Plunger Lift
Optimize and Troubleshoot
Optimized ?
Optimize a single well
Optimize many wells
PRIMARY PURPOSE
Remove liquid from the tubing so gas can
flow freely to the surface
OPTIMIZED
70 % or more of AOF
Line Pressure
1000
200
800
MCF / D
150
psi
600
100
400
16-Jul-09
16-Nov-09
16-Dec-09
16-Aug-09
16-Sep-09
16-Mar-09
16-Jan-09
16-Jun-09
16-Jan-10
16-Oct-09
16-Apr-09
1200
150
MCF / D
psi
800
100
600
400 50
Daily Production Production stabilized
200
and increased
0 0
4-Oct-09
18-Oct-09
19-Apr-09
28-Jun-09
14-Jun-09
1-Nov-09
12-Jul-09
26-Jul-09
6-Sep-09
9-Aug-09
15-Nov-09
29-Nov-09
13-Dec-09
27-Dec-09
3-May-09
17-May-09
31-May-09
23-Aug-09
20-Sep-09
2,500
psi
2,000
2,000
1,500
1,500
1 1,000
1,000 Liquid
Produced
500 500
2
Production goals or
Casing
Pressure trial and error?
Super Flow
Plunger
Gas
Produced
70 %
250 Casing 300
Pressure
200 250
200
150
150
100 Standing
Valve 100
50 Gas 50
Set a production target for Produced 26 %
each well! 0 0
BACKPRESSURE
Qsc = C ( Pr2 - Pwf2)n High line pressure
LIQUID LOADING
Scale / paraffin build-up
Chokes
Motor valve trim size
Multiple 90 degree elbows
Small orifice plates
IPR CURVE
Hi Pressure Well
1,200
800
1,000
600
CASING 800
PRESSURE
600
400
400
200
200
200 Mcf / d X 45 days X $ 4 / mcf
= $ 36,000 lost in 45 days !
Use
0
decline curve to 0
set production target
Use checklists!
Pre-Installation
Installation
Troubleshooting
Etc
Select the appropriate algorithm
Time assumes limited well variations
Self adjusting algorithms can be less labor intensive
Minimize variation! Same lift pressure and liquid load
Optimize production – use plunger velocity as indicator
9
10
FILTER CP TP LP
(if req’d)
Vent
OPENS / CLOSES
25 – 35
REGULATOR WELL
psi
SCRUBBER
1500
CASING
psi
1. Set tubing plug and pressure test tubing. If tubing integrity is good, continue.
2. Check tubing diameter using a ring gauge. If necessary, broach the tubing to
ensure no tight spots between the seating nipple and lubricator connection
point.
3. Ensure well head diameter is the
same as the tubing ID. If larger,
sleeve the wellhead.
4. Prepare the flow line and install
the flanged control valve for
plunger lift control.
5. Install the lubricator (dual outlet
preferred) on the wellhead and
plumb in the flow line.
11. Using plunger fall time calculations, allow adequate time for the plunger to
reach the bottom hole spring assembly.
12. Document the lift pressure prior to opening the well. Allow the plunger to
surface, documenting plunger arrival velocity. Generally, plunger arrival
velocities between 500 and 1000 feet per minute are desirable.
13. Allow the well to flow until the flow rate approaches the critical flow rate.
Then, shut the well in, documenting the liquid load soon after the well is
closed. Compare the liquid load, lift pressure and plunger arrival velocity.
14. If necessary, adjust controller settings in preparation for the next cycle to
achieve optimal production at desirable plunger velocities.
Objective: Objective:
Open at minimum pressure required to Maximize production while allowing the designed
surface plunger at desired plunger velocity quantity of liquid to enter tubing on every cycle
open
Tubing
Pressure
Only round trip
times recorded Flow
Rate
Less shut-in
Line
Pressure
Excessive
plunger
velocities
possible
Plunger free cycling
800 Note:
MCF / D
TWO STAGE PLUNGER LIFT GAS ASSISTED PLUNGER LIFT PLUNGER ASSISTED GAS LIFT
o Low GLR, marginal wells o Low GLR wells o Low GLR wells
600 800
600
400
400
200
200
CASING
0 PRESSURE 0
20-Feb
20-Nov
20-Dec
20-Nov
20-Dec
20-Oct
20-Feb
20-Oct
20-Mar
20-Apr
20-May
20-Aug
20-Sep
20-Mar
20-Apr
20-May
20-Aug
20-Sep
20-Jan
20-Jun
20-Jul
20-Jan
20-Jun
20-Jul
20-Jan
1. DETECT RAPIDLY
Station Name : Well # 2 H
Alarm Text : Low Sales Press
Time Logged : Feb 4, 2011, 7:06 AM
Value : 32.9
Set point : 45.0 ALARM!
Casing
Pressure
Liquid
Load
Lift LOOK FOR VARIATIONS
Pressure TO THE TYPICAL
PLUNGER CYCLE !
Flow Rate
Tubing
Pressure
Line
Pressure
Casing
Pressure
Tubing
Pressure
Flow
Rate
Line
Pressure Control Valve Closed
Tubing declines
Flow rate observed
Control Valve Leak!
Casing
Pressure Control Valve Closed
Line pressure declines
Tubing Possible Dump Valve Leak!
Pressure
Flow
Rate
Line
Pressure
Casing
Pressure Control Valve Open
Well closed when flow
Tubing rate is increasing
Pressure Flow longer!
Flow
Rate
Line
Pressure
Casing
Pressure
Tubing
Pressure
Line
Pressure
Liquid Load
Lift Pressure
Plunger Velocity
Close time Self Adjusting Controllers
Production
Greater than 1000 fpm
Lubricator top seeps / leaks Dry threads. Inspect “o” ring. Grease “o” ring.
Catcher will not trap plunger Inspect / replace spring (ball and spring type).
Motor valve closed, flow rate not zero Motor valve leak or calibrate flow meter
Motor valve closed, TP & CP slowly equalize, fast Pressure is pushing liquid out of tubing. Shorten close
and dry plunger runs, possible liquid produced after time or add a standing valve.
plunger arrives
Fall time elapsed, casing pressure not increasing, Reduce shut-in time or open at lower lift pressure
shut-in time remains
Consistent plunger runs; consistent fluid loads Tubing set too high. Liquid column slowly builds below
followed by instant liquid loading and no plunger runs tubing. When column reaches tubing, well loads
Fast, dry plunger runs. Liquid in tubing on each cycle Fall time too short
Appalachian Basin Gas Well Deliquification Seminar 40
June 4 – 6, 2012
Marietta, Ohio
Optimize many wells
5. Troubleshoot -
25 psi Motor
2
To Valve
Motor
4 Valve
1 Latching
Solenoid
3 Valve
Supply Line
Vent Line
1) Check supply line pressure (clean gas)
2) Check pressure to motor valve
3) Ensure vent line is not obstructed
4) Ensure solenoid valve is functioning 5
Clean if obstructed
5) Check trim/seat for wear, leaks
Appalachian Basin Gas Well Deliquification Seminar 41
June 4 – 6, 2012
Marietta, Ohio
Optimize many wells
5. Troubleshoot -
COMMON PROBLEMS
Barbour County 12 H
Jan through Aug 20XX
Actionable data
What
prevents
missed
arrivals?
1) Is the problem
5) Has a plan been
statement clear and
identified to
accurate?
standardize and save
2) Has the systemic root
all lessons learned
cause been
across all groups?
identified?
DO
CHECK Implement the plan
Follow-up
4) Has a plan been 3) Has irreversible
identified to verify corrective actions
the effectiveness of been implemented for
all corrective all root causes?
actions?
Prioritize before
going to well site!
Minimize restrictions
OPTIMIZE PRODUCITON