Introduction Contents
The industry operates equipment that has the potential to cause harm if What is LOTO and how it has
not operated or isolated correctly. evolved to LOTOTO 04
We have seen from incidents within the industry, that giving employees LOTOTO - Lock-Out, Tag-out and Try-Out 06
and contractors as much information and guidance on the risks involved
LOTOTO step 1 - Prepare 07
when operating heavy machinery and the types of energy to be protected
against is critical. LOTOTO step 2 - Notify 08
This document will describe LOTOTO ( Lock-Out – Tag-Out – Try-Out) LOTOTO step 3 - Turnoff / Shutdown 09
which is the way to isolate equipment to ensure maintenance and
cleaning can be undertaken safely. LOTOTO step 4 - Isolation 10
This document has been prepared by the MPA and Reece Safety to Share LOTOTO step 5 - Apply Locks 11
Best Practice and to raise awareness of the subject ‘LOTOTO’ to help guide LOTOTO step 5 - Apply Tags 12
the industry to a safer working environment. In this document you will
also find also find product information to safe guard the workforce. LOTOTO step 6 - Zero Energy State 13
LOTOTO step 7 - Tryout 14
LOTOTO step 8 - Perform Task 15
LOTOTO step 9 - Inspect and Restore 16
More complex LOTOTO Methods – Where? 17
Safety Padlocks 18
Safety Lockout Hasps and Tags 19
Area isolation 20
Plant Labelling 21
Signs 23
Designing Captive Key Systems 24
LOTOTO Safety Conversations 25
Isolation of Mobile Plant 26
Why Reece safety 28
2 Guide to Energy Isolation and LOTOTO Guide to Energy Isolation and LOTOTO 3
Guide to Energy Isolation and LOTOTO What is LOTO?
4 Guide to Energy Isolation and LOTOTO Guide to Energy Isolation and LOTOTO 5
Guide to Energy Isolation and LOTOTO LOTOTO Step 1
1 Prepare • R
eviews the machinery, equipment and process together with
any associated risk assessment and Safe Working Practice.
2 Notify
• Complete
associated paperwork or a permit/schedule
3 Turnoff / Shutdown of isolation for the work.
4 Isolation
5 Apply Locks and Tags
6 Zero Energy State
7 Tryout
8 Perform Task
9M
ake safe, inspect
and restore
6 Guide to Energy Isolation and LOTOTO Guide to Energy Isolation and LOTOTO 7
Guide to Energy Isolation and LOTOTO LOTOTO Step 3
8 Guide to Energy Isolation and LOTOTO Guide to Energy Isolation and LOTOTO 9
Guide to Energy Isolation and LOTOTO LOTOTO Step 5
10 Guide to Energy Isolation and LOTOTO Guide to Energy Isolation and LOTOTO
8 11
Guide to Energy Isolation and LOTOTO LOTOTO Step 6
12 Guide to Energy Isolation and LOTOTO Guide to Energy Isolation and LOTOTO 13
Guide to Energy Isolation and LOTOTO LOTOTO Step 8
4 8
14 Guide to Energy Isolation and LOTOTO Guide to Energy Isolation and LOTOTO 15
Guide to Energy Isolation and LOTOTO More Complex LOTOTO Methods
16 Guide to Energy Isolation and LOTOTO Guide to Energy Isolation and LOTOTO 17
Guide to Energy Isolation and LOTOTO Safety Lockout Hasps and Tags
18 Guide to Energy Isolation and LOTOTO Guide to Energy Isolation and LOTOTO 19
Guide to Energy Isolation and LOTOTO Plant Labelling
Area isolation is a great way of defining Designated isolation points shall be clearly labeled:
a specific area or zone by prescriptive
isolation station which reflects the safe • Permanent and weather resistant
working document which enable you • Standardised and consistent format
to be able to perform and train
individuals on the machine
specific requirements. Label information:
• Isolation device name and function
• Ideal for complex isolations
• Energy type and magnitude (eg hydraulics and air line)
• Defines requirement
• Promotes ownership • The standard of colour coding should be to BSEN 1710
• Prescriptive process • Located as close as practicable to the activity
• Easy to identify if a stage/isolation • Sites should have a schematic of the electrical system
has been missed
Protecting from:
• Contact with energized electrical component
• Arc flash hazard
• Capable of being securely locked out
• Items should be easily identifiable
20 Guide to Energy Isolation and LOTOTO Guide to Energy Isolation and LOTOTO 21
Guide to Energy Isolation and LOTOTO Signs
Signs
22 Guide to Energy Isolation and LOTOTO Guide to Energy Isolation and LOTOTO 23
Guide to Energy Isolation and LOTOTO LOTOTO Safety Conversations
Designing Captive
Key Systems
Captive key interlocking follows a process which cannot be The three points of trapped key interlocking
circumvented or short cut. A key is used to start the process and
remains trapped whilst the machine is running. The only way to
remove the key is to isolate the hazard.
There are three simple steps in designing a captive key system:
1. Establish what is being isolated
1 Isolation
24 Guide to Energy Isolation and LOTOTO Guide to Energy Isolation and LOTOTO 25
Guide to Energy Isolation and LOTOTO Isolation of Mobile Plant
26 Guide to Energy Isolation and LOTOTO Guide to Energy Isolation and LOTOTO 27
Guide to Energy Isolation and LOTOTO Why Reece Safety
Work performed by maintenance personnel generally requires more We at Reece have partnered with the MPA to put this guide together as
complex isolation, and consideration of stored energy sources, such as: we pride ourselves on giving the very best advice and understanding of
the industry when it comes to safe isolation.
• Accumulators
We have over 15 years’ experience in the field and have a range of
• Tensioners
products that complement the industry’s requirement for all energy
• Hydraulics sources and control of lockout, tagout, tryout (LOTOTO).
• Pneumatics MPA have chosen to work closely with Reece because we manufacture all
our own products in house which gives flexibility when it comes to the
• Batteries, inverters and solenoids
safe working practice of both simple and complex isolations.
• Radiators
We hope that you found this guide useful. For further information please
• Tyres. refer to the references.
Where more than one person is performing the work, each person should References
apply their personal lock to the isolator and danger tag as a minimum.
Mineral Products Association
www.mineralproducts.org
Reece Safety
www.reecesafety.co.uk
www.safequarry.com
www.safeprecast.com
www.metso.com
28 Guide to Energy Isolation and LOTOTO Guide to Energy Isolation and LOTOTO 29
Guide to Energy Isolation and LOTOTO Notes
Notes Notes
30 Guide to Energy Isolation and LOTOTO Guide to Energy Isolation and LOTOTO 31
Please ensure that you report all Incidents or incidents.
If you see anything on your sites or customer sites
that you think is unsafe, it is okay to Stop and Report
it as a Near Miss.
1
Prepare
9 t&
Restor
e No
t
2
ec
ify
p
Ins
8
k
as ty Tu
UT T
i r
or Ac T
Perform
tiv
n
O
off
3
AG
LOCK-
/ Shut d
-OUT
o
wn
TR
Y- O U T
Tr y -
7
e
ou
t
at
l
Iso
4
Sto
C o red
ag
nf
Ap
r pl T
E nm N o yL d
i
6 erg ock an
5
y