Sunteți pe pagina 1din 2

HOUSING & DEVELOPMENT BOARD

FORM OF QUOTATION

i) Breakdown of Total Sum

Cost
S/n Work
(SGD)

1 CONSTRUCTION OF NEW ROOM

i Supply and install dry walls in paint finish.


ii Supply and install a new door with ironmongery
including door handle, lockset, door stopper and
hinge.
iii Supply and install timber grain laminate cladding on
dry wall to match entrance door.

Sub-Total

2 LIGHTING & ELECTRICAL WORKS

i Lighting works:
- Remove 8 existing lights
- Supply and install 12 new downlights (including
light bulbs)
- Re-configure lighting layout
- Supply and install new electrical faceplate
ii Carry out wiring and provide electrical points including
but not limited to the following for the completeness of
works:
- two high level ceiling electrical points
- eight wall-mounted 13A SSO
- 2 concealed 13A SSO in new dry wall
- relevant conduits in ceiling, dry wall and beneath
ground cover to allow future provision of audio
video cabling works
Iii Relocate existing Services Outlet Box

Sub-Total

3 FIRE SPRINKLER WORKS


i Relocate/add fire-sprinklers to meet statutory
requirements, including endorsement by QP

Sub-Total

Total Cost (SGD)

1 of 2
Schedule of Rates

Unit Cost
S/n Item
(SGD)

1 Supply and install one ceiling light

2 Supply and install one electrical point

We understand that:

1. HDB is not bound to accept the lowest or any quotation proposal received and
HDB reserves the right to accept the quotation proposal either in whole or in
part.

2. HDB reserves the right to instruct variations to the quantities of any of the items
and to vary the quantity of works. Should there be any variations to the
quantities of the items listed, the unit rates provided in the tables above shall
prevail.

Submitted by:

Name of Company

Name of Authorised person

Contact No.

Email

Address of Company

GST Registration No.


(if applicable)

2 of 2

S-ar putea să vă placă și