EAST ZONE
Building has already been taken over by zonal office. Additional A/A
& E/S issued for construction of boundary wall and the construction
to be completed by Sept.’19.
3. Bardhaman: 10kW FM Tx. with limited studio facility
Building has already been taken over. All civil and electrical works
completed. Clarification submitted by CCW in r/o estimate of
boundary wall to Estimate Section to be resubmitted. CCW to
examine the issue related to drainage of water and find the feasible
solution.
6. Digitalisation of Studios:
Page 1 of 5: Agenda Final Budget Meeting (RE 2019-20) of East Zone on 26.08.2019
M&C Section, P&D Unit, DG: AIR
Page 2 of 5: Agenda Final Budget Meeting (RE 2019-20) of East Zone on 26.08.2019
M&C Section, P&D Unit, DG: AIR
Page 3 of 5: Agenda Final Budget Meeting (RE 2019-20) of East Zone on 26.08.2019
M&C Section, P&D Unit, DG: AIR
Page 4 of 5: Agenda Final Budget Meeting (RE 2019-20) of East Zone on 26.08.2019
M&C Section, P&D Unit, DG: AIR
Page 5 of 5: Agenda Final Budget Meeting (RE 2019-20) of East Zone on 26.08.2019