REPUBLIC OF THE PHILIPPINES

DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS


REGION V
CAMARINES SUR 5TH DISTRICT ENGINEERING OFFICE
BARAS, CANAMAN, CAMARINES SUR

LOCATION: DPWH CAMARINES SUR V DISTRICT ENGINEERING OFFICE,


BRGY. BARAS, CANAMAN, CAMARINES SUR

SUBMITTED BY: RECOMMENDING APPROVAL: APPROVED BY:

EDGAR R. BRIAGAS MAXIMO C. ELEDA EDY FERDINAND R. JOVEN


ENGINEER III ENGINEER III ASSISTANT DISTRICT ENGINEER
CHIEF-PLANNING AND DESIGN SECTION (ACTING ASSISTANT DISTRICT ENGINEER) (ACTING DISTRICT ENGINEER)
SUMMARY OF QUANTITIES TABLE OF CONTENTS

PART I FACILITIES FOR THE ENGINEER PART C FINISHING AND OTHER CIVIL WORKS

PART II OTHER GENERAL REQUIREMENTS 1007(1)a ALUMINUM FRAMED GLASS DOOR (Sliding Type) 7.00 sq.m.
- TITLE PAGE

PERSPECTIVE
B.5 PROJECT BILLBOARD / SIGNBOARD 1.00 each 1007(1)b ALUMINUM FRAMED GLASS DOOR (Swing Type) 18.00 sq.m. SUMMARY OF QUANTITIES
CANAMAN
B.7(1) OCCUPATIONAL SAFETY AND HEALTH PROGRAM 3.00 months 1008(1)a ALUMINUM FRAMED GLASS WINDOWS (Sliding Type) 6.50 sq.m. A1 SITE DEVELOPMENT PLAN
LOCATION PLAN
VICINITY MAP
PART III CIVIL, MECHANICAL, ELECTRICAL AND SANITARY/PLUMBING WORKS 1013(2)a2 FABRICATED METAL ROOFING ACCESSORY (Gauge 26, Flashing) 20.00 l.m. TABLE OF CONTENTS
LAND USE AND ZONING
PART A EARTHWORKS 1013(2)b1 FABRICATED METAL ROOFING ACCESSORY (Gauge 24, Gutter) 8.00 l.m. FLOOR PLAN
ROOF PLAN
@ CONSTRUCTION SECTION 801(1) REMOVAL OF STRUCTURES AND OBSTRUCTIONS 1.00 lumpsum 1014(1)b1 PRE-PAINTED METAL SHEETS (Corrugated Type, Long Span) 23.00 sq.m. SCHEDULE OF FLOOR FINISH
SCHEDULE OF WALL FINISH
FRONT ELEVATION
803(1)a STRUCTURE EXCAVATION (COMMON SOIL) 9.60 cu.m. 1018(1) GLAZED TILES AND TRIMS 6.00 sq.m.

804(4) GRAVEL FILL 3.40 cu.m. 1027(1) CEMENT PLASTER FINISH 156.00 sq.m.
A2 RIGHT SIDE ELEVATION
SCHEDULE OF DOORS AND WINDOWS
REFLECTED CEILING PLAN
SCHEDULE OF CEILING FINISH
PART B PLAIN AND REINFORCED CONCRETE WORKS 1032(1)a PAINTING WORKS (Masonry/Concrete) 470.00 sq.m. LIGHTING LEGEND
LOCATOR PLAN, QAS BUILDING
900(1)c2 STRUCTURAL CONCRETE (Footings & Slab on Fill) Class A, 28 Days 5.00 cu.m. 1032(1)b PAINTING WORKS (Wood) 238.00 sq.m.
SECOND FLOOR PLAN-ANDAYA III
900(1)c3 STRUCTURAL CONCRETE (Footing Tie Beam) Class A, 28 Days 0.35 cu.m. 1032(1)c PAINTING WORKS (Steel) 72.50 sq.m. LONGITUDINAL SECTIONS LINE AND GRADE
CROSS SECTION
900(1)c4 STRUCTURAL CONCRETE (Columns) Class A, 28 Days 1.10 cu.m. 1038(1) REFLECTIVE INSULATION 23.00 sq.m. A3 GROUND FLOOR PLAN-GAD BUILDING
DOORS AND WINDOW SCHEDULE-FMS
900(1)c6 STRUCTURAL CONCRETE (Beams/Girders) Class A, 28 Days 1.20 cu.m. 1046(2)a1 CHB NON-LOAD BEARING (Including Reinforcing Steel) 100mm 7.00 sq.m. NOTES
LOW PARTITION DETAILS-PDS/CONST.
902(1)a REINFORCING STEEL (Deformed) (Grade 40) 1,004.00 kgs. 1046(2)a2 CHB NON-LOAD BEARING (Including Reinforcing Steel) 150mm 54.50 sq.m.

903(1) FORMWORKS AND FALSEWORKS 1.00 lumpsum 1047(2)a STRUCTURAL STEEL (Trusses) 74.00 kgs. A4 DETAIL OF WALL PARTITIONS
CABINETS AND SHELVES DETAILS
ISOMETRIC DETAIL OF PARTITIONS AND
PART C FINISHING AND OTHER CIVIL WORKS 1047(2)b STRUCTURAL STEEL (Purlins) 254.00 kgs. TABLES
FLOOR PLAN-STORAGE
@ STORAGE ROOM/ 1001(8) SEWER LINE WORKS 1.00 lumpsum 1047(3)a METAL STRUCTURE ACCESSORIES (Bolts) 24.00 each ROOF PLAN-STORAGE
REFLECTED CEILING PLAN
PDS EXTENSION 1001(9) STORM DRAINAGE AND DOWNSPOUT 1.00 lumpsum 1047(6) METAL STRUCTURE ACCESSORIES (Steel Plates) 24.00 kgs. A5 ELEVATIONS
SECTIONS
ARCHITECTURAL

1002(4) PLUMBING FIXTURES 1.00 lumpsum 1047(7)b METAL STRUCTURE ACCESSORIES (Sagrods) 15.00 pcs. NOTES
DOORS AND WINDOWS SCHEDULE
1002(24) COLD WATER LINES 1.00 lumpsum PART D ELECTRICAL
GENERAL NOTES/SPECIFICATIONS
@ PLANNING AND DESIGN SECTION 1003(1)c2 CEILING (6mm Marine Plywood, Wood Frame) 36.00 sq.m. 1100(10) CONDUITS, BOXES AND FITTINGS 1.00 lumpsum
DESIGN CRITERIA
CONSTRUCTION NOTES
1003(11)a1 FASCIA BOARD (12.50mm Fiber Cement Board) 1101(33) 1.00 lumpsum S1 TIE BEAM DETAIL
1 PERSPECTIVE 1003(17)
11.00 m.

1.00 lumpsum 1102(1)


WIRES AND WIRING DEVICES

1.00 lumpsum
BAR BENDING DETAIL
COLUMN AND FOOTING DETAIL
A 1 NOT TO SCALE CARPENTRY AND JOINERY WORKS PANELBOARD WITH MAIN AND BRANCH BREAKERS WALL FOOTING DETAIL

1004(2) FINISHING HARDWARE 1.00 lumpsum 1103(1) LIGHTING FIXTURES AND LAMPS 1.00 lumpsum FOUNDATION PLAN-QAS
ROOF FRAMING PLAN STRUCTURAL
OVERLAPPING DETAIL
RAFTER DETAIL

S2 STRUT DETAIL
ROOF BEAM DETAILS

TO MAGARAO
COUNTER DETAILS
LIBMANAN AERONAUTICAL FOUNDATION PLAN-PDS
ACADEMY OF THE
PHILIPPINES-CANAMAN ROOF FRAMING PLAN
CAMPUS RAFTER DETAIL
REPAIR OF OFFICE INTERIOR FOR PLANNING
AND CONSTRUCTION SECTION, REPAIR OF
REPAIR/INSTALLATION OF PANTRY AND PLUMBING LAYOUT
DOORS AND WINDOWS IN ANDAYA III BUILDING
LABORATORY SHOWER IN MTQC BUILDING SAN JUAN WATERLINE LAYOUT
LEGEND
MARINER'S ISOMETRIC PLUMBING DIAGRAM
REPAIR OF STORAGE BUILDING FOR POLYTECHNIC
ISOMETRIC WATERLINE DIAGRAM
REPAIR OF DOORS FOR ACCOUNTING FUNDADO

P1
DPWH 1ST, 2ND
SECTION IN GAD BUILDING
PLANNING SECTION AND 5TH
COLLEGE
FOUNDATION SITE DEVELOPMENT PLAN SANITARY
DISTRICT
SAN NICOLAS
ENGINEERING ROOF DRAIN LAYOUT
OFFICES ISOMETRIC ROOF DRAIN LAYOUT
DPWH CAMARINES SUR V DISTRICT ENGINEERING OFFICE PAMPLONA VICINITY MAP
BAWA GENERAL NOTES/ SPECIFICATIONS
2.70
5.00 SAN ROQUE SITE LOCATION PLAN
SAN FRANCISCO
TO MAGARAO

LIGHTING LAYOUT 1
2.68

CR
2.38

MTQC ANDAYA III COMMUNAL


DPWH CS-II / TEMPORARY
OFFICES FOR PLANNNING, QAS,
CANAMAN POWER LAYOUT 1
GAD CR CONSTRUCTION & MAINTENANCE
COA
BUILDING BRGY.
BUILDING BUILDING BLDG SINGLE LINE DIAGRAM 1
M.R.F.
COVERED
GUARD
HOUSE
LINAGA
MAGARAO CHAPEL
SCHEDULE OF LOADS 1
GARAGE
SAN JOSE WEST TO CANAMAN PROPER
IQUIN TALIDTID DESIGN CRITERIA 1
GEN.SET TEMPORARY
ASSEMBLY AREA
(FLAG-RAISING) ELECTRICAL RISER DIAGRAM
DPWH CAMARINES SUR II
E1
FOR I.T.C.S. GARAGE

SAN JOSE EAST


DALURO SHELL LEGEND
BAC OFFICE
DISTRICT ENGINEERING OFFICE MANGAYAWAN
ELECTRICAL
FLAG
POLE
NOTES
GARAGE
PORO SANTA TERESITA SANTA CRUZ (POB.)
VILLA
LIGHTING LAYOUT 2
SUA
DPWH 2ND DEO STORAGE TIBGAO (POB.) SALVACION POWER LAYOUT 2
NEW BUILDING
POBLACION CANAMAN SUBDIVISION SCHEDULE OF LOADS 2
MOTORPOOL
MPB BUILDING
STORAGE
CAMALIGAN DEL ROSARIO GENERAL NOTES / SPECIFICATIONS
ANDAYA I BUILDING
AREA
(DPWH CS-II)
GAINZA BARAS (POB.) DESIGN CRITERIA 2
DINAGA (POB.) RJ VILLAGE
SUBDIVISION SINGLE LINE DIAGRAM 2
D.E. CS-I
SAN VICENTE
QUARTER
JULIE'S TO BRGY. CALAUAG, SECOND FLOOR POWER LAYOUT
SAN AGUSTIN
BAKESHOP NAGA CITY SECOND FLOOR LAN LAYOUT
DPWH CAMARINES SUR I LEGEND
E2
HARING
DISTRICT ENGINEERING OFFICE TO CAMALIGAN
SCHEDULE OF LOADS
LCC EXPRESS
D.E. CS-II
MART SITE DEVELOPMENT PLAN
DPWH CS-I
QUARTER PLANNING/CONST./ ANDAYA I BUILDING DPWH CS-I
VICINITY MAP

TO NAGA CITY
MAINTENANCE (DPWH CS-I) (MQCS)
BLDG
D.E. OFFICE LOCATION PLAN MECHANICAL
TO NAGA CITY

2 SITE DEVELOPMENT PLAN 3 VICINITY MAP 4 LOCATION PLAN


A 1 SCALE 1:1000M. A 1 NOT TO SCALE A 1 NOT TO SCALE

DESIGNED BY:
PROJECT TITLE AND LOCATION: SHEET CONTENTS: SUBMITTED BY: RECOMMENDING APPROVAL: APPROVED BY: SET NO.: SHEET NO.:
JOEY S. MAROLLANO
ENGINEER II
PERSPECTIVE
CADD BY:
SUMMARY OF QUANTITIES
BARAS, CANAMAN, CAMARINES SUR
SITE DEVELOPMENT PLAN HILDA CHARITO A. BELTRAN
ARCHITECT I
1 2
LOCATION PLAN EDGAR R. BRIAGAS MAXIMO C. ELEDA EDY FERDINAND R. JOVEN A 5
LOCATION: DPWH CAMARINES SUR V DISTRICT ENGINEERING
VICINITY MAP CHECKED BY:
ENGINEER III ENGINEER III ASSISTANT DISTRICT ENGINEER
11
TABLE OF CONTENTS SHARON A. PARAFINA CHIEF - PLANNING & DESIGN SECTION (ACTING ASSISTANT DISTRICT ENGINEER) (ACTING DISTRICT ENGINEER)
OFFICE, ARCHITECT II
1 2 1 2
1 2
0.80 0.90
0.30 2.70 0.70 0.45 0.45 0.40
2.70 VERIFY DRILLED HOLES FOR
ROOF APEX CEILING VENTILATION

0.40
VERIFY 1.65 1.05
0.60

0.90
1.00
TOP OF BEAM
QAS BUILDING QAS BUILDING

2.10

1.70
B NOT INCLUDED B

1.20
3.60
IN P.O.W.
PANTRY
1.03

1.21

2.40
E +0.20 m.
FF-1 FFL
LANDSCAPE
2.38 VERIFY

CF-1
D W W LINE OF SHOWER BELOW
1 1 2
WF-1

LINE OF SHOWER BELOW


SHOWER
ALUMINUM FRAMED GLASS DOOR,
1.20

W
E +0.18 m.

1.00
1
SINGLE SWING TYPE
SINK FF-1 FIN. FLR. LINE

0.20
1 SET REQ'D
WF-1
(NOT INCLUDED IN PROGRAM OF WORKS) (NOT INCLUDED IN PROGRAM OF (NOT INCLUDED IN PROGRAM
N.G.L. WORKS) OF WORKS)
A A
FRONT ELEVATION

0.15
SCHEDULE OF DOORS AND WINDOWS
W
VERIFY

2
ROOF LINE

ACU'S CONDENSING UNITS


3 PANTRY/QAS EXTENSION 6 PANTRY/QAS EXTENSION
A 2 SCALE 1:50mts. A 2 SCALE 1:40mts.
GAD BUILDING GAD BUILDING

0.60 0.85
B A
FLOOR PLAN 2.38 0.30 REFLECTED CEILING PLAN
1 PANTRY/QAS EXTENSION ROOF APEX
7 PANTRY/QAS EXTENSION
A 2 SCALE 1:50mts. A 2 SCALE 1:50mts.

TOP OF BEAM
1 2 SCHEDULE OF CEILING FINISH
CONCRETE
3.5mm THK. FIBER CEMENT BOARD CEILING ON WOODEN
GA. 26, CORR. G.I. ROOFING
NOT INCLUDED CF-1

3.61
COLUMN CEILING JOISTS AND SUPPORTS
3.10 VERIFY IN P.O.W.
GA. 26, G.I. WALL FLASHING

0.40 0.48
PERSPECTIVE @ SHOWER LIGHTING LEGEND
GA. 26, G.I. GUTTER 6 PANTRY/QAS EXTENSION

1.10
MASONRY
WALL A 2 NOT TO SCALE
QAS BUILDING FIN. FLR. LINE

0.20
N.G.L.
B FIREWALL FIREWALL PERIMETER FENCE
RIGHT SIDE ELEVATION
4 PANTRY/QAS EXTENSION
A 2 SCALE 1:50mts. OPEN
2.28

AREA
2.70

EQUIPMENT TESTING AREA T&B

LANDSCAPE
PHOTOCOPY
NEW PANTRY W/ COMPUTER

2 1
AREA
TABLE

A LABORATORY PANTRY

CABINET
0.42

SHOWER

CABINET
2.70 Q.A.S. ENGINEERS' Q.A.S.'
LABORATORY
LABORATORY AREA CHIEF
ROOF APEX
ACU'S CONDENSING UNITS
EXISTING
FILE
GAD BUILDING PIPES FILE
1.00

CABINET CABINET
SEAT
QAS BUILDING
STRUT

TABLE
GA. 26, G.I. WALL FLASHING TOP OF BEAM COMPUTER
TABLE

GA. 26, G.I. END FLASHING LINE OF CEILING/BOTTOM OF BEAM GAD BUILDING CURING
TANK
LABORATORY WATER
AIDES DISPENSER

CABINET
LABORATORY NOT INCLUDED BUDGET
ROOF PLAN SHOWER
MATERIAL'S RECEIVING
3.60

CABINET
IN P.O.W. CABINET
TESTING AREA
OFFICER
2 PANTRY/QAS EXTENSION 0.60 CABINET UNIT HEAD
2.40

A 2 SCALE 1:50mts. COMPUTER


TABLE
1.50

UP
1.10

PLANTBOX
VOID VOID VOID
0.85

3"THK. CONC.

SCHEDULE OF FLOOR FINISH FIN. FLR. LINE


TOPPING

W A L K W A Y
0.20

FF-1 PLAIN CEMENT FLOOR FINISH N.G.L.

CROSS SECTION LOCATOR PLAN, QAS BUILDING


SCHEDULE OF WALL FINISH 5 PANTRY/QAS EXTENSION 8 EXTENSION OF BUILDING FOR PANTRY AREA
A 2 SCALE 1:100mts.
WF-1 PLAIN CEMENT SMOOTH FINISH, PAINTED A 2 SCALE 1:50mts.
NOTE: THIS PROJECT SHALL FOLLOW DPWH SPECIFICATION 2012 EDITION

DESIGNED BY:
PROJECT TITLE AND LOCATION: SHEET CONTENTS: SUBMITTED BY: RECOMMENDING APPROVAL: APPROVED BY: SET NO.: SHEET NO.:
JOEY S. MAROLLANO
ENGINEER II
FLOOR PLAN SCHEDULE OF DOORS AND
ROOF PLAN WINDOWS CADD BY:
SCHEDULE OF FLOOR FINISH REFLECTED CEILING PLAN
BARAS, CANAMAN, CAMARINES SUR SCHEDULE OF WALL FINISH SCHEDULE OF CEILING
HILDA CHARITO A. BELTRAN
ARCHITECT I
2 3
FRONT ELEVATION FINISH EDGAR R. BRIAGAS MAXIMO C. ELEDA EDY FERDINAND R. JOVEN A 5
LOCATION: DPWH CAMARINES SUR V DISTRICT ENGINEERING
RIGHT SIDE ELEVATION LIGHTING LEGEND CHECKED BY:
ENGINEER III ENGINEER III ASSISTANT DISTRICT ENGINEER
11
LOCATOR PLAN, QAS SHARON A. PARAFINA CHIEF - PLANNING & DESIGN SECTION (ACTING ASSISTANT DISTRICT ENGINEER) (ACTING DISTRICT ENGINEER)
OFFICE, BUILDING ARCHITECT II
1 6
2 7
3 8
4 1 2 3 4 C B A
3 A 3 A 3 A
15.00 6.00
15.00
0.60
3.84 1.20 0.63 1.60 1.27 1.62 1.27 1.60 0.63 1.28 1.73 1.25 1.62 0.66
0.30
5.00 5.00 5.00

ACU ACU
W W W ACU ACU

C
3 2 2
WINDOW WINDOW WINDOW

0.39
ACU ACU

HANGING SHELVES
WINDOW

2.36
PHOTOCOPY FILE HANGING SHELVES HANGING SHELVES SINK
CABINET 3
4" THK. PLYWOOD CUBICLE PARTITIONS, PAINTED FINISH
AREA FILE FILE
EXISTING STORAGE CABINET

CABINETS CABINETS
PHOTO
COPY

0.76
PANTRY 1.00
3.00

FILE
4 CABINET CONSTRUCTION SECTION PLANNING AND DESIGN SECTION PANTRY
3
A 3 SEE DETAIL
A 3 DN

SLIDING DOOR

SLIDING DOOR

SLIDING DOOR
FIRE EXIT

2.00
LONGITUDINAL SECTION 01 CROSS SECTION 01
PUBLIC
C O R R I D O R RESTROOM

B
6.00

D
HANGING SHELVES
PHOTOCOPY
3 REPAIR OF OFFICE LAYOUT PDS AND CONSTRUCTION SECTION 6 PDS AND CONSTRUCTION SECTION

SHELVES
2 EPSON L1455 AREA
PRINTERS
T&B
EXISTING HANGING CABINET

T&B
5
SCALE 1:100mts. SCALE 1:100mts.

1.00
A 3 A 3

STORAGE CABINET
HANGING SHELVES
DOOR DN
A 3
3.00

D
FILE
CABINET
PLANNING AND
1 DESIGN CHIEF
FILE
CABINET

FILE

4 3 2 1 A B C
CABINET
PRINTERS
HANGING SHELVES HANGING SHELVES EPSON L1455 HANGING SHELVES

A EXISTING WINDOW

C A N O P Y
EXISTING WINDOW

C A N O P Y
ACU

15.00 6.00

0.30 0.08 0.30 0.08 0.08 0.35 0.08


0.90 2.11 1.39 3.68 1.17 0.98 0.88 2.65 0.65 2.25 0.85 2.02

SECOND FLOOR PLAN, ANDAYA III BUILDING DOOR DOOR WINDOW


ALUMINUM FRAMED SLIDING GLASS DOOR DOOR

REPAIR OF OFFICE LAYOUT PDS AND CONSTRUCTION SECTION

2.30
WINDOW
1

1.50
NEW

1.15
SCALE 1:100mts. SLIDING
ALUMINUM FRAMED SLIDING GLASS DOOR, 2 PANELS

1.00
A 3

0.76
GLASS
DOOR CONSTRUCTION
PANTRY PLANNING AND DESIGN SECTION LANDING CONSTRUCTION SECTION CHIEF PLANNING AND DESIGN

3.00 4.00 4.00 3.50


LONGITUDINAL SECTION 02 CROSS SECTION 02
4 REPAIR OF OFFICE LAYOUT PDS AND CONSTRUCTION SECTION 7 PDS AND CONSTRUCTION SECTION
SCALE 1:100mts. SCALE 1:100mts.
FILE FILE
CABINET CABINET
A 3 A 3
T&B T&B
CHIEF
3.00

D
ACCOUNTANT'S 3.00
D 7
OFFICE
6

PANTRY
1 2 3 4 A B C
WATER
DISPENSER

D
15.00 6.00
UP
4
D
5
3.00 0.85 2.33 1.85 1.98 1.59 1.05 1.84 0.53 1.95 0.95 0.85 2.02
2.02
9.00

3.00

ACCOUNTING / BUDGET STAFF

COMPUTER
TABLE NETWORK ROOM WINDOW DOOR DOOR DOOR
COMPUTER WINDOW
TABLE
FILE PRINTERS FILE
D D D

1.35
CABINETS 3 CABINETS PRINTERS
LOBBY FILE PHOTOCOPY PHOTO
4" THK. PLYWOOD CUBICLE PARTITIONS, PAINTED FINISH

1.00
4 CABINET 4 4 COPY
PHOTOCOPY

0.70
AREA BATTERY
AREA PACK CONSTRUCTION PLANNING PLANNING
COMPUTER
4.28

SHELF
TABLE CONSTRUCTION SECTION CHIEF CHIEF CHIEF PLANNING AND DESIGN
M.B.C.
BUDGET ACCOUNTING
3.00

CABINET
OFFICER STAFF ACCOUNTANT

LONGITUDINAL SECTION 03 CROSS SECTION 03


II
FILE SERVER AREA
CABINET

5 REPAIR OF OFFICE LAYOUT PDS AND CONSTRUCTION SECTION 8 PDS AND CONSTRUCTION SECTION
SCALE 1:100mts. SCALE 1:100mts.
1.00

CORRIDOR A 3 A 3

GROUND FLOOR PLAN NOTES:


1 FINANCIAL MANAGEMENT SECTION & ICTS * REPLACEMENT OF OFFICE LOW PARTITIONS FOR
A 3 SCALE 1:100M. PLANNING AND DESIGN SECTION AND INSTALLATION
OF NEW LOW PARTITIONS FOR CONSTRUCTION 3 3
4" THK. MARINE PLYWOOD 4" THK. MARINE PLYWOOD
SECTION. INCUDES DEMOLITION OF EXISTING CABINET 2"X2" S4S WOOD FRAME 2"X2" S4S WOOD FRAME
0.90 0.975 0.965 0.96 AND SHELVES AND RESTORATION OF PART OF ITS
CEILING ALONG GRID B FOR ANDAYA III BUILDING PLAN
* DEMOLITION OF PARTIAL WALL ALONG PDS CHIEF FOR
2.02 1.32 3.00
REPAIR OF PDS SECRETARY AREA. INCLUDES NEW WALL
PARTITION AND FIXED COUNTERS, PRINTER TABLES 1.00 1.00 0.65 0.65 0.38 0.60 0.38 0.60 0.38 0.60 2"
AND SHELVING SYSTEM (SEE DETAIL). 3
4" 3 0.60 0.05
4" 3
4"
* INSTALLATION OF HANGING SHELVES ALONG WALLS OF
2.165
2.145

2.115
2.16

CONSTRUCTION SECTION AND PLANNING SECTION (SEE

0.39

0.39

0.39
DETAIL)

4"
* INCLUDES REMOVAL OF OLD PARTITIONS

3
1.15

1.15

1.15
4"
3
* REPAINTING OF NEW PARTITIONS

0.76

0.76

0.76

0.76
F.F.L. * REWIRING OF CONVENIENCE OUTLETS AND
COMMUNICATION LINES TO NEW PARTITIONS
D D D D
4 5 6 7
* INSTALLATION OF SLIDING DOORS FOR CONSTRUCTION

ALUMINUM FRAMED GLASS DOOR, ALUMINUM FRAMED GLASS DOOR, ALUMINUM DOOR W/ SMOKED TYPE ACRYLIC ALUMINUM DOOR W/ SMOKED TYPE ACRYLIC
CHIEF'S OFFICE @ PLANNING CROSS SECTION @ CONSTRUCTION
HEAVY SWING TYPE, W/ ALUMINUM HEAVY SWING TYPE, W/ ALUMINUM
* REPLACEMENT OF STEEL WINDOWS TO ALUMINUM
TOP PANEL/MIRROR, W/ ALUMINUM JAMB & TOP PANEL/MIRROR, W/ ALUMINUM JAMB &
JAMB & ACCESSORIES JAMB & ACCESSORIES ACCESSORIES ACCESSORIES WINDOWS WITH GRILLES FOR PLANNING SECTION AND
4 SETS REQ'D 1 SET REQ'D 1 SET REQ'D 1 SET REQ'D REDUCING OF WINDOWS SIZE FOR CONSTRUCTION
SECTION.
LOW PARTITION DETAILS
DOORS AND WINDOW SCHEDULE * REPAIR OF DOOR FOR MAINTENANCE SECTION STAFF
TOILET TO ALUMINUM FRAMED DOOR. 9 PDS AND CONSTRUCTION SECTION
9 FINANCIAL MANAGEMENT SECTION, GAD BUILDING * AT ACCOUNTING SECTION REPLACEMENT OF A 3 SCALE 1:40mts.
SCALE 1:50mts. DOORS ONLY FROM DAMAGED WOODEN FLUSH
A 3
DOORS TO ALUMINUM FRAMED DOORS (SEE DETAIL).
NOTE: THIS PROJECT SHALL FOLLOW DPWH SPECIFICATION 2012 EDITION

DESIGNED BY:
PROJECT TITLE AND LOCATION: SHEET CONTENTS: SUBMITTED BY: RECOMMENDING APPROVAL: APPROVED BY: SET NO.: SHEET NO.:
JOEY S. MAROLLANO
ENGINEER II
SECOND FLOOR PLAN-ANDAYA III
LONGITUDINAL SECTIONS CADD BY:
CROSS SECTION
BARAS, CANAMAN, CAMARINES SUR GROUND FLOOR PLAN-GAD BUILDING
HILDA CHARITO A. BELTRAN
ARCHITECT I
3 4
DOORS AND WINDOW SCHEDULE-FMS EDGAR R. BRIAGAS MAXIMO C. ELEDA EDY FERDINAND R. JOVEN A 5
LOCATION: DPWH CAMARINES SUR V DISTRICT ENGINEERING
NOTES CHECKED BY:
ENGINEER III ENGINEER III ASSISTANT DISTRICT ENGINEER
11
LOW PARTITION DETAILS-PDS/CONST. SHARON A. PARAFINA CHIEF - PLANNING & DESIGN SECTION (ACTING ASSISTANT DISTRICT ENGINEER) (ACTING DISTRICT ENGINEER)
OFFICE, ARCHITECT II
REPLACEMENT OF CABINET
DRAWERS TO SWING CABINET
DOORS (SEE DETAIL)
BUILT-IN COUNTER AND LOW WALL 3
4" THK. MARINE
PARTITION USING 34" THK. MARINE PLYWOOD COUNTER
PLYWOOD AND WOOD SUPPORTS TOP W/ HINGE
3
4" THK. MARINE 3
4" THK. MARINE
3
4" THK. MARINE PLYWOOD PLYWOOD HANGING 3 3 PLYWOOD DOOR
HANGING SHELF W/ STEEL SHELF W/ STEEL 4" THK. MARINE 4"THK. MARINE 3
PLYWOOD PLYWOOD SHELVES 4" THK. MARINE
W BRACKET W BRACKET W PLYWOOD COUNTER
3 2 2
AND PARTITION
ACU ACU

HANGING SHELVES
PHOTOCOPY FILE HANGING SHELVES HANGING SHELVES
SINK
EXISTING STORAGE CABINET

AREA CABINET

0.30

0.30
3.44 2.54

1.08
PRINTER
TABLE 1
BUILT-IN COUNTER AND LOW WALL

2.02
PARTITION USING 43" THK. MARINE
0.30 FILE PLYWOOD AND WOOD SUPPORTS
CABINET PANTRY
3
DN 4" THK. MARINE

4"
3
25mm
PLYWOOD
2.21 FIRE EXIT
0.60 1.60 0.60 0.60 1.62 0.60 0.60 1.60 0.60

SLIDING DOOR

SLIDING DOOR

SLIDING DOOR
3 3 2"X2" S4S GOOD
25mm 25mm 4" 25mm 25mm 4" 25mm 25mm
LUMBER SUPPORTS
1.39

0.60

DEMOLITION OF EXISTING CABINET AND


C O R R I D O R 1.10
0.11

RESTORATION OF DAMAGED CEILING


4"
3

0.40
3
4" THK. MARINE
@ PDS, SECRETARY'S AREA

0.30
D
PLYWOOD
0.60
2
HANGING SHELVES BUILT-IN COUNTER AND LOW WALL
PHOTOCOPY

0.95
EPSON L1455
1.55 PARTITION USING 43" THK. MARINE

SHELVES
0.83
AREA 2"X2" S4S GOOD

0.73
PRINTERS
3 T&B PLYWOOD AND WOOD SUPPORTS AND
4" LUMBER SUPPORTS

EXISTING STORAGE CABINET


T&B PRINTER TABLE (SEE DETAIL)

1.15
0.60
EXISTING HANGING CABINET

PRINTER TABLE 1

2.25
DOOR
3 0.95 0.55 0.05
4"
THK. MARINE 2.78

HANGING SHELVES
2.48
PLYWOOD HANGING
SHELF W/ STEEL
D @ CONSTRUCTION SECTION
0.30 1

BRACKET 2.78
FILE
25mm

CABINET
3 1.55 1.38 PLANNING AND
4" 3
PRINTER TABLE 2 FILE DESIGN CHIEF 4" THK. MARINE
3.60 0.26 CABINET DRYWALL PLYWOOD
1.49

0.65
0.60

0.60
PRINTERS PARTITION
HANGING SHELVES HANGING SHELVES EPSON L1455 HANGING SHELVES
0.30

0.60

0.60
ACU
2"X2" S4S GOOD
EXISTING WINDOW EXISTING WINDOW
LUMBER SUPPORTS

C A N O P Y C A N O P Y

3 3 3
4" THK. MARINE PLYWOOD 4" THK. MARINE 4" THK. MARINE PLYWOOD
HANGING SHELF W/ STEEL PLYWOOD PRINTER HANGING SHELF W/ STEEL
BRACKET CABINET (SEE DETAIL) BRACKET
PRINTER TABLE 2
@ CONSTRUCTION SECTION
1 DETAIL OF WALL PARTITIONS
A 4 SCALE 1:50mts.

3
4" THK. MARINE
PLYWOOD
1.10
3/4" THK.
0.55 0.55 MARINE PLYWOOD
3
4"THK. MARINE PLYWOOD
PARTITION AND COUNTER W/
2"X2" S4S SUPPORT
0.60 1.10 0.95

0.05 0.55
0.48

0.18

0.18
SHELF SHELF
@ PLANNING AND DESIGN SECTION
0.95

0.18

0.18
3/4" THK. 3/4" THK.
0.70

0.70
MARINE PLYWOOD MARINE PLYWOOD SHELF SHELF
EXISTING

0.24

0.24
0.47
0.39

SHELF SHELF
0.04

0.10

0.10
PLAN FRONT/REAR SIDES 3 ISOMETRIC DETAIL OF PARTITIONS AND TABLES
SCALE 1:50mts.
1.15

REPLACEMENT OF DRAWERS
A 4
0.60

0.64

INTO CABINET DOORS SWING


PRINTER TABLE 1
0.76

TYPE W/ HINGES AND DOOR


HANDLE, PAINTED FINISH 3/4" THK.
MARINE PLYWOOD
1.55
1.55

1.34

0.39 0.39 0.65 0.45 0.45 0.60


0.10

@ CONSTRUCTION SECTION 3/4" THK.


0.60

MARINE PLYWOOD
0.43
0.50

0.50
3/4" THK.
MARINE PLYWOOD
0.10

0.10
0.65 0.45 0.45

PLAN FRONT/REAR SIDES


PRINTER TABLE 2

2 CABINETS AND SHELVES DETAIL


A 4 SCALE 1:25mts.
NOTE: THIS PROJECT SHALL FOLLOW DPWH SPECIFICATION 2012 EDITION

DESIGNED BY:
PROJECT TITLE AND LOCATION: SHEET CONTENTS: SUBMITTED BY: RECOMMENDING APPROVAL: APPROVED BY: SET NO.: SHEET NO.:
JOEY S. MAROLLANO
ENGINEER II
DETAIL OF WALL PARTITIONS
CABINETS AND SHELVES DETAILS CADD BY:
ISOMETRIC DETAIL OF PARTITIONS AND TABLES
BARAS, CANAMAN, CAMARINES SUR
HILDA CHARITO A. BELTRAN
ARCHITECT I
4 5
EDGAR R. BRIAGAS MAXIMO C. ELEDA EDY FERDINAND R. JOVEN A 5
LOCATION: DPWH CAMARINES SUR V DISTRICT ENGINEERING
CHECKED BY:
ENGINEER III ENGINEER III ASSISTANT DISTRICT ENGINEER
11
SHARON A. PARAFINA CHIEF - PLANNING & DESIGN SECTION (ACTING ASSISTANT DISTRICT ENGINEER) (ACTING DISTRICT ENGINEER)
OFFICE, ARCHITECT II
1 2 3 1 2 3 1 2
2 3
5.00 5.00 A 3
5.00
2.50 2.50 2.50 2.50

2 CHB PARAPET 2
EXISTING ELEC. POST EXISTING ELEC. POST 2.50 2.50
A 3 A 3
LINE OF CONCRETE CANOPY CONCRETE CANOPY EXISTING ELEC. POST
EXISTING PERIMETER WALL
B B B

0.706
2 0.50 2 0.50

0.71
A 3 A 3
STORAGE ROOM 0.50
2.67

2.67
2.57
RWCS RWCS
EXISTING SEPTIC TANK
D
3
0.72
2 CF-1
A A A 3

2.67
W W
1.50

0.95
1 5.00 1

1.30
PUBLIC TOILET
EXISTING ROOF
2.28
PUBLIC TOILET A
5.00

ANDAYA III BUILDING ANDAYA III BUILDING

4.07
FIRE EXIT ABOVE FIRE EXIT ABOVE
REFLECTED CEILING PLAN
COVERED PARKING COVERED PARKING 3 STORAGE ROOM/PDS EXTENSION
A 4 SCALE 1:50mts.

SCHEDULE OF CEILING FINISH


FLOOR PLAN ROOF PLAN CF-1 3.5mm THK. FIBER CEMENT BOARD CEILING ON WOODEN CEILING JOISTS AND SUPPORTS
1 STORAGE ROOM/PDS EXTENSION 2 STORAGE ROOM/PDS EXTENSION
A 4 SCALE 1:100mts. A 4 SCALE 1:100mts. LIGHTING LEGEND

1 2 3 A B B A 1 2 3
5.00 EXISTING ELEC. POST 5.00
CONCRETE CANOPY CONCRETE CANOPY
2.50 2.50 2.67 CHB PARAPET WALL 2.67 2.50 2.50
CONCRETE CANOPY
ROOF APEX ROOF APEX ROOF APEX ROOF APEX
0.70

0.70

0.70
ANDAYA III
TOP OF BEAM TOP OF BEAM TOP OF BEAM TOP OF BEAM
BUILDING
0.704
0.20

0.20

0.20
3.20

3.20

3.20
PUBLIC TOILET PUBLIC TOILET

2.58
RWCS RWCS
2.20

2.20

2.20
2.00

2.00
0.10

0.10

0.10
FIN. FLR. LINE FIN. FLR. LINE FIN. FLR. LINE FIN. FLR. LINE STORAGE ROOM/PDS EXTENSION

N.G.L. N.G.L. 0.95 0.706 N.G.L. 2.57 0.95 N.G.L.


1.50
2.67

FRONT ELEVATION RIGHT-SIDE ELEVATION LEFT-SIDE ELEVATION LONGITUDINAL SECTION


4 STORAGE ROOM/PDS EXTENSION 5 STORAGE ROOM/PDS EXTENSION 6 STORAGE ROOM/PDS EXTENSION 7 STORAGE ROOM/PDS EXTENSION
A 4 SCALE 1:100mts. A 4 SCALE 1:100mts. A 4 SCALE 1:100mts. A 4 SCALE 1:100mts.

2.25
1.13 1.13

NOTES: 0.80 1.30 0.68 2.275 1.85 1.23


0.60 0.60 0.55 0.55 0.55 0.55 0.93 0.93 0.62 0.62

B A

0.40
* CONSTRUCTION OF

0.575
STORAGE ROOM/PDS

1.00
EXTENSION BUILDING.
10mm SQUARE BAR HORIZONTAL
* ROOF EAVES TO MEET
2.36
2.10

2.06
2.00

2.00

2.00
GRILLES SPACED @ 0.10m.
1.95

1.90

1.90
ROOF APEX WITH EXISTING ROOF ON CENTER

1.60
0.70

1.325
EAVES OF ADJACENT
TOP OF BEAM 10mm SQUARE BAR HORIZONTAL 10mm SQUARE BAR HORIZONTAL

0.90
TOILET INSTALLED WITH GRILLES SPACED @ 0.10m. GRILLES SPACED @ 0.10m.
0.20

G.I. GUTTER IN BETWEEN. ON CENTER ON CENTER


3.20

F.F.L.
2.20

D D D D W W W
1 2 3 8 1 2 3
0.10

STORAGE ROOM/
FIN. FLR. LINE PDS EXTENSION ALUMINUM FRAMED GLASS DOOR, ALUMINUM FRAMED GLASS DOOR, ALUMINUM FRAMED GLASS DOOR, ALUMINUM DOOR W/ SMOKED TYPE ACRYLIC TOP
N.G.L. SINGLE SLIDING TYPE W/ ONE FIXED PANELS AND ONE SLIDING PANEL DOUBLE SWING TYPE PANEL/MIRROR, W/ ALUMINUM JAMB & ACCESSORIES
1 SET REQ'D 1 SET REQ'D 1 SET REQ'D 1 SET REQ'D
@ MAINTENANCE SECTION STAFF TOILET

CROSS SECTION DOORS AND WINDOW SCHEDULE


8 STORAGE ROOM/PDS EXTENSION
A 4 SCALE 1:100mts. 9 PLANNING, CONSTRUCTION & MAINTENANCE SECTION
A 4 SCALE 1:50mts.
NOTE: THIS PROJECT SHALL FOLLOW DPWH SPECIFICATION 2012 EDITION

DESIGNED BY:
PROJECT TITLE AND LOCATION: SHEET CONTENTS: SUBMITTED BY: RECOMMENDING APPROVAL: APPROVED BY: SET NO.: SHEET NO.:
JOEY S. MAROLLANO
ENGINEER II
FLOOR PLAN-STORAGE
ROOF PLAN-STORAGE CADD BY:
REFLECTED CEILING PLAN
BARAS, CANAMAN, CAMARINES SUR ELEVATIONS
HILDA CHARITO A. BELTRAN
ARCHITECT I
5 6
SECTIONS EDGAR R. BRIAGAS MAXIMO C. ELEDA EDY FERDINAND R. JOVEN A 5
LOCATION: DPWH CAMARINES SUR V DISTRICT ENGINEERING
NOTES CHECKED BY:
ENGINEER III ENGINEER III ASSISTANT DISTRICT ENGINEER
11
DOORS AND WINDOWS SCHEDULE SHARON A. PARAFINA CHIEF - PLANNING & DESIGN SECTION (ACTING ASSISTANT DISTRICT ENGINEER) (ACTING DISTRICT ENGINEER)
OFFICE, ARCHITECT II
GENERAL NOTES/SPECIFICATIONS: DESIGN CRITERIA CONSTRUCTION NOTES 3-50mm, 3-100mm, 3-150mm
AND REST @ 200mm O.C.
REMOVAL EXCAVATION SHALL CONSIST OF EXCAVATION FOR I. LOADINGS A. GENERAL
FOUNDATION AND WALL FOOTING A. DEAD LOAD 1. CONSTRUCTION NOTES AND TYPICAL DETAILS APPLY TO ALL DRAWINGS UNLESS OTHERWISE
F.F.L.
SHOWN OR NOTED. MODIFY TYPICAL DETAILS AS DIRECTED TO MEET SPECIAL CONDITIONS.

0.20
ALL MATERIALS FOR EMBANKMENT SHALL NOT CONTAIN ANY STUMP, N.G.L.
BRUSHWEED, ROOT, TURF, CLOD AND OTHER ORGANIC MATERIALS. 2. SHOP DRAWINGS WITH ERECTION AND PLACING DIAGRAMS OF ALL STRUCTURAL STEELS,
150mm THK. CHB WALL - 2.73 kPa
EARTHFILL MATERIALS SHALL MAKE DUE ALLOWANCE FOR CONSOLIDATION 100mm THK. CHB WALL - 2.11 kPa MISCELLANEOUS IRON, PRE-CAST CONCRETE ETC. SHALL BE SUBMITTED FOR ENGINEERS 5-16mm RBS
APPROVAL BEFORE FABRICATION. EITHERWAY
AND SETTLEMENT WHETHER COMPACTION IS SPECIFIED OR NOT BE LESS

0.75
B. LIVE LOAD

1.00
THAN LEVELS AND DIMENSIONS SHOWN ON THE PLAN. ROOF - 1.00 kPa 3. CONTRACTOR SHALL VERIFY ALL DIMENSIONS BEFORE ALL WORK IS TO BEGIN CHECK WITH
CLASSROOMS - 1.90 kPa MECHANICAL AND ELECTRICAL CONTRACTORS FOR CONDUITS PIPE SLEEVES, ETC., TO BE
REINFORCED CONCRETE SHALL CONSIST OF FURNISHING, PLACING AND CORRIDORS ON GROUND - 4.80 kPa EMBEDDED IN CONCRETE.

0.25
CONCRETE IN BUILDING AND RELATED STRUCTURES, AND WATER SUPPLY C. WIND LOAD (NSCP 2010) 4. IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO PROVIDE ADEQUATE SHORING & BRACINGS
STRUCTURES IN ACCORDANCE WITH THIS SPECIFICATION AND CONFORMING V = 250 kph OF THE STRUCTURE FOR ALL LOADS THAT MAYBE IMPOSED DURING CONSTRUCTION.
TO THE LINES, GRADES AND DIMENSIONS SHOWN ON THE PLANS. P = qh [ (GCpf) - (GCpi) ] (DESIGN WIND PRESSURE)
0.80

CONCRETE MASONRY BLOCKS MAY BE RECTANGULAR OR SEGMENTED


WHERE: qh = VELOCITY PRESSURE, kPa B. CONCRETE & REINFORCEMENT SECTION
GCpf = EXTERNAL PRESSURE COEFFICIENT 1. ALL MATERIALS AND WORKMANSHIP SHALL CONFORM WITH THE LATEST BUILDING CODE OF 4-16mm VERTICAL
AND WHEN SPECIFIED,SHALL HAVE ENDS SHAPED TO PROVIDE INTERLOCK AT GCpi = INTERNAL PRESSURE COEFFICIENT BARS W/ 10mm TIES 0.30 0.20 0.30
VERTICAL JOINTS HOLLOW BLOCKS SHALL CONFORM TO THE REQUIREMENTS AMERICAN CONCRETE INSTITUTE (ACI-318). SPACED @ 3-50mm,
D. SEISMIC LOAD (NSCP 2010) 3-100mm, 3-150mm
OF ASTM C 90, GRADE AS SPECIFIED. 2. ALL CONCRETE SHALL DEVELOP A MIN. COMPRESSIVE STRENGTH AT THE END OF TWENTY EIGHT AND REST @ 200mm

0.30
V = Cvl W (DESIGN BASE SHEAR) (28) DAYS W/ CORRESPONDING MAXIMUM SIZE AGGREGATE & SLUMPS AS FOLLOWS. O.C.
RT
CORRUGATED METAL ROOFING SHALL CONSIST OF FURNISHING ALL

0.80

0.20
MATERIALS AND LABOR REQUIRED TO PROPERLY PERFORM AND COMPLETE Vmax = 2.50 Cal W Vmin = 0.11 Cal W LOCATION 28 DAYS STRENGTH MAX. SIZE AGGREGATE MAX. SLUMP
R Vmin = 0.80 ZN vl W (ZONE 4)

0.30
5-16mm RBS
THE CORRUGATED METAL ROOFING TOGETHER WITH RELATED ACCESSORIES
R FOUNDATION FOOTING 20.7 Mpa(3000 PSI) 3/4 IN. (19 MM) 4 IN. (100 MM) EITHERWAY
SUCH AS RIDGE/HIP ROLLS, VALLEY, GUTTERS AND FLASHING WHEN CALLED
FOR ON PLANS ALL IN CONFORMITY WITH SPECIFICATION. II. DESIGN STRESSES ELEVATOR SHAFT 20.7 Mpa(3000 PSI) 3/4 IN. (19 MM) 4 IN. (100 MM) 0.80
A. CONCRETE COLUMNS 20.7 Mpa(3000 PSI) 3/4 IN. (19 MM) 4 IN. (100 MM) PLAN
CEMENT PLASTER FINISH SHALL CONSIST OF FURNISHING ALL CEMENT
( SEE CONSTRUCTION NOTES ) BEAMS, SLABS 20.7 Mpa(3000 PSI) 3/4 IN. (19 MM) 4 IN. (100 MM) C1F1
B. REINFORCING BARS SLAB ON GRADE 17.2 Mpa(2500 PSI) 3/4 IN. (19 MM) 4 IN. (100 MM)
PLASTER MATERIALS, LABOR, TOOLS, AND EQUIPMENTS REQUIREMENT IN 10mm TIES SPACED @ 3-50mm,
( SEE CONSTRUCTION NOTES ) 3-100mm, 3-150mm AND REST @
UNDERTAKING CEMENT PLASTER FINISH AS SHOWN IN PLANS AND 200mm O.C.
C. STRUCTURAL STEEL, ASTM-A36 3. ALL REINFORCING BARS SHALL CONFORM TO ASTM A615 GRADE 33 FOR DIAMETER 12 &
ACCORDANCE WITH SPECIFICATION.
FOR TRUSSES, BRACINGS & STRUTS fy = 248 MPa (36,000 psi)
SMALLER BARS AND GRADE 40 FOR DIA. 16 AND LARGER BARS. F.F.L.

0.15
CARPENTRY AND JOINERY WORKS SHALL CONSIST OF FURNISHING ALL D. PURLINS
4. IN GENERAL THE LATEST EDITION OF ACI-315, MANUAL OF STANDARD PRACTICE N.G.L.
REQUIRED MATERIALS, FABRICATED WOODWORK, TOOLS, EQUIPMENT AND COLD FORMED LIGHT GAGE SHAPES fy = 248 MPa (36,000 psi)
E. MASONRY UNIT (CHB) DETAILING REINFORCED CONCRETE STRUCTURES SHALL BE ADHERED TO UNLESS
LABOR AND PERFORMING ALL OPERATIONS NECESSARY FOR THE
SATISFACTORY COMPLETION OF ALL CARPENTRY AND JOINERY WORKS IN ( SEE CONSTRUCTION NOTES ) OTHERWISE SHOWN OR NOTED. 6-16mm RBS

0.95
5. MAINTAIN MINIMUM CONCRETE COVER FOR REINFORCING STEEL AS FOLLOWS. EITHERWAY
STRICT ACCORD WITH APPLICABLE DRAWINGS DETAILS AND THESE E. WELDS-USED E-60xx ELECTRODE

1.20
SPECIFICATION. F. STRUCTURAL BOLTS, ASTM-A307 SUSPENDED SLABS---------------------------------------3/4 IN. (19 MM)
a. Ft = 96.60 MPa (14,000 psi) b. Fv = 69 MPa (10,000psi)
PORTLAND CEMENT CONCRETE PAVEMENT SHALL CONSIST OF PAVEMENT SLAB ON GRADE--------------------------------------------1 1/2 IN. (38 MM)
WITH OR WITHOUT REINFORCEMENT CONSTRUCTED ON THE PREPARED BASE IN WALLS ABOVE GRADE-----------------------------------1 IN. (25 MM)

0.25
ACCORDANCE WITH THIS PLAN AND SPECIFICATION AND IN CONFORMITY WITH III. FOUNDATION BEAM STIRRUPS AND COLUMN TIES---------------1 1/2 IN. (38 MM)
ASSUMED ALLOWABLE SOIL BEARING CAPACITY IS EQUAL TO 95.76 kPa.
LINES, THICKNESS, GRADES AND TYPICAL CROSS SECTION SHOWN ON THE WHERE CONCRETE IS EXPOSED TO
PLANS. WATER USED FOR MIXING, CURING OR OTHER DESIGNATED APPLICATION EARTH BUT POURED AGAINST FORMS
NOTES:
SHALL BE REASONABLY CLEAN AND FREE OF OIL SALT, ACID, ALKALI, GRASS OR WHERE CONCRETE IS DEPOSITED
0.80
1. SOIL TEST SHALL BE CONDUCTED PRIOR TO START OF SECTION
OTHER SUBSTANCES INJURIOUS TO THE FINISH PRODUCT. WATER WILL BE DIRECTLY AGAINST EARTH-------------------------3 IN. (75 MM)
CONSTRUCTION.
TESTED IN ACCORDANCE WITH AND SHALL MEET THE REQUIREMENTS OF ITEM 6. SPLICES SHALL BE SECURELY WIRED TOGETHER & SHALL LAP OR EXTEND IN 4-16mm VERTICAL BARS W/ 0.33 0.15 0.33
2. IN CASE THE ACTUAL SOIL BEARING CAPACITY IS
714. WATER WHICH IS DRINKABLE MAY BE USED WITHOUT TEST. FINE 10mm TIES SPACED @ 3-50mm,
FOUND LESS THAN THE ASSUMED, 95.76 kPa., NOTIFY ACCORDANCE W/ TABLE 1 (TABLE OF LAP SPLICE & ANCHORAGE LENGTH) UNLESS 3-100mm, 3-150mm AND REST @
AGGREGATES SHALL CONSIST OF NATURAL SAND, STONE, SCREENING OR OTHER 200mm O.C.

0.33 0.15 0.33


THE DESIGNER FOR PROPER REVISION OF FOUNDATION OTHERWISE SHOWN ON DRAWINGS, SPLICES SHALL BE STAGGERED WHENEVER
INERT MATERIALS WITH SIMILAR CHARACTERISTICS OR COMBINATIONS
3. NO FOOTING SHALL REST ON FILL. POSSIBLE.
THEREOF HAVING HARD, STRONG, AND DURABLE PARTICLES, FINE AGGREGATES 5-16mm RBS
SHALL BE FREE FROM INJURIOUS AMOUNT OF ORGANIC IMPURITIES. COARSE 7. ALL ANCHOR BOLTS, DOWELS, AND OTHER INSERTS, SHALL BE PROPERLY POSITIONED & EITHERWAY

0.80
AGGREGATES SHALL CONSIST OF CRUSHED STONE, GRAVEL BLAST FURNACE SECURED IN PLACE PRIOR TO PLACING OF CONCRETE.
SLAG, OR OTHER APPROVED INERT MATERIALS OF SIMILAR CHARACTERISTIC OR 8. CONTRACTOR SHALL NOTE AND PROVIDE ALL MISCELLANEOUS CURBS, SILLS, STOOLS,
COMBINATIONS THEREOF HAVING HARD, STRONG DURABLE PIECES AND FREE EQUIPMENT'S AND MECHANICAL BASES THAT ARE REQUIRED BY THE ARCHITECTURAL, 0.80

FROM ANY ADHERENT COATINGS. ELECTRICAL, AND MECHANICAL DRAWINGS. PLAN


9. ALL CONCRETE SHALL BE KEPT MOIST FOR A MINIMUM OF SEVEN CONSECUTIVE DAYS C2F1
IMMEDIATELY AFTER POURING BY THE USE OF WET BURLAP FOG SPRAYING, CURING
COMPOUNDS OR OTHER APPROVED METHODS. 3 COLUMN AND FOOTING DETAIL
10. STRIPPING OF FORMS AND SHORES: S 1 SCALE 1:30mts.
FOUNDATION------------------------------------------------24 HOURS
SUSPENDED SLAB EXCEPT WHEN 10mm
VERTICAL AND
0.15 ADDITIONAL LOADS ARE IMPOSED------------------8 DAYS HORIZONTAL
10mm VERTICAL AND
BARS @ 0.60 m.
HORIZONTAL BARS @ WALLS---------------------------------------------------------18 HOURS O.C.
0.60 m. O.C.
BEAMS---------------------------------------------------------14 DAYS DOWEL BARS TO
4-16mm MAIN BARS W/ MAIN BAR END HOOKS STIRRUP AND TIE HOOKS MATCH VERT.
10mm STIRRUPS (ALL GRADES) (ALL GRADES) BARS
SPACED @ 3-50mm,
3-100mm, 3-150mm BAR SIZE DIAMETER BAR SIZE DIAMETER
C. FOUNDATION

0.20

0.20
&REST @ 200mm O.C. (DEFORMED) (mm)
D+2db L L
(DEFORMED) (mm)
D+2db L L 1. FOUNDATION DESIGN WAS BASED ON ASSUMED SOIL BEARING CAPACITY OF 95.76KPA
0.20

3-10mm
0.30

10mm 60 75 125 150 10mm 40 125 85 100 BOTTOM


BARS

0.40

0.40
12mm 75 100 150 200 12mm 50 165 115 115 D. CONSTRUCTION JOINTS IN CONCRETE

0.20

0.20
16mm 95 125 175 250 16mm 65 200 140 150
0.20
20mm 115 150 200 300 20mm 115 250 165 300 1. WHERE CONSTRUCTION JOINT IS TO BE MADE, THE SURFACE OF CONCRETE SHALL BE CLEANED
0.40 0.53
TB 25mm 150 200 230 450 25mm 150 365 230 405 AND ALL LAITANCE AND STANDING WATER REMOVED. SHEAR KEY SHALL BE PROVIDED AT THE
28mm 240 300 300 550 JOINT. WF1 WF2
32mm 300 335 450 600

1 TIE BEAM DETAIL 4 WALL FOOTING DETAIL


S 1 SCALE 1:25mts. 2 BAR BENDING DETAILS S 1 SCALE 1:25mts.
S 1 NOT TO SCALE
NOTE: THIS PROJECT SHALL FOLLOW DPWH SPECIFICATION 2012 EDITION
DESIGNED BY:
PROJECT TITLE AND LOCATION: SHEET CONTENTS: SUBMITTED BY: RECOMMENDING APPROVAL: APPROVED BY: SET NO.: SHEET NO.:
JOEY S. MAROLLANO
ENGINEER II
GENERAL NOTES/SPECIFICATIONS
DESIGN CRITERIA CADD BY:

BARAS, CANAMAN, CAMARINES SUR


CONSTRUCTION NOTES
TIE BEAM DETAIL
HILDA CHARITO A. BELTRAN
ARCHITECT I
1 7
BAR BENDING DETAIL EDGAR R. BRIAGAS MAXIMO C. ELEDA EDY FERDINAND R. JOVEN S 2
LOCATION: DPWH CAMARINES SUR V DISTRICT ENGINEERING COLUMN AND FOOTING DETAIL
CHECKED BY:
ENGINEER III ENGINEER III ASSISTANT DISTRICT ENGINEER
11
WALL FOOTING DETAIL
ARIS C. ABERGOS CHIEF - PLANNING & DESIGN SECTION (ACTING ASSISTANT DISTRICT ENGINEER) (ACTING DISTRICT ENGINEER)
OFFICE, ENGINEER II
0.10
1 2 2 GA. 26, G.I. FLASHING
1 1 2 3
GA. 26, CORRUGATED G.I. ROOFING
5.00

PARAPET
2.70 EXISTING ELEC. POST
2.70 VERIFY 2.50 2.50
2-2"X4"X2.00mm THK. RAFTERS
0.10m. THK. CONCRETE PAVEMENT
WITH 10mm RSB TEMPERATURE
VERIFY 1.65 1.05 2"X4"X2.00mm. THK. C-PURLINS W/
B ROOFING
0.15

0.10
0.60 2"X3/16" ANGLE BAR CLEATS PURLINS
BARS SP. @ 0.60m. ON CENTER
3.14
0.60 WF2 WF2

0.20
GA. 26, G.I. GUTTER

2"X3/16" ANGLE BAR STRUT


EXISTING FASCIA BOARD BEAM
QAS BUILDING PIPES C2F1 C2F1 C2F1 2"X2"X4.5mm THK. ANGLE
BAR SUPPORT, BOLTED ON

WF1

WF1
C1F1

2.67

WALL
ROOF BEAM W/ 10mm
B RWCS
BARS SP. @ 0.60m.
EXPANSION BOLTS SP. @
0.30 m. O.C.
ON CENTER B.W.

1.21
SPOT DETAIL 01

0.30
WF1
2.38 VERIFY

0.30
A 11 STORAGE/PDS EXTENSION
TB

SCALE 1:15mts.
WF1
S 2
LINE OF CEILING/BOTTOM OF BEAM 0.20 WF1 WF1

1.00
C2F1
C2F1 C2F1
A RAFTER DETAIL 1
TB FOUNDATION PLAN

0.15
2"X4"X1.50mm THK.
C1F1
4 PANTRY/QAS EXTENSION GA. 26, CORRUGATED G.I.
2 C-PURLINS SPACED AT
C1F1
SCALE 1:25mts.
8 STORAGE ROOM/PDS EXTENSION ROOFING SHEETS
0.55m. ON CENTER
S 2
S 2 SCALE 1:50mts.
GAD BUILDING
2.35 (VERIFY)
(5 EQUAL PARTS) ROOFING
0.47 0.47 0.47 0.47 0.46 PURLINS

1 2 12
3
FOUNDATION PLAN 5.00
S 2

1 PANTRY/QAS EXTENSION

0.70
2.50 2.50
S 2 SCALE 1:50mts. 2-2"X4"X2.00mm THK.
C-RAFTERS
B
RB2 RB2
3
2" X 2" X 16 " THK. ANGLE BAR
TOP, BOT. & WEB MEMBERS
0.50
2-2"X4"X2.00mm THK.
RAFTERS SPOT DETAIL 02
EXISTING ELECTRICAL 12 STORAGE/PDS EXTENSION
1 2

RB2 RB3
POST

2"X4"X2.00mm THK. C-PURLINS SP.


STRUT DETAIL S 2 SCALE 1:10mts.

RB2
2.67

CONCRETE CANOPY
@ 0.60n. ON CENTER 5 PANTRY/QAS EXTENSION 2"X4"X2.00mm THK.
C-PURLINS SP. @ 0.55m. ON
2-2"X4"X2.00mm THK. 3.10 VERIFY S 2 SCALE 1:25mts. CENTER

1.50
RAFTERS

SAGROD, STAGGERED 0.60


0.40
SAGROD, STAGGERED RB2 RB2 CERAMIC TILE FINISH

1 3-50mm, 3-100mm, 3-150mm AND 2 A 3" THK. CONCRETE COUNTER

0.60
G U T T E R
REST @ 200mm O.C. W/ 10mm RSB MATTING
QAS BUILDING 2.70 SPACE @ 0.20m ON CENTER
TAP TO EXISTING BEAM 0.20 0.20 2.20 0.30 0.20 BOTHWAYS
B 1.20
0.30

0.30

0.80
RB1 (QAS) ROOF FRAMING PLAN CHB WALL
RB1
2.28

F.F.L.
9 STORAGE ROOM/PDS EXTENSION
S 2 SCALE 1:50mts. SECTION
1 3-50mm, 3-100mm, 3-150mm AND 2
REST @ 200mm O.C.
VARIES
COUNTER DETAILS
A 2"X2"X4.5mm THK. ANGLE BAR 7 PANTRY/QAS EXTENSION
0.42

0.15 0.15 VARIES 0.15 0.15


RB1 BOLTED ON ROOF BEAM FOR
PURLINS SUPPORT S 2 SCALE 1:40mts.
0.20

0.20

B 2"X4"X2.00mm. THK. C-PURLINS


A
W/ 2"X3/16" ANGLE BAR CLEATS

GAD BUILDING RB2 (PDS EXTENSION)


2"X3/16"THK. ANGLE BAR GA. 26, CORRUGATED G.I. ROOFING NOTES:
STRUT FASCIA BOARD W/ FASCIA
B A 0.55
11

0.15
1/2" THK. FASCIA BOARD ON 3-50mm, 3-100mm, 3-150mm AND 2.84 S 2 BOARD NAILERS * ROOF BEAM 3 (RB3) FOR SUPPORT OF CONCRETE CANOPY ALONG
1"X3/16" THK. ANGLE BAR REST @ 200mm O.C. 0.55
VARIES GRID A TO B FOR PDS STORAGE ROOM
BOARD FRAME 0.55
* ROOF BEAM 2 (RB2) ALONG GRID A TO B FOR PDS STORAGE
ROOF FRAMING PLAN 1 0.15 0.15 VARIES 0.15 0.15
BEAM
0.55
ROOM SHALL HAVE 2"X2"X4.5mm THK. ANGLE BAR BOLTED
0.15

0.15

0.70
ALONG BEAM FOR SUPPORT OF PURLINS (SEE DETAIL)
2 PANTRY/QAS EXTENSION

0.55

0.10
LINE O OF
SCALE 1:50mts. F CHA OF
S 2 NNE L RO LET

0.20
LINE O T ING TOI
IS C
RB3 (PDS EXTENSION) F ROO
F BEA EX UBLI
M P
(RB2) RB2
2 12 SIDE LAPPING CORRUGATION BEAM
EXISTING PERIMETER
GA #26 CORR.G.I. WALL RB3 LINE OF CANOPY
SIDE LAP GA. 26, G.I. GUTTER
SHEET ROOFING CHB WALL
CHB WALL (CONNECTED TO
6 ROOF BEAM DETAILS EXISTING ROOF)

S 2 SCALE 1:30mts.
RAFTER DETAIL 2
3 OVERLAPPING DETAIL 10 STORAGE/PDS EXTENSION
SCALE 1:25mts.
S 2 NOT TO SCALE S 2
NOTE: THIS PROJECT SHALL FOLLOW DPWH SPECIFICATION 2012 EDITION
DESIGNED BY:
PROJECT TITLE AND LOCATION: SHEET CONTENTS: SUBMITTED BY: RECOMMENDING APPROVAL: APPROVED BY: SET NO.: SHEET NO.:
JOEY S. MAROLLANO
ENGINEER II
FOUNDATION PLAN-QAS FOUNDATION PLAN-PDS
ROOF FRAMING PLAN ROOF FRAMING PLAN CADD BY:

BARAS, CANAMAN, CAMARINES SUR


OVERLAPPING DETAIL
RAFTER DETAIL 1
RAFTER DETAIL 2
SPOT DETAIL 1
HILDA CHARITO A. BELTRAN
ARCHITECT I
2 8
STRUT DETAIL SPOT DETAIL 2 EDGAR R. BRIAGAS MAXIMO C. ELEDA EDY FERDINAND R. JOVEN S 2
LOCATION: DPWH CAMARINES SUR V DISTRICT ENGINEERING ROOF BEAM DETAILS
CHECKED BY:
ENGINEER III ENGINEER III ASSISTANT DISTRICT ENGINEER
11
COUNTER DETAILS
ARIS C. ABERGOS CHIEF - PLANNING & DESIGN SECTION (ACTING ASSISTANT DISTRICT ENGINEER) (ACTING DISTRICT ENGINEER)
OFFICE, ENGINEER II
TAP TO EXISTING
SEPTIC TANK

QAS BUILDING GENERAL NOTES/SPECIFICATIONS:


1. ALL SANITARY WORKS INCLUDE HEREIN SHALL BE EXECUTED ACCORDING TO THE
PROVISIONS OF THE NATIONAL PLUMBING CODE OF THE PHILIPPINES, THE NATIONAL
BUILDING CODE OF THE PHILIPPINES, AND ITS IMPLEMENTING R ULES AND
REGULATIONS.

2. COORDINATE WITH THE DRAWING WITH OTHER RELATED AND SPECIFICATIONS. THE
ARCHITECT AND / OR ENGINEER SHALL BE NOTIFIED IMMEDIATELY OF ANY
KS DISCREPANCY FOUND HEREIN HIS/HER SHALL BE FINAL.
SHO
CO
FD 3. ALL PIPES SHALL BE INSTALLED AS INDICATED.ANY RELOCATION REQUIRED FOR
PROPER EXECUTION OF OTHER TRADES SHALL BE WITH APPROVAL OF THE ARCHITECT
DS DS DS AND / OR ENGINEER.

4. PROPOSED SANITARY UTILITIES SHALL CONFORM TO THE ACTUAL LOCATION, DEPTH


AND INVERT ELEVATION OF EXISTING PIPES
AND STRUCTURES AS VERIFIED BY THE CONTRACTOR.

GAD BUILDING ISOMETRIC PLUMBING DIAGRAM 5. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ALL REQUIRED FLOOR AND WALL
3 PANTRY/QAS EXTENSION OPENING.
P 1 SCALE 1:50mts. ROOF DRAIN LAYOUT 6. ALL SLOPE FOR HORIZONTAL DRAINAGE SHALL BE MAINTAIN 1% AS MINIMUM, UNLESS
6 STORAGE ROOM/PDS EXTENSION OTHERWISE NOTED.
PLUMBING LAYOUT P 1 SCALE 1:50mts.
7. SIZE OF WATER PIPES TO THE FIXTURES SHALL BE IN ACCORDANCE WITH THE
1 PANTRY/QAS EXTENSION MANUFACTURER'S INSTRUCTIONS.
P 1 SCALE 1:50mts.
8. ALL FIXTURES SHALL BE VENTED, UNLESS OTHERWISE NOTED.

9. THE WORK THROUGHOUT SHALL BE EXECUTED IN THE BEST AND MOST THROUGH
MANNER KNOWN TO THE TRADE AND
TO THE SATISFACTION OF THE ARCHITECT AND / OR ENGINEER.

QAS BUILDING 10. THE CONTRACTOR SHALL VERIFY ALL EXISTING UTILITIES AT SITE AND COORDINATE
THE WORKS WITH THE SEWER EFFLUENT DISPOSAL AND WATERLINE SERVICE
CONNECTING POINT.

11. REFER TO THE TECHNICAL SPECIFICATION FOR DETAILED MATERIALS AND EQUIPMENT
SPECIFICATIONS.

KS

F SHO

ISOMETRIC WATER LINE DIAGRAM


4 PANTRY/QAS EXTENSION

TO MAGARAO
P 1 SCALE 1:50mts. AERONAUTICAL

ISOMETRIC ROOF DRAIN DIAGRAM


ACADEMY OF THE
PHILIPPINES-CANAMAN
FROM EXISTING
CAMPUS
WATER SOURCE
7 STORAGE ROOM/PDS EXTENSION
P 1 SCALE 1:50mts.
GAD BUILDING
LIBMANAN MARINER'S
POLYTECHNIC
DPWH 1ST, 2ND COLLEGE
AND 5TH FOUNDATION
REPAIR/INSTALLATION OF DISTRICT
PANTRY AND LABORATORY ENGINEERING

WATERLINE LAYOUT SAN JUAN


SHOWER IN MTQC BUILDING
REPAIR OF OFFICE INTERIOR FOR PLANNING
AND CONSTRUCTION SECTION, REPAIR OF
OFFICES

2 PANTRY/QAS EXTENSION REPAIR OF DOORS


FOR ACCOUNTING
DOORS AND WINDOWS IN ANDAYA III BUILDING
P 1 SCALE 1:50mts. SECTION IN GAD SITE
FUNDADO REPAIR OF STORAGE BUILDING FOR
BUILDING
PLANNING SECTION
SAN NICOLAS
DPWH CAMARINES SUR V DISTRICT ENGINEERING OFFICE BRGY.
CHAPEL
PAMPLONA TO CANAMAN PROPER
2.70
BAWA 5.00

SITE

TO MAGARAO
L E G E N D :

2.68
SAN ROQUE CR DALURO SHELL

2.38
DPWH CS-II / TEMPORARY
SAN FRANCISCO MTQC COMMUNAL OFFICES FOR PLANNNING, QAS,
GAD ANDAYA III CR CONSTRUCTION & MAINTENANCE
COA
BUILDING
BUILDING BUILDING BLDG GUARD

CANAMAN M.R.F.
HOUSE
VILLA
SYMBOL DESCRIPTION COVERED
GARAGE
SALVACION
LINAGA
MAGARAO SUBDIVISION
ASSEMBLY AREA
SAN JOSE WEST (FLAG-RAISING)

STORM DRAIN LINE GEN.SET TEMPORARY


IQUIN FOR I.T.C.S. GARAGE
DPWH CAMARINES SUR II
TALIDTID
FLAG BAC OFFICE
DISTRICT ENGINEERING OFFICE
POLE
RJ VILLAGE
PLUMBING LINE MANGAYAWAN
SAN JOSE EAST GARAGE
SUBDIVISION

WATER LINE PORO


SANTA TERESITA SANTA CRUZ (POB.)
DPWH 2ND DEO
NEW
STORAGE
BUILDING JULIE'S TO BRGY. CALAUAG,
SUA MOTORPOOL
MPB BUILDING
BAKESHOP NAGA CITY
TIBGAO (POB.)
VTR VENT THRU ROOF POBLACION CANAMAN
STORAGE
AREA ANDAYA I BUILDING
(DPWH CS-II)

CAMALIGAN DEL ROSARIO


TO CAMALIGAN
SP SUPPLY PIPE GAINZA BARAS (POB.)
LCC EXPRESS
MART
DINAGA (POB.)

TO NAGA CITY
WC WATER CLOSET D.E. CS-I
QUARTER

SAN VICENTE
FD FLOOR DRAIN DPWH CAMARINES SUR I
SAN AGUSTIN DISTRICT ENGINEERING OFFICE
CO CLEAN OUT HARING
D.E. CS-II DPWH CS-I

LAVATORY
QUARTER ANDAYA I BUILDING DPWH CS-I
LAV PLANNING/CONST./
MAINTENANCE
BLDG
(DPWH CS-I) (MQCS)

D.E. OFFICE

F FAUCET 9 LOCATION PLAN


NOT TO SCALE

TO NAGA CITY
HB HOSE BIB P 1
8 VICINITY MAP 5 SITE DEVELOPMENT PLAN
P 1 NOT TO SCALE
P 1 SCALE 1:1000M.

NOTE: THIS PROJECT SHALL FOLLOW DPWH SPECIFICATION 2012 EDITION

DESIGNED BY:
PROJECT TITLE AND LOCATION: SHEET CONTENTS: SUBMITTED BY: RECOMMENDING APPROVAL: APPROVED BY: SET NO.: SHEET NO.:
JOEY S. MAROLLANO
PLUMBING LAYOUT ROOF DRAIN LAYOUT ENGINEER II
WATERLINE LAYOUT ISOMETRIC ROOF CADD BY:
LEGEND DRAIN LAYOUT
BARAS, CANAMAN, CAMARINES SUR VICINITY MAP
HILDA CHARITO A. BELTRAN
ARCHITECT I
1 9
GENERAL NOTES/ EDGAR R. BRIAGAS MAXIMO C. ELEDA EDY FERDINAND R. JOVEN P 1
SITE DEVELOPMENT PLAN SPECIFICATIONS
CHECKED BY: 11
LOCATION: DPWH CAMARINES SUR V DISTRICT ENGINEERING ARIS C. ABERGOS ENGINEER III ENGINEER III ASSISTANT DISTRICT ENGINEER
LOCATION PLAN CHIEF - PLANNING & DESIGN SECTION (ACTING ASSISTANT DISTRICT ENGINEER) (ACTING DISTRICT ENGINEER)
OFFICE, ENGINEER II/MASTER PLUMBER
SCHEDULE OF LOADS 1 (PANTRY/QAS EXTENSION)
DISTRIBUTION PANEL BOARD "DP "
NOTES:
QAS BUILDING GENERAL NOTES/SPECIFICATIONS:
FLUSH MOUNTED, NEMA 1 ENCLOSURE WITH GROUND TERMINAL 1. ALL ELECTRICAL WORKS SHALL BE DONE IN ACCORDANCE WITH THE PROVISION OF THE
CIRCUIT BREAKER LATEST EDITION OF THE PHILIPPINE ELECTRICAL CODE, EXISTING APPLICABLE ORDINANCES,
a b TAP TO CKT.NO. LOAD DESCRIPTION VA LOAD WIRE AND CONDUIT SIZE RULES AND REGULATIONS OF THE LOCAL GOVERNMENT AND WITH THE REQUIREMENTS OF
EXISTING THE LOCAL POWER COMPANY.
VOLTS POLE AT AF KAIC
20mm uPVC 2. THE TYPE OF SERVICE POWER SUPPLY TO BE USED SHALL BE SINGLE-PHASE, 2-WIRE, 230V,
1 LIGHTING OUTLETS 400 230 2 15 50 10 60HERTZ, A.C.
Sabc PNS-14
a c
20mm uPVC 3. THE CONTRACTOR SHALL VERIFY AND ORIENT THE ACTUAL LOCATION OF SERVICE ENTRANCE
2 CONVENIENCE OUTLET 360 230 2 20 50 10 FOR CONNECTION TO THE POWER COMPANY SERVICE POINT.
PNS-14

TOTAL 760 40AT/50AF,2P,240V,10kAIC 4. UNLESS OTHERWISE SPECIFIED, THE MINIMUM SIZES OF WIRE AND GALVANIZED RIGID STEEL
CONDUIT TO BE USED SHALL BE 3.5mm ,THHN AND 15mm NOMINAL DIAMETER,
RESPECTFULLY, LIKEWISE ALL ELECTRICAL WIRES SHALL BE COLOR-CODED.

DESIGN CRITERIA 1 (PANTRY/QAS EXTENSION): 5. ALL LIGHTING CIRCUIT HOMERUNS AND CONVENIENCE OUTLETS SHALL BE WIRED WITH NOT
EXISTING ELEC. POST LESS THAN 3.5mm IN SIZE.
GAD BUILDING TOTAL LOAD:
6. WHEREVER REQUIRED AND NECESSARY, PULL OR JUNCTION BOXES SHALL BE INSTALLED AT
1. LIGHTING OUTLET = 400 VA CONVENIENT AND INCONSPICUOUS LOCATION, ALTHOUGH SUCH BOXES ARE NOT SHOWN ON
2. CONVENIENCE OUTLET = 360 VA THE PLAN NOR MENTIONED IN THE SPECIFICATIONS.
= 760 VA a b

LIGHTING LAYOUT 1 Application of Demand Factor:


c

Sabc
7. ALL NON-CURRENT CARRYING METAL PARTS OF ELECTRICAL EQUIPMENT SHALL BE PROPERLY
GROUNDED IN ACCORDANCE WITH THE PROVISIONS IN ARTICLE 2.50 "GROUNDING"
1 PANTRY/QAS EXTENSION First 3000 volt-ampere or less @ 100 D.F. = 760 VA PHILIPPINE ELECTRICAL CODE, VOLUME 1,2000 EDITION.
E 1 SCALE 1:50mts. Remainder @ 35% D.F. = 0 VA
Total Net Computed Load = 760 VA 8. ALL MATERIALS TO BE USED SHALL BE BRAND NEW AND OF THE APPROVED TYPE FOR
a
b c LOCATION AND PURPOSE.
760VA/230V = 3.30 AMP 9. STANDARD TYPE OF ACCESSORIES, SPLICING DEVICES, TERMINATIONS AND OTHER
APPURTENANCES FOR THE ENTIRE ELECTRICAL INSTALLATION SHALL BE USED.
USE:
for grounding in 25mm PVC Pipe one 40AT, 2 Pole, 10kAIC, 240 Volt 10. ALL WALL OUTLETS SHALL BE INSTALLED AT THE FOLLOWING HEIGHTS ABOVE THE FINISHED
QAS BUILDING FLOORLEVEL UNLESS NOTED IN THE PLANS.
Commercial Cicuit Breaker
A. WALL SWITCHES @ 1200mm
LIGHTING LAYOUT 2 B. WALL CONVENIENCE OUTLETS @ 300mm OR 150mm ABOVE WORKTABLE/COUNTER
C. WALL FAN OUTLET @ CONVENIENT HEIGHT
1 STORAGE ROOM/PDS EXTENSION
OVERHEAD SERVICE ENTRANCE: 230V,
TAP TO
E 1 SCALE 1:50mts. 11. ALL ELECTRICAL WORKS SHALL BE DONE UNDER THE DIRECT AND IMMEDIATE SUPERVISION
EXISTING 10, 2W, 60Hz., A.C. WITH 20mm
OF A DULY REGISTERED ELECTRICAL ENGINEER.
TYPE "F" CONDULET, WEATHERHEAD

"DP" wire in 25mm PVC pipe


WP

DESIGN CRITERIA 2 (STORAGE/PDS EXTENSION):


EXISTING ELEC. POST
3.10

M TOTAL LOAD:
in 15mm C- CLAMPED TO 1. LIGHTING OUTLET = 600 VA
COPPER-CLAD GROUNDING\

1.80
ROD 2. CONVENIENCE OUTLET = 720 VA
GAD BUILDING = 1320 VA
1.80

Application of Demand Factor:


BUILDING LINE

First 3000 volt-ampere or less @ 100 D.F. = 1320 VA


GROUND FLOOR LEVEL
Remainder @ 35% D.F. = 0 VA
POWER LAYOUT 1 FINISHED GRADE LEVEL Total Net Computed Load = 1320 VA
1 PANTRY/QAS EXTENSION GROUNDING SYSTEM
1320VA/230V = 5.74 AMP
E 1 SCALE 1:50mts. 16mm x 2400mm LENGTH
COPPERCLAD GROUNDING ROD
USE:
for grounding in 25mm PVC Pipe one 40AT, 2 Pole, 10kAIC, 240 Volt
6 ELECTRICAL RISER DIAGRAM Commercial Cicuit Breaker
E 1 N.T.S.
SERVICE ENTRANCE
POWER LAYOUT 2 SERVICE ENTRANCE

M 2 STORAGE ROOM/PDS EXTENSION


2-WIRE 60Hz
E 1 SCALE 1:50mts.
1 , 230V, 2-WIRE 60Hz
M
THHN wire in 25mm PVC pipe PANEL BOARD THHN wire in 25mm PVC pipe
SYMBOL DESCRIPTION PANEL BOARD
40 AT,50 AF, 2P,
SERVICE ENTRANCE 40 AT,50 AF, 2P,
230V, 10kAIC
230V, 10kAIC
KILOWATTHOUR METER SCHEDULE OF LOADS 2 (STOARGE ROOM/PDS EXTENSION)
PANEL BOARD DISTRIBUTION PANEL BOARD "DP "
15 AT, 2P 20 AT, 2P
15 AT, 2P 20 AT, 2P
LIGHTING CONVENIENCE CIRCUIT BREAKER
1 2 FLUSH MOUNTED, NEMA 1 ENCLOSURE WITH GROUND TERMINAL LIGHTING CONVENIENCE
OUTLET OUTLET
6" PINLIGHT W/ 18W CFL (RECESSED TYPE) OUTLET 1 2 OUTLET
CKT.NO CIRCUIT BREAKER
DUPLEX CONVENIENCE OUTLET LOAD DESCRIPTION VA LOAD WIRE AND CONDUIT SIZE
.
VOLTS POLE AT AF KAIC
WP WEATHER PROOF CONVENIENCE OUTLET GROUND
GROUND 20mm
Sa,Sab,Sabc, SWITCHES LOCATION (1GANG,2GANG,3GANG ) 1 LIGHTING OUTLETS 600 230 2 15 50 10 uPVC
PNS-14
SINGLE LINE DIAGRAM 2
SINGLE LINE DIAGRAM 1 1 CIRCUIT HOMERUN
20mm
6 STORAGE ROOM/PDS EXTENSION
N.T.S.
6 PANTRY/QAS EXTENSION E 2
POWER & LIGHTING CIRCUIT. LINE 2 CONVENIENCE OUTLET 720 230 2 20 50 10 uPVC
E 1 N.T.S. PNS-14
TOTAL 1320 40AT/50AF,2P,240V,10kAIC NOTE: THIS PROJECT SHALL FOLLOW DPWH SPECIFICATION 2012 EDITION

PROJECT TITLE AND LOCATION: SHEET CONTENTS: DESIGNED BY: SUBMITTED BY: RECOMMENDING APPROVAL: APPROVED BY: SET NO.: SHEET NO.:
JOEY S. MAROLLANO
ENGINEER II
LIGHTING LAYOUT 1 NOTES
POWER LAYOUT 1 LIGHTING LAYOUT 2 CADD BY:
POWER LAYOUT 2
BARAS, CANAMAN, CAMARINES SUR SCHEDULE OF LOADS 1 SCHEDULE OF LOADS 2
HILDA CHARITO A. BELTRAN
ARCHITECT I
1 10
DESIGN CRITERIA 1 EDGAR R. BRIAGAS MAXIMO C. ELEDA EDY FERDINAND R. JOVEN E 2
DESIGN CRITERIA 2
CHECKED BY: 11
LOCATION: DPWH CAMARINES SUR V DISTRICT ENGINEERING SHERIN R. ARENAS ENGINEER III ENGINEER III ASSISTANT DISTRICT ENGINEER
OFFICE, LEGEND SINGLE LINE DIAGRAM 2 ENGINEER II CHIEF - PLANNING & DESIGN SECTION (ACTING ASSISTANT DISTRICT ENGINEER) (ACTING DISTRICT ENGINEER)
MCB COMPUTATION
CKT. NO. Load Description L.O. C.O. WATT VOLT AMPERE CB RATING WIRES SIZE CONDUIT SIZE
7
____
8
____
5
___
ACUP
ACUP
1 LP 109 10900 230 47.39 60 AT, 2P 25mm uPVC CKT. SIZE OF WIRE &
PP
L.O. C.O. OTHER LOADS VOLTS WATTS AMPS ACB PANEL BOARD
2 PP 113 22600 230 98.26 100 AT, 2P 38mm uPVC NO. CONDUIT
LP ACUP PP

3
ACU
3 3 3 3
ACU
3 3 ACU 9 20700 230 90.00 100 AT, 2P 38mm uPVC 1 6 230V 600 2.61 15A
b b b b b b IN 20 mm uPVC
TOTAL 109 122 54200 230 235.65
2 6 230V 600 2.61 15A
COMPUTATION: IFL =235.65 X 80% D.F. = 188.52 AMP. USE = 175AT/250AF, 2P, 230V, 60HZ, NEMA 1 ENCLOSURE IN 20 mm uPVC
3 3 3 3 3 3
uPVC M
b b b b b 7 b
___ 3 3 230V 600 2.61 15A
9
___ PP IN 20 mm uPVC
PP
8
___
PP SCHEDULE OF LOADS 4 6 230V 1200 5.22 20A
IN 20 mm uPVC
60 AT

LP
b 3 b 3 b 3 15 AT 15 AT
b 3
1 2
b 3 b 3 15 AT 20 AT
b 3 b 3 b 3 5 ACU 230V 2760 12 20A
CKT. NO. Load Description L.O. WATT VOLT AMPERE CB RATING WIRES SIZE CONDUIT SIZE IN 20 mm uPVC 3
20 AT 20 AT
4

5 6
20 AT 20 AT
1 LIGHTING OUTLET 17 1700 230 7.39 15 AT, 2P 20mm uPVC 6 SPARE 230V 1500 6.52 20A 7 8
IN 20 mm uPVC
3
2 LIGHTING OUTLET 13 1300 230 5.65 15 AT, 2P 20mm uPVC
6
___ 7 SPARE 230V 1500 6.52 20A
PP 3 LIGHTING OUTLET 11 1100 230 4.78 15 AT, 2P 20mm uPVC IN 20 mm uPVC
4 LIGHTING OUTLET 11 1100 230 4.78 15 AT, 2P 20mm uPVC 8 SPARE 230V 1500 6.52 20A
ACU
b 3 b 3 b 3 3
IN 20 mm uPVC
ACU ACU 5 LIGHTING OUTLET 13 1300 230 5.65 15 AT, 2P 20mm uPVC
15 AT, 2P COMPUTATION:
9
____ 6
____ 5
____ 6 LIGHTING OUTLET 15 1500 230 6.52 20mm uPVC
ACUP ACUP ACUP ILOAD = 44.61 X 0.8 D.F. = 35.69 AMPS.
7 LIGHTING OUTLET 14 1400 230 6.09 15 AT, 2P 20mm uPVC USE: = 60AT, 2P, 240 VOLTS, NEMA 1 ENCLOSURE
8 LIGHTING OUTLET 15 1500 230 6.52 15 AT, 2P 20mm uPVC uPVC
TOTAL 109 10900 230 47.39
POWER SERVICE ENTRANCE
COMPUTATION: IFL = 47.39 X 80% D.F. = 37.91 AMP. USE = 60AT/100AT 2P, 230V, 60HZ, NEMA 1 ENCLOSURE 230V, 1 , 2W, 60HZ

SECOND FLOOR POWER LAYOUT uPVC


KWH-METER
M IN 63mm uPVC
1 PDS AND CONSTRUCTION SECTION PP
E 2 SCALE 1:100mts. CKT. NO. Load Description C.O. WATT VOLT AMPERE CB RATING WIRES SIZE CONDUIT SIZE
MCB

20 AT, 2P 175 AT, 2P


1 CONVENIENCE OUTLET 11 2200 230 9.57 2C-3.5mm THHN WIRE 20mm uPVC
2 CONVENIENCE OUTLET 10 2000 230 8.70 20 AT, 2P 2C-3.5mm THHN WIRE 20mm uPVC
3 CONVENIENCE OUTLET 13 2600 230 11.30 20 AT, 2P 2C-3.5mm THHN WIRE 20mm uPVC IN 63mm uPVC
4 CONVENIENCE OUTLET 12 2400 230 10.43 20 AT, 2P 2C-3.5mm THHN WIRE 20mm uPVC
METAL PULL
5 CONVENIENCE OUTLET 14 2800 230 12.17 20 AT, 2P 2C-3.5mm THHN WIRE 20mm uPVC BOX

6 CONVENIENCE OUTLET 12 2400 230 10.43 20 AT, 2P 2C-3.5mm THHN WIRE 20mm uPVC
7 CONVENIENCE OUTLET 11 2200 230 9.57 20 AT, 2P 2C-3.5mm THHN WIRE 20mm uPVC
8 CONVENIENCE OUTLET 17 3400 230 14.78 20 AT, 2P 2C-3.5mm THHN WIRE 20mm uPVC LP ACUP IN 38mm uPVC
PP IN 38mm uPVC

9 CONVENIENCE OUTLET 13 2600 230 11.30 20 AT, 2P 2C-3.5mm THHN WIRE 20mm uPVC
TOTAL 113 22600 230 98.26 60 AT, 2P 100 AT, 2P 100 AT, 2P

TO INTRANET COMPUTATION: IFL = 98.26 X 80% D.F. = 78.61 AMP. USE = 100AT/100AF, 2P, 230V, 60HZ, NEMA 1 ENCLOSURE 15 AT, 2P 15 AT, 2P 30 AT, 2P 30 AT, 2P 20 AT, 2P SPARE ADDITIONAL BREAKER
LADDER uPVC ON SPARE

15 AT, 2P 15 AT, 2P 30 AT, 2P 30 AT, 2P 20 AT, 2P 20 AT, 2P


ACUP
CKT. NO. Load Description C.O. WATT VOLT AMPERE CB RATING WIRES SIZE CONDUIT SIZE 15 AT, 2P 15 AT, 2P 30 AT, 2P 30 AT, 2P 20 AT, 2P 20 AT, 2P

1 ACU 1.5HP 1 2300 230 10 30 AT, 2P 25mm uPVC


30 AT, 2P 15 AT, 2P 15 AT, 2P 30 AT, 2P 30 AT, 2P 20 AT, 2P 20 AT, 2P
2 ACU 1.5HP 1 2300 230 10 25mm uPVC
3 ACU 2HP 1 2760 230 12 30 AT, 2P 25mm uPVC
30 AT, 2P 30 AT, 2P 20 AT, 2P 20 AT, 2P
4 ACU 2HP 1 2760 230 12 25mm uPVC 30 AT, 2P

5 ACU 1HP 1 1840 230 8 30 AT, 2P 25mm uPVC


6 ACU 0.75HP 1 1380 230 6 30 AT, 2P 25mm uPVC GROUND
7 ACU 2HP 1 2760 230 12 30 AT, 2P 25mm uPVC
GROUND GROUND
8 ACU 1HP 1 1840 230 8 30 AT, 2P 25mm uPVC
9 ACU 2HP
TOTAL
1
9
2760
20700
230
230
12
90.00
30 AT, 2P 25mm uPVC SINGLE LINE DIAGRAM
COMPUTATION: IFL = 90.00 X 80% D.F. = 72.00 AMP. USE = 100AT/100AF, 2P, 230V, 60HZ, NEMA 1 ENCLOSURE
3 (EXISTING) ANDAYA III BUILDING
E 2 N.T.S.
SECOND FLOOR LAN/INTRANET LAYOUT uPVC

1 PDS AND CONSTRUCTION SECTION REPAIR/INSTALLATION OF


REPAIR OF OFFICE INTERIOR FOR
E 2 SCALE 1:100mts. PANTRY AND LABORATORY
PLANNING AND CONSTRUCTION LIBMANAN

TO MAGARAO
SHOWER IN MTQC BUILDING
SECTION, REPAIR OF DOORS AND
WINDOWS IN ANDAYA III BUILDING AERONAUTICAL
ACADEMY OF THE
REPAIR OF DOORS FOR PHILIPPINES-CANAMAN
ACCOUNTING SECTION REPAIR OF STORAGE BUILDING FOR
CAMPUS

IN GAD BUILDING PLANNING SECTION SAN JUAN

DPWH CAMARINES SUR V DISTRICT ENGINEERING OFFICE

NOTES: 2.70
5.00
FUNDADO
DPWH 1ST, 2ND
AND 5TH
MARINER'S
POLYTECHNIC
COLLEGE
FOUNDATION

TO MAGARAO
SAN NICOLAS DISTRICT

2.68
CR ENGINEERING
* SCHEDULE OF LOADS FOR PDS SECTION IS EXISTING.
2.38

DPWH CS-II / TEMPORARY


OFFICES FOR PLANNNING, QAS,
OFFICES
GAD MTQC ANDAYA III COMMUNAL
CR CONSTRUCTION & MAINTENANCE
COA

* ADDITION OF BREAKER ONLY ON SPARE PANEL AT "PP" BUILDING BUILDING BLDG


BUILDING

GUARD PAMPLONA
HOUSE

* REWIRING AND RE-ROUTING OF CONVENIENCE OUTLET LINES AND


SITE
M.R.F.
COVERED
GARAGE BAWA

LAN/INTRANET LINES FOR NEW WALL PARTITIONS. ASSEMBLY AREA SAN ROQUE
(FLAG-RAISING)
GEN.SET TEMPORARY

DPWH CAMARINES SUR II


SYMBOL DESCRIPTION SAN FRANCISCO
FOR I.T.C.S. GARAGE

FLAG BAC OFFICE


DISTRICT ENGINEERING OFFICE BRGY.
POLE
CANAMAN CHAPEL
SERVICE ENTRANCE GARAGE TO CANAMAN PROPER
LINAGA
MAGARAO
DPWH 2ND DEO STORAGE
KILOWATTHOUR METER NEW BUILDING
IQUIN
SAN JOSE WEST
DALURO SHELL
MOTORPOOL TALIDTID
MPB BUILDING
STORAGE
PANEL BOARD AREA ANDAYA I BUILDING
(DPWH CS-II)
SAN JOSE EAST VILLA
MANGAYAWAN SALVACION
CIRCUIT BREAKER SUBDIVISION
SANTA TERESITA SANTA CRUZ (POB.)
PORO
D.E. CS-I SUA

b
CONVENIENCE OUTLET (BLANK PLATE) QUARTER
TIBGAO (POB.)
RJ VILLAGE
POBLACION CANAMAN
SUBDIVISION
2-GANG CONVENIENCE OUTLET DPWH CAMARINES SUR I CAMALIGAN DEL ROSARIO
DISTRICT ENGINEERING OFFICE GAINZA BARAS (POB.) JULIE'S
BAKESHOP
TO BRGY. CALAUAG,
NAGA CITY
DINAGA (POB.)
3 3-GANG CONVENIENCE OUTLET
D.E. CS-II DPWH CS-I
QUARTER PLANNING/CONST./ ANDAYA I BUILDING
(DPWH CS-I)
DPWH CS-I
(MQCS)
TO CAMALIGAN
MAINTENANCE
SAN VICENTE
1 CIRCUIT HOMERUN BLDG
D.E. OFFICE
LCC EXPRESS
MART

TO NAGA CITY
SAN AGUSTIN

POWER & LIGHTING CIRCUIT. LINE HARING

TO NAGA CITY
5 VICINITY MAP
4 SITE DEVELOPMENT PLAN E 1 NOT TO SCALE

E 2 SCALE 1:1000M. 6 LOCATION PLAN


E 1 NOT TO SCALE

NOTE: THIS PROJECT SHALL FOLLOW DPWH SPECIFICATION 2012 EDITION

PROJECT TITLE AND LOCATION: SHEET CONTENTS: DESIGNED BY: SUBMITTED BY: RECOMMENDING APPROVAL: APPROVED BY: SET NO.: SHEET NO.:
JOEY S. MAROLLANO
ENGINEER II
SECOND FLOOR POWER LAYOUT
SECOND FLOOR LAN LAYOUT CADD BY:

BARAS, CANAMAN, CAMARINES SUR


LEGEND HILDA CHARITO A. BELTRAN
ARCHITECT I
2 11
SCHEDULE OF LOADS EDGAR R. BRIAGAS MAXIMO C. ELEDA EDY FERDINAND R. JOVEN
SITE DEVELOPMENT PLAN CHECKED BY: E 2 11
LOCATION: DPWH CAMARINES SUR V DISTRICT ENGINEERING VICINITY MAP SHERIN R. ARENAS ENGINEER III ENGINEER III ASSISTANT DISTRICT ENGINEER
OFFICE, ENGINEER II CHIEF - PLANNING & DESIGN SECTION (ACTING ASSISTANT DISTRICT ENGINEER) (ACTING DISTRICT ENGINEER)
LOCATION PLAN