CONDOMINIO RESIDENCIAL
“LAS TERRAZAS DE PACOCHA”
Rev. : 00
Código : PT – ASAC - IV - INFORME DE ACTIVIDADES Página : 1 de Formatted: Page Number, Font: 8 pt, Bold, Spanish
2019 “PAVIMENTACIÓN DE VÍAS” 21
Fecha : 22 de JULIO, 2019 (Peru), Check spelling and grammar
INFORME DE ACTIVIDADES N° 01
Rev. : 00
Código : PT – ASAC - SSO - INFORME DE ACTIVIDADES Página : 2 de Formatted: Page Number, Font: 8 pt, Bold, Spanish
2019 “PAVIMENTACIÓN DE VÍAS” 21
Fecha : 11 de JULIO, 2019 (Peru), Check spelling and grammar
INDICE
1. RESUMEN EJECUTIVO
1.1 ANTECEDENTES
1.2 DATOS REFERIDOS AL CONTRATISTA
1.2.1 NOMBRE DEL CONTRATISTA
1.2.2 ORGANIGRAMA DEL CONTRATISTA
1.3 DATOS REFERIDOS AL CONTRATO
1.3.1 MONTO DE CONTRATO
1.3.2 FECHA DE SUSCRIPCION DEL CONTRATO
1.3.3 FECHA DE INICIO DE OBRA
1.3.4 CURVA DE VALORIZACIONES
1.3.5 FECHA DE FINALIZACION.
1.4 VALORIZACIONES A EJECUTAR
1.5 AVANCE DE LA VALORIZACION ACUMULADA
1.6 AVANCE DE VALORIZACION EN EL PERIODO ACTUAL
1.7 INFORME DE PAGOS
2. REPORTE DE AVANCE DE VALORIZACIÓN
2.1 RESUMEN DEL TRABAJO EJECUTADO EN LA SEMANA
2.2 DESCRIPCION ORDENADA DE LOS TRABAJOS EFECTUADOS EN CADA
RUBRO
2.3 DIFICULTADES Y SOLUCIONES
2.4 CONTROL DE VALORIZACIONES
2.4.1 VALORIZACIONES PROGRAMADAS VS REALMENTE EJECUTADAS
2.5 METRADO Y VALORIZACION ESTIMADA A EJECUTAR EN EL PERIODO
SIGUIENTE
2.6 CONCLUSIONES
2.7 RECOMENDACIONES
3. ANEXOS
3.1 PLANOS
Formatted: Font: Bold, Expanded by 0.75 pt
CONDOMINIO RESIDENCIAL
“LAS TERRAZAS DE PACOCHA”
Rev. : 00
Código : PT – ASAC - SSO - INFORME DE ACTIVIDADES Página : 3 de Formatted: Page Number, Font: 8 pt, Bold, Spanish
2019 “PAVIMENTACIÓN DE VÍAS” 21
Fecha : 11 de JULIO, 2019 (Peru), Check spelling and grammar
Rev. : 00
Código : PT – ASAC - SSO - INFORME DE ACTIVIDADES Página : 4 de Formatted: Page Number, Font: 8 pt, Bold, Spanish
2019 “PAVIMENTACIÓN DE VÍAS” 21
Fecha : 11 de JULIO, 2019 (Peru), Check spelling and grammar
1. RESUMEN EJECUTIVO
El proyecto tiene como objetivo la Construcción de vía con pavimento flexible en la
residencial las terrazas que estará conformado por las siguientes capas: sub base de
e=0.15 mts, base granular e=0.20 mts, Pavimento asfáltico en frío e=0.05 mts, con
RC-250, con la finalidad de adecuadas condiciones de transitabilidad vehicular.
1.1. ANTECEDENTES
DPI una empresa dedicada al desarrollo y ejecución de proyectos de ingeniería y
construcción, encargado de la construcción de la obra Condominios Residencial
Las Terrazas de Pacocha.
Con la finalidad de culminar los trabajos de pavimentación en el condominio
residencial las terrazas se realiza el contrato con la empresa AMADO SAC, una
empresa con capacidad, experiencia, recursos, personal y mano de obra
necesarios para la ejecución de los trabajos contratados que consiste en la
pavimentación de vías urbanas de la Urb. Las terrazas.
Rev. : 00
Código : PT – ASAC - SSO - INFORME DE ACTIVIDADES Página : 5 de Formatted: Page Number, Font: 8 pt, Bold, Spanish
2019 “PAVIMENTACIÓN DE VÍAS” 21
Fecha : 11 de JULIO, 2019 (Peru), Check spelling and grammar
GERENTE
RESIDENTE DE OBRA
Rev. : 00
Código : PT – ASAC - SSO - INFORME DE ACTIVIDADES Página : 6 de Formatted: Page Number, Font: 8 pt, Bold, Spanish
2019 “PAVIMENTACIÓN DE VÍAS” 21
Fecha : 11 de JULIO, 2019 (Peru), Check spelling and grammar
Rev. : 00
Código : PT – ASAC - IV - INFORME DE ACTIVIDADES Página : 7 de Formatted: Page Number, Font: 8 pt, Bold, Spanish
2019 “PAVIMENTACIÓN DE VÍAS” 21 (Peru), Check spelling and grammar
Fecha : 22 de JULIO, 2019
04.01.01 PERFILADO, NIVELACION Y COMPACTACION DE LA SUB RASANTE m2 10,863.30 1.93 20,966.17 20,966.17
04.01.02 CORTE DE TERRENO NATURAL A NIVEL DE SUB RASANTE m3 90.00 4.91 441.90 441.90
RELLENO COMPACATADO CON MATERIAL PROPIO A NIVEL DE
04.01.03 m3 400.00 7.65 3,060.00 3,060.00
SUB RASANTE
05 SUB BASES Y BASES
05.01 SUB BASE GRANULA e=0.15 m m2 10,863.30 9.30 101,028.69 101,028.69
05.02 BASE GRANULAR E=0.20 m m2 11,235.20 11.86 133,249.47 133,249.47
06 CARGUIO Y TRANSPORTE DE MEZCLA ASFALTICA
06.01 IMPRIMACION ASFALTICA MO Y EQUIPOS m2 11,235.20 0.57 6,404.06 6,404.06
PREPARACION DE LA MEZCLA SFALTICA EN FRIO E=2" MO Y
06.02 m2 11,235.20 6.33 71,118.82 71,118.82
EQUIPOS
06.03 CARGUIO Y TRANSPORTE DE MEZCLA ASFALTICA m3 617.93 6.84 4,226.64 4,226.64
06.04 ESPARCIDO Y COMPACTADO DE MEZCLA SFALTICA EN FRIO E=2" 11,235.20 3.48 39,098.50 39,098.50
m2
06.05 DISTRIBUCION DE ARENA Y BARRIDO m2 11,235.20 0.70 7,864.64 7,864.64
07 CONTROLES DE CALIDAD
07.01 CONTROLES DE CALIDAD glb 1.00 4,406.60 4,406.60 771.16 771.16 771.16 771.16 771.16 550.83
07.02 LIMPIEZA FINAL DE OBRA m2 11,235.20 0.42 4,718.78 4,718.78
COSTO DIRECTO 437,532.10 38,423.07 8,151.23 106,119.92 142,686.04 86,840.75 55,311.09
Formatted: Font: Bold, Expanded by 0.75 pt
CONDOMINIO RESIDENCIAL
“LAS TERRAZAS DE PACOCHA”
Rev. : 00
Código : PT – ASAC - SSO - INFORME DE ACTIVIDADES Página : 8 de Formatted: Page Number, Font: 8 pt, Bold, Spanish
2019 “PAVIMENTACIÓN DE VÍAS” 21 (Peru), Check spelling and grammar
Fecha : 11 de JULIO, 2019
ITEM DESCRIPCCION
UND METRADO PRECIO PARCIAL METRADO COSTO % METRADO COSTO % METRADO COSTO % METRADO COSTO %
01 OBRAS PROVISIONALES
01.01 CONSTRUCCIONES PROVISIONALES
01.01.01 CONSTRUCCION PROVISIONAL DE ALMACEN DE OBRA m2 88.00 44.78 3,940.64 - 0.00% 88.00 3,940.64 100.00% 88.00 3,940.64 100.00% - 0.00 0.00%
01.01.02 CONSTRUCCION PROVISIONAL DE VESTUARIOS Y COMEDOR PERSONAL m2 94.00 38.70 3,637.80 - 0.00% 70.50 2,728.35 75.00% 70.50 2,728.35 75.00% 23.50 909.45 25.00%
03.01.01 MOVILIZACION Y DESMOVILIZACION DE HERRAMIENTAS Y EQUIPOS EN OBRA gbl 1.00 10,292.70 10,292.70 - 0.00% 0.50 5,146.35 50.00% 0.50 5,146.35 50.00% 0.50 5,146.35 50.00%
04.01.03 RELLENO COMPACATADO CON MATERIAL PROPIO A NIVEL DE SUB RASANTE m3 400.00 7.65 3,060.00 - 0.00% 400.00 3,060.00 100.00% 400.00 3,060.00 100.00% - 0.00 0.00%
COSTO DIRECTO 437,532.10 - 0.00% 325,574.59 74.41% 325,574.59 74.41% 111,957.51 25.59%
GASTOS GENERALES 52,296.45 - 0.00% 38,906.16 74.40% 38,906.16 74.40% 13,378.92 25.58%
UTILIDAD 44,271.42 - 0.00% 32,948.15 74.42% 32,948.15 74.42% 11,330.10 25.59%
IGV 18% 96,137.99 - 0.00% 71,537.20 74.41% 71,537.20 74.41% 24,599.98 25.59%
PRESUPUESTO TOTAL 630,237.95 - 0.00% 468,966.10 74.41% 468,966.10 74.41% 161,266.51 25.59%
Formatted: Font: Bold, Expanded by 0.75 pt
CONDOMINIO RESIDENCIAL
“LAS TERRAZAS DE PACOCHA”
Rev. : 00
Código : PT – ASAC - IV - INFORME DE ACTIVIDADES Página : 9 de Formatted: Page Number, Font: 8 pt, Bold, Spanish
2019 “PAVIMENTACIÓN DE VÍAS” 21 (Peru), Check spelling and grammar
Fecha : 22 de JULIO, 2019
Rev. : 00
Código : PT – ASAC - SSO - INFORME DE ACTIVIDADES Página : 10 Formatted: Page Number, Font: 8 pt, Bold, Spanish
2019 “PAVIMENTACIÓN DE VÍAS” de 21 (Peru), Check spelling and grammar
Fecha : 11 de JULIO, 2019
a) Espacio Disponible
b) Cantidad prevista de bienes por almacenar
c) Cantidad de Clase de Bienes
d) Manipulación que necesitan
e) Características del Mobiliario y Equipos necesarios para su
conservación
f) Seguridad que hay que proporcionarles
g) Control que necesitan
Rev. : 00
Código : PT – ASAC - SSO - INFORME DE ACTIVIDADES Página : 11 Formatted: Page Number, Font: 8 pt, Bold, Spanish
2019 “PAVIMENTACIÓN DE VÍAS” de 21 (Peru), Check spelling and grammar
Fecha : 11 de JULIO, 2019
Se realizó los trabajos con el fin de contar con el espacio provisional para los
vestuarios y comedor personal de obra, espacios necesarios. Está ubicado
en la zona de construcción si obstaculizar el desarrollo posterior de obra.
Rev. : 00
Código : PT – ASAC - SSO - INFORME DE ACTIVIDADES Página : 12 Formatted: Page Number, Font: 8 pt, Bold, Spanish
2019 “PAVIMENTACIÓN DE VÍAS” de 21 (Peru), Check spelling and grammar
Fecha : 11 de JULIO, 2019
Rev. : 00
Código : PT – ASAC - SSO - INFORME DE ACTIVIDADES Página : 13 Formatted: Page Number, Font: 8 pt, Bold, Spanish
2019 “PAVIMENTACIÓN DE VÍAS” de 21 (Peru), Check spelling and grammar
Fecha : 11 de JULIO, 2019
Rev. : 00
Código : PT – ASAC - SSO - INFORME DE ACTIVIDADES Página : 14 Formatted: Page Number, Font: 8 pt, Bold, Spanish
2019 “PAVIMENTACIÓN DE VÍAS” de 21 (Peru), Check spelling and grammar
Fecha : 11 de JULIO, 2019
Los trabajos corte del terreno natural se realizó posterior a los trabajos de
trazo, niveles y replanteo preliminar con equipo, en conjunto con el protocolo
de liberación para corte y posteriormente se inspecciono los trabajos de corte
con excavadora tipo oruga, cargador frontal y excavadora para eliminar las
elevaciones o montículos sobre el nivel superficial del terreno hasta alcanzar
los niveles de sub rasante.
Rev. : 00
Código : PT – ASAC - SSO - INFORME DE ACTIVIDADES Página : 15 Formatted: Page Number, Font: 8 pt, Bold, Spanish
2019 “PAVIMENTACIÓN DE VÍAS” de 21 (Peru), Check spelling and grammar
Fecha : 11 de JULIO, 2019
Rev. : 00
Código : PT – ASAC - SSO - INFORME DE ACTIVIDADES Página : 16 Formatted: Page Number, Font: 8 pt, Bold, Spanish
2019 “PAVIMENTACIÓN DE VÍAS” de 21 (Peru), Check spelling and grammar
Fecha : 11 de JULIO, 2019
Rev. : 00
Código : PT – ASAC - SSO - INFORME DE ACTIVIDADES Página : 17 Formatted: Page Number, Font: 8 pt, Bold, Spanish
2019 “PAVIMENTACIÓN DE VÍAS” de 21 (Peru), Check spelling and grammar
Fecha : 11 de JULIO, 2019
Rev. : 00
Código : PT – ASAC - SSO - INFORME DE ACTIVIDADES Página : 18 Formatted: Page Number, Font: 8 pt, Bold, Spanish
2019 “PAVIMENTACIÓN DE VÍAS” de 21 (Peru), Check spelling and grammar
Fecha : 11 de JULIO, 2019
PROGRAMADO SALDO
ITEM DESCRIPCCION
UND METRADO COSTO %
01 OBRAS PROVISIONALES
01.01 CONSTRUCCIONES PROVISIONALES
CONSTRUCCION PROVISIONAL DE VESTUARIOS Y COMEDOR
01.01.02 m2 23.50 909.45 25.00%
PERSONAL
01.02 INSTALACIONES PROVISIONALES
01.02.01 ALMACENAMIENTO DE AGUA PARA LA CONSTRUCCION mes 0.50 355.93 33.33%
01.02.02 PROVISION Y REPOSICION DE AGUA PARA CONSUMO HUMANO mes 0.50 190.71 33.33%
01.02.03 INSTALACION PROVISIONAL DE SERVICIOS HIGIENICOS mes 0.50 783.90 33.33%
01.02.04 ENERGIA ELECTRICA PROVISIONAL 350 V mes 0.50 169.49 33.33%
02 SEGURIDAD Y SALUD EN EL TRABAJO
02.04 EXAMEN MEDICO PREOCUPACIONAL ser 0.80 2,711.84 80.00%
06 CARGUIO Y TRANSPORTE DE MEZCLA ASFALTICA
PREPARACION DE LA MEZCLA SFALTICA EN FRIO E=2" MO Y
06.02 m2 6,536.28 41,374.68 58.18%
EQUIPOS
06.03 CARGUIO Y TRANSPORTE DE MEZCLA ASFALTICA m3 617.93 4,226.64 100.00%
06.04 ESPARCIDO Y COMPACTADO DE MEZCLA SFALTICA EN FRIO E=2" m2 11,235.20 39,098.50 100.00%
06.05 DISTRIBUCION DE ARENA Y BARRIDO m2 11,235.20 7,864.64 100.00%
07 CONTROLES DE CALIDAD
07.01 CONTROLES DE CALIDAD glb 1.00 4,406.60 100.00%
07.02 LIMPIEZA FINAL DE OBRA m2 11,235.20 4,718.78 100.00%
3.6. CONCLUSIONES
Rev. : 00
Código : PT – ASAC - SSO - INFORME DE ACTIVIDADES Página : 19 Formatted: Page Number, Font: 8 pt, Bold, Spanish
2019 “PAVIMENTACIÓN DE VÍAS” de 21 (Peru), Check spelling and grammar
Fecha : 11 de JULIO, 2019
3.7. RECOMENDACIONES
4. ANEXOS
4.1. PLANOS
4.2. REGISTRO FOTOGRAFICO
CONTROL FOTOGRÁFICO
Rev. : 00
Código : PT – ASAC - SSO - INFORME DE ACTIVIDADES Página : 20 Formatted: Page Number, Font: 8 pt, Bold, Spanish
2019 “PAVIMENTACIÓN DE VÍAS” de 21 (Peru), Check spelling and grammar
Fecha : 11 de JULIO, 2019
Rev. : 00
Código : PT – ASAC - SSO - INFORME DE ACTIVIDADES Página : 21 Formatted: Page Number, Font: 8 pt, Bold, Spanish
2019 “PAVIMENTACIÓN DE VÍAS” de 21 (Peru), Check spelling and grammar
Fecha : 11 de JULIO, 2019