Sunteți pe pagina 1din 2

Doc.

No: PM3-HSE-GEN-PR-F-0108
Talisman Malaysia Limited
Revision: 0
HS&E Section
Date: June 2006
Job Safety Analysis
Page: Appendix 3

JOB SAFETY ANALYSIS WORKSHEETS

JOB SAFETY ANALYSIS DATE PERMIT NO:


JOB Pull, lay, Dress and Gland cables
WORK TEAM Riggers, E & I Technicians
SEQUENCE OF BASIC JOB STEPS POTENTIAL ACCIDENTS OR HAZARDS RECOMMENDED SAFE JOB PROCEDURES
1. Raise Cold Work Permit for the job. Conflict with others activities.
2. Handling / Lifting of end of the coiled cables Manual handling-back injury Adopt correct posture and positioning when lifting.
prior to cable pulling Use mechanical aid where possible.
3. Pull the cable completely to its terminal end as Working at height & fall. Manual handling. Sharp Use certificate access / scaffold at all times. Carry-
per cable schedule. object / surfaces. out visual inspection of sharp objects. Wear proper
leather gloves.
4. Lay of cables. Hand / finger trapped or pinched. Slip and Trip. Wear proper hand gloves and watch where your
hand goes. Watch your steps and remove
obstructed object.
5. Dress the cable along the cable route and install Install the wrong Tag number or tagging the wrong Refer to drawing and supervisor.
cable marking/Tag nos. cable.
6. Properly gland the cable at each end. Insulation Falling object, cable gland component. Good house keeping.
check of cables.
WHAT TO CHECK AND NOT LIMITED TO WITH REFERENCE TO APPENDIX 1 & 2 OF THE JOB SAFETY ANALYSIS SECTION OF MOGP MANUAL
EXPERIENCE YES NO YES NO
Are you knowledgeable with the job to be
Have you done this job before? / /
performed?
Have you referred to technical drawing/vendor
/ Is supervision/experienced assistance required? /
procedure/SSP?
PPE YES NO YES NO
Hard hat? / Work vest? /
Safety Glasses? / Apron? /
Safety shoes? / Goggle? /
Ear plugs? / Face shield? /
Right type of gloves? / Respiratory protection? /
Safety harness? /
POTENTIAL HAZARDS YES NO YES NO
Slippery floor? / Trapped pressure? /
Congested area? / Pressurized equipment/vessel hazard? /

TML MANAGING OPERATIONS WITH GENERAL PROCEDURES Rev. 0


Doc. No: PM3-HSE-GEN-PR-F-0108
Talisman Malaysia Limited
Revision: 0
HS&E Section
Date: June 2006
Job Safety Analysis
Page: Appendix 3

Tripping? / Fire/explosion hazards? /


Overhead work? / Escape route? /
Working at height? / Shock/electricity/static? /
Scaffolding? / Breaker rack out? /
Secure ladder? / Valve isolation? /
Heavy load? / Guard rotating equipment? /
Hammer strikes? / Power tools hazards? /
Pinch/trap finger, hand? / High noise area, double ear protection? /
Back injury hazard? / Spark/hot slag? /
Swinging object? / Burn (heat/chemical)? /
Falling object? / Near radioactive materials/sources? /
Others closeby? / Environmental spill? /
Sharp object? / Hose connection? /
Eye injury? / Windy? /
Grating/deck opening? / Dusty? /
Blocked drains? /

Prepared by:…SAMUEL EDWARD…… Reviewed by: ………………………….. Closed out: _________________________