Documente Academic
Documente Profesional
Documente Cultură
D E L I V E R S . E V O LV E S .
O F FS H O R E P I P E L I N E S
FLOW ASSURANCE
PROCUREMENT SERVICES
IMR PROGRAMS
DESIGN VERIFICATION
Woodside BP Shell BP
Second Trunkline Project Bombax Pipeline Pipeline Penguin Field Nam Con Son Pipeline Project
Australia Trinidad and Tobago UK North Sea Vietnam
Woodside is expanding its domestic BP Trinidad and Tobago has devel- The Penguin field is a subsea The Nam Con Son project developed
gas and LNG Export facilities. As oped a program for the expansion satellite to the Brent Charlie a regional gas transportation and
part of this expansion a second of its offshore fields and gas tran- platform situated in the North Sea. processing system in the Nam Con
trunkline system has been installed. sportation system to supply new The field is developed through four Son Basin in Vietnam. This system
This system consists of a new 42" LNG trains. The gas transportation drilling centres, approximately included 360km of offshore and
trunkline extending between the system expansion includes 70km 66km from the host platform. With 40km of onshore pipelines and a
30" Goodwyn A Interfield Line and of 48" offshore pipeline from the a shut-in well pressure of almost gas terminal.
the LNG Facilities onshore Western Cassia B hub platform to landfall 6000 psi (390 bar) and a tempera-
Australia. J P Kenny was respon- on the east coast of Trinidad. ture of 110°C, the line was, at J P Kenny’s involvement in this
sible for all engineering of the new installation, the longest high pres- project commenced with feasibility
system, including procurement J P Kenny performed the sure, high temperature tie-back. studies and continued through
assistance and offshore installa- Engineering for the pipelines and preliminary, FEED and detailed
tion supervision. risers, including a tie-in 400 tonne J P Kenny developed a cost effec- design to project and construction
manifold adjacent to the Cassia B tive design strategy for the pipe- management.
The scope of work included hub plat-form. This work included: line. This involved the application
offshore tie-ins, risers, subsea • Onshore and offshore surveys of a limit state approach based on J P Kenny personnel also provided
valve stations, controls, pipeline • Detailed definition of the pipeline DNV F101 and a pipeline protec- support to the BP Integrated
mechanical design, stability, shore characteristics tion system to reduce design pres- Management Team in Singapore
approaches and all associated • Preparation of specifications sure to 200 bar. Most significantly, and Vietnam as well as contractor
activities. The North West Shelf • Procurement of long lead items however, J P Kenny designed the offices in London and Melbourne.
Area is prone to tropical cyclones such as linepipe and valves pipe to undertake controlled lateral
and there is a history of seabed • Construction management buckling, saving at least £10million
instability, which made pipeline and support. compared to other means of
stabilisation a major technical managing high pressure and
and commercial issue. J P Kenny Constructability was a major issue temperature such as pipe burial
engineered an innovative patented due to the high design D/t ratio or the use of expansion spools.
gravity anchor system that and the 5" concrete coating. As a During operation the behaviour
resulted in savings of more than consequence early contact was of the pipe closely matched that
$20 million when compared to made with contractors to deter- predicted by J P Kenny.
conventional rock dumping. mine installation feasibility. The
high D/t ratio fell outside of code
constraints, which led to a peer
review presentation and the need
to perform 3D FE analyses. A
detailed schedule and cost estimate
was also developed. The project
cost estimate was the subject of a
detailed risk analysis to establish
the project budget for sanction at
the Execute Stage.
JP KENNY
KEY CAPABILITIES
J P Kenny’s offshore pipeline group has developed proprietary J P Kenny has more than 500 professional
processes, technologies and capabilities including: staff on 4 continents and also provides
services in the following business areas:
Pipeline design: This is our core capability and includes design of offshore
pipelines in any location to internationally recognised codes and standards. Project Management
Fundamental to our success in this area is our industry recognised Development Studies
PIPECALC software suite.
Offshore Pipelines
Route selection: J P Kenny has developed specialised tools, such as Subsea Systems
IMPRESS, to streamline and accelerate route selection. By using
IMPRESS onboard the survey vessel, our engineers can optimise the Onshore Pipelines
route in ‘real time’. Asset Management