CHAINAGE HORIZONTAL R.L. H.F.L DEPTH OF VERTICAL C/S AREA WEIGHTED
DIST. WATER DIST. PEREMITER
(2/3) (1/2)
Velocity (v)= 1/N x R xS 2.20 m / sec
AT CHAINAGE 50 m (UPSTREAM)
CHAINAGE HORIZONTAL R.L. H.F.L DEPTH OF VERTICAL C/S AREA WEIGHTED
DIST. WATER DIST. PEREMITER
(2/3) (1/2)
Velocity (v)= 1/N x R xS 2.23 m / sec
(2/3) (1/2)
Velocity (v)= 1/N x R xS 2.24 m / sec
(2/3) (1/2)
Velocity (v)= 1/N x R xS 2.04 m / sec
(2/3) (1/2)
Velocity (v)= 1/N x R xS 1.95 m / sec
(2/3) (1/2)
Velocity (v)= 1/N x R xS 1.95 m / sec
(2/3) (1/2)
Velocity (v)= 1/N x R xS = 1.75 m / sec
H1 H2 D1 D2 Obstruction.
8.04 8.96 3.5 8 5.87
8.04 8.96 3.5 8 5.87
3.34 13.66 1.7 2.4 2.26
Avg Obstruction = 4.67
2 1/3
Hence Scour Depth d sm = [1.34 x (Dd b /Ksf) ]= 6.26 m
Non Seismic Scour depth at pier 2d sm= 12.53 m
Non Seismic Scour depth at abutment 1.27 d sm= 7.95 m
For Seismic Scour depth at pier we take 90% of 2d sm= 11.27 m
For Seismic Scour depth at abutment e take 90%of 1.27 d sm= 7.16 m
H1 H2 D1 D2 Obstruction.
8.04 8.96 3.5 8 5.87
8.04 8.96 3.5 8 5.87
3.34 13.66 1.7 2.4 2.26
Avg Obstruction = 4.67
2 1/3
Hence Scour Depth d sm = [1.34 x (Dd b /Ksf) ]= 6.26 m
Non Seismic Scour depth at pier 2d sm= 12.53 m
Non Seismic Scour depth at abutment 1.27 d sm= 7.95 m
For Seismic Scour depth at pier we take 90% of 2d sm= 11.27 m
For Seismic Scour depth at abutment e take 90%of 1.27 d sm= 7.16 m