Sunteți pe pagina 1din 6

SA EPULO H NURJA MA N

Kampung Kepakan,DesaKarya,
MekarKecamatanPasirWangi|Kabupaten Garut |Provinsi Jawa
Barat – Indonesia 44161 | +62 81312744164 | +62 82235405642
Nurjaman_saepuloh@yahoo.com
WhatsApp’s : +62 812744164
https://www.linkedin.com/in/saepuloh-nurjaman-0859b0a0

OBJECTIVE
ELECRTICAL

SKILLS PROFILE
• AC AND FREEZER SPECIALIST
• KITCHEN EQUIPMENT AND LAUNDRY
• GENSET OPERATION SYNCHRONIZING PANEL
• ELECTRICAL MAINTENANCE
• WTP MOTOR AND PUMPS OPERATION AND MAINTENANCE
• SCHEMATIC DIAGRAM INTERPRETATION
• WIRING PANEL PLC & MCC
• WIRING CABLE INSTRUMENT
• SET UP VSD ( VARIABLE SPEED DRIVE )
• MAINTENANCE FIX PLANT GOLD MINING
• MAINTENANCE FIX PLAN COAL MINING
• PIPING & INSTRUMENT DIAGRAM
• WORK PLANNING
• SCHEDULING PREVENTIVE MAINTENANCE
• PREVENTIVE MAINTENNACE SCHDULING
• SOP EQUIPMENT ELECTRICAL PUMP
• WORK ORDER DISTRIBUTION
• MATERIAL PURCHASE REQUEST
• WEEKLY PLANNING

EMPLOYMENT HIST ORY


THIESS CONTRACTOR INDONESIA 4/4/2005 — 8/18/2007
CHEVRON TEXACO GEOTHERMAL POWER PLANT UNIT III- GARUT – Electrician
• Cable tray Installation
• Pulling Cable Power & Control
• Install MCC Panel
• Plant Lighting Installation
• High Voltage cable Installation
• AC Installation
• Control Room cable termination
• Install Motor 3 Fhase For Colling Tower
• Electrical Maintenance

PT.CAKRA GEMILANG 2/28/2008 — 12/31/2008


SCHNEIDER ELECTRIC INDONESIA- Electrician
• Assembly panel MV ( Medium Voltage)
• Assembly panel LV ( Low Voltage )
• Control Cable For MV , LV, SM6, Other
• Electrical Cable Pre wiring
• Schematic diagram interpretation
• Finishing Wire Marker
• Finishing plate name panel
• Punch list quality control

PT.GLOBAL SARANA KARYA 1/1/2009 — 10/31/2009


SCHNEIDER ELECTRIC INDONESIA- Electrician
• Assembly Panel MV ( Medium Voltage )
• Assembly panel MV ( Low Voltage )
• Control Cable Installation For MV, LV, MCC , Other
• Cable Pre wiring
• Schematic diagram interpretation
• Finishing wire Marker
• Finishing name plate panel
• Punch list quality Control

PT .MULTI BINTANG 11/3/2009 — 5/20/2010


JalanDaanMogot Jakarta Barat – Electrical Supervisor
• Maintenance WTP (Water Treatment Plant )
• Maintenance equipment Machine Industri
• Maintenance Air conditioner
• Maintenance Conveyor
• Maintenance proximity
• Troubleshooting Machine
• Other

PT.SANKYU INDONESIA INTERNATIONAL 5/21/2010 — 9/18/2010


Jababeka Industrial Estate – Cikarang Bekasi – Electrician Foreman
• Booster Pump Installation
• 3 phase Motor Installation
• Control Cable Termination
• AC installation and Maintenance
• Electrical Maintenance
• Electrical Maintenance WTP ( Water Treatment Plant )
• Electrical Maintenance STP ( Sewage Treatment Plant )
• Install Molding Machine
• Install Machine Conveyor
• Install VSD Booster Pump

PT GRAMA BAZITA ENGINEERING 9/23/2010 — 1/15/2011


MARTABE GOLD MINING PROJECT- Electrician
• Fibre Optic Installation
• Lighting Instalation
• Office and Camp Electrical Installation
• Electrical Equipment Troubleshooting
• Generator Operation
• Electrical Maintenance

PT.PRASMANINDO BOGA UTAMA 1/16/2011 — 7/19/2013


MARTABE GOLD MINING PROJECT- Electrician
• AC and Freezer maintenance
• Laundry and Kitchen Equipment Maintenance
• WTP and Pumps Maintenance
• Camp and Office Electrical Maintenance
• Generator Operation Synchronizing Panel
• Install Panel MCC & PLC
• Maintenance STP ( Sewage treatment plant
• Maintenance Generator
PT.AGINCOURT RESOURCES 8/17/2013 — 14/3/2018
MARTABE GOLD MINING PROJECT- Maintenance Planner
• Work Order Preparation
• Work Order Distribution
• Material Sourcing
• Manpower allocation
• Closing Work Order
• Scheduling Preventive Maintenance
• Weekly Report
• Monthly Report
• Purchase Request Material Mechanical, Electrical, Plumbing and Civil
• Prepare ANSI
• Pronto applications
• Other

PT.BAJRA MANDALA SAKTI 24/10/2018 – 01/06/2019


BANYUWANGI GOLD MINE BUKIT TUJUH PROJECT - Electrical Foreman
Location PT. BUMI SUKSESINDO GOLD MINING

• Install Panel to MCC & Panel PLC


• Install Flow Meter Promag 800
• Terminations cable for power supply Motor
• Termination Cable Control PLC for Actuator Valve , Pressure Indicator transmitter,
Flow Indicator Transmiter
• Commissioning Transfer Pump, Booster Pump and Sump Pump
• Wiring Cable Instrument
• Pre – Commissioning Equipment Electrical Instrument
• Install VSD ( Variable speed drive )
• Set up VSD
• Wiring cable Plc for signal Digital Input, Digital output, Analog Input, Analog output
• Finishing marker cable
• Other
PT. BANGUN ARTA HUTAMA 25/07//2019 – Now
MAINTENANCE FIX PLANT COAL MINING – FOREMAN ELECTRICAL
Location PT. BORNEO INDOBARA, south Kalimantan

• Maintenance Fix plant


• Maintenance Electrical motor conveyor
• Maintenance panel MV, MCC, other
• Maintenance air conditioner
• Maintenance PLC
• Troubleshooting
• Other

EDUCATION AND TRAINI NG


• HIGH SCHOOL
• Electrical Training ( Certificate from Vocational Training Center )
• Cable Gland Installation Training ( Certificate from PT Thiess Indonesia )
• First Aid Training ( Certificate from PT Thiess Indonesia )
• Fire Watcher Training ( Certificate from PT. Thiess Indonesia )
• Frontline Operational Supervisor ( Certificate from MINERBA )

S-ar putea să vă placă și