Documente Academic
Documente Profesional
Documente Cultură
INSTITUTE ROOMS
TRAINING INSTITUTE AGRICULTURAL TRAININ
G
SHOPS
PETROL PUMP
SERVICE RO PARKING
AD
SERVICE ROAD SERVICE ROAD
BIKE LANE
DRAIN
BIKE LANE S.B
S.B
BRT BRT
Alignment Channel
Alignment Channel
BRT
BRT
BRT BRT
Alignment Channel
BRT
XSIZE
YSIZE
D3 UP
BRT
XSIZE
YSIZE
1.5mx1.5m
Toilet
El.+0.28 D1
CONNECTION
BS-24
El.+0.28 CONNECTION PLATFORM
El.+0.28 El.+0.28
S.B
El.+0.28 PLATFORM UP
PLATFORM
BRT
UP
BRT BRT
BRT
Alignment Channel
Alignment Channel
Alignment Channel
BIKE LANE
PLATFORM
UP
CONNECTION El.+0.28
BS-24 PLATFORM
UP
PLATFOR
El.+0.28 El.+0.28
UP Toilet
1.5mx1.5m CONNECTION El.+0.28
D3
XSIZE
YSIZE
XSIZE
YSIZE
Alignment Channel Alignment Channel BRT AT GRADE
FLYOVER RAMP
FLYOVER
UNDERPASS RAMP
UNDERPASS SLAB
BIKE LANE
FOOTPATH
©
This document should not be relied on or used in circumstances other than those for which it was originally prepared and for which MMP was commissioned. MMP accepts no responsibility for this document to any other party other than the person by whom it was commissioned. GREEN VERGE
Consultants Client Financing Agency Rev Date Drawn Description Ch'k'd App'd Title Designed AN
A 18-09-2018 AK FOR CONSTRUCTION GH TM LAYOUT PLAN Drawn AK
Transport and Mass - ROAD MARKING MIX TRAFFIC Checked GH
Transit Department (TMTD) ASIAN DEVELOPMENT BANK REACH 3
Government of Approved TM
CENTRAL DESIGN CELL
* 2nd Floor, CTI Building, Khyber Pakhtunkhwa Project Scale at A3 H=1:1000 V= 1:200
27-Empress Road, Lahore
( 042-36292525-7 Pakistan Peshawar Sustainable Bus Rapid Transit Scale at A1 H=1:500 V= 1:100
7 042-36292528
Rev Status
: cdc.mmp@mmpakistan.com Corridor Project - Project Design Advance Drawing No.
8 http://www.mmpakistan.com
MMP-1020PO1-BRT-PSH-HWY-RMS-315 A CON
E:\Design Data 24-11-2017\0-BRT Updated\Updates 06-04-2018\Plan & Profile BRT Peshawar Reach 3\REACH 3\Bus station Marking Reach-3 (26-03-2019) Final.dwg Jul 9, 2019 - 2:42PM Abid Nawaz