CLIENT

CONSTRUCTION ISSUE
24 July 2019
Engineer / Designer / Consultant: Designer: Owner:
LAKE MAINIT HYDROPOWER PLANT PROJECT
Drawn: MSD

Designed: WGB
WGB Lake Mainit - Powerhouse
0 WGB GFC Issue AGUSAN POWER CORPORATION
- WILFREDO SALAZAR -
Engineering and Development Checked: JVP PROJECT HEAD
2 WGB
Corporation of the Philippines - - Power Station Framing Plan @ Ele. 16.80
NOEL M. ORTIGAS Approved: NMO 1 WGB Revision 1 Draft Issue
CIVIL ENGINEER CADD FILE: 0 WGB Draft Issue RMD JOG Scale: AS SHOWN Sheet No.
- - 1
REV DATE BY REVISION DESCRIPTION CHD APP Date : DWG No. LM-PH-STR-061 Rev. 0 1