MACKINTOSH BURN LIMITED

(Government of West Bengal Enterprise)

CONSTRUCTION OFFICE : MBL HOUSE,


BLOCK - DD-18/8 Sector-1 Salt Lake
Kolkata-700064

CONSTRUCTION OF R.C.C. BRIDGE OVER RIVER


KALNAGINI CONNECTING WEST SIDE OF TAKIPUR
MOUZA OF BAPUJI G.P. & EAST SIDE OF MANMATHAPUR.

SCOUR DEPTH CALCULATION

DOC NO. – MBL/2015/104/KALNAGINI/DOC-D1(A)

CLIENT

SUNDARBAN DEVELOPMNT BOARD


Project: Construction of Bridge over river Kalnagini Client : Sundarban Development Board

HYDRAULOGICAL CALCULATION FOR KALNAGINI BRIDGE

Page 1 of 10 Prepared By : Mackintosh Burn Limited


Project: Construction of Bridge over river Kalnagini Client : Sundarban Development Board

AT BRIDGE CENTER
CHAINAGE HORIZONTAL R.L. H.F.L DEPTH OF VERTICAL C/S AREA WEIGHTED
DIST. WATER DIST. PEREMITER

-50.58 4.07 4.07 0.00


-49.80 0.78 3.80 4.07 0.27 0.27 0.11 0.83
-42.45 7.35 1.26 4.07 2.81 2.53 11.31 7.77
-39.77 2.68 -0.24 4.07 4.31 1.50 9.55 3.08
-31.30 8.47 -3.37 4.07 7.44 3.13 49.77 9.03
-27.48 3.81 -4.75 4.07 8.82 1.38 30.98 4.05
-24.99 2.49 -5.51 4.07 9.58 0.76 22.93 2.61
-22.33 2.66 -6.32 4.07 10.39 0.81 26.51 2.78
-15.47 6.86 -6.16 4.07 10.23 0.16 70.74 6.86
-9.88 5.59 -6.06 4.07 10.13 0.10 56.92 5.59
0.00 9.88 -5.99 4.07 10.06 0.08 99.76 9.88
4.31 4.31 -5.78 4.07 9.85 0.20 42.89 4.31
13.69 9.38 -5.60 4.07 9.67 0.19 91.58 9.39
15.83 2.14 -5.49 4.07 9.56 0.11 20.57 2.14
20.11 4.28 -4.74 4.07 8.81 0.75 39.28 4.34
24.21 4.10 -3.78 4.07 7.85 0.96 34.17 4.21
25.94 1.72 -3.53 4.07 7.60 0.25 13.31 1.74
34.88 8.95 -2.07 4.07 6.14 1.46 61.47 9.06
44.72 9.84 -0.47 4.07 4.54 1.60 52.57 9.97
52.73 8.01 1.20 4.07 2.87 1.67 29.66 8.18
56.23 3.50 1.62 4.07 2.45 0.42 9.30 3.52
65.02 8.79 1.51 4.07 2.56 0.11 22.02 8.79
69.92 4.90 1.44 4.07 2.63 0.06 12.72 4.90
75.79 5.87 1.37 4.07 2.70 0.08 15.63 5.87
81.48 5.69 1.30 4.07 2.78 0.07 15.59 5.69
86.63 5.15 1.23 4.07 2.84 0.07 14.46 5.15
93.03 6.40 1.17 4.07 2.90 0.06 18.35 6.40
98.75 5.72 1.13 4.07 2.95 0.05 16.71 5.72
101.47 2.72 1.42 4.07 2.65 0.29 7.62 2.74
104.14 2.66 2.32 4.07 1.75 0.90 5.86 2.81
106.21 2.07 4.07 4.07 0.00 1.75 1.81 2.71
904.15 160.14

Manning's coefficient (N) = 0.05


Longitudinal Slope (S) = 0.0012

Hydraulic mean depth = R =(A/p) 5.65

(2/3) (1/2)
Velocity (v)= 1/N x R xS 2.20 m / sec

Discharge Q= A x V = 1986.17 cumec

Page 2 of 10 Prepared By : Mackintosh Burn Limited


Project: Construction of Bridge over river Kalnagini Client : Sundarban Development Board

AT CHAINAGE 50 m (UPSTREAM)
CHAINAGE HORIZONTAL R.L. H.F.L DEPTH OF VERTICAL C/S AREA WEIGHTED
DIST. WATER DIST. PEREMITER

-59.919 4.07 4.07 0.00


-59.44 0.48 3.78 4.07 0.29 0.29 0.07 0.56
-58.26 1.18 3.79 4.07 0.28 0.01 0.34 1.18
-49.92 8.35 2.39 4.07 1.68 1.40 8.20 8.46
-46.00 3.92 1.74 4.07 2.33 0.65 7.86 3.97
-41.63 4.37 -0.14 4.07 4.21 1.88 14.29 4.76
-32.93 8.71 -3.77 4.07 7.84 3.63 52.47 9.43
-26.13 6.80 -5.88 4.07 9.95 2.11 60.46 7.12
-22.52 3.61 -6.34 4.07 10.41 0.46 36.80 3.64
-16.51 6.00 -6.20 4.07 10.27 0.15 62.07 6.01
-11.25 5.26 -6.07 4.07 10.14 0.13 53.64 5.26
0.00 11.25 -5.81 4.07 9.88 0.25 112.65 11.26
5.80 5.80 -5.57 4.07 9.64 0.25 56.62 5.81
15.47 9.67 -4.99 4.07 9.06 0.57 90.41 9.69
24.82 9.34 -3.54 4.07 7.61 1.45 77.88 9.45
27.98 3.16 -3.12 4.07 7.19 0.42 23.40 3.19
36.23 8.25 -1.62 4.07 5.69 1.50 53.12 8.39
45.98 9.75 0.16 4.07 3.91 1.77 46.78 9.91
50.53 4.55 1.06 4.07 3.01 0.91 15.76 4.64
60.10 9.57 2.23 4.07 1.84 1.17 23.20 9.64
72.18 12.08 1.65 4.07 2.42 0.58 25.70 12.09
77.53 5.36 1.80 4.07 2.27 0.14 12.56 5.36
78.47 0.93 2.32 4.07 1.75 0.53 1.88 1.07
81.67 3.20 2.79 4.07 1.28 0.47 4.83 3.23
83.25 1.58 4.07 4.07 0.00 1.28 1.01 2.03
841.98 146.14

Manning's coefficient (N) = 0.05


Longitudinal Slope (S) = 0.0012

Hydraulic mean depth = R =(A/p) 5.76

(2/3) (1/2)
Velocity (v)= 1/N x R xS 2.23 m / sec

Discharge Q= A x V = 1874.73 cumec

Page 3 of 10 Prepared By : Mackintosh Burn Limited


Project: Construction of Bridge over river Kalnagini Client : Sundarban Development Board

AT CHAINAGE 100 m (UPSTREAM)


CHAINAGE HORIZONTAL R.L. H.F.L DEPTH OF VERTICAL C/S AREA WEIGHTED
DIST. WATER DIST. PEREMITER

-59.173 4.07 4.07 0.00


-58.87 0.31 4.03 4.07 0.04 0.04 0.01 0.31
-57.90 0.97 3.92 4.07 0.15 0.11 0.09 0.97
-53.17 4.73 2.08 4.07 1.99 1.84 5.06 5.08
-44.73 8.43 1.14 4.07 2.94 0.95 20.76 8.49
-42.73 2.01 -0.05 4.07 4.12 1.19 7.08 2.33
-31.46 11.27 -4.81 4.07 8.88 4.76 73.25 12.23
-25.15 6.32 -5.63 4.07 9.70 0.81 58.66 6.37
-11.79 13.36 -6.31 4.07 10.38 0.68 134.12 13.38
0.00 11.79 -5.65 4.07 9.72 0.66 118.45 11.80
13.68 13.68 -4.97 4.07 9.04 0.68 128.36 13.70
26.31 12.63 -3.34 4.07 7.41 1.63 103.90 12.73
27.63 1.33 -3.15 4.07 7.22 0.19 9.70 1.34
43.76 16.13 -0.20 4.07 4.27 2.95 92.72 16.40
48.17 4.41 0.79 4.07 3.28 0.99 16.64 4.52
52.56 4.39 1.74 4.07 2.33 0.95 12.30 4.49
55.60 3.04 1.94 4.07 2.14 0.20 6.80 3.05
63.51 7.91 2.15 4.07 1.92 0.21 16.04 7.91
68.98 5.48 1.94 4.07 2.13 0.21 11.10 5.48
70.90 1.91 2.30 4.07 1.77 0.36 3.73 1.94
79.22 8.32 2.97 4.07 1.10 0.68 11.95 8.35
80.50 1.29 4.07 4.07 0.00 1.10 0.71 1.69
831.43 142.56

Manning's coefficient (N) = 0.05


Longitudinal Slope (S) = 0.0012

Hydraulic mean depth = R =(A/p) 5.83

(2/3) (1/2)
Velocity (v)= 1/N x R xS 2.24 m / sec

Discharge Q= A x V = 1866.41 cumec

Page 4 of 10 Prepared By : Mackintosh Burn Limited


Project: Construction of Bridge over river Kalnagini Client : Sundarban Development Board

AT CHAINAGE 250 m (UP STREAM)

CHAINAGE HORIZONTAL R.L. H.F.L DEPTH OF VERTICAL C/S AREA WEIGHTED


DIST. WATER DIST. PEREMITER

-72.92 4.07 4.07 0.00


-72.54 0.38 3.86 4.07 0.21 0.21 0.04 0.43
-70.09 2.45 2.59 4.07 1.49 1.28 2.08 2.76
-64.83 5.26 2.22 4.07 1.85 0.37 8.77 5.27
-58.35 6.48 2.17 4.07 1.90 0.05 12.15 6.48
-52.94 5.40 2.13 4.07 1.94 0.04 10.39 5.41
-49.21 3.73 2.10 4.07 1.97 0.03 7.30 3.73
-44.74 4.47 -0.06 4.07 4.13 2.15 13.64 4.97
-31.21 13.53 -3.44 4.07 7.51 3.38 78.67 13.94
-26.35 4.87 -4.49 4.07 8.56 1.05 39.09 4.98
-20.32 6.03 -6.21 4.07 10.28 1.72 56.77 6.27
-11.91 8.41 -6.06 4.07 10.13 0.15 85.77 8.41
-4.10 7.81 -5.87 4.07 9.94 0.19 78.38 7.82
0.00 4.10 -5.92 4.07 9.99 0.05 40.83 4.10
11.82 11.82 -5.59 4.07 9.66 0.34 116.11 11.82
15.86 4.05 -4.99 4.07 9.06 0.60 37.86 4.09
21.30 5.44 -4.08 4.07 8.15 0.91 46.77 5.51
26.59 5.29 -3.57 4.07 7.64 0.51 41.76 5.32
38.83 12.24 -0.18 4.07 4.25 3.39 72.74 12.70
44.27 5.44 1.10 4.07 2.97 1.28 19.63 5.59
51.35 7.08 1.88 4.07 2.20 0.78 18.29 7.12
60.02 8.67 1.86 4.07 2.21 0.01 19.08 8.67
66.17 6.16 1.85 4.07 2.22 0.01 13.64 6.16
75.49 9.31 1.83 4.07 2.24 0.02 20.76 9.31
84.28 8.80 1.82 4.07 2.25 0.02 19.75 8.80
96.46 12.18 1.80 4.07 2.27 0.02 27.57 12.18
99.95 3.49 2.51 4.07 1.56 0.72 6.68 3.56
101.29 1.34 4.07 4.07 0.00 1.56 1.04 2.05
895.56 177.43

Manning's coefficient (N) = 0.05


Longitudinal Slope (S) = 0.0012

Hydraulic mean depth = R =(A/p) 5.05

(2/3) (1/2)
Velocity (v)= 1/N x R xS 2.04 m / sec

Discharge Q= A x V = 1825.67 cumec

Page 5 of 10 Prepared By : Mackintosh Burn Limited


Project: Construction of Bridge over river Kalnagini Client : Sundarban Development Board

AT CHAINAGE 50 m (DOWN STREAM)


CHAINAGE HORIZONTAL R.L. H.F.L DEPTH OF VERTICAL C/S AREA WEIGHTED
DIST. WATER DIST. PEREMITER

-106.62 4.07 4.07 0.00


-105.97 0.65 3.75 4.07 0.32 0.32 0.11 0.73
-102.57 3.40 2.07 4.07 2.00 1.68 3.96 3.79
-97.10 5.48 1.80 4.07 2.27 0.26 11.69 5.48
-92.58 4.51 1.46 4.07 2.61 0.35 11.01 4.53
-87.49 5.09 1.55 4.07 2.52 0.09 13.05 5.09
-83.64 3.85 1.58 4.07 2.49 0.03 9.65 3.85
-79.23 4.41 1.54 4.07 2.53 0.04 11.08 4.42
-78.45 0.78 2.06 4.07 2.01 0.52 1.76 0.93
-77.80 0.65 0.95 4.07 3.12 1.11 1.67 1.28
-77.12 0.68 2.23 4.07 1.84 1.28 1.69 1.45
-72.52 4.60 2.22 4.07 1.85 0.01 8.47 4.60
-67.99 4.53 2.21 4.07 1.86 0.01 8.38 4.53
-63.72 4.27 2.21 4.07 1.86 0.01 7.95 4.27
-59.18 4.53 2.20 4.07 1.87 0.01 8.47 4.53
-58.20 0.99 2.65 4.07 1.42 0.45 1.62 1.08
-45.70 12.50 1.97 4.07 2.10 0.68 21.98 12.51
-42.14 3.56 0.14 4.07 3.94 1.84 10.74 4.01
-37.49 4.65 -1.52 4.07 5.59 1.66 22.14 4.93
-30.44 7.05 -3.19 4.07 7.26 1.67 45.33 7.25
-26.28 4.16 -4.84 4.07 8.91 1.65 33.63 4.47
-21.88 4.41 -6.46 4.07 10.53 1.61 42.84 4.69
-17.25 4.63 -6.39 4.07 10.46 0.06 48.57 4.63
-12.52 4.73 -6.33 4.07 10.40 0.06 49.29 4.73
-9.11 3.42 -6.28 4.07 10.35 0.05 35.43 3.42
-2.92 6.18 -6.24 4.07 10.31 0.04 63.85 6.18
0.00 2.92 -6.23 4.07 10.30 0.01 30.10 2.92
1.79 1.79 -6.19 4.07 10.26 0.04 18.40 1.79
8.07 6.28 -5.81 4.07 9.88 0.38 63.18 6.29
13.57 5.51 -5.50 4.07 9.57 0.30 53.54 5.51
23.22 9.65 -4.10 4.07 8.17 1.40 85.61 9.75
31.47 8.25 -2.57 4.07 6.64 1.54 61.05 8.39
43.44 11.97 -0.34 4.07 4.41 2.23 66.11 12.18
48.07 4.63 0.60 4.07 3.47 0.94 18.24 4.72
54.21 6.15 1.16 4.07 2.91 0.56 19.61 6.17
61.43 7.22 1.82 4.07 2.25 0.66 18.62 7.25
69.66 8.22 1.64 4.07 2.43 0.18 19.23 8.22
78.27 8.61 1.46 4.07 2.61 0.19 21.69 8.61
86.79 8.52 1.28 4.07 2.80 0.18 23.03 8.52
91.85 5.06 1.29 4.07 2.78 0.01 14.11 5.06
92.37 0.53 1.84 4.07 2.23 0.55 1.32 0.76
97.81 5.44 2.72 4.07 1.35 0.89 9.73 5.51
100.42 2.61 4.07 4.07 0.00 1.35 1.76 2.93
999.68 211.99

Manning's coefficient (N) = 0.05


Longitudinal Slope (S) = 0.0012

Hydraulic mean depth = R =(A/p) 4.72

(2/3) (1/2)
Velocity (v)= 1/N x R xS 1.95 m / sec

Discharge Q= A x V = 1947.66 cumec

Page 6 of 10 Prepared By : Mackintosh Burn Limited


Project: Construction of Bridge over river Kalnagini Client : Sundarban Development Board

AT CHAINAGE 100 m (DOWN STREAM)


CHAINAGE HORIZONTAL R.L. H.F.L DEPTH OF VERTICAL DIST. C/S AREA WEIGHTED
DIST. WATER PEREMITER

-106.276 4.07 4.07 0.00


-105.994 0.28 3.989 4.07 0.08 0.08 0.01 0.29
-103.362 2.63 3.493 4.07 0.58 0.50 0.87 2.68
-97.917 5.44 3.026 4.07 1.04 0.47 4.41 5.46
-92.181 5.74 2.535 4.07 1.54 0.49 7.40 5.76
-86.214 5.97 2.023 4.07 2.05 0.51 10.69 5.99
-79.252 6.96 1.924 4.07 2.15 0.10 14.60 6.96
-69.707 9.55 2.194 4.07 1.88 0.27 19.19 9.55
-58.67 11.04 2.51 4.07 1.56 0.31 18.97 11.04
-46.10 12.57 1.99 4.07 2.08 0.52 22.90 12.58
-41.29 4.81 -0.18 4.07 4.25 2.17 15.22 5.28
-31.05 10.24 -3.19 4.07 7.26 3.02 58.92 10.67
-26.80 4.25 -5.77 4.07 9.84 2.58 36.32 4.97
-21.63 5.18 -6.54 4.07 10.61 0.77 52.91 5.23
-14.02 7.61 -6.21 4.07 10.28 0.32 79.46 7.62
-6.92 7.10 -6.22 4.07 10.29 0.01 72.96 7.10
0.00 6.92 -6.24 4.07 10.31 0.02 71.27 6.92
1.80 1.80 -6.21 4.07 10.28 0.02 18.53 1.80
8.41 6.61 -5.92 4.07 9.99 0.30 67.00 6.62
15.71 7.30 -5.35 4.07 9.42 0.57 70.78 7.32
23.67 7.97 -3.91 4.07 7.98 1.44 69.29 8.09
29.57 5.90 -2.90 4.07 6.97 1.01 44.11 5.99
44.24 14.67 -0.42 4.07 4.49 2.48 84.06 14.87
48.63 4.39 0.49 4.07 3.58 0.92 17.73 4.49
55.96 7.33 1.37 4.07 2.70 0.88 22.98 7.38
65.13 9.17 1.58 4.07 2.49 0.20 23.82 9.18
71.84 6.71 1.73 4.07 2.35 0.15 16.23 6.71
80.34 8.50 1.91 4.07 2.16 0.19 19.12 8.50
87.02 6.68 2.37 4.07 1.70 0.46 12.88 6.70
94.05 7.03 3.12 4.07 0.95 0.75 9.32 7.07
95.30 1.25 4.07 4.07 0.00 0.95 0.60 1.57
962.53 204.38

Manning's coefficient (N) = 0.05


Longitudinal Slope (S) = 0.0012

Hydraulic mean depth = R =(A/p) 4.71

(2/3) (1/2)
Velocity (v)= 1/N x R xS 1.95 m / sec

Discharge Q= A x V = 1873.63 cumec

Page 7 of 10 Prepared By : Mackintosh Burn Limited


Project: Construction of Bridge over river Kalnagini Client : Sundarban Development Board

AT CHAINAGE 250 m (DOWN STREAM)


CHAINAGE HORIZONTAL R.L. H.F.L DEPTH OF VERTICAL C/S AREA WEIGHTED
DIST. WATER DIST. PEREMITER

-58.35 4.07 4.07


-57.24 1.11 3.57 4.07 0.50 0.50 0.28 1.22
-54.43 2.80 2.46 4.07 1.62 1.11 2.97 3.02
-52.92 1.51 2.34 4.07 1.73 0.11 2.53 1.52
-51.41 1.51 1.66 4.07 2.41 0.68 3.11 1.65
-47.24 4.18 0.07 4.07 4.00 1.59 13.38 4.47
-41.59 5.65 -0.46 4.07 4.53 0.53 24.11 5.68
-36.35 5.24 -1.96 4.07 6.03 1.50 27.69 5.45
-29.47 6.88 -4.65 4.07 8.72 2.69 50.73 7.38
-21.96 7.51 -6.81 4.07 10.88 2.16 73.58 7.81
-13.80 8.16 -6.64 4.07 10.71 0.16 88.04 8.16
-6.41 7.39 -6.40 4.07 10.47 0.24 78.26 7.39
0.00 6.41 -6.24 4.07 10.31 0.16 66.63 6.41
4.75 4.75 -6.08 4.07 10.15 0.17 48.58 4.75
13.31 8.57 -5.68 4.07 9.75 0.40 85.20 8.57
22.42 9.11 -4.92 4.07 8.99 0.76 85.36 9.14
27.76 5.34 -3.63 4.07 7.70 1.29 44.55 5.49
35.03 7.27 -2.89 4.07 6.96 0.74 53.30 7.31
46.54 11.51 -0.58 4.07 4.65 2.32 66.84 11.74
50.86 4.32 0.33 4.07 3.74 0.91 18.09 4.41
61.50 10.64 0.81 4.07 3.26 0.48 37.22 10.65
72.25 10.75 1.30 4.07 2.77 0.48 32.40 10.76
82.56 10.31 1.76 4.07 2.31 0.47 26.20 10.32
92.39 9.83 1.77 4.07 2.30 0.01 22.63 9.83
103.22 10.83 1.78 4.07 2.29 0.01 24.84 10.83
110.12 6.90 3.27 4.07 0.80 1.49 10.66 7.06
111.47 1.35 3.88 4.07 0.19 0.61 0.67 1.48
112.09 0.63 3.89 4.07 0.18 0.01 0.12 0.63
112.83 0.73 3.40 4.07 0.67 0.49 0.31 0.88
115.22 2.39 2.54 4.07 1.53 0.86 2.63 2.54
124.53 9.31 2.55 4.07 1.52 0.01 14.18 9.31
135.90 11.37 2.51 4.07 1.56 0.04 17.51 11.37
145.46 9.56 2.47 4.07 1.60 0.04 15.12 9.56
156.39 10.94 2.25 4.07 1.82 0.22 18.70 10.94
166.95 10.56 2.04 4.07 2.03 0.21 20.34 10.57
178.77 11.81 1.80 4.07 2.27 0.24 25.39 11.82
188.73 9.96 1.60 4.07 2.47 0.20 23.58 9.96
197.89 9.16 1.71 4.07 2.36 0.10 22.11 9.16
208.89 11.00 1.83 4.07 2.24 0.12 25.32 11.00
219.83 10.94 1.95 4.07 2.12 0.12 23.83 10.94
226.92 7.08 2.03 4.07 2.04 0.08 14.70 7.08
236.27 9.36 2.60 4.07 1.47 0.57 16.39 9.38
243.99 7.71 2.37 4.07 1.70 0.23 12.20 7.72
247.34 3.35 4.07 4.07 0.00 1.70 2.85 3.76
1243.11 309.12
Manning's coefficient (N) = 0.05
Longitudinal Slope (S) = 0.00

Hydraulic mean depth = R =(A/p) = 4.02

(2/3) (1/2)
Velocity (v)= 1/N x R xS = 1.75 m / sec

Discharge Q= A x V = 2177.97 cumec

Page 8 of 10 Prepared By : Mackintosh Burn Limited


Project: Construction of Bridge over river Kalnagini Client : Sundarban Development Board

Regime Width and Scour depth Calculation (Considering Ksf as 0.8) :

Maximum Discharge is = 2177.97 cumec


As per irc 78 for catchment area between 10000 to 40000 sqm,
We increase discharge by 20%
Hence Design discharge =1.2x 1922.011 = 2613.562 cumec

Regime width =(4.8 x 2613.56^(0.5)) = 245.39 m

Now Length of the bridge provided = 196.915 m

For 1st trial we assume the scour depth is = 17.00 m

H1= Height of the pier upto HTL.


H2= Depth of the well below scour depth.
D1= Dia of the pier.
D2= Dia of the well.

H1 H2 D1 D2 Obstruction.
8.04 8.96 3.5 8 5.87
8.04 8.96 3.5 8 5.87
3.34 13.66 1.7 2.4 2.26
Avg Obstruction = 4.67

Hence lenth of waterway = (196.915 - 3 x 4.67) = 182.91 m.

Discharge per metre width =Ddb(2306.413/182.91) = 14.29 cumec


let Ksf = 2

2 1/3
Hence Scour Depth d sm = [1.34 x (Dd b /Ksf) ]= 6.26 m
Non Seismic Scour depth at pier 2d sm= 12.53 m
Non Seismic Scour depth at abutment 1.27 d sm= 7.95 m
For Seismic Scour depth at pier we take 90% of 2d sm= 11.27 m
For Seismic Scour depth at abutment e take 90%of 1.27 d sm= 7.16 m

Page 9 of 10 Prepared By : Mackintosh Burn Limited


Project: Construction of Bridge over river Kalnagini Client : Sundarban Development Board

Alternate Regime Width and Scour depth Calculation (Considering Ksf as 2) :

Maximum Discharge is = 2177.97 cumec


As per irc 78 for catchment area between 10000 to 40000 sqm,
We increase discharge by 20%
Hence Design discharge =1.2x 1922.011 = 2613.562 cumec

Regime width =(4.8 x 2613.56^(0.5)) = 245.39 m

Now Length of the bridge provided = 196.915 m

For 1st trial we assume the scour depth is = 17.00 m

H1= Height of the pier upto HTL.


H2= Depth of the well below scour depth.
D1= Dia of the pier.
D2= Dia of the well.

H1 H2 D1 D2 Obstruction.
8.04 8.96 3.5 8 5.87
8.04 8.96 3.5 8 5.87
3.34 13.66 1.7 2.4 2.26
Avg Obstruction = 4.67

Hence lenth of waterway = (196.915 - 3 x 4.67) = 182.91 m.

Discharge per metre width =Ddb(2306.413/182.91) = 14.29 cumec


let Ksf = 2

2 1/3
Hence Scour Depth d sm = [1.34 x (Dd b /Ksf) ]= 6.26 m
Non Seismic Scour depth at pier 2d sm= 12.53 m
Non Seismic Scour depth at abutment 1.27 d sm= 7.95 m
For Seismic Scour depth at pier we take 90% of 2d sm= 11.27 m
For Seismic Scour depth at abutment e take 90%of 1.27 d sm= 7.16 m

Page 10 of 10 Prepared By : Mackintosh Burn Limited