Sunteți pe pagina 1din 80

ROHTAS FASTENERS PVT. LTD.

SUPPLIER / IN-PLANT QUALITY PROBLEM ANALYSIS AND COUNTERMEASURE SHEET (5

VENDOR / DEPTT : PART NAME :

PROBLEM PART NO. :

ACTUAL CONTENTS ACTUAL INVESTIGATION (PRODN.


PLACE OF RANK Man
MODEL: Machine
OCCURRENCE
SAFETY /
REJ. QTY.:
PERFORMANCE/

OTHERS:

DETAIL OF PROBLEM (DATA/SKETCH)

Method Material

ROOT CAUSE : COUNTERMEASURE DETAIL


CONTAINMENT ACTION :
(SKETCH/DATA/DETAIL)
CORRECTIVE ACTION :

PREVENTIVE ACTION :

WHY-WHY ANALYSIS : MONITORING SHEET (REOCCURAN


PROBLEM I II III IV V May'17 June'17 III MONTH IV MONTH
Occurrence
FMT NO.: F/QA/08-A

VT. LTD. REV.NO.: 01

UNTERMEASURE SHEET (5-RULE) EFF.DT.: 20/04/18

APPROVED
PROBLEM NO. PREPARED BY CHECKED BY DATE:
BY

ACTUAL INVESTIGATION (PRODN. END - MACHINE / METHOD / MATERIAL / JIG / EQUIPMENT)


PROCESS FLOW RESULT ANALYSIS

RESP. IMPL. DATE OBSERVATION / EFFECTIVENESS (GRAPH/Cp)


FEED BACK TO OTHER (HORIZONTALLY
ONITORING SHEET (REOCCURANCE OF DEFECT ) (QTY./GRAPH) DEPLOYMENT)
V MONTH VI MONTH REMARKS PROCESS ( IF SAME TYPE

PROBLEM)
ROHTAS FASTENERS PVT. LTD.
SUPPLIER / IN-PLANT QUALITY PROBLEM ANALYSIS AND COUNTERMEASURE SH

VENDOR / DEPTT : Inhouse Analysis PART NAME : Boot Collar

PROBLEM Thread out PART NO. : 009-M85-044

ACTUAL CONTENTS ACTUAL INVESTIGATION (


PLACE OF RANK
MODEL: : MACHINE
OCCURRENCE MEN

SAFETY /
REJ. QTY.:
PERFORMANCE/ Play in machine undersize
Inhouse Analysis transfer fingure punch Allocation of
used operator &
FIT FUNCTION inspectors
OTHERS:

Clamping not ok
Improper lubrication on tool
DETAIL OF PROBLEM (DATA/SKETCH) and die (collent flow shift)
Neglegence
of inspector

SOP not
followed Poor material
forgability
Drill Out
Thread Out in Boot Collar Poor handling
of setting parts
Work instruction not
available

Method MATERIAL

ROOT CAUSE : COUNTERMEASURE DETAIL


CORRECTIVE ACTION :
(SKETCH/DATA/DETAIL) 1) Quality alert made and displayed in all relevent locations.

2) More than 100 sample will be checked for tapping parameter by


Inprocess inspection engineer before release the material for Tappin
1) Quality alert made and displayed in all relevent locations.

2) More than 100 sample will be checked for tapping parameter by


Inprocess inspection engineer before release the material for Tappin
preventive action to be for next three supplied lot.

PREVENTIVE ACTION :
Drill out during Drilling operation as clamping area was less for holding 1. Drilling process removed and through hole done in forging itself
part in fixture.
2. Forging drawing revised and conc. Added

3. Defect awareness training given to operators

4. 2) More than 100 sample will be checked for tapping parameter b


Inprocess inspection engineer before release the material for Tappin
preventive action to be for next three supplied lot.

WHY-WHY ANALYSIS : MONITORING SHEET (REOC


PROBLEM I II III IV V I MONTH II MONTH III MONTH
During drilling drill out

part loose due to less


direction due to hole
Tapping out during
Tapping process

Tap guided in tilt

clamping area in
clamping fixture
Occurrence

out.
FMT NO.: F/QA/08-A

PVT. LTD. REV.NO.: 01

COUNTERMEASURE SHEET (5-RULE) EFF.DT.: 20/04/18

APPROVED
Boot Collar PROBLEM NO. PREPARED BY CHECKED BY
BY
DATE:

009-M85-044

ACTUAL INVESTIGATION (PRODN. END - MACHINE / METHOD / MATERIAL / JIG / EQUIPMENT)


PROCESS FLOW RESULT ANALYSIS
MEN

OK
RM Incoming
un-skilled inspector
OK
RM Inspection
OK
Forging
Neglegence Not OK
of inspector Thread Drilling
Out in OK
Boot CNC it is analysed that Drill out during Drilling
Collar operation as clamping area was less for holding
Thread Tapping part in fixture.
Poor material OK
forgability
Plating
OK

OK
F. Inspection
Other grade OK
material used Packing &
Despatch

MATERIAL

RESP. IMPL. DATE OBSERVATION / EFFECTIVENESS (GRAPH/Cp)

n all relevent locations.


Vikas '-------
cked for tapping parameter by
e release the material for Tapping , this
Vikas '-------

QA Inspector Next Forging

ugh hole done in forging itself


P. Sharma
. Added
P. Sharma
o operators Vikas Kumar 27.02.2018
hecked for tapping parameter by
e release the material for Tapping , this QA Inspector
e supplied lot.

FEED BACK TO OTHER (HORIZONTALLY


MONITORING SHEET (REOCCURANCE OF DEFECT ) (QTY./GRAPH) DEPLOYMENT)
IV MONTH V MONTH VI MONTH REMARKS PROCESS ( IF SAME TYPE

PROBLEM)

NA
Objective Evidenc
Before Afte

As shown in above picture coolant nozzle with soft material during coolant Now soft material coolant nozzle replaced w
pressure their position shift from actual position nozzle position on tools then coolant flow o
Evidence
After

ial coolant nozzle replaced with metal nozzle, When we fix the
on tools then coolant flow on same position.
Objective Evidenc
Before Afte

80

Drilling operation was there. During Drilling operation drill out problem due to Drilling operation removed and conc. Can b
less clamping area.
Evidence
After

on removed and conc. Can be achieved up to 0.08 mm


Evidence
Sr. No. Action Taken
Before After

01 PQCT Revised

02 Process Forging Drawing Revised


BOOT COLLER BEFORE Model.pdf BOOT COLOR AFTER Model (1).pdf

03
Pages 18 OF 80

ROHTAS

ITEM : Boot Color

ITEM CODE: 009-M85-044-3

CORE TEAM: GM (Operations), Engg. I/C,Prod I/C,Q.A. I/C


C
S L
PROCESS POTENTIAL
PC ID./ DESC. POTENTIAL EFFECT(S) OF FAILURE E A
REQUIREMENTS FAILURE MODE
V S
S

This will leads to problem During Forging,


Over Size Coil will not enter into die,Hence Reject 6 M
the material.

Diameter
(9.35 ~ 9.40)

This will cause difficulty to control size


Under size 5 M
during forging, Hence Reject the material
Pages 19 OF 80

ROHTAS

ITEM : Boot Color

ITEM CODE: 009-M85-044-3

CORE TEAM: GM (Operations), Engg. I/C,Prod I/C,Q.A. I/C


C
S L
PROCESS POTENTIAL
PC ID./ DESC. POTENTIAL EFFECT(S) OF FAILURE E A
REQUIREMENTS FAILURE MODE
V S
S

This will cause cracks in product,Hence


Crack Crack found in R/M Reject the material & send back to 7 C
supplier.

Mechanical Properties/ Forgability


Chemical
Not OK properties will be effected,Hence Reject 7 C
Composition
the material.
Pages 20 OF 80

ROHTAS

ITEM : Boot Color

ITEM CODE: 009-M85-044-3

CORE TEAM: GM (Operations), Engg. I/C,Prod I/C,Q.A. I/C


C
S L
PROCESS POTENTIAL
PC ID./ DESC. POTENTIAL EFFECT(S) OF FAILURE E A
REQUIREMENTS FAILURE MODE
V S
S

Mechanical Properties will be effected,


Decarb More 7 C
Hence Reject the material.
10. RAW
MATERIAL
INSPECTION

Not as per IS 11169 Mechanical Properties will be


Inclusion Rating 6 M
part-1-1984 effected.,Hence Reject the material.
Pages 21 OF 80

ROHTAS

ITEM : Boot Color

ITEM10.
CODE:
RAW 009-M85-044-3
MATERIAL
INSPECTION
CORE TEAM: GM (Operations), Engg. I/C,Prod I/C,Q.A. I/C
C
S L
PROCESS POTENTIAL
PC ID./ DESC. POTENTIAL EFFECT(S) OF FAILURE E A
REQUIREMENTS FAILURE MODE
V S
S

Not as per IS 11169 Hardenability Properties will be


Grain Size 6 M
part-1-1984 effected,Hence Reject the material.

More than Leads to poor forgability, adverse effect


Tensile Strength 4 m
specification on the tool life,Hence Reject the material.
INSPECTION
Pages 22 OF 80

ROHTAS

ITEM : Boot Color

ITEM CODE: 009-M85-044-3

CORE TEAM: GM (Operations), Engg. I/C,Prod I/C,Q.A. I/C


C
S L
PROCESS POTENTIAL
PC ID./ DESC. POTENTIAL EFFECT(S) OF FAILURE E A
REQUIREMENTS FAILURE MODE
V S
S

Hardness in Soft Leads to poor forgability, adverse effect


More than
Condition on the tool life, Hence Reject the 4 m
specification
(HRB) material.

As Quenched Less than Mechanical Properties will be


7 C
Hardness specification effected.Hence Rejct the material.
Pages 23 OF 80

ROHTAS

ITEM : Boot Color

ITEM CODE: 009-M85-044-3

CORE TEAM: GM (Operations), Engg. I/C,Prod I/C,Q.A. I/C


C
S L
PROCESS POTENTIAL
PC ID./ DESC. POTENTIAL EFFECT(S) OF FAILURE E A
REQUIREMENTS FAILURE MODE
V S
S

Fitment problem may arise during


Over Size 6 M
Assembly , Leads to Rework
1. Total Length
(9.35 ~ 9.65)
Fitment problem may arise during
Under Size 6 M
Assembly , Leads to Rejection

Fitment problem may arise during


Over Size 6 M
Assembly , Leads to Rework
2. Length
(5.35 ~ 5.65)
Fitment problem may arise during
Under size 6 M
Assembly , Leads to Rejection
Pages 24 OF 80

ROHTAS

ITEM : Boot Color

ITEM CODE: 009-M85-044-3

CORE TEAM: GM (Operations), Engg. I/C,Prod I/C,Q.A. I/C


C
S L
PROCESS POTENTIAL
PC ID./ DESC. POTENTIAL EFFECT(S) OF FAILURE E A
REQUIREMENTS FAILURE MODE
V S
S

Fitment problem may arise during


Over Size 6 M
Assembly , Leads to Rework
3. Length
Fitment problem may arise during
Under size 6 M
Assembly , Leads to Rejection

Fitment problem may arise during


Over Size 6 M
Assembly , Leads to Rework
4. Collar Dia.
Fitment problem may arise during
Under size 6 M
Assembly , Leads to Rejection
Pages 25 OF 80

ROHTAS

ITEM : Boot Color

ITEM CODE: 009-M85-044-3

CORE TEAM: GM (Operations), Engg. I/C,Prod I/C,Q.A. I/C


C
S L
PROCESS POTENTIAL
PC ID./ DESC. POTENTIAL EFFECT(S) OF FAILURE E A
REQUIREMENTS FAILURE MODE
V S
S

Over Size Spanner will not insert ,Leads to Rework 6 M


5. Across Flat
Spanner will become Loose , Leads to
Under size 6 M
Rejection

20. FORGING NP: Problem During Tapping


C1:Fitment Problem
Over Size 7 M
OEM:Performance not OK
EU:None
Drill Dia
Pages 26 OF 80

ROHTAS

ITEM : Boot Color

ITEM CODE: 009-M85-044-3

CORE TEAM: GM (Operations), Engg. I/C,Prod I/C,Q.A. I/C


C
20. FORGING S L
PROCESS POTENTIAL
PC ID./ DESC. POTENTIAL EFFECT(S) OF FAILURE E A
REQUIREMENTS FAILURE MODE
V S
S
Drill Dia
NP: Problem During Tapping
C1:Fitment Problem
Under Size 6 M
OEM:Performance not OK
EU:None

Fitment problem may arise during


Over Size 6 M
Assembly , Leads to Rework
7. Counter Dia.
(8.10 ~ 8.25)
Fitment problem may arise during
Under Size 6 M
Assembly , Leads to Rejection

8. Chamfer
Not OK Not much significant effect. 8 C
(0.50 x 45°)
20. FORGING
Pages 27 OF 80

ROHTAS

ITEM : Boot Color

ITEM CODE: 009-M85-044-3

CORE TEAM: GM (Operations), Engg. I/C,Prod I/C,Q.A. I/C


C
S L
PROCESS POTENTIAL
PC ID./ DESC. POTENTIAL EFFECT(S) OF FAILURE E A
REQUIREMENTS FAILURE MODE
V S
S

9. Counter Angle
Not OK Not much significant effect. 8 C
(30°)

10. Collar Angle


Not OK Not much significant effect. 8 C
(30° Max.)

11. Hex Angle


Not OK Not much significant effect. 8 C
(31° ~ 36°)

Burr,Dent,Chip,Unfil
ling,Cracks,Without May Leads to rejection & hence
12. Appearance 6 M
Operation Pcs etc. Customer Dissatisfaction
Are not allowed
Pages 28 OF 80

ROHTAS

ITEM : Boot Color

ITEM CODE: 009-M85-044-3

CORE TEAM: GM (Operations), Engg. I/C,Prod I/C,Q.A. I/C


C
S L
PROCESS POTENTIAL
PC ID./ DESC. POTENTIAL EFFECT(S) OF FAILURE E A
REQUIREMENTS FAILURE MODE
V S
S

Go Thread Plug May cause fitment problem , Leads to


7 C
Gauge tight rework

1. Threads
(M8 x 1.25 - 6g)

No Go Thread Plug May cause fitment problem , Leads to


7 C
Gauge Qualifies rework
30. TAPPING
Pages 29 OF 80

ROHTAS

ITEM : Boot Color

ITEM CODE: 009-M85-044-3

CORE TEAM: GM (Operations), Engg. I/C,Prod I/C,Q.A. I/C


C
S L
PROCESS POTENTIAL
PC ID./ DESC. POTENTIAL EFFECT(S) OF FAILURE E A
REQUIREMENTS
30. TAPPING FAILURE MODE
V S
S

Burr,Dents,Chips in
Threads, Reverse
Threads , Inclined May Leads to rejection & hence
2. Appearance 6 M
Threads ,Without Customer Dissatisfaction
Operation Pcs etc.
Are not allowed

May cause fitment problem,


Over Size 7 M
Leads to rework
1. U-Cut Dia.
(9.90 ~ 10.10)
May Cause Fitment problem,
Under size 7 M
Leads to Rejection
Pages 30 OF 80

ROHTAS

ITEM : Boot Color

ITEM CODE: 009-M85-044-3

CORE TEAM: GM (Operations), Engg. I/C,Prod I/C,Q.A. I/C


C
S L
PROCESS POTENTIAL
PC ID./ DESC. POTENTIAL EFFECT(S) OF FAILURE E A
REQUIREMENTS FAILURE MODE
V S
S

May cause fitment problem,


Over Size 7 M
Leads to rework
2. U-Cut Width
(2.40 ~ 2.60)
May Cause Fitment problem,
Under size 7 M
Leads to Rejection
40. MACHINING
May cause fitment problem,
Over Size 7 M
Leads to rework
3. Length
(1.90 ~ 2.10)
May Cause Fitment problem,
Under size 7 M
Leads to Rejection
Pages 31 OF 80

ROHTAS

ITEM : Boot Color

ITEM CODE: 009-M85-044-3


40. MACHINING
CORE TEAM: GM (Operations), Engg. I/C,Prod I/C,Q.A. I/C
C
S L
PROCESS POTENTIAL
PC ID./ DESC. POTENTIAL EFFECT(S) OF FAILURE E A
REQUIREMENTS FAILURE MODE
V S
S

Burr,Dent,Chip,Tool
Marks, Without May Leads to rejection & hence
4. Appearance 7 M
Operation Pcs etc. Customer Dissatisfaction
Are not allowed
Pages 32 OF 80

ROHTAS

ITEM : Boot Color

ITEM CODE: 009-M85-044-3

CORE TEAM: GM (Operations), Engg. I/C,Prod I/C,Q.A. I/C


C
S L
PROCESS POTENTIAL
PC ID./ DESC. POTENTIAL EFFECT(S) OF FAILURE E A
REQUIREMENTS FAILURE MODE
V S
S

Go Thread Plug May cause fitment problem , Leads to


7 M
Gauge tight rework

1. Threads
(M8 x 1.25 - 6h)

No Go Thread Plug May cause fitment problem , Leads to


7 M
Gauge Qualifies rework
Pages 33 OF 80

ROHTAS

ITEM : Boot Color

ITEM CODE: 009-M85-044-3

CORE TEAM: GM (Operations), Engg. I/C,Prod I/C,Q.A. I/C


C
S L
PROCESS POTENTIAL
PC ID./ DESC. POTENTIAL EFFECT(S) OF FAILURE E A
REQUIREMENTS FAILURE MODE
V S
S

2. Plating
Trivalent Zn. White
Not OK Product Becomes Rusty Very Soon 7 M
(Hexavalent
50. SURFACE Chromium Free)
TREATMENT
(M/S SK
Enterprises)
3. Plating Thickness Less than
Product Becomes Rusty Very Soon 7 M
(8 Microns Min.) specification
Pages 34 OF 80

ROHTAS

ITEM : Boot Color

ITEM CODE: 009-M85-044-3


50. SURFACE
TREATMENT
CORE TEAM:
(M/S SK
GM (Operations), Engg. I/C,Prod I/C,Q.A. I/C
Enterprises) C
S L
PROCESS POTENTIAL
PC ID./ DESC. POTENTIAL EFFECT(S) OF FAILURE E A
REQUIREMENTS FAILURE MODE
V S
S

4. SST Life
(For White Rust
Less than
72 Hrs. Min. Product Becomes Rusty Very Soon 7 M
specification
For Red Rust
240 Hrs. Min.)

Rusty,Black & White


Spots ,Dents,Plating May Leads to rejection & hence
5. Apperance 6 M
Peel Off etc. are not Customer Dissatisfaction
allowed
Pages 35 OF 80

ROHTAS

ITEM : Boot Color

ITEM CODE: 009-M85-044-3

CORE TEAM: GM (Operations), Engg. I/C,Prod I/C,Q.A. I/C


C
S L
PROCESS POTENTIAL
PC ID./ DESC. POTENTIAL EFFECT(S) OF FAILURE E A
REQUIREMENTS FAILURE MODE
V S
S

Parameters (Length,
Parameters
Dia, Outness etc.) 1. Leads to rejection during Assembly
60. FINAL (Length,Dia.,Angle,
checked as per 2. Chances 7 M
INSPECTION Appearance etc.)
Sampling plan / of field failure
Not ok
Product Drawing/ CP
Pages 36 OF 80

ROHTAS

ITEM : Boot Color

ITEM CODE: 009-M85-044-3

CORE TEAM: GM (Operations), Engg. I/C,Prod I/C,Q.A. I/C


C
S L
PROCESS POTENTIAL
PC ID./ DESC. POTENTIAL EFFECT(S) OF FAILURE E A
REQUIREMENTS FAILURE MODE
V S
S

a) Improper Qty.
1. Customer will not meet his set target
B) Part
a) Qty. as per 2. Damage part is
70. PACKING Damage due to
specified unusable 3. 7 M
Improper Packing
b) Standard Packing Mixing leads to Rejection
c) Mixing
of Diff. Parts
Pages 37 OF 80

ROHTAS

ITEM : Boot Color

ITEM CODE: 009-M85-044-3

CORE TEAM: GM (Operations), Engg. I/C,Prod I/C,Q.A. I/C


C
S L
PROCESS POTENTIAL
PC ID./ DESC. POTENTIAL EFFECT(S) OF FAILURE E A
REQUIREMENTS FAILURE MODE
V S
S

1. Due to Improper Stacking


i) More space covered for limited
a) Improper parts ii) More time consume
stacking during parts take out from Rack
a) Proper Stacking
b) Damage during iii) Part may be
80. STORAGE b)Safe handling 5 M
Handling damage 2. Damage part
c) Maintain FIFO
c) FIFO not is unusable 3.If FIFO not
followed followed i)
Material becomes unusable due to Rusty
etc.
Pages 38 OF 80

ROHTAS

ITEM : Boot Color

ITEM CODE: 009-M85-044-3

CORE TEAM: GM (Operations), Engg. I/C,Prod I/C,Q.A. I/C


C
S L
PROCESS POTENTIAL
PC ID./ DESC. POTENTIAL EFFECT(S) OF FAILURE E A
REQUIREMENTS FAILURE MODE
V S
S

a) Part should be
90. DISPATCH Part Damage during
damage free during Damage Part is unusable 5 M
Transit
Transport

Rev. No. Rev. Date


01 26.07.2016 Drawing revied as per Customer Inspection standard
02 27.02.2018 ID 6.90/6.80 Thru hole added in forging was 6.85/6.75 blind
Pages 39 OF 80

ROHTAS FASTENERS PVT. LTD.

PROCESS FAILURE MODE AND EFFECT ANALYSIS


PROCESS RESPONSIBILITY: Mgr. (Q.A) PFMEA No. :
FMEA DATE (ORG)
PREPARED BY: Q.A FMEA DATE (APPL
FMEA LATEST REV
APPROVED BY: GM (Operations) FMEA LATEST REV
O D
POTENTIAL CAUSE C E R
CURRENT PROCESS CONTROL CURRENT PROCESS
MECHANISM(S) OF C T P
PREVENTION CONTROL DETECTION
FAILURE U E N
R C

Raw Material Fault (Drawing Regular audit at supplier end as per Checking Each Coil /Raw
2 3 36
die not OK/ Worn out) audit plan Material Test Report

Raw Material Fault (Drawing Regular audit at supplier end as per Checking Each Coil /Raw
2 3 30
Die Not Ok) audit plan Material Test Report
Pages 40 OF 80

ROHTAS FASTENERS PVT. LTD.

PROCESS FAILURE MODE AND EFFECT ANALYSIS


PROCESS RESPONSIBILITY: Mgr. (Q.A) PFMEA No. :
FMEA DATE (ORG)
PREPARED BY: Q.A FMEA DATE (APPL
FMEA LATEST REV
APPROVED BY: GM (Operations) FMEA LATEST REV
O D
POTENTIAL CAUSE C E R
CURRENT PROCESS CONTROL CURRENT PROCESS
MECHANISM(S) OF C T P
PREVENTION CONTROL DETECTION
FAILURE U E N
R C

Doing Upsetting of one piece


Regular audit at supplier end as per
Raw Material Fault 2 from each Coil/ Raw Material 3 42
audit plan
Test Report

Cross checking by Doing


Regular audit at supplier end as per spectro analysis from out
Raw Material Fault 2 3 42
audit plan side lab/ Raw Material Test
Report
Pages 41 OF 80

ROHTAS FASTENERS PVT. LTD.

PROCESS FAILURE MODE AND EFFECT ANALYSIS


PROCESS RESPONSIBILITY: Mgr. (Q.A) PFMEA No. :
FMEA DATE (ORG)
PREPARED BY: Q.A FMEA DATE (APPL
FMEA LATEST REV
APPROVED BY: GM (Operations) FMEA LATEST REV
O D
POTENTIAL CAUSE C E R
CURRENT PROCESS CONTROL CURRENT PROCESS
MECHANISM(S) OF C T P
PREVENTION CONTROL DETECTION
FAILURE U E N
R C

Doing microscopic checking


Raw Material Fault (Improper Regular audit at supplier end as per
2 of one piece from each Coil/ 3 42
Annealing) audit plan
Raw Material Test Report

Doing microscopic checking


Regular audit at supplier end as per
Raw Material Fault 2 of one piece from each Coil/ 3 36
audit plan
Raw Material Test Report
Pages 42 OF 80

ROHTAS FASTENERS PVT. LTD.

PROCESS FAILURE MODE AND EFFECT ANALYSIS


PROCESS RESPONSIBILITY: Mgr. (Q.A) PFMEA No. :
FMEA DATE (ORG)
PREPARED BY: Q.A FMEA DATE (APPL
FMEA LATEST REV
APPROVED BY: GM (Operations) FMEA LATEST REV
O D
POTENTIAL CAUSE C E R
CURRENT PROCESS CONTROL CURRENT PROCESS
MECHANISM(S) OF C T P
PREVENTION CONTROL DETECTION
FAILURE U E N
R C

Doing microscopic checking


Regular audit at supplier end as per
Raw Material Fault 2 of one piece from each Coil/ 3 36
audit plan
Raw Material Test Report

Doing Tensile testing of one


Regular audit at supplier end as per piece from the Coil having
Raw Material Fault 2 3 24
audit plan HRB higher than specified/
Raw Material Test Report
Pages 43 OF 80

ROHTAS FASTENERS PVT. LTD.

PROCESS FAILURE MODE AND EFFECT ANALYSIS


PROCESS RESPONSIBILITY: Mgr. (Q.A) PFMEA No. :
FMEA DATE (ORG)
PREPARED BY: Q.A FMEA DATE (APPL
FMEA LATEST REV
APPROVED BY: GM (Operations) FMEA LATEST REV
O D
POTENTIAL CAUSE C E R
CURRENT PROCESS CONTROL CURRENT PROCESS
MECHANISM(S) OF C T P
PREVENTION CONTROL DETECTION
FAILURE U E N
R C

Doing hardness checking of


Raw Material Fault (Improper Regular audit at supplier end as per
2 one piece from each Coil/ 3 24
Reduction) audit plan
Raw Material Test Report

Doing hardness checking of


Regular audit at supplier end as per
Raw Material Fault 2 one piece from each Coil/ 3 42
audit plan
Raw Material Test Report
Pages 44 OF 80

ROHTAS FASTENERS PVT. LTD.

PROCESS FAILURE MODE AND EFFECT ANALYSIS


PROCESS RESPONSIBILITY: Mgr. (Q.A) PFMEA No. :
FMEA DATE (ORG)
PREPARED BY: Q.A FMEA DATE (APPL
FMEA LATEST REV
APPROVED BY: GM (Operations) FMEA LATEST REV
O D
POTENTIAL CAUSE C E R
CURRENT PROCESS CONTROL CURRENT PROCESS
MECHANISM(S) OF C T P
PREVENTION CONTROL DETECTION
FAILURE U E N
R C
Inspection at the time of
Tool not ok / Tool / Die inspection report /
3 Setting / Tooling Change & 3 54
Setting not ok Setting approval slip.
/ 2Hr.
Inspection at the time of
Tool not ok / Tool / Die inspection report /
3 Setting / Tooling Change & 3 54
Setting not ok Setting approval slip.
/ 2Hr.
Inspection at the time of
Tool not ok / Tool / Die inspection report /
3 Setting / Tooling Change & 3 54
Setting not ok Setting approval slip.
/ 2Hr.
Inspection at the time of
Tool not ok / Tool / Die inspection report /
3 Setting / Tooling Change & 3 54
Setting not ok Setting approval slip.
/ 2Hr.
Pages 45 OF 80

ROHTAS FASTENERS PVT. LTD.

PROCESS FAILURE MODE AND EFFECT ANALYSIS


PROCESS RESPONSIBILITY: Mgr. (Q.A) PFMEA No. :
FMEA DATE (ORG)
PREPARED BY: Q.A FMEA DATE (APPL
FMEA LATEST REV
APPROVED BY: GM (Operations) FMEA LATEST REV
O D
POTENTIAL CAUSE C E R
CURRENT PROCESS CONTROL CURRENT PROCESS
MECHANISM(S) OF C T P
PREVENTION CONTROL DETECTION
FAILURE U E N
R C
Inspection at the time of
Tool not ok / Tool / Die inspection report /
3 Setting / Tooling Change & 3 54
Setting not ok Setting approval slip.
/ 2Hr.
Inspection at the time of
Tool not ok / Tool / Die inspection report /
3 Setting / Tooling Change & 3 54
Setting not ok Setting approval slip.
/ 2Hr.
Inspection at the time of
Tool not ok / Tool / Die inspection report /
3 Setting / Tooling Change & 3 54
Setting not ok Setting approval slip.
/ 2Hr.
Inspection at the time of
Tool not ok / Tool / Die inspection report /
3 Setting / Tooling Change & 3 54
Setting not ok Setting approval slip.
/ 2Hr.
Pages 46 OF 80

ROHTAS FASTENERS PVT. LTD.

PROCESS FAILURE MODE AND EFFECT ANALYSIS


PROCESS RESPONSIBILITY: Mgr. (Q.A) PFMEA No. :
FMEA DATE (ORG)
PREPARED BY: Q.A FMEA DATE (APPL
FMEA LATEST REV
APPROVED BY: GM (Operations) FMEA LATEST REV
O D
POTENTIAL CAUSE C E R
CURRENT PROCESS CONTROL CURRENT PROCESS
MECHANISM(S) OF C T P
PREVENTION CONTROL DETECTION
FAILURE U E N
R C
Inspection at the time of
Tool not ok / Tool / Die inspection report /
3 Setting / Tooling Change & 3 54
Setting not ok Setting approval slip.
/ 2Hr.
Inspection at the time of
Tool not ok / Tool / Die inspection report /
3 Setting / Tooling Change & 3 54
Setting not ok Setting approval slip.
/ 2Hr.
Wrong setting in machine./
M/c parameter setting as per PCS./ Inspection at the time of
Die/Punch misalignment /
3 Tool History Card / initial setting Setting / Tooling Change & 5 105
Approval / Training To operator. / 2Hr.
Punch size over /
Pages 47 OF 80

ROHTAS FASTENERS PVT. LTD.

PROCESS FAILURE MODE AND EFFECT ANALYSIS


PROCESS RESPONSIBILITY: Mgr. (Q.A) PFMEA No. :
FMEA DATE (ORG)
PREPARED BY: Q.A FMEA DATE (APPL
FMEA LATEST REV
APPROVED BY: GM (Operations) FMEA LATEST REV
O D
POTENTIAL CAUSE C E R
CURRENT PROCESS CONTROL CURRENT PROCESS
MECHANISM(S) OF C T P
PREVENTION CONTROL DETECTION
FAILURE U E N
R C
Wrong setting in machine./
M/c parameter setting as per PCS./ Inspection at the time of
Die/Punch misalignment /
3 Tool History Card / initial setting Setting / Tooling Change & 5 90
Approval / Training To setter. / 2Hr.
Punch size Under /

Inspection at the time of


Tool not ok / Tool / Die inspection report /
3 Setting / Tooling Change & 3 54
Setting not ok Setting approval slip.
/ 2Hr.
Inspection at the time of
Tool not ok / Tool / Die inspection report /
3 Setting / Tooling Change & 3 54
Setting not ok Setting approval slip.
/ 2Hr.

Tool not ok / Tool/Die inspection report/ Inspection at the time of


3 3 72
Setting not ok Setting approval slip. Setting & Tooling Change
Pages 48 OF 80

ROHTAS FASTENERS PVT. LTD.

PROCESS FAILURE MODE AND EFFECT ANALYSIS


PROCESS RESPONSIBILITY: Mgr. (Q.A) PFMEA No. :
FMEA DATE (ORG)
PREPARED BY: Q.A FMEA DATE (APPL
FMEA LATEST REV
APPROVED BY: GM (Operations) FMEA LATEST REV
O D
POTENTIAL CAUSE C E R
CURRENT PROCESS CONTROL CURRENT PROCESS
MECHANISM(S) OF C T P
PREVENTION CONTROL DETECTION
FAILURE U E N
R C

Tool not ok / Tool/Die inspection report/ Inspection at the time of


3 3 72
Setting not ok Setting approval slip. Setting & Tooling Change

Tool not ok / Tool/Die inspection report/ Inspection at the time of


3 3 72
Setting not ok Setting approval slip. Setting & Tooling Change

Tool not ok / Tool/Die inspection report/ Inspection at the time of


3 3 72
Setting not ok Setting approval slip. Setting & Tooling Change

Inspection at the time of


Raw Material Problem OR Raw Material Incoming Records/
3 Setting / Tooling Change & 3 54
Forging Problem Setting Approval Slip
/Hr.
Pages 49 OF 80

ROHTAS FASTENERS PVT. LTD.

PROCESS FAILURE MODE AND EFFECT ANALYSIS


PROCESS RESPONSIBILITY: Mgr. (Q.A) PFMEA No. :
FMEA DATE (ORG)
PREPARED BY: Q.A FMEA DATE (APPL
FMEA LATEST REV
APPROVED BY: GM (Operations) FMEA LATEST REV
O D
POTENTIAL CAUSE C E R
CURRENT PROCESS CONTROL CURRENT PROCESS
MECHANISM(S) OF C T P
PREVENTION CONTROL DETECTION
FAILURE U E N
R C

Inspection at the time of


Setting Not OK 3 Setting Approvel Slip Setting / Tooling Change & 3 63
/Hr.

Inspection at the time of


Setting Not OK 3 Setting Approvel Slip Setting / Tooling Change & 3 63
/Hr.
Pages 50 OF 80

ROHTAS FASTENERS PVT. LTD.

PROCESS FAILURE MODE AND EFFECT ANALYSIS


PROCESS RESPONSIBILITY: Mgr. (Q.A) PFMEA No. :
FMEA DATE (ORG)
PREPARED BY: Q.A FMEA DATE (APPL
FMEA LATEST REV
APPROVED BY: GM (Operations) FMEA LATEST REV
O D
POTENTIAL CAUSE C E R
CURRENT PROCESS CONTROL CURRENT PROCESS
MECHANISM(S) OF C T P
PREVENTION CONTROL DETECTION
FAILURE U E N
R C

Inspection at the time of


Setting Not OK 3 Setting Approvel Slip Setting / Tooling Change & 3 54
/Hr.

Inspection at the time of


Setting Not OK 3 Setting Approvel Slip Setting / Tooling Change & 3 63
/2Hr.
Inspection at the time of
Setting Not OK 3 Setting Approvel Slip Setting / Tooling Change & 3 63
/2Hr.
Pages 51 OF 80

ROHTAS FASTENERS PVT. LTD.

PROCESS FAILURE MODE AND EFFECT ANALYSIS


PROCESS RESPONSIBILITY: Mgr. (Q.A) PFMEA No. :
FMEA DATE (ORG)
PREPARED BY: Q.A FMEA DATE (APPL
FMEA LATEST REV
APPROVED BY: GM (Operations) FMEA LATEST REV
O D
POTENTIAL CAUSE C E R
CURRENT PROCESS CONTROL CURRENT PROCESS
MECHANISM(S) OF C T P
PREVENTION CONTROL DETECTION
FAILURE U E N
R C
Inspection at the time of
Setting Not OK 3 Setting Approvel Slip Setting / Tooling Change & 3 63
/2Hr.
Inspection at the time of
Setting Not OK 3 Setting Approvel Slip Setting / Tooling Change & 3 63
/2Hr.
Inspection at the time of
Setting Not OK 3 Setting Approvel Slip Setting / Tooling Change & 3 63
/2Hr.
Inspection at the time of
Setting Not OK 3 Setting Approvel Slip Setting / Tooling Change & 3 63
/2Hr.
Pages 52 OF 80

ROHTAS FASTENERS PVT. LTD.

PROCESS FAILURE MODE AND EFFECT ANALYSIS


PROCESS RESPONSIBILITY: Mgr. (Q.A) PFMEA No. :
FMEA DATE (ORG)
PREPARED BY: Q.A FMEA DATE (APPL
FMEA LATEST REV
APPROVED BY: GM (Operations) FMEA LATEST REV
O D
POTENTIAL CAUSE C E R
CURRENT PROCESS CONTROL CURRENT PROCESS
MECHANISM(S) OF C T P
PREVENTION CONTROL DETECTION
FAILURE U E N
R C

Inspection at the time of


Setting Not OK 3 Setting Approvel Slip Setting / Tooling Change & 3 63
/Hr.
Pages 53 OF 80

ROHTAS FASTENERS PVT. LTD.

PROCESS FAILURE MODE AND EFFECT ANALYSIS


PROCESS RESPONSIBILITY: Mgr. (Q.A) PFMEA No. :
FMEA DATE (ORG)
PREPARED BY: Q.A FMEA DATE (APPL
FMEA LATEST REV
APPROVED BY: GM (Operations) FMEA LATEST REV
O D
POTENTIAL CAUSE C E R
CURRENT PROCESS CONTROL CURRENT PROCESS
MECHANISM(S) OF C T P
PREVENTION CONTROL DETECTION
FAILURE U E N
R C

Process parameter Regular audit at supplier end as per Incoming Inspection Report /
3 3 63
not followed. audit plan Vendor PDIR

Process parameter Regular audit at supplier end as per Incoming Inspection Report /
3 3 63
not followed. audit plan Vendor PDIR
Pages 54 OF 80

ROHTAS FASTENERS PVT. LTD.

PROCESS FAILURE MODE AND EFFECT ANALYSIS


PROCESS RESPONSIBILITY: Mgr. (Q.A) PFMEA No. :
FMEA DATE (ORG)
PREPARED BY: Q.A FMEA DATE (APPL
FMEA LATEST REV
APPROVED BY: GM (Operations) FMEA LATEST REV
O D
POTENTIAL CAUSE C E R
CURRENT PROCESS CONTROL CURRENT PROCESS
MECHANISM(S) OF C T P
PREVENTION CONTROL DETECTION
FAILURE U E N
R C

Process parameter Regular audit at supplier end as per Incoming Inspection Report /
3 3 63
not followed. audit plan Vendor PDIR

Process parameter Regular audit at supplier end as per Incoming Inspection Report /
3 3 63
not followed. audit plan Vendor PDIR
Pages 55 OF 80

ROHTAS FASTENERS PVT. LTD.

PROCESS FAILURE MODE AND EFFECT ANALYSIS


PROCESS RESPONSIBILITY: Mgr. (Q.A) PFMEA No. :
FMEA DATE (ORG)
PREPARED BY: Q.A FMEA DATE (APPL
FMEA LATEST REV
APPROVED BY: GM (Operations) FMEA LATEST REV
O D
POTENTIAL CAUSE C E R
CURRENT PROCESS CONTROL CURRENT PROCESS
MECHANISM(S) OF C T P
PREVENTION CONTROL DETECTION
FAILURE U E N
R C

Process parameter Regular audit at supplier end as per Incoming Inspection Report /
3 3 63
not followed. audit plan Vendor PDIR

Process parameter Regular audit at supplier end as per Incoming Inspection Report /
3 3 54
not followed. audit plan Vendor PDIR
Pages 56 OF 80

ROHTAS FASTENERS PVT. LTD.

PROCESS FAILURE MODE AND EFFECT ANALYSIS


PROCESS RESPONSIBILITY: Mgr. (Q.A) PFMEA No. :
FMEA DATE (ORG)
PREPARED BY: Q.A FMEA DATE (APPL
FMEA LATEST REV
APPROVED BY: GM (Operations) FMEA LATEST REV
O D
POTENTIAL CAUSE C E R
CURRENT PROCESS CONTROL CURRENT PROCESS
MECHANISM(S) OF C T P
PREVENTION CONTROL DETECTION
FAILURE U E N
R C

Setting Slip / Patrol/Procss Inspection Final Inspection report/


In-Process fault 3 Report / Process Drawing/Process Customer Drawing/Control 3 63
Control Plan Plan
Pages 57 OF 80

ROHTAS FASTENERS PVT. LTD.

PROCESS FAILURE MODE AND EFFECT ANALYSIS


PROCESS RESPONSIBILITY: Mgr. (Q.A) PFMEA No. :
FMEA DATE (ORG)
PREPARED BY: Q.A FMEA DATE (APPL
FMEA LATEST REV
APPROVED BY: GM (Operations) FMEA LATEST REV
O D
POTENTIAL CAUSE C E R
CURRENT PROCESS CONTROL CURRENT PROCESS
MECHANISM(S) OF C T P
PREVENTION CONTROL DETECTION
FAILURE U E N
R C

Check Points followed during


Check Points during Packing Awareness by Training provide to Packing regarding
3 3 63
not followed concerned Qty./Wt./Poly Bag Size/Box
Size/Labelling etc.
Pages 58 OF 80

ROHTAS FASTENERS PVT. LTD.

PROCESS FAILURE MODE AND EFFECT ANALYSIS


PROCESS RESPONSIBILITY: Mgr. (Q.A) PFMEA No. :
FMEA DATE (ORG)
PREPARED BY: Q.A FMEA DATE (APPL
FMEA LATEST REV
APPROVED BY: GM (Operations) FMEA LATEST REV
O D
POTENTIAL CAUSE C E R
CURRENT PROCESS CONTROL CURRENT PROCESS
MECHANISM(S) OF C T P
PREVENTION CONTROL DETECTION
FAILURE U E N
R C

Check Point followed during


Check Points during Storage
Awareness by Training provide to FG Storage regarding
in FG Store 3 3 45
concerned FIFO/Damage Free
not followed
Handling/Stacking etc.
Pages 59 OF 80

ROHTAS FASTENERS PVT. LTD.

PROCESS FAILURE MODE AND EFFECT ANALYSIS


PROCESS RESPONSIBILITY: Mgr. (Q.A) PFMEA No. :
FMEA DATE (ORG)
PREPARED BY: Q.A FMEA DATE (APPL
FMEA LATEST REV
APPROVED BY: GM (Operations) FMEA LATEST REV
O D
POTENTIAL CAUSE C E R
CURRENT PROCESS CONTROL CURRENT PROCESS
MECHANISM(S) OF C T P
PREVENTION CONTROL DETECTION
FAILURE U E N
R C

Material loading under


Awareness by Training provide to
Improper Material Loading 3 supervision of PPC 3 45
concerned
Supervisor

Rev. Detail
Pages 60 OF 80
FMT No.:- F/PD/04
Rev. No.:- 00
Eff. Date :- 01.09.11

8
01
ID 6.90/6.80 Thru
PFMEA-SA-0102

.2
hole added in

02
forging was
FMEA DATE (ORG): 30.07.15

7.
6.85/6.75 blind

/2
FMEA DATE (APPL):

02
30.07.15
FMEA LATEST REV. No. 02 REV NO/ REVISION
APP.
FMEA LATEST REV. DT. 27.02.2018 DATE: DETAILS
ACTION RESULTS
RESPONSIBILI
RECOMMENDATION TY & TARGET S O D R
ACTION(S) COMPLETION ACTION
E C E P
DATE TAKEN
V C T N

Rej. the Material & Ask


Supplier for action Plan

DO
Pages 61 OF 80
FMT No.:- F/PD/04
Rev. No.:- 00
Eff. Date :- 01.09.11

8
01
ID 6.90/6.80 Thru
PFMEA-SA-0102

.2
hole added in

02
forging was
FMEA DATE (ORG): 30.07.15

7.
6.85/6.75 blind

/2
FMEA DATE (APPL):

02
30.07.15
FMEA LATEST REV. No. 02 REV NO/ REVISION
APP.
FMEA LATEST REV. DT. 27.02.2018 DATE: DETAILS
ACTION RESULTS
RESPONSIBILI
RECOMMENDATION TY & TARGET S O D R
ACTION(S) COMPLETION ACTION
E C E P
DATE TAKEN
V C T N

DO

DO
Pages 62 OF 80
FMT No.:- F/PD/04
Rev. No.:- 00
Eff. Date :- 01.09.11

8
01
ID 6.90/6.80 Thru
PFMEA-SA-0102

.2
hole added in

02
forging was
FMEA DATE (ORG): 30.07.15

7.
6.85/6.75 blind

/2
FMEA DATE (APPL):

02
30.07.15
FMEA LATEST REV. No. 02 REV NO/ REVISION
APP.
FMEA LATEST REV. DT. 27.02.2018 DATE: DETAILS
ACTION RESULTS
RESPONSIBILI
RECOMMENDATION TY & TARGET S O D R
ACTION(S) COMPLETION ACTION
E C E P
DATE TAKEN
V C T N

DO

DO
Pages 63 OF 80
FMT No.:- F/PD/04
Rev. No.:- 00
Eff. Date :- 01.09.11

8
01
ID 6.90/6.80 Thru
PFMEA-SA-0102

.2
hole added in

02
forging was
FMEA DATE (ORG): 30.07.15

7.
6.85/6.75 blind

/2
FMEA DATE (APPL):

02
30.07.15
FMEA LATEST REV. No. 02 REV NO/ REVISION
APP.
FMEA LATEST REV. DT. 27.02.2018 DATE: DETAILS
ACTION RESULTS
RESPONSIBILI
RECOMMENDATION TY & TARGET S O D R
ACTION(S) COMPLETION ACTION
E C E P
DATE TAKEN
V C T N

DO

DO
Pages 64 OF 80
FMT No.:- F/PD/04
Rev. No.:- 00
Eff. Date :- 01.09.11

8
01
ID 6.90/6.80 Thru
PFMEA-SA-0102

.2
hole added in

02
forging was
FMEA DATE (ORG): 30.07.15

7.
6.85/6.75 blind

/2
FMEA DATE (APPL):

02
30.07.15
FMEA LATEST REV. No. 02 REV NO/ REVISION
APP.
FMEA LATEST REV. DT. 27.02.2018 DATE: DETAILS
ACTION RESULTS
RESPONSIBILI
RECOMMENDATION TY & TARGET S O D R
ACTION(S) COMPLETION ACTION
E C E P
DATE TAKEN
V C T N

DO

DO
Pages 65 OF 80
FMT No.:- F/PD/04
Rev. No.:- 00
Eff. Date :- 01.09.11

8
01
ID 6.90/6.80 Thru
PFMEA-SA-0102

.2
hole added in

02
forging was
FMEA DATE (ORG): 30.07.15

7.
6.85/6.75 blind

/2
FMEA DATE (APPL):

02
30.07.15
FMEA LATEST REV. No. 02 REV NO/ REVISION
APP.
FMEA LATEST REV. DT. 27.02.2018 DATE: DETAILS
ACTION RESULTS
RESPONSIBILI
RECOMMENDATION TY & TARGET S O D R
ACTION(S) COMPLETION ACTION
E C E P
DATE TAKEN
V C T N

--

--

--

--
Pages 66 OF 80
FMT No.:- F/PD/04
Rev. No.:- 00
Eff. Date :- 01.09.11

8
01
ID 6.90/6.80 Thru
PFMEA-SA-0102

.2
hole added in

02
forging was
FMEA DATE (ORG): 30.07.15

7.
6.85/6.75 blind

/2
FMEA DATE (APPL):

02
30.07.15
FMEA LATEST REV. No. 02 REV NO/ REVISION
APP.
FMEA LATEST REV. DT. 27.02.2018 DATE: DETAILS
ACTION RESULTS
RESPONSIBILI
RECOMMENDATION TY & TARGET S O D R
ACTION(S) COMPLETION ACTION
E C E P
DATE TAKEN
V C T N

--

--

--

--
Pages 67 OF 80
FMT No.:- F/PD/04
Rev. No.:- 00
Eff. Date :- 01.09.11

8
01
ID 6.90/6.80 Thru
PFMEA-SA-0102

.2
hole added in

02
forging was
FMEA DATE (ORG): 30.07.15

7.
6.85/6.75 blind

/2
FMEA DATE (APPL):

02
30.07.15
FMEA LATEST REV. No. 02 REV NO/ REVISION
APP.
FMEA LATEST REV. DT. 27.02.2018 DATE: DETAILS
ACTION RESULTS
RESPONSIBILI
RECOMMENDATION TY & TARGET S O D R
ACTION(S) COMPLETION ACTION
E C E P
DATE TAKEN
V C T N

--

--

--
Pages 68 OF 80
FMT No.:- F/PD/04
Rev. No.:- 00
Eff. Date :- 01.09.11

8
01
ID 6.90/6.80 Thru
PFMEA-SA-0102

.2
hole added in

02
forging was
FMEA DATE (ORG): 30.07.15

7.
6.85/6.75 blind

/2
FMEA DATE (APPL):

02
30.07.15
FMEA LATEST REV. No. 02 REV NO/ REVISION
APP.
FMEA LATEST REV. DT. 27.02.2018 DATE: DETAILS
ACTION RESULTS
RESPONSIBILI
RECOMMENDATION TY & TARGET S O D R
ACTION(S) COMPLETION ACTION
E C E P
DATE TAKEN
V C T N

--

--

--

--
Pages 69 OF 80
FMT No.:- F/PD/04
Rev. No.:- 00
Eff. Date :- 01.09.11

8
01
ID 6.90/6.80 Thru
PFMEA-SA-0102

.2
hole added in

02
forging was
FMEA DATE (ORG): 30.07.15

7.
6.85/6.75 blind

/2
FMEA DATE (APPL):

02
30.07.15
FMEA LATEST REV. No. 02 REV NO/ REVISION
APP.
FMEA LATEST REV. DT. 27.02.2018 DATE: DETAILS
ACTION RESULTS
RESPONSIBILI
RECOMMENDATION TY & TARGET S O D R
ACTION(S) COMPLETION ACTION
E C E P
DATE TAKEN
V C T N

--

--

--

--
Pages 70 OF 80
FMT No.:- F/PD/04
Rev. No.:- 00
Eff. Date :- 01.09.11

8
01
ID 6.90/6.80 Thru
PFMEA-SA-0102

.2
hole added in

02
forging was
FMEA DATE (ORG): 30.07.15

7.
6.85/6.75 blind

/2
FMEA DATE (APPL):

02
30.07.15
FMEA LATEST REV. No. 02 REV NO/ REVISION
APP.
FMEA LATEST REV. DT. 27.02.2018 DATE: DETAILS
ACTION RESULTS
RESPONSIBILI
RECOMMENDATION TY & TARGET S O D R
ACTION(S) COMPLETION ACTION
E C E P
DATE TAKEN
V C T N

--

--
Pages 71 OF 80
FMT No.:- F/PD/04
Rev. No.:- 00
Eff. Date :- 01.09.11

8
01
ID 6.90/6.80 Thru
PFMEA-SA-0102

.2
hole added in

02
forging was
FMEA DATE (ORG): 30.07.15

7.
6.85/6.75 blind

/2
FMEA DATE (APPL):

02
30.07.15
FMEA LATEST REV. No. 02 REV NO/ REVISION
APP.
FMEA LATEST REV. DT. 27.02.2018 DATE: DETAILS
ACTION RESULTS
RESPONSIBILI
RECOMMENDATION TY & TARGET S O D R
ACTION(S) COMPLETION ACTION
E C E P
DATE TAKEN
V C T N

--

--

--
Pages 72 OF 80
FMT No.:- F/PD/04
Rev. No.:- 00
Eff. Date :- 01.09.11

8
01
ID 6.90/6.80 Thru
PFMEA-SA-0102

.2
hole added in

02
forging was
FMEA DATE (ORG): 30.07.15

7.
6.85/6.75 blind

/2
FMEA DATE (APPL):

02
30.07.15
FMEA LATEST REV. No. 02 REV NO/ REVISION
APP.
FMEA LATEST REV. DT. 27.02.2018 DATE: DETAILS
ACTION RESULTS
RESPONSIBILI
RECOMMENDATION TY & TARGET S O D R
ACTION(S) COMPLETION ACTION
E C E P
DATE TAKEN
V C T N

--

--

--

--
Pages 73 OF 80
FMT No.:- F/PD/04
Rev. No.:- 00
Eff. Date :- 01.09.11

8
01
ID 6.90/6.80 Thru
PFMEA-SA-0102

.2
hole added in

02
forging was
FMEA DATE (ORG): 30.07.15

7.
6.85/6.75 blind

/2
FMEA DATE (APPL):

02
30.07.15
FMEA LATEST REV. No. 02 REV NO/ REVISION
APP.
FMEA LATEST REV. DT. 27.02.2018 DATE: DETAILS
ACTION RESULTS
RESPONSIBILI
RECOMMENDATION TY & TARGET S O D R
ACTION(S) COMPLETION ACTION
E C E P
DATE TAKEN
V C T N

--
Pages 74 OF 80
FMT No.:- F/PD/04
Rev. No.:- 00
Eff. Date :- 01.09.11

8
01
ID 6.90/6.80 Thru
PFMEA-SA-0102

.2
hole added in

02
forging was
FMEA DATE (ORG): 30.07.15

7.
6.85/6.75 blind

/2
FMEA DATE (APPL):

02
30.07.15
FMEA LATEST REV. No. 02 REV NO/ REVISION
APP.
FMEA LATEST REV. DT. 27.02.2018 DATE: DETAILS
ACTION RESULTS
RESPONSIBILI
RECOMMENDATION TY & TARGET S O D R
ACTION(S) COMPLETION ACTION
E C E P
DATE TAKEN
V C T N

--

--
Pages 75 OF 80
FMT No.:- F/PD/04
Rev. No.:- 00
Eff. Date :- 01.09.11

8
01
ID 6.90/6.80 Thru
PFMEA-SA-0102

.2
hole added in

02
forging was
FMEA DATE (ORG): 30.07.15

7.
6.85/6.75 blind

/2
FMEA DATE (APPL):

02
30.07.15
FMEA LATEST REV. No. 02 REV NO/ REVISION
APP.
FMEA LATEST REV. DT. 27.02.2018 DATE: DETAILS
ACTION RESULTS
RESPONSIBILI
RECOMMENDATION TY & TARGET S O D R
ACTION(S) COMPLETION ACTION
E C E P
DATE TAKEN
V C T N

--

--
Pages 76 OF 80
FMT No.:- F/PD/04
Rev. No.:- 00
Eff. Date :- 01.09.11

8
01
ID 6.90/6.80 Thru
PFMEA-SA-0102

.2
hole added in

02
forging was
FMEA DATE (ORG): 30.07.15

7.
6.85/6.75 blind

/2
FMEA DATE (APPL):

02
30.07.15
FMEA LATEST REV. No. 02 REV NO/ REVISION
APP.
FMEA LATEST REV. DT. 27.02.2018 DATE: DETAILS
ACTION RESULTS
RESPONSIBILI
RECOMMENDATION TY & TARGET S O D R
ACTION(S) COMPLETION ACTION
E C E P
DATE TAKEN
V C T N

--

--
Pages 77 OF 80
FMT No.:- F/PD/04
Rev. No.:- 00
Eff. Date :- 01.09.11

8
01
ID 6.90/6.80 Thru
PFMEA-SA-0102

.2
hole added in

02
forging was
FMEA DATE (ORG): 30.07.15

7.
6.85/6.75 blind

/2
FMEA DATE (APPL):

02
30.07.15
FMEA LATEST REV. No. 02 REV NO/ REVISION
APP.
FMEA LATEST REV. DT. 27.02.2018 DATE: DETAILS
ACTION RESULTS
RESPONSIBILI
RECOMMENDATION TY & TARGET S O D R
ACTION(S) COMPLETION ACTION
E C E P
DATE TAKEN
V C T N

Follow Cantrol Plan


During Inspection
Pages 78 OF 80
FMT No.:- F/PD/04
Rev. No.:- 00
Eff. Date :- 01.09.11

8
01
ID 6.90/6.80 Thru
PFMEA-SA-0102

.2
hole added in

02
forging was
FMEA DATE (ORG): 30.07.15

7.
6.85/6.75 blind

/2
FMEA DATE (APPL):

02
30.07.15
FMEA LATEST REV. No. 02 REV NO/ REVISION
APP.
FMEA LATEST REV. DT. 27.02.2018 DATE: DETAILS
ACTION RESULTS
RESPONSIBILI
RECOMMENDATION TY & TARGET S O D R
ACTION(S) COMPLETION ACTION
E C E P
DATE TAKEN
V C T N

Do Periodical Internal
Audit
Pages 79 OF 80
FMT No.:- F/PD/04
Rev. No.:- 00
Eff. Date :- 01.09.11

8
01
ID 6.90/6.80 Thru
PFMEA-SA-0102

.2
hole added in

02
forging was
FMEA DATE (ORG): 30.07.15

7.
6.85/6.75 blind

/2
FMEA DATE (APPL):

02
30.07.15
FMEA LATEST REV. No. 02 REV NO/ REVISION
APP.
FMEA LATEST REV. DT. 27.02.2018 DATE: DETAILS
ACTION RESULTS
RESPONSIBILI
RECOMMENDATION TY & TARGET S O D R
ACTION(S) COMPLETION ACTION
E C E P
DATE TAKEN
V C T N

Do Periodical Internal
Audit
Pages 80 OF 80
FMT No.:- F/PD/04
Rev. No.:- 00
Eff. Date :- 01.09.11

8
01
ID 6.90/6.80 Thru
PFMEA-SA-0102

.2
hole added in

02
forging was
FMEA DATE (ORG): 30.07.15

7.
6.85/6.75 blind

/2
FMEA DATE (APPL):

02
30.07.15
FMEA LATEST REV. No. 02 REV NO/ REVISION
APP.
FMEA LATEST REV. DT. 27.02.2018 DATE: DETAILS
ACTION RESULTS
RESPONSIBILI
RECOMMENDATION TY & TARGET S O D R
ACTION(S) COMPLETION ACTION
E C E P
DATE TAKEN
V C T N

--

Prepared By Approved By

S-ar putea să vă placă și