Sunteți pe pagina 1din 17

BENGUET ELECTRIC COOPERATIVE, INC.

South Drive, Baguio City

NOTICE OF POWER INTERRUPTION

Please be informed that the BENGUET ELECTRIC COOPERATIVE, INC. (BENECO) is scheduling Electric Service Interruption on the following date/s and time:

EST.
EST. NO. OF
SUB EQUIP'T REF. OF UNDELIVERED PROJECT
DATE TIME FEEDER AREAS AFFECTED PURPOSE CONS. CREW
STATION DE-ENERGIZED AREA /UNUSED CODE
AFFECTED
ENERGY

Parts of Jungle Town, Virac, Itogon BENECO POWER INTERRUPTION:


- Uprating of Communal Distribution Transformers from
9:00AM to Dalicno B005743 25kVA to 37.5kVA
Monday,August 26, 2019 Dalicno 57 104 Blesi ELT-080-2019
5:00PM Substation 25kVA B6895

Parts of Lamug and Victoria Village, Quezon Hill, Baguio City BENECO POWER INTERRUPTION:
- Relocation of Secondary Pole
Irisan BC09515 (1pc 30ft Concrete Pole) PRO-129-2019
Feeder 04 180 296 Ammecs
Substation 100kVA B4498 (resched.)

Parts of San Luis Extension and Asin Road, Baguio City BENECO POWER INTERRUPTION:
9:00AM to - Uprating of Communal Distribution Transformers from
Tuesday,August 27, 2019 B032947 25kVA to 37.5kVA
5:00PM Feeder 03 99 216 Expendables ELT-045-2019
25kVA B5971
North Sanitary
Camp
Substation Parts of , Dontogan, Sto. Tomas, Baguio City BENECO POWER INTERRUPTION
- Uprating of Communal Distribution Transformers from
B026849
Feeder 08 25kVA to 37.5kVA 106 200 Blesi ELT-059-2019
25kVA B1055

WHOLE OF Atok BENECO POWER INTERRUPTION:


WHOLE OF Kabayan - Extension of Primary Lines dedicated to Man-asok
WHOLE OF Kapangan Hydro Power Plant
WHOLE OF Bokod EXCEPT parts of Ambuklao and Bobok-Bisal - Uprating of Insulators from 13.2kV to 23kV
Angtod
Atok WHOLE OF Tublay EXCEPT parts of Caponga and Tuel - Replacement of Communal Transformer from
Circuit 01 Ammecs PEP-095-2019
Substation Feeder Reclosers WHOLE OF Buguias 50kVA/7.62kV to 50kVA/13.2kV
9:00AM to Circuit 02 Blesi PEP-096-2019
Wednesday,August 28, 2019 & & WHOLE OF Bakun EXCEPT Kayapa 23,845 23,928
5:00PM Circuit 03 Expendables PEP-097-2019
Bulalacao Circuit Breakers WHOLE OF Palina, Kibungan
Circuit 04 Siglat ELT-065-2019
Substation
Crew

Parts of: Coyeesan, Lower Victoria Village, San Roque Village, Km. 3, Asin BENECO POWER INTERRUPTION
Irisan B022302 Rd., Baguio City - Installation of Intermediate Pole
Feeder 03
Substation Fuse Sta. Lucia Crossing Whole of: San Luis Village (including Diamond Subd., Marigold Spring Subd., (1pc 35ft Steel Pole)
Ridge Park Subd., Sunset Subd., Celestial Village, San Luis Extension), - Reconfiguration of Primary Structure Expendables PRO-262-2019
Baguio City 2,480 5,952
Siglat PR0-122-2019
9:00AM to B04111
Thursday,August 29, 2019
5:00PM Fuse Shangrila Village
North Sanitary
Camp Feeder 07 Parts of Lourdes Subdivision, Baguio City BENECO POWER INTERRUPTION
Substation - Uprating of Communal Distribution Transformers from
BC07606 37.5kVA to 50kVA 94 248 Blesi ELT-129-2019
37.5kVA B0473

Page 1 of 17
La Trinidad: Parts of Ambiong-LT, Beckel BENECO POWER INTERRUPTION:
Itogon: Parts of Tuding (including Monterazzas), Ucab, Gumatdang, Virac, - Correction of Leaning Primary Pole
Loacan, Poblacion (Maligaya) - Retapping and Installation of 10kVA Communal
Bokod: Parts of Ambuklao, Bobok Bisal Distribution Transformer
Baguio City: Parts of Navy Base, Cabinet Hill-Teachers Camp, Bakakeng - Retirement of Poles
Norte/ Sur (Ciudad Grande, Eagle Crest, Montebello Village), Pacdal, Mines
View Park, Gibraltar, Pucsusan, Lualhati Village, Outlook Drive, Lucnab,
Country Club Village, Camp John Hay, VOA, South Drive, DPS Compound, Ammecs
Feeder Reclosers Happy Hallow, Green Water Village, Military Cut-off, Sta. Scholastica Village, Blesi
9:00AM to Lamut Feeder 11
Friday,August 30, 2019 & Scout Barrio, Upper Dagsian, Lower Dagsian, Balsigan, Hillside, Gabriela 15,238 21,942 Expendables
5:00PM Substation Feeder 13
Circuit Breakers Silang, Camp 7, Camp 8, Camp 6, Poliwes, San Vicente, Kias, Atok Trail, Siglat
PMA Fort del Pilar, Pinesville Subdivision, Loakan Apugan, Loakan Proper, Crew
Loakan-Liwanag, Loakan Magsaysay, Kadaclan Village, EPZA, New Site
SLU-SVP Bakakeng
Tuba: Parts of Camp 4, Camp 3, Twin Peaks, Camp 1, Tabaan Sur
Pangasinan: Parts of Dungon

Please be informed that the National Grid Corporation of the Philippines is scheduling Electric Service Interruption on the following date/s and time:

EST.
EST. NO. OF
SUB EQUIP'T REF. OF UNDELIVERED PROJECT
DATE TIME FEEDER AREAS AFFECTED PURPOSE CONS. CREW
STATION DE-ENERGIZED AREA /UNUSED CODE
AFFECTED
ENERGY

WHOLE OF Atok NGCP POWER INTERRUPTION:


WHOLE OF Kabayan To conduct the following maintenance activities:
WHOLE OF Kapangan - Replacement of damaged insulators at Tower 8, 17 & 18
WHOLE OF Bokod EXCEPT parts of Ambuklao and Bobok-Bisal - Installation of Line lighting arresters at Tower 18.
WHOLE OF Tublay EXCEPT parts of Caponga and Tuel - Replacement of poles and crossarms at STR 83, Atok
PARTS OF Ampusongan, Bakun line.
- Isolation of conductor jumper loops, Phase ABC at
Tower 36.
La Trinidad-Sagada - Shifting of power source of Mankayan-Sagada 69kV
Circuit 01 69kV Line Line Segment from La Trinidad-Mankayan(L1)/ Sagada
7:00AM to Atok 69kV TL to La Trinidad-Mankayan(L2)/ Lepanto 69kV TL
Circuit 02 18,015 21,618
5:00PM Substation to facilitate the implementation of rerouting works at
Circuit 03 La Trinidad-Lepanto
69kV Line Tower Nos. A & B along the La Trinidad-Mankayan 69kV
Line.

Note: La Trinidad-Mankayan(L1)/Sagada 69kV will be


energized until Tower No. 36 with BENECO Atok Load
Wednesday,August 28, 2019 only.

WHOLE OF Mankayan NGCP POWER INTERRUPTION:


WHOLE OF Buguias To conduct the following activities:
WHOLE OF Bakun EXCEPT Kayapa - Shifting of power source of Mankayan-Sagada 69kV
WHOLE OF Palina, Kibungan Line Segment from La Trinidad-Mankayan(L1)/ Sagada
La Trinidad-Sagada PARTS OF Cervantes, Ilocos Sur 69kV TL to La Trinidad-Mankayan(L2)/ Lepanto 69kV TL
69kV Line to facilitate the implementation of rerouting works at
7:00AM to Bulalacao Circuit 04 Tower Nos. A & B along the La Trinidad-Mankayan 69kV 9,905 11,886
8:00AM Substation Circuit 05 Line.
La Trinidad-Lepanto
69kV Line
Note: La Trinidad-Mankayan(L1)/Sagada 69kV will be de-
energized from Tower No. 36 (forward span) to 139 only.

NOTES: 1. This also serves as notice to all concerned Cable & Communication Companies to inspect and institute necessary safety measures/actions
on their cables/lines attached on the affected BENECO poles.
2. Always consider all lines energized. Power maybe restored earlier than the scheduled time.
For more information please contact the following nos.: 637-4400 local 605 to 607 / 09088657202 / 09175921698
APPROVED FOR PUBLIC ANNOUNCEMENT:

JOAQUIN O. CALAWEN
OIC Manager, Network Services Department
cc: all local Radio & TV stations, Telephone & Cable Companies, all affected big loaders
nsd/cwocc/isd/nnsd/file/comrel/NGCP

Page 2 of 17
BENGUET ELECTRIC COOPERATIVE, INC.
South Drive, Baguio City

NOTICE OF POWER INTERRUPTION

Please be informed that the National Grid Corporation of the Philippines is scheduling Electric Service Interruption on the following date/s and time:

EST.
EST. NO. OF
SUB EQUIP'T REF. OF UNDELIVERED PROJECT
DATE TIME FEEDER AREAS AFFECTED PURPOSE CONS. CREW
STATION DE-ENERGIZED AREA /UNUSED CODE
AFFECTED
ENERGY

Kapangan: Balakbak, Beleng-Belis, Boklaoan, Cayapes, Cuba, Datakan, NGCP POWER INTERRUPTION:
Gadang, Gaswiling, Labueg, Paykek, Poblacion Central, Pongayan, Pudong, To conduct the following maintenance activities:
Sagubo, Taba-ao - Replacement of damaged insulators at Tower 8, 17 & 18
Kibungan: Badeo, Lubo, Madaymen, Palina, Poblacion KN, Sagpat - Installation of Line lighting arresters at Tower 18.
Kabayan: Adaoay, Anchokey, Bashoy, Batan, Duacan, Eddet, Gusaran, - Replacement of poles and crossarms at STR 83, Atok
Kabayan Barrio, Lusod, Pacso, Poblacion KB, Tawangan line.
Bokod: Bila, Bobok-Bisal, Daclan BD, Ekip, Karao, Kawal, Nawal, Pito, - Isolation of conductor jumper loops, Phase ABC at
Poblacion BD, Tikey Tower 36.
La Trinidad-Sagada Tublay: Ambassador, Ambongdolan, Ba-ayan, Basil, Daclan TY, Tublay - Shifting of power source of Mankayan-Sagada 69kV
Circuit 01 69kV Line Central Line Segment from La Trinidad-Mankayan(L1)/ Sagada
7:00AM to Atok Atok: Abiang, Caliking, Naguey, Pasdong, Poblacion AT, Topdac 69kV TL to La Trinidad-Mankayan(L2)/ Lepanto 69kV TL
Circuit 02 18,015 21,618
5:00PM Substation Itogon: Parts of Guisset, Tinongdan to facilitate the implementation of rerouting works at
Circuit 03 La Trinidad-Lepanto
69kV Line Tower Nos. A & B along the La Trinidad-Mankayan 69kV
Line.

Note: La Trinidad-Mankayan(L1)/Sagada 69kV will be


energized until Tower No. 36 with BENECO Atok Load
Wednesday,August 28, 2019 only.

Buguias: Bangao, Abatan, Lo-o, Baculongan Norte/Sur, Sebang, Catlubong, NGCP POWER INTERRUPTION:
Buguias Central, Amlimay, Besocol, Buyacaoan, Lengaoan, To conduct the following activities:
Bakun: Gambang - Shifting of power source of Mankayan-Sagada 69kV
Mankayan: Guinaoang, Taneg, Line Segment from La Trinidad-Mankayan(L1)/ Sagada
La Trinidad-Sagada Kibungan: 69kV TL to La Trinidad-Mankayan(L2)/ Lepanto 69kV TL
69kV Line to facilitate the implementation of rerouting works at
7:00AM to Bulalacao Circuit 04 Tower Nos. A & B along the La Trinidad-Mankayan 69kV
8:00AM Substation Circuit 05 Line.
La Trinidad-Lepanto
69kV Line
Note: La Trinidad-Mankayan(L1)/Sagada 69kV will be de-
energized from Tower No. 36 (forward span) to 139 only.

NOTES: 1. This also serves as notice to all concerned Cable & Communication Companies to inspect and institute necessary safety measures/actions
on their cables/lines attached on the affected BENECO poles.
2. Always consider all lines energized. Power maybe restored earlier than the scheduled time.
For more information please contact the following nos.: 637-4400 local 605 to 607 / 09088657202 / 09175921698

APPROVED FOR PUBLIC ANNOUNCEMENT:

JOAQUIN O. CALAWEN
OIC Manager, Network Services Department
cc: all local Radio & TV stations, Telephone & Cable Companies, all affected big loaders
nsd/cwocc/isd/nnsd/file/comrel/NGCP

Page 3 of 17
BENGUET ELECTRIC COOPERATIVE, INC.
South Drive, Baguio City

NOTICE OF POWER INTERRUPTION

Please be informed that the BENGUET ELECTRIC COOPERATIVE, INC. (BENECO) is scheduling Electric Service Interruption on the following date/s and time:

EST.
EST. NO. OF
SUB EQUIP'T REF. OF UNDELIVERED PROJECT
DATE TIME FEEDER AREAS AFFECTED PURPOSE CONS. CREW
STATION DE-ENERGIZED AREA /UNUSED CODE
AFFECTED
ENERGY

NHA, Tagadi, Tadiangan, Tuba BENECO POWER INTERRUPTION:


B017145 - Rerouting of Primary Line
Feeder 03 236 200 Crew MS-748-2019
Fuse NHA Tadiangan
Irisan
Substation Parts of Victoria Village, Baguio City BENECO POWER INTERRUPTION:
BC09702 - Installation of Alley arm MS-332-2019
Feeder 04 280 520 Crew
75kVA B2186 (resched.)

Parts of Upper Ambiong, Riverside, Ambiong, La Trinidad BENECO POWER INTERRUPTION:


9:00AM to B014899 - Relocation of Secondary Pole
Feeder 05 106 184 Crew MS-322-2019
5:00PM 37.5kVA B2656 (1pc 35ft Steel Pole)
North Sanitary
Camp
Substation Suwi, Balangabang, Bodiweng and Central Bineng, La Trinidad BENECO POWER INTERRUPTION:
LT04830 - Extension of Primary Lines
Feeder 10 259 256 Blesi PEP-055-2019
Fuse Bineng (1pc 35ft Steel Pole, 170mtrs #2 Bare)
Monday,August 19, 2019
Parts of Mangitit, Camp 7, Baguio City BENECO POWER INTERRUPTION:
B031683 - Relocation of Secondary Pole 101 120 Crew PRO-257-2019
37.5kVA B2143 (1pc 30ft Steel Pole)

Parts of Poblete and Paterno St., South Drive, Baguio Country Club, Country BENECO POWER INTERRUPTION:
9:00AM to Club Village, Happy Hallow, Camp John Hay, Baguio City - Facilitate opening of fuse cut-out at Camp John Hay
9:30AM
Lamut BC01287
Feeder 13 1,108 7,091
Substation Recloser Paterno BENECO POWER INTERRUPTION:
4:30PM to
- Facilitate closing of fuse cut-out at Camp John Hay
5:00PM
Camp John Hay, Baguio City BENECO POWER INTERRUPTION:
9:00AM to BC12726 - Facilitate Line Clearing
136 1,948
5:00PM Fuse Camp John Hay

Sta. Lucia Pumping, Pinewoods Subdivision, Asin Rd., Baguio City BENECO POWER INTERRUPTION:
B026724 - Replacement of 2-75kVA with 3-50kVA Buyback
2-75kVA Distribution Transformers Blesi ELT-161-2019
Feeder 03 2
NPN - Replacement of 3-37.5kVA with 3-25kVA Buyback SEMO ELT-162-2019
Irisan 3-37.5kVA Transformers
Substation
Parts of Purok 4, Purok 8, Purok 9, and Badihoy, Pinsao Proper, Baguio City BENECO POWER INTERRUPTION:
BC09284 - Replacement of Rotten Pole
Feeder 04 (1pc 35ft Steel Pole) 216 311 Expendables PRO-256-2019
Hot line clamp

Parts of Fatima, Bayan Park Village, Baguio City BENECO POWER INTERRUPTION:
9:00AM to - Relocation of Secondary Pole
Tuesday,August 20, 2019 BC00174
5:00PM Feeder 05 (1pc 30ft Steel Pole) 101 176 Crew MS-366-2019
50kVA B0015

Parts of Central Tawang, La Trinidad BENECO POWER INTERRUPTION:


North Sanitary LT02559 - Installation of Intermediate Pole
Camp (1pc 30ft Steel Pole) 144 208 Crew PRO-245-2019
50kVA B9621
Substation
Feeder 09 DC 058 Bahong, La Trinidad BENECO POWER INTERRUPTION:
LT02314 - Relocation of Secondary Pole OPX-252-2019
(1pc 30ft Secondary Pole) 7 12 Crew
Secondary Loop Jumper (resched.)

Page 4 of 17
EST.
EST. NO. OF
SUB EQUIP'T REF. OF UNDELIVERED PROJECT
DATE TIME FEEDER AREAS AFFECTED PURPOSE CONS. CREW
STATION DE-ENERGIZED AREA /UNUSED CODE
AFFECTED
ENERGY

Parts of Pipingew, Lubas, La Trinidad BENECO POWER INTERRUPTION:


North Sanitary - Relocation of Secondary Pole
B025794
Camp Feeder 09 (1pc 30ft Steel Pole) 239 392 Expendables OPX-268-2019
75kVA B0572
Substation

Wednesday,August 21, 2019


9:00AM to Parts of Lower Lucnab and Acapulco, Lucnab, Baguio City BENECO POWER INTERRUPTION:
5:00PM - Installation of Intermediate Pole
Lamut BC10928 (1pc 30ft Steel Pole) MS-743-2019
Feeder 11 - Relocation of Secondary Pole 79 37 Siglat
Substation 25kVA B9220 MS-357-2019
(1pc 30ft Steel Pole)

Parts of Bato, Longlong, Puguis, La Trinidad BENECO POWER INTERRUPTION:


Irisan B023720 - Replacement of Rotten Pole
Feeder 04 (2pcs 35ft Steel Pole) 57 83 Expendables PRO-255-2019
Substation Fuse Bato Longlong

Parts of Honeymoon Rd., Holyghost Proper, Baguio City BENECO POWER INTERRUPTION:
9:00AM to BC04127 - Replacement of Rotten Pole
Thursday,August 22, 2019 Feeder 05 (1pc 35ft Concrete Pole) 417 808 Ammecs PRO-249-2019
5:00PM 167kVA B0269
North Sanitary
Camp
Substation Parts of Cogcoga, Pico, La Trinidad BENECO POWER INTERRUPTION:
LT00226 - Relocation of Secondary Pole
Feeder 10 (1pc 30ft Steel Pole) 30 48 Siglat MS-040-2019
25kVA B4264

Baguio City: Marcos Highway, Pucay Village, Campo Sioco, Sto. Rosario BENECO POWER INTERRUPTION:
Valley, Chapiz Village, Crystal Cave,Gulfview Subdivision, Kitma, Bengao, - Relocation of Pole affected by DPWH Project
Suello Village, Teacher's Village, Bakakeng Central, Eagle parts of Crest- (1pc 50ft Steel Pole, 1pc 40ft Concrete Pole)
Bakakeng Norte/Sur, Balacbac, Green Valley, Dontogan, Sto. Tomas Proper, - Replacement of 3-15kVA with 3-25kVA Buyback MS-361-2019
Sto. Tomas School Area, parts of Upper Km 3, Asin Road Distribution Transformers Crew
ELT-163-2019
North Sanitary Tuba: Poblacion, Taloy Norte, Taloy Sur, Tabaan Norte - Relocation of Secondary Pole Blesi
BC07561 PRO-217-2019
Camp Feeder 08 (1pc 30ft Concrete Pole) 10,869 15,681 Ammecs
Recloser Justice Village (resched.)
Substation - Rerouting of Secondary Lines and Replacement of SEMO
PRO-239-2019
Transformer Pole Expendables
(1pc 35ft Steel Pole, 1pc 30ft Steel Pole)
- Line Clearing

9:00AM to
Friday,August 23, 2019
5:00PM Kapangan: Balakbak, Beleng-Belis, Boklaoan, Cayapes, Cuba, Datakan, BENECO POWER INTERRUPTION:
Gadang, Gaswiling, Labueg, Paykek, Poblacion Central, Pongayan, Pudong, - Replacement of Substation Power Fuse
Sagubo, Taba-ao
Kibungan: Badeo, Lubo, Madaymen, Palina, Poblacion KN, Sagpat
Kabayan: Adaoay, Anchokey, Bashoy, Batan, Duacan, Eddet, Gusaran,
Circuit 01 Kabayan Barrio, Lusod, Pacso, Poblacion KB, Tawangan
Atok Bokod: Bila, Bobok-Bisal, Daclan BD, Ekip, Karao, Kawal, Nawal, Pito,
Circuit 02 69kV Line 18,015 21,618 Crew
Substation Poblacion BD, Tikey
Circuit 03
Tublay: Ambassador, Ambongdolan, Ba-ayan, Basil, Daclan TY, Tublay
Central
Atok: Abiang, Caliking, Naguey, Pasdong, Poblacion AT, Topdac

NOTES: 1. This also serves as notice to all concerned Cable & Communication Companies to inspect and institute necessary safety measures/actions
on their cables/lines attached on the affected BENECO poles.
2. Always consider all lines energized. Power maybe restored earlier than the scheduled time.
For more information please contact the following nos.: 637-4400 local 605 to 607 / 09088657202 / 09175921698

APPROVED FOR PUBLIC ANNOUNCEMENT:

JOAQUIN O. CALAWEN
OIC Manager, Network Services Department
cc: all local Radio & TV stations, Telephone & Cable Companies, all affected big loaders
nsd/cwocc/isd/nnsd/file/comrel/NGCP

Page 5 of 17
JOB ORDER ENDORSEMENT SCHEDULE:

JOB ORDER/
CREW Monday, February 04, 2019 Tuesday, February 05, 2019 Wednesday, February 06, 2019 Thursday, February 07, 2019 Friday, February 08, 2019 Saturday, February 09, 2019
SCHEDULE

Time 9:00AM to 5:00PM 9:00AM to 5:00PM 9:00AM to 5:00PM 9:00AM to 5:00PM 9:00AM to 5:00PM 9:00AM to 5:00PM
Project Code
Ammecs
Description
Location
Time 9:00AM to 5:00PM 9:00AM to 5:00PM 9:00AM to 5:00PM 9:00AM to 5:00PM 9:00AM to 5:00PM 9:00AM to 5:00PM
Project Code
Blesi
Description
Location
Time 9:00AM to 5:00PM 9:00AM to 5:00PM 9:00AM to 5:00PM 9:00AM to 5:00PM 9:00AM to 5:00PM 9:00AM to 5:00PM
Project Code
Expendables
Description
Location
Time 9:00AM to 5:00PM 9:00AM to 5:00PM 9:00AM to 5:00PM 9:00AM to 5:00PM 9:00AM to 5:00PM 9:00AM to 5:00PM
Project Code
Siglat
Description
Location
Time 9:00AM to 5:00PM 9:00AM to 5:00PM 9:00AM to 5:00PM 9:00AM to 5:00PM 9:00AM to 5:00PM 9:00AM to 5:00PM
Project Code
Hyrax
Description
Location
Time 9:00AM to 5:00PM 9:00AM to 5:00PM 9:00AM to 5:00PM 9:00AM to 5:00PM 9:00AM to 5:00PM 9:00AM to 5:00PM
Project Code
IMJ
Description
Location
Time 9:00AM to 5:00PM 9:00AM to 5:00PM 9:00AM to 5:00PM 9:00AM to 5:00PM 9:00AM to 5:00PM 9:00AM to 5:00PM
Project Code
Siglat
Description
Location
Time 9:00AM to 5:00PM 9:00AM to 5:00PM 9:00AM to 5:00PM 9:00AM to 5:00PM 9:00AM to 5:00PM 9:00AM to 5:00PM
Project Code
Columbus
Description
Location
Time 9:00AM to 5:00PM 9:00AM to 5:00PM 9:00AM to 5:00PM 9:00AM to 5:00PM 9:00AM to 5:00PM 9:00AM to 5:00PM
Project Code
Foxtrot
Description
Location
Time 9:00AM to 5:00PM 9:00AM to 5:00PM 9:00AM to 5:00PM 9:00AM to 5:00PM 9:00AM to 5:00PM 9:00AM to 5:00PM
Project Code
Jedi
Description
Location
Time 9:00AM to 5:00PM 9:00AM to 5:00PM 9:00AM to 5:00PM 9:00AM to 5:00PM 9:00AM to 5:00PM 9:00AM to 5:00PM
Project Code
J1
Description
Location
Time 9:00AM to 5:00PM 9:00AM to 5:00PM 9:00AM to 5:00PM 9:00AM to 5:00PM 9:00AM to 5:00PM 9:00AM to 5:00PM
Project Code
Garnet
Description
Location
Time 9:00AM to 5:00PM 9:00AM to 5:00PM 9:00AM to 5:00PM 9:00AM to 5:00PM 9:00AM to 5:00PM 9:00AM to 5:00PM
Project Code
SEMO
Description
Location
Time 9:00AM to 5:00PM 9:00AM to 5:00PM 9:00AM to 5:00PM 9:00AM to 5:00PM 9:00AM to 5:00PM 9:00AM to 5:00PM
Project Code
Haevy Crew 2
Description
Location
Time 9:00AM to 5:00PM 9:00AM to 5:00PM 9:00AM to 5:00PM 9:00AM to 5:00PM 9:00AM to 5:00PM 9:00AM to 5:00PM
Project Code
Winston
Description
Location
Time 9:00AM to 5:00PM 9:00AM to 5:00PM 9:00AM to 5:00PM 9:00AM to 5:00PM 9:00AM to 5:00PM 9:00AM to 5:00PM
Project Code
Regular Crew
Description
Location
Time 9:00AM to 5:00PM 9:00AM to 5:00PM 9:00AM to 5:00PM 9:00AM to 5:00PM 9:00AM to 5:00PM 9:00AM to 5:00PM
Project Code
SEMO
Description
Location

Prepared by: Checked by:

SHERAINE MAE T. WILLY JOAQUIN O. CALAWEN


SPDE-Prob SPDO
BENGUET ELECTRIC COOPERATIVE, INC.
South Drive, Baguio City

NOTICE OF POWER INTERRUPTION

Please be informed that the BENGUET ELECTRIC COOPERATIVE, INC. (BENECO) is scheduling Electric Service Interruption on the following date/s and time:

EST.
EST. NO. OF
SUB EQUIP'T REF. OF UNDELIVERED PROJECT
DATE TIME FEEDER AREAS AFFECTED PURPOSE CONS. CREW
STATION DE-ENERGIZED AREA /UNUSED CODE
AFFECTED
ENERGY

TB01832 Parts of Agaynec, Poblacion, Tuba BENECO POWER INTERRUPTION:


Feeder 08 - Replacement of Primary Pole 44 56 Blesi PRO-204-2018
North Sanitary Fuse Agaynec
Camp Whole of Shilan, La Trinidad and Caponga, Tublay BENECO POWER INTERRUPTION:
9:00 AM to Substation B006471 Parts of Beckel, La Trinidad - Relocation of Primary Pole
Monday, December 17, 2018 Feeder 09 2199 1888 Ammecs PRO-218-2018
5:00 PM Recloser Shilan

Dalicno BC10372 Parts of Spring Hills, Apugan, Loakan BENECO POWER INTERRUPTION:
Dalicno - Relocation of Secondary Pole 120 256 Winston PRO-194-2018
Substation 50KVA B2662
North Sanitary Samuyao, Cruz, La Trinidad BENECO POWER INTERRUPTION:
LT01061 - Replacement of Rotten Secondary Pole
Camp Feeder 09 169 304 Winston OPX-649-2018
50KVA B1549
Substation
BC04982 Parts of Botanical Garden, Baguio City BENECO POWER INTERRUPTION:
Lamut - Upgrade metering of Mansion House
Feeder 13 50KVA 6 20 SEMO
Substation Pumping
25KVA
Tuesday, December 18, 2018
9:00 AM to
5:00 PM Tipong and Tococ, Manganese, Dalicno, Itogon BENECO POWER INTERRUPTION:
Dalicno B012283 - Relocation of Transformer Pole with
Dalicno 165 816 Blesi PRO-216-2018
Substation Fuse Tipong Dalicno Eroded Base

Sitio Tabbak, Akipan and Beling, Lengaoan, Buguias BENECO POWER INTERRUPTION:
Bulalacao B013589 - Relocation of Primary Pole
Circuit 04 3496 3376 Angtod MS-353-2018
Substation Fuse Sectionalizer

San Carlos Heights, Irisan, Baguio City BENECO POWER INTERRUPTION: {PRQ-101-2018
Irisan B032907 - Uprating of Secondary Lines Blesi (cont)
Feeder 03 1,806 3,192 PRQ-102-2018}
Substation Fuse San Carlos Heights - Relocation of Primary Pole Foxtrot
MS-371-2018

North Sanitary Parts of Buyagan, Poblacion, La Trindad (near cemetery) BENECO POWER INTERRUPTION:
9:00 AM to LT02155 50KVA B0057 - Rehabilitation of Secondary Lines
Wednesday, December 19, 2018 Camp Feeder 10 155 328 IMJ (cont.) PRQ-106-2018
5:00 PM B010869 37.5KVA B5024
Substation
Binanga Sur, Tuding, Itogon BENECO POWER INTERRUPTION:
Lamut B011935 - Rerouting of Secondary Lines
Feeder 11 106 176 Winston PRO-205-2018
Substation 25KVA B0774

Parts of Central Ambiong, La Trinidad BENECO POWER INTERRUPTION:


B029536 - Rehabilitation of Secondary Lines and
Feeder 05 100 264 Blesi PRO-153-2018
75KVA B4587 Replacement of Rotten Secondary Poles

North Sanitary Parts of Lower Kesbeng, Poblacion, La Trinidad BENECO POWER INTERRUPTION:
9:00 AM to LT04558
Thursday, December 20, 2018 Camp Feeder 09 - Rehabilitation of Secondary Lines 92 200 IMJ (cont.) PRQ-112-2018
5:00 PM 75KVA B5736
Substation
Parts of Upper Wangal, La Trinidad BENECO POWER INTERRUPTION:
B001903 - Replacement of Rotten Secondary Pole
Feeder 10 68 163 Winston OPX-669-2018
50KVA B0587

Page 8 of 17
EST.
EST. NO. OF
SUB EQUIP'T REF. OF UNDELIVERED PROJECT
DATE TIME FEEDER AREAS AFFECTED PURPOSE CONS. CREW
STATION DE-ENERGIZED AREA /UNUSED CODE
AFFECTED
ENERGY
Parts of Dominguez Subd., San Luis Village, Baguio City BENECO POWER INTERRUPTION:
Irisan B033345 - Rehabilitation of Secondary Lines
Feeder 03 184 416 IMJ (cont.) PRQ-103-2018
Substation 75KVA B5313
Friday, December 21, 2018
9:00 AM to
5:00 PM Parts of Palispis Highway, Tuba (near Ford Metro Baguio) BENECO POWER INTERRUPTION:
North Sanitary
BC03672 - Diversion of Secondary Lines
Camp Feeder 08 38 360 Blesi (cont.) MS-086-2018
50KVA B0686
Substation
Parts of Lower Cypress, Purok 14, Irisan BENECO POWER INTERRUPTION:
9:00 AM to Irisan BC05334 - Reconductoring of Secondary Line
Saturday, December 22, 2018 Feeder 03 79 256 Ammecs (cont.) PRQ-098-2018
5:00 PM Substation 75KVA B4182

North Sanitary Parts of Camp Bado Dangwa Compound, La Trinidad BENECO POWER INTERRUPTION:
9:00 AM to LT02090 - To facilitate cutting of trees
Sunday, December 23, 2018 Camp Feeder 09 120 224 Regular Crew
5:00 PM 75KVA B4349
Substation

NOTES: 1. This also serves as notice to all concerned Cable & Communication Companies to inspect and institute necessary safety measures/actions
on their cables/lines attached on the affected BENECO poles.
2. Always consider all lines energized. Power maybe restored earlier than the scheduled time.
For more information please contact the following nos.: 637-4400 local 605 to 607 / 09088657202 / 09175921698

APPROVED FOR PUBLIC ANNOUNCEMENT:

CARLO JOEL D. ANDRES


Manager OIC, Network Services Department

cc: all local Radio & TV stations, Telephone & Cable Companies, all affected big loaders
radio room/isd/nnrsd/file/comrel/NGCP

Page 9 of 17
JOB ORDER ENDORSEMENT SCHEDULE:

JOB ORDER/
CREW Monday, November 12, 2018 Tuesday, November 13, 2018 Wednesday, November 14, 2018 Thursday, November 15, 2018 Friday, November 16, 2018
SCHEDULE

Time 9:00AM to 5:00PM 9:00AM to 5:00PM 9:00AM to 5:00PM 9:00AM to 5:00PM 9:00AM to 5:00PM
Project Code PES-163-2018 MS-761-2018 PBB-075-2018/ PRQ-116-2018
PRO-093-2018
Description Extension of Lines Relocation of Pole Installation of Sole-use Rehabilitation of
Ammecs Diversion / Re-routing Transformer/ Secondary Lines
of newly constructed Installation of
lines and Intermediate Pole
Location row clearing Bato, Ba-ayan, Tublay Adiwang Road, Irisan National High Imelda Village
Dontogan School
Time 9:00AM to 5:00PM 9:00AM to 5:00PM 9:00AM to 5:00PM 9:00AM to 5:00PM 9:00AM to 5:00PM
Project Code MS-783-2018 PBB-076-2018 PBB-086-2018
Description Relocation of Pole Transformer Buyback Installation of Buyback
Blesi Transformer
Location BC02914 Crystal Dale, Elpidio Quirino Adarna St., Dizon
Bakakeng Central Elementary School, Subdivision
Irisan
Time 9:00AM to 5:00PM 9:00AM to 5:00PM 9:00AM to 5:00PM 9:00AM to 5:00PM 9:00AM to 5:00PM
Project Code MS-119-2018
Hyrax Description Pole Relocation
(DPWH)
Location B008446, Along
Naguilian Road, Irisan
Time 9:00AM to 5:00PM 9:00AM to 5:00PM 9:00AM to 5:00PM 9:00AM to 5:00PM 9:00AM to 5:00PM
Project Code PRQ-112-2018 PES-156-2018/ PRQ-106-2018 PRQ-103-2018 PRQ-121-2018
(cont.) PRQ-117-2018 (cont.) (cont.) (cont.)
IMJ Description Rehabilitation of Extension of Sec. Lines/ Rehabilitation of Rehabilitation of Rehabilitation of
Secondary Lines Rehabilitation of Secondary Lines Secondary Lines Secondary Lines
Location Buyagan, Poblacion Secondary Lines Pinsao
Tam-awan Village, Buyagan, Poblacion Dominguez West Quirino Hill
Proper (near cemetery) Subdivision, Asin Rd.
Time 9:00AM to 5:00PM 9:00AM to 5:00PM 9:00AM to 5:00PM 9:00AM to 5:00PM 9:00AM to 5:00PM
Project Code OPX-611-2018 OPX-547-2018 OPX-489-2018 OPX-531-2018
OPX-459-2018
(w/ Winston)
Description Rehabilitation of Rerouting of Secondary Replacement of Old Installation of
Foxtrot Secondary Lines Lines/ FCO (c/o Danes Sectionalizing Fuse
Installation of Intermediate Bakeshop) Cut-out
Secondary Pole

Location Lower West Bayabas, Pico Bubon, Loakan Proper Mangi, Nangalisan
Monticello, Camp 7
Time 9:00AM to 5:00PM 9:00AM to 5:00PM 9:00AM to 5:00PM 9:00AM to 5:00PM 9:00AM to 5:00PM
Project Code OPX-431-2018 OPX-619-2018 OPX-603-2018 MS-117-2018
Description Replacement of Replacement of Rotten Extension of Pole Relocation
Jedi Undersized Pole Secondary Lines (DPWH)
Secondary Pole
Location near St. Lorenzo Ruiz Tabangaoen, Balili Tomay, Bahong B000567, Along
Church, Loakan Naguilian Road, Irisan
Proper
Time 9:00AM to 5:00PM 9:00AM to 5:00PM 9:00AM to 5:00PM 9:00AM to 5:00PM 9:00AM to 5:00PM
Project Code OPX-595-2018 MS-181-2018 OPX-577-2018 MS-114-2018
J1/ Description Relocation of Pole Correction of Secondary Correction of Eroded Pole Relocation
Falcon Line Clearance Pole (DPWH)
Location Upper Riverside, Pidawan, Loakan Lower Kesbeng, LTB B032401, Along
Ambiong Naguilian Road, Irisan
Time 9:00AM to 5:00PM 9:00AM to 5:00PM 9:00AM to 5:00PM 9:00AM to 5:00PM 9:00AM to 5:00PM
Project Code OPX-558-2018/ OPX-547-2018 OPX-264-2018 PSS-040-2018
PES-135-2018 OPX-459-2018
(w/ Foxtrot)

Winston
Description Correction of Rerouting of Secondary Correction of Installation of Fuse
Secondary Line Lines/ Secondary Line Sectionalizer
Winston Clearance/ Installation of Intermediate traversing Rooftop
Installation of Secondary Pole
Underbuilt Secondary

Location Pines Park, Balili/ Bayabas, Pico Upper Scout Barrio, Near Bencab, Asin
Bodiweng, Bineng Baguio City Road, Tadiangan

Prepared by: Checked by:

SHERAINE MAE T. WILLY JOAQUIN O. CALAWEN


Engineering Associate I - Prob PDS
DATE JOB ORDER Ammecs Blesi
Time 9:00AM to 5:00PM 9:00AM to 5:00PM
Project Code

Monday, September 17, 2018


Description

Location
Time 9:00AM to 5:00PM 9:00AM to 5:00PM
Project Code
Tuesday, September 18, 2018
Description
Location
Time 9:00AM to 5:00PM 9:00AM to 5:00PM
Project Code
Wednesday, September 19, 2018
Description
Location
Time 9:00AM to 5:00PM 9:00AM to 5:00PM
Project Code
Thursday, September 20, 2018
Description
Location
Time 9:00AM to 5:00PM 9:00AM to 5:00PM
Project Code
Friday, September 21, 2018
Description
Location
Time 9:00AM to 5:00PM 9:00AM to 5:00PM
Project Code
Saturday, September 22, 2018
Description
Location
Expendables Siglat Hyrax Angtod
9:00AM to 5:00PM 9:00AM to 5:00PM 9:00AM to 5:00PM 9:00AM to 5:00PM

9:00AM to 5:00PM 9:00AM to 5:00PM 9:00AM to 5:00PM 9:00AM to 5:00PM

9:00AM to 5:00PM 9:00AM to 5:00PM 9:00AM to 5:00PM 9:00AM to 5:00PM

9:00AM to 5:00PM 9:00AM to 5:00PM 9:00AM to 5:00PM 9:00AM to 5:00PM

9:00AM to 5:00PM 9:00AM to 5:00PM 9:00AM to 5:00PM 9:00AM to 5:00PM

9:00AM to 5:00PM 9:00AM to 5:00PM 9:00AM to 5:00PM 9:00AM to 5:00PM


FP Lineman Foxtrot Jedi J1/Falcon
Winston
9:00AM to 5:00PM

9:00AM to 5:00PM

9:00AM to 5:00PM

9:00AM to 5:00PM

9:00AM to 5:00PM

9:00AM to 5:00PM
Compatibility Report for Scheduled Power Interruption on November 19-
24, 2018.xls
Run on 11/16/2018 16:39

The following features in this workbook are not supported by earlier versions of
Excel. These features may be lost or degraded when opening this workbook in
an earlier version of Excel or if you save this workbook in an earlier file format.

Minor loss of fidelity # of occurrences

Some cells or styles in this workbook contain formatting that is not supported 20
by the selected file format. These formats will be converted to the closest
format available.
Version

Excel 97-2003

S-ar putea să vă placă și