Sunteți pe pagina 1din 4

JP KENNY

D E L I V E R S . E V O LV E S .

O F FS H O R E P I P E L I N E S

FEED, BASIC AND DETAILED ENGINEERING

FLOW ASSURANCE

MATERIALS AND CORROSION ENGINEERING

PROCUREMENT SERVICES

CONSTRUCTION MANAGEMENT AND


SUPERVISION

IMR PROGRAMS

DESIGN VERIFICATION

AUDIT AND EXPERT WITNESS COMMISSIONS


Complex fluid flows in balance
with natural geology.

OUR EXPERTISE Europe-Maghreb Pipeline Ltd


The J P Kenny offshore pipeline group has a combined global resource Gibraltar Submarine Gas Pipeline
of more than 200 engineers and specialists. Our expertise includes the Morocco and Spain
design of trunklines, export pipelines, in-field flowlines, pipe-in-pipe,
bundles, tie-in and riser systems, for the transportation of oil, gas and The Gibraltar Submarine Gas Pipe-
multi-phase products through water depths now exceeding 2,000m. line Project involved the design and
installation of two 22" pipelines
One of the factors contributing to J P Kenny’s 25 year catalogue of across the Strait of Gibraltar and
successful pipeline projects, is our ability to help define our Client’s was regarded at the time as the
requirements and to understand their technical and economic drivers. most technically challenging
Another is J P Kenny’s reputation for engineering innovation. We submarine project in the world.
constantly re-invest in new technologies that add value to our projects. J P Kenny was involved in all phases
We have led the industry in the application of limit state design of the project from conceptual
techniques, pipe-in-pipe systems, retrofit risers, pipeline stability and design through construction and
a host of pipeline related techniques. into operations. The project was
delivered ahead of schedule and
The Capex reductions that we’ve achieved for our customers through was 25% under budget.
the application of these technologies extends to hundreds of millions
of dollars. Considerable improvements to project schedules, operating Several major technical challenges
performance and safety have also been achieved. were encountered during detailed
design, these included: water
Although J P Kenny has a reputation for executing large offshore pipeline depths up to 390m, extremely
projects, we also provide a comprehensive consultancy service that can rugged and rocky seabed condi-
be tailored to suite our Client requirements in terms of work scope, tions and a bi-directional water
global location and schedule. column with high bottom currents.
A 3-D digital terrain model (DTM)
was produced and used to optimise
the pipeline route so as to minimise
the number of pre-lay and post-
lay span rectifications required.

As well as providing the engineering


design, J P Kenny was responsible
for managing the installation
contractor, Saipem. The J P Kenny
team was responsible for the
review and approval of all the
contractor’s procedures prior to
construction. A close working
relationship with the contractor,
contributed to the success and high
level of safety that was achieved
during the pipeline installation.
OFFSHORE PIPELINES

Industry leadership in the application of limit state design, pipe-in-pipe


systems, retrofit risers, HPHT design, and a host of pipeline technology.
Hundreds of millions of dollars of Capex Savings.

Woodside BP Shell BP
Second Trunkline Project Bombax Pipeline Pipeline Penguin Field Nam Con Son Pipeline Project
Australia Trinidad and Tobago UK North Sea Vietnam

Woodside is expanding its domestic BP Trinidad and Tobago has devel- The Penguin field is a subsea The Nam Con Son project developed
gas and LNG Export facilities. As oped a program for the expansion satellite to the Brent Charlie a regional gas transportation and
part of this expansion a second of its offshore fields and gas tran- platform situated in the North Sea. processing system in the Nam Con
trunkline system has been installed. sportation system to supply new The field is developed through four Son Basin in Vietnam. This system
This system consists of a new 42" LNG trains. The gas transportation drilling centres, approximately included 360km of offshore and
trunkline extending between the system expansion includes 70km 66km from the host platform. With 40km of onshore pipelines and a
30" Goodwyn A Interfield Line and of 48" offshore pipeline from the a shut-in well pressure of almost gas terminal.
the LNG Facilities onshore Western Cassia B hub platform to landfall 6000 psi (390 bar) and a tempera-
Australia. J P Kenny was respon- on the east coast of Trinidad. ture of 110°C, the line was, at J P Kenny’s involvement in this
sible for all engineering of the new installation, the longest high pres- project commenced with feasibility
system, including procurement J P Kenny performed the sure, high temperature tie-back. studies and continued through
assistance and offshore installa- Engineering for the pipelines and preliminary, FEED and detailed
tion supervision. risers, including a tie-in 400 tonne J P Kenny developed a cost effec- design to project and construction
manifold adjacent to the Cassia B tive design strategy for the pipe- management.
The scope of work included hub plat-form. This work included: line. This involved the application
offshore tie-ins, risers, subsea • Onshore and offshore surveys of a limit state approach based on J P Kenny personnel also provided
valve stations, controls, pipeline • Detailed definition of the pipeline DNV F101 and a pipeline protec- support to the BP Integrated
mechanical design, stability, shore characteristics tion system to reduce design pres- Management Team in Singapore
approaches and all associated • Preparation of specifications sure to 200 bar. Most significantly, and Vietnam as well as contractor
activities. The North West Shelf • Procurement of long lead items however, J P Kenny designed the offices in London and Melbourne.
Area is prone to tropical cyclones such as linepipe and valves pipe to undertake controlled lateral
and there is a history of seabed • Construction management buckling, saving at least £10million
instability, which made pipeline and support. compared to other means of
stabilisation a major technical managing high pressure and
and commercial issue. J P Kenny Constructability was a major issue temperature such as pipe burial
engineered an innovative patented due to the high design D/t ratio or the use of expansion spools.
gravity anchor system that and the 5" concrete coating. As a During operation the behaviour
resulted in savings of more than consequence early contact was of the pipe closely matched that
$20 million when compared to made with contractors to deter- predicted by J P Kenny.
conventional rock dumping. mine installation feasibility. The
high D/t ratio fell outside of code
constraints, which led to a peer
review presentation and the need
to perform 3D FE analyses. A
detailed schedule and cost estimate
was also developed. The project
cost estimate was the subject of a
detailed risk analysis to establish
the project budget for sanction at
the Execute Stage.

JP KENNY
KEY CAPABILITIES
J P Kenny’s offshore pipeline group has developed proprietary J P Kenny has more than 500 professional
processes, technologies and capabilities including: staff on 4 continents and also provides
services in the following business areas:
Pipeline design: This is our core capability and includes design of offshore
pipelines in any location to internationally recognised codes and standards. Project Management
Fundamental to our success in this area is our industry recognised Development Studies
PIPECALC software suite.
Offshore Pipelines
Route selection: J P Kenny has developed specialised tools, such as Subsea Systems
IMPRESS, to streamline and accelerate route selection. By using
IMPRESS onboard the survey vessel, our engineers can optimise the Onshore Pipelines
route in ‘real time’. Asset Management

Advanced engineering: Many of the projects undertaken by J P Kenny


require advanced engineering analysis to solve problems that are either
a ‘first’ or add value. To aid this work we have developed SIMULATOR,
an advanced FE analysis tool which predicts pipeline behaviour in D E L I V E R S . E V O LV E S .
‘real time’.

Materials engineering: Material selection for offshore pipelines is


paramount to ensure uninterrupted operability. Our specialists produce
the material specifications and provide continuous technical support
during the tendering and manufacturing processes.

Cost estimating and scheduling: J P Kenny has always provided detailed


realistic project cost estimates and schedules and has access to worldwide
‘local’ cost data. It is this knowledge that underpins FOCU$, a GIS based
field development and cost evaluation tool.

Design verification: As a world leader in offshore pipeline design we offer


an independent design verification service. This ranges from specific
design items to a full offshore pipeline design verification to meet defined
performance standards.

Audit and Expert Witness services: Potential investors, owners, insurance


companies, loss adjusters, banks and lawyers have commissioned
J P Kenny’s experts for: audits of ongoing projects, due diligence studies,
technical advice on contractual claims, condition assessments and repair
philosophies and estimates, following system failures and accidents.

ABERDEEN MELBOURNE KUALA LUMPUR


JP KENNY +44 1224 347300 +613 9211 6400 +60 3 2162 1266
HOUSTON NEW DELHI PERTH
+1 281 675 1000 +91 11 2642 7700 +61 8 9 4818222
LONDON JAKARTA
+44 1784 417200 +62 21 8370 2455 www.jpkenny.com
J P Kenny is a Wood Group company. Wood Group is an international energy services company with more than $2.2bn sales, employing more than 14,000 people worldwide
and operating in 36 countries. Strategic partners within Wood Group include; Alliance Engineering, Frontier Engineering Solutions, Ionik Consulting and Mustang Engineering.

S-ar putea să vă placă și