Documente Academic
Documente Profesional
Documente Cultură
er Day
Day
1. Clean and check Trainees x To be
Driving done
8am-
equipment/ 9am
accessories from
&4pm-
dust and oil; dry 5pm
and properly laid-
out/
secured/stable
2. Clean and free Trainees x To be
Driving booths done
8am-
and Driving 9am
petitioners from
&4pm-
dust/rust /gums, 5pm
used Mig wire
stubs and metal
scraps
3. Clean and Trainees x To be
arrange working done
8am-
tables according 9am
to floor plan/lay-
&4pm-
out; check 5pm
stability
4. Clean and check Trainees x To be
floor, walls, done
8am-
windows, ceilings 9am
&4pm-
5pm
5. Clean and check Trainees x To be
work shop done
ventilation and 15th day
illumination
6. Clean and check Trainees x To be
computer set done
8am-
-monitor, CPU, 9am
keyboards, mouse
&4pm-
5pm
7. Clean, inspect Trainees x To be
air conditioning done
8am-
equipment 9am
&4pm-
5pm
8. Clean, check and Trainees x To be
maintain Tool done
8am-
Room 9am
DRIVING NC II WORKSHOP HOUSEKEEPING SCHEDULE
DAILY TASK YES NO
1. Clean and check Driving equipment/ accessories
2. Clean and free Driving booths and Driving materials
from dust/rust /gums.
3. Clean and arrange working tables
4. Clean and check Rest Room
5. Clean and check wash area
6. Clean and maintain work shop
7. Disposal of waste materials
WEEKLY TASK YES NO
1. Clean and check floor, walls, windows, ceilings
2. Clean and check computer set -monitor, CPU, keyboards,
mouse
MONTHLY TASK YES NO
1. Clean and check work shop ventilation and illumination
2. Clean, inspect air conditioning equipment:
3. Clean, check and maintain Tool Room
DRIVING NC II EQUIPMENT MAINTENANCE SCHEDULE*
8 HOURS 50 Hours 100 HOURS
Let the material Stop pressing . Wipe off any dirt and
you’re drilling so hard and let debris from the end of
and the size of the tool do the the bit that goes into the
the hammer work. hammer to prevent tool
determine the Grease the bit holder failure and
type of bit you shank every jamming
use. time you Use manufacturer-
Know what your change bits to recommended grease
tool's LED service prevent and follow weight and
lights mean and premature wear viscosity guidelines.
follow the of the bit holder
recommended
maintenance
guidelines when
they alert you.
EQUIPMENT MAINTENANCE SCHEDULE
EQUIPMENT TYPE CAR
EQUIPMENT CODE Car_001
LOCATION Practical Area
Schedule for the Month of March
ACTIVITIES MANPO Dai Ever Weekl Eve Mont Remark
WER ly y y ry hly s
Othe 15t
r h
Day Day
To be done
Let the Trainees 8am-9am
material X
you’re &4pm-5pm
drilling and
the size of
the hammer
determine
the type of
bit you use.
To be done
Know what Trainees 8am-9am
your tool's X
LED service &4pm-5pm
lights mean
and follow
the
recommend
ed
maintenanc
e guidelines
when they
alert you.
Trainees X To be done
Stop pressing 8am-9am
so hard and let
the tool do the &4pm-5pm
work.
Grease the Trainees X To be done
8am-9am
bit shank
every time &4pm-5pm
you change
bits to
prevent
premature
wear of the
bit holder
Wipe off any Trainees X To be
dirt and debris done
from the end of 15th day
the bit that
goes into the
hammer to
prevent tool
holder failure
and jamming
Use Trainees X To be
manufacturer- done
recommended 15th day
grease and
follow weight
and viscosity
guidelines.
WORKSHOP INSPECTION CHECKLIST
Qualification DRIVING NC II
Area/Section Practical Area In-Charge Romulo A. Selga
Qualification Driving NC II
Area/Section Practical Area
1. Gear oil x
2. Air freshener x
3. Distilled water x
4. Fan belt x x
5. Wheel cal x x
6. fuse x x
7. brake fluid x x
8. fuel x x
9. polish x x
WORK REQUEST