO EXISTING 3 5/8"


BRICKLEDGE
3/8" 5" 3/8"
DEPTH EXPANSION MATERIAL
P
5" REINFORCED CONCRETE
STEEL BEAM SEE
SLAB
STRUCTURAL DWG
FIBERGLASS COLUMN COVER
TO CONTINUE ABOVE
PORTER CEILING
3/4" PLYWOOD, PAINTED
LIGHT GAGE METAL FIBERGLASS
SEALANT FRAMING COLUMN COVER
4" METAL STUDS

N SHEATHING

1 1/2" RIGID INSULATION

NEW METAL PANEL SYSTEM

ALUMINUM
CURTAIN WALL
SYSTEM

M
M17 PORTER STATION SILL DETAIL
PRE-FINISHED SHEET METAL 12" FIBERGLASS BATT
SCALE: 1 1/2" = 1'-0" A103
FASCIA FINSIHED TO MATCH INSULATION (R-38)
CURTAIN WALL T19
19 20

A5 T20
L A601 LINEAR METAL SUSPENDED CEILING
1"

CONTINUOUS WOOD
BLOCKING
5/8" MOISTURE RESISTANT
GYPSUM WALL BOARD
GENERAL NOTES:
3" CHANNELS @ 2'-0" O.C.
WELDED TO WEB OF BEAM

ALUMINUM CURTAIN WALL


SYSTEM

NEW METAL PANEL


SYSTEM
NEW METAL
PANEL SYSTEM

J
Callout of PORTER STATION - PORTER STATION CORNER
J1 J9
NORTH END CONNECTION
20
SCALE: 3" = 1'-0" A601 SCALE: 1 1/2" = 1'-0" A103
B.9 C

T20 PORTER DESK GRANITE BASE PORTER DESK


KEY PLAN:
H
PORTER STATION - EXTERIOR
H14
TB.9 TC ELEVATION
SCALE: 1/4" = 1'-0" A803

G
TD TD

F
FIBER GLASS COLUMN
COVER CONTINUED BOVE
PORTER STATION
CEILING

PLYWOOD, PAINTED
J1
A601

E R-38 BATT
PLYWOOD, PAINTED
INSULATION

PREFINISHED .050" A1 No. Revisions / Submissions Date


ALUMINUM FASCIA LIGHT GUAGE STEEL FRAMING & INSULATION 9'-6" A601
GYPSUM BOARD CEILING

LWC
1" RIGID INSUALTION
TOP TRACK
NEW METAL
PANEL SYSTEM

D TC TC I NCOR P O R ATED

R -19 BATT INSULATION


434 East First Street Dayton, OH 45402 937.223.6500
SHEATHING
4440 Garwood Place Richmond, IN 47374 765.966.3546

GYPSUM R-19 BATT INSULATION

DAYTON INTERNATIONAL AIRPORT


BOARD WEATHER BARRIER

3600 TERMINAL DRIVE


9'-6"

ALUMINUM CURTAIN VANDALIA, OH 45377


R-19 BATT INSULATION WALL SYSTEM
5/8" GYPSUM WALL
C NEW METAL PANEL SYSTEM BOARD (937) 454-8209
4" PIPE COLUMN
PHASE ONE CANOPY
C:\Revit\14613.00-DAY-Canopy-ARCH-2014_sbg.rvt

REPLACEMENT PROJECT
METAL STUD
CAVITY WALL 3
A403

M17
SIM 1.5" RIGID INSULATION
R-7.5 A5 3600 TERMINAL DRIVE
A601
8" GRANITE M17 A601
BASE A601
BOTTOM TRACK
B 8" GRANITE BASE

PORTER STATION DETAILS


MATCH TO EXISTING BRICK
8" GRANITE BASE
LEDGE DEPTH

EXISTING TERMINAL FLOOR PROGRESS Comm. No.

14613.00
Date

JAN 15, 2015


DRAWING
NOT FOR Drawn

SBG
Drawing No.

A
PORTER STATION - NORTH END PORTER STATION - ENLARGED CONSTRUCTION
A1 PORTER STATION - WALL SECTION A5
WALL SECTION
A14
REFLECTED CEILING PLAN 3/26/2015 Checked

EGS/JCF
A601
SCALE: 1/2" = 1'-0" A601 SCALE: 1/2" = 1'-0" A103 SCALE: 1/4" = 1'-0" A201 4:40:42 PM
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 © 2013 LWC, INCORPORATED
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
3/26/2015 4:41:00 PM

1/4" SOLID SURFACE


SHEET NOTES:
LAMINATE

2' 5 1/4"
R
1' HINGLED LID WITH BRACKET TO HOLD
LID IN UP POSITION. PROVIDE
CONTINUOUS STAINLESS PIANO HINGE AND KEYED
LOCK. wRAP EXPOSED TOP AND EDGES WITH 1/4"
1" SOLID SURFACE LAMINATETX

6"
1"
3/4" EXTERIOR 1"
GRADE PLYWOOD
1"
3"
Q
RADIANT PANEL
SEE ELECTRICAL DRAWNIGS.
STORAGE COMPARTMENT COORDINATE ROUGHIN
1/4" SOLID SURFACE BELOW LID REQUIREMENTS
LAMINATE

3' 6"
P
1/2" EXTERIOR GRADE 3'
PLYWOOD
2X6" FRAMING

1/4" SOLID SURFACE


CONTRASTING
BASE

N 10"
SLOP BOTTOM TO
MATCH SHAPE OF
SIDEWALK

M
M1 PORTER DESK SECTION M6 PORTER DESK BACK ELEVATION
SCALE: 1 1/2" = 1'-0" SCALE: 1 1/2" = 1'-0"

GENERAL NOTES:
1/4" SOLID SURFACE
LAMINATE

K 2X FRAMING

3/4" EXTERIOR GRADE


PLYWOOD

1/4" SOLID SURFACE


LAMINATE

1/2" EXTERIOR
GRADE PLYWOOD

1/4" SOLID SURFACE


CONTRASTING BASE KEY PLAN:
H

G
G1 PORTER DESK SIDE SECTION G6 PORTER DESK SIDE ELEVATION
SCALE: 1 1/2" = 1'-0" SCALE: 1 1/2" = 1'-0"

No. Revisions / Submissions Date

D
LWC
I NCOR P O R ATED
434 East First Street Dayton, OH 45402 937.223.6500
4440 Garwood Place Richmond, IN 47374 765.966.3546

DAYTON INTERNATIONAL AIRPORT


3600 TERMINAL DRIVE
VANDALIA, OH 45377
C (937) 454-8209

PHASE ONE CANOPY


C:\Revit\14613.00-DAY-Canopy-ARCH-2014_sbg.rvt

REPLACEMENT PROJECT
3600 TERMINAL DRIVE
B
PORTER STATION DETAILS
PROGRESS Comm. No.

14613.00
Date

JAN 15, 2015


DRAWING
NOT FOR Drawn

Author
Drawing No.

A
CONSTRUCTION
3/26/2015 Checked

Checker
A602
4:41:00 PM
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 © 2013 LWC, INCORPORATED
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
3/26/2015 4:41:34 PM
SHEET NOTES:

PREFINISHED METAL FASCIA ETCHED FOR UPPER 30"

9"

PREFINISHED METAL
Q PANEL SYSTEM
STAINLESS STEEL
GLASS CLAMPS
10'-9"

9'-7"

AT JOINT

P
5"

STAINLESS STEEL BASE


3/4" THICK TEMPERED GLASS
PANELS, 48" WIDE WITH 3/4"
BETWEEN. ETCHED ON INSIDE
SURFACE OF UPPER 30" OF
EXPOSED GLASS

N
N1 EAST ELEVATION VALET SHELTER 1 AREA "A" - ROOF PLAN
SCALE: 1/4" = 1'-0" SCALE: 1/4" = 1'-0" A01

PREFINISHED METAL FASCIA PREFINISHED


METAL PANEL SYSTEM RD RD
ETCHED FOR UPPER 30"
9"

PREFINISHED METAL FASCIA

9"
PREFINISHED METAL
STAINLESS STEEL GLASS
PANEL SYSTEM
10'-9"

CLAMPS AT JOINT
9'-6"

GENERAL NOTES:

10'-9"

9'-6"
K
6"

STAINLESS STEEL
2 AREA "A" - ROOF PLAN
3/4" THICK TEMPERED GLASS PANELS, 48" STAINLESS STEEL BASE BASE
WIDE WITH 3/4" BETWEEN. ETCHED ON INSIDE SCALE: 1/4" = 1'-0" A01
6"
SURFACE OF UPPER 30" OF EXPOSED GLASS.

J
VALET SHELTER- NORTH
J1 VALET SHELTER WEST ELEVATION J7
ELEVATION SIM
SIM
J1
SCALE: 1/4" = 1'-0" SCALE: 1/4" = 1'-0" A604 J7
A604

H
26'-7 13/16"
20'-7 13/16" 6'-0"
11 1/8" 18'-7 1/2" 11 1/8"
1 1/16"

1 1/16"

2 5/16" 4'-0" 3/4" 4'-0" 3/4" 4'-0" 4'-1 1/2" 4'-0" 2 9/16"

9 3/8"
9 3/8"

2'-1 1/16"

1'-1 5/8"
2'-0"

2'-0"

1'-5 9/16"
6'-3 1/4"

4'-1 1/2"

4'-1 1/2"

8'-3 9/16"

6'-3 3/16"
4'-1 1/2"

FD FD

8'-6"
3'-4"

F.D. F.D.
SIM
J1
2'-1 1/16"

1'-5 5/8"

A604
2'-0"
11 1/8"

2'-0"

1'-1 3/16"
SIM
F A7
1 1/16"

A604
9 3/8"

11 1/8" 18'-7 5/16" 1'-0 5/16" 6'-0"


1 1/16"

2 1/4" 4'-0" 3/4" 4'-0" 3/4" 4'-0" 3/4" 4'-0" 3/4" 4'-0" 2 1/2"

E
BUS SHELTER METAL PANEL
E1 BUS SHETLER - PLAN E7 VALET SHELTER - PLAN E13 E16 BUS SHELTER SECTION
SECTION No. Revisions / Submissions Date
SCALE: 1/4" = 1'-0" A01 SCALE: 1/4" = 1'-0" A605 SCALE: 1/2" = 1'-0" SCALE: 1/2" = 1'-0"

D
LWC
I NCOR P O R ATED
434 East First Street Dayton, OH 45402 937.223.6500
PREFINISHED METAL FASCIA PREFINISHED METAL FASCIA 4440 Garwood Place Richmond, IN 47374 765.966.3546
PREFINISHED METAL FASCIA

LINEAR METAL PANEL


DAYTON INTERNATIONAL AIRPORT
9"

9"

9"
CEILING GYPSUM WALLBOARD
SUSPENDED CEILING STAINLESS STEEL STAINLESS STEEL
STAINLESS STEEL 3/4" THICK GLASS CLAMPS GLASS CLAMPS AT 3600 TERMINAL DRIVE
GLASS TEMPERED GLASS AT EACH JOINT EACH JOINT VANDALIA, OH 45377
CLAMPS AT PANELS, 48" SIDE
C EACH JOINT WITH 3/4" BETWEEN. (937) 454-8209
EDGED ON INSDIE 3/4" THICK TEMPERED 3/4" THICK
SURFACE OF UPPER GLASS PANELS, 48" SIDE TEMPERED
WITH 3/4" BETWEEN EDGE GLASS PANELS,
PHASE ONE CANOPY
10'-9"

10'-9"

10'-9"
30"
9'-6"

9'-6"

9'-6"
OF EXPOSED GLASS ON INSIDE SURFACE OF UPPER 48" SIDE
C:\Revit\14613.00-DAY-Canopy-ARCH-2014_sbg.rvt

30" OF EXPOSED GLASS WITH 3/4"


BETWEEN EDGE
ON INSIDE REPLACEMENT PROJECT
STAINLESS
STEEL BASE
STAINLESS STEEL BASE
SURFACE OF
UPPER
30" OF EXPOSED
3600 TERMINAL DRIVE
GLASS

B
EXISTING 100'-0" EXISTING 100'-0"
6"

6"

6"
STRUCTURAL PIPE COLUMNS
100' - 0" 100' - 0" BUS SHELTER DETAILS
STAINLESS STEEL BASE
PROGRESS Comm. No.

14613.00
Date

JAN 15, 2015


DRAWING
NOT FOR Drawn

SBG
Drawing No.

A
BUS SHELTER - NORTH CONSTRUCTION
A1 BUS SHELTER - CEILING A7 BUS SHELTER - WEST ELEVATION A12
ELEVATION
A16 BUS SHELTER - EAST ELEVATION 3/26/2015 Checked

EGS/JCF
A603
SCALE: 1/4" = 1'-0" A201 SCALE: 1/4" = 1'-0" SCALE: 1/4" = 1'-0" A603 SCALE: 1/4" = 1'-0" 4:41:34 PM
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 © 2013 LWC, INCORPORATED
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
3/26/2015 4:41:57 PM
SHEET NOTES:

R
PRESSURE TREATED 2X8 NAILER

PRESSURE TREATED 2X8 NAILER


PREFINISHED SHEET PREFINISHED SHEET METAL
METAL FASCIA AND CLEAT PRESSURE TREATED 2X6 NAILER
PRESSURE TREATED 2X6 NAILER SINGLE PLY MEMBRANE ROOF FASCIA AND CLEAT
SINGLE PLY MEMBRANE ROOF

TAPERED INSULATION, 1/4" / FT. TAPERED INSULATION, 1/4"/ FT.

Q
CONTINULOUS ALUMINUM
GLASS RECIEVER PRESSURE TREATED
2X6 NAILER

STEEL BEAM. SEE


STRUCTURAL DWGS
CONTINUOUS 1/4" BENT
STEEL PLATE PREFINSIHED, ZINC-COATED
STEEL FORMED SHEET METAL FASCIA
P WITH RETURNED EDGES, ALIGN PANEL
EDGES WITH GLASS PANELS

2" METAL STUDS @ 16" O.C.


PESSURE TREATED
2X4 NAILERS

3/4" TEMPERED GLASS


3 5/8" METAL STUD KICKERS
SUSPENDED 5/8" GYPSUM WALL @ 48" O.C.
N BOARD CEILING STAINLESS STEEL GLASS
CLAMP AT EACH VERT.
JOINT BETWEEN GLASS
PANELS

PREFINISHED METAL PANEL SUSPENDED LINEAR METAL CEILING


SYSTEM
3 5/8" METAL STUDS @ 16" O.C. 1" 1/4" STAINLESS STEEL
BAR WITH ALL FACES AND EDGES
M SMOOTHED WITH A BRUSH FINISH.
PROVIDE AT EACH GLASS PANEL
JOINT

5/8" GYPSUM SHEATHING

FLUID APPLIED
WEATHER BARRIER

GENERAL NOTES:

J
8'
SHELTER- METAL PANEL TO ROOF SHELTER- GLASS PANEL TO ROOF
J1 J7
CONNECTION CONNECTION
SCALE: 1 1/2" = 1'-0" A603 SCALE: 1 1/2" = 1'-0" A603

KEY PLAN:
H

8'

5/8" MOISTURE RESISTANT


GYSPUM WALLBOARD

No. Revisions / Submissions Date


STEEL PIPE COLUMN
SEALANT BEYOND. SEE STRUCTURAL
DRAWIGNS

LWC
FLASHING TAPE

5" REINFORCED CONCRETE


CONTINUOUS ALUMINUM GLASS
D STAINLESS STEEL 4" VINYL WALLBASE SLAB
RECEIVER WITH STAINLESS STEEL
I NCOR P O R ATED
BASE CLADDING
434 East First Street Dayton, OH 45402 937.223.6500
4440 Garwood Place Richmond, IN 47374 765.966.3546
SEALANT
5" REINFORCED CONCRETE
SLAB. SEE FOUNDATION DWGS
DAYTON INTERNATIONAL AIRPORT
3600 TERMINAL DRIVE
VANDALIA, OH 45377
C (937) 454-8209

PHASE ONE CANOPY


C:\Revit\14613.00-DAY-Canopy-ARCH-2014_sbg.rvt

REPLACEMENT PROJECT
5" REINFORCED CONCRETE
SLAB EXPANSION MATERIAL EXPANSION MATERIAL 3600 TERMINAL DRIVE
B
BUS SHELTER DETAILS
PROGRESS Comm. No.

14613.00
Date

JAN 15, 2015


DRAWING
NOT FOR Drawn

Author
Drawing No.

A
CONSTRUCTION
A1
SHELTER METL PANEL SILL
CONNECTION
A7
SHELTER- METAL PANEL TO
FLOOR CONNECTION 3/26/2015 Checked

Checker
A604
SCALE: 1 1/2" = 1'-0" SCALE: 1 1/2" = 1'-0" A603 4:41:57 PM
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 © 2013 LWC, INCORPORATED
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
3/26/2015 5:42:15 PM
SHEET NOTES:
P-1 PAINT COLOR ON GARAGE WALL

1. RE-PAINT EXISTING GARAGE WALLS BETWEEN STAIR TOWERS/ENTRIES.


R REFER TO SPECIFICATIONS. COLOR SELECTED BY ARCHITECT.
2. EXISTING STAIR TOWER EXTERIOR WALLS AND GLASS STOREFRONT TO
REMAIN. PROTECT DURING CONSTRUCTION.
3. PROVIDE TEMPORARY PROTECTION FOR ADJACENT CONSTRUCTION AND
VEHICLES.
4. EXISTING PAINTED SURFACE ON STAIR TOWERS TO REMAIN (BEYOND).
PROTECT DURING PAINTING OPERATIONS.
5. PAINT RETURN FACES OF STRUCTURAL COLUMNS AT OPENINGS.
SCOPE OF RE-PAINT WORK EXTENDS TO 6. EXISTING PAVING TO REMAIN. PROTECT DURING CONSTRUCTION
SIDE WALL

P
EXISTING PAINT FINISH AS ACCENT.
PROTECT DURING PAINTING. TYPICAL
EACH COLUMN.

N
NEW PAINT SCHEME

EXISTING CONDITIONS EXISTING CONDITIONS


M

SCOPE OF RE-PAINT WORK EXTENDS TO


SIDE WALL
GENERAL NOTES:

A. GARAGE PAINT SCOPE SHALL INCLUDE SUBSTRATE PREPARATION AND


TEMPORARY SCREENING TO PROTECT ADJACENT CONSTRUCTION AND
VEHICLES FROM PAINTING ACTIVITIES.
B. CONTRACTOR SHALL COORDINATE A PAINT MOCKUP WITH THE OWNER AND
ARCHITECT.

EXISTING CONDITIONS EXISTING CONDITIONS

F CCTV

F
F F F F F T T F F F T F F F
JJ JJ JJ JJ JJ JJ JJ T F T T
F T T F T T
F T F T F T J F T
F F
T T
F T

5'-3"
3
1

8'-11"
E

No. Revisions / Submissions Date

12'-0"

4'-7"
5 4

LWC
J J J J

D 3 I NCOR P O R ATED
434 East First Street Dayton, OH 45402 937.223.6500

7'-5"
4440 Garwood Place Richmond, IN 47374 765.966.3546

1 DAYTON INTERNATIONAL AIRPORT


3600 TERMINAL DRIVE
VANDALIA, OH 45377
C (937) 454-8209

6'-0"
5

13'-8"
6
2
6 PHASE ONE CANOPY
C:\Revit\14613.00-DAY-Canopy-ARCH-2014_sbg.rvt

2 1 1 2
REPLACEMENT PROJECT
3 3600 TERMINAL DRIVE

4'-0"
B
PARKING GARAGE PAINTING
PROGRESS Comm. No.

14613.00
Date

JAN 15, 2015


DRAWING
PARKING GARAGE FLOOR PLAN OUTLINE IS REPRESENTATIVE FOR AREAS OF WORK ONLY. IT DOES NOT CONVEY CONSTRUCTION OR MATERIAL DETAILS.
NOT FOR Drawn

SBG
Drawing No.

A
CONSTRUCTION
A1 GARAGE PAINTING SCOPE A17 GARAGE PAINT SECTION 3/26/2015 Checked

EGS/JCF
A606
SCALE: 1" = 30'-0" A01 SCALE: 1/4" = 1'-0" 5:42:15 PM
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 © 2013 LWC, INCORPORATED
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
3/26/2015 5:42:32 PM
SHEET NOTES:
2'-10"
R
SIDE A REFLECTIVE YELLOW

FASTEN WITH STAINLESS


STEEL SCREWS

2'

1"
2" X 5" X 3/16" STEEL

-0
"
ALUMINUM PLATE SIGN PANEL WITH TUBE WELDED TO COLUMNS
RETROFLECTIVE WHITE BACKGROUND AND PAINTED WITH HIGH
Q PERFORMANCE COATING
TO MATCH COLUMNS

3'-6"
BLACK
2'-10"

2'-10"

2'-8"
P 2" X 4" 3/16" STEEL
TUBE, MITERED AND
WELDED. PAINT WITH HIGH
PERFORMANCE COATING STEEL COLUMN
TO MATCH COLUMNS BEYOND
1"

1"
2'-10"
MOUNTING BRACKET.
SEE DETAIL

SIDE A SIDE B

M
M1 CROSSWALK SIGN S-2 M6 CROSS WALK SIGN S-2 M11 CROSS WALK SIGN BRACKET
SCALE: 1 1/2" = 1'-0" SCALE: 1 1/2" = 1'-0" SCALE: 1 1/2" = 1'-0"

RED

FASTEN WITH STAINLESS CL OF COLUMN

BLACK
STEEL SCREWS

RED
GENERAL NOTES:

1"
BLACK

K 2" X 5" X 3/16" STEEL


TUBE WELDED TO COLUMNS
AND PAINTED WITH HIGH
PERFORMANCE COATING
TO MATCH COLUMNS
2" X4" X 3/16" STEEL
TUBE, MITERED AND WELDED.
PAINT WITH HIGH PERFORMANCE
ALUMINUM PLATE COATING TO MATCH COLUMNS
SIGN PANEL WITH
RETROFLECTIVE WHITE
BACKGROUND
J

3'-6"
3'-8"

3'-8"

WHITE ON RED STEEL COLUMN


BEYOND

KEY PLAN:
H

RED

108'-1"

1"
G BLACK

2'-0"
2'-0"

SIDE A MOUNTING BRACKET. SEE DETAIL


SIDE B
F
F1 NO PARKING S-1 F9 NO PARKING SIGN BRACKET
SCALE: 1 1/2" = 1'-0" SCALE: 1 1/2" = 1'-0"

RIGHT LEFT No. Revisions / Submissions Date


ALUMINUM PLATE
SIGN PANEL

LWC
1 1/2"

1 1/2"

D I NCOR P O R ATED

RED 434 East First Street Dayton, OH 45402 937.223.6500


RED 4440 Garwood Place Richmond, IN 47374 765.966.3546
9"

9"

DAYTON INTERNATIONAL AIRPORT


3600 TERMINAL DRIVE
BLACK VANDALIA, OH 45377
BLACK
C (937) 454-8209

PHASE ONE CANOPY


1 1/2"

1 1/2"
C:\Revit\14613.00-DAY-Canopy-ARCH-2014_sbg.rvt

REPLACEMENT PROJECT
3600 TERMINAL DRIVE
BLACK

B
SIGNS
PROGRESS Comm. No.

14613.00
Date

JAN 15, 2015


DRAWING
SEE FOR FLOOR PLANS FOR LOCATION NOT FOR Drawn Drawing No.

Author
A
CONSTRUCTION
A1
3" = 1'-0"
NO SMOKING SIGN- S3
3/26/2015 Checked

Checker
A607
SCALE: 5:42:32 PM
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 © 2013 LWC, INCORPORATED
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
3/26/2015 5:09:31 PM
SHEET NOTES:
2'-10"
R
SIDE A REFLECTIVE YELLOW

FASTEN WITH STAINLESS


STEEL SCREWS

2'

1"
2" X 5" X 3/16" STEEL

-0
"
ALUMINUM PLATE SIGN PANEL WITH TUBE WELDED TO COLUMNS
RETROFLECTIVE WHITE BACKGROUND AND PAINTED WITH HIGH
Q PERFORMANCE COATING
TO MATCH COLUMNS

3'-6"
BLACK
2'-10"

2'-10"

2'-8"
P 2" X 4" 3/16" STEEL
TUBE, MITERED AND
WELDED. PAINT WITH HIGH
PERFORMANCE COATING STEEL COLUMN
TO MATCH COLUMNS BEYOND
1"

1"
2'-10"
MOUNTING BRACKET.
SEE DETAIL

SIDE A SIDE B

M
M1 CROSSWALK SIGN S-2 M6 CROSS WALK SIGN S-2 M11 CROSS WALK SIGN BRACKET
SCALE: 1 1/2" = 1'-0" SCALE: 1 1/2" = 1'-0" SCALE: 1 1/2" = 1'-0"

RED

FASTEN WITH STAINLESS CL OF COLUMN

BLACK
STEEL SCREWS

RED
GENERAL NOTES:

1"
BLACK

K 2" X 5" X 3/16" STEEL


TUBE WELDED TO COLUMNS
AND PAINTED WITH HIGH
PERFORMANCE COATING
TO MATCH COLUMNS
2" X4" X 3/16" STEEL
TUBE, MITERED AND WELDED.
PAINT WITH HIGH PERFORMANCE
ALUMINUM PLATE COATING TO MATCH COLUMNS
SIGN PANEL WITH
RETROFLECTIVE WHITE
BACKGROUND
J

3'-6"
3'-8"

3'-8"

WHITE ON RED STEEL COLUMN


BEYOND

KEY PLAN:
H

RED

108'-1"

1"
G BLACK

2'-0"
2'-0"

SIDE A MOUNTING BRACKET. SEE DETAIL


SIDE B
F
F1 NO PARKING S-1 F9 NO PARKING SIGN BRACKET
SCALE: 1 1/2" = 1'-0" SCALE: 1 1/2" = 1'-0"

RIGHT LEFT No. Revisions / Submissions Date


ALUMINUM PLATE
SIGN PANEL

LWC
1 1/2"

1 1/2"

D I NCOR P O R ATED

RED 434 East First Street Dayton, OH 45402 937.223.6500


RED 4440 Garwood Place Richmond, IN 47374 765.966.3546
9"

9"

DAYTON INTERNATIONAL AIRPORT


3600 TERMINAL DRIVE
BLACK VANDALIA, OH 45377
BLACK
C (937) 454-8209

PHASE ONE CANOPY


1 1/2"

1 1/2"
C:\Revit\14613.00-DAY-Canopy-ARCH-2014_sbg.rvt

REPLACEMENT PROJECT
3600 TERMINAL DRIVE
BLACK

B
SIGNS
PROGRESS Comm. No.

14613.00
Date

JAN 15, 2015


DRAWING
SEE FOR FLOOR PLANS FOR LOCATION NOT FOR Drawn Drawing No.

Author
A
CONSTRUCTION
A1
3" = 1'-0"
NO SMOKING SIGN- S3
3/26/2015 Checked

Checker
A608
SCALE: 5:09:31 PM
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 © 2013 LWC, INCORPORATED
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
3/26/2015 5:47:38 PM
SHEET NOTES:
1. SS-1 SST FRAME, SEE DETAILS FOR ADDITIONAL INFORMATION.
2. ACCESSIBLE URINAL.
R 3. TP-1 TOILET PARTITION AND URINAL SCREEN.
G7 4. DUAL-HEIGHT DRINKING FOUNTAINS WITH BOTTLE REFILL STATION.
A701
5. FLUSH-MOUNTED WALL SCONCE.
6. QZ-1 SOLID SURFACE QUARTZ COUNTER WITH UNDER-MOUNTED
PORCELAIN SINKS (SEE TYPICAL CROSS SECTION FOR ADULT SINK)
7. QZ-1 SOLID SURFACE QUARTZ COUNTER WITH UNDER-MOUNTED
PORCELAIN SINKS (SEE TYPICAL CROSS SECTION FOR CHILD SINK)
3" 5'-2" 3" 3" 2'-6" 3" 8. QZ-1 QUARTZ SOLID SURFACE COUNTER OVER LT GA STL FRAMING.
9. PROVIDE PLASTIC WALL PROTECTION 48" HIGH WITH SEALANT AND
106'-0" 106'-0" MIRROR MIRROR WAINSCOT
106'-0" PLASTIC TRIM MOLDING ALONG ALL EDGES AND JOINTS ALONG BOTH

4'-5"
EL. 106'-0" EL. 106'-0" EL. 106'-0" WALLS ABOVE MOP SINK.

5'-1"
BIO- RH
PTW
Q CH2 DCS PTW HAZARD PTW
HD

3'-4"
2'-10"
3'-1"

2'-8"
2'-5"
2'-2"
EXISTING
TERMINAL 100'-0"
BLDG
EXISTING
FIRST 1ST FL
FLOOR
100'-0" EXISTING 100'-0"
EXISTING
FIRST FLOOR
100'-0" EXISTING
TERMINAL 100'-0"
BLDG
EXISTING
FIRST 1ST FL
FLOOR
100'-0"
100'
EL. - 0"
EL.100'
100'-0"
- 0" 100' - 0"
EL. 100'-0" 100' - 0"
EL. 100'-0"

P
P7 MEN'S RR WEST ELEVATION P11 MEN'S RR NORTH ELEV P15 MEN'S RR EAST ELEVATION
SCALE: 1/4" = 1'-0" A120 SCALE: 1/4" = 1'-0" A120 SCALE: 1/4" = 1'-0" A120

N
N1 CEILING COVE DETAIL 3" 2'-6" 3" 3" 5'-2" 3"

MIRROR MIRROR 106'-0" WAINSCOT


106'-0" 106'-0"
SCALE: 1 1/2" = 1'-0" A701

4'-5"
EL. 106'-0" EL. 106'-0" EL. 106'-0"

5'-1"
BIO-
PTW HAZARD
PTW
HD HD

SND
N1
A701

3'-4"
2'-10"

3'-1"
M

2'-8"
2'-5"
2'-2"
HD
EXISTING
TERMINAL 100'-0"
BLDG
EXISTING
FIRST 1ST FL
FLOOR
100'-0" EXISTING
TERMINAL 100'-0"
BLDG
EXISTING
FIRST 1ST FL
FLOOR
100'-0" EXISTING 100'-0"
EXISTING
FIRST FLOOR
100'-0"
100' - 0"
EL. 100'-0" 100' - 0"
EL. 100'-0" 100' 100'-0"
EL. - 0"

L
106'-0"
EL. 106'-0" L11 WOMEN'S RR WEST ELEVATION L15 WOMEN'S RR SOUTH ELEV L18 WOMEN'S RR NORTH ELEV
SCALE: 1/4" = 1'-0" A120 SCALE: 1/4" = 1'-0" A120 SCALE: 1/4" = 1'-0" A120 GENERAL
A. NOTES:
PROVIDE INTERNAL WALL BLOCKING WHERE SURFACE-MOUNTED OR
RECESSED EQUIPMENT OCCURS ON OR WITHING GYP BD WALLS. ALL
BLOCKING SHALL BE FIRE-RETARDANT TREATED MATERIAL.
B. ALL GYP BD WALLS AND CEILINGS IN RESTROOMS AND JANITOR
CLOSETS SHALL BE MOLD/MILDEW/MOISTURE RESISTANT. ALL GYP BD
WALLS AND SIDEWALLS ADJACENT TO DRINKING FOUNTAIN SHALL
ALSO BE MOLD/MILDEW/MOISTURE RESISTANT.

8 1/4"
MECHANICAL
B20

1'-9" 2"

CH2 TSC TPH


G1
J A701 8
3'-1"
2'-10"

PTW
19'-4 7/8" 2'-0" 10'-11 1/2" 4 7/8"

BIOHAZARD
7'-0"

DCS
S S
EXISTING
TERMINAL 100'-0"
BLDG
EXISTING
FIRST 1ST FL
FLOOR
100'-0" F6 G3

EXISTING 100'-0" 100' - 0"


EL. 100'-0"
TERMINAL BLDG
EXISTING
FIRST
100'
1ST FL
FLOOR
100'-0"
- 0"
EL. 100'-0" KEY PLAN:
H
TPH TSC CH2

2'-0"
B16C 7 3/8"
G
DCS B16D

3'-0 3/8"
8'-2 3/4"
A
SNR SNR SNR SNR SNR FAMILY RR G2
A B22

6'-1"
TPH TPH

6'-4"
TPH F5
S 7'-7 3/4"
TSC

B22
G2 TSC TSC TSC TSC

10'-2 3/4"
G CH1 3'-6" CH1 3'-6" CH1 3'-6" CH1 3'-6"
3'-0" 8 FAMILY RR
5'-0"
G1 DETAIL AT SINK G7 SECTION AT SINK
B21
PTW BIOHAZARD

8"
CH2 DCS 
SCALE: 1 1/2" = 1'-0" A701 SCALE: 3/4" = 1'-0" A701 CH2
PTW E D F
ALIGN

19'-2 3/16"
WOMEN'S

6'-6 3/16"

6'-6 3/16"
7'-0 3/16"
3 A
RESTROOM F5
B23 A B C
3
F 3'-0" 3'-0" 12'-0" 10'-8" 4'-2 7/8" 5'-0"

CH2
SIM
D5
A HD A104
5'-0" 3'-6" 3'-6" G2
MH1 L18 A701 L15 1
CH1 CH1

2'-0"
CH1 A A

5'-2"
BIOHAZARD F5 G2
TSC TSC
TSC

6'-4"
A
TO OPENING AT TOP OF CONTAINER

6'-1"
L11
6'-0"

DCS PTW 2" 2" A A G2


TO HIGHEST OPERABLE ELEMENT

SND TPH

1'-6"
5 5
HD TPH F5 G2 A
CH2 PTW SND HD G2
SNR SNR SNR 6 7
DCS
E
5'-6" - CH1

BIOHAZARD A
PTW
5'-6"
TO PAPER SLOT

F5
4'-0" - CH2

4'-0"

4'-0"

4'-0"

16'-1 13/16"
No. Revisions / Submissions Date
TO DECK

6'-0 1/2"
2'-7 1/2"

B15A

3'-0"
DF
(WOMEN'S)
1'-4" HD

(MEN'S)
1'-1" HD

4
1'-0"

1'-6"

LWC

1'-9"

1'-9"
4'-2 7/8"
2 PTW
S
CH - COAT HOOK DCS - DIAPER CHANGING STATION PTW - PAPER TOWEL / BIOHAZARD WASTE SND - SANITARY NAPKIN HD - HAND DRYER MH1 - MOP & BROOM HOLDER WMS - WHITE MELAMINE SHELVING G2 8 8
WASTE RECEPTICLE CONTAINER DISPENSER W/SHELF, HOOKS & HOLDERS 12" DEEP UNLESS OTHERWISE NOTED A 4" 5'-0" 4" 4" 2'-4" 4" A
PTW

1'-6"
D SURFACE MTD BRACKETS AND STANDARDS F5
TPH
HD G2 I NCOR P O R ATED
6'-1"

3'-0" APART MAXIMUM AND WITHIN 12" OF SIDE WALLS TPH 5'-8" 2'-0" 3'-0" 5'-0"

6'-4"
434 East First Street Dayton, OH 45402 937.223.6500

5'-2"
2'-0"
5'-0"
TSC
3'-6"
TSC TSC
3'-6" 6
G7 7
G2
A 4440 Garwood Place Richmond, IN 47374 765.966.3546
SIDE GRAB BARS REAR GRAB BARS CH1 CH1 BIOHAZARD A701 SIM
NO. LENGTH MOUNT HGT. APPLICATION NO. LENGTH MOUNT HGT. A
HD A5
G2 A104
GB1A 3'-6" 3'-0" ADULT HC GB2A 3'-0" 3'-0"
P15
1
DAYTON INTERNATIONAL AIRPORT
CH2
12'-0"
3 MEN'S 3600 TERMINAL DRIVE
P11 A701 RESTROOM
VANDALIA, OH 45377
5'-10 3/8"

3'-4" B12
C PROVIDE VERTICAL BAR AT ALL
P7
A4 A702
(937) 454-8209

18'-6 1/8"
1'-0" MAX. 3'-6" SIDE BAR (GB1) LOCATIONS

3'-0" 6" MAX. 3


CH2
PTW DCS CH2
PHASE ONE CANOPY
1'-6"

2'-0" 1'-0"
C:\Revit\14613.00-DAY-Canopy-ARCH-2014_sbg.rvt

URS SPOUT HEIGHT

REPLACEMENT PROJECT
GB1
3"

GB2
3'-6"

5'-0" 3'-0" 3'-0" 3'-0" 3'-0"


3600 TERMINAL DRIVE
(ADULT NON HC)
SIDE BAR HGT.

B12
3'-7 5/16"

TPH
2'-10" - LA2

(ADULT HC)

TSC
3'-0" - LA1

3'-0 5/16"

SNR ZONE LA
6'-1"
6'-1"

DF
(ADULT NON HC)
(ADULT NON HC)

WC
(ADULT HC)
(ADULT HC)
1'-5" - WC2

1'-5" - UR2
1'-3" - WC1

TPH
1'-9" - UR1

INTERIOR RESTROOM ELEVATIONS &


3
B WC A
1'-6"

1'-0"

F5
UR URS URS URS

TSC - TOILET SEAT PLANS


COVER DISPENSER

PROGRESS
UR - URINAL URS - URINAL LA - LAVATORY DF - DRINKING FOUNTAIN
Comm. No. Date
2'-0"

WC - WATER CLOSET SCREEN (HI-LO UNIT)


GB - GRAB BARS
14613.00 JAN 15, 2015
DRAWING
TPH - TOILET TISSUE DISPENSER
SNR - SANITARY NAPKIN RECEPTACLE
(WOMEN'S RESTROOM ONLY - ALL STALLS)

BAGGAGE
CLAIM
NOT FOR Drawn

DCC
Drawing No.

A
ARCH - LEGEND - RR FIXTURES - CONSTRUCTION
A701
LOBBY

A12 ENLARGED PLAN - RESTROOMS


A01

MOUNTING HGT 3/26/2015 Checked

SCALE: 3/8" = 1'-0" SCALE: 1/4" = 1'-0" A01 5:47:38 PM EGS/JCF


1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 © 2013 LWC, INCORPORATED
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
3/26/2015 5:50:28 PM
SHEET NOTES:

2'-5 3/4"
1 1/2" LAMINATE
M COUNTER W/ 4" 1 1/2" LAMINATE
BACKSPLASH COUNTER W/ 4"
BACKSPLASH

7'-0"

4"
4'-6 1/4"

4"
2'-10"
REF BY

2'-10"
OWNER

3'-0" 3'-0" 1'-0"


L
2'-6" 2'-1"

36"X36" CORNER BASE CABINET WITH


LAZY SUSAN SHELF INSIDE
SINK BASE CABINET 24" DEEP
2 DRAWER BASE CABINET 24" DEEP (TYP) WITH FALSE FRONT
"DRAWER" PANEL
GENERAL NOTES:
PANTRY CABINET WITH ONE FIXED 36"X36" CORNER BASE CABINET WITH
SHELF AT DOOR TRANSITION, LAZY SUSAN SHELF INSIDE
THREE ADJUSTABLE SHELVES IN
LOWER PORTION AND ONE
ADJUSTABLE SHELF IN UPPER
PORTION, 24" DEEP (TYP)
K
K13 USO BREAK SOUTH K17 USO BREAK WEST
SCALE: 1/4" = 1'-0" A120 SCALE: 1/4" = 1'-0" A120

T9.5 T9

J
1 1/2" THICK SOLID SURFACE COUNTER
25" DEEP + FULL HEIGHT BACKSPLASH USO
LOUNGE
1 1/2" THICK SOLID SURFACE B15
TRANSACTION COUNTER 12" DEEP
ABOVE WEST WALL; 6 7/8" DEEP
ABOVE NORTH WALL; 1" OVERHANG F
ON CUSTOMER SIDE OF THE WALL

6 7/8" KEY PLAN:


H

6 1/2"
A702 A702 K13
USO

3'-6"
GREETERS BREAK

2'-10"

10'-3"
OPEN KNEE F13 K17
B13 B14
SPACE

4'-2 15/16" 6 7/8" 6'-9" 7'-7"

1'-6" 3'-8" 1'-6"

6'-10" 4 7/8"

G J

4 DRAWER BASE CABINET 24" DEEP

2 DRAWER BASE CABINET 24" DEEP (TYP)

F
F13 USO GREETER ELEV F17 ENLARGED PLAN USO
SCALE: 1/4" = 1'-0" A120 SCALE: 1/4" = 1'-0" A104

E NOTE THAT THIS ELEVATION IS TYPICAL;


REPRESENTING THREE SETS OF WORKSTATIONS FOR
THE CAR RENTAL AGENCIES
EACH SET OF WORKSTATIONS IS TO BE CENTERED
ON THE EXISTING COLUMN LINE. No. Revisions / Submissions Date

SIM SIM
M9

LWC
H5
A104 A104
1

D I NCOR P O R ATED
434 East First Street Dayton, OH 45402 937.223.6500
1 1/2" THICK SOLID SURFACE
TRANSACTION COUNTER 12" DEEP 4440 Garwood Place Richmond, IN 47374 765.966.3546
ABOVE EAST WALL; 6 7/8" DEEP
1'-4"

ABOVE NORTH AND SOUTH WALLS; 1"


OVERHANG ON CUSTOMER SIDE OF
1 1/2" LAMINATE
COUNTER W/ 4"
THE WALL DAYTON INTERNATIONAL AIRPORT
BACKSPLASH 1 1/2" THICK SOLID SURFACE COUNTER 3600 TERMINAL DRIVE
25" DEEP + FULL HEIGHT BACKSPLASH VANDALIA, OH 45377
SINK BASE CABINET 24" DEEP 6 7/8" 3/4" PLYWOOD/LAMINATE SHELF
C 4
WITH FALSE FRONT WITH VERTICAL DIVIDERS (937) 454-8209
8'-0"

"DRAWER" PANEL EQUALLY SPACED

PHASE ONE CANOPY

4"

2'-1 1/2" 4"


4 DRAWER BASE
C:\Revit\14613.00-DAY-Canopy-ARCH-2014_sbg.rvt

4'-0"
CABINET 24" DEEP

REPLACEMENT PROJECT
OPEN FOR

3'-5"
2'-10"

3'-0"
(TYP) TRASH
RECEPTAC
LE BY
TENANT
3600 TERMINAL DRIVE
2'-3" 3'-1 1/2" 2'-3"
1" 1'-6" 1'-6" 1'-6" 2'-6" 1'-6" 1'-6" 1'-6" 1'-6" 1"
13'-6 13/16" 8" 4'-3 5/16" 6'-0 1/2" 4'-6" 8" 15'-1 13/16" CABINET BASE +
B 13'-2" TOE KICK
5" AND 1'-2" TALL DRAWERS
(CUSTOM DRAWER BASE CABINET 24" DEEP) INTERIOR ELEVATIONS
OPEN WITH PULL OUT SHELF FOR PRINTER

PROGRESS
(MIN 6" CLEAR VERTICAL HEIGHT ABOVE Comm. No. Date
SHELF) - OPEN BACK SECTION OF CABINET TO
ACCOMMODATE ELEC/DATA 14613.00 JAN 15, 2015
3/4" FIXED SHELF FOR PRINTER PAPER
DRAWING
3" WIDE FILLER STRIP
NOT FOR Drawn

DCC
Drawing No.

A
CONSTRUCTION
A4 RESTROOM PORTAL A13 CAR RENTAL LOUNGE ELEV A17 CAR RENTAL ELEV (TYP) 3/26/2015 Checked

EGS / JCF
A702
SCALE: 1/4" = 1'-0" A120 SCALE: 1/4" = 1'-0" SCALE: 1/4" = 1'-0" 5:50:28 PM
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 © 2013 LWC, INCORPORATED
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
3/26/2015 11:57:16 AM

DETAIL NUMBER
NORTH ARROW SHEET NOTES:

R
A10 View Name
SCALE: 1/8" = 1'-0" R101

REFERENCE SHEET NUMBER

SIM
Q A10
A900-3
AREA OF DETAIL SHEET NOTE NUMBER
ROOM NAME
CALLOUT
0
ROOM
NAME
9999
150 SF
ROOM NUMBER

MODIFICATIONS
TO PARTITION TYPE
P
S4S LEVEL
M3

FIRST FLOOR
PARTITION TYPE EL. 100' - 0"

DIRECTION OF DETAIL NUMBER BENCHMARK HEIGHT


BUILDING SECTION

SIM SIM
A99 A99 99'-99"
A900-3 A900-3
N
PHASE NUMBER
SHEET NUMBER (IF APPLICABLE) CEILING HEIGHT REVISION NUMBER
ABOVE FINISHED FLOOR

DIRECTION OF DETAIL NUMBER AREA OF REVISION


WALL SECTION

SIM
A99
A900-3
M PHASE NUMBER
SHEET NUMBER (IF APPLICABLE)

DIRECTION OF DETAIL NUMBER


DETAIL EXISTING SWING
DOOR TO REMAIN
SIM
A10 WINDOW KEY LETTER
A900-3

PHASE NUMBER
SHEET NUMBER (IF APPLICABLE) WW00
L DOOR NUMBER

GENERAL NOTES:
DETAIL NUMBER

SIM SIM
NEW SWING DOOR
A99 A99
A900-3 A900-3

PHASE NUMBER
SHEET NUMBER (IF APPLICABLE)

K
FINISH MATERIAL ABOVE

FINISH MATERIAL BELOW

EXTENTS OF FINISH

J
J1 SYMBOL LEGEND
SCALE: N.T.S.

& AND CUSP CUSPIDOR HORIZ HORIZONTAL OW OPERABLE WALL SW SHORT WAY

ANGLE CWF CONTINUOUS WOOD FIBER HP HORSE POWER OZ OUNCE SYM SYMMETRY/SYMMETRICAL KEY PLAN:
H @ AT D DEPTH/DEEP HR HOUR PA PUBLIC ADDRESS SYN SYNTHETIC

AAP ATTIC ACCESS PANEL DBL DOUBLE HTG HEATING PAT PATIENT T or TR TREAD

A/C AIR CONDITIONING DL DEAD LOAD HVAC HEATING/VENTILATION/COOLING PL PLATE TA TOILET ACCESSORY(IES)

AC.CLG ACOUSTIC CEILING D DEGREE HW HOT WATER P PROPERTY LINE TB TACK BOARD

ACT ACOUSTICAL CEILING TILE DEMO DEMOLISH/DEMOLITION HWG HIGHWAY PLAS PLASTER TEL TELEPHONE

AD AREA DRAIN DEPT DEPARTMENT ID INSIDE DIAMETER PLASLAM PLASTIC LAMINATE TERR TERRAZZO

ADJ ADJUSTABLE DF DRINKING FOUNTAIN IN. OR " INCHES PLBG PLUMBING T& B TOP & BOTTOM

AFF ABOVE FINISHED FLOOR DTL DETAIL INCL INCLUDED/INCLUDING PLYWD PLYWOOD T& G TONGUE & GROOVE
G
AFP ACOUSTICAL FOLDING PARTITION DIA DIAMETER INFO INFORMATION PREFAB PREFABRICATED TOC TOP OF CONCRETE

ALUM ALUMINUM DIM DIMENSION INSUL INSULATION/INSULATE PRVT PRIVATE TOF TOP OF FOOTING

ALT ALTERNATE DS DOWNSPOUT INTR INTERIOR PS PROJECTION SCREEN TOM TOP OF MASONRY

AP ACCESS PANEL DT DRAPERY TRACK INV INVERT PSF POUNDS PER SQUARE FOOT TOS TOP OF STEEL

APPROX APPROXIMATE DW DRY WALL JANCL JANITOR'S CLOSET PSI POUNDS PER SQUARE INCH TRANS TRANSFORMER

ARCH ARCHITECT/ARCHITECTURAL DWG DRAWING JT JOINT PSS PENCIL SHARPENER SUPPORT TV TELEVISION

A/V AUDIO/VISUAL OR AV DWC DRINKING WATER COOLER JB JOIST BEARING PT PRESSURE TREATED TWS TACKABLE WALL SERVICE

F AWG AMERICAN WALL GAUGE d PENNY (NAILS, ETC.) JS JOIST SUBSTITUTE PVC POLYVINYL CHLORIDE TYP. TYPICAL

AWT ACOUSTICAL WALL TREATMENT E EAST KIT KITCHEN QT QUARRY TILE U.L. UNDERWRITER'S LABORATORY

BD. BOARD EA EACH KW KILOWATTS RAD RADIUS UON or UNO UNLESS OTHERWISE NOTED

BLDG BUILDING EF EXHAUST FAN L LENGTH/LONG R RISER UR URINAL

BLKG BLOCKING EJ EXPANSION JOINT LAB LABORATORY RA RETURN AIR UV UNIT VENTILATOR

BM BENCHMARK/BEAM EL ELEVATOR LAM LAMINATE RB RESILIENT BASE VIF VERIFY IN FIELD

BOS or BOT BOTTOM OF STEEL ELEC ELECTRIC LAV LAVATORY RCP REINFORCED CONCRETE PIPE VERT VERTICAL

BRK BRICK ELEV ELEVATION LB OR # POUND RD ROOF DRAIN VCT VINYL COMPOSITION TILE
E
BTWN BETWEEN ENGR ENGINEER LL LIVE LOAD RCPT RECEPTACLE VCGWB VINYL COVERED GYPSUM WALLBOARD

BUR BUILT-UP ROOFING EP ELECTRIC PANEL BOARD LLV LONG LEG VERTICAL RENF REINFORCED/REINFORCEMENT VIT VITREOUS

CAB CABINET EQUIP EQUIPMENT LKR LOCKER REF REFERENCE VOL VOLUME No. Revisions / Submissions Date
CAR CARPET ESR ELASTIC SHEET ROOFING LVR LOUVER REFR REFRIGERATOR VRB VENTED RESILIENT BASE

CAT CATALOGUE EW EACH WAY LM LONG WAY REQ'D REQUIRED V. RET VAPOR RETARDER

LWC
CB CATCH BASIN EIFS EXTERIOR INSULATED FINISH SYSTEM M METER/THOUSAND RE V REVISION(S) VS VENT STACK

CBD CHAULK BOARD EXH EXHAUST MAS MASONRY RM ROOM VS/ VERSUS

D CFM CUBIC FEET PER MINUTE EXIST EXISTING MAT MATERIAL RO ROUGH OPENING VT VINYL TILE
I NCOR P O R ATED
CH CABINET HEATER EXP EXPANSION MAX MAXIMUM ROW or R/W RIGHT OF WAY VTR VENT THROUGH ROOF
434 East First Street Dayton, OH 45402 937.223.6500
CI CAST IRON EXT EXTERIOR/EXTENSION MB MASONRY BEARING S SOUTH W WEST
4440 Garwood Place Richmond, IN 47374 765.966.3546
CJ CONTROL JOINT FACT FACTORY BUILT MECH MECHANICAL SA SUPPLY AIR W/ WITH

C CENTERLINE F.D. FLOOR DRAIN MEZZ MEZZANINE SAC SUSPENDED ACOUSTICAL CEILING WA WARDROBE ACCESSORIES

CL CLOSET F.H. FIRE HYDRANT MFR MANUFACTURER SCH SCHEDULE WB WOOD BASE DAYTON INTERNATIONAL AIRPORT
CLG CEILING FNDT FOUNDATION MH MANHOLE SCWD SOLID CORE WOOD WC WATER CLOSET 3600 TERMINAL DRIVE
CMT CERAMIC MOSAIC TILE FRACT FRACTIONAL MIL .001 SD STORM DRAIN WCOL WIND COLUMN
VANDALIA, OH 45377
C CMP CORRUGATED METAL PIPE FTS FOOTING MIN MINIMUM SECT SECTION WD WOOD (937) 454-8209
CMU CONCRETE MASONRY UNIT FT or ' FEET MISC MISCELLANEOUS SF or SQFT SQUARE FEET WH WATER HEATER

CO CLEANOUT GA GAUGE MM MILLIMETER SGFT STRUCTURAL GLAZED FACING TILE W/O WITHOUT
PHASE ONE CANOPY
C:\Revit\14613.00-DAY-Canopy-ARCH-2014_sbg.rvt

REPLACEMENT PROJECT
COL COLUMN GAL GALLON MO MASONRY OPENING SHT SHEET WP WORKING POINT

CONC CONCRETE GALV GALVANIZED MTL METAL SIM SIMILAR WR WATER RESISTANT

CONSTR CONSTRUCTION GB GRAB BAR N NORTH SLV SHORT LEG VERTICAL WSSK WALL SERVICE SINK 3600 TERMINAL DRIVE
CONT. CONTINUOUS/CONTINUE GC GENERAL CONTRACTOR N.I.C. NOT IN CONTACT SPEC(S) SPECIFICATION(S) WWF WELDED WIRE FABRIC

CORG. CORRUGATED GHM GALVANIZED HOLLOW METAL NO. or # NUMBER SPKR SPEAKER WWM WOVEN WIRE MESH
B
ABBREVIATIONS & SYMBOLS
CORR. CORRIDOR/CORRUGATED GL GLASS NOM NOMINAL SQ SQUARE YD YARD/YARD DRAIN

CT. CERAMIC TILE GWB GYPSUM WALL BOARD NTS NOT TO SCALE SS STAINLESS STEEL

CTBR COUNTER BORE GYP GYPSUM OC ON CENTER STL STEEL

CTSK COUNTER SINK H HEIGHT/HIGH OD OUTSIDE DIAMETER STM STORM SEWER PROGRESS Comm. No.

14613.00
Date

JAN 15, 2015


CU FT

CU IN
CUBIC FEET

CUBIC INCHES HDW


HB HOSE BIBB

HARDWARE
OFF

OPING
OFFICE

OPENING
STO

STRUCT
STORAGE

STRUCTURE
DRAWING
CU YD CUBIC YARDS HM HOLLOW METAL OPP OPPOSITE/OPPOSITE HAND SUSP SUSPENDED NOT FOR Drawn

DCC
Drawing No.

A
CONSTRUCTION
A1 ABBREVIATIONS 3/26/2015 Checked

EGS/JCF
G001
SCALE: N.T.S. 11:57:16 AM
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 © 2013 LWC, INCORPORATED
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
3/26/2015 11:58:17 AM
SHEET NOTES:
OBC 2007 CODE NOTES
R
Chapter 3: Use and Occupancy Classification

Section 303:
G A-3: Waiting areas in transportation terminals
B: Office and traffic control towers
M: Sales rooms, retail or wholesale stores
S-1: Storage (Baggage sorting)

Chapter 4: Special Detailed Requirements for Use and Occupancy

Section 402: Covered Mall – Does not meet requirements for covered mall.

Chapter 5: General Building Heights and Areas

Q Table 503: Allowable Heights and Areas for Type IA construction


A-3: Unlimited
B: Unlimited
S-1: Unlimited

Table 508.2.5: Incidental Accessory Occupancies


Furnace rooms > 400,000 btu 1-hour or sprinkler
E D F Boiler rooms > 15 psi or 10 hp 1-hour or sprinkler
 Refrigeration machine rooms > 1-hour or sprinkler
Fire pump rooms > 2-hour or 1-hour with sprinkler

Section 508.3: Non-separated mixed use: Most restrictive applies which is A-3

Chapter 6: Construction Classification


A B C
Section 602.2: Type I, non-combustible
P
Table 601: For Type IA Construction
Primary Structural Frame 3-hour, 2-hour if only supporting roof
Bearing Walls Exterior 3-hour
Bearing Walls Interior 3-hour, 2-hour if only supporting roof
Non-bearing Interior partitions 0
Floor Construction and Secondary Members 2-hour
Roof Construction and Secondary Members 1.5-hours

Table 602: Exterior Walls for Type IA Construction


X<5’ 2-hour for M & S, 1-hour for A & B
5’ < x < 10’ 2-hour for M & S, 1-hour for A & B
10’ < x < 30’ 1-hour for A, B, M, & S
X > 30’ 0

N Chapter 7: Fire and Smoke Protection

KEY PLAN Table 706.4: Fire Resistance of Fire Walls for Type IA Construction
A, B, M, S-1 3-hour

Table 707.3.9: Fire Barriers


SCALE: 1" = 300'-0" S-1
A, B, M
3-hour
2-hour

Chapter 9: Fire Protection Systems: Full Automatic Sprinkler System Exists and will be
Maintained.

Section 906: Portable Fire Extinguishers


A, B, M, S Within 30’ of commercial cooking equipment
In areas of flammable or combustible liquids storage, use, or dispensing
M Special hazards as determined by the Building Official

Section 907: Fire Alarm and Detection

OPEN 907.2.1 Group A >300 OL: Manual fire alarm system that actives occupant notification system.
TO Manual fire alarm not required with alarm activated by flow of sprinkler.
TSA 907.2.1.1 Group A > 1000 OL: Alarm must include a voice/alarm communication system.
OUTSIDE
Chapter 10: Means of Egress

Table 1004.1.1
Storage 300 gross/occupant
ADDITIONAL EXITING Airport Terminal 20 gross/occupant
AVAILABLE Baggage Claim 300 gross/occupant
Baggage Handling 100 gross/occupant
L Business areas 100 gross/occupant

Section 1005.1: Minimum Exit width – OL x .3” for stairs and OL x .2” for other
From Airline Offices: 88 OL x .2” = 18” required, 288” provided
From General Terminal: 2280 OL x .2” = 456” required, 688” provided
From Baggage Sorting Room: 78 OL x .2” = 16” required, 36” provided

Section 1008.1.2: Doors swing in direction of egress with OL > 50


Doors comply with swing or 1008.1.4.3 for horizontal sliding doors

Section 1008.1.10: Panic hardware for A occupancies with OL > 50


Doors comply with 1008.1.4.3, horizontal sliding doors

Table 1015.1: Spaces with one exit


PRIVATE RESOLUTION
STSO SCREENING ROOM A, B, M 49 OL
78 S 29 OL
K
? MECHANICAL Table 1016.1: Exit Travel Distance with Sprinkler
? B20 A, M, S-1 250’
AVS

BLS ETD
AVS

BLS ETD
AVS
B 300’
O.L. 2 FRONT FRONT

AVS AVS AVS

Table 1018.1: Corridor Fire-Resistance Rating with Sprinkler


BLS ETD BLS ETD
FRONT FRONT

A, B, M, S 0

CART
2'x3'

EMPTY

CART
2'x3'

CART
2'x3'
BINS

EMPTY

EMPTY
BINS

BINS
CART
2'x3'

CART
2'x3'

CART
2'x3'
EMPTY

EMPTY
EMPTY
BINS

BINS

BINS
Section 10108.4: Dead Ends 20’ maximum
Exception 2: B, M, S 50’ max.
Exception 3: Not limited when length is 2.5 times minimum width.
CAFE Section 1014.3: Common Path of Egress Travel: 75’
245' TRAVEL DISTANCE 10 9
STORAGE
WOMEN'S 8 14 12 21 14
B17 Table 1021.1: Minimum Number of Exits
J RESTROOM

AIT
L3

AIT
AIT
1-500 2 exits

L3
L3
BAGGAGE O.L. 2 B23 2
2

501-1000 3 exits

2
2
CLAIM 620DV
RAPISCAN
620DV
RAPISCAN
620DV
RAPISCAN
620DV
RAPISCAN
X-RAY
620DV
RAPISCAN
620DV
RAPISCAN

>1000 4 exits

ADA GATE
X-RAY X-RAY

ADA GATE
X-RAY X-RAY

ADA GATE
X-RAY

A20 O.L. 9

L
L
14361.01 SF USO 4
2
4 O.L. 2 Section 1028.2: Assembly Main Exit - When OL exceeds 300, must have a main exit capable of

238' TRAVEL DISTANCE


O.L. 8 O.L. 14 O.L. 12 O.L. 19 handling half of the occupant load. Exception: Where no well-defined main entrance, the exits may
O.L. 156 LOUNGE L

be distributed around perimeter


GATE
2 SECURITY

B15 O.L. 14
4

TABLE630

TABLE630

TABLE630
TABLE630
TABLE630

TABLE630
O.L. 20 MEN'S Chapter 11: Accessibility – Meeting ICC 117.1 and 2010 Accessibility Standards of the ADA
RESTROOM O.L. 10

TABLE630

TABLE630

TABLE630
TABLE630
TABLE630

TABLE630
Chapter 29: Plumbing

LANE 4
USO B12
78 GREETERS BREAK Table 2902.1: Minimum Plumbing Fixtures

TABLE630

TABLE630
TABLE630
TABLE630

TABLE630

CART
2'x3'

EMPTY
BINS

LANE 5

LANE 6
LANE 1

LANE 2

LANE 3
B13 B14 Occupancy Water Closets Lavatories Drinking Fnt. Serv. Sink
O.L. 2 M F M F
H

EL. 1'-1"
SOUTHWEST A-3 Terminals 1:500 1:500 1:750 1:750 1:1000 1

CART
2'x3'

CART
2'x3'
EMPTY

EMPTY
BINS
CART
2'x3'

BINS
CART
2'x3'

CART
2'x3'
EMPTY

EMPTY
EMPTY
DELTA UNITED VACANT AMERICAN FRONTIER

BINS

BINS
BINS
AIRTRAN US AIR
STORAGE B 1:50 1:50 1:80 1:80 1:100 1
TICKETING O.L. 28 S-1 1:100 1:100 1:100 1:100 1:1000 1
A19
222' TRAVEL DISTANCE

SOUTHWEST
BAGGAGE O.L. 3 TDC TDC TDC A 2.2 2.2 1.5 1.5 2.2 1
OFFICE B 1.5 1.5 1.0 1.0 1.5 1
S-1 0.8 0.8 0.8 0.8 0.2 1
A18
DELTA Total Req’d. 4.5 4.5 3.3 3.3 3.9 1
BAGGAGE
OFFICE Provided 9 9 4 4 4 1
CAFE
A17
DELTA O.L. 3
B09
STORAGE 1384.05 SF
A16
US
CENTRAL
G AIRWAYS
BAGGAGE LOBBY
BAGGAGE
CLAIM B01 TICKET
OFFICE O.L. 3 LOBBY 13396.94 SF LOBBY
A15
A01 C01
18194.99 SF SERVES TERMINAL LOBBY 19912.36 SF
161' TRAVEL DISTANCE
VESTIBULE
234 AND BAGGAGE CLAIM
A14 O.L. 41 TERMINAL O.L. 1767
NO ADDITIONAL OCCUPANTS
UNITED/AMERICAN
LOST
LUGGAGE O.L. 3 WHEELCHAIRS
OFFICE
C06
A13

F O.L. 3 STOR. VESTIBULE STOR. O.L. 3 O.L. 3 STOR. VESTIBULE STOR.


STAIR STAIR
LOUNGE STOR. VESTIBULE STOR. LOUNGE
LOUNGE
STOR. VESTIBULE STOR.
A09 A08 A07 A02 B08 B07 LOUNGE B03 B02 C08 C04 C03 C02
ALAMO HERTZ BUDGET NATIONALAVIS S1 S2
B04 C07
C05
BREAK RM B06 1086.06 SF Not Enclosed
A10 A06 A05 A04 A03 1134.52 SF
A12 1104.87 SF
ENTERPRISE O.L. 59 O.L. 29 O.L. 62
O.L. 34 196 196 196 196 O.L. 59 239 239 196 196 196 196
O.L. 16 A11 O.L. 62
VESTIBULE
B05

No. Revisions / Submissions Date

D
LWC
I NCOR P O R ATED
434 East First Street Dayton, OH 45402 937.223.6500
4440 Garwood Place Richmond, IN 47374 765.966.3546

DAYTON INTERNATIONAL AIRPORT


3600 TERMINAL DRIVE
VANDALIA, OH 45377
C (937) 454-8209

PHASE ONE CANOPY


C:\Revit\14613.00-DAY-Canopy-ARCH-2014_sbg.rvt

REPLACEMENT PROJECT
3600 TERMINAL DRIVE
B
LIFE SAFETY PLAN - OVERALL
PROGRESS Comm. No.

14613.00
Date

JAN 15, 2015


DRAWING
NOT FOR Drawn

DCC
Drawing No.

A
CONSTRUCTION
A1 LIFE SAFETY PLAN 3/26/2015 Checked

EGS/JCF
G002
SCALE: 1" = 20'-0" A01 11:58:17 AM
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 © 2013 LWC, INCORPORATED
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
3/26/2015 12:01:08 PM
SHEET NOTES:
1. PHASE 1A: EXISTING MEN'S RESTROOM MUST REMAIN FULLY FUNCTIONAL
AND WILL REMAIN TO BE OCCUPIED UNTIL NEW MEN'S RESTROOM IS
R FULLY FUNCTIONAL AND ABLE TO BE OCCUPIED. USE EXISTING 4'-0"
WIDE DOOR ON WEST WALL TO BAGGAGE CLAIM LOBBY AS

C
TEMPORARY ENTRANCE TO NEW MEN'S RESTROOM UNTIL NEW
RESTROOM LOBBY CAN BE COMPLETED. PHASE 1B: CONSTRUCT NEW
FAMILY RESTROOM AFTER THESE AFOREMENTIONED STEPS ARE
COMPLETED. CONTRACTOR SHALL PROVIDE TEMPORARY DIRECTIONAL
SIGNAGE (QTY AS NEEDED) UNTIL CONSTRUCTION IS COMPLETED AND
NEW SIGNAGE IS IN PLACE. TEMPORARY SIGNAGE TO BE MINIMUM
PRIVATE RESOLUTION
24"X36" AND PRINTED ON 10MM SINTRA BOARD OR APPROVED EQUAL.
SCREENING ROOM

ALL COPY/GRAPHICS SHALL BE APPROVED BY ARCHITECT PRIOR TO


STSO

PRODUCTION.
2. PHASE 1A (CONCURRENT): EXISTING USO AREA MUST REMAIN INTACT
Q AVS AVS AVS
UNTIL NEW USO AREA IS FULLY FUNCTIONAL AND ABLE TO BE OCCUPIED.
BLS ETD
FRONT
BLS ETD
FRONT

AVS AVS AVS


3. PHASE 1A (CONCURRENT): EXISTING CAFE STORAGE AREA MUST BE
BLS ETD
FRONT
BLS ETD
FRONT
TEMPORARILY RELOCATED UNTIL NEW CAFE STORAGE AREA IS ABLE TO
BE OCCUPIED FOR STORAGE PURPOSES. DISASSEMBLY AND
RECONSTRUCTION OF EXISTING CHAIN LINK FENCE AND GATE WILL BE

CART
2'x3'

EMPTY

CART
2'x3'

CART
2'x3'
BINS

EMPTY

EMPTY
BINS

BINS
CART
2'x3'

CART
2'x3'

CART
2'x3'
EMPTY

EMPTY

EMPTY
BINS
BINS

BINS
REQUIRED BY CONTRACTOR FOR TEMPORARY LOCATION.
CONTRACTOR TO COORDINATE LOCATION WITH OWNER.
3
4. PHASE 1A (CONCURRENT): NEW CAR RENTAL STORAGE AREA TO BE
CONSTRUCTED AND ABLE TO BE OCCUPIED FOR STORAGE PURPOSES
PRIOR TO ANY NEW WORK IN EXISTING CAR RENTAL SALES COUNTER AND

BAGGAGE CLAIM DROP-OFF OFFICE AREAS.

AIT
L3

AIT
AIT

L3
L3
2
2

2 5. PHASE 1A (CONCURRENT): NEW CAR RENTAL BREAK ROOM TO BE

2
CONSTRUCTED AND ABLE TO BE OCCUPIED PRIOR TO ANY NEW WORK IN

2
620DV 620DV 620DV
620DV 620DV 620DV RAPISCAN RAPISCAN RAPISCAN
RAPISCAN RAPISCAN RAPISCAN X-RAY

ADA GATE
X-RAY X-RAY

ADA GATE
ADA GATE
X-RAY X-RAY X-RAY

P EXISTING CAR RENTAL SALES COUNTER AND OFFICE AREAS.

L
L
4
2
4
6. PHASE 1C: CAR RENTAL SALES COUNTER AND OFFICE IN "AREA 1" TO BE
L
GATE
CONSTRUCTED FIRST. EXISTING CAR RENTAL SALES AND OFFICE STAFF
WILL BE TEMPORARILY RELOCATED IN AN ADJACENT CAR RENTAL
2 SECURITY
4

TABLE630

TABLE630

TABLE630
TABLE630
TABLE630

TABLE630
SPACE.

CHECKPOINT
7. PHASE 1D: CAR RENTAL SALES COUNTER AND OFFICE IN "AREA 2" TO

TABLE630

TABLE630

TABLE630
TABLE630
TABLE630

TABLE630
1 BE DEMO/CONSTRUCTED AFTER AREA 1 IS COMPLETED.

LANE 4
8. PHASE 1E: CAR RENTAL SALES COUNTER AND OFFICE IN "AREA 3" TO BE

TABLE630

TABLE630
DEMO/CONSTRUCTED AFTER AREA 2 IS COMPLETED.

TABLE630
TABLE630

TABLE630

CART
2'x3'

EMPTY
BINS

LANE 5

LANE 6
LANE 1

LANE 2

LANE 3
9. PHASE 1A (CONCURRENT): WORK PERFORMED IN EXISTING OFFICES TO
BE LIMITED TO THE HOURS OF 11:00 PM - 7:00 AM. THESE AREAS WILL

EL. 1'-1"
CART
2'x3'

CART
2'x3'
EMPTY

EMPTY
BINS
CART
2'x3'

BINS
CART
2'x3'

CART
2'x3'
EMPTY

EMPTY
EMPTY
DELTA UNITED VACANT AMERICAN FRONTIER

BINS

BINS
BINS
AIRTRAN US AIR
REMAIN OCCUPIED DURING CONSTRUCTION. DEBRIS MUST BE CLEANED
ON A DAILY BASIS AND ALL SURFACES WIPED DOWN.
N 10. PHASE 1A (CONCURRENT): BAGGAGE CAROUSEL SHALL BE

ST
DECOMMISSIONED IN COORDINATION WITH THE OWNER, HOWEVER NEW
TDC TDC TDC

FLOORING SHALL BE INSTALLED IMMEDIATELY TO MINIMIZE VISUAL


IMPACT ON THE PUBLIC SIDE. ALL COMPONENTS OF THE BAGGAGE
AIRTRAN DELTA UNITED/SKYWAY CONTINENTAL AMERICAN FRONTIER US AIRWAYS CAROUSEL SHALL BE PROVIDED TO THE OWNER IMMEDIATELY UPON
DIS-ASSEMBLY.

A SOUTHWEST 11. PHASE 1C (OR AFTER): DO NOT DEMOLISH EXISTING UNITED/AMERICAN


LOST LUGGAGE OFFICES UNTIL ALL WORK IN THEIR NEW OFFICE
LOCATION IS FULLY COMPLETED AND ABLE TO BE OCCUPIED, INCLUDING
TENANT'S IT SERVICES.
BAGGAGE CLAIM BAGGAGE CLAIM
12. PHASE 1C (OR AFTER): GIFT SHOP WALLS CONSIST OF DEMOUNTABLE

S
PARTITIONS. DEMO OF EXISTING WALLS MUST BE COMPLETED AND NEW

OFFICES
10
ELEC/DATA FOR NEW LOCATION MUST BE IN PLACE AND READY TO
M RECEIVE RELOCATED GIFT SHOP ASSEMBLY PRIOR TO RELOCATION TO
MINIMIZE DOWN TIME.
13. EXISTING PORTER STATION SHALL BE DEMOLISHED IN SYNC WITH WHEN
THE EXTERIOR WORK IS OCCURRING IN THIS SAME AREA. DAY WILL MAKE
12
12 2 TEMPORARY ACCOMMODATIONS FOR PORTERS DURING CONSTRUCTION,
6 7 8 BUT THE NEW PORTER STATIONS SHALL BE MADE OCCUPYABLE AS
9 11 13 14 SOON AS POSSIBLE THEREAFTER.
13 14. EXISTING PRAYER ROOM SHALL BE DEMOLISHED AND RECONSTRUCTED
WITH THE NEW DESIGN IN SYNC WITH WHEN WORK IS OCCURRING IN THE
IMMEDIATELY ADJACENT AREAS. DAY WILL MAKE TEMPORARY
ACCOMMODATIONS FOR PRAYER ROOM. NEW PRAYER ROOM WILL
CONSIST OF FURNISHINGS BY CONTRACTOR. NEW FURNISHINGS SHALL BE
L INSTALLED AND MADE OCCUPYABLE AS SOON AS POSSIBLE
THEREAFTER.

GENERAL NOTES:
1.9
3.4 5.1 7.4 9.5 9.9 10.6 15.2 16.1 16.4 18.1 21.4 23.2 A. THE DAYTON INTERNATIONAL AIRPORT WILL REMAIN OCCUPIED
THROUGHOUT THE ENTIRE CONSTRUCTION PROCESS. THIS AIRPORT IS
OPEN 24 HOURS PER DAY / 7 DAYS PER WEEK AND DOES NOT CLOSE.
THEREFORE PROPER EGRESS MUST ALWAYS BE MAINTAINED AND IF/WHEN
EXITS ARE CLOSED, TEMPORARY SIGNAGE MUST BE PROVIDED TO
K DIRECT THE OCCUPANTS ACCORDINGLY. COORDINATE ALL EXIT
CLOSURES WITH THE OWNER AND THE FIRE DEPARTMENT.
B. CONTRACTOR IS RESPONSIBLE FOR DEVELOPING A PHASED
CONSTRUCTION SCHEDULE TO ACCOMMODATE THE GOALS SETFORTH IN
THE SHEET NOTES ABOVE. CONTRACTOR SHALL CONSTRUCT NEW
RESTROOMS, USO SUITE, CAFE STORAGE, CAR RENTAL STORAGE AREAS,
AND THE CONTROLLED-ACCESS CORRIDOR FIRST. OCCUPANCY OF
THESE AREAS MUST BE PERMITTED PRIOR TO IMPACTING THE PUBLIC
SPACES WITHIN THE TERMINAL. CONTRACTOR MUST PRESENT A DETAILED
PHASING SCHEDULE FOR OWNER/ARCHITECT APPROVAL PRIOR TO
PROCEEDING WITH ANY CONSTRUCTION.
C. CONTRACTOR IS RESPONSIBLE FOR PROVIDING CONSTRUCTION
J BARRIERS TO RESTRICT ACCESS AND LIMIT CONSTRUCTION DEBRIS
CONSTRUCTION PHASING PLAN - PASSAGE TO ADJACENT SPACES. PROVIDE STICKY MATS AND REPLACE
J1 AS NEEDED. ALL PUBLIC SIDES OF EACH CONSTRUCTION AREA MUST BE
DEMO D.
CLEANED ON A DAILY BASIS.
NOISY AND/OR MALODOROUS WORK MUST BE LIMITED TO THE HOURS OF
SCALE: 1" = 20'-0" A01 E.
11:00 PM - 7:00 AM.
THIS IS A NON-SMOKING FACILITY AND NO SMOKING WILL BE ACCEPTABLE
ON THE PREMISES.
F. NO MUSIC WILL BE ALLOWED AND VOICE LEVELS SHALL BE KEPT TO A
MINIMUM IN PUBLIC AREAS.

KEY PLAN:
H
G

C
4

PRIVATE RESOLUTION
STSO SCREENING ROOM

G MECHANICAL
? B20
? AVS

BLS ETD
AVS

BLS ETD
AVS

FRONT FRONT

AVS AVS AVS

BLS ETD BLS ETD


FRONT FRONT

E D  F

CART
2'x3'

EMPTY

CART
2'x3'

CART
2'x3'
BINS

EMPTY

EMPTY
BINS

BINS
CART
2'x3'
CART
2'x3'

CART
2'x3'
EMPTY

EMPTY

EMPTY
BINS
BINS

BINS

FAMILY RR
CAFE B22 A B C

BAGGAGE CLAIM DROP-OFF


BAGGAGE STORAGE WOMEN'S
CLAIM B17 RESTROOM AIT
L3

AIT
AIT

L3
L3

F A20
3
B23
2
2

2
2

2
2

620DV 620DV 620DV


620DV 620DV 620DV RAPISCAN RAPISCAN RAPISCAN
RAPISCAN RAPISCAN RAPISCAN X-RAY
ADA GATE

X-RAY X-RAY

ADA GATE
ADA GATE

X-RAY X-RAY X-RAY


L

L
L

USO 4
2
4

LOUNGE L
GATE
2 SECURITY

B15 4
TABLE630

TABLE630

TABLE630
TABLE630

TABLE630

TABLE630

MEN'S
RESTROOM
CHECKPOINT
TABLE630

TABLE630

TABLE630
TABLE630

TABLE630

TABLE630

1
LANE 4

B12
USO
GREETERS BREAK
TABLE630

TABLE630
TABLE630

TABLE630

TABLE630

CART
2'x3'

EMPTY
BINS

LANE 5

LANE 6
LANE 3
LANE 1

LANE 2

B13 B14
SOUTHWEST

EL. 1'-1"
CART
2'x3'

CART
2'x3'
EMPTY

EMPTY
BINS
CART
2'x3'

CART
2'x3'

BINS
CART
2'x3'

EMPTY
EMPTY

EMPTY

DELTA UNITED VACANT AMERICAN FRONTIER


BINS

BINS
BINS

AIRTRAN
E STORAGE
US AIR

A19
SOUTHWEST
BAGGAGE
ST
TDC TDC TDC

OFFICE 2
No. Revisions / Submissions Date
A18
CENTRAL
DELTA LOBBY
BAGGAGE
OFFICE
B01
AIRTRAN DELTA UNITED/SKYWAY CONTINENTAL AMERICAN FRONTIER US AIRWAYS
A
CAFE

LWC
A17
DELTA
STORAGE B10 SOUTHWEST
A16
US

D
AIRWAYS
BAGGAGE BAGGAGE CLAIM BAGGAGE
CLAIM
BAGGAGE CLAIM I NCOR P O R ATED
S OFFICE
A15 OFFICES
LOBBY
A01
TICKET
LOBBY 434 East First Street Dayton, OH 45402 937.223.6500
VESTIBULE C01 4440 Garwood Place Richmond, IN 47374 765.966.3546
A14
UNITED/AMERICAN
11 6 7 8
LOST 12
LUGGAGE 13 14
OFFICE 9
DAYTON INTERNATIONAL AIRPORT
A13
3600 TERMINAL DRIVE
VANDALIA, OH 45377
STOR. VESTIBULE STOR. STOR. VESTIBULE STOR. STAIR STAIR STOR. VESTIBULE STOR. STOR. VESTIBULE STOR.
C ENTERPRISE
ALAMO
A09 A08 A07
HERTZ BUDGET NATIONAL AVIS
A02 B08 B07 LOUNGE S1 S2 LOUNGE B03 B02 C08 WHEELCHAIRS C04 C03 C02
(937) 454-8209
B06 B04 LOUNGE C06 LOUNGE
BREAK RM A11 A10 A06 A05 A04 A03 C03 C05
A12
5 PHASE ONE CANOPY
C:\Revit\14613.00-DAY-Canopy-ARCH-2014_sbg.rvt

VESTIBULE
B05
REPLACEMENT PROJECT
1.9
3.4
3600 TERMINAL DRIVE
5.1 7.4 9.5 9.9 10.6 15.2 16.1 16.4 18.1 21.4 23.2

B
CONSTRUCTION PHASING PLAN
PROGRESS Comm. No.

14613.00
Date

JAN 15, 2015


DRAWING
NOT FOR Drawn

Author
Drawing No.

A
CONSTRUCTION PHASING PLAN - CONSTRUCTION
A1
COMPLETED 3/26/2015 Checked

Checker
G003
SCALE: 1" = 20'-0" A01 12:01:08 PM
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 © 2013 LWC, INCORPORATED
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
3/26/2015 12:04:00 PM
SHEET NOTES:

L
L1 TYPICAL SECONDARY ENTRY L11 ARIAL OF MAIN CANOPY
SCALE: SCALE: GENERAL NOTES:

KEY PLAN:
H

E
E12 ARIAL OF CANOPY
No. Revisions / Submissions Date
SCALE:

D
LWC
I NCOR P O R ATED
434 East First Street Dayton, OH 45402 937.223.6500
4440 Garwood Place Richmond, IN 47374 765.966.3546

DAYTON INTERNATIONAL AIRPORT


3600 TERMINAL DRIVE
VANDALIA, OH 45377
C (937) 454-8209
E1 MAIN CANOPY ENTRY
PHASE ONE CANOPY
C:\Revit\14613.00-DAY-Canopy-ARCH-2014_sbg.rvt

SCALE:
REPLACEMENT PROJECT
3600 TERMINAL DRIVE
B
3D PROJECT VIEWS
PROGRESS Comm. No.

14613.00
Date

JAN 15, 2015


DRAWING
NOT FOR Drawn

SBG
Drawing No.

A
CONSTRUCTION
3/26/2015 Checked

JCF/EGS
G004
12:04:00 PM