DAFTAR KUANTITAS DAN HARGA

SATUAN KERJA : DINAS PERHUBUNGAN KOTA MEDAN

NAMA PEKERJAAN : PEMASANGAN AREA TRAFFIC CONTROL SYSTEM (ATCS) LANJUTAN

TAHUN ANGGARAN : 2019

No Jenis barang/jasa Satuan Volume Harga satuan (Rp.) Pajak 10% (Rp.) Total (Rp.) Keterangan

1 Survey dan Penentuan Titik Lokasi ls 4,00 1.250.000,00 500.000,00 5.500.000,00 PEKERJAAN PERSIAPAN
2 Perangkat Kendali APILL 8 SG 24VDC, ATCS Unit 4,00 96.000.000,00 38.400.000,00 422.400.000,00 PENINGKATAN APILL UNTUK ATCS
3 Power Back up 24 VDC Unit 4,00 10.140.000,00 4.056.000,00 44.616.000,00 PENINGKATAN APILL UNTUK ATCS
4 Tiang Siku APILL, Oktagonal galvanis (Tinggi = 8,8 m Lengan = 4,5 m), angkur Bh 1,00 19.404.000,00 1.940.400,00 21.344.400,00 PENINGKATAN APILL UNTUK ATCS
5 Tiang Siku APILL, Oktagonal galvanis (Tinggi = 8,8 m Lengan = 7,5 m), angkur Bh 8,00 20.953.000,00 16.762.400,00 184.386.400,00 PENINGKATAN APILL UNTUK ATCS
6 Tiang Lurus APILL, Oktagonal galvanis (Tinggi = 4 m ), angkur Bh 23,00 4.343.000,00 9.988.900,00 109.877.900,00 PENINGKATAN APILL UNTUK ATCS
7 Unit luminer DC Lampu 3 Aspek 30 Cm Sekunder Polos (Vertikal) Set 3,00 13.930.000,00 4.179.000,00 45.969.000,00 PENINGKATAN APILL UNTUK ATCS
8 Unit luminer DC Lampu 3 Aspek 30 Cm Sekunder Panah (Vertikal) Set 2,00 12.930.000,00 2.586.000,00 28.446.000,00 PENINGKATAN APILL UNTUK ATCS
9 Unit luminer DC Lampu 3 Aspek 30 Cm Primer Polos Horisontal Set 7,00 13.770.000,00 9.639.000,00 106.029.000,00 PENINGKATAN APILL UNTUK ATCS
10 Unit luminer DC Lampu 3 Aspek 30 Cm Primer Polos Vertikal Set 26,00 13.730.000,00 35.698.000,00 392.678.000,00 PENINGKATAN APILL UNTUK ATCS
11 Lampu 3 Aspek 30 Cm Primer Panah Horisontal Set 2,00 12.430.000,00 2.486.000,00 27.346.000,00 PENINGKATAN APILL UNTUK ATCS
12 Lampu 3 Aspek 30 Cm Primer Panah Vertikal Set 4,00 12.430.000,00 4.972.000,00 54.692.000,00 PENINGKATAN APILL UNTUK ATCS
13 Kabel NYBY 16 x 1.5 mm2 Mtr 646,00 100.000,00 6.460.000,00 71.060.000,00 PENINGKATAN APILL UNTUK ATCS
14 Kabel NYBY 12 x 1.5 mm2 Mtr 1.446,80 80.000,00 11.574.400,00 127.318.400,00 PENINGKATAN APILL UNTUK ATCS
15 Kabel NYBY 4 x 2.5 mm2 Mtr 80,00 47.000,00 376.000,00 4.136.000,00 PENINGKATAN APILL UNTUK ATCS
16 Kabel NYYHY 4 x 0.75 mm2 Mtr 248,00 18.000,00 446.400,00 4.910.400,00 PENINGKATAN APILL UNTUK ATCS
17 Pipa PVC dia 4 Btg 87,45 206.000,00 1.801.470,00 19.816.170,00 PENINGKATAN APILL UNTUK ATCS
18 Grounding 6 M Include Tombak 4 Meter (Untuk Perangkat Kendali) Set 4,00 1.472.000,00 588.800,00 6.476.800,00 PENINGKATAN APILL UNTUK ATCS
19 Grounding 6 M Include Tombak 4 Meter (Untuk Tiang Siku) Set 9,00 1.472.000,00 1.324.800,00 14.572.800,00 PENINGKATAN APILL UNTUK ATCS
20 Kerangkeng Set 4,00 1.913.080,00 765.232,00 8.417.552,00 PENINGKATAN APILL UNTUK ATCS
21 Patok Pengaman + Pengecatan Buah 12,00 702.530,00 843.036,00 9.273.396,00 PENINGKATAN APILL UNTUK ATCS
22 Terminal Kabel 10 mm 12 pin batang 32,00 26.000,00 83.200,00 915.200,00 PENINGKATAN APILL UNTUK ATCS
23 Pembongkaran Kontroller lama Unit 4,00 73.080,00 29.232,00 321.552,00 PEKERJAAN PEMBONGKARAN DAN PEMASANGAN
24 Pembongkaran Unit Lampu lama Unit 28,00 73.080,00 204.624,00 2.250.864,00 PEKERJAAN PEMBONGKARAN DAN PEMASANGAN
25 Pembongkaran Tiang Lama Unit 19,00 198.600,00 377.340,00 4.150.740,00 PEKERJAAN PEMBONGKARAN DAN PEMASANGAN
26 Pemasangan Kontroler Unit 4,00 79.500,00 31.800,00 349.800,00 PEKERJAAN PEMBONGKARAN DAN PEMASANGAN
27 Pemasangan Unit lampu Unit 44,00 79.500,00 349.800,00 3.847.800,00 PEKERJAAN PEMBONGKARAN DAN PEMASANGAN
28 Pemasangan Grounding 6 M Include Tombak 4 Meter Meter 78,00 127.880,00 997.464,00 10.972.104,00 PEKERJAAN PEMBONGKARAN DAN PEMASANGAN
29 Pemasangan Tiang Siku APILL, Oktagonal galvanis buah 9,00 201.790,00 181.611,00 1.997.721,00 PEKERJAAN PEMBONGKARAN DAN PEMASANGAN
30 Pemasangan Tiang Lurus APILL, Oktagonal galvanis (Tinggi = 4 m ) buah 23,00 201.790,00 464.117,00 5.105.287,00 PEKERJAAN PEMBONGKARAN DAN PEMASANGAN
31 Gali Tanah pondasi Kontroller m3 0,88 100.680,00 8.859,84 97.458,24 Pondasi Kontroler
32 Urug Pasir dibawah pondasi Kontroller. m3 0,12 278.100,00 3.337,20 36.709,20 Pondasi Kontroler
33 Bakesting pondasi kontroller. m2 8,40 57.030,00 47.905,20 526.957,20 Pondasi Kontroler
34 Pengecoran pondasi kontroller. Bh 4,00 577.470,00 230.988,00 2.540.868,00 Pondasi Kontroler
35 Urug tanah kembali dan pemadatan pondasi kontroller. m3 0,40 71.220,00 2.848,80 31.336,80 Pondasi Kontroler
36 Gali Tanah pondasi Tiang Siku. m3 2,79 100.680,00 28.089,72 308.986,92 Pondasi Tiang Siku
37 Urug Pasir dibawah pondasi Tiang Siku. m3 0,18 278.100,00 5.005,80 55.063,80 Pondasi Tiang Siku
38 Bakesting pondasi Tiang Siku. m2 19,80 57.030,00 112.919,40 1.242.113,40 Pondasi Tiang Siku
39 Beton Cor Pondasi Tiang Siku. Bh 9,00 1.422.420,00 1.280.178,00 14.081.958,00 Pondasi Tiang Siku
40 Urug tanah kembali dan pemadatan pondasi Tiang Siku. m3 1,08 71.220,00 7.691,76 84.609,36 Pondasi Tiang Siku
41 Galian Tanah pondasi Tiang lurus m3 5,29 100.680,00 53.259,72 585.856,92 Pondasi Tiang Lurus
42 Urug Pasir dibawah pondasi Tiang lurus m3 0,46 278.100,00 12.792,60 140.718,60 Pondasi Tiang Lurus
43 Bakesting pondasi Tiang lurus m2 39,56 57.030,00 225.610,68 2.481.717,48 Pondasi Tiang Lurus
44 Beton Cor Pondasi Tiang lurus Bh 23,00 417.300,00 959.790,00 10.557.690,00 Pondasi Tiang Lurus
45 Urug tanah kembali dan pemadatan pondasi Tiang lurus m3 3,22 71.220,00 22.932,84 252.261,24 Pondasi Tiang Lurus
46 Gali Tanah pondasi Kerangkeng Kontroler m3 0,80 100.680,00 8.054,40 88.598,40 Pondasi Kerangkeng Kontroler
47 Beton Cor Pondasi Kerangkeng Kontroler Bh 16,00 33.280,00 53.248,00 585.728,00 Pondasi Kerangkeng Kontroler
48 Gali Tanah patok pengaman m3 1,24 100.680,00 12.484,32 137.327,52 Pondasi Patok Pengaman
49 Urug Pasir dibawah pondasi Patok Pengaman m3 0,08 278.100,00 2.224,80 24.472,80 Pondasi Patok Pengaman
50 Begesting Pondasi Patok pengaman m2 13,44 57.030,00 76.648,32 843.131,52 Pondasi Patok Pengaman
51 Beton Cor Patok pengaman bh 12,00 155.000,00 186.000,00 2.046.000,00 Pondasi Patok Pengaman
52 Urug tanah kembali dan pemadatan pondasi patok pengaman m3 0,56 71.220,00 3.988,32 43.871,52 Pondasi Patok Pengaman
No Jenis barang/jasa Satuan Volume Harga satuan (Rp.) Pajak 10% (Rp.) Total (Rp.) Keterangan

53 Gali tanah untuk lubang boring m3 74,00 100.680,00 745.032,00 8.195.352,00 Pengeboran Jalan
54 Boring Kabel m 206,00 277.700,00 5.720.620,00 62.926.820,00 Pengeboran Jalan
55 Urug tanah kembali dan pemadatan lubang boring m3 74,00 71.220,00 527.028,00 5.797.308,00 Pengeboran Jalan
56 Gali Tanah, Pasang pipa, & Perbaikan Jalur Kabel Tanah Keras m 271,00 43.390,00 1.175.869,00 12.934.559,00 Pengeboran Jalan
57 Penarikan dan Instalasi Kabel Tanah m 2.092,80 6.620,00 1.385.433,60 15.239.769,60 Pengeboran Jalan
58 Programming & Set-up Perangkat APILL Set 4,00 2.382.000,00 952.800,00 10.480.800,00 Pengeboran Jalan
59 PTZ IP-Camera H.264 23x zoom 2 MP, IR, Smart Tracking Unit 4,00 30.490.000,00 12.196.000,00 134.156.000,00 PEMASANGAN KAMERA
60 Tiang Penyangga PTZ-Kamera, galvanis Tinggi=8.8 meter, lengan 4 meter Buah 4,00 18.124.000,00 7.249.600,00 79.745.600,00 PEMASANGAN KAMERA
61 Konektor 8 Pin M12 Set 4,00 731.000,00 292.400,00 3.216.400,00 PEMASANGAN KAMERA
62 Kabel Data 4 x 2 - 24 AWG SWA Meter 327,00 37.000,00 1.209.900,00 13.308.900,00 Kabel Kamera
63 Kabel NYBY 4 x 1,5 Meter 327,00 39.000,00 1.275.300,00 14.028.300,00 Kabel Kamera
64 Kabel NYYHY 2 x 1,5 Meter 48,00 18.000,00 86.400,00 950.400,00 Kabel Kamera
65 Kabel Lan Cat 6 FTP Meter 48,00 20.000,00 96.000,00 1.056.000,00 Kabel Kamera
66 Grounding Kamera 6 M Include Tombak 4 Meter Set 4,00 1.472.000,00 588.800,00 6.476.800,00 Kabel Kamera
67 Terminal Kabel 10 mm 12 pin buah 4,00 26.000,00 10.400,00 114.400,00 Kabel Kamera
68 Gali Tanah pondasi Tiang Kamera m3 2,56 100.680,00 25.774,08 283.514,88 Pondasi Tiang Kamera
69 Urug Pasir dibawah pondasi Tiang Kamera m3 0,08 278.100,00 2.224,80 24.472,80 Pondasi Tiang Kamera
70 Bakesting pondasi Tiang Kamera m 13,44 57.030,00 76.648,32 843.131,52 Pondasi Tiang Kamera
71 Beton Cor Pondasi Tiang Kamera buah 4,00 930.040,00 372.016,00 4.092.176,00 Pondasi Tiang Kamera
72 Urug tanah kembali dan pemadatan pondasi Tiang Kamera m3 1,16 71.220,00 8.261,52 90.876,72 Pondasi Tiang Kamera
73 Pemasangan Tiang Kamera buah 4,00 201.790,00 80.716,00 887.876,00 Pondasi Tiang Kamera
74 Pemasangan IP Kamera PTZ Unit 4,00 422.900,00 169.160,00 1.860.760,00 Pondasi Tiang Kamera
75 Pemasangan Grounding Kamera 6 M Include Tombak 4 Meter m 24,00 127.880,00 306.912,00 3.376.032,00 Pondasi Tiang Kamera
76 Penarikan dan Istalasi Kabel m 654,00 6.620,00 432.948,00 4.762.428,00 Pondasi Tiang Kamera
77 Set-up & Programming IP Kamera Unit 4,00 627.700,00 251.080,00 2.761.880,00 Pondasi Tiang Kamera
78 Speaker Outdoor include klem buah 8,00 570.000,00 456.000,00 5.016.000,00 PEMASANGAN AUDIO ANOUNCER/SPEAKER OUTDOOR
79 Kabel NYBY 4 x 0,75 Meter 327,00 27.000,00 882.900,00 9.711.900,00 PEMASANGAN AUDIO ANOUNCER/SPEAKER OUTDOOR
80 Kabel NYYHY 4 x 0,75 Meter 16,00 18.000,00 28.800,00 316.800,00 PEMASANGAN AUDIO ANOUNCER/SPEAKER OUTDOOR
81 Pemasangan Speaker Outdoor Buah 8,00 353.900,00 283.120,00 3.114.320,00 PEMASANGAN AUDIO ANOUNCER/SPEAKER OUTDOOR
82 Penarikan dan Instalasi kabel Meter 327,00 6.620,00 216.474,00 2.381.214,00 PEMASANGAN AUDIO ANOUNCER/SPEAKER OUTDOOR
83 Display Info Sistem (DIS) pada Simpang, Single Colour P.10 Uk. 160 x 48 Cm + Klem Unit 4,00 29.450.000,00 11.780.000,00 129.580.000,00 PEMASANGAN DISPLAY INFORMASI SISTEM (SIMPANG)
84 Kabel Data 4 x 2 - 24 AWG SWA Meter 287,00 37.000,00 1.061.900,00 11.680.900,00 PEMASANGAN DISPLAY INFORMASI SISTEM (SIMPANG)
85 NYBY 4 x 0,75 mm Meter 287,00 27.000,00 774.900,00 8.523.900,00 PEMASANGAN DISPLAY INFORMASI SISTEM (SIMPANG)
86 Pemasangan Display Informasi Sistem (Simpang) Unit 4,00 265.600,00 106.240,00 1.168.640,00 PEKERJAAN PEMASANGAN
87 Penarikan dan Instalasi Kabel Meter 574,00 6.620,00 379.988,00 4.179.868,00 PEKERJAAN PEMASANGAN
88 Setup & Programming Display Informasi Sistem (Simpang) Unit 4,00 674.450,00 269.780,00 2.967.580,00 PEKERJAAN PEMASANGAN
89 DIS Full Colour P.10 uk 192 x 96 SMD + klem Unit 4,00 83.080.000,00 33.232.000,00 365.552.000,00 PEMASANGAN DISPLAY INFORMASI SISTEM FULL COLOUR
90 Rangka dudukan DIS Colour di Tiang Overhead model siku Unit 4,00 5.720.000,00 2.288.000,00 25.168.000,00 PEMASANGAN DISPLAY INFORMASI SISTEM FULL COLOUR
91 Perangkat Kendali DIS Unit 4,00 20.340.000,00 8.136.000,00 89.496.000,00 PEMASANGAN DISPLAY INFORMASI SISTEM FULL COLOUR
92 Kabel Data 4 x 2 - 24AWG SWA Meter 384,00 37.000,00 1.420.800,00 15.628.800,00 PEMASANGAN DISPLAY INFORMASI SISTEM FULL COLOUR
93 Kabel Cat 6 FTP Meter 80,00 20.000,00 160.000,00 1.760.000,00 PEMASANGAN DISPLAY INFORMASI SISTEM FULL COLOUR
94 NYBY 4 x 1,5 mm Meter 384,00 39.000,00 1.497.600,00 16.473.600,00 PEMASANGAN DISPLAY INFORMASI SISTEM FULL COLOUR
95 Kabel NYYHY 2 x 1,5 mm Meter 80,00 18.000,00 144.000,00 1.584.000,00 PEMASANGAN DISPLAY INFORMASI SISTEM FULL COLOUR
96 Ethernet Protection Unit 4,00 730.000,00 292.000,00 3.212.000,00 PEMASANGAN DISPLAY INFORMASI SISTEM FULL COLOUR
97 Ethernet Connector Set 4,00 230.000,00 92.000,00 1.012.000,00 PEMASANGAN DISPLAY INFORMASI SISTEM FULL COLOUR
98 Pemasangan Module DIS Unit 4,00 409.600,00 163.840,00 1.802.240,00 PEMASANGAN DISPLAY INFORMASI SISTEM FULL COLOUR
99 Pemasangan Perangkat Kendali DIS Unit 4,00 362.200,00 144.880,00 1.593.680,00 PEMASANGAN DISPLAY INFORMASI SISTEM FULL COLOUR
100 Penarikan dan Instalasi Kabel Tanah Unit 768,00 6.620,00 508.416,00 5.592.576,00 PEMASANGAN DISPLAY INFORMASI SISTEM FULL COLOUR
101 Programming & Setup DIS Unit 4,00 674.450,00 269.780,00 2.967.580,00 PEMASANGAN DISPLAY INFORMASI SISTEM FULL COLOUR
102 VID-Deep Learning - (Presence + Counting) Unit 3,00 60.040.000,00 18.012.000,00 198.132.000,00 PENGADAAN DAN PEMASANGAN VID - PRESENCE DAN COUNTING
103 Fixed IP Kamera Unit 6,00 9.920.000,00 5.952.000,00 65.472.000,00 PENGADAAN DAN PEMASANGAN VID - PRESENCE DAN COUNTING
104 Switch HUB Outdoor Unit 2,00 3.130.000,00 626.000,00 6.886.000,00 PENGADAAN DAN PEMASANGAN VID - PRESENCE DAN COUNTING
105 Etehrnet Protection Unit 6,00 730.000,00 438.000,00 4.818.000,00 PENGADAAN DAN PEMASANGAN VID - PRESENCE DAN COUNTING
106 Ethernet Connector Set 6,00 230.000,00 138.000,00 1.518.000,00 PENGADAAN DAN PEMASANGAN VID - PRESENCE DAN COUNTING
107 Kabel Data 4 x 2 - 24AWG SWA Meter 449,00 37.000,00 1.661.300,00 18.274.300,00 PENGADAAN DAN PEMASANGAN VID - PRESENCE DAN COUNTING
108 Kabel NYBY 4 x 1,5 mm Meter 449,00 39.000,00 1.751.100,00 19.262.100,00 PENGADAAN DAN PEMASANGAN VID - PRESENCE DAN COUNTING
109 Kabel NYYHY 2 x 1,5 mm Meter 72,00 18.000,00 129.600,00 1.425.600,00 PENGADAAN DAN PEMASANGAN VID - PRESENCE DAN COUNTING
110 Kabel Lan Cat 6 FTP Meter 72,00 20.000,00 144.000,00 1.584.000,00 PENGADAAN DAN PEMASANGAN VID - PRESENCE DAN COUNTING
111 Terminal Kabel 12 Pin 10 mm Batang 2,00 26.000,00 5.200,00 57.200,00 PENGADAAN DAN PEMASANGAN VID - PRESENCE DAN COUNTING
112 Pemasangan Fixed-IP Kamera Unit 6,00 350.300,00 210.180,00 2.311.980,00 PENGADAAN DAN PEMASANGAN VID - PRESENCE DAN COUNTING
113 Pemasangan VID - Deep Learning Unit 3,00 866.300,00 259.890,00 2.858.790,00 PENGADAAN DAN PEMASANGAN VID - PRESENCE DAN COUNTING
114 Penarikan dan Instalasi Kabel Tanah Unit 898,00 6.620,00 594.476,00 6.539.236,00 PENGADAAN DAN PEMASANGAN VID - PRESENCE DAN COUNTING
115 Setup dan Programing Perangkat Fixed IP Kamera Unit 6,00 350.300,00 210.180,00 2.311.980,00 PENGADAAN DAN PEMASANGAN VID - PRESENCE DAN COUNTING
116 Setup dan Programing Perangkat VID-Deep Learning Lokasi 3,00 866.300,00 259.890,00 2.858.790,00 PENGADAAN DAN PEMASANGAN VID - PRESENCE DAN COUNTING
117 Manageable Switch-Hub, 8 Port LAN 1000 MB + dual slot FO 1000 Mbps Unit 1,00 18.200.000,00 1.820.000,00 20.020.000,00 PERANGKAT CC-ROOM ATCS DISHUB KOTA MEDAN
118 Mini - SFP 1.25G TX, Single Mode WDM 1310 / 1550, 40 KM Unit 1,00 3.130.000,00 313.000,00 3.443.000,00 PERANGKAT KERAS (HARDWARE) ATCS
No Jenis barang/jasa Satuan Volume Harga satuan (Rp.) Pajak 10% (Rp.) Total (Rp.) Keterangan

119 Mini - SFP 1.25G RX, Single Mode WDM 1550 / 1310, 40 KM Unit 1,00 4.050.000,00 405.000,00 4.455.000,00 PERANGKAT KERAS (HARDWARE) ATCS
120 Pemasangan perkabelan LAN dan Catudaya Set 1,00 1.487.900,00 148.790,00 1.636.690,00 PERANGKAT KERAS (HARDWARE) ATCS
121 Aplikasi Server-ATCS, lisensi untuk 1 Simpang Lisensi 4,00 7.180.000,00 2.872.000,00 31.592.000,00 JASA PEMASANGAN PERANGKAT KERAS (HARDWARE) ATCS
122 Aplikasi Client-ATCS, lisensi untuk 1 Simpang Lisensi 4,00 6.000.000,00 2.400.000,00 26.400.000,00 PERANGKAT LUNAK (SOFTWARE) ATCS
123 Aplikasi Client-Video-Manager, lisensi untuk 1 Kamera Lisensi 10,00 2.780.000,00 2.780.000,00 30.580.000,00 PERANGKAT LUNAK (SOFTWARE) ATCS
124 Aplikasi Audio Announcer, lisensi untuk 1 lokasi public announcer Lisensi 4,00 3.300.000,00 1.320.000,00 14.520.000,00 PERANGKAT LUNAK (SOFTWARE) ATCS
125 Aplikasi Client Display Informasi Sistem Single Colour Lisensi 4,00 990.000,00 396.000,00 4.356.000,00 PERANGKAT LUNAK (SOFTWARE) ATCS
126 Aplikasi Client Display Informasi Sistem Full Colour Lisensi 4,00 1.560.000,00 624.000,00 6.864.000,00 PERANGKAT LUNAK (SOFTWARE) ATCS
127 Kabel FO (24 core, ADSS Aerial) Meter 1.542,00 32.000,00 4.934.400,00 54.278.400,00 PERANGKAT NETWORKING FIBER OPTIC
128 Tiang Penyangga Kabel FO (Tiang 9 M) Buah 18,00 3.447.000,00 6.204.600,00 68.250.600,00 PERANGKAT NETWORKING FIBER OPTIC
129 Fiber Optic Node Termination (FONT) 1000 Mbps Unit 4,00 67.010.000,00 26.804.000,00 294.844.000,00 PERANGKAT NETWORKING FIBER OPTIC
130 Manageable Switch-Hub, 8 Port LAN 1000 MB + dual slot FO 1000 Mbps Unit 5,00 18.200.000,00 9.100.000,00 100.100.000,00 PERANGKAT NETWORKING FIBER OPTIC
131 Mini - SFP 1.25G TX, Single Mode WDM 1310 / 1550, 40 KM Unit 5,00 3.130.000,00 1.565.000,00 17.215.000,00 PERANGKAT NETWORKING FIBER OPTIC
132 Mini - SFP 1.25G RX, Single Mode WDM 1550 / 1310, 40 KM Unit 5,00 4.050.000,00 2.025.000,00 22.275.000,00 PERANGKAT NETWORKING FIBER OPTIC
133 Joint Closure 24 Core Unit 1,00 3.440.000,00 344.000,00 3.784.000,00 PERANGKAT NETWORKING FIBER OPTIC
134 Aksesoris Tiang Set 33,00 517.000,00 1.706.100,00 18.767.100,00 PERANGKAT NETWORKING FIBER OPTIC
135 Pipa besi Galvanis 1,5 Batang 4,00 443.000,00 177.200,00 1.949.200,00 PERANGKAT NETWORKING FIBER OPTIC
136 Grounding FONT 6 Meter Include Tombak 4 Meter Set 4,00 1.472.000,00 588.800,00 6.476.800,00 PERANGKAT NETWORKING FIBER OPTIC
137 Patch Core ST-ST 0,6 M Buah 2,00 330.000,00 66.000,00 726.000,00 PERANGKAT NETWORKING FIBER OPTIC
138 Patch Core LC-ST 1,5 M Buah 14,00 400.000,00 560.000,00 6.160.000,00 PERANGKAT NETWORKING FIBER OPTIC
139 Kerangkeng FONT/ Node Kontrol Buah 4,00 1.913.080,00 765.232,00 8.417.552,00 PERANGKAT NETWORKING FIBER OPTIC
140 Gali Tanah pondasi FONT m3 1,72 100.680,00 17.316,96 190.486,56 Pondasi FONT dan Dudukan Battery Back-Up
141 Urug Pasir dibawah pondasi FONT m3 0,16 278.100,00 4.449,60 48.945,60 Pondasi FONT dan Dudukan Battery Back-Up
142 Bakesting pondasi FONT m 8,40 57.030,00 47.905,20 526.957,20 Pondasi FONT dan Dudukan Battery Back-Up
143 Beton Cor Pondasi FONT buah 4,00 508.180,00 203.272,00 2.235.992,00 Pondasi FONT dan Dudukan Battery Back-Up
144 Urug tanah kembali dan pemadatan pondasi FONT m3 0,40 71.220,00 2.848,80 31.336,80 Pondasi FONT dan Dudukan Battery Back-Up
145 Gali Tanah pondasi Kerangkeng Kontroler m3 0,80 100.680,00 8.054,40 88.598,40 Pondasi Kerangkeng Kontroler
146 Beton Cor Pondasi Kerangkeng Kontroler Bh 16,00 33.280,00 53.248,00 585.728,00 Pondasi Kerangkeng Kontroler
147 Pemasangan Fiber Optic Node Termination (FONT) Unit 4,00 416.600,00 166.640,00 1.833.040,00 Pondasi Kerangkeng Kontroler
148 Penggelaran Kabel FO Meter 1.542,00 28.100,00 4.333.020,00 47.663.220,00 Pondasi Kerangkeng Kontroler
149 Pemasangan Tiang Penyangga FO Buah 18,00 201.790,00 363.222,00 3.995.442,00 Pondasi Kerangkeng Kontroler
150 Pemasangan Aksesoris Tiang FO Set 33,00 75.800,00 250.140,00 2.751.540,00 Pondasi Kerangkeng Kontroler
151 Pemasangan Grounding FONT 6 Meter Include Tombak 4 M. meter 4,00 127.880,00 51.152,00 562.672,00 Pondasi Kerangkeng Kontroler
152 Terminasi Kabel FO (Splicing dan pengukuran OTDR) Unit 56,00 284.300,00 1.592.080,00 17.512.880,00 LAIN-LAIN
153 Set-up dan Programming Perangkat Networking Lisensi 4,00 627.700,00 251.080,00 2.761.880,00 LAIN-LAIN

JUMLAH 366.933.992,00 4.036.273.912,00

Medan, 14 Agustus 2019


PT. SARANA LALULINTAS INDONESIA

DANI KUSWANDANI
Direktur