Sunteți pe pagina 1din 5

BALANCE DE OBRA

CONST. ASFALTADO (CALLE LUIS MENDIZABAL SANTA CRUZ ENTRE LA PAZ Y 6 DE OCTUBRE) J. V. SANTA CRUZ

ENTIDAD CONTRATANTE: GOBIERNO AUTONOMO MUNICIPAL DE ORURO ENTIDAD EJECUTORA:


SUPERVISOR DE OBRA: Ing. Gerónimo Aguilar Marca DIRECTOR DE OBRA:
MONTO DEL CONTRATO INICIAL 677,365.66 Bolivianos

CONTRATO INICIAL PRESUPUESTO BALANCE CANTIDADES DE OBRA ACTUALES


ITE DE OBRA INCREMENTO (+) DECREMENTO (-)
DESCRIPCION UND PRESUPUESTO
M CANT. P.U. (Bs) PRESUPUES
(Bs) CANT.
TO (Bs) CANT. FISICO (%) MONTO (Bs.) CANT. FISICO (%) MONTO (Bs)
M01 - CARPETA ESTRUCTURAL
1 INSTALACION DE FAENAS GLB 1.00 9,001.21 9,001.21 1.00 9,001.21 - 0.00% - - 0.00% -
2 REPLANTEO TRAZADO Y CONTROL ML 6,498.00 0.52 3,378.96 5,833.53 3,033.44 - 0.00% - -664.47 -10.00% -345.52
3 RETIRO DE LOSETAS C/CARGUIO M2 4,982.39 6.10 30,392.58 5,240.03 31,964.18 257.64 5.17% 1,571.60 - 0.00% -
4 MOVIMIENTO DE TIERRAS CON MAQUINARIA M3 3,585.83 19.30 69,206.52 2,620.81 50,581.63 - 0.00% - -965.02 -0.27 -18,624.89
5 MEJORAMIENTO DE SUBRASANTE M2 4,982.39 5.98 29,794.69 5,240.03 31,335.38 257.64 5.17% 1,540.69 - - -
6 CAPA SUB-BASE EST. GRANULOMETRICAMENTE M3 1,494.72 112.51 168,170.95 1,572.01 176,866.85 77.29 5.17% 8,695.90 - - -
7 CAPA BASE EST. GRANULOMETRICAMENTE M3 996.48 146.24 145,725.24 1,048.01 153,260.98 51.53 5.17% 7,535.75 - - -
8 LIMPIEZA GENERAL DE LA OBRA M2 6,498.00 3.26 21,183.48 5,833.53 19,017.31 - 0.00% - -664.47 -0.10 -2,166.17
M02 - RENOVACION ALC. SANITARIO ###
9 REPLANTEO Y TRAZADO TUBERIAS ML 348.00 5.13 1,785.24 358.45 1,838.85 10.45 3.00% 53.61 - - -
10 EXCAVACION (0-2M) SUELO SEMIDURO M3 220.39 16.78 3,698.14 193.57 3,248.10 - 0.00% - -26.82 -0.12 -450.04
11 CAMARA DE INSP. 1.5<H<=2M + INC. TAPA F.F. PZA 7.00 4,734.70 33,142.90 9.00 42,612.30 2.00 28.57% 9,469.40 - - -
12 ASIENTO PARA TUBERIA M3 43.51 187.61 8,162.91 32.26 6,052.30 - 0.00% - -11.25 -0.26 -2,110.61
13 PROV/TENDIDO TUBERIAS PVC SDR-41 D=6" ML 181.00 91.95 16,642.95 358.45 32,959.48 177.45 98.04% 16,316.53 - - -
14 PROV/TENDIDO TUBERIAS PVC SDR-41 D=8" ML 167.00 148.80 24,849.60 - - - 0.00% - -167.00 -1.00 -24,849.60
15 RELLENO ZANJA TIERRA CERNIDA SIN MATERIAL DE PRESTAMO M3 176.88 42.88 7,584.61 43.02 1,844.70 - 0.00% - -133.86 -0.76 -5,739.92
16 RELLENO Y COMP. DE ZANJAS SIN MAT. DE PRESTAMO M3 300.00 41.81 12,543.00 118.29 4,945.70 - 0.00% - -181.71 -0.61 -7,597.30
17 RETIRO DE ESCOMBROS C/CARGUIO M3 220.39 26.99 5,948.33 220.39 5,948.33 - 0.00% - - - -
18 CUNETA PLUVIAL M3 38.12 1,511.46 57,616.86 29.49 44,572.96 - 0.00% - -8.63 -0.23 -13,043.90
M03 - CARPETA DE RODADURA ###
19 IMPRIMACION ASFALTICA M2 0.00 0.00 - - - - - -
20 CARPETA DE CONCRETO ASFALTICO E=7CM M2 0.00 0.00 - - - - - -
M04 - AMBIENTAL ###
21 HUMEDECIMIENTO DE SUELO M2 4,982.39 1.37 6,825.87 5,240.03 7,178.84 257.64 5.17% 352.97 - - -
22 DELIMITACION DE AREAS ML 100.00 1.37 137.00 100.00 137.00 - 0.00% - - - -
23 SEñALIZACION PARA LA PROTECCION AMBIENTAL PZA 1.00 768.27 768.27 1.00 768.27 - 0.00% - - - -
24 SEñALIZACION CON PARANTE PZA 2.00 768.27 1,536.54 2.00 1,536.54 - 0.00% - - - -
25 SEñALIZACION DE MADERA PZA 2.00 249.41 498.82 2.00 498.82 - 0.00% - - - -
26 SEñAL DE IDENTIFICACION PZA 6.00 65.69 394.14 6.00 394.14 - 0.00% - - - -
27 MONITOREO DE RUIDO PTO 1.00 175.56 175.56 1.00 175.56 - 0.00% - - - -
28 MEDICION DE GASES AN1 1.00 905.21 905.21 1.00 905.21 - 0.00% - - - -
29 MEDICION CALIDAD DE AIRE AN1 1.00 824.14 824.14 1.00 824.14 - 0.00% - - - -
30 EQUIPO CONTRA INCENDIOS PZA 1.00 1,188.30 1,188.30 1.00 1,188.30 - 0.00% - - - -
31 BOTIQUIN PRIMEROS AUXILIOS PZA 1.00 2,028.21 2,028.21 1.00 2,028.21 - 0.00% - - - -
32 CAPACITACION AMBIENTAL EV1 1.00 1,953.53 1,953.53 1.00 1,953.53 - 0.00% - - - -
33 CONTENEDORES DIFERENCIADOS PZA 2.00 1,730.85 3,461.70 2.00 3,461.70 - 0.00% - - - -
CONTRATO INICIAL PRESUPUESTO BALANCE CANTIDADES DE OBRA ACTUALES
ITE DE OBRA INCREMENTO (+) DECREMENTO (-)
DESCRIPCION UND PRESUPUESTO
M CANT. P.U. (Bs) PRESUPUES
(Bs) CANT.
TO (Bs) CANT. FISICO (%) MONTO (Bs.) CANT. FISICO (%) MONTO (Bs)
34 CONTENEDORES DIFERENCIADOS DE ACOPIO PZA 2.00 3,920.10 7,840.20 2.00 7,840.20 - 0.00% - - - -

SUB - TOTAL GENERAL 677,365.66 647,974.16 45,536.45 -74,927.95

DESCRIPCION DE MONTO TOTAL (Bs) %


MONTO TOTAL DE CONTRATO INICIAL = 677,365.66
INCREMENTO POR ORDEN DE CAMBIO -29,391.50 -4.34% DIRECTOR DE OBRA
MONTO TOTAL POR ORDEN DE CAMBIO #1 647,974.16 95.66%

DIRECTOR D.I.E.S.D. SECRETARIO MUNICIPAL DE DESARROLLO URBANO

RPTE. LEGAL EMP. CONST. ''CONISA" SUPERVISOR DE OBRA FISCAL DE OBRA


COMPUTOS METRICOS
PROYECTO: CONST. ASFALTADO (CALLE LUIS MENDIZABAL SANTA CRUZ ENTRE LA PAZ Y 6 DE OCTUBRE)
J. V. SANTA CRUZ
LUGAR: J.V. SANTA CRUZ
DIMENSIONES (m) Nº DE
ÍTEM ITEM/DESCRIPCION UND. OBSERVACIONES PARCIAL TOTAL
LARGO ANCHO ALTO AREA VECES
1 INSTALACION DE FAENAS GLB 1.00
TOTAL 1.00
2 REPLANTEO TRAZADO Y CONTROL ML
5,833.53 1 5,833.53
0.00
0.00
TOTAL 5,833.53
3 RETIRO DE LOSETAS C/CARGUIO M2
Area Externo 5,755.77 1 5,755.77
Areas de jardineras 515.74 -1 -515.74
0.00
0.00
TOTAL 5,240.03
4 MOVIMIENTO DE TIERRAS CON MAQUINARIA M3
De las secciones transversaales vol de corte Calle prolongacion 1 882.73
Calle intermedia 1 202.77
Calle Santa cruz 1 2,059.31
Volumne de resta losetas -1 -524.00
TOTAL 2,620.81
5 MEJORAMIENTO DE SUBRASANTE M2
Area Externo 5,755.77 1 5,755.77
Areas de jardineras 515.74 -1 -515.74
0.00
0.00
0.00
TOTAL 5,240.03
6 CAPA SUB-BASE EST. GRANULOMETRICAMENT M3
0.30 5,240.03 1 1,572.01
0.00
0.00
0.00
0.00
0.00
TOTAL 1,572.01
7 CAPA BASE EST. GRANULOMETRICAMENTE M3
0.20 5,240.03 1 1,048.01
0.00
0.00
0.00
0.00
TOTAL 1,048.01
8 LIMPIEZA GENERAL DE LA OBRA M2
5,833.53 1 5,833.53
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
TOTAL 5,833.53
9 REPLANTEO Y TRAZADO TUBERIAS ML calle santa cruz derecha (Alcaldia) 0.00 1 0.00
calle intramedia corta (conisa) 33.33 1 33.33
calle santa cruz izquierda (conisa) 181.31 1 181.31
calle prolongacion derecha (alcaldia) 0.00 1 0.00
calle prolongacion izquierda (Conisa) 143.81 1 143.81
0.00
0.00
0.00
TOTAL 358.45
10 EXCAVACION (0-2M) SUELO SEMIDURO M3
calle santa cruz derecha (Alcaldia) 0.00 0.60 0.90 1 0.00
calle intramedia corta (conisa) 33.33 0.60 0.90 1 18.00
calle santa cruz izquierda (conisa) 181.31 0.60 0.90 1 97.91
calle prolongacion derecha (alcaldia) 0.00 0.60 0.90 1 0.00
calle prolongacion izquierda (Conisa) 143.81 0.60 0.90 1 77.66
0.00
0.00
0.00
0.00
0.00
TOTAL 193.57
11 CAMARA DE INSP. 1.5<H<=2M + INC. TAPA F.F. PZA
9 9.00
0.00
0.00
0.00
0.00
0.00
0.00
TOTAL 9.00
12 ASIENTO PARA TUBERIA M3
calle santa cruz derecha (Alcaldia) 0.00 0.60 0.15 0.00
calle intramedia corta (conisa) 33.33 0.60 0.15 3.00
calle santa cruz izquierda (conisa) 181.31 0.60 0.15 16.32
calle prolongacion derecha (alcaldia) 0.00 0.60 0.15 0.00
calle prolongacion izquierda (Conisa) 143.81 0.60 0.15 12.94
0.00
TOTAL 32.26
13 PROV/TENDIDO TUBERIAS PVC SDR-41 D=6" ML
calle santa cruz derecha (Alcaldia) 0.00 1 0.00
calle intramedia corta (conisa) 33.33 1 33.33
calle santa cruz izquierda (conisa) 181.31 1 181.31
calle prolongacion derecha (alcaldia) 0.00 1 0.00
calle prolongacion izquierda (Conisa) 143.81 1 143.81
0.00
TOTAL 358.45
14 PROV/TENDIDO TUBERIAS PVC SDR-41 D=8" ML
0.00 1 0.00
0.00 1 0.00
0.00 1 0.00
0.00
TOTAL 0.00
15 RELLENO ZANJA TIERRA CERNIDA SIN MATER M3
calle santa cruz derecha (Alcaldia) 0.00 0.60 0.20 0.00
calle intramedia corta (conisa) 33.33 0.60 0.20 4.00
calle santa cruz izquierda (conisa) 181.31 0.60 0.20 21.76
calle prolongacion derecha (alcaldia) 0.00 0.60 0.20 0.00
calle prolongacion izquierda (Conisa) 143.81 0.60 0.20 17.26
TOTAL 43.02
16 RELLENO Y COMP. DE ZANJAS SIN MAT. DE PR M3
calle santa cruz derecha (Alcaldia) 0.00 0.60 0.55 0.00
calle intramedia corta (conisa) 33.33 0.60 0.55 11.00
calle santa cruz izquierda (conisa) 181.31 0.60 0.55 59.83
calle prolongacion derecha (alcaldia) 0.00 0.60 0.55 0.00
calle prolongacion izquierda (Conisa) 143.81 0.60 0.55 47.46
TOTAL 118.29
17 RETIRO DE ESCOMBROS C/CARGUIO M3
0.00
0.00
0.00
0.00
TOTAL 0.00
18 CUNETA PLUVIAL M3
Av santa Cruz Izq 187.26 0.40 0.10 7.49
Av santa Cruz Der 238.35 0.40 0.10 9.53
Prolongacion Izq 172.11 0.40 0.10 6.88
Prolongacion Der 139.83 0.40 0.10 5.59
TOTAL 29.49
19 IMPRIMACION ASFALTICA M2
0.00
0.00
TOTAL 0.00
20 CARPETA DE CONCRETO ASFALTICO E=7CM M2
0.00
0.00
TOTAL 0.00
21 HUMEDECIMIENTO DE SUELO M2
0.00
0.00
0.00
0.00
TOTAL 0.00
22 DELIMITACION DE AREAS ML
0.00
0.00
0.00
0.00
TOTAL 0.00
23 SEñALIZACION PARA LA PROTECCION AMBIEN PZA
0.00
0.00
0.00
0.00
TOTAL 0.00
24 SEñALIZACION CON PARANTE PZA
0.00
0.00
0.00
0.00
TOTAL 0.00
25 SEñALIZACION DE MADERA PZA
0.00
0.00
0.00
0.00
TOTAL 0.00
26 SEñAL DE IDENTIFICACION PZA
0.00
0.00
0.00
0.00
TOTAL 0.00
27 MONITOREO DE RUIDO PTO
0.00
0.00
0.00
0.00
TOTAL 0.00
28 MEDICION DE GASES AN1
0.00
0.00
0.00
0.00
TOTAL 0.00
29 MEDICION CALIDAD DE AIRE AN1
0.00
0.00
0.00
0.00
TOTAL 0.00
30 EQUIPO CONTRA INCENDIOS PZA
0.00
0.00
0.00
0.00
TOTAL 0.00
31 BOTIQUIN PRIMEROS AUXILIOS PZA
0.00
0.00
0.00
0.00
TOTAL 0.00
32 CAPACITACION AMBIENTAL EV1
0.00
0.00
0.00
0.00
TOTAL 0.00
33 CONTENEDORES DIFERENCIADOS PZA
0.00
0.00
0.00
0.00
TOTAL 0.00
34 CONTENEDORES DIFERENCIADOS DE ACOPIO PZA
0.00
0.00
0.00
0.00
TOTAL 0.00

S-ar putea să vă placă și